Red Hill Minerals Limited (RHI) Earnings Call Transcript & Summary
April 20, 2023
Earnings Call Speaker Segments
Operator
operatorAt this point I'd like to pass the conference to Mr. Andrew Graham, our interim Chief Executive Officer. Go ahead, please.
Andrew Graham
unknownThanks, Melanie. And thank you, everyone, for being with us this morning as we discuss what is a strong set of results for the March quarter. Joining me on the call today are Martin Cummings, our CFO, and Peter Trout, our COO. So that you can follow along, the presentation we'll be referring to during this call has been released on the ASX website, and we'll be going through the slides as we proceed. Just to give a bit of context before I turn to the slide pack, overall, we consider this a very strong set of results for the quarter, and we're very pleased to be able to share those with you today. Touching on a few high points, given the strong result was spread right across the business. First, there's a genuine step change in operating performance, 26,000 ounces produced, all-in sustaining costs of AUD 1,884. That's certainly a material improvement on where we were in the December quarter. As we get to later on, it definitely gives us confidence in our guidance for the year. With that, obviously it flows from that strong cash flow, pleasingly across all of our assets. Operating cash flow from the asset in excess of AUD 30 billion, and it has allowed us to extend our cash balance to over AUD 39 billion at the 31st of March.
Andrew Graham
unknownThis leaves us in a far better spot than before. Last week, of course, we put out the generation update. We'll spend a little time on it today, since we know shareholders haven't yet had a chance to hear from us about it beyond the announcement, or to ask questions on it. And last, even with all the attention on cash and costs, we've kept putting money into exploration. We know how important that is, and over the quarter you've all seen some solid results emerge from our exploration programs — both in and near mine at Peak, and also some regional IP work we were doing around Hera. I'll now move to the slide pack and begin on slide four. The key point, I think, is that a strong set of results like that can't happen without contributions from everyone in our business. What has really pleased me is that every single person in our business is genuinely driving toward a common goal, working together to better the business and deliver some strong results. For the whole team, I'm pleased that we're able to put out such a strong set of quarterly results today.
Andrew Graham
unknownThat's a nice payoff for all that work. Safety is one of the more revealing things to report on. We're extremely pleased to say that across the first quarter we had zero recordable injuries. It's often said that strong safety results and strong operational results tend to go together. This is likely more proof of that. You know, I think it's fairly evident that when people understand what they should be doing, when they're focused on the task, have thought it through, and have planned it in advance, you end up with a good safety outcome. In the same way, you end up with a good production outcome. We've definitely seen that. The other pleasing aspect of it was that this didn't happen at a time of, you know, great stability in the business. If you consider what took place over the quarter, Hera did reach the end of its life. We began moving the plant to care and maintenance during that quarter. Likewise, Peak hasn't been without its changes. I mean, we fully demobilized PYBAR, for instance, from Peak by the close of that quarter as well, shifting very much to under-operated mining. To achieve no recordable injuries during a relatively unstable period for the business is a fantastic outcome.
Andrew Graham
unknownYou know, I have to give credit to the whole team for pulling that off. Just to mention the graph on the right side of that slide, recordable environmental incidents. There was one we should discuss. It was minor, in that a minor fire occurred at the batch plant at Peak, in a storage area. It came from a faulty light bulb, and smoke leaving the site being classified as a recordable environmental incident, but certainly there was no lasting consequence from that one. I want to move to the next slide then, slide five, for those following along, regarding the outlook for the business. It summarizes our results for the year to date, the half one plus the March quarter, against our guidance. I can say, as I mentioned earlier, that we are maintaining guidance, based on how the business has performed, to this point, three-quarters of the way through the financial year. Gold, we had a particularly strong quarter, and we are now tracking at 85% of our guidance for the year. That puts us in a very strong position to haul home that gold production. Similarly with the other commodities, they are all sitting at 75%, 77%, of our full-year guidance. Three-quarters of the way through the year, it is a good place to find ourselves and gives us every confidence that we can achieve guidance across the board.
Andrew Graham
unknownOn all-in sustaining costs, I’m aware that several of you previously raised questions—given that the first half stood at AUD 2,600—about whether the AUD 2,300 guidance could be met. With the March quarter coming in below AUD 1,900, that should again give everyone confidence that the guidance figure can definitely be achieved. Looking ahead, when I think about what lies in front of us, I wouldn’t want to take this quarter and simply extrapolate it directly through to the final quarter of the year. As everyone is aware, and as I said earlier, there are a few factors: Hera has transitioned to care and maintenance, so that production from Hera is lost. Peter will discuss that in somewhat more detail shortly, including the strong finish it had. Rest assured that this was taken into account in our guidance when we set it in December. There is nothing new or unexpected in that change. This quarter also includes two items that we are actually working through this month as part of the regular routine: the realignment of the mill at Peak will be completed. We will also be installing a man-riding cage in the shaft at Peak, which will cause some south mine downtime during that period.
Andrew Graham
unknownThat said, we’ll move personnel to the north mine during the time that work is being completed. What truly stands out as a major advantage for us there is how quickly we can subsequently transport workers to and from the Peak job, and that will deliver some genuine gains. In any case, I think it’s... I’ll stop there regarding those broader points, and you’re likely quite keen on the specifics of what happened at each site. With that in mind, I may pass things over to Peter, who can then walk us through the site slides from that deck.
Peter Trout
unknownThanks, Andrew. To follow up on what Andrew said, it's genuinely a pleasure to report a solid set of results for the March quarter, especially with the changes taking place at our Peak and Hera sites and with delivering those changes and those strong metal production results without a serious injury anywhere across our operations. I'll touch on the site discussions individually, beginning with slide six, the Peak mine. For Peak, I'd say the quarter's highlight was the higher grades we were mining from the underground operations there, which clearly carried through into the improved metal production. Ore was mined from 5 different areas across the north and the south mine, and in a couple of those areas we saw scoping fronts move into higher grade zones as we worked through the scoping sequence. The more pronounced grades we saw were probably in the Chronos deposit, particularly for lead zinc, and Perseverance Deep for gold. In fact, the gold grade got a boost from a positive reconciliation against the geological model over the campaigns we ran during the quarter. On mined ore production, we had been looking to achieve higher output for the quarter, but some poor drill and blast results in two of our stopes early in the quarter held us back, along with labor availability in some of our contracted services.
Peter Trout
unknownMost of those problems are behind us at this point, and with our owner mining crews now fully staffed, we're looking ahead to moving past them. During the quarter, as Andrew noted, the underground mining services contract with PYBAR wrapped up by mutual agreement at the end of March. With that shift, Redpath stepped in from the start of April to take over long haul drilling and cable bolting services. That effectively let us pull forward the last phase of the owner mining transition at low cost. Ownership of the core mining fleet at Peak now sits with us, and we're leveraging it to begin generating productivity gains across the site. At the process plant, throughput was curtailed at times by reduced mined ore tonnages — notably early in the quarter — and by stretches of very high lead zinc grades that lowered throughput rates and also hurt zinc recovery to concentrate. During some periods we were mining combined lead zinc grades higher than 30%, while the sole alternative source for blending ran at 12% combined, which forced us to throttle back plant performance. Where we can, we blend the lead zinc ores so feed grade stays consistent through the float circuit.
Peter Trout
unknownOnce we can achieve that, we genuinely observe improved recovery along with better concentrate grades. In March, we actually conducted a trial designed to replicate the grind size as well as the flotation reagent conditions used for federation ore, and over a period spanning a full week—during which we were able to supply steady-state feed to the float circuit—we saw some favorable results. Another encouraging trend coming from Peak, I believe, is a sustained decrease in mining costs, something we reported on in the December quarter. We have additionally pinpointed some further gains in cost and productivity. Those are being pursued across the rest of this calendar year as we look to sustain and enhance our cash margin. Moving now to slide seven, I would truly like to praise our Hera team for what was an outstanding result for the quarter. In fact, they exceeded the modified production plan we announced in December. The chart on slide seven of the presentation deck illustrates the 43% improvement in gold production and also the drop in all-in sustaining costs to roughly $1,700 per ounce. That was quite a shift compared with the December quarter. Our management team at site, our employees throughout the business, and our site contractors truly performed excellently in handling some challenging conditions.
Peter Trout
unknownWe intended to operate at full tilt until the very end and then halt abruptly and cleanly, and the site team achieved precisely that. We were fortunate to have lateral development completed during the first portion of this fiscal year, allowing us to stope from 3 separate mining areas. This enabled us to maintain strong ore supply to the surface while the process plant operated without restriction at maximum throughput. That factor was the primary reason for increased precious and base metal output. Now for some rather sad news. Processing activities concluded on March 27, and the site has swiftly moved into preparations for care and maintenance. We retrieved all valuable equipment from the underground mine and in fact shut down the primary fan and sealed the portal. Redpath, our mining contractor, has demobilized from the site and has left behind the essential mining equipment we need to resume development of the Federation decline. Our surface contractors are in the process of demobilizing, and we remain well on track to put the process plant into hibernation by the close of April. Given the shift to care and maintenance at Hera and its implications, I believe it is worth reflecting on what Hera has contributed to our company and to the local community.
Peter Trout
unknownThe project got commissioned back in 2014 as Australia's first operating asset, and it was anticipated to recover roughly 1.9 million tons across an operating life of five and a half years. Since commissioning, though, the mine has turned out 3.2 million tons of ore across nine years, and that supported 180 full-time jobs while contributing around AUD 216 million to the local economy — an outstanding outcome. We now look forward to the next chapter of mining in the district as the Federation project gets developed, and it's worth noting that a 4 million ton Production Target already sits in front of the Federation project. Turning to slide eight, just to speak about how our Dargues Mine performed. You'll notice quarterly production there rose to approximately 9,600 ounces, and that carried through into a healthy contribution in terms of group cash flow. The operation hit a couple of milestones during the quarter. It processed its millionth ton of ore and also went past 100,000 tons of gold production since operations began in 2019. We managed to process at higher rates during the quarter, thanks to the development consent modification received in December. Mill feed tonnage went up by 9%, and that drove the higher gold production.
Peter Trout
unknownOre production at our mine fell slightly, partly because the December quarter had been so strong. Over the quarter, the site team had to contend with a number of slope production and backfill interruptions, and they've now gotten us back on track. Opening ROM stocks had built up to a high level, which meant mill processing volumes were unaffected, though we did experience some downtime events stemming from unplanned power outages. Underground, development advance once more came in above what we had expected, and the decline has now reached the lowest mining level. That solid progress lets us cut back on development over the coming months, and we have already moved one of the two development jumbos from Dargues over to Peak to help out there. One last point on Dargues: we finished the underground infill and extensional diamond drilling program early in the quarter, and those results are right now being folded into the update of the site's life of mine plan. At this early stage, it points to a marginal extension of mine life beyond what was indicated in the Production Target published last October. With that, I might pass things to Martin to discuss our financial results.
Martin Cummings
unknownThanks, Peter. If you look at slide nine of the presentation, as Andrew and Peter have described, the better operating results this quarter led to a much stronger financial position as of the end of March. We ended the period with $39.3 million in unrestricted cash, compared with $23.7 million at the close of December. That represents a rise of more than $15 million. Happily, this really is an actual cash increase, with our metal sales and supply payments all completed consistent with our standard processes. Every one of our assets was cash positive and together produced $30.2 million of cash flow from operations, roughly $10 million above the previous quarter. As Peter described at Peak, we gained from both solid production and metal sales along with reduced costs, which produced cash flow of $14.4 million. I should note this is below the December quarter. That earlier period contained concentrate sales tied to September. During March the team managed to finalize the mining contract with PYBAR, which now underpins our continuing cost reduction efforts as an owner miner. It did produce a favorable year to date reduction in mining costs of approximately AUD 2 million. Dargues' cash flow of AUD 9.2 million was very strong this quarter relative to the AUD 1.6 million generated in the prior quarter.
Martin Cummings
unknownThis quarter, we sold roughly 1,700 additional ounces thanks to concentrate sales in December. Even so, it remained a highly steady quarter. Dargues' is now plainly gaining from the recent gold price strength. That is a factor we will take into account when considering the strategy for this asset over its remaining life. As Peter noted, Hera wrapped up operations on a very strong note, and the shift to care and maintenance was carried out exceptionally well, which produced metal output and cash flow above what we had planned. We still have some concentrate and doré left to sell in this quarter, and that will assist in offsetting costs tied to the move to care and maintenance as well as payment of outstanding supply invoices in April. Our capital exploration spending has been kept at minimal levels while we finish the refinance, and development spending on Federation will step up following that announcement. As I have reported on recent calls, in January we received a tax refund of AUD 9.8 million connected to our FY22 tax return. Since we are likely to record another tax loss in the FY23 tax year, the loss carry back provisions create an opportunity for a further tax refund once we file the FY23 tax return later this calendar year.
Martin Cummings
unknownTax refunds may come in above the amount we got for FY22. Turning now to our debt facilities. We completed our standard quarterly repayment of AUD 4.05 million on the term loan, and in March we also got back another AUD 5.1 million in performance bonds. The balance on our term loan has dropped to just AUD 8.6 million now, while our restricted cash backing the performance bonds has risen to AUD 46 million. The drawn balance on the performance bond facility remains the same at AUD 56.8. Since we'll be shutting these facilities down soon, once the new facilities are in place, we made some changes in March that our strong liquidity position made possible. We decided not to extend the undrawn AUD 10 million working capital facility, which matured in March, since it was unlikely to be needed in the near term. We also canceled the remaining headroom of AUD 8.2 million on the performance bond facility, because we have no near-term requirement for additional performance bonds to be lodged. Both of these adjustments mean we avoid paying unnecessary commitment fees to keep those facilities in place. The last movement in the cash waterfall on this slide has to do with working capital, which was an unfavorable movement of AUD 8.7 million.
Martin Cummings
unknownThe main reason for this comes from a lower balance in trade creditors. This quarter, our operations spent roughly AUD 17 million less than in the previous quarter, and that left trade creditors eight and a half million dollars lower at the end of March. We do expect that to decline further in April, as we complete supplier payments tied to Hera. As I said earlier, we also have some sales still to finalize, and from a cash standpoint those will help offset part of that. I discussed the higher gold price earlier with DAR, but to reiterate, Aurelia is currently benefiting from those higher gold prices, with only a modest hedge book of just over 4,000 ounces hedged and deliveries extending out to September 2023. Those contracts carry an average price of AUD 2,640 an ounce, which is not materially below the current spot price. We do hold some quotation period hedges for recent concentrate shipments, but all of these are very short-dated, with contracts running out to June. As we enter a capital-intensive phase with the development of Federation, hedging is a tool we will use to manage the balance sheet, but it will be done in a measured manner that takes into account all of our metal exposures.
Martin Cummings
unknownAnd lastly, regarding the refinance, I want to reassure everyone that this remains our number one priority. Issuing the updated Federation feasibility study earlier this month mattered a great deal as an input for the financiers' due diligence, which is why we had to bring that release forward before they could finalize a facility. Right now we are in the process of documenting terms, and as soon as an announcement goes out, we'll begin remobilizing Redpath to Federation so development work can resume. I'm certainly looking forward to bringing you up to date on the new financing arrangements when the time comes. Thank you for spending time with us this morning. With that, I'll turn the call back over to Andrew.
Andrew Graham
unknownThanks, Martin. And thanks as well, Peter, for those explanations — very detailed and very clear. I'll pause for a moment on slide 10. Anyone following along will see a lovely photo of one of our sites taken early in the morning. It's just an illustration of some of what we're doing on cost improvement, and how that effort is built into everything we do. We did acknowledge that we needed some refreshed pictures of our sites. We could have brought in an expensive professional photographer to handle it. Since they'd be on site only briefly, they likely wouldn't have caught the essence of our sites. So instead, Bright Star in the organization chose to hold a competition in which employees could take photos and submit them. Eventually there will be a winner, and a calendar featuring those photos will come out. That's one of the pictures shown on slide 10. It's all part of our Working Smarter program, which makes for a good transition to slide 11, where we touch briefly on what we're doing on organizational renewal. I've spoken about this a fair amount before. I think there are nine ticks on this page.
Andrew Graham
unknownYou know, this is just a small portion of a very large number of things we're doing across the business. I've decided to highlight a few of those this morning. Going through site by site, Hera and Federation, it's come up a few times, that strong finish to the Hera operation in its life. You know, credit goes to Rob and Nick down there on site for really driving that outcome, and the entire team. The conditions to the end required management, and the team there certainly managed them extremely well. You know, everything we had hoped to do in December when we talked about the new mine plan, we have been able to do. As mentioned earlier, care and maintenance is expected to wrap up tomorrow. The other elements in there, obviously, Federation development consent we've talked about in the past. It's a very important step for us. It really unlocked the ability to bring forward tons at Federation into production, therefore bring forward revenue. Peter will talk a little bit about that in a moment when we talk about Federation optimization. That's the third tick I've got there against Hera Fed. We obviously put out the Federation update last week and included a very large number of initiatives to really bring down cost and more than offset the inflationary impacts we're seeing.
Andrew Graham
unknownWe'll touch on that a bit too, but it's a really significant milestone for us. Moving ahead with Hera and Federation, wrapping up the care and maintenance work at Hera, and as I said, that's progressing well, so it'll be finished quickly, as expected. Then, as Martin noted, once the funding is in place, we'll start remobilizing to the Federation site. I still expect that to happen during the quarter we're in now. At Peak, there's a great deal happening. Peter talked about the switch to owner mining. We want to thank PYBAR for what they contributed at Peak. My view is that if you've decided to be an owner miner, then you should be an owner miner. This transition had to be brought to a close. It was good that we could accomplish that in a way that worked for both sides and now lets us really concentrate on getting the most out of Peak with our own people running our own equipment. It's good to see that transition now completed, and it gives our new general manager there the tools and the capacity to move forward and take Peak where we know it can go. One of Peak's strengths is that it has contributed very strongly to our Working Smarter program.
Andrew Graham
unknownEven as recently as yesterday, we give out a monthly award for generating ideas and for how good those ideas are, and I believe the most recent two recipients were from Peak. It is genuinely encouraging to see ideas continuing to come in for enhancing our assets overall and our company overall. Our Working Smarter program has delivered some excellent momentum. That said, at Peak we acknowledge there is room for improvement. A major priority for us beginning this quarter is a continuous improvement initiative, though taking it a step further. What options exist at Peak, you know, to bring its total unit cost down and to boost its productivities? We observe, and the team on site has already pinpointed quite a few actions we could take that will feed into a larger effort I have previously discussed concerning optimizing Cobar for us, rather than treating our Cobar asset as a set of separate operations. What can we do to maximize the total value we can capture from our Cobar business? Regarding Dargues, you know, mention was made of the processing limit increase we secured through December, which has definitely delivered benefits for us and keeps doing so with greater throughput than we would otherwise have managed.
Andrew Graham
unknownIt has, on its own, been a big contributor to Working Smarter, which is great. Dargues is already operating well. Its costs are competitive. There are always better ways of doing things, and it's genuinely wonderful to watch that team take that on board. The second item Peter brought up — that extra expansion through infill drilling — is now finalized. The asset is recovering. We're currently considering how that carries through into the life of mine plan, which is very much underway right now. I noted we wanted to spend a little time on the Federation update. I realize we released it last week. We didn't hold a call on it, given this quarterly call wasn't too far away. Just at a very high level, before I hand over to Peter, I had said — going right back to the AGM — the feasibility study, in my view, is never a completed piece of work that you never revisit. We always acknowledged there were things we could do to further enhance that study and further enhance the project. The aim of this piece of work was to try to capture some of that. Obviously, we see the inflation environment we're in every day.
Andrew Graham
unknownWe have definitely watched other projects across the industry watch their capital costs spiral away from them because of that higher inflationary environment. We are not immune to that. We insulated ourselves somewhat by not building a new plant, and we are only building a mine. You know, we have got lower capital spend and less exposure to things like equipment and those sorts of things. We are not immune to it. One of the hopes through this update was that we were able to combat that inflation. You will see, you know, as you can on slide 12, at the table on the bottom, certainly, you know, capital to first scope ore. We have certainly combated that inflation in that space through a whole bunch of means. That was, for me, you kind of can look at the release and look at the total capital, AUD 143 versus AUD 145, and think, "Oh, not much has changed." The reality is, there are a lot of things we have done, and assuming the overall project to really fight that inflation come in at a competitive cost and also improve the operability and the timing of cash flow from that asset. Very, very pleased with the outcome of that update.
Andrew Graham
unknownA benefit we gained was that Hera went into care and maintenance at the time it did. We had already baked in some advantage from Federation sitting 10 kilometers from the fully operational Hera mine, you know. But with it now in care and maintenance, we've really been able to make the most of what Hera had, especially certain underground equipment. I'll have Peter go into more detail on all of that. Over to you, Peter.
Peter Trout
unknownAlright, Andrew, thanks. So regarding what we've been doing at Federation, we've essentially focused on three key areas. The first one is the mine design and mine plan. The second involves looking at refinements to the scope. As Andrew mentioned, given some of the shifts occurring in the business and simply having time and perspective on things, we've managed to create some positive impacts there. And lastly, combined with that, is a revised cost estimate. The positive aspect of that is we've kept some fairly compelling project economics for Federation, and that holds true even with a decrease in the zinc price, when we consider the like-for-like spot price, NPVs relative to the October feasibility study announcements. Moving to slide 12, I figured it would be useful to elaborate on a few of those points. First, with the mine design. We've reviewed it and simply made some adjustments to the layout. Mainly, there's a reduction in the access decline gradient, making it a somewhat shallower gradient. That gives us two benefits. The first is that we're able to shift to a figure-eight layout in plan view instead of the spiral that was in the feasibility study.
Peter Trout
unknownThat configuration really does lengthen how far we can reach into the decline, and it gives us a stronger base for doing infill drilling down the strike extent of the deposit. Naturally, the gentler gradient may introduce a few extra meters into the early development needs, but it does favor greater truck productivity. In addition, because the exploration decline timing shifted and we recently received the project's development consent, we've been able to pull stope ore production forward relative to what we had planned in the feasibility study. Under the feasibility study, the assumption was that the exploration licence would remain valid and that the mining lease and its associated development consent would not yet have been granted when we reached ore. We now observe those circumstances shifting, and that is what has let us advance some stope ore. We give that ore priority for feeding our Peak process plant, with the goal of using that capacity fully before we restart the Hera process plant. Beyond the unit cost gains that will come at Peak, it also lets us achieve higher payabilities for the metal that goes out in the lead and the zinc concentrates. That is in contrast with a combined lead and zinc concentrate of the kind Hera could produce.
Peter Trout
unknownThat differs from the feasibility study, since that study assumed Hera would keep operating through 2024. We've also had the opportunity to sharpen the scope items and the layout of the site, and those refinements give us added confidence in the capital cost estimate, and they've also let us cut or push out part of the CapEx. One illustration is the regrind mill that's planned for Peak, for which we had previously used a higher-level estimate. We've since completed more detailed engineering, which increases our confidence in the pricing underlying that installation. We're also planning to relocate the tailings filter and storage shed from the Hera site over to Peak. That provides a lower-risk route to delivering the tailings volume required for paste fill at Federation. In other areas, we've in fact tightened the site footprint, drawing on some of what we learned while initially developing the site plus a fresh perspective. Take the services corridor linking the two sites. We can reduce the vegetation disturbance in that area. Besides lowering land clearing costs, this has also let us eliminate certain biodiversity payments that would otherwise have been required for disturbing that vegetation.
Peter Trout
unknownFinally, as Andrew said, switching Hera over to care and maintenance has meant that certain assets and infrastructure we already own can be reused rather than bought new — which is what the feasibility study had assumed, since it took as given that both sites would be producing at the same time. Items such as refuge chambers, pump stations, secondary fans and jumbo boxes did not need to be acquired new; instead, we were able to refurbish them from Hera. We had also budgeted for a temporary construction camp to house the extra personnel. That is no longer needed, and that gives a direct saving of roughly AUD 2.7 million on CapEx. Overall, we are really, really happy with how the feasibility study update turned out, and we are now getting ready for project execution activities and aiming to restart site activities around the end of the June quarter. Andrew, I might hand things back to you.
Andrew Graham
unknownAppreciate the added context, Peter. So to close out on the final slide—number 13, the one we went through today—which deals with exploration. You'll remember that when we were assessing our position as a company and considering what had to be done on the cash management front, we cut back fairly aggressively on certain exploration holes, surface ones in particular. Even so, we kept those items in our plans and are now carrying them out. Underground drilling at Peak will keep going. A key reason is that we understand the worth of what we discover near the mine at Peak, and when it sits close to development and represents a step-out extension, those tons can show up in a mine plan quite fast, feed into a mill, and convert into revenue. That's a vital element for us as a company to keep pursuing. We've enjoyed some strong results this year, as we reported in our release toward the end of March. Three items to mention, then. Moving away from the workings, I'd say—and on the Chesney East gold lands, you really can't get much nearer to the workings.
Andrew Graham
unknownJust 10 meters away from the existing underground development. To give you an example here, 9 M at 21 grams gold. There’s plenty of other strong drilling results in the release that came out in March, from that. Obviously, because it sits so close to existing workings, the ability to convert that into something within a mine plan is quite readily available. The team at Peak is currently considering how and when that might be incorporated into the plan. Really excellent, and I’m confident that as drilling continues, we’ll uncover more of these kinds of things at Peak. Moving a bit farther out — not far at all, 100 meters from existing underground workings — at Burrabungie. You know, 16 meters and almost 2% copper. That’s just one example from the drilling there. Definitely an interesting piece. It’s not very far from surface. There is somewhat of a gap between Chesney and Burrabungie that is now planned for us to drill from underground out of Chesney in the latter part of this financial year or early in the next, to test whether mineralization is continuous between Chesney and Burrabungie. It’s very exciting. Good to see strong copper grades there, and something we’ll keep following up.
Andrew Graham
unknownOne quick item to mention, as we did in the March release, is Queen Bee. Looking at it now, it's 10 Ks from Peak, so it remains well within a very, very easy trucking distance. Some outstanding copper — 4.2% copper in the section highlighted at the back. So good grades, definitely economic grades. How that all comes together will require more work. It's one of many, many exciting targets. The slide shows a few of them. We have well over 100 targets that we want to pursue. It's probably worth discussing that. That's an annual process we run to prioritize our exploration activity. It's an active piece we're working on effectively right now. One of the issues we have is that we have so many opportunities and priority targets — what order do you do them in, and how much do you spend on them? It's a good challenge and a good problem to have. It's something we're working through at the moment. Just to wrap up, early in the quarter, we did put out IP results. This time we're down closer to Hera. Federation. Interestingly, we did four IP surveys. All of them came back with results that warrant some form of follow-up.
Andrew Graham
unknownOnce more, dig into those opportunities—the priority ones within the mix—and we have to consider scheduling and budgeting. In any case, look, I realize we've gone through quite a bit today, and that's likely since a lot has been happening. Now, though, we'll stop and take questions to find out whether anyone requires more clarification.
Operator
operatorThanks. Should you want to pose a question, hit star one on your phone and hold until your name is called. To withdraw that request, press star two. When using a speakerphone, kindly lift the handset before asking. Our first question is from Adam Baker of Macquarie. Go ahead, please.
Adam Baker
analystHi Andrew, and hello to the whole team. Solid quarter. I just had a question about the South Mine shaft refurbishment — roughly how long do you expect that work to take? And I'm also wondering whether you can offset the ore tonnage lost at that mine by pulling ore from the North Mine over that same stretch. On top of that, regarding the SAG mill reline, could you tell me approximately how long that's expected to run? Thanks.
Peter Trout
unknownHi Adam, Peter here. I'll take both of your questions. You've figured out our approach for handling the shaft outage at the South Mine. The changeover period runs about five to 6 days. This is actually the first time in that shaft's history that we're replacing the man-riding cage. There's some corrosion in there. While that work happens, we'll move our workforce from the South Mine over to the North Mine and concentrate on copper ore from the North Mine. Right now we have decent stocks of lead-zinc ore sitting ahead of the mill, and we'll finish those off over the next week or so. Additional lead-zinc will be brought to surface to feed the mill, and the mill really shouldn't see a material impact from that outage. You also brought up the SAG mill reline. We had to push that from March into April. Labor availability was the main reason. That work has now been completed. Rather than our usual three-day reline program, we could only run day shifts because of the labor we had available. It ended up taking us closer to six days. The mill restarted late last week and has been operating through to today. It then goes into a pause for the operator change. Those are separate events, and we've planned for them so that disruption to mill feed is minimized across the quarter.
Adam Baker
analystOkay, yeah — those outages were fairly brief. Nothing that really moves the needle on guidance, and you've kept FY23 guidance unchanged. That's clearly reflected in there. And maybe just turning to Darce. Now that the decline has been completed, what number of ore tons remain to be extracted under the mine plan there?
Peter Trout
unknownHonestly, Adam, the most useful thing I can point you to right now is the Production Target we put out last year and where we currently sit against it. As we noted in the announcement, we do anticipate a modest amount of upside from the newest program. We'll be able to share more on that around the time we publish the updated Mineral Resource Statement or reserve statement and Production Target early in the September quarter.
Adam Baker
analystThat's helpful. I'll pass it along. Appreciate it, everyone.
Operator
operatorThanks. And again, if you’d like to ask a quick question, just press star one on your phone and wait for your name to be announced. Our next question is from Michael Evans at Acova Capital. Please go ahead.
Michael Evans
analystMorning, Andy, Peter, and Martin. Many thanks for today’s update. I’d like to ask about the grades at Peak. Clearly, with the mine sequencing—something we aren’t privy to—when modeling it, everything was sort of based on the reserve grades. At Peak, grade was a major factor in output across both the copper and gold and the lead zinc, it appears. You also said Perseverance is achieving some strong grades with some favorable reconciliation. I’m just wondering whether you could provide some guidance on what you expect for those grades in the near term. How large is that favorable reconciliation at Perseverance? Is it, I don’t know, 5%, 20%? Will that have an impact on the June quarter and the September quarter as we head into FY24? Should we, you know, for the next few years going forward, should we still be using the reserve grades for modeling purposes, I suppose? If not, why not? Just a bit more detailed color around that would be great. Thanks.
Peter Trout
unknownAbsolutely, Michael. On the question of what ought to be used for modeling — what we rely on is our resource model reserve grade for planning purposes, and we refresh that as grade control information arrives. When it comes to longer-term planning, we essentially use resource and reserve. That is a sensible approach to take as well. As you likely know, grades at Peak vary to a high degree. At least where gold is concerned, they are rather patchy and nuggety, and that genuinely makes estimation hard. Although reconciliation came in as much as 40% above the grade control model, I would flag that this is not something that continues indefinitely. We have likewise had negative movements, or reconciliations, versus the grade control model. I would not treat that as a persistent positive uplift to factor into the resource and reserve models. Perseverance Deeps did beat expectations on gold, yet together with Kairos it is the harder one to estimate. We also saw a nice uplift in gold grades from Jubilee, which was somewhat unexpected, especially given historical performance. I may come across as a bit of a whinger, but with the Chronos areas we are currently mining, and some of Claros, we are mining exceptionally high grades.
Peter Trout
unknownEven though we make every effort to line those items up so that the high-grade and low-grade material arrive at the same time, there are occasions when that simply isn't possible. You know, those grades have come together fairly well. The infection figure is low on the money leads. On that basis, I believe it makes sense to use the reserve and exhaust grades from here on.
Michael Evans
analystOkay. Just to refresh my memory on Percy Deep — what sort of timeframe do you figure you'll be extracting there? And what portion of the mine plan does that represent?
Peter Trout
unknownAt this point, we've largely extracted the Perseverance deep ore. With the elevated gold price we're currently seeing, we're revisiting remnant zones for another look. Beneath that, we do intend to carry out some extensional drilling. As for meaningful stope tonnage coming from Perseverance deeps, that is set to decline.
Michael Evans
analystAlright. Alright, good. One last thing since I still have you. I'm sure your quarterly report is right there with you. If I flip to the peak figures near the back, in the appendix, the detailed quarterly physicals. The peak copper, the mine grade for gold — I'm looking at page 13. Do you have that in front of you, Peter? It's 1.44, and the process gold grade is 3.75. Is that correct? What's behind that? Does that mean the following quarter will be significantly lower?
Peter Trout
unknownWell, that’s, uh—
Michael Evans
analystIs that visible to everyone? Can everybody see it?
Peter Trout
unknownYes. Let me step back and explain that our reconciliation doesn't happen monthly or by period. We do it by campaign. Once a campaign wraps up, we reconcile back. What you're seeing in those mine grades is a mix of reconciled grades and model grades for the period — that's the reason they differ from the mill feed grades, which are where the reconciled numbers come from.
Michael Evans
analystThat gold grade is quite a striking difference, isn't it, between what gets mined and what gets processed?
Peter Trout
unknownAbsolutely, happy to do that.
Michael Evans
analystAnd how does that compare with the other grades?
Peter Trout
unknownSo, what we have is—
Michael Evans
analystAll right, sounds good.
Peter Trout
unknownThose elements I mentioned come into play, and their origin matters too. As I noted, we classify the ore from Percy Deep as copper. Its performance has beaten the grade control model by a wide margin.
Michael Evans
analystAll right, sounds good. Peter, I’ll give that some further thought. Should anything else come up, I’ll reach out to you offline. Many thanks. I’ll relay it. Thank you.
Andrew Graham
unknownAll right.
Operator
operatorMuch appreciated. The following question is from William Thurlow at Ord Minnett. You have the floor.
William Thurlow
unknownHello there, Andrew, Martin, and Peter. I appreciate your time on this call, and congratulations on the results. I'm glad we can discuss the grade profile—that was definitely something I was hoping to explore too. So, starting with something simple: I'd like to know whether there is a specific figure for the expense tied to Hera care and maintenance that will hit in the fourth quarter. And on a separate note, are there any other significant sustaining or growth CapEx items coming up, apart from the ones tied to Federation?
Martin Cummings
unknownAlright, Martin here. So what we'll see in April is roughly AUD 7 million of costs still to come out of Hera, purely in terms of trade payables and the unwind of other working capital. Offsetting that, we do have revenue — some concentrate revenue and some doré — on the order of AUD 2 million to AUD 3 million. There'll be a further bit of unwind in that final quarter, which we've built into our plans. On the ongoing cost side, there's a monthly charge of AUD 200,000 to keep the operation maintained, to keep the inspection routine going, and to keep the operation genuinely ready — or in a state such that when we return to the mill there, the site has been looked after. I might just hand over to Peter regarding other sustaining capital coming through this quarter. Not much other sustaining capital is coming through. At DAR, as I mentioned, the decline had reached its lowest level. That has been the primary source of sustaining capital at DAR, and it will drop away this quarter. There are a few routine maintenance-related tasks at Peak that we're carrying out, but nothing major relative to what we've seen in some of the earlier quarters.
William Thurlow
unknownAll right, that's great. Thanks so much. I'll be sure to share that.
Operator
operatorThanks. There are no more questions in the queue right now. I'll turn things back over to Andrew Graham for the closing remarks.
Andrew Graham
unknownThanks, Melanie. So, I’ll run through the key points once more, just to leave them with you. First, as a management team and as the entire workforce, we are clearly very happy to have completed the quarter with zero recordable injuries. That is a very strong result for the business, and obviously we hope to carry that forward through the next quarter and the quarters after that. As I mentioned at the outset, there was a step change in operating performance: 26,000 ounces while sustaining at AUD 1,884, far better than where we had been on the half year to date, and it certainly put us squarely in line with our guidance target. Strong cash flow, as Martin discussed, pleasingly across all three of our assets, let us build that cash balance to more than AUD 39 million at the end of March, which puts us in a strong position as we look to finalise funding and move to development of Federation. On the Federation update, Peter took us through it in good detail. We are very pleased with the result there, particularly the fact that capital came down rather than rising despite the inflationary environment. And more pleasing from where I sit, I think we now have a much more robust plan to develop, with better operability; things such as decline gradients and the figure-eight layout and those sorts of things will let us deliver that mine with confidence.
Andrew Graham
unknownAnd then last, as I noted on the previous slide, exploration. Even with our strong emphasis on cash, we're continuing to put money into exploration and are still achieving, well, excellent results, which once more simply underscores how valuable our tenement package in Cobar is. To finish up, I'm certainly very proud of everyone across the Aurelia team. These are an excellent set of results, and we hope the whole team takes pride in what they've accomplished. Thanks for your time today.
Operator
operatorThat brings today’s conference to a close, then. We appreciate everyone taking part. You’re welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.