At this point I'd like to pass the conference to Mr. Dan Clifford, our Managing Director. Please proceed.

Dan Clifford

unknown
#2

Thank you, Amanda. Morning, everyone, and thanks for joining us. Ian Poole, Peter Trout, and Adam McKinnon are here with me this morning as well. I'll begin with a key summary and an overview of how we performed this quarter. Peter will go through asset performances. Adam will speak to both near mine and regional exploration results, or how those progressed during the quarter, and then Ian Poole will cover corporate and financial matters at the end. Before that, I'd like to take this opportunity — particularly given Mike Menzies' retirement from the Aurelia Board last month — to thank him very much for his service and dedication to AMI as one of our longest-serving directors for the company. Myself, the management team, and the Board wish him the very best in his retirement. Just taking the full-year results and a look forward in August. I'd like to give a quick recap of that last conference call, as it sets the groundwork for how this quarter has unfolded for Aurelia. On that call, we covered the on-strategy execution for FY 2020, that the NSR and margin approach for our assets would continue, and that we articulate an extension of our then stated strategy to take a look forward beyond the current assets that we operate.

Dan Clifford

unknown
#3

The main points from that presentation—and especially what the strategy has delivered—come down to getting more out of our assets and infrastructure, directing our capital toward the highest internal rate of return, whether through exploration or other investments. It also means taking a portfolio approach to strengthening the group's cost position and reserve base, and maintaining a sustainable, trusted presence in every region where we operate. Beneath all of those strategic elements, reliability, predictability, and control stay front and center for the management team. With that in mind, it has been a strong quarter across the board. Our health and safety performance improved considerably during the quarter as we introduced the Aurelia Metals Safe Metals program, which delivered a 32% reduction in our 12-month rolling TRIFR. On an actual year-to-date basis, we sit at zero. That is a remarkable turnaround in the business's lag indicators. Production came in at 30,000 oz, our all-in sustaining cost fell 9% to AUD 1,000 an ounce, and we hold a net cash position of AUD 104 million—and note that this is before the dividend paid earlier this month—which leaves the company well placed for the remainder of the year.

Dan Clifford

unknown
#4

Things at Kairos are going according to schedule. Work on the Federation studies is advancing nicely, and we are pinning down just how strongly accretive this asset really is. Exploration keeps producing results for Federation, and we have pushed that exploration out further to Kairos once more, and now to Great Cobar as well. Having said all that, I will pass things to Peter, who will walk us through how the assets performed.

Peter Trout

unknown
#5

Thanks, Dan, and good day to everyone joining us. It's a pleasure to share that performance across both of our operating assets stayed consistent quarter on quarter, as measured by ore mined and processed as well as our underlying unit costs. Group metal production came in slightly lower than the June quarter, which genuinely reflected the blend of ore sources and variability in grades across our polymetallic ore bodies. Lower gold grade at Hera, as anticipated, was partly offset by stronger grades at Peak, and together that produced a 9% decrease in gold output quarter on quarter. All-in sustaining cost for the group fell to AUD 1,000 per ounce, as a robust result at Peak more than offset the higher unit cost at Hera. On COVID-19, we keep actively managing the protocols designed to prevent transmission of COVID-19 into our operations. Cross-border travel restrictions during the quarter curtailed some movement of our management, technical, and operational personnel. While we did see some minor effects on efficiency and productivity, what matters more is that no COVID cases were reported in the Cobar region, nor at our sites. Moving to operations and beginning with Peak, we continued to see the benefit of the process plant upgrade through the September quarter, during which we treated multiple campaigns of copper and lead-zinc ore.

Peter Trout

unknown
#6

We pulled from ore stockpiles left over from the June quarter, and during August we hit an annualized throughput rate of slightly more than 800,000 tons per annum at the process plant. The ore we produced came mainly out of the Chronos and Perseverance Deeps zones, which gave us higher NSR value ore, and it was also a bit lower in tonnage than the previous quarter. That accounted for roughly 2/3 of all development in the quarter, versus about 12% of total development in the June quarter. That development toward Kairos represented most of our growth capital expenditure across the group. The lower decline to Kairos has now reached the elevation of the first stope block, and the internal ramp is progressing upward, where it will connect with the upper decline, while also continuing downward to reach new mining levels. We have also broken through to the first production level at Kairos. Over the next quarter, we will raise bore a large internal ventilation raise and stay on schedule for first stope production in the March quarter. Unit costs at Peak declined owing to the blend of operating and capital development, our levels of stoping activity, and the timing of expenditure. In particular, our sustaining capital expenditure is set to rise next quarter as we begin a TSF embankment raise to carry out statutory compliance and plant refurbishment programs within our budget.

Peter Trout

unknown
#7

Peak's all-in sustaining cost fell sharply to AUD 594 per ounce, driven by stronger gold sales and reduced site costs. Over at Hera, we're moving into ores with a lower average gold grade but higher base metal grades. That shift shows up in the quarterly production figures for gold and base metals. Lower gold output was the biggest factor behind Hera's all-in sustaining costs of AUD 1,250 per ounce. At Hera, our operational priority is getting as much ore as possible through the mill and bringing unit costs down to partly offset the reduced gold revenue and the weaker gold grades. Several initiatives delivered benefits during the September quarter. Among them: actively managing how many unplanned stoppages occur in the process plant, blending ores so the flotation circuit receives a more consistent base metal grade, cutting variability in the process circuit by changing our control systems strategies, and also targeting reagent additions to lower consumption while holding our metal recoveries steady. On capital development, we carried on with the North Pod incline during the quarter and began development toward a drill site that will let us test potential mine life extension in the main southeast area.

Peter Trout

unknown
#8

We are additionally setting up access to a historically backfilled stope, which is going to serve as a supply of waste rock backfill in the future for every new mining area. Now shifting from Hera to Federation. We have achieved solid progress on the scoping study, and several work streams are currently in motion. Our study program is being carried out alongside the infill drilling and environmental baseline studies, so that we can carefully examine the timeline toward permitting and toward possible mine development in order to maintain production from the Hera facility. The study work done recently backs an underground mine development as well as the recovery of both gold and base metal concentrates. Among the initial findings is an assessment of geotechnical conditions, which resemble those at the Hera Mine, the occurrence of gold as coarse grain particles that are well suited to recovery via a gravity circuit, and mineralogy work plus grind size analysis indicating that separate lead, zinc, and copper concentrates can be generated from a flotation circuit, or circuits. We will keep advancing the various work streams at Federation during the next quarter and fold the findings into one or more project configurations that we are able to take forward to the following stage of evaluation and permitting. With that, Dan, I will hand things back over to you.

Dan Clifford

unknown
#9

Thank you, Peter. On the exploration side, Adam is going to walk us through both near-mine and regional exploration. Over to you, Adam.

Adam McKinnon

unknown
#10

Thanks, Dan. At Federation, the first quarter has again involved a great deal of exploration and evaluation work. New results came out from the company in August confirming that exceptional gold grades are present at Federation. Among the intercepts were 21 m at 32 g/t gold and 45% lead, zinc, plus 20 m at 17 g/t gold and 44% lead, zinc. These rank among the highest-grade intercepts ever drilled in the region, surpassing even the best results at the nearby Hera Mine. Intensive evaluation work continues into the current quarter, and follow-up drilling is further testing the gold, lead, zinc, copper, and silver potential of the system. Geotechnical data will also keep being collected to support mining studies for Federation. In light of how much drilling has taken place at Federation since the maiden resource estimate was released this year, an updated resource estimate will be prepared and released, due early in the March quarter, if not sooner. Now moving up to Peak. A new drilling platform has been set up in the lower Kairos decline, and diamond drilling has recently begun there. Drilling will initially target the first high-grade stoping area at Kairos. This platform will also offer a stage for testing extensions at Kairos at depth, with the system still remaining open.

Adam McKinnon

unknown
#11

Up north now, we've kicked off a surface drilling campaign at the Great Cobar deposit. Great Cobar matters a lot to this company — it currently holds an indicated and inferred resource of 4.1 million tonnes grading 2.2% copper and 0.8 g/t gold. That program is going after infill as well as extensional targets, and it should give us added confidence in the resource estimates. We'll be gathering drill core too, along with confirmatory geotechnical and metallurgical work. In line with the company's continuous disclosure commitments, we aim to update you on drilling results at Federation and Peak in the current quarter. Thanks, Dan.

Dan Clifford

unknown
#12

Thanks, Adam. Ian, over to you for Corporate and Financial, please.

Ian Poole

unknown
#13

Thanks, Dan. Quarterly sales came in at AUD 107 million, a modest decline from AUD 112 million in the previous quarter, driven by softer volumes that were mostly offset by better prices received. Group all-in sustaining costs ran at AUD 1,000 per ounce for the quarter, AUD 104 below the prior quarter, mainly on reduced mining costs and the timing of sustainable capital. We're keeping full-year all-in sustaining cost guidance at AUD 1,500-1,720 per ounce. Net cash at the end of September stood at AUD 104 million, up AUD 25 million from the June balance, helped by solid operating and sustainable capital results at Hera and Peak. Growth capital of AUD 110 million was invested, comprising the Kairos development plus exploration and valuation work at Federation. Overall, a strong and consistent quarter.

Dan Clifford

unknown
#14

Thank you, Ian. I'll offer a few closing remarks prior to opening the floor for questions. Building on what Ian said, this has certainly been a robust quarter, and we are reaffirming our guidance. Cost per ton and throughput look favourable and are trending better, especially at Peak. Within those controllables, we will experience quarter-to-quarter variability relative to this quarter when it comes to gold and all-in sustaining costs. Cost per ton and throughput, being controllables, serve as our gauge of reliability and predictability and control. Given where head grades are landing and how the year phases, particularly at Peak once more, we do not anticipate the December quarter reaching the gold production levels recorded in this quarter. As a result, guidance is reaffirmed at 80,000 oz to 90,000 oz, between AUD 1,500 and 1,750 an ounce. With that said, I'd like to invite questions now, please, Amanda.

Operator

operator
#15

Thank you. Should you like to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, simply press star two. In case you are using a speakerphone, please pick up your handset before asking. Our first question is from Dylan Kenny-- Kelly at Ord Minnett. Please proceed.

Dylan Kelly

analyst
#16

Morning, everyone, and congratulations to the team on a strong outcome. It's genuinely encouraging to see momentum building on safety and tons, effectively across all areas. A few questions for you. I was wondering, Dan, about your final point on grade. I know there are two questions regarding the December quarter, and what that implies as we roll into the second half. Could you remind us of the timing for Kairos coming in and how much we should expect that grade profile to shift? Are we going from 3.9 g/t down to 3.5 g/t, 3 g/t, and then rebounding once Kairos also begins to come in? Will that be more of a 4Q update on timing?

Dan Clifford

unknown
#17

Thanks, Dylan Kelly. So I think the main point — and I'll just restate what we laid out on the earlier conference call back in August — is that with Kairos, we begin generating meaningful volumes late in the March quarter. Given how early-stage that ore body is, we really won't see big tonnage coming from Kairos until FY 2022. We're on schedule to get there, but large volume contributions from that ore body won't show up over the course of this year. Essentially, as far as guidance goes, or what the coming three quarters look like, we expect fairly steady numbers quarter to quarter. Quite simply, I take the 30,000 oz off the midpoint, divide it by three, allow for some variability around that, and that's approximately what we anticipate achieving over the rest of the year.

Dylan Kelly

analyst
#18

Alright, got it. On the second question, about Great Cobar and what you said in the update: it looks as though there are some straightforward gains there that could extend mine life fairly fast. Could you remind us where things stand on the environmental side? And how will you get into the ore body — via a decline or an exploration drive? Any rough estimates on the cost of input?

Peter Trout

unknown
#19

Dylan, this is Peter Trout. Right now we are working on moving the EIS forward for Great Cobar. Earlier this year we got a list of criteria that we needed to address, and our response to those is quite far along in preparation. As for how we would access Great Cobar, we are considering an underground decline running from the New Cobar complex over to the deposit itself, plus ventilation shafts drilled through the surface to give us ventilation and services access. I am not in a position to give capital guidance. There is work still to do on the drilling program that Adam outlined, along with additional technical work, and those will let us examine the mining schedules and cost estimates.

Dylan Kelly

analyst
#20

To go back to what was said earlier about that roughly AUD 20 million drop in exploration, is that still the way we ought to view it as far as the first step goes? My assumption is that you'd be able to handle the bulk of the drilling from surface instead of bringing a rig over from what would be Jubilee?

Peter Trout

unknown
#21

Right now, drilling from surface lets us obtain results much faster and more cheaply than pushing the decline further. Currently, within this financial year, we have no plan to advance the decline. Once the surface program results come back, we'll review them so we can position the decline in the best possible way.

Dylan Kelly

analyst
#22

All right, understood. I’ll make sure that gets shared.

Operator

operator
#23

Thanks. Our following question is from Brian Chu of Australian Gold Fund. The line is yours.

Brian Chu

analyst
#24

Hi Dan, and hello to the whole team. Congratulations on a September quarter that was really outstanding. Regarding the Hera mine and what could be developed at the Federation deposit, could you walk us through once more what the timeline looks like for Federation to begin feeding ore into the processing plant, so we can see output rise and costs come down? Is that something we should expect in the reasonably near future?

Dan Clifford

unknown
#25

Regarding Federation, Brian, the schedule we've discussed depends entirely on how state and regulatory approvals come through. To begin with, that process typically takes multiple years—two to three years. We're now roughly six months into the study, so we expect it to land within that 2.5-year window. In theory, that aligns with the remaining life of Hera. Given the approval timelines, our plan right now is that, assuming successful studies and feeds through Federation, it would arrive near the end of Hera's life. That's still a bit more than two years off—2.5 years away.

Brian Chu

analyst
#26

Okay, that's all from me.

Dan Clifford

unknown
#27

Our view is that this carries fairly low risk—though it isn't risk-free—when it comes to securing approvals for mining operations via the New South Wales planning system. I call it low risk because this is a satellite ore body. It sits 10 km away from our core infrastructure area as well as the tailings and camp facilities. So as a business, we are genuinely reducing our environmental footprint in bringing this asset online.

Brian Chu

analyst
#28

If I could just ask one more thing. Is it reasonable to describe the Hera output we're currently observing as the pattern going forward, or should we expect some bumping right ahead?

Peter Trout

unknown
#29

Brian, this is Peter speaking. In the results, I believe we noted that the gold profile at Hera is going to shift toward the reserve grade, and over time we'll see base metals rise as well. The first quarter of this financial year, I think, simply confirms that, and it lines up with what we observe in the ore body and in our mining plans.

Brian Chu

analyst
#30

All right, thank you. We're eager for a strong December quarter as well. Thanks for that.

Operator

operator
#31

Thank you. As a reminder, if you'd like to pose a question, press star one on your phone and hold until your name is called. Our next question is from Mike Millikan at Euroz Hartleys. You may proceed.

Mike Millikan

analyst
#32

Good afternoon, and congratulations on such a strong quarter. I’ve just got one quick question about guidance. Will you be revisiting your estimates after this half?

Dan Clifford

unknown
#33

Appreciate that, Mike. We'll keep taking a fresh look at how our forward projections are shaping up, Mike.

Mike Millikan

analyst
#34

Yeah, that's right.

Dan Clifford

unknown
#35

Should continuous disclosure reveal a need for us to revise guidance, that is the moment we would act.

Mike Millikan

analyst
#36

Alright, cool. Then regarding Federation as well — clearly the resource update is due in the March quarter. As for the scoping study coming out, will that land in the June quarter? Is that what you're expecting?

Dan Clifford

unknown
#37

When it comes to Federation right now, Mike, every study we're running is pretty much internal. We'll evaluate them as they move along. That's essentially how our timing works. Regarding how much we release and when, we'll provide updates as we make headway through those studies.

Mike Millikan

analyst
#38

Great, many thanks to all of you.

Operator

operator
#39

Much appreciated. Our following question is from Mark Fichera of Foster Stockbroking. The floor is yours.

Mark Fichera

analyst
#40

Hey there, thanks — solid results. I've got a question about sustaining CapEx. With respect to guidance, it's clear you spent less during this quarter, and I was curious about the rest of the committed guidance: would you expect it to be spread fairly evenly across the three quarters that remain? And on top of that, where will most of it be directed?

Peter Trout

unknown
#41

Mark, at Hera the sustaining CapEx is quite small. The bulk of what we'll spend on sustaining CapEx for the rest of this year is going to be at Peak, and it will fluctuate across the three quarters that remain.

Mark Fichera

analyst
#42

Okay, so will that hold steady across all three quarters, or is there one quarter where it could come in higher than the others?

Dan Clifford

unknown
#43

Right now, Mark, it's fairly balanced across the board, because — as Peter said before — much of our CapEx at present, definitely during this quarter, has gone toward Kairos, and that has been growth-related. But as we begin moving away from a development mix and back toward sustaining, and as Peter noted, the compliance and sustaining capital investment for the surface.

Ian Poole

unknown
#44

Those storage facilities for tailings.

Dan Clifford

unknown
#45

Thanks. That's exactly the point I was making. As the year moves along, what we'll see is those tailing storage upgrades arriving across the coming two quarters. Because of that, that spending should stay fairly steady.

Mark Fichera

analyst
#46

Alright, thank you.

Operator

operator
#47

Thanks. We’ll take the next question from Stuart Dodd at Renaissance Asset Management. Please go ahead.

Stuart Dodd

analyst
#48

Thanks, everyone. I imagine others have already offered their congrats, so nice work on the quarter. Mark actually addressed what I was going to ask, so thanks regardless.

Operator

operator
#49

Thank you. At this point, we don't have any additional questions. Excuse me — one more question has just come in. Joshua Hain of Rest Investments is our next caller. Please go ahead.

Joshua Hain

analyst
#50

Hello, Dan and everyone. Strong results, as others have noted. Here's my favorite question, regarding Peak's rates: you left a small hint in there that you reached 800,000 tons around August. So what needs work for you to stay at that level? Is development still the constraint, or are there other bottlenecks that must be resolved gradually?

Operator

operator
#51

Sorry about that — the operator here. The caller's line dropped for a moment. Apologies again, this is the operator. The speakers are back on the line now. Please continue.

Dan Clifford

unknown
#52

Amanda, I believe Stuart was next — I think he had a question.

Joshua Hain

analyst
#53

This is Josh, I believe — assuming you’re able to hear me.

Dan Clifford

unknown
#54

Hello there, Josh.

Joshua Hain

analyst
#55

I believe Stuart's question was said to have been answered, and then I jumped in, but I'm not sure my question actually got through. Let me repeat it, maybe. I just asked that, since you let slip a little nugget about Peak running at an 800,000 tonne rate in August, I was wondering what limits you going forward when it comes to holding that level. Is it still on the development side, or are there other bottlenecks inside the plant that have to be worked through?

Peter Trout

unknown
#56

Joshua, right now the biggest constraint we face is simply establishing sufficient stoping areas in the mine so we can deliver and utilize that plant capacity. That August run performed very well — no changeovers between ore feeds, solid circuit reliability, and strong throughput rates. That let us draw down on some stockpiles that had built up. The real challenge sits squarely in the mine: making sure we have enough stoping areas ready to satisfy that ore demand and to accomplish that across the transition between the copper campaign and the lead/zinc campaigns.

Joshua Hain

analyst
#57

For my own understanding—since I’ve never operated an underground mine—couldn’t we simply bring in a handful of additional workers for a brief stretch so we can pull ahead on development? Is there a constraint on your side, and I suppose the whole world has been constrained lately?

Peter Trout

unknown
#58

It's likely a mix of things, Josh. Through our mining contractor, we've been short on operators, and travel restrictions have made that worse — it means we can't reliably fly our trucks in for every shift, and that's being addressed. Second, on the production side, we have enough areas open. What matters is turning the stopes around. You finish pulling the ore from a stope, backfill it, and bring the neighbouring stope into line in sequence. Right now we have five or six active mining areas, and generally we're retreating from one end back along the axis. It's simply a matter of cycling through those stopes and making sure backfill is available. We're getting the ore out and keeping the operation in a good rhythm.

Joshua Hain

analyst
#59

Appreciate it. Thanks.

Operator

operator
#60

Thank you. Lindsay Hayes, a private investor, has the next question. Please go ahead.

Lindsay Hayes

unknown
#61

Afternoon, gentlemen. Solid results. I fully concur with all your comments—the business is turning around well. Nice work. During the prior quarter, we discussed the company target readiness somewhat, and I entirely agree on that point. If you could offer any high-level remarks about the quarter, is there anything you observed that you liked, which we ought to examine?

Dan Clifford

unknown
#62

Well, I appreciate the question. My responses will naturally stay focused on internal matters, as you'd expect. I'm not in a position to discuss external M&A. On the internal side, the developments we're seeing that benefit the business are these: we've kicked off the surface drilling program at Great Cobar to build greater certainty around that resource for our company. We're also beginning to see emerging gold coming through at the Federation deposit for the business. That has certainly caught our attention. Regarding external opportunities, we'd let the market know if and when any arise.

Lindsay Hayes

unknown
#63

Appreciate it.

Operator

operator
#64

Thanks. At this point we have no more questions. I'll now return the call to Mr. Clifford for his closing remarks.

Dan Clifford

unknown
#65

Thanks, Amelia. Just a few closing remarks. To sum up, our strategy remains on course for this year and for several years ahead. The assets are performing strongly. Exploration is delivering results. Federation keeps developing nicely. To echo a few words from the other speakers on the conference, overall it has been a great start to the year and a strong quarter. Regarding the next information flow for the business, as Adam mentioned, following the continuous disclosure lines, we will be aiming for potential exploration updates. Towards the end of the year, if not into the March quarter, a resource update for Federation and the December quarterly result. Our AGM is on the nineteenth of November. Unfortunately, given the multiple COVID restrictions, it will be a fully virtual meeting. Those notices were distributed to the market during last week. Thank you very much, everyone, for your time, and we look forward to continuing Aurelia's progression through the course of the year. Thanks.

Operator

operator
#66

That brings today’s conference to a close. Thanks for taking part. You’re welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.