Red Hill Minerals Limited (RHI) Earnings Call Transcript & Summary
January 30, 2023
Earnings Call Speaker Segments
Operator
operatorAt this point, I'd like to pass the conference to Mr. Andrew Graham, our Interim Chief Executive Officer. Go ahead, please.
Andrew Graham
unknownThanks, Rachel, and thank you all for being on the call. Peter Trout and Martin Cummings are here with me today; they'll handle portions of the presentation and will also be around to take questions once we reach that stage. If you're not aware, we'll be speaking to the presentation that's on the ASX announcements platform as of today, and I'll point to slides along the way so you can follow. We'll begin at slide 3 for those who have the presentation open. My decision to start with guidance is partly because, when you opened our quarterly today, you might have thought the December quarterly resembles the September quarterly closely and that nothing has shifted. I can tell you that plenty has shifted, and plenty keeps shifting, and today's presentation will walk you through several of the things we're working on. First, on guidance, we remain on track to hit our guidance, and I'll go into that in some detail. Regarding production, the four graphs on the right provide a solid snapshot of why we have confidence that we're on track to achieve guidance, with every one of our major commodities sitting above the roughly halfway mark as we reach the midpoint of the year.
Andrew Graham
unknownYou do get some sharp moves from one quarter to the next, and quite a bit of variability between copper, lead and zinc. Much of that comes down to the flows going through Peak and the order in which material arrives there, since we process copper ore in batches, and lead and zinc ore in batches. With the new mine plan at Hera, lead-zinc output has been lower, and we'll come to that later in the pack. On All-in Sustaining, you'll notice that what we actually recorded for the quarter is above guidance. We remain very confident about hitting guidance for the year. As you'll recall, we revised guidance on 19 December, and that was announced. When we released it, we had taken the first five months of the year into account. Going through the pack, you'll see December delivered an extremely strong result, with All-in Sustaining at about AUD 1,675, so we're on track to meet our guidance for the year. That's not to say we'll hold at that level for the remainder of the year — a lot simply went right during December — but with the full knowledge in December of where we stood, we're still very confident of delivering the guidance we set.
Andrew Graham
unknownMoving to page 4. Those of you who were at the AGM will remember that Peter Botten and I discussed our near-term priorities with you there. I'm happy to say we can report positive progress on those priorities. The slide title now is The CEO's Priorities. It's important to point out that this isn't my work alone — it's great to see the team across the business stepping up and supporting the change process, and we'll talk through some of that as I go through this slide. I'll only give a summary here. Some of the detail behind these activities, and the work supporting them, will be covered in a bit more detail as we go through the presentation by both Martin and Peter. Starting with safety, TRIFR remained stable for the quarter. Honestly, stable is not good enough. In a period with a lot of change going on, we were very pleased to see that it didn't go backwards or materially backwards. As I said, it's not good enough, and there's quite a bit of focus in the business coming into our lead indicator program and doing the work to ensure these injuries don't occur rather than just counting them after the fact, including things like risk assessments and hazard identification.
Andrew Graham
unknownEspecially when it comes to tasks that aren't routine but rather unusual, and we encountered a handful of incidents on that front during the quarter. Another area of effort involves spotting things early in the mental health space, since we recognize this is a time of considerable change, and some of that change—as you heard discussed on the call regarding Hera—has a material effect on our people. We're being highly deliberate about making sure we stay ahead of the curve there. Turning to operational delivery and cash management. Peter will address a variety of further subjects on this. At this point, I'll concentrate on the Hera change we discussed in December. That change went live at the beginning of December, and I'm happy to report it truly is paying off. We saw very strong results in December. We mined roughly 36,000, slightly more than 36,000 tons from underground, which is essentially the rate we aim to feed into that plant. We fed approximately 37,000 tons during the month of December. That really helped bring down fixed costs and contributed to a very strong All-in Sustaining. For Hera in December, All-in Sustaining came in around the AUD 1,400 mark, which, you know, was a strong contributor to the overall December outcome for the business.
Andrew Graham
unknownThat credit truly belongs to Rob Walker, our site General Manager, along with Mick McCluskey, the Mining Manager on site — the two of them invested substantial effort in devising a plan that could be delivered, factored in risk, and then actually carried it through during December and continuing today. It wasn't the smoothest month, admittedly. In mining they never are, but they had a plan in place. A backup plan existed as well. Working through both let them reach what was a very, very strong result. Credit goes to Justin Woodward in our mine planning department, who genuinely drove a portion of that early mine planning effort. Our other area of focus has been Hera. The plan has been implemented. We are delivering on that plan. The focus now needs to move toward an efficient transition into care and maintenance. As you'll recall, that plan reduced the mine life, concentrating on higher value materials, and the benefits of that are visible now in cash flow. Considerable work remains to make sure the shift into care and maintenance goes smoothly. The people side of it is very active, and we began on that immediately, as we discussed during the December call.
Andrew Graham
unknownMaking sure folks have a degree of certainty regarding what lies ahead for them. The physical side of care and maintenance is where our attention sits right now, and genuinely working through the sequence, the timing, the work involved, and then, once it is in care and maintenance, what is required to preserve it in a reusable state for when we are prepared to switch it back on for Federation. The other major program that is underway and definitely achieving results is our Working Smarter Program, focused on continuous improvement and margin improvement. Real credit on that goes to Simon Young and our team, who have been really driving it and putting in a lot of time across the sites, pushing that program alongside the sites. It is genuinely great to see the entire team pulling together and being part of this change program. Changing tack to Federation. We will begin with the optimization work. There will be more detail on this later in the pack. You know, but we spoke about further optimization of the feasibility study. That effort is continuing. There is a very active mine planning component to it that we are carrying out at present as part of our life of mine planning process. We are also examining optimization of the capital to develop the project within scope and schedule, all the familiar elements that constitute project delivery, recognizing that most of what remains is either mine development or brownfield and smaller capital tied to the existing plants.
Andrew Graham
unknownThere's another workstream that's still in progress — some additional metallurgical testing. You'll remember the plans to bring early ore from Federation up to Peak. We're carrying out extra test work simply to verify that the recoveries and results we anticipate will indeed be achieved. Federation funding was discussed at considerable length previously. Naturally, everyone is waiting to see how that turns out. I'm happy to report that we remain on schedule to reach a solution for funding Federation in an efficient and effective way during this quarter. Martin will go into more detail on that later in the pack. Another really significant positive for us regarding Federation is regulatory approval, which is certainly sitting well ahead of where we had predicted it would be, and I'll say a little more on that later. Yes, we're genuinely aiming to have development consent secured within this quarter. Lastly, just a brief note on leadership renewal, which Peter spoke about in particular at the AGM. There have been a few changes and a couple of new faces in the business. As you can see, I'm addressing you today as interim CEO. Cummings is with us on the call as our new CFO. Rochelle's role has been widened, I suppose, into a general counsel and company secretarial position, taking over from Ian Poole, who was CFO and company secretary before that.
Andrew Graham
unknownWe’re also very happy to welcome another change: Matt Nuttall has come on board as General Manager of the Peak Mine. His start was last week, and he’s already settling in and getting up to speed very fast. Last, I won’t address it because that’s for Peter Botten to discuss, but the comprehensive hunt for a new CEO is continuing. Once that search wraps up, Peter will have something to announce. Moving to slide 5, as I said earlier, we’re especially pleased about the strong December result. We’re careful not to get ahead of ourselves, though. We know one swallow doesn’t make a summer. Still, we’re definitely glad to see how December turned out and to get some payoff for the hard work done throughout the business. Starting with production, look at the right-hand column. In December, Peak was mostly mining copper ore from Jubilee. That came with strong gold, which produced a solid gold result and a solid copper result, and a very strong All-in Sustaining cost, around AUD 700 an ounce. That was a great performance at Peak. Will it remain that way for the rest of the year?
Andrew Graham
unknownSo Peak, as you're aware, shifts across different ore bodies and different commodities. I'd say that was likely an outstanding month relative to what lies ahead, though we definitely expect Peak to be a solid contributor through the remainder of the year. Hera — the graph tells the story on its own. We discussed the mine plan adjustment, and that truly produced a step change in how December performed. I believe we're mining at roughly 2.3-2.4 grams gold. There isn't much lead sink credit attached to that, which is one drawback compared with where we've stood historically. The gold certainly speaks for itself and generates very strong cash. Dargues — we bring it up fairly often. It's a reliable, steady performer. It delivers the way it should, the way it's planned to, and December was certainly no exception. If I turn to the left-hand graphs and look at the top one, you can first see what that December performance produced: AUD 1,675 All-in Sustaining. Against the AUD 2,300 guidance, that is certainly a very pleasing result. It did somewhat average out, or average down, the first two months of the quarter, leaving us coming in very similar to how we came in the first quarter.
Andrew Graham
unknownNaturally, we're hoping to now settle at some level beneath that AUD 2,300 and thereby hit the All-in Sustaining guidance for the year. Moving to cash, in line with what we discussed regarding December, that month was a robust one for cash and halted the decline in our cash position that had persisted across several months. The other element that makes this even more encouraging is that you have to keep in mind our bank debt repayments, with one instalment falling due every quarter and one landing in December. Beyond bringing extra cash into our balance, we also had within that, paid close to AUD 10 million toward the term loan, plus cash backing for the closure facility. Another item that happened after December, even though it was submitted during December, was our tax refund of nearly AUD 10 million, which arrived in early January. That certainly gave our cash balances a boost. I'll now hand over to Peter Trout, our COO, who will continue from slide 7 to discuss our operational results.
Peter Trout
unknownThanks, Andrew. Across a number of initiatives, we made progress during the December quarter. A robust December production outcome has genuinely positioned us well, and that momentum has carried into the new calendar year. On page 7 of the ASX presentation, the slide covering our total recordable injury frequency rate shows a modest rise in that rate — and that reflects fewer hours being worked group-wide in the December quarter rather than any shift in the count of recordable injuries. As Andrew noted, we stayed highly compliant with our proactive lead indicators and moved our externally facilitated mental health program forward for our people. On environmental performance, the quarter passed with no reportable environmental events. That drove the improvement in the frequency rate you can see in the chart. It's a particularly strong outcome when you consider that the Cobar sites experienced several high-intensity rainfall events, and the runoff from those events was managed carefully so that no water discharge occurred from the Peak and Hera sites. Moving to slide 8, let's look at how Hera performed. There you'll see the effect of the modified mine plan brought in at Hera to accelerate the higher margin ore.
Peter Trout
unknownIncreased ore delivery and better gold grade combined to double gold output, reaching 4,500 ounces, which fed straight into revenue, cash flow, and All-in Sustaining Costs. What drove that solid ore delivery was having three stoping areas available, the Upper Hay Zone among them, which helped deliver a 39% rise in mined ore tonnage versus the previous quarter. Another notable point is that development mining declined during the quarter, consistent with the new mine plan, and it will wrap up this month, which will cut operating costs further at the Hera site. The process plant did especially well, with strong runtime and metallurgical recoveries, and feed grades showed the priority placed on gold-dominant ores over the lower grade base metal ores. Regarding the shift Andrew previously discussed toward the care and maintenance plan, our care and maintenance planning and activities are now well advanced. We are examining redeployment options for Hera employees, moving them into other vacant roles within the business. We have already begun taking out some assets from the underground mine that are no longer needed for its continued operation across the coming months.
Peter Trout
unknownOver at Peak Mine, things moved forward in line with the fresh operating strategy we announced during the first quarter. During the first half of this fiscal year, our mining and milling work has hit the 550,000 tons per annum rates we were aiming for under that new strategy. Another major shift was the ongoing phased move toward majority owner mining at Peak. We stood down most of the contract mining crew during the December quarter and have now filled the bulk of the new owner mining positions created by that change. Consequently, labor hours in the mining department dropped 47% across the 6 months from June to December, while mining expenditure declined roughly 25% over that same stretch. On slide 9, the chart shows that downward trend in contractor costs. The mobile fleet transition is essentially finished, with hired equipment demobilized and the first of two haul trucks owned by Aurelia now introduced, delivering immediate productivity gains. We're confident these efforts, along with others, give us a foundation to push further productivity and cost initiatives site-wide in the months ahead.
Peter Trout
unknownOn the metal production side, the sequencing of our ore campaigns meant mill feed contained a greater share of copper ore, which pushed copper output up while gold, lead, and zinc output came in lower. We also made certain adjustments to concentrate stocks after clearing the large concentrate inventory that had built up at the end of September. If we move to slide 10 and Dargues, the team delivered yet another steady quarterly result there, with gold production for the quarter coming in at just under 8,800 ounces. At the underground mine, solid development and ore production rates were maintained, and the gold grade kept reconciling well with the geological model. That really underscores the value of the infill diamond drilling program that has been running for roughly the last two years. Happily, we obtained regulatory approval for Modification 5 of the Dargues mine development consent, which came through on December 20. Among other things, this permits processing rates to rise to as much as 415,000 tons per year. Absent that approval, we would have reached the prior cap in December and would have had to suspend processing operations. That approval delivered an immediate benefit, since we were able to process an extra 2,000 tons of ore during the December month.
Peter Trout
unknownAs we look ahead, those increased ore processing rates are going to shift the production bottleneck over to the underground mine. In preparation for that shift, we kicked off a stope backfill optimization program. Its purpose is to lower our cement usage, which delivers a direct cost benefit, and to cut down the filling time for stopes, which lets us cycle stopes faster and maintain higher production rates. The underground infill and central diamond drilling program is now wrapping up, and the newest results will be incorporated into the geological model, and we'll apply them to mine planning work that will define the economic depth extent of the underground workings and possibly bring the Ruby Lode into the mine plan. Those results should be arriving over the next month or two. I'll now turn things over to Martin, who will walk through the financial results for the group.
Martin Cummings
unknownThanks, Peter. As you saw earlier, our cash was lower this quarter at AUD 23.7 million, but it did grow from November to December. It's important to reiterate here that the cash balances we report exclude a further AUD 41 million that we're holding as restricted cash to back our performance bonds. As Andrew mentioned earlier, this is after almost AUD 10 million of payments to the banks in December to either reduce our term loan or to further cash our bonds. You can see the chart on the bottom right here, just the rapid repayment over the last 12 months of our performance bond and debt facility, and our term loan is now down to AUD 12.7 million, and we only have a gap of AUD 16 million of performance bonds that we haven't cash backed. As Andrew also said, again, this cash performance really does exclude the AUD 9.8 million tax refund that we received in mid-January. I'll just work through some of the movements in cash for the quarter. Peak had a very strong quarter, as Peter mentioned, and AUD 19.8 million of mine cash flow. Concentrate sales were higher this quarter, and it did include sale of production from the September quarter.
Martin Cummings
unknownMine operating costs were, pleasingly, down as well. Dargues contributed solidly once more. Cash flow came in a touch below the previous quarter. The real reason is the timing of shipments out of Dargues around that Christmas and New Year's stretch, which we'll sell in this quarter. Hera was marginally negative, yet that's a material improvement versus the prior quarter, and it really stems from the steps we've taken at Hera to maximize remaining value, and it produced a much better cash flow in December of AUD 6 million. Growth capital was lower this quarter given the suspension of development at Federation. We expect it to stay relatively low through the next quarter before we anticipate restarting development in the June quarter. I've covered debt and cash backing. I'll move now to the biggest bar on this chart, which is working capital. Let me explain that unfavorable movement. There are really two main drivers behind it. The first was roughly AUD 13 million in higher trade payables paid during the quarter, and those were payables that had built up over the June and September period. With our spend a little lower in the December quarter, some of that working capital has unwound.
Martin Cummings
unknownThe next item concerns how we revalue shipments. Each month we do a valuation of both our shipments and our QP hedges, and the resulting revenue gets reported inside operations. The cash tied to those movements, though, doesn't settle until the quotation period wraps up, so during that stretch we push those overs and unders through working capital. On Federation, more in a moment — first a couple of remarks about the balance sheet and the funding. Our current bank syndicate has shown clear appetite for backing the company through this financing exercise, and over the quarter they gave us covenant waivers running through March so we'd have room to get the financing done. That package also brought an extension of the AUD 10 million working capital facility, also out to March. As you'd expect, the funding process is moving briskly, and as we flagged in the pack, several term sheets have come in by now. A performance bond facility will form part of the funding package, sized at roughly the same level as the one in place today — around AUD 65 million. The facility's other component will provide funding for Federation — that is, the Federation development — though keep in mind that the AUD 41 million currently held as cash backing will be an important piece of that funding requirement as we move ahead.
Martin Cummings
unknownWe keep assessing the financing alternatives on several fronts. We're still on schedule to wrap this up before this quarter ends. So with that, I'll turn things back over to Andrew.
Andrew Graham
unknownThanks, Martin. Now we'll move on to the upside opportunities and the chances to unlock additional value, which the entire business is heavily focused on. If you look at slide 13 first, I'll give a bit more detail on our Working Smarter Program that I brought up earlier. The Program is essentially a classic bottom-up business improvement, continuous improvement program. We're running it in-house. All of us have had a great deal of experience with those kinds of programs over many years, so we definitely have the skill set inside the business to run it without an extensive external consultant. And it's truly delivering benefits, as you can see on the chart on the right. In my mind, one of the strong elements of these kinds of programs is that it taps the knowledge, the experience, the ideas of the entire organization. We're certainly seeing that. We haven't put it on this chart, but the initiatives that are being implemented, there are 106 of those that make up the partial circle there on the left. Of the initiatives in the pipeline, there are another 222 on top of that. You can see there are a lot of ideas being generated across the business. The team has a very robust program of prioritizing those after an assessment, making sure we're putting our energy into those that will have the biggest bang for the business.
Andrew Graham
unknownTo give you a bit more detail on what we've put in place so far: it's a combination of deferring costs, one-time savings, and savings that continue. Roughly half of what you see in that partial circle on the left is cost deferral. In some ways, those are the simple, early, low-hanging items. I call them easy, but the truth is the business has them in the plan for a reason. Moving those things, pushing them out into the future, usually takes a good deal of effort and some thought and making do with what you've got. Then by and large the other half of the initiatives implemented right now consists of those one-time savings and also the ongoing recurring year-on-year kind of savings. You know, the program hasn't been going for very long to have reached this level already. We're very, very confident that our AUD 24 million target will be blown out of the water, particularly with those 222 initiatives and AUD 20 million worth of value in the pipeline. We're definitely looking ahead and the team is working very hard to bring some of those savings to bear in the near term. Turning to slide 14, a bit more information on Federation. I've touched on all of these items, and Martin has certainly touched on funding.
Andrew Graham
unknownFirst, I want to cover approvals, since the past month has brought a really, really encouraging step forward on the Federation approval. We were progressing nicely through that process. What we're seeking to permit at the mine, I'd say, carries every characteristic of something the world requires and of a solid corporate citizen. The development has low impact. Most of it sits on brownfield land. It involves critical minerals — copper, zinc, lead — the materials the world needs in order to move forward. So it comes as little surprise, honestly, that things have moved along fairly fast. The other element is the team. The team has genuinely done an excellent job of considering what the business's impact will be, reducing that impact, and making sure we've got something that, in certain respects, is simpler to approve. On top of all that, we've received tremendous backing from the New South Wales Government — and in particular the Department of Planning and Environment, which has worked diligently on its portion of the approval process. It's really the mix of our efforts, our projects and our work together with the effort and work of the New South Wales Government that has enabled this to come together so quickly.
Andrew Graham
unknownWe do expect to receive development consent during this quarter, and that is, as you know, ahead of the mid-year timeline we had previously been guiding people toward. For anyone not familiar with how this works, development consent is essentially the critical approval that lets a project proceed. That said, it isn't the end point. After that we'll obtain a mining license, an ML, and that can take roughly two months. Then there's the remaining piece — the various management plans that the Development Consent requires, which we'll be preparing in parallel throughout that process. Development consent really is the central milestone when it comes to moving the project forward, and we are certainly very happy with where we stand on that right now. I won't go into Federation funding any further. I think Martin addressed that very well earlier on the call. And on optimization as well, I've mentioned a few things we're working on — refining the mine plan, particularly with a view to getting early tons from the mine up the road to Peak Gold Mines for processing and turning those into revenue. I mentioned the met testing we've been doing. One thing to bear in mind is that, as the photo on the right suggests, this has all the look.
Andrew Graham
unknownIf you visit the site, you will see a mine. In the end, we have surface workshop facilities. We have change houses. We have equipment park areas, you know. We have, as you can see in the photo, a fully developed box cut and roughly 90 meters of underground development. The face of that, you know, now sits 80 meters above the ore body. Once we are ready to go again, getting underground and starting to develop a mine is a very, very quick process for us. Another thing — and this is sort of cross your fingers and hope the scheduling all works — we have Redpath at Hera. Redpath is also on the contract to develop Federation. With the changes scheduled at Hera, it is possible that crews coming out of Hera may be able to be redeployed to Federation if our funding timing allows. Turning to slide 15. For those who may have missed it, on 18th of January, we put out some very exciting geophysical results. All of the results were around what we call the Ny magee district, which is the area and the exploration ground that we hold around the Hera mine and the Federation mine. And we did four IP surveys as part of that program in the back end of last year, finalizing that at the start of this year.
Andrew Graham
unknownEach of the four came through with results that are, you know, genuinely thrilling. We hold a firm conviction that our land position in the Cobar Basin ranks as the best available, and it is unquestionably among Australia's most promising base metal packages. Being in a position to direct money toward this sort of early-stage work, to secure solid results from it, and to now concentrate our efforts on pursuing a number of these targets, amounts to a genuinely strong outcome for the exploration team. Following release of the announcement on the geophysical results, one question did come my way about why we chose to run IP first rather than undertaking things such as soils. The truth is we hold a very, very robust database covering soils, magnetics and other survey types, and we rely on it to guide this IP program. Soils have already been completed. When we stated that the following step involves finely spaced soils, that is precisely what is meant. We will carry out further soil sampling around these IP results prior to directing our drilling, so that we extract the most opportunity from the money we spend on drilling. Moving to slide 16. I'll open this section and then hand over to Martin to add a little more color. Anyone tracking our commodity mix, and our commodity prices relative to the commodities we hold, will recognize that we're in the right commodities at the moment.
Andrew Graham
unknownAs you're aware, gold has been climbing, copper is rising too, and zinc is moving higher as well — all of that is certainly quite robust. I believe a question came up on a prior call regarding our hedging, so we figured it would likely be helpful to provide a bit more detail on the matter, letting you see that we have substantial exposure to this appealing surge in commodity prices. Martin, perhaps I could hand things over to you for further specifics on that.
Martin Cummings
unknownYes, thank you, Andrew. The extra point I would add here is that, as Andrew said earlier, we are actively managing our cash while we finish the refinance. For the near term, we do have some hedging in place for shipments, and as noted there, we hold a very modest hedge book for gold. Beyond this refinance window, really, we are well positioned to give exposure to these price moves. The gold hedge book will be fully delivered by the end of October. Another point worth noting, which was contained in the Federation feasibility study release, is that over the next few years we are going to transition away from what is at the moment an equal mix of precious metal and base metal to a much more dominant exposure to these future-facing metals, with around 80% of our revenue coming from base metals. Once the balance sheet is in place and the funding for Federation is there, we are well positioned to take advantage of this favorable outcome. I might just finish there and hand back to Rachel to open the line for questions.
Operator
operatorThank you. To ask a question, hit star one on your phone and hold until your name is called. Should you want to withdraw that request, press star two instead. When using a speakerphone, lift the handset before posing your question. We’ll take a brief pause now so attendees can sign up to ask something. To repeat: if you’d like to pose a question, dial star one on your telephone and wait for us to announce your name. Our first question is from Adam Baker at Macquarie. You may proceed.
Adam Baker
analystMorning, guys. I was just wondering about the draft conditions for development consent at Federation. That's good news that everything is ticking along nicely. I was just wondering if you could add a bit more color regarding what those conditions are?
Andrew Graham
unknownYeah, Adam, I’ll just speak to that briefly. It’s Andrew here. Look, I won’t walk through all the conditions, as you’d appreciate. That document is a long one. Still, I think it’s fair to say nothing in it really caught us off guard. By and large, everything was consistent with the conditions we operate under for assets like Peak and for the Cobar approval we received earlier. As we went through it, we found nothing that would materially alter or affect how we had intended to run the business. You know, we had planned, designed, and submitted what was a world-class kind of operation, so it lines up well with what the New South Wales Government expects.
Adam Baker
analystYeah, absolutely, great. On Federation funding, given the strong start we've had this year with base metals prices and gold as well, have you been seeing much more inbound interest? Yeah, anything you could add there?
Andrew Graham
unknownI’ll hand that over to Martin, who has done a great job leading that funding process for us on the internal side.
Martin Cummings
unknownHi Adam. Look, I wouldn’t claim we’ve observed anything further. This opportunity is drawing considerable attention, and I think, you know, a valuation gap exists right now. I wouldn’t attribute any of that interest necessarily to a strong, you know, strong connection with commodity prices. Obviously, you know, demand for the metals we produce is getting better. I think there’s also a, you know, an investment opportunity here that is attracting interest. Andrew, anything you’d like to add to that?
Andrew Graham
unknownNo, I think that's covered well, Martin. There's certainly been a fair amount of interest in what we offer. And I don't think anything has really changed materially because of commodity prices, Martin said.
Adam Baker
analystYes, absolutely. Thanks for that. On guidance, the metals production figure seems quite achievable for this financial year. It's around a bit above 50% for most year metals, which is good. I just wanted to ask where we stand regarding costs. You probably expect an improved second half of the financial year for all-in sustaining costs. Are you still comfortable with that AUD 2,300 sustaining cost level? Clearly, higher base metals prices will assist in bringing that down. Is there anything on the operational side we should be considering to achieve lower costs at these operations? Thanks.
Peter Trout
unknownHi, Adam. Peter speaking. Yes, as you mentioned, on the metal production side, we're on track against guidance. As Andrew noted earlier, we do experience some variability at Peak, depending on how all the processing campaigns are timed. That results in fluctuations from quarter to quarter. Turning to costs. A few things are coming up where we're observing reduced expenditure across the business, and that will carry through into All-in Sustaining Cost. Take Hera, for instance — it's really a matter of mining for cash there. We're scaling back development and other activities, and that will lower the spend at Hera. We're already seeing that flow through. At Dargues, several initiatives are underway through the Working Smarter Program, which will take some costs out of the business. It's also worth noting that, you know, in the back end of this half, development rates at Dargues will come down. Based on the current mine plan, we're already at the next to last final level in the mine. With less development, obviously, we'll see fewer costs coming through there. There are initiatives around the backfilling campaigns, and competitive tendering for some of the consumables we use across all sites is delivering some benefits compared with what we currently pay outside of contract.
Peter Trout
unknownTurning to Peak, our biggest cost center: that slide in the deck showing contractor spend coming down is, I think, a pretty solid parallel to what we're seeing on the mining expenditure side at Peak. We're taking out some of the duplication we were carrying in the first quarter — that was really just to ensure we didn't hit a production hiccup as we shifted to owner mining — and also letting go of hired equipment so we can carry out work more productively with our own people. A good illustration of that is multi-skilling our operators, so on one day they might run one piece of equipment on a given task, and the following day they can move across and take on a different task for which they're just as well skilled and qualified. Then there's the Working Smarter Program. That covers a whole host of initiatives we haven't reached yet. We've gained traction on several of them, but plenty more remain in the pipeline that we need to work through. Right now, it's a question of prioritizing the ones delivering the biggest impact for the smallest upfront investment.
Adam Baker
analystGreat. I'll pass that along. Appreciate it, everyone.
Operator
operatorAnthony Wallace, a private investor, has the next question. You may proceed.
Anthony Wallace
analystHi there, fellas. I appreciate you taking the time for this call. My question has to do with the announcements made this month — well, last month's, actually — regarding the IP surveys in the vicinity of Nymagee. Given all the work being done around that area right now, I was curious to know what the situation is with Great Cobar?
Andrew Graham
unknownHi, Anthony. Appreciate you being on the call, and thank you for the question. Regarding Great Cobar, at the end of the day, it requires capital in order to be developed. When we consider where our near-term cash is best deployed and the margin — the extremely high margin we derive from Federation, plus the modest amount of capital required to bring it up and running now that much of the work has already been done — getting Federation operational is certainly our priority. Great Cobar is absolutely not forgotten. You know, going forward the world is going to be desperate for copper. We are sitting on a very, very large resource at Peak, Great Cobar included. Its time in the sun will come. What we're ultimately doing, and with our plan to run Federation through all of our existing mills, is getting to a point where the ore effectively has to compete for space in the mill. As I said, Federation, very, very high margin material, will compete well for that mill space. We have some additional high margin, high-grade material at Peak that we're working through as part of our mine plan right now. Once we reach a point where Great Cobar then has its day in the sun, ultimately it becomes somewhat of a lever for us as to when we choose to do that.
Andrew Graham
unknownWe anticipate that this will happen shortly after Federation is operational and has ramped up. Eventually, it will be filling the mill with original Peak inventory. After that, once a portion of that higher-grade Peak inventory has been depleted, Great Cobar will then be brought into the Peak mill.
Anthony Wallace
analystThat’s great. Yes. Andrew, thank you so much for that.
Operator
operatorOur following question is from Michael Evans of Acova Capital. You have the floor.
Michael Evans
analystMorning, Andrew team. I appreciate the quarterly update very much. A few questions from me. Perhaps I'll begin with the simpler ones. In the appendix at the back of your report, which contains plenty of useful details, you break out Peak Copper and Peak Lead Zinc separately. Have you done that before? Is the plan to keep doing so in future?
Peter Trout
unknownMichael, this is Peter Trout speaking, and I'll address your question. In response to what you asked, no, that's not something we've done previously; however, because of how things shifted from one quarter to the next, we felt that including this data in the quarterly report would offer somewhat greater transparency regarding the factors behind the metal production we report. We have shown it for the December quarter as well as for year to date. Our plan is to keep providing it going forward, particularly, I suppose, as our portfolio comes to hold more base metals once Federation is introduced later on.
Michael Evans
analystAppreciate that, Peter — that gives us plenty to work with. Now turning to Federation: at one stage, selling down the project was floated as one possible way to raise funding. Does that remain a live option, or are you leaning more toward the usual equity and debt routes?
Andrew Graham
unknownMartin, did you want to say something about that before I do? I'm glad to go after you.
Martin Cummings
unknownHello, Michael. Look, right now the priority is definitely more conventional funding. You know, I'm actively involved in Aurelia funding that project.
Andrew Graham
unknownI'd like to piggyback on that point. At the end of the day, Federation represents the top grade, the biggest margin, and the most valuable inventory within our business. We're able to bring it in essentially as a brownfield development, leveraging the plants we already have. That alone serves as a cornerstone for our business moving forward. We're quite eager to secure a conventional funding path for it, and then bring it on and unlock the value for shareholders.
Michael Evans
analystAlright, thank you, Andrew and Martin. While we're on the subject of Federation, regarding simply the capacity to place debt against the project, you have roughly — and please correct me if I'm mistaken — around 2.2 million tons of reserves and approximately 4 million tons within the mine plan. In what way does that affect the volume, the quantum, of debt that can be assigned to the project? Then, my second question, which stands separately: could you remind me how you're directing the higher-grade material to Peak and the lower-grade material to the Hera Mill? Put simply, how are those ores divided at the mine? Thanks, guys.
Andrew Graham
unknownI'll let Martin take the first one, and then I can say a bit about, you know, how we plan to mine that selectively.
Martin Cummings
unknownThe main thing I want to emphasize is that this isn't really a project finance facility we're after. What we're putting in place is a corporate facility. The refinancing we're currently working through will take into account cash flows from all the operations and the bonding requirements across all the operations, with the goal of refinancing the existing term loan and performance bond facilities. The key point there, probably, is that we aren't viewing this refinance in terms of how much debt Federation could carry on its own.
Michael Evans
analystThat is genuinely useful. Thank you.
Andrew Graham
unknownMichael, to address your other question about where the material goes, Peak mill fits Federation ore really well, since it’s able to produce a zinc concentrate along with a separate lead concentrate. It can recover the copper into the lead concentrate. We also have the gravity gold and the gold leach circuit, which lets it get the most gold recovery possible. We genuinely wanted to take advantage of those plant features. Given the full tailings leach — the all-of-ore leach — and what it does for gold, it makes sense that high gold material is directed to Peak. In the same way, high grade zinc and high grade lead material runs well through Peak and achieves maximum payability as individual products. The other one — a bit more nuanced than the two that are straight grade, I suppose — is the copper-lead ratio. If we’re getting a lot of copper-bearing material, it makes sense for that to go up to Peak and finish up in a lead concentrate rather than going through Hera, where it ends up in a bulk concentrate and doesn’t get paid. Now, the planning group have come up with a split based on stope grades.
Andrew Graham
unknownIt’s on something closer to a stope scale rather than a block scale or anything like that, and that, it seems, gives us a bit of confidence that a split along those lines could potentially be achieved at the levels we’ve modeled it at.
Michael Evans
analystAll right, Andrew. That's very clear, thank you. Just so I understand, since you're directing separate materials to Peak and to Hera, what impact does that have on how quickly you can develop? In other words, do you need to complete more development sooner in the mine's life, given that additional faces must be opened up so you have the flexibility to route the correct grades to the correct mill? Compared with a scenario where everything goes to a single mill, as in a more standard process, do you require additional development early on in the mine life?
Andrew Graham
unknownI think I'll take that one first. Peter might want to add a bit more detail. On development, one of the key elements for Federation is the ramp-up, and as you know, the ramp-up comes from having more faces open. Part of the exploration decline, per the original plan, involves pushing that down beneath the exploration decline permit. Then, once development consent was in hand, we could push laterally and begin mining stope material. It now looks like we'll have development consent much earlier in the development of the underground workings. In that life-of-mine planning work I mentioned, the team is very active right now, thinking about how we can effectively ramp up output sooner. Part of that means making sure you have enough faces. The other piece really concerns where we prioritize our development. Rather than pushing all the way down the decline, since we lacked the permit to begin mining, it lets us direct some of that development laterally and start bringing stope blocks online. It's more about achieving a ramp-up, a sooner ramp-up, rather than necessarily trying to do more development to chase, you know, a good mix of materials.
Andrew Graham
unknownAfter we get operational, there's sufficient capacity for us to handle that. The feasibility study has laid that out in some detail, which should give you some confidence. Now, this fluctuates, though it stays steady relative to the volume of feed that travels up the road. That formed part of the feasibility effort. Peter, I don't know whether you'd like to add anything else regarding the developments and the mine planning work currently underway at Federation.
Peter Trout
unknownI'd like to add one thing, Andrew: this breaks into two stages. The first is the ramp-up period for all output from Federation, and the second is steady state. Basically, the feasibility study — and you'd need to go back about 12 months for the shaping and the assumptions behind it — expected that the Hera and Peak mills would both be running at the same time. Obviously that has shifted, with the Hera mill moving to care and maintenance and all the ore initially heading up the road to Peak. The mine scheduling work Andrew mentioned will take that change into account. Once we're in steady state operations, it becomes a somewhat simpler exercise, in the sense that development will be in place. The stoping cycles and routines will be established. As the ore reaches the surface, we'll likely follow an approach similar to the one at Dargues, where every stope goes onto its own dedicated stockpile on the ROM pad. As Andrew said, we'll know the grades for those stopes, and then at crushing we can segregate the material into a truck that heads either to Peak or to Hera depending on that material's value.
Peter Trout
unknownWe have a process that's well established at our Dargues operation, and we envisage carrying it over to Federation.
Michael Evans
analystThat's great. Thanks, Andrew. Thanks, Peter. I'll leave it there. No further questions from me. Thanks.
Operator
operatorThank you. At this point we have no more questions. I will now return the floor to Mr. Graham for his closing remarks.
Andrew Graham
unknownThanks, Rachel. Honestly, there isn’t much more for me to add. I appreciate everyone joining this call and spending your valuable time with us. To recap briefly, the main points we want to leave you with: first, we’re still on track to meet the guidance we set in December. December certainly gave us confidence about that. It was a really strong month, with the various initiatives we’ve been pursuing beginning to show results—particularly the revision to Hera, the Hera mine plan, which clearly made a substantial difference in December compared with where we had been tracking. Both permitting and funding for Federation are progressing well. As I said, we now expect development consent considerably sooner than the mid-year target we had been working toward. In short, the entire team here is eager to move ahead with developing Federation—truly one of Australia’s best undeveloped base metals projects—and we look forward to bringing its product to market. Thank you once again for your time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.