operatorAt this point, I'd like to pass the conference to Mr. Dan Clifford, our Managing Director and Chief Executive Officer. He has the floor.
Dan Clifford
unknownThanks, Ashley. Good afternoon, everyone, and I appreciate you taking the time today. Ian Poole is also here with me on this call. As a way of opening, and to put it simply in terms of how we see the year's performance, it was certainly a tale of two halves. To put it briefly and plainly, I'd say the first half was a fairly solid performance for the business, and the second half was not. It's the effects of that second half that have weighed on our full year results, which we'll walk through today. We'll go through those, along with some of the changes that have either already been made or are currently underway, as we work to fix the performance from the second half and also position ourselves to move into the multi-year extensions ahead of our Cobar Basin assets. We'll also touch on the next steps around information, particularly regarding the Federation Feasibility Study, toward the end of today's call. Let's turn to slide three. In FY 2021, we concentrated heavily within the business on the fundamentals across our sustainability performance, covering fatal risk, injury rates, and our Environmental Performance. The drive through FY 2022 has very much been to broaden that effort and to get our arms around the wider essentials of the aspects involved in running a great business, across culture, conduct, engagement, diversity, climate, and more recently the psychological safety area.
Dan Clifford
unknownThe fundamentals we laid out for FY 2021 have stayed on course, with consistent performance across a two to three-year stretch. And at this point I feel confident — both personally and together with the board — that we've established the correct foundations and base needed for the broader sustainability elements of the business to perform. Let's go to slide four. This just covers operations, and we'll go into somewhat more depth on this as either Ian or I walk through the different parts of the financial year. At the group level, volume was really the whole story, and that's where most of the problem sat for us. Even though total processed tons across the business rose roughly 6% year-on-year, Peak and Hera, especially during the second half, came in under par by about 60,000-70,000 tonnes apiece. On that point, Dargues did fine, as it actually beat its nameplate for throughput during the year. Base metal grade and price were a plus, lifting our gold equivalent to just under the 200,000 ounce equivalent for the year. I believe that genuinely demonstrates the advantage of our commodity mix in the business. Over to you, Ian.
Ian Poole
unknownThanks, Dan. Good afternoon, everyone. Slide five covers group financial performance. The company recorded a statutory loss after tax of AUD 85.1 million, along with an underlying loss of AUD 1.3 million rather than the AUD 3.2 shown on the slide. I'll be issuing an update on that shortly. The main drivers behind the loss will be discussed when we get to slide seven. Revenue came in at AUD 438 million for the year, up 5% versus the prior year. I'll go through that on the following slide. Underlying EBITDA for the period was AUD 43 billion, down 15% against the prior year. That decline in EBITDA stemmed mainly from higher costs — namely the underground contractors at transitions at both Peak and Hera, a full year of costs at Dargues, which was acquired in December 2020, and increased freight costs reflecting greater volumes along with an increase in rates. There were also higher zinc treatment charges on the zinc concentrates, driven by both volume and rates. Although cash flow from operations of AUD 154 million improved relative to the prior year, Aurelia's weaker EBITDA was offset by tax refunds of AUD 12.5 million received during the year.
Ian Poole
unknownTurning to slide six. As mentioned before, total revenue for the year rose to AUD 438 million. This slide presents a bridge from last year's revenue to this year's revenue. As you can see, higher prices across all our key commodities benefited the company, though lower volumes—especially gold—offset that. Production at Peak and Hera was lower, owing to reduced mill throughput and grade. The decreased output at Peak and Hera was partly offset by greater gold production at Peak at Dargues, thanks to higher throughput and grades and a full year of ownership. However, zinc volumes were higher because production improved at both Peak and Hera, driven by higher grades at both operations. As noted when Aurelia released its June quarterly report, zinc treatment charges rose in calendar 2022 versus calendar 2021. Let's look at profitability on slide seven. As mentioned earlier, the company recorded a statutory loss of AUD 85 million and an underlying loss after tax of AUD 1.3 million. The slide on this page shows a bridge from profit before tax of AUD 71 million to underlying profit after tax of AUD 1.3 million.
Ian Poole
unknownRevenue and operating cost movements were already covered on the earlier slides. Now, take the first line item under D&A expense. The depreciation charge rose by AUD 60.7 million versus the prior year. That shift comes mainly from Dargues. Since Aurelia calculates depreciation amortization mostly on a units of production basis, a rise in Gold Equivalent Production — which happened at Dargues — pushes the depreciation amortization charge higher. Gold production at Dargues came in at just under three times the FY 2022 level out of FY 2021. That was a key driver. The following column covers acquisition and integration costs. Those were costs incurred in FY 2021 when we acquired Dargues, and they have been added back. The next column relates to the impairment expense for Dargues. In March 2022, Aurelia flagged an upper range post-tax impairment of AUD 80 million at its Dargues mine. The final impairment charge came to AUD 185 million, equal to AUD 95 million post-tax, which sits above the upper post-tax range. In March, management and the board learned of this potential impairment and told the market right away, drawing on the best information on hand and forecasts for outstanding exploration results.
Ian Poole
unknownAfter that point, the exploration outcomes came in weaker than we had anticipated, and the impairment figure was raised to AUD 135 million. That impairment gets added back in the underlying performance calculation. The AUD 21 million, along with the net movement in remeasurement of the financial liability, ties to the Dargues life of mine royalty versus the previous year. Following the impairment, the life of mine royalty at Dargues was remeasured, and AUD 127.1 million has been added back in arriving at underlying performance. The AUD 114 million represents a statutory loss before tax, and the company brought in a tax benefit of AUD 32 million, giving a statutory loss of AUD 81.7 million. Beyond the impairment and the Dargues royalty we already mentioned, we also added back three point five million of rehabilitation costs tied to historical workings at Hera Mine when deriving underlying performance. Those adjustments produced an underlying net loss after tax of AUD 1.3 million. It was a fairly complex set of results, but I believe we can see where we landed for the year. I'll now hand it back to Dan.
Dan Clifford
unknownOkay, thank you, Ian. Moving along to slide eight, we’ll go into somewhat more depth on how the sites performed operationally. As I said before, group results were largely affected—especially by volumes—with both Hera sites hit by labor availability. At Peak, gold grade came in below what we expected, and Q4 output was disrupted by the shaft issue and a blasting misfire in the north mine that carried over into the south mine, causing a delay. The main thing we’re doing at Peak now is concentrating on what improvements we can deliver at that asset—both to make sure the near term gets fixed and to align with the future expansion at Great Cobar. That’s shifting toward a business that is mostly owner operated. Some specialist contract work is still present at the site. The emphasis is clearly on full-time equivalent efficiency. The market is tight. Securing all the people the business requires could be a risk, and we’re strongly focused on achieving more efficient operations at that asset. Hera came in slightly lower, which is interesting, and it differed between the first half and the second half.
Dan Clifford
unknownDuring the first half, actual throughput at the Hera mill was limited by base metal grades that came in above what we had anticipated, and that meant throughput ended up being lower. That's fine, because we still recover the metal, but in the end it did have an effect on throughput. As we moved into the second half, following the long-term view we adopted on transitioning our contract partner there so that it would also dovetail into the Federation decline development, we encountered some reliability problems with the mobile fleet and with the new contractor, and those were made worse toward the end of the year by poor ground conditions. Having said that, as I noted earlier, Dargues met all of its physicals. I believe the company and our shareholders are well aware of the grade impacts on the asset, but its physicals have in fact either matched or exceeded expected performance. If you move over to slide nine, we'll talk about cash flow. Although the impacts I described earlier, and that Ian has also covered, did reduce our operating mine cash flow by roughly 10% versus the prior year. Our sustaining capital rose to AUD 70 million, an increase of 22-odd million over last year. The real breakdown there is that at least 50% of that AUD 70 million spend was entirely in development within the business, since we have also had a full year of development at Dargues on top of a switch of great capital development at Peak to sustaining and ongoing development at Hera.
Dan Clifford
unknownThe remainder of that 35 out of the 70 relates to our equipment and lease costs on equipment, along with contracted equipment and certain TSF work at Dargues. Growth came in at 19.1. Of that figure, Federation accounted for AUD 14 million, with the rest split between Peak and Great Cobar. Beyond that, we kept funding exceptional exploration throughout the group, reaching AUD 30 million this year, and most—or the majority—of that spending went toward advancing Federation so we could reach this point with the feasibility. In addition, there were debt repayments of roughly AUD 16 million, as well as cash backing for our bonds, and that cash backing plus debt repayments came to AUD 38 million in total, of which we now hold approximately AUD 30 million as restricted cash to support the environmental bonds and liabilities of the business going forward. Turning to slide 10. To build on what was said regarding how much investment goes back into the ground, whether through exploration or growth capital, the tangible progress from that investment is excellent to see. AUD 50 million beyond our sustaining capital in the business was put back into the civils—you can find some updated photos in the slide deck—along with mobilization of the contractor ahead of the decline and advancement through state consenting, which is a complicated task, especially in New South Wales.
Dan Clifford
unknownOn the consenting side, Great Cobar is already in place for us, and when you put together where Federation stands in its progress plus Great Cobar's consenting being finished, that takes a lot of risk out of the business as we move ahead, since two key projects are either consented or well along the path. On top of that, I think having this much exposure to Zinc and Copper in the business is genuinely really valuable, and both of those assets sit only a few steps away from us. Turning to the Federation feasibility: we put out to the market that we'll communicate those outcomes during September. I'm sure people can appreciate that this is a sizable investment for our business, along with weighing the different milling options for the Federation ore, particularly given business conditions at the moment, project risk and capital escalation. I think people will understand it's very clearly linked to other businesses or other assets in the group, and so is the N law. It wouldn't be appropriate for us right now, without the Federation feasibility, to be issuing guidance alongside it. Once we get to September and we have full support from the board on what we're doing with Federation, we'll communicate that to the market.
Dan Clifford
unknownAll right, Ashley — at this point I’d like to open things up for questions. Please go ahead.
Operator
operatorThank you. Should you want to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, press star two instead. In case you are using a speaker phone, please lift the handset before asking your question. Our first question is from Dylan Kelly of Ord Minnett. Please proceed.
Dylan Kelly
analystOh, right. Good morning — or actually, sorry, afternoon, everyone. Thank you very much for the extra disclosure, which provides a breakdown of certain underlying figures. To begin, Ian, with a few questions concerning the Dargues write-downs and how large and significant they are. I didn't fully pick up what you said earlier regarding the components involved and the reason it ultimately came in somewhat above expectations. Would you mind taking us through those various elements? I caught mention of the bonding, the royalty, and the exploration. Could you take us through them?
Ian Poole
unknownSo overall, the impairment had two major adjustments. First, there was the writedown of AUD 135 million, and second, a royalty tied to Dargues — a life-of-mine royalty. Since that mine's life is now shorter than it was when we last accounted for it, remeasuring the royalty produced a writeback. That explains it. Those are the two figures — AUD 135 million and AUD 27 million — that get you to the underlying number. That's the point there. Then, when we run our modeling, we simply examine prices, cost assumptions, capital assumptions, and where we believe resources and reserves will land. That's the reason. It produced a modest increase from AUD 120 to 125-135.
Dylan Kelly
analystAll right, understood. Turning to Dargues and D&A, you noted that it rose considerably compared with a year earlier, purely because of higher production throughput. Are there any changes in accounting treatment that we ought to expect in the coming year which would affect that, or alter any run rate?
Ian Poole
unknownNo. Obviously, that impairment will leave us with a reduced cost base. Then, by and large, we’ll examine the units of production, and from that we’ll arrive at that figure—we’ll work out that figure. I can walk you through it offline.
Dylan Kelly
analystAlright, yes, that would be excellent. Turning to the subject of sustaining CapEx, Dan, earlier you remarked that this represented, you know, a sizeable investment for the year, yes, going back into Dargues and development, plus what you had underway at Hera and the activity at Fed. Looking ahead to FY 2022 and FY 2023, could you give us a feel for that development profile? Have we passed the worst of it when it comes to major outflows of cash being put back into the ground?
Dan Clifford
unknownYes, I hear you. I believe we'll handle that. Once we finalize Federation, Dylan, we'll make things quite clear in the guidance.
Dylan Kelly
analystAll right, that's fair. Staying with the subject of extra charges — the environmental bonding for the coming year — you noted AUD 30 million remains undrawn. Should we simply view that as being released gradually from this point on, or after the upcoming MRE update? Is it going to come back, or could there be a refund on that?
Dan Clifford
unknownFrom a planning standpoint, I think we're keeping it in restricted for now, but as you say, Dylan, that ties into the broader discussion of the funding package. It falls under the business's overall funding, and we'll deal with that at some point during the year.
Dylan Kelly
analystAll right, that's reasonable. I'll relay it and follow up.
Operator
operatorOur following question is from Michael Evans of Acova Capital. You have the floor.
Michael Evans
analystMorning, Dan. Many thanks. My first question follows up on Dargues. Back in March, you highlighted the impairment at that point. I believe you mentioned contained gold of 195,000 ounces, and that you anticipated it would come in roughly 15% lower. Then a note shows a figure 15% below 195,000, which works out to about 165,000 or thereabouts. Then, toward the back of your accounts, a note states recoverable gold of 72,000 ounces. If you take that 165,000 and assume roughly 90% recovery, I think you land near 150. The note in the accounts refers to a remaining life of mine, or recoverable gold, of 72,000 ounces. Is that a consequence of the exploration work done since that March announcement? Will we gain more clarity on this once the reserves and resources are published? Are there other items I'm failing to reconcile between your March announcement and those notes in the accounts on Dargues?
Ian Poole
unknownThat assessment was put together using the preliminary data available to us, so the MRE can be released. The formal MRE will be issued somewhat later on. It rests on our evaluation together with the audit from an accounting standpoint.
Michael Evans
analystI’m sorry—could you repeat that final point, Dan?
Ian Poole
unknownWe've examined it conservatively and from an accounting standpoint regarding what the carrying value might be, and that is the foundation for the assessment we've applied. Once the MRE and the production target are finalized, they will be released to the market. We've relied on some preliminary figures.
Michael Evans
analystAlright. Regarding depreciation, the group’s depreciation came in above what I had anticipated and much higher than last year. If we take the new asset base and divide it by 72,000 ounces or something along those lines, we’d be close to the mark on depreciation for Dargues going forward. Is that correct?
Ian Poole
unknownYes. And we’d also factor in any additional development that may occur down the road, since we’re not quite at the point yet. There will be further mine development, so that has to be part of the cost base too. It’s not only what sat on their books as of today, but also what it would cost to reach those ore bodies — the future ore bodies. That also has to be added in. Then you divide it by the—
Michael Evans
analystDan, here's a question for you, and it may be a little out there, but regarding Hera, at the moment you've got the higher base metals there. Do you currently have spare capacity at Peak? Is there any scenario in which you'd place the Hera mill on care and maintenance and send ore from Hera over to the Peak mine, gaining economies of scale that way during the interim period or over the mine life that remains here? Is there any scenario where you'd do that? Or are there obstacles I can't think of apart from economic ones, perhaps?
Dan Clifford
unknownMichael, I believe that's the right call for us. What you're raising there, and the question itself, are really central things we're weighing at the moment — specifically within the feasibility decision about whether to use or get the most out of the milling capacity we already have, versus constructing or substantially upgrading the Hera plant, or alternatively building a brand-new one. That, I think, is the point I was making at the quarterly update in July, and it's the crux — in my view one of the most significant decisions or outcomes to come out of the feasibility. I think the best approach is for me to answer that question once we reach the release of the feasibility. There's no doubting-
Michael Evans
analystAll right.
Dan Clifford
unknownIt's clear that making the most of, or fully using, the capacity we already have plays a big role in how decisions get made.
Michael Evans
analystSure. That's fine. No problem at all—I'll hang tight until you have additional detail to share.
Dan Clifford
unknownWhich, of course, can mean — and, you know, the revenue models behind those decisions are — they can be quite complex. They are, even though both are polymetallic plants: one turns out a bulk concentrate, while the other turns out three separate concentrates. I understand that this is a fairly complex decision.
Michael Evans
analystRight, and I get it in simple terms — there are certain benefits to splitting the concentrates between the Peak plant and the Hera plant, though I realize that's just a single factor among plenty of others in this decision, so.
Dan Clifford
unknownCorrect.
Michael Evans
analystAll right, that's perfectly fine.
Dan Clifford
unknownAnother thing I think matters there — and I'll return to it when we get to feasibility — is that we have to factor in the permitting for moving ore between the mills, along with the levels and the timeframes we're permitted to do that at.
Michael Evans
analystAlright, just a moment. Excellent. Thank you, Dan. I'll relay that.
Operator
operatorIf you'd like to ask something, just hit star one on your phone again. Our next question is from Brad Newcombe at Brazil Farming. Go right ahead.
Brad Newcombe
unknownYeah. Hello, everyone. We're quite eager to see the production and cost guidance for the year. Just to note, that has been delayed. My assumption is that this is because you typically also disclose your sustaining CapEx and growth CapEx at the same time, and that's the primary reason it hasn't been possible to provide that at this point.
Dan Clifford
unknownThat's basically right, Brad, that's correct. Those two are connected, especially in the way I was just discussing with Michael. The results that come out of those choices tie together both of the assets in the Cobar Basin.
Brad Newcombe
unknownHonestly, we're just holding out for Federation to launch before you're able to—
Dan Clifford
unknownSure.
Brad Newcombe
unknownWrap that up, since it’s genuinely going to have an effect—particularly on growth CapEx.
Dan Clifford
unknownPrecisely. You've got it exactly.
Brad Newcombe
unknownThat covers everything.
Operator
operatorThat brings us to the end of the Q&A. I'll turn things back over to Mr. Clifford for some closing comments.
Dan Clifford
unknownYeah. Thanks, Ashley, and thanks to everybody. So just to close out, I think, as I said before, it was a year of two halves. I think the changes we need have either been made or are underway across contracted transitions, a mix of owner operated, FTE efficiencies, the real push into planning and asset management for reliability of the assets, and not only to fix the issues from the second half into this financial year, but also to make sure that whatever changes we're making now really complement the life extension projects that we've got coming. On those, for us, for those, they're very much about improvement in asset quality and performance. The progress, I think, across both of those extensions has been quite solid, or actually more than solid in FY 2022. As I said earlier, I think the other key advantage in this for the business is actually having the ground in front of us for a huge organic pivot towards zinc and copper, of which are very valuable not only to us, the business, but also into the market and the world with the changes going on. With that, I look forward to another call in September at some time.
Dan Clifford
unknownWe'll let the market know the date of that call, so we can address what we see as the results for the Federation feasibility and what comes out of the rest of the business on that. Thanks for your time, and we'll speak during September.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.