Red Hill Minerals Limited (RHI) Earnings Call Transcript & Summary

July 20, 2023

ASX AU Materials Metals and Mining earnings

Earnings Call Speaker Segments

Operator

operator
#1

At this point, I'd like to turn the conference call over to Bryan Quinn, our Managing Director and CEO. Bryan, the floor is yours.

Bryan Quinn

unknown
#2

Thanks, and welcome, everyone, to this call where we'll walk through our update on results for the June quarter of 2023. I'm speaking to you today from the Noosa Mining Conference, where I'll actually be giving a presentation tomorrow. There'll be more detail on Aurelia Metals and our quarterly results, so please watch for that information, which will be lodged tomorrow on the ASX. With me on the call from Aurelia Metals are Andrew Graham, Interim CEO, Martin Cummings, Chief Financial Officer, and Peter Trout, Chief Operating Officer. We're genuinely excited to bring you the fourth quarter results today. I'll start by running through a few of the highlights for Aurelia. It's genuinely been a very strong quarter and half year for Aurelia when it comes to financial improvement and getting set up for FY 2024. First, I want to highlight the safety outcomes at the operating assets. The operating assets and projects have been managed safely and exceptionally well, with major step changes achieved and a reduction in total recordable injuries. In fact, I was on site this week celebrating Dargues' 12-month injury-free lunch, followed by an underground visit to the operating stakes. Production from the operating assets has come in line with our FY 2023 guidance, and so has the All-in Sustaining Cost for the business.

Bryan Quinn

unknown
#3

We saw some favorable tailwinds and pricing from certain commodities, gold among them, offset by weaker prices in others such as zinc. Martin is going to walk through a few of those specifics shortly, a couple of minutes from now, in the presentation. Naturally, we will give the complete full year results and the financials covering these outcomes for our reporting period within the next couple of months too. Some significant activities were finished during the quarter, and that includes Hera moving into care and maintenance. As we said in the March quarter, we have now also switched to owner-operator at Peak and are resourcing up with Aurelia employees and equipment to deliver into FY 2024. We have also taken some very good decisions to repay all debt on the balance sheet in full during the June quarter, and that leaves Aurelia Metals in a strong position to take on the new financing facility for our next major project, Federation. It also puts us in a very good spot to examine the project pipeline itself, our next projects, once Federation is successfully completed in August 2023. We will share further details on the outlook of that kind in the full year results. To get 56 set up for Federation during the June quarter, after the funding solution was delivered, our focus has been on remobilizing Redpath, our underground construction contractor, along with tendering out packages and concentrating on critical path items so the project is delivered on time and on cost.

Bryan Quinn

unknown
#4

We have also brought on board Michelle Tracey, a highly seasoned project director. She reports directly to me, takes charge of the project, and is currently on site at Federation as we speak. Over the past five weeks, I have been familiarizing myself with the team, the assets, what our resource could deliver, and a number of the shareholders and investors — my thanks to everyone who has given me their feedback. From that, I have put together a focused 100-day plan, and I will walk you through it near the end of this call. Its purpose is to genuinely build on the stronger performance achieved across the last six months and position our company for exciting results in the years ahead. In short, it was a very strong close to the year across the second half of FY 2023 — in safety, operations, production, the balance sheet and cash — establishing Project Federation and, crucially, positioning us for an exciting financial year, 2024. To take you through some of the specifics, I will first pass things to Andy Graham, our Interim CEO, who will go into more detail on the guidance results for the quarter just ended. Andrew, over to you.

Andrew Graham

unknown
#5

Thanks, Bryan. And like Bryan, I’m attending the Noosa Conference this week, so I do apologize if there’s some background noise. Anyone who was with us at the AGM in December or November would have appreciated that at that point a few things were absolutely critical to me during my time as Interim CEO. One of them was doing what we said, meaning delivering on guidance. For those following along on the presentation on slide four, we give a summary of that. I’m very, very pleased to say that we have achieved guidance across the board on all commodities and also on non-sustaining costs for the full year. I’ll talk in a little more detail about that — March was very strong. When we look at the June quarter compared to the March quarter, it does seem a bit softer. The first thing people should be aware of is that we didn’t have Hera in the June quarter. March includes three operating assets. June quarter includes two. Therefore, we did see a reduction in production of commodities. That said, particularly, Peak was making a lot of base metals, less gold, and therefore, we did see a shift to base metals in the June quarter, when we saw, say, gold.

Andrew Graham

unknown
#6

Costs are the area that worried me the most, I'd say. During our March quarter discussion, we reviewed the commodity charts. Every one of them was tracking toward guidance, and I'm happy to report they hit it, with gold finishing at the high end of that range. Price and cost were likely the areas requiring our attention if we were to reach the AUD 2,300 target for the year. I'm glad to say the half year landed under AUD 2,000 — and I remember being in Sydney early in my tenure as Interim CEO, meeting with investors, and that was the item most folks thought couldn't be done. So we had to deliver All-in Sustaining below AUD 2,000. As the chart on the right shows, we achieved exactly that, and so we landed on guidance at roughly AUD 2,300 All-in Sustaining per ounce. That matters enormously for us as a business — it proves we say what we'll do, and then we do what we said, and that's what you can count on from us going forward. In the same vein, around the AGM, and sticking with that theme of doing what we say, I told people that safety was a key priority for me.

Andrew Graham

unknown
#7

I firmly believe that when production is done safely, both output and quality move together with it. That's definitely what we've observed, and I'll get into that shortly when it comes to Dargues. Looking at the entire group, the six months delivered a really encouraging outcome, since we recorded zero injuries through to the close of June. As a result, our total recordable frequency rate has come down into the fives, which is a tremendous outcome given that we're running three underground mines. Another point worth bearing in mind is that conditions were not steady state. Nothing was stable. The company was experiencing a considerable period of flux on the corporate side, and on the operational side too. Bryan mentioned this. We shut down Hera at the end of March and had to move that site into care and maintenance. A site transitioning from the close of its operating life into care and maintenance certainly weighs heavily on people's minds, and it also adds a whole lot of work on top of business as usual. The other item Bryan mentioned is that we shifted Peak to owner-operated mining during that same stretch, and it was hugely gratifying to see us exit Life-of-Mine and transition into owner-operator without a single safety incident occurring over that time.

Andrew Graham

unknown
#8

The second item covered on slide five concerns our environmental incident frequency rate record. I should note that Johan Theron, our Group Manager of Environment, was essentially the person behind that effort, and it has been named a finalist in the NSW Mining HSEC Awards. Happily, we had set a goal of three for the year and we achieved 2.9. Beyond avoiding harm to people, we are glad to report that our environmental impact is minimal too. I mentioned earlier that strong safety performance and strong operational performance go together, and that brings us to slide six, the Dargues result. For an underground mine in Australia, it is genuinely remarkable that no recordable injury has occurred there in 12 months. As a result, the total recordable injury frequency rate, a 12-month moving average, has fallen to zero. That is, you know, an incredible statistic when you consider what it really means: it means nobody has been hurt to the level of a recordable injury over the last 12 months, and that is the essence of safety. People arrive at work, carry out their duties, and are able to head home in a condition as good as, or better than, the one they came in with.

Andrew Graham

unknown
#9

On slide six, there's a photo showing a portion of our underground workforce, and they're clearly very happy with what we've achieved. Credit for the safety result goes to Peter Trout, along with our three operations general managers, for making that happen. That kind of result doesn't come without effort, and it's genuinely wonderful to see everyone concentrating on their own safety as well as the safety of their coworkers, which ensures we keep operations running continuously and deliver the production performance we achieved in hitting guidance for the full year. That covers everything from my side, and to go through the assets in a little more depth, I'll now pass over to Peter Trout.

Peter Trout

unknown
#10

Thanks, Andrew, and good morning everyone joining the call today. As you can likely tell from what Bryan and Andrew have said, it was an extremely active quarter right across the business and at every site. I'll go through the results for each site this quarter, referring to the presentation slides that came out this morning. Beginning with slide seven, covering our Peak operation. During the quarter, the amount of ore mined and processed at Peak held steady versus the previous quarter. This quarter, however, most of the mill feed came from lead zinc ore, which accounted for roughly 2/3 of feed tonnage, versus approximately 50% of tonnage in the quarter before. That carried through into the metal production figures we've reported today. Zinc and lead metal output was strong, including a substantial 78% rise in zinc metal, driven by the higher grades from the Kronos deposit as set out in the mine plan, along with the larger share of lead zinc ore in the mill feed. On the other side, copper metal production fell by about 453 tons, reflecting that less copper ore was processed and that we treated lower grades during the quarter. Gold production dropped by 37% to 6,400 ounces, consistent with the lower grades in the mine feed.

Peter Trout

unknown
#11

Looking at the quarter, we finished significant scheduled shutdowns at both the shaft hoisting system and the process plant. Additional activity is scheduled for the September quarter, when we'll swap out structural steel in the mill and carry out remediation work on the south mine shaft system, allowing it to return to full capability for riding personnel. I want to address underground mining performance at Peak, since although our owner mining transition is done, performance isn't at the level we're aiming for. A number of initiatives have been implemented to boost productivity and, in the end, our ore production rates, which are the key drivers of unit costs and operating margin at Peak. Under this program, development rates climbed starting in the March quarter and will rise further during the current quarter as we open access to future stoping areas. These include the Chesney East Zone at the North Mine, which was delineated recently. We've observed encouraging results from these initiatives site-wide, and we'll keep pushing them through the current and future quarters. Turning to slide eight, which covers our Dargues mine, we generated slightly more than 9,000 ounces of gold in the quarter. That represented 57% of the group's total gold production for the quarter, bearing in mind that Hera is no longer part of the mix.

Peter Trout

unknown
#12

We kept up strong production volumes at the site. With modest gains in the tons mined and processed, we've taken full advantage of the development consent modification obtained in mid-December of last year to push more volume through the process plant. As we noted in the March quarter results, development rates have come down consistent with the mine plan. That is helping lower site spend as well as unit cost. Development of the lowest mining level is now finished, and our focus has shifted to development in the upper remnant mining areas, where some good grades have come through, and we'll get that area ready for production over the quarters ahead. Another key activity in the quarter was the update to the Dargues' Life-of-Mine plan, which brought together the results from the infill and extensional drilling programs completed in the March quarter. The Life-of-Mine plan confirmed that mining and processing will wrap up during the first half of FY 2025, and it shows we can deliver a strong cash contribution from Dargues' across the remaining Life-of-Mine period. Moving to slide 9. During the quarter we moved the Hera site into care and maintenance, and finished demobilizing contractors, personnel, and plant.

Peter Trout

unknown
#13

As Andrew mentioned, that process went really smoothly. It's not something we do on a regular basis, and the site management team's effort there, along with what our contractors' employees contributed, was essential to achieving that outcome. The final cleanup of the process plant produced 540 ounces of gold, which gave us a nice boost to revenue. On slide nine, the photo shows the last bar that came out of Hera. Work at the site now centers on preserving the assets that are already there, so they can be used in the Federation project and in future processing operations. I'd also like to talk about the Working Smarter Program, which is on slide 10 of the deck. That has genuinely been a standout for the business over roughly the past eight months. We've banked quite a few cost and efficiency gains from this program, which kicked off in November last year. The whole point is to tap the knowledge and ideas that come from our workforce. It's great to see more than 600 ideas submitted, with 220 of them validated and moved into implementation. The example on slide 10 features members of our underground service crew at Peak, who have just completed the setup of a 3D load scanner.

Peter Trout

unknown
#14

It provides us with live feedback regarding how much rock load is in every haul truck tray. Using this information, we're able to give feedback to the operators of our loaders, allowing them to make full use of tray capacity and in that way boost the payload moved per load. That's just a small illustration of one among many productivity and cost initiatives currently underway at Peak. If we step back and consider the Working Smarter Program, back in November we set ourselves a genuinely challenging target, to deliver AUD 24 million in benefits. We were well aware that was a stretch for the business. Reaching that final result of AUD 25.6 million in benefits is a real credit to everyone across our entire organization who has contributed to that program. With that said, I'll hand over to Bryan to talk about the Federation project.

Bryan Quinn

unknown
#15

Yeah, thanks, Peter. Look, Federation is a really exciting project for Aurelia Metals, and it backs our ambition — actually, my ambition — to make Aurelia Metals the developer and operator of choice in base metals, namely copper and zinc. We're staffing the project with highly experienced leadership and contractors so we can hit the schedule and costs we've committed to, and do it safely. The operating model we're putting in place is genuinely something we'll replicate on future projects, with a very seasoned team. Right now the team is remobilizing, getting safety management systems in place, planning the vent shaft and tendering for various critical path activities, including rail upgrades, et cetera. I was on site recently and can report it's well set up for remobilization, and the workforce camp is also ready to go and in very good condition. With Michelle Tracey appointed, that's a massive opportunity for us to leverage her experience and her contacts, and obviously to deliver this project in a very disciplined way in line with our targets. We'll obviously be giving more updates on a quarter-by-quarter results basis on how we're tracking against this project. Once again, I'll just reinforce, it's a very exciting opportunity to really build this mine in a very, very good location and close to our facilities in the Cobar Province.

Bryan Quinn

unknown
#16

I'll pass things over to Martin at this point so he can walk us through the financials.

Martin Cummings

unknown
#17

Thanks, Bryan. Moving to slide 12 — beyond the strong safety and operational results the team walked me through, the June quarter brought a major milestone: we announced the new Trafigura funding package and wrapped up the equity raise. As Bryan mentioned, that lets us resume development at Federation. I'll walk through the waterfall items shown on this slide, then give an update on where the refinance process stands. We closed the quarter with AUD 38.9 million in cash, and as set out in the June operating performance, we remain focused on keeping our assets cash positive, with cash flow of just under AUD 15 million generated. As we noted in the March quarterly, operating cash flow was anticipated to be lower this quarter, given that operations at Hera ceased at the end of March, and because the March quarter included some extra concentrate sales tied to production from a prior period. Beyond those factors, at Peak this quarter we incurred somewhat higher concentrate treatment charges — part of that reflecting the larger sales in the previous quarter — and we also put money into a new haul truck for the underground fleet.

Martin Cummings

unknown
#18

Operating cash flow at Dargues is still solid. It's getting a lift from today's supportive gold prices and from the deliberate cutback in mine development. During FY 2024, what we're really concentrating on is squeezing the most operating margin we can out of our assets, especially at Peak. One essential lever for bringing Peak's unit costs down is pushing volumes higher, all the more so since we have unused milling capacity on hand. As a management team, our attention is now squarely on delivering those operational gains, along with getting the operating cost base to the right size. With the Life-of-Mine plan at Dargues now projecting that operations will wrap up in H1 2025, as Peter noted, that asset genuinely turns into a significant cash contributor over the rest of its mine life, thanks to those robust gold prices and the reduced development needs. Our plans today center on capturing that cash contribution via consistently predictable performance and disciplined cost management. We'll be glad to share further detail on our operating plans for FY 2024 when we announce our FY 2023 results, which we have scheduled for late August. As noted, Hera has now moved into care and maintenance. On a positive note, we did recover roughly 540 ounces during the final cleanup of the plant.

Martin Cummings

unknown
#19

Hera’s operating cash flow was modest this quarter, clearly. It was affected by certain revenue adjustments tied to earlier shipments and by the final costs of running the operation through March. During this quarter we incurred an AUD 4.8 million cost for the care and maintenance transition. That was consistent with our plan. It did include slightly less than AUD 2 million for redundancy payments made to staff. The remaining one-off costs are associated with demobilizing contractors and service providers, as Peter mentioned. It also includes the start of some of the continuing care and maintenance costs at that asset. Those continuing costs are expected to come in below AUD 1 million each quarter going forward. Hera was in fact the primary driver of the unfavorable AUD 2.9 million working capital movement as well. Inside that figure, roughly AUD 3.3 million consists of payments we made to various suppliers. I do want to note, however, that these movements represent only the cash flow effect of the working capital unwinding, and they are not extra costs beyond what has previously been reported as operating cash flow for Hera. Growth, capital, exploration, and corporate costs rose slightly, driven by somewhat higher corporate costs. As you are aware, growth capital will begin to ramp up starting this quarter with development restarting at Federation.

Martin Cummings

unknown
#20

Looking at the waterfall, the last item concerns the refinancing, and it shows a positive AUD 1 million for the quarter. So with that, let me direct you to slide 13 to walk through where things stand on the refinancing. The steps shown on this chart match the refinance steps I laid out during the call on 31 May. In June, we received the proceeds from the institutional placement and entitlement offer, which came to AUD 23.4 million. As Bryan mentioned, we also repaid the term loan in full — that was AUD 8.6 million — and we fully cashed back our performance bond facility for a further AUD 10.6 million. Those were essential steps, since they let our existing banks release their security, which will now open the way when we get to financial close on the new Trafigura facility. We paid AUD 3.4 million in fees during June, relating to the institutional equity raise and part of the debt arranging fees. That gave the positive AUD 1 million net movement in June. As you can see, some meaningful cash flows are coming in during July. In early July, we received proceeds from the retail entitlement offer of AUD 16.4 million, and we also paid the remainder of the fees tied to the retail offer and the debt arranging fees, a further AUD 2.5 million.

Martin Cummings

unknown
#21

All of those fees matched what the equity raise presentation set out. At this point, our attention is on completing the conditions precedent tied to the Trafigura facilities, which will let us draw on the performance bond facility. We anticipate clearing those CPs quite soon—sometime during this month. After the performance bond is replaced, our current bankers will release the AUD 56.8 million in cash backing they hold. Combined with the AUD 38.9 million of cash on hand we already have, that brings total cash on hand to roughly AUD 110 million. As I mentioned earlier, we also hold the loan note advance facility, which we intend to leave undrawn for the time being, though it offers additional liquidity of up to approximately AUD 145 million. To sum up, this quarter has been transformational for Aurelia and for our balance sheet, which is now positioned to fully fund the coming phase of growth. Thank you for your time. I'll now return the call to Bryan.

Bryan Quinn

unknown
#22

Thank you very much, Martin. Now, if I've just switched to the slide outlining the 100-day plan, the real question is: how are we unlocking future value for the company and for our shareholders? As laid out at the beginning of the presentation, and as my colleagues have also covered, over the last six months we've had a more stable platform from which to build our full potential for shareholders going forward. Drawing on the feedback and information I've received — and I'm still gathering more as I go — the 100-day plan is tightly focused on five areas in the immediate period, with no particular order of priority, but one really is that we must keep attracting, retaining, and developing quality people, since this is the key to our long, you know, long-term success. We need to safely deliver a step change in our cost base and higher throughput to fill our mills. We can deliver higher shareholder value through all the commodity price cycles at Peak. Obviously, we're working through a plan to understand what's required to deliver lower half the cost of performance in the medium term. Number three is really about safely maximizing value from Dargues' operation over the remaining life of the asset.

Bryan Quinn

unknown
#23

Clearly, operations there are performing strongly. At Dargues, the management team is excelling, and we simply have to keep ensuring we extract maximum value right through to the end of that operation, doing so in a manner that is sustainable and safe. Fourth, getting Federation positioned for success — delivering safely, on schedule, and within budget — but crucially, ensuring we are also arranged for long-term success at Federation, so that the entire resource's value can be maximized. Fifth, optimizing our Cobar province and pulling together every one of our organic options so the mills are filled with quality ore, which ought to produce superior shareholder value and cash, encompassing Safe and Great Cobar, which will become one of many upcoming projects within the province's hub-and-spoke model. We will cover more on that during forthcoming presentations and releases, in relation to our focus areas and in relation to our business plan. To sum up, a really strong close to the year across the last half and last quarter of FY 2023 — in safety, operating production, balance sheet, and cash — along with establishing the Federation Project and, importantly, positioning ourselves for an exciting financial year in 2024.

Bryan Quinn

unknown
#24

A key priority for us is that everyone returns home safely each day. When they arrive at work, they actually leave in better shape than when the shift began. That matters a great deal to us and is something we as an organization value very much. I'm genuinely excited about the opportunity that lies ahead for us in the business, and now I'll turn things over for questions.

Operator

operator
#25

Thanks. Should you like to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, press star two instead. In case you are using a speakerphone, please lift the handset before asking. Our first question is from Will Charlston of Ord Minnett. Go ahead, please.

Will Charlston

unknown
#26

Yes, good morning, Bryan, and to the team. I have a couple of questions, probably for you, Peter. Regarding Peak, I was just wondering how we ought to think about the mining rates across the copper and the lead zinc sections of the asset. Will those two roughly deplete in lockstep, or will the lead zinc be depleted at a faster rate compared with the copper?

Peter Trout

unknown
#27

That one will, yes. It really comes down to which timeframe you're considering. Across the coming couple of years, we'll keep feeding in a blend of lead, zinc ore, and copper ore coming from both the south mine and the north mine. Past that point, once Great Cobar is up and running, the lead zinc contribution will decline under the current outlook, while copper volumes come in much higher. As Bryan said earlier, that's only the baseline, and with our hub-and-spoke model we're evaluating other options across the district so we get the best feed mix into those process plants.

Will Charlston

unknown
#28

Alright, no issues there. Perhaps a question for Dargues. How ought we to view the grade profile through to the end of mine life? Will that be largely in line with what we've seen recently, or might there be some sort of reversion toward the grades in the 2022 production target?

Peter Trout

unknown
#29

Honestly, I'd say the clearest answer to that will emerge over the next few weeks, once we put out our update on mineral resources and ore reserves along with the production target to the market. Given the length of the mine life at Dargues and what those grades are going to be, that should give you a more quantitative sense of things. That said, I will note that in this random area, we're back into the upper levels of the mine. We're already seeing grades from development there that come in above the quarterly grades from the June quarter.

Will Charlston

unknown
#30

Alright, no problems at all. For the update, naturally, I will relay it. Thanks.

Operator

operator
#31

Thank you. The following question is from Caf Pietropaolo of Canaccord Genuity. Go ahead, please. Sorry about that. Our next questioner is Wolfgang Kissel, a private investor. Please proceed.

Wolfgang Kissel

unknown
#32

Hi there, and thanks a lot for the presentation. I'd like to ask about your zinc output, which you called out as really strong. Gallium and germanium come out of zinc production as by-products. Do you have any plans to use your zinc operations to also turn out gallium and germanium, particularly given that these two rare earths sit at the leading edge of high-tech hardware manufacturing?

Peter Trout

unknown
#33

Wolfgang, this is Peter speaking. No, we don’t. The processing facilities we operate at Peak are designed to recover a concentrate. On site, aside from the gold that we produce, we lack the capability to extract any additional metals. Extracting any of those other elements is truly a step that takes place at the smelting and refining stage.

Wolfgang Kissel

unknown
#34

All right, thanks.

Operator

operator
#35

Thank you. The next question is from Caf Pietropaolo at Canaccord Genuity. Please go ahead.

Caf Pietropaolo

unknown
#36

Cass, I've held shares in this business for quite a while. My question is for Bryan Quinn. Earlier managing directors, in a way, operated this company from a head office and didn't get their hands dirty by visiting sites, meeting people, and building confidence among employees. What's your plan, Bryan? Will you go out to sites? I realize you have managers on the ground, along with supervisors and so on, but how actively do you speak with employees to lift morale, simply to make your presence felt there, and to give employees a bit of confidence so productivity improves?

Bryan Quinn

unknown
#37

Yes, thank you — I appreciate the question. So, look, I've now been at the company for five weeks, and during two of those weeks — two and a half of those weeks — I've been out at site. I spent two weeks out at Cobar, one week on each occasion, and I've also been to Dargues this week as well as in previous weeks. What I intend to do is work alongside the teams and give them support. Obviously there are many stakeholders I need to engage with, and the employees are certainly among them. Our job is clearly to hold them accountable, but at the same time to back them up, so that we can get the most value possible for the company. To answer your question, we will definitely be around the sites, on the projects, in Brisbane, and with the stakeholders and investors, on a very routine sort of basis.

Caf Pietropaolo

unknown
#38

All right, thank you.

Operator

operator
#39

Thank you. As a reminder, if you'd like to pose a question, press star one. We'll take a brief pause so additional questions can come in. Thank you. We have no more questions at this point. I'll return the floor to Bryan Quinn for his closing comments.

Bryan Quinn

unknown
#40

Well, thank you all for being on the call today. We're looking forward to presenting the full year results in the coming weeks and to further questions. Just want to reiterate — you know, I'm really, really happy with the quarter results and the last half results. The team's been able to work together with. We look forward to speaking to you very soon about the, the full year results and the guidance going forward. That's all. Thank you, everyone, for joining, and we'll speak soon.

Operator

operator
#41

That brings today's conference to a close. We appreciate everyone joining us. You're free to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.