Good morning, and thanks to all of you for taking the time today. Peter and Ian are also with me online. During today's discussion, we'll be referencing the June 2022 quarterly update and outlook, which was posted on the platform this morning alongside the quarterly report. Before we get into that, given the time of year and the sheer number of results and calls you've no doubt all sat through, and while the impact is real and well understood, I'm fairly certain people really don't want to hear about COVID-related issues and labor risk shortages. For us, it's going to be entirely about performance on what we can control — and we do control it — and how we respond, or will respond, to the things we can't control. Today, if we move to slide four of the presentation deck, we'll concentrate on operational performance for the quarter and the year across production, AISC and capital, the major project advancements across Cobar, the Great Cobar and the Federation operation, and then how the business is adapting to the headwinds that I think we can all see, with the economy and particularly project development risk.

Daniel Clifford

unknown
#2

Okay, let's turn to operational performance, moving to slide six. Following 2 really strong years of steady gains, especially in health and safety and environment, this quarter actually saw a deterioration. That's not too unusual when a business is under pressure — injury rates tend to start rising, and that's what happened in certain cases here. Although injury rates did rise during the quarter, the positive for us is that rather than being scattered across many injury types and body areas, they were largely concentrated in hands, particularly among our contracting partners. That's it. That makes it much simpler to pinpoint where our improvement efforts need to be directed, and it's very clear where we step in to fix the problems. Environmental performance also rose during the quarter. Particularly in H2 of the year, with our governance and oversight of the operations, we launched a number of internal compliance audits on our development consents across all 3 operations and tenements. Through that, we found some minor non-conformances against those consents. In fact, a handful of them required self-reporting, and that accounted for the uptick, especially in the last quarter through May and June.

Daniel Clifford

unknown
#3

Moving on to slide seven. In my view, our results—especially during the most recent quarter—have fallen well short of what shareholders, and I myself, would rightly anticipate from this company. It was unquestionably a difficult quarter. Gold came in 5% below full-year guidance, though I should note that relative to what had been expected for that quarter, the shortfall was considerably larger than 5%. Lead was 1% lower and zinc 8% lower, while copper exceeded guidance by 12%, which I will address shortly. What I find disappointing is that several self-inflicted issues within areas we control genuinely shaped this outcome, and Peter will go through those in greater depth when he reviews each operation. The principal driver of the shortfall was at Peak, where a campaign involving higher-grade lead, zinc and gold ore was in fact pushed back because of operational interruptions. A copper campaign was run in its place, and that is the chief reason for the miss on lead, zinc and gold at year-end, though it drove the beat on copper. All-in sustaining costs, as we told the market last week, came in 10% above the range at 17, a touch over AUD 1,700 per ounce.

Daniel Clifford

unknown
#4

That difference, again, as we explained at the time, came mainly from the equipment deliveries tied to the Peak owner-operator transition and the late June TC settlement for Hera, and those two items added roughly AUD 110 an ounce to the AUD 150 an ounce exceedance above guidance. What was genuinely encouraging, though, was the capital investment, especially on the growth side, which was largely federation and consenting and exploration. Putting those two together with the equipment, we still succeeded in putting a further AUD 20 million to work during the quarter, investing in the future of the business. And even with what inflation is doing, the scopes that were achieved were in fact either met or surpassed rather than trimmed back to hold the spend in check against that inflationary pressure, and that left us inside or below the ranges we committed to at the start of the year across sustaining, growth and exploration and evaluation. While we did see growth in the gold equivalent, which you can see over the page, it was delivered, but operating performance, as I said earlier, was not there. I personally, in particular, and the management team, we own that result, and we can and will put it right over the quarters ahead, because the growth is good, but it could have been stronger if we had delivered a stronger quarter.

Daniel Clifford

unknown
#5

Having said that, Ian, I'll turn things over to you.

Ian Poole

unknown
#6

Thanks, Dan. Aurelia wrapped up the June quarter holding AUD 76 million in cash. Sales revenue for June stayed pretty much flat versus the previous quarter, at AUD 101 million, as bigger volumes were offset by weaker prices. Operating cash flow at Dargues came in at AUD 4.3 million, helped by stronger quarter-on-quarter gold sales, while sustaining capital was higher because of the stage three tailings lift, which was moved forward from FY2023 to lower the future risk of the tailings facility hitting operational capacity during periods of heavy rainfall. Hera's operating cash flow for the period was AUD 3.9 million, reflecting higher sales volumes offset by lower prices. Settlement of the 2022 zinc benchmark treatment charges at a rate above the provisional treatment charges drove overall higher expense in the quarter of AUD 4.5 million. At Peak, operating cash flow for the quarter was hit by higher operating costs, lower gold volumes, and softer base metal prices. During the quarter, Peak took delivery of mobile equipment to support its move to owner mining. That equipment was financed through AUD 6 million of equipment loans. Aurelia spent AUD 4.8 million on enabling work for the Federation project, including the box cut, plus AUD 1.3 million on studies and environmental approvals.

Ian Poole

unknown
#7

On the exploration side, we spent AUD 3.7 million on infill drilling and exploration at Federation, AUD 1.4 million on near mine exploration at Peak, and AUD 2.1 million on exploration at Dargues. We also saw a release of AUD 14.4 million in working capital from the prior quarter, which was mainly tied to a reduction in debtors. Aurelia keeps its balance sheet strong, with AUD 76 million of cash on hand and low gearing. During the quarter, we made debt repayments of AUD 4.3 million. The term loan's remaining balance now stands at AUD 19.3 million. Aurelia also got AUD 5.1 million back in cash from its bank guarantees used for environmental bonding. The restricted cash balance now sits at AUD 30.7 million. I'll now pass it over to Peter, who'll give you more detail on the operations.

Peter Harvey

unknown
#8

Thanks, Ian, and good morning to everyone joining the call. I want to begin by echoing what Dan Clifford said — the June quarter's results fell well short of what we had expected, particularly at the Cobar district operations. Our management team is focused on producing a stronger outcome across the coming financial year. If you turn to slide 10 of the presentation, I'll walk through how we've performed operationally of late, beginning with the Peak Mine. Taking a step back at a high level, metal production at Peak during the June quarter came down to the reduced tonnage of ore processed and the fact that we ran one lead-zinc and two copper ore processing campaigns. A second lead-zinc processing campaign could not be carried out owing to unplanned interruptions to mining operations, which pushed the delivery and processing of that ore into the September quarter. Mining performance had been on plan until mid-May, when we hit two abnormal production interruptions at the mine. The first of these came from damage to a conveyance tail rope in the shaft hoisting system, and it happened shortly after the existing tail ropes had been swapped out under a condition-based maintenance regime. We switched to a less productive and more expensive method of ore haulage — trucking it to the surface — while the replacement tail ropes were being manufactured and installed.

Peter Harvey

unknown
#9

I'm happy to report that hoisting got back underway yesterday, once those new tail ropes had been put in place. The second of our unplanned events stemmed from a misfire on a stope blast, which caused us to halt all blasting work site-wide while the circumstances around the incident were looked into. After that, we made our blast initiation system simpler so that the chance of human error, and of a repeat event, was removed. Over at the process plant, we carried out a significant planned outage through the peak months of June, along with several refurbishment activities on the plant. Those depended on specialist labor from outside, and sadly the scheduling was locked to when that labor was available, so we couldn't process the ore that had come out of the mine following those two incidents in May. As a result, ore stocks built up by quarter end. At Peak, our team is rolling out a number of initiatives aimed at lifting operational performance, with focus on our asset management plans and on recruiting professional staff to support that work. We also have several cost containment initiatives in progress, and benefits are already coming through. One example is the electricity supply agreement that started in January of this year, which locked in prices substantially below current market tariffs.

Peter Harvey

unknown
#10

There's also more good news to report regarding the transition to owner mining at South Mine. The initial units of the new mobile mining fleet are currently being commissioned, and they'll be put to work alongside the hire trucks that have already brought a clear productivity gain at the mine. In addition, we're busy recruiting people for operating and maintainer positions and sourcing consumables to back up the owner mining transition. Moving on to slide 11, which covers how the Hera operation performed — put simply, it showed a shortfall in ore processed along with feed grades that came in a bit above our plan, yet were lower quarter on quarter. Mine production held back the ore processing results, which caused surface stocks to be drawn down during the quarter. At the mine, a mix of factors led to delays in stoping and therefore reduced ore production. We ran into extensive ground support rehabilitation needs in older mining areas, and this went beyond what we had expected. An underground loader suffered significant damage when it was buried in a stope during remote bogging operations, and bringing it back into service required substantial component change outs. On top of that, parts suppliers are taking longer to deliver, which has further worsened some of the loader downtime experienced at the site.

Peter Harvey

unknown
#11

Given those conditions, Redpath — the contractor handling our mining — has brought one more loader onto the site and boosted its stock of spare parts so that any further interruptions are kept to a minimum. It is also worth pointing out that Hera is a mature operation, so our mining sequences offer only limited room to manoeuvre. As a result, when one stope is delayed, a domino effect ripples through the scheduled output of that stoping block, and that pushes back all production, exactly as happened in the June quarter. To address this, and as we said in the March call announcement, we are putting in place a fourth mining area up in the Upper Hays zone, where stoping is about to begin. That extra mining front will support more dependable ore delivery and also helps extend the life of the Hera mine. Turning now to Dargues, with its results summarised on slide 12. It is excellent to see the site turn in its strongest quarterly result. Faster processing rates through the mill, together with a 26% lift in grade, produced gold output of nearly 12,000 ounces. That accounted for over half of the group's gold production in the quarter. It also brought the all-in sustaining cost down, since the greater gold sales more than made up for the higher activity levels at the site.

Peter Harvey

unknown
#12

I think it's also worth acknowledging that we achieved these results amid a number of difficult circumstances. Following some unusual rainfall late last year and earlier this year, the site management team had to keep a close watch on water buildup in the tailings dam. In doing that, they moved up the stage 3 embankment lift on the dam so we'd have extra storage capacity. That move added roughly AUD 60 per ounce to the site's full year all-in sustaining cost. Another standout was running the backfill plant and reconfiguring the underground reticulation system, which permitted greater backfill placement rates. These things matter more and more to us when it comes to cycling through stopes fast enough to keep your production rates up. At the process plant, we recorded some genuinely strong runtimes thanks to our asset management regime and ongoing optimization of the flotation circuit, which cut gold losses to tailings and in turn helped our gold recovery results. Lastly, we finished the newest phase of the underground drilling program, or the infill drilling program. As information arrives from that program, it will be applied to establish the boundaries of mineralized zones and to upgrade grade estimates for use in mine planning.

Peter Harvey

unknown
#13

We're going to start another infill drill campaign this quarter, once drill sites become available deeper in the mine workings, and that will let us test extensions of the deposit at depth. I'll stop there and hand things back to Dan.

Daniel Clifford

unknown
#14

Thanks, Peter. I believe it's obvious — and you'll certainly come away from this call with this impression — that right now nothing matters more to us than delivering operationally and providing certainty, since that cash flow is what we're putting directly back into the excellent pro-growth projects and future life extensions involving the group's main assets. Let's turn to slide 14, because a genuine bright spot in all this — especially given the economic headwinds, particularly in Australia at present — has been the progress we've made on these projects. Beginning with Great Cobar, with the PFS and Maiden announced earlier this year, so I believe that was in January. That is now being followed by what I'd describe as something of a minefield in New South Wales. We have now secured full government consent for the Great Cobar project, which is a fantastic achievement. It provides us with a very clear path toward a valuable organic copper contribution to the business. A bit later, in August, when we release our results at the end of August, we'll provide a fuller update and further detail regarding the timelines for the Great Cobar project.

Daniel Clifford

unknown
#15

Turning to slide 15. Federation is progressing quickly as well. On slide 4 — sorry, slide 15 — you can see just how much surface work and excavation has been carried out. The box cut now sits at roughly 90%, and we're finishing up final cleanup along with sidewall support. Surface civil works stand at about 70%. Some of the shots are there for you to view. Perhaps more importantly, for anyone wanting more comprehensive footage, a video was posted to our website this morning, and through it you'll be able to view the full scope of the activity taking place there, all of it in preparation for getting us underground. I'll move on to slide 18, but before I do, I just want to step back for a moment — we've discussed the controllables and where our performance needs lifting. Thinking ahead about where the business stands, particularly in this environment — I mean, just considering some of the external factors and some of the uncontrollables as I see them, and what our response can be under these circumstances. I know everyone will have heard this, especially from the mining houses, but the hyperinflation period we're in right now is something that is coming at us.

Daniel Clifford

unknown
#16

This really got going in earnest three, four, five months back, and it keeps hitting us. We're seeing labor costs up 10%-12%, and that's before you even factor in whether you can actually secure the people. On top of that, energy costs are climbing, consumables and supplies are climbing too — across reagents, explosives and steels — and in many cases those are being reported at 25% escalations. At the same time, there's been a wide range of project blowouts right across the sector, both internationally and domestically here in Australia. Some of the most recent results or data I've seen, especially from commodity analysts, looked at, for instance, 78 projects globally, particularly in copper. Not a single one of them came in on budget, and brownfields and greenfields projects alike showed CapEx blowouts of between 30%-50%. That has an enormous impact on the expected returns from those projects. From where we sit right now, this is creating high risk, or higher risk. What really matters to us now, especially at this particular juncture in the project timing that we have, is that what we won't do is just — and I think all our shareholders would expect us not to do this either — charge in blindly to this environment with the assumptions we made in the business six to 12 months ago.

Daniel Clifford

unknown
#17

I think, aside from that — well, if you include the absolute push on our operational performance, it's also about delivering on these excellent projects. The costs we're observing are placing pressure on lower-grade material across all our projects, especially at Peak. We have a high-grade to low-grade spread spanning two mines across six different mining areas. There are various steps we'll implement to rein in the cost pressure that's arriving, but it's like swimming against the tide. Under certain conditions, some of the lower-grade material could turn negative, and that's understandable if it's marginal. What matters to us, though, is that every ton we mine is positive, and making sure of that going forward will require a review of our operating strategies — in particular the cost structure and debottlenecking — so we can bring as many of those tons into positive territory as possible. In addition, I've discussed this extensively in strategy over the last two years, and that is prioritizing the highest NSR from Federation, Hera, Peak and Great Cobar through our mills over their time frames. Combine those two things, and there's a possibility that we see some existing capacity open up if tons mined — well, if we're not mining negative margin tons.

Daniel Clifford

unknown
#18

The CapEx inflation that we're observing, along with project risk, means it makes a lot of sense for us to weigh that against the standalone option for Federation. It's definitely worth us looking at optimizing the capacity of our existing mill in the basin alongside that standalone option. For us, I think that's a logical step given where we sit at this point in the project junctures. I think the reality right now — and I'd even go so far as to say it isn't just reality, it's an absolute benefit — is that having two polymetallic base metals mills in the basin gives us options and puts us in a position where, when I think about prioritizing the highest NSR material, it's not a loss of ore, it's a deferral of lower grade ore to later timing, and that puts us in a great position to be able to adjust the business for the risks that we can see coming to the sector. I think that's the work we're doing now, through the feasibility as we draw that to a completion. I'm sure there are plenty of other mining houses out there doing exactly the same reviews that we're doing now. With that said, I'd like to hand over, please, Peter, to questions.

Operator

operator
#19

Thank you. Should you want to pose a question, kindly hit star one on your phone and hold until your name is called. To withdraw your request, press star two instead. In case you're using a speakerphone, please lift the handset before asking your question. Dylan Kelly of Ord Minnett is our first questioner. Go ahead, please.

Dylan Kelly

analyst
#20

Yes. Morning, everyone. I’ve got a few questions. First, looking at the results, I think we were somewhat taken aback last week by the production and the costs. When I look at your cash balance for the period, well, your net cash is up a little, and debt has come down by AUD 5 million. Could you take us through that. I just want to point directly to the waterfall chart regarding how this has ended up this way. Is it mostly a working capital unwind from all the concentrate stockpiles that are sitting behind it? What was that bridge between what looked like a loss, you know, AUD 30 million-AUD 50 million, that suddenly just seems benign, if I’m reading this correctly?

Daniel Clifford

unknown
#21

Sure, Dylan, I'll field that one — it's Dan. Regarding operating cash flow from the business, as the waterfall shows, there's no question that concentrate stocks built up. I think folks saw that on the investor trip late last calendar year — the stock build we had. The team took some really constructive steps around sourcing containers and extra rail cars to clear that concentrate during that half. What you'll notice is working capital coming back, as Ian said, with respect to receivables in the business. That's flowing through to the business. We knew those were coming, so it gets right to the heart of what operating performance looked like at that point. We kept up the investment. You're right — we did repay debt. We also keep returning cash to the business. We're looking forward to N Raw and the Federation Maiden Reserve letting us extend our lives out, so we can, if possible, get some relief on that cash backing. Overall, for us, a slight decline in cash from AUD 80 to AUD 76 as we keep running the operations and reinvesting into the future.

Dylan Kelly

analyst
#22

Sure, that's reasonable. On the operations side and what's going on at Hera and Peak, I get that there are quite a few moving pieces involved. When we discuss the constrained operating flexibility and how you might alter that over the short to medium term given the current environment, do your plans or your strategy for addressing those kinds of issues produce a tangible near-term effect when it comes to restoring that reliability within the business?

Peter Harvey

unknown
#23

Hi, Dylan. Peter here. So, in short, I said that at Hera we currently have just three stoping blocks running, and we felt the impact of that. When we ran into a hiccup in a few of those areas during the last quarter, there was nowhere else to go, so bringing in Upper Hays gives us a fourth area and a bit more flexibility on that front. I'll note, and you know this, Dylan, that Hera is a fairly mature mine, and we do have some old areas there that deteriorated more than we expected as we extracted stopes during the quarter. That means we have to go back and do a lot more ground support to make the area safe before we reenter. We won't be able to avoid that going forward, but having another mining block certainly gives us a little more flexibility than we had in the last quarter. At Peak, we have the North Mine and the South Mine operating there. It's really the last quarter that's been impacted by what happened at the South Mine with the shaft outage. We have used that time to set up areas, so we give ourselves a clearer run into the current quarter.

Peter Harvey

unknown
#24

The team has done an excellent job getting everything hauled to surface at this point for, you know, nearly two months, working to keep rates up and ensure we hit the ground running as the shaft returns to service. It's going to stay a difficult underground mine, since we're once again in retreat sequences there, and there isn't much tonnage in some of these stopes at present. We're having to turn those stopes over quite fast to keep the production rate going at both Peak and Hera.

Dylan Kelly

analyst
#25

All right, understood. Peter, I want to dig a bit deeper into a few of the closing points you made regarding the hoist. From what I gather, that's an area where you've been steadily devoting considerable effort toward boosting reliability. Do you have any view on what we ought to be factoring in for extra capital so we can achieve greater availability from that equipment?

Peter Harvey

unknown
#26

As you mentioned, Dylan, we've already been doing some work around the shaft to boost reliability. That infrastructure is now well past 30 years old. When we issue guidance, we'll factor in the capital set aside for that program across the year. I'd note that what happened here was especially disappointing, since we had just changed out the tail ropes. That replacement was carried out according to the condition assessment at the time, and the damage that showed up within just a few weeks put us behind where we wanted to be, because we had only just installed the spare set of ropes that were on site. That hit the team quite hard, I have to say. We definitely made practice better in the past when operations were running fairly close to failure. Today we operate under a far more proactive approach for that shaft as well as for the process plant.

Dylan Kelly

analyst
#27

Alright, got it. Let me just ask one last thing, if that's okay. Dan and Peter, it sounds like you're both emphasizing flexibility quite a bit when it comes to what's going on with Federation. Did I hear correctly that maybe there's somewhat of a shift in approach regarding the plan to build or expand the Hera mill, and maybe instead just using the Hera mill or the Peak infrastructure to process that material? Anything to that? Or am I overreading your wording?

Daniel Clifford

unknown
#28

Not really, Dylan. As I said before, I think what matters most right now is just how much risk there is in developing projects at present, along with the costs we see emerging. Like I said, shareholders would, I believe, want us at this point to be looking at ways to safeguard value within the business, and that is precisely what we intend to do. Whether measured against a standalone option — either a full rebuild or a standalone version of the Federation plant — we are also weighing it against maximizing the existing facilities as much as possible and adding tonnage on an incremental basis to, you know, back their own capital. We will examine that. As I mentioned, I think it's really — I don't think many mornings pass when I don't wake up thinking, "Thank God we have two polymetallic mills in the region." To support the business there. That's a genuinely great chance for us to truly safeguard value going forward. It's an option we will be assessing.

Dylan Kelly

analyst
#29

All right, that's reasonable. I'll relay it and follow up.

Operator

operator
#30

Thanks. Matthew Giddings, a private investor, is our next questioner on the line. Go ahead, please.

Matthew Giddings

unknown
#31

Morning, everyone. I wanted to touch briefly on the announcement that came out earlier today regarding FY2022 production. The discussion there appears to center on the main growth projects — Federation and Great Cobar. I noticed Dargues isn't included among them, even though it was acquired under two years ago — is it no longer seen as a major growth driver for Aurelia?

Daniel Clifford

unknown
#32

No, that isn’t what we intend to do with it. For Dargues, we have timelines set for changes to consents and for ongoing—I suppose you’d call it—enhancement or expansion of the facilities already there. What we are really waiting for is the results from drilling. Right now, we are still waiting on some of those exploration outcomes. Dargues remains, in our view, an important part of the portfolio. The only difference is that it probably does not involve the same amount of capital expenditure and project expenditure that we are considering for the two projects currently in the Cobar Basin.

Matthew Giddings

unknown
#33

And beyond that, how does it stack up against what you expected when you made the original purchase?

Daniel Clifford

unknown
#34

No, that's not the case. I believe we were quite explicit when we issued that early warning this year regarding the year-end impairment on those assets—the ones we highlighted back in the March quarter, toward the end of it. That by itself, I think, makes clear it isn't living up to what we expected. As for Dargues, when you look at its physical metrics—tons mined, development, throughput, backfill, feed rates—it is performing in line with our expectations. The grade is plainly the piece that hasn't, and there's no other way for me to frame it beyond the fact that we raised that concern early alongside the impairment. Logically speaking, on that measure it is not delivering what we anticipated when we acquired it.

Matthew Giddings

unknown
#35

Appreciate it. That covers everything from me.

Operator

operator
#36

Thanks. We’ll take our next question from Anthony Wallace, who is a private investor. Please proceed.

Anthony Wallace

unknown
#37

Hello there, Dan. I’d like to revisit a question that came up a short time ago about how much marketing and promotional activity the company intended to carry out, and you mentioned that you’d brought in someone on staff to strengthen that effort. We’ve just had the Noosa Mining Conference, the Gold Coast Resources Rising Stars, and the Sydney Gold Conference, and there are really small companies out there with a single deposit, a single project, promoting themselves and getting their story into the market. I haven’t seen anything from Aurelia. What’s going on?

Daniel Clifford

unknown
#38

Yeah, I believe we’re familiar with the Noosa Mining Conference. From our side, that’s something we’re watching for next year. It has definitely come a long way over the past couple of years. We’ve been putting our attention on some of the more virtual events, including certain domestic broker-led events too. It’s definitely on our radar. I know we said earlier that there needs to be more activity in that area. I think we’re definitely working toward that. There are also, in some cases, conferences we attempt to join that we actually can’t secure an invitation for. It’s a bit of a mix. Still, I think I hear what you’re saying, and it is definitely on our radar.

Anthony Wallace

unknown
#39

I mean, a few of those conferences run by brokers are all right, but the trouble is that, you know, if you aren't a client of that particular broker, you basically won't see a thing. You really don't receive that broad exposure the way you do at these other events, you know, Diggers and Dealers and all those other kinds of gatherings that are out there. The broker-run ones are fine, but you're simply not getting any exposure out of them.

Daniel Clifford

unknown
#40

You're making a fair point there.

Anthony Wallace

unknown
#41

Look, there's another matter I'd appreciate your raising at a board meeting: how many directors and members of management are purchasing stock in the market. Personally, I'd like to see some directors buying right now, as a way of showing support for the company—visible support. I realize everyone has different reasons for doing or not doing that, but I've noticed Adam McKinnon, who spent years with you folks, moved over to Magnetic, and he's made at least 2 or 3 purchases online, and that alone has lifted shareholder morale. With our current share prices as low as they are right now, those windows when the board can buy shares—might I suggest that be given consideration?

Daniel Clifford

unknown
#42

I'll move this along, Anthony, though as you said before, each person has their own limits when it comes to investing personally. So I will definitely raise it. Great. Thanks.

Operator

operator
#43

Thanks. We’ll take our next question from Michael Evans at Acorn Capital. Go ahead, please.

Michael Evans

analyst
#44

Much appreciated. Thanks, Dan, for the update. A couple of straightforward questions. And I apologize if the announcement covered this and I missed it, but no guidance has been given for FY2023. When do you expect to provide that? That's the second one. The other question concerns Federation and what you said about the CapEx blowout. I mean, I understand it's really hard for mining companies to draw a line in the sand, since that sand keeps shifting as CapEx costs move and so on. But some projects see a 30% CapEx blowout destroy the IRR, while other projects with a 30% CapEx blowout don't actually see the IRR destroyed, you know. And I would have thought Federation fell into that latter camp. Do you f I mean, how do you think about flex testing? Well, this is our base case CapEx, and, but even if it, you know, do you run sensitivities and maybe show the market in due course that sensitivity and say, "Well, the IRR is still pretty robust." Is that how you think about it? Or is it one of the things you think about?

Daniel Clifford

unknown
#45

Let me address that first question first. I had planned to touch on it during my closing remarks about guidance and what lies ahead. Michael, I might handle it there, if that works for you.

Michael Evans

analyst
#46

Absolutely.

Daniel Clifford

unknown
#47

Regarding that second point, I can't say I share your view that a 30% CapEx overrun is harmless no matter the situation.

Michael Evans

analyst
#48

Oh, no. It's damaging every time.

Daniel Clifford

unknown
#49

It's 30% relative to size. That's always the case, and there's no way around it.

Michael Evans

analyst
#50

Uh-huh. Right.

Daniel Clifford

unknown
#51

From my perspective, accepting a 30% risk in a business where other options exist that won't diminish the asset's or project's value over time is—

Michael Evans

analyst
#52

Mm.

Daniel Clifford

unknown
#53

It's something that deserves our review. I think, you know, we've consistently.

Michael Evans

analyst
#54

That's right.

Daniel Clifford

unknown
#55

You also have to consider these from a cash standpoint, not just value. Those options are going to be evaluated by us. I don't share the view that a 30% overrun on a large project is any less damaging. Allowing that to happen at all is something I would not be open to.

Michael Evans

analyst
#56

No, I'm not saying you should. That 30% figure was just something I made up on the spot, somewhere in between, as you pointed out, among those 78 projects that somebody has looked at. Yeah. On average it's been around that or higher. But yeah. Okay. Clearly, whenever capital gets allocated, it's measured against every alternative.

Daniel Clifford

unknown
#57

Yeah, that's right.

Michael Evans

analyst
#58

which I'd imagine are organic.

Daniel Clifford

unknown
#59

Yes, that’s right.

Michael Evans

analyst
#60

Sort of—

Daniel Clifford

unknown
#61

That's right.

Michael Evans

analyst
#62

You've got IRRs for projects, and separately you've got IRRs for capital deployed elsewhere, right? Okay. Got it.

Daniel Clifford

unknown
#63

I think the key point, Michael, is that over the past four to five months, the world has shifted. You know, we set assumptions at the beginning of a financial year and issue guidance based on them. If something changes, we can re-guide. Certainly on project studies, this year we've completed a pre-feasibility study on Great Cobar and are drawing the feasibility work on Federation to completion. Sticking to those assumptions from 12 or 18 months back, when we launched those studies, doesn't make sense given what's hit us during the last four to five months.

Michael Evans

analyst
#64

Um.

Daniel Clifford

unknown
#65

My sense is that shareholders would want us to examine our efforts in that area and ensure that, regarding capital deployment, we are safeguarding value and generating the strongest return available given the choices at that moment. We do review it. Right now, we are evaluating that option—once more, the standalone option, which formed the initial scope of the feasibility study. Let us complete the work, and we will see how it develops.

Michael Evans

analyst
#66

Yeah. Yeah. No, that's fine. Thanks, Dan. I'm eager to see that work once it's released. That's everything from my side. Thanks.

Operator

operator
#67

Thanks. Glenn Heard, a private investor, has the next question on the line. Go right ahead.

Glenn Heard

unknown
#68

Yes. Hey, guys. How’s it going? My question really comes back to—circling back to the actual dollars in all-in sustaining costs, which obviously is a big jump for the quarter. There were some figures tossed around regarding the one-off numbers on capital and so forth. I just need some clarity on, you know, the AUD 30 million extra in all-in sustaining costs for the quarter, and which of those are more one-off or tied to future capital investment.

Daniel Clifford

unknown
#69

Hi, Glenn. Dan here. The main factor, when I think about all-in sustaining cost, is typically the denominator — gold — and then the base metal offsets or credits. That's where most of it originated for us. We were able to observe operating performance and to estimate and forecast ahead how it was shaping up. Bringing the equipment in at the back end of the year, plus the recent shifts in TC costs, pushed us outside the range, and that's what we've been concentrating on. As for sustaining capital in the business right now, thinking about it from a broad standpoint, it's mostly underground mine development across all the assets. When development rises, sustaining CapEx rises. On top of that, we had the Dargues TSF lift, which was brought forward into this year. That's an acceleration of a project that had been planned for next year. Equipment leases — the new equipment arriving — were picked up in sustaining rather than being handled as a finance lease and a cross. That's a one-off too, and it represents direct investment in reaching owner-operator status. Mostly, if we see a lift in sustaining capital that's much higher than planned, it will flow through to all-in sustaining costs, and the usual primary driver of that is underground development.

Glenn Heard

unknown
#70

Right, okay. So, the quarter's costs came to AUD 60 million, and that's well above the usual AUD 35 million to AUD 40 million we'd see in a typical quarter. The bulk of it sits in sustaining capital, compared with what's normal.

Daniel Clifford

unknown
#71

Sustaining capital, and there was this as well.

Glenn Heard

unknown
#72

Apologies — I wasn’t able to hear that.

Daniel Clifford

unknown
#73

Apologies for that. Yes, I do apologize. It's sustaining capital, along with higher treatment charges at Hera, which we flagged.

Glenn Heard

unknown
#74

Okay, so, right.

Daniel Clifford

unknown
#75

That comes to 4.5 million Australian dollars.

Glenn Heard

unknown
#76

Did treatment charges go up?

Daniel Clifford

unknown
#77

Sure.

Glenn Heard

unknown
#78

Was that carried over, or does it simply reflect the material we were processing?

Daniel Clifford

unknown
#79

No, that reflects a shift in the market. It isn't something pulled forward. It's an expense.

Glenn Heard

unknown
#80

Is that a shift in some kind of accounting system, or something else?

Daniel Clifford

unknown
#81

Apologies, I was on mute. Oh, God. The accounting system hasn't changed at all. Treatment charges get settled by the market, and that settlement for the 2022 treatment charges happened during the current quarter. So at Hera, in the current quarter, we recorded both the treatment charges for the quarter and a catch-up from the March quarter reflected in the current quarter. From that perspective, there was a cost increase.

Glenn Heard

unknown
#82

All right, okay. Partly, that relates to an adjustment for a previous quarter.

Daniel Clifford

unknown
#83

That's right. The reason is that treatment charges across the entire market were finalized during the June quarter, whereas before that point we were working with provisional estimates.

Glenn Heard

unknown
#84

All right, thanks so much.

Operator

operator
#85

Thank you. As a reminder, should you wish to pose a question, simply press star one on your phone and hold until your name is called. Colin Peek, a Private Investor, is up next. Go ahead, please.

Colin Peek

unknown
#86

Hi, Dan Clifford, and the team. On labor — you expect that to go up by 10%-12%, is that right?

Daniel Clifford

unknown
#87

Right now — hi, Colin Peek, this is Dan Clifford. What we're seeing, I should say, and what we're seeing in the market and hearing from other businesses in the market, is what we expect. Something along those lines is coming toward us, we're seeing and expecting it. Internally, those increases aren't necessarily something we see, but as far as what we observe from the outside market — contractors, casual labor, et cetera — that's what we expect to be able to see coming at us.

Colin Peek

unknown
#88

I was just reviewing Aurelia's employee history. Back in July 2019, the company had roughly 85 employees. Today you're at about 169 or 170, which works out to a 99% increase. So can you share what percentage of overall sales labor currently represents, and confirm what the ideal labor percentage should be for this industry? That covers both direct and indirect labor. Is that how it's tracked?

Daniel Clifford

unknown
#89

It doesn't have to be tied to sales, Colin. I mean, you do see standard benchmarks—like run of mine tons per full-time equivalent and so on—circulating in different businesses, but not in the form you've put it there.

Colin Peek

unknown
#90

Okay.

Daniel Clifford

unknown
#91

What I believe needs to be recognized is that full-time labor at Aurelia has risen over the past three years. A few factors have contributed to that. We have to keep in mind that during that period we bought an operation with Dargues, and full-time employment arrangements were put in place with the management team and staff for that operation. We also moved the processing facility at Dargues away from being contract operated, and it is now run by full-time Aurelia staff, as are Hera, Peak, and now Dargues. Those increases stem from bolt-on acquisitions and from instances where we have then taken over and will shift from contract provision of that service or labor to in-housing it or owner operating it. As Peter mentioned earlier, we are going to see that once more when it comes to the decision to transition the Peak underground, or certainly the South Mine underground, to owner operator labor rather than externally provided. Full-time labor numbers will rise again, but that will directly offset externally supplied or contract labor.

Colin Peek

unknown
#92

Right. Yeah. Okay. So just to touch on Dargues, and picking up on what you said a while back, we think this deal meets every criterion for Aurelia shareholders and provides outstanding potential for value growth over both the near and longer term. For investors listening right now, what would the distinction be, you know, between short and long term? We're aware it hasn't lived up to expectations, but looking ahead, where do you see this going? Is it a year, two years? Obviously, a lot of shareholders are worried at the moment, given where the share price sits right now, and I just think we need some reassurance here.

Daniel Clifford

unknown
#93

Yeah, I'd put it similarly to my earlier answer: the grade fell short of what we expected. As for the asset's other physical operations, those have held up.

Colin Peek

unknown
#94

Correct.

Daniel Clifford

unknown
#95

I believe we called that out, so it fell short of what we were expecting on that measure. We need to — and we already are — putting money into exploration across the assets, along with keeping costs in check so that we hold on to margin. On those results, we're honestly still waiting for a number of them to land. Much of the attention has gone toward underground infill drilling, which raises confidence — especially at any grade control level — for what is headed our way in the near term. I think there is still an exploration runway ahead of us to shape what we believe, and how long we believe, the asset can keep going. We continue to fund that exploration over the balance of this year and into FY2023, so that we can uncover extra value in the asset should it be there.

Colin Peek

unknown
#96

All right, let's hope for the best. Okay, thank you, Gary.

Daniel Clifford

unknown
#97

Appreciate that, Colin.

Operator

operator
#98

Thanks. At this point we have no more questions. I'll now return the call to Mr. Clifford for his closing remarks.

Daniel Clifford

unknown
#99

Thanks, Peter. So to recap, I believe we covered how operations performed. To wrap that piece up: that outcome is ours to own, and we will fix it. Peter, Peter and I have all voiced how committed we are to reversing it. The effects felt in that quarter have been addressed — specifically the shaft work, the blasting, and loader reliability at Hera. As we move beyond that quarter, I think performance will be considerably stronger. Our projects are progressing nicely, and we're pleased with their direction — all the way from government consents through to execution, especially given what's happening on the surface at Federation right now. As I said, that places us in a strong spot to adapt our business today, really, since we have flexibility when it comes to milling capacities. Going back to Michael's earlier question — it genuinely does. Assessing the flexibility now available to us at this moment helps us adjust the business to the risks approaching us in this economic cycle. That's a great position for us to be in.

Daniel Clifford

unknown
#100

We'll complete that work. What it results in is what lies ahead for us across this quarter. We anticipate a Federation exploration update. Much of the drilling there has now been finished, particularly within this tranche, aimed at resource definition, and we'll provide an update in the weeks ahead once the final assays arrive. Those assays will likewise assist in shaping the final outcomes for the Federation PFS. After we do that, it feeds into the Federation feasibility and the options we are examining there, which will also let us print the maiden on Federation. That in turn lets us, since Federation expenditure is near term, do a couple of things. First, give guidance for the business — again, returning to Michael's question — will that happen during this quarter, it's late August, especially on CapEx. Depending on the assessments we make regarding milling capacity, the additional or existing milling capacity enables us to offer further guidance and development schedules. More importantly, of course, the full year results at the end of August. Also included there will be the FY2022 MROR, since we'll be able to put the Federation Maiden Reserve into that as well.

Daniel Clifford

unknown
#101

A great deal is converging on multiple fronts during this quarter, and we look forward to sharing with shareholders—every one of our shareholders—how those results are shaping up. All right. With that said, thank you so much for spending time with us this morning, and without a doubt, you will be hearing from us again near the end of August. Many thanks.

Operator

operator
#102

Appreciate it. That brings today's conference to a close. Thanks for joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.