Red Hill Minerals Limited (RHI) Earnings Call Transcript & Summary
July 27, 2021
Earnings Call Speaker Segments
Operator
operatorAt this point I'd like to pass the conference call to Mr. Dan Clifford, our Managing Director. He has the floor.
Dan Clifford
unknownThank you, Bernadette. Morning, everyone, and thanks for spending time with us today. Joining me are Ian Poole, Peter Trout, and Adam McKinnon. There's a small adjustment to the format of this morning's update, and it comes largely as a result of the market announcements we've issued recently — the exploration updates from all our sites, the mineral resource and reserve report, the June quarterly activities report, and the FY22 guidance that sits alongside it. Because of that, we'll be working from a presentation lodged on the ASX this morning called June 2021 Quarter Update and Outlook. This gives us our first chance to look back over the year — both at the commitments we made for it and at the steps taken to put our strategy into action on the ground. Moving to slide 3. Combining our sustainability work with the results from our asset base has left us in an incredibly strong position, with a footprint that is gold-dominant and holds incredibly high value-based metals, including Federation, plus well-advanced organic copper exposures, namely Great Cobar. Being set up with the diversity of three operating assets, each with fantastic exploration potential ahead of it, is driving improvements in our reserve and cost bases, our commodity mix, and our mine lives, so we can steer through the cycle of relevant commodities.
Dan Clifford
unknownTurning to slide 5, we'll focus on the year and highlight the main features of this year's performance. It has been excellent to watch the momentum build in sustainability — especially in health and safety and environment community, and more recently in diversity and climate change — with significant decreases in incidents that cause harm throughout our business. Guidance for FY 2021 was either achieved or exceeded in full. We have added Dargues to the portfolio and integrated it, and we kept up a substantial exploration investment across Federation, Great Cobar and Hera, and Dargues, with results on all three fronts. Those results have produced a substantial bow wave of material in our resource and amount to a 63% rise in resource growth across the business. With the Federation scoping study finished, enabling works and the feasibility study in progress, and a PFS at Great Cobar, there is potential to unlock considerable conversion of resources to reserves during FY22. Now to slide 6. Our operations leadership, along with all our people and contract partners, have thrown themselves into this performance, delivering a 58% decrease in injuries and an impressive 82% decrease in reportable environmental incidents over the year, and the entire team deserves real credit for that performance throughout the year.
Dan Clifford
unknownNow turning to slide seven, where we look at how we performed versus FY 2021 guidance. Gold came in on target, posting a 13% rise year-on-year. Beneath that number, Peak's contribution to gold climbed 22%, six months of Dargues were added, and Hera declined by roughly 30% year-on-year, which we had flagged in advance. Lead beat and zinc was on. Together those two commodities rose 23% year-on-year, mainly thanks to Peak and the 2019/20 mill upgrades. Copper beat, even though it was lower than in prior years. All-in sustaining costs also beat, with OpEx costs hitting target, sustaining capital a touch below, and strong base metal pricing lifting our all-in sustaining credits. Turning to slide eight. Drilling further into the June quarter, the main factor was the quarter-on-quarter gold reduction at Hera that we had flagged, and to a smaller degree Dargues falling short of plan during the quarter. On to slide nine. Underlying performance and cost throughput across the site were met or exceeded, including a 10% throughput gain versus the FY 2020 year at both the Hera and Peak site mills. Peak did, however, face some headwinds from labor shortages, especially during the early part of half two and later in Q4.
Dan Clifford
unknownAt Dargues, certain high-grade starts that had been scheduled slipped into FY 2022. Peter will take us deeper into Dargues shortly; as noted in the reports, July is showing a 47% grade increase versus June and a 19% grade increase versus the full-year performance, with the investment thesis well intact. I'll now hand things over to Ian.
Ian Poole
unknownThanks, Dan. Moving to slide 10. Aurelia kept its cash on hand steady through the June quarter. As of the end of June, the cash balance stood at AUD 74.5 million. In the course of the quarter, operations funded post capital of AUD 14.5 million, made up mainly of AUD 8.2 million for exploration, including infill drilling at Federation, and AUD 5 million for growth, being mine development at Peak and Dargues. The company also repaid AUD 4.1 million on Aurelia Metals' term loan, which is due to be fully repaid by September 2023. In addition, Aurelia Metals cash-backed AUD 4.3 million of its bank guarantees, which serve environmental bonding purposes. We made AUD 8.9 million of tax payments during the quarter, and working capital moves around from quarter to quarter, depending on the timing of trade receivables, prepayments, and payables. The June quarter saw a cash inflow of AUD 9.9 million. I'd now like to hand back to Dan.
Dan Clifford
unknownThanks, Ian. Turning to slide 11 — before we get into the forward-looking view for the company, it's genuinely worth pausing on the strong and sustained growth record from 2014 through today. That spans exploration, development, and operations at Hera, acquisition, operations, and expansions at Peak, and now an acquisition plus operations to date at Dargues. This has — and while the chart displays gold production, it has in fact delivered a gold equivalent record for the company of roughly 180,000 ounces. With expansion and extension opportunities across all three complexes, we're set up for continued company growth over the next three or four years. Moving to slide 13. Turning to guidance for FY22, gold is lifting 13% at the midpoint, ranging between 112,000 and 123,000 ounces. Beneath that, Peak is steady. Dargues contributes a full year this year. Hera is in fact halving, as has been well flagged to the market, as gold grades decline and we move to higher grade base metals over the coming two years. Lead is steady at 24,500 to 27,000 tons. Zinc is rising 30% at the midpoint to 31,000-34,500 tons, with both Hera and Peak contributing to that lift.
Dan Clifford
unknownAt Peak, copper output is dropping 25%, down to a range of 3,500 to 4,000 tons, as a result of medium-term ore body phasing and lower grades during this year. AISC is climbing to between AUD 1,500 and AUD 1,700 per ounce, pushed by Peak and by Dargues' first full year along with ongoing ramp-up of gold grades. Sustaining capital goes up to AUD 61 million to AUD 69 million, which reflects the fact that no further growth capital development is happening at any of the sites and that Dargues has been folded into the estimate. Growth capital then comes down because of the move away from growth capital, and it is entirely aimed at the Federation and Great Cobar projects' growth for the company. Exploration increases to AUD 28 to AUD 31, reflecting the directing of dollars toward the best return and a growing footprint on the ground. I'll now pass things to Peter for the detail on the individual assets.
Peter Trout
unknownThanks, Dan, and good morning, everyone on the call. I'll walk through the FY22 guidance at the asset level, which you can see on slide 14 of the presentation deck. I'll also provide some commentary on the production ramp-up at our Dargues mine. Turning to the individual sites: at Peak Mine, processed ore volumes will keep ramping up in FY22, consistent with higher mine tonnages. That increase in tonnage will partly offset planned lower gold, lead, and copper grades, and we do expect a modest rise in zinc grade. The year-on-year movement in operating unit costs and all-in sustaining costs mirrors a doubling of sustaining capital expenditure versus FY21. Three main factors drive the higher sustaining CapEx. First, all mine capital development has moved into sustaining CapEx now that growth capital development in the Kairos mining area is complete. Mine development within sustaining CapEx makes up roughly half of the site's sustaining CapEx budget for FY22. Second, we're starting fixed plant refurbishments on some of our long-serving infrastructure, along with compliance upgrade projects to meet current regulatory requirements. We're also raising the TSF embankment, which will account for about 11% of total capital spend at the site.
Peter Trout
unknownTurning to Hera. Our FY22 operation mirrors the deliberate drop in gold grade alongside increased base metal grades. Those elevated base metal head grades are going to create a bottleneck at the concentrate filter, which in turn results in a modest decrease in mill feed tonnage. Unit operating costs should come in around the same level as FY21, since we're seeing reduced underground mine capital development spend, and that offsets the smaller amount of tonnage put through the plant. Over at the Dargues mine, we'll have our first complete year of production with Aurelia Metals as owner. We expect gold production in the range of 45,000 to 50,000 ounces, with mine grade improving and ore production heading toward the permitted cap of 355,000 tons per annum. The site's unit costs are projected to be close to what was achieved during the second half of FY 2021, and FY 2022 decline development is now being categorized as sustaining rather than growth capital expenditure, given that operations are ramping up to nameplate capacity. There is no additional growth capital expenditure budgeted at Dargues in FY 2022. We also anticipate a substantial decrease in all-in sustaining costs in FY 2022. The guidance of AUD 1,500-AUD 1,700 per ounce stems from the larger gold production denominator, as illustrated in the top table on slide 15.
Peter Trout
unknownThis puts the FY 2022 outlook side by side with what was actually achieved in FY 2021. Turning next to Dargues, results from that asset were uneven during the quarter. The physical production figures came through nicely and landed right where we expected, with the operation showing the monthly development, ore output, backfill placement, and mill throughput volumes that were required. Gold output for the quarter reached 5,200 ounces, which fell short of plan, mainly since the ore came from lower-grade areas lying outside the original mining schedule. Ore from the third high-grade stope, originally scheduled for quarter four, is now being fed to the process plant. Head grade has been climbing through July as that material moves into the plant. We're also building a better understanding of the deposit, particularly thanks to the recent 12,000 meters of close-spaced infill drilling, mapping of newly exposed underground development, and production reconciliation. That understanding is guiding how we engineer the underground environment and is helping us refine the mine layout so it fits local conditions. Insights from our recent drilling programs and analysis have been folded into the mineral resource, ore reserve, and production target statements released last Friday. One thing I want to flag: those statements do not capture every drill result for Dargues that came out earlier this month. In the lower table on slide 15, life of mine parameters from the June 2021 production target are set against the acquisition model's outlook as of November last year, bearing in mind that these comparisons span differing time periods.
Peter Trout
unknownI want to make three points here. First, the production target includes 200,000 ounces of in-situ gold, and the other scheduled measures line up with what we expected when we made the acquisition. Recent drilling and work have confirmed that gold grade rises with depth, which leads to the life of mine outlook. We expect the average grade to come in toward the lower bound of the acquisition model, and that has pushed up the forecast all-in sustaining costs. At this point I'll hand things over to Adam McKinnon, who will talk through our recent mineral resource, ore reserve, and production target statements.
Adam McKinnon
unknownThanks, Peter. If you turn to slide 17 in the presentation. It has been a truly exceptional year for resource growth right across the group. We completed a record 141,000 meters of surface and underground drilling, and that, together with the acquisition of Dargues, gave us a group resource total of 27 million tons, which is an increase of 63% net of depletion. At Peak, resource growth of 51% included strong contributions from Great Cobar and Kairos, while the resource growth of 67% for the Hera Federation complex comes mainly from doubling the resource tonnage at the exceptionally high-grade Federation deposit during the year. Dargues also recorded resource growth of 35% after just six months of drilling. That strong resources growth has carried through into a 53% increase in the group's production target, which now sits at 7.8 million tons. Backed by new data and modeling, the production target now includes material from the Great Cobar deposit for the first time. Group reserves of 4.4 million tonnes stayed relatively steady over the year. FY21 brought a significant rise in reserve confidence, with more than 50% of the group tonnage upgraded to the proven classification. The company is also now very well placed for strong reserve growth in FY22, with a maiden reserve for the Great Cobar deposit expected in the December quarter of this year, and a maiden reserve and production target expected for Dargues once the feasibility study is completed mid-next year.
Adam McKinnon
unknownNow let's turn to slide 18. Infill and extensional drilling at Peak has driven the production target up 48%, to 5.6 million tonnes. At Great Cobar, strong results in copper, gold, and also lead and zinc have pushed resources there up 43%, to 5.8 million tonnes, which now hold more than 120,000 pounds of copper and over 130,000 ounces of gold. The upside potential at Great Cobar is still exceptionally high, and in late June we reported high-grade copper intercepts that extended mineralization at depth. That included 7 meters at 6.3% copper, 6 meters at 3.4% copper, 7.5 meters at 3.3% copper, and 6.1 meters at 3.1% copper. Because of assay timing, these results were not part of the new resource for Great Cobar and leave the deposit completely open at depth. With drilling continuing into FY22, decline development access permitted from the new Cobar mine, and a maiden reserve declaration expected in the December quarter, Great Cobar is likely to be a strong value driver for the Peak operations going forward. In addition to the results at Great Cobar, ongoing exploration and evaluation work has seen resources at the high-grade Kairos deposit grow 68%, to 1.6 million tonnes.
Adam McKinnon
unknownRecent drilling has shown that high-grade mineralization is still open both at depth and along strike. With development access now in place and production underway, Kairos is also likely to deliver significant upside in the years ahead. If we now turn to slide 19. In late June, the company published a set of exceptional exploration results from the Federation deposit, including, among many others, 70 meters at 18.4% lead zinc. To put that in context, on a length weighted basis, this is thought to be the best base metal intercept released to the ASX this year. The emphasis on exploration and evaluation at Federation has driven a 45% increase in indicated and inferred resources since the February 2021 update, and it now stands at 5.1 million tons at 14.8% lead zinc, 0.9 grams per ton gold, 7 grams per ton silver, and 0.3% copper. Drilling at Federation keeps showing these incredibly high grades extending, with the new resources carrying an average zinc equivalent grade of 17.9%. For anyone who prefers to think in gold terms, that is roughly equivalent to around 8 grams a ton when calculated using a similar methodology. These latest resource figures have firmly established Federation as one of the most significant discoveries in the region over the last 30 years, with a Tier 1 grade profile.
Adam McKinnon
unknownTo give you a comparison, Federation today holds 40% more tons than the whole undepleted Hera mine up to the north, with a grade that is 27% higher and close to 80% more metal on an equivalent basis. We expect that strong growth in the Federation resources to carry on into FY 2022, and an accelerated resource conversion program is underway right now to support the Federation feasibility study. Once that study is complete, it will permit a maiden reserve declaration for the Federation deposit during the first half of the 2022 calendar year. Turning now to Dargues on slide 20. Following the acquisition of the Dargues mine in December last year, Aurelia began an intensive evaluation program both at surface and underground, and to date we have drilled approximately 20,000 meters in the 6 months through June. Beyond infill drilling aimed at boosting the company's existing resources and reserves, the company has verified that gold mineralization is present at a number of high potential extensional targets, which had been identified during the acquisition process. Drilling has delivered a 35% increase in resources, inclusive of mining depletion since mine production began. The Dargues mineralization stays open in several directions, and extensional drilling continues. The area along strike west of Main Lode and east of Plum Lode is still very sparsely drill tested and is set to be targeted in FY22.
Adam McKinnon
unknownAppreciate it, Dan.
Dan Clifford
unknownMuch appreciated, Adam. With that said, Bernadette, would you mind opening things up for the question-and-answer portion? Once the Q&A wraps, I'll share some closing remarks, if you would.
Operator
operatorThank you. Should you want to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw that request, simply press star two. In case you are using a speakerphone, please lift the handset before asking your question. Our first question is from Dylan Kelly at Ord Minnett. Please proceed.
Dylan Kelly
analystMorning, everyone — nice work on those quite striking charts at the start that showed your audio distortion dropping sharply. I’ve got a couple of questions. Could we return to the points Peter raised on slide 15? Please help us get a clearer picture of what has occurred at Dargues, both regarding the tons coming back and the grade sitting where it is, and explain what is going on with the resource model now that you have recut the numbers. Is there any indication yet of how the reconciliation is shaping up, or is it too soon to tell?
Peter Trout
unknownHi, Dylan — Peter here, and I’ll field your questions. First off, in quarter four we saw both the tons and the grade decline. A couple of delays across different staging areas deferred high-grade production into the current financial year. Lower-grade feed from other sources made up for that. Some stopes managed to pull forward a significantly larger share of development than had been scheduled for the period. Looking back across the half year, we took roughly 40% of the stoping tonnage we had planned in the schedule because of a couple of delays in the stoping areas. We now have better information on that, especially regarding ground support, along with improved definition of the ore zones that we’re now feeding into our mine designs, grade control models, and resource and reserve estimates. Having been through that experience at the site, we feel more confident now about some of those parameters. You also asked about reconciliation, and it is an early mark. I can say, though, that we have been through a process of routine grade control updates, now that the infill drilling is coming through, as well as the mapping and face sampling from development.
Peter Trout
unknownFrom the grade control model, what we’re seeing matches what we’ve reconciled through the mill. It’s within 5% on grade and looks spot on for tonnage. When we compare back to the acquisition model — and we’ve done that — the acquisition model actually projected lower grades than what we mined, with similar tons. Overall, from the big-picture perspective, at the resource level, we’re tracking quite well. We’ve had learnings at local area levels, but that isn’t surprising when you move from 50-meter spacings on surface drill holes down to roughly 25-meter intervals that we’re seeing with grade control drilling. At this moment, globally, we aren’t seeing any areas that raise concern for us with the resource model.
Dylan Kelly
analystAll right, understood. Now, regarding the reserve and resource update that came out last week, it looks like the resource has grown to a bit more than 2 million tons. Is there anything new yet on the possibility of adding a submission to audio distortion versus where it sits now, or is that something we ought to be considering closer to the end of 2022 or the beginning of 2023?
Peter Trout
unknownYeah, Dylan, there's still more work for us to do on that front. Some really strong results came in late in the quarter that the resource modeling didn't capture and that haven't flowed through yet. We need to incorporate those, and we have additional infill drilling and further results on the way, and before we move into the mine design phase, we first need to grasp the big picture. We'll definitely be examining what the lead items demand there, and in particular getting a handle on what permitting requirements and modifications we might need.
Dylan Kelly
analystAll right, got it. Would it be okay if we move over to Peak now? Can you walk us through the reason gold production is likely to stay level versus last year under the guidance, or maybe come in a bit lower? It would help to get some detail on where the targeted ore is sourced from — Peak North, the Kairos contribution, those various pieces — so we can grasp what's going on.
Dan Clifford
unknownI'll handle that question, Dylan. This is Dan speaking. Before today's call, we received several inquiries specifically about the contribution from Kairos. The key point to keep in mind is that Kairos is one ore body out of four or five that we feed into the Peak processing plant. It's a distinct ore body from the Chronos comparisons. We've said before that Kairos will make up roughly around 20% of the mill feed, plus or minus a bit, over the next two years. As that resource expands, its life expands as well. For us, that's essentially the constraining factor. It's narrow, it's deep, and it's tight. With total volumes rising into the Peak mill, it will account for about 20%, give or take.
Dylan Kelly
analystAlright, got it. I wasn't aware that throughput rates for the sites were tucked away in the presentation. Do you have any idea how the regional lockdowns might affect your gross tons production over the coming couple of months? Or is it likely too soon to tell?
Peter Trout
unknownDylan, this is Peter speaking. It's likely too soon to tell. What I can say is that with the Sydney lockdown, plus more recent border restrictions in Victoria and Queensland, we've seen an effect during the past week involving a number of workers from our contract workforce. Whether that has consequences across the entire year is too early to determine. From a guidance standpoint, certainly, no allowance has been made on our side for prolonged COVID disruptions at the sites.
Dylan Kelly
analystAll right, that's reasonable. I'll relay that message.
Operator
operatorThank you. As a reminder, if you'd like to pose a question, please press star one on your phone and hold until your name is called. We'll take a brief pause now so questions can be registered. Our next question comes as a follow-up from Dylan Kelly at Ord Minnett. Please proceed.
Dylan Kelly
analystAll right, I'll keep that. If Adam happens to be on the call, I'd like to ask about the reserve replacement — from last year, oh, sorry, from last week. If you look near the bottom of slide 17, could you help us see why reserves dropped from 2020 levels, from slightly above 3.5 million tons back down to 2.5? And am I right to think that you actually haven't replaced depletion for the year?
Adam McKinnon
unknownApologies, could you clarify which slide you meant? Slide 17?
Dylan Kelly
analystOn slide 17, in the lower left corner, beneath ore reserves.
Adam McKinnon
unknownYes, that's right. Some of the material we removed during the year has been replaced, though not all of it. As we head into FY22, what we'll see is — as Dan mentioned at the beginning of the presentation — we have this fairway with our resources, and as drilling increases and some of these studies come through, we'll see a substantial rise in reserves in FY22.
Dylan Kelly
analystAll right, got it. At this point, how much volume from Great Cobar is actually going to flow into the reserves? Right now it's five, a bit above five. I didn't notice any breakdown on that. Should we expect something on the order of 1.5 to 2 million tons?
Dan Clifford
unknownDylan, Dan here. To be frank, answering questions like that is far too premature for us. We're still drilling it. Whatever the ore body turns out to be, that's what it'll be. The mine design will be built around it, and at that point we can be much more precise about the actual tonnage that will come out of that portion of the asset. You're able to see how it appears in the production target as well as the grade control and the flow-through of that material. Once we've locked down the studies, the decline, and ongoing exploration, we'll zero in on how that shapes up.
Dylan Kelly
analystAll right, that's reasonable. I'll make sure to relay it.
Operator
operatorThanks. And just a reminder — if you'd like to pose a question, hit star one on your phone and hang on until we call your name. Our next question is from Michael Evans at Acova Capital. Go right ahead.
Michael Evans
analystMorning, everyone. Thanks a lot. Regarding your guidance and the mill throughput figures, you basically addressed that on the individual slides — 800,000 tons at Peak, 480 at Hera, 355 at Dargues. I mean, I haven't worked through the figures yet for FY22. Should we be using those throughput numbers for the three operations next year?
Dan Clifford
unknownMike, Dan here. How's it going?
Michael Evans
analystYes, that’s fine — thank you.
Dan Clifford
unknownThe guidance we're providing for individual asset throughputs is shown on slide 14, within those ranges, taken from the left-hand vertical axis of each individual asset description. You'll observe Peak increasing from 560 in 2020 to 625 and 630 in FY21, then climbing into that range of roughly 700,000 for the year. Those figures are what you should be assuming. The production target descriptors in the slides, around 17 onward, are implied from the production target.
Michael Evans
analystThanks a lot. One more question, if I may. Regarding the production targets you published last week — take Peak as an example: there's a cutoff of 100, and I believe for most areas production applies an NSR cutoff of AUD 150 per ton. For Chesney and Jubilee, I think it's AUD 130. Then you look at your costs, and they're considerably above that — correct me if I'm mistaken — roughly AUD 230 in the most recent quarter. The way I have to think about it is that those costs need to come down before you can reach all that ore contained in those production targets, or are those production targets reachable at your present unit costs for mining, milling, and admin? You know, cost per ton. Is all of that production target accessible, or do those costs need to fall?
Dan Clifford
unknownMichael, this is Dan. We just ran into a technical problem there involving Peter. Adam, can you take care of that? Just give us a moment, Michael.
Michael Evans
analystOkay, thank you.
Peter Trout
unknownApologies, Michael — this is Peter speaking. The call dropped for me, so I had to dial back in. Sorry about that.
Michael Evans
analystNo, that's fine. Would you like me to say the question again?
Peter Trout
unknownYes, I caught the question. I simply botched my answer — I pressed cancel instead of mute.
Michael Evans
analystAlright.
Peter Trout
unknownTo address what you asked, AUD 150 represents the floor. The mean figure is higher than that level. What matters most is that typical grades processed must exceed that NSR for the operation to make money. Given that, whenever we draw a scoping outline around a block, we examine the overall value contained in it and decide if it should be sent to the mill. Another thing worth mentioning is that, as I believe you pointed out earlier, the plant has spare capacity. We are working urgently to raise mill throughput by getting more ore delivered from the mine. That will bring a natural decline in unit costs. Is that a satisfactory response to your question?
Michael Evans
analystYeah, I believe that's right. As far as those unit costs go, in our forecasting we essentially hold them flat in absolute terms. If there's any decrease, it would probably come more from higher mill throughput than from other operating factors as such.
Peter Trout
unknownWe do have additional initiatives underway aimed at reducing our costs, and that pattern will show up especially in peak performance. I wouldn't credit volume alone for it. Cost reduction is an area we're addressing too.
Michael Evans
analystYeah, and while I have you, kind of building on what Dylan asked, since that seems to be the important piece. You came in under your Dargues output for the quarter, but on the ore you actually wound up mining, that grade reconciliation landed inside 5% of what had been anticipated. Would that be a fair way to put it, as a summary?
Peter Trout
unknownYes. There are two parts to this. The first is the in-situ estimation, and that's the answer I gave Dylan regarding reconciliation. The second involves spatial compliance with the schedule. During quarter four, in particular, it was a shortfall in spatial compliance that caused higher grade stopes to be deferred into the current financial year, and those were replaced with lower grade feed from stoping and development.
Michael Evans
analystAll right, thanks a lot. I simply wanted to get that clarified. Appreciate it. That covers everything I needed.
Operator
operatorThank you. And again, should you want to pose a question, just press star one on your phone and hold until your name is called. At this point we'll take a brief pause so questions can be registered. We have no more questions right now. I'll turn things back over to Mr. Clifford for his closing comments.
Dan Clifford
unknownThanks, Bernadette. To wrap up, we're far along with this strategy and positioned with gold dominance, high-grade base metals, and copper ready to go. Over the year, we've witnessed a quantum shift in reductions of harm events throughout our business. Our guidance was achieved, and that guidance included higher throughput commitments from both Peak and Hera. With extensive drilling success, we added to a significant resource growth of 63%. Our plans are being met with an asset added and strong expectations of reserve conversion during FY22. With that, I want to thank everyone for your time this morning. We look forward to further updates accompanying over the coming months. Thank you.
Operator
operatorThat wraps up today's conference. We appreciate you joining us. You're welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.