Operator
operatorAt this point, I'd like to pass the conference call to Mr. Bryan Quinn, our Managing Director and CEO. He has the floor.
Bryan Quinn
unknownThanks, everyone, for joining us today as we present Aurelia's full year Financial Results for 2023. I want to introduce several members of the Aurelia team who are with us today, both in person and online. Martin Cummings, our Chief Financial Officer; Andrew Graham, General Manager of Growth; Matt Nuttall, General Manager of Peak Mine, North and South; and Angus Wyllie, General Manager of Dargues Mine. The results, though, give a really clear picture of improving performance across the last six months, set against a volatile backdrop of economic uncertainty when it comes to prices for some of our commodities. We recognize that being able to operate strongly in all situations is actually fundamental for our company's success, and also for managing the risks that come with these periods. We gave feedback throughout the year, noting that the H1 of FY 2023 was not a good result, with H2 delivering step change improvement and helping towards setting up the FY 2024 to be a stronger year. It's very clear the management team in place now understands there is a step change performance required, and FY 2024 is a priority. ... Achieve 12 months recordable injury-free, which is an incredible achievement.
Bryan Quinn
unknownDargues also managed to set records for mine and mill tonnage as well as revenue during FY 2023. The Hera Mine, located in the Cobar Region, was ramped down and put on care and maintenance, and the team was extremely occupied with setting up funding arrangements for the Federation Project, which ended up delivering a low credit risk counterparty, Trafigura, that has helped our liquidity to access our high-grade Federation Ores in the near future. Finally, we produced some very strong results in expanding our resource and reserve in FY 2023. We've cut capital expenditure, and we acknowledge this is going to be a focus in FY 2024, given that our resource base ranks among the largest in the Cobar region. However, it, it's crucial that we convert this over the coming years, and we've actively budgeted capital for infill drilling and for reviewing opportunities within our existing resource base. To help cash flow in the H2 of the year, the Aurelia board orchestrated an organizational reset program, which really concentrated on safety performance, reducing capital spend, paying down debt, and launched a Working Smarter campaign, which uncovered AUD 25 million of cost benefits. These actions were all essential to set up FY 2024 as a year in which we focus strongly on operating discipline and driving down costs, while having a clear Growth Plan, which will position Aurelia to emerge as a stronger base metals company.
Bryan Quinn
unknownThe cash we generated over the past six months went a long way toward reducing what we owe and making our balance sheet stronger. We know that matters for positioning the company around our growth pipeline and for getting to a point where we fund ourselves beyond the Federation Project. We keep evaluating and carrying out the set of outstanding growth projects we have in the Cobar region, and that includes delivering on the Federation project. We're also continually examining ways to get the most out of each of these projects through technological solutions, which ultimately means lower cost, better returns, and improved volumes and grades. Now, we do acknowledge that growth in China has eased and that changes in government policy aren't yet settled enough for us to know which way the government will go, and clearly that has a near-term effect on demand and pricing for our base metals. We hold a strong belief in the Medium-term Fundamentals: population growth coming back, urbanization, and rising living standards will each help drive a substantially bigger global economy over the medium term. Beyond that, we also acknowledge that the emphasis on decarbonization will speed up demand for critical base metals of the kind we produce. Regardless of that medium-term outlook, honestly, our emphasis on pushing our costs lower and aiming for the bottom half of the cost curve is essential for countering our Inflationary Pressures, with the top priority being to deliver the greatest margins across the cycles for our Shareholders and Stakeholders.
Bryan Quinn
unknownWhat we're really trying to do is put ourselves in a lower position than every one of our peers, and we think we're well along the path to getting there. We know a lot of them are dealing with headwinds: no new economic discoveries, the costs involved in buying assets, refinancing costs, a shortage of development opportunities, and problems with permit issuance and opposition from local stakeholders. So I strongly believe Aurelia is well placed on every front in the Cobar region — with our large resource, our growing infrastructure, our grades, our permits, and solid relationships that will help us speed up as we move forward. With a clear near-term plan for the future in critical base metals and a strengthening balance sheet, we're setting ourselves up to be a catalyst for possible integration in the Cobar region wherever it makes commercial sense, drawing on our high-quality infrastructure and access to our resources. As all of you noted, we've refreshed the company's vision, and we now aim to be the development operator of choice for critical base metals, powering a low carbon footprint and delivering superior shareholder value. This deliberate reshaping of our company and the life of our portfolio means we'll be well positioned to gain from these trends going forward. The best result for delivering superior returns will come from raising our productivity and bringing down our costs across existing and future assets.
Bryan Quinn
unknownWe need to concentrate on building a culture that welcomes innovation and ongoing enhancement, and it is appropriately scaled for our business to maximize returns for shareholders. It also matters that we keep creating possibilities for our future through other avenues, such as exploration success, and that we keep advancing our hub-and-spoke model for the Cobar region, which will deliver considerable synergies in a tier-one jurisdiction with substantial resource potential. Having assets close together enhances career prospects for people, equipment optimization, working capital advantages, refinement of plans and growth projects, blending and logistics gains, and potential supply chain and procurement savings. The hub-and-spoke approach will additionally bring the advantage of lower overheads, along with the chance to streamline certain back office tasks. Naturally, we must finish the federation project to unlock some of those synergy benefits and complete the project study on Great Cobar, which is our next possible high-grade copper project, and that work will be undertaken in financial year FY 2024. I will now pass things to Martin so he can discuss the FY 2023 actual results and the FY 2024 guidance. Thank you, Martin.
Martin Cummings
unknownThanks, Bryan. Bryan has already gone through how we performed operationally, so I’ll just give a quick recap of the outcomes on slide five. Last month we published our June quarterly report, and the standout there was that we hit both our production and our cost guidance. Gold output came in above guidance at 86,000 ounces, while copper, lead, and zinc all landed inside the ±5% range we had set out. The AISC we achieved, AUD 2,315 an ounce, was within guidance as well, and that was a really pleasing result given the weaker base metal price environment in the H2 of the year. Within Aurelia, this was also a time of enormous change in the business, with the underground mining transition at Peak completed and the Hera Mine closed. I want to acknowledge the team at Hera, who took the mine through to closure and the plant into care and maintenance, both safely, and in doing so generated cash flow above what we had planned. Now let’s move to the group’s financial performance on slide six. You’ll remember that back in February, we released a disappointing set of results for the H1. While we couldn’t recover that across the full year, we have delivered a much improved result in the H2.
Martin Cummings
unknownStarting with sales revenue: it came in at AUD 369 million for the year, roughly AUD 70 million lower, and the main drivers were reduced metal volumes sold, stemming from fewer tonnes processed at Peak plus the effect of the Hera mine closing in March. If we break the revenue variance down by metal, though, the biggest hit came from zinc, where we sold 10,000 fewer tonnes during the period, and that was compounded by a realized price roughly USD 200 under the previous year. So zinc accounted for about AUD 48 million of that 70. On the other metals: lead sales fell by approximately AUD 13 million, with some 6,500 tonnes fewer sold, though a somewhat better average price received offset part of that. Gold sold came in just over 8,000 ounces lower, yet thanks to the strong gold prices in FY 2023, revenue was down only about AUD 3 million, while copper was broadly in line, with higher sales offset by a lower realized price. EBITDA rose from AUD 12 million at the half to AUD 56 million for the full year on both a statutory and underlying basis, and while that is below the prior year, it marks a material improvement.
Martin Cummings
unknownThe main factor was the revenue decline—the lower revenue I just walked through was the primary driver—but we also recorded higher ore inventory charges during the year. Lifting our EBITDA margin from 15% is now a key focus for FY 2024, and that will come from efficiency gains and cost reduction programs that are already underway. We reported a statutory net loss of AUD 52 million for the year. A significant portion of that was the depreciation and amortization expense of AUD 103 million, which is below the prior year, due to lower production, but also because of a lower asset carrying value at Dargues, which led to reduced depreciation charges this year. The remaining items making up the gap between statutory and underlying loss after tax relate to two impairments booked during the year. The first, put through in December, was an impairment of the Hera asset, and we cut its carrying value by AUD 5.4 million pre-tax. Then at year-end, we booked an additional impairment expense of AUD 15.4 million pre-tax tied to the carrying value of our exploration assets. Most of that impairment concerns exploration around Dargues, and roughly half of that Dargues impairment relates to exploration expense incurred pre-acquisition.
Martin Cummings
unknownAnd lastly, group cash flow showed a reduction of AUD 38 million for the year. What matters, though, is that this movement takes in the complete repayment of the term loan, which was AUD 20.7 million when FY 2023 began, and on top of that we put another AUD 26.1 million into restricted cash over the year, bringing it to 50, just under 57 million across the full year. So altogether, AUD 47 million of debt reduction and cash backing came out of our operating cash flow during the year. Late in the year our cash balance got an extra boost from proceeds tied to the Institutional Placement and Entitlement Offer, which came to just under AUD 24 million, net of fees, and that left us holding a cash balance of AUD 39 million at the end of June. If you go to slide seven, this slide really carries the key message I want you to take away about the results, and that is that FY 2023 was genuinely a year of two halves. Across nearly every metric, we managed to stabilize and improve how the business performed in the H2, which positions us to deliver further gains in FY 2024. On safety, as Bryan outlined, Dargues reached 12 months recordable injury-free in FY 2023, which left the site with a site TRIFR at the end of June of zero, remarkably.
Martin Cummings
unknownAcross the entire group, we had a six-month stretch with zero recordable injuries. That drove a 41% decrease in our TRIFR for the year, plus a 52% drop in TRIFR between December and June. And again, this happened while substantial change was underway across the business. Group all-in sustaining cost per ounce fell 24% from December through June, and H2 all-in sustaining cost came in below AUD 2,000. As I said earlier, this occurred in a setting where base metal prices were declining. That reduced cost helped drive a 267% jump in EBITDA, from AUD 12 million up to AUD 44 million in H2. You can see how that improved performance came together in the chart at the bottom right. At December's end, cash net of bank debt stood at AUD 11 million. To break that down, it consists of AUD 23.7 million in cash on hand, with our term loan balance sitting at AUD 12.6 million. Restricted cash at that point was AUD 41 million. So during H2, we paid off that term loan entirely. We fully cashed back our performance bonds, and together with proceeds from the institutional placement and entitlement offer, we lifted cash on the balance sheet to AUD 96 million.
Martin Cummings
unknownNow, if you go to slide 8 and we stay on the balance sheet topic, I'd like to give you a quick recap of the transformation that's taken place, which now positions us to resume development at Federation. The new Trafigura facility that we announced in May is made up of a loan of US $24 million, or AUD 36 million, plus a performance bond facility of AUD 65 million. The pricing on this facility is very competitive — 6% above the US dollar benchmark rate for the loan, and a flat 6% margin on the performance bonds. And just as importantly, it's highly flexible: there's no financial governance, no establishment fees or early repayment fees, and no obligation to draw down on the loan right away, which saves us on interest costs. The repayment schedule has been structured to support Federation's capital spend, with most repayments backended into years three and four of the 4-year term. We met all conditions precedent under the facility in August and reached financial close. So we now begin FY 2024 debt-free, with a substantial pro forma cash balance of AUD 132 million — which, we'd note, isn't far off our market cap today.
Martin Cummings
unknownI call this pro forma cash, because the balance contains certain items that have been or will be received during this half. First, the restricted cash. As I noted, financial close has been reached on the facility, the performance bonds have been replaced, and that cash is in the process of coming back to us within days. The next item on the chart is the proceeds from the retail entitlement offer. That was the second component of the equity raise, and that AUD 16 million came in early July. Finally, one more amount we've added is the tax refund we expect to receive this year. So once we file our FY 2023 tax return, AUD 21 million under the loss carryback — a tax offset for tax paid in the FY 2020 and 2021 tax years — will be returned, and we're carrying that amount as a receivable on the balance sheet at 30 June. So in summary, pro forma cash plus the AUD 36 million undrawn under the Trafigura loan brings our total liquidity to AUD 168 million, and really means we're truly positioned to support our excellent growth opportunities at Federation and beyond. But now, just turning to slide nine, we've outlined our guidance for FY 2024.
Martin Cummings
unknownFor this year, gold output is guided down to 60-65,000 ounces; the decrease stems from Hera's closure in FY 2023 and also mirrors somewhat lower gold grades anticipated at both Peak and Dargues. Base metals output is quite robust in FY 2024 and will be derived entirely from Peak, with solid zinc and lead nearly fully offsetting the effect of Hera's closure. Copper output, too, will be a touch higher. All-in sustaining cost guidance stands at $1,850-$2,050 per ounce, extending the cost-reduction path we began in the H2 of FY 2023. I'd like to flag that this guidance does incorporate present base metal prices, which sit below the realized prices we attained in FY 2023, with zinc particularly affected. As per our budget, we do anticipate somewhat lower output in Q1, and that's as Peak lifts its mining rates. That will probably mean a somewhat higher all-in sustaining cost for Q1, but from quarter two we expect it to trend lower. Federation growth capital is broadly consistent with the profile we set out back in April, with AUD 70 million-AUD 80 million incurred during the year.
Martin Cummings
unknownAs we announced earlier this month, Redpath is now back underground, and development kicked off again on 1 August. We anticipate spending will be fairly low in Q1, consistent with our capital plan, and it should rise through the year as on-site activity picks up. We've also set aside funding to explore our extensive tenement portfolio in FY 2024, with AUD 10 million to AUD 15 million included in our guidance, which is a modest increase over FY 2023. I'll direct you to the appendix of the presentation for further detail supporting that guidance. To sum up, I know plenty of the Aurelia team are on the call listening today, so I simply want to thank you all for what you've contributed to the substantial volume of information we've put out today. It really is appreciated. Thanks for your time, and I'll now pass things over to Andrew.
Andrew Graham
unknownThanks, Martin. Today, as we go along, we’ll switch over to slide 11 at this point. But just returning to a little of what Martin mentioned. You know, during the last six months, when I stepped into the interim role, the key piece was a step change in what we were doing. And as Martin has gone through on slide seven, we certainly achieved that in the H2, you know, across the board, be it safety, production, costs, whatever. It was a real step change in the business, and it set us up very, very well for FY 2024 and the future. The other key element, which Martin had a lot to do with, was outlined on slide eight around funding. And certainly relative to our peers, but, but definitely looking at ourselves, we’re in excellent shape now to be funded to deliver what it was that we wanted to deliver. And when I turn to slide 11, effectively that’s what we want to deliver. And Bryan touched on it at the start, we formalized it down with a change of vision, but we’ve been talking about this slide, you know, for the last six months. Aurelia is a base metals business.
Andrew Graham
unknownRight now, we're generating a lot of gold, but over time—and we're not talking about a lot of time—we will organically shift into base metals, and that's visible in the updated chart on slide 11. It's a chart similar to one I've used many times before, but we've added the FY 2023 actual year on the left. As you can see, we produced a lot of gold through 2023, on a review basis. No surprises there. Dargues operating Peak was producing good gold, Hera producing good gold. And let's be honest, when the Aussie dollar gold price is more than AUD 3,000, as it is at the moment, that's a great place to be. In that we're generating substantial cash, and we have generated cash from that gold, through last year, and we will continue to do so into this year, as you can see by the guidance that Martin has outlined. That said, we do transition. We transition very quickly to being a very well-balanced base metals producer. 2026 is what's approximated there on the chart on the right, and we will update that in due course. But you can see just visually, we shift from being very gold heavy to being a very well-balanced, but very base metals balanced business.
Andrew Graham
unknownWe’ve got a solid combination of copper and zinc, and for those of you who track commodities, both are down from where they’ve been. Copper still stands at a healthy price compared with its historical levels. And in our view, both metals have a strong future, driven by the move toward electrification and decarbonization. So what backs all of that up? I’ll move over to the next slide. The other item we put out today, alongside our full-year results, is our updated mineral resource and reserve statement, plus our production target statement. There’s a great deal of detail in those documents, and I really urge you to dig into them and spend some time reading so you fully grasp what the Aurelia business is. I mention that because, when you turn to page one of our mineral resource statement, 27 million tons, we hold a very, very substantial resource with very good grade inventory. But looking at it as that single total doesn’t really tell the story, since what you’re doing is blending copper ore together with zinc lead ore and with gold ore. So I’d strongly encourage you to consider it and examine it at a more granular level.
Andrew Graham
unknownSure — at the asset level, and specifically regarding Peak, it's worth looking even more closely, since Peak is ultimately a copper ore body as well as a lead-zinc ore body. We've set that out in both the mineral resource statement and the reserve statement, and that should give you a clearer picture of what Peak in particular is, and what Aurelia actually is. Moving to slide 12 on that point, here are a few highlights for us. First, just to flag right away on Peak: we haven't done much drilling this year. We discussed that through December and January. Part of the reason was cash preservation, you know. We cut back a great deal of drilling. We did keep drilling at Peak, especially underground near-mine drilling, and some of those results have come through today. You know, a substantial increase in resource for Chesney, for example, largely copper ore. Likewise, for us, quite excitingly, the release of a maiden resource for Burrabungie. It isn't huge — 220,000 tons — but a very, very good grade for us going forward, 2.1% copper, certainly economic as those tons begin to fill out. One of our tasks this year is to keep thinking about how that fills out and also what it means, particularly to the south, for other opportunities.
Andrew Graham
unknownIf you take a look at Peak, one thing worth pointing out is that it’s moving toward being heavily copper dominant. I believe in our resource statement we have 16 million tons, 1.8% copper and 0.9 grams gold. If an exploration company had something like that, everyone would be very excited about it. We have that in a greenfield setting within very, very short trucking distance of a fully operational, fully permitted processing plant. So I think it’s very, very well set up to transition from the ores it’s feeding today, largely gold heavy, largely zinc, into that very, very large copper inventory over time. We’re doing some work this year to think a bit about how that’s best processed at Peak and through the Peak plant, and whether there’s anything we can do to improve that. And Bryan touched on the fact that we’ll do a study on Great Cobar through the year. We have done a pre-Peak previously, but thinking about with all that we know now, is there something we can do around that to make it even better? On Federation, I did mention we didn’t do a lot of drilling this year.
Andrew Graham
unknownWe did cut back on one item: additional drilling at Federation. As a result, we definitely possessed a resource, a reserve, and a production target that fully backed the project's development. So advancing that development ranks as our top priority. The efficiency gains will stem from drilling underground, and we're—well, as was noted during the call, Redpath is on site right now, taking it deeper. As soon as those drill cuttings are available, we'll begin drilling from underground. Our budget also includes a plan for a modest amount of surface work, testing the extensions toward the northeast and the southwest. Still, we felt good about it. We cleared a massive drilling backlog. Keep in mind, five Drill Rigs were operating at Federation. We needed to get through all of that core, and we have. It mostly upgraded material across categories, backed up the inventory we held, and thus far our production target there hasn't really shifted. I'd like to highlight the MRO imaging. Anyone following our MREs would have noticed it in prior years. You know, 1.9 million tonnes at 2.2% copper.
Andrew Graham
unknownOnce more, any explorer that makes a discovery like that is going to generate a lot of excitement. That asset sits in our portfolio, and we have a plan for this year to carry out additional drilling around the imaging, and then begin considering how we turn that into mineable tons. Lastly, a quick word on Dargues: as we have previously disclosed, its life is 12-15 months, and that is captured both in the MRO and in the production target. We hold a good level of confidence in that inventory. What is genuinely challenging for us at this point is simply to keep running Dargues the way we have been through the remaining portion of its life. I will now hand over to Bryan, who I believe will take us through where things stand at Federation.
Bryan Quinn
unknownThanks, Andrew. As Martin pointed out, Federation got underway on August 1, with that first cut happening according to schedule. A considerable amount of effort is also underway regarding project changes that have now been issued, and that work is proceeding in line with the plan as well. Commitments have been placed for the critical long lead items — ventilation fans, roadheaders, and raise boring among them — and all of that is well and truly in progress. The photos on slide 13 simply show a couple of images. One is a long shot I captured roughly two weeks back during an inspection while I was at the mine. I think what matters most for Federation right now is that the team has settled in. It is settling into a routine. It is progressing well through the development phase and ramping up nicely. At present, about 40-50 people are working on site through Redpath and our own team, and our focus right now is very much on growing our team and positioning it for success. So I think the main takeaway for Federation is that following the funding being approved — the board approval — the project has truly kicked off in line with the expectations we laid out earlier in the year. We will keep optimizing and assessing scope as we move forward.
Bryan Quinn
unknownTo make sure it's clear, the project's overall capital comes to AUD 143 million, and our guidance for this year covers somewhere between AUD 70 million and AUD 80 million of that. So to sum up, we're genuinely in a strong position when it comes to resources and infrastructure. Our balance sheet is solid and backs our growth ambitions. We have a renewed vision for the company, which Andrew also discussed, and it truly pushes our focus toward base metals going forward, as shown in the graphics Andrew put up on slide 11. And it's really going to let us move ahead of our peers when it comes to generating returns from our business over roughly the next five years. If I could just turn to slide 14, there are six dot points there that matter. I issued a CEO's 100-day plan only 90 days ago, and those points remain very much on track. Naturally, point one, which is really about finalizing the revised vision and strategy. We've touched on that. It's well and truly underway, we're launching it, and we're rolling it out across the organization, with a strong focus on being a developer and the preferred developer and operator of choice for critical base metals.
Bryan Quinn
unknownLike I mentioned, you know, driving toward a low-carbon future, but truly centered on maximizing and delivering better returns for shareholders. When it comes to consistently meeting our operational goals and reinforcing our balance sheet, you know, we're really... Right now we have two major projects in progress. The first is really centered on unit costs and the volume potential at Peak, while also ensuring we maintain very strong capital discipline. And clearly, we're doing that as we attempt to fill the mill at Peak as fast as we can. So that's a substantial body of work and an active project. The team at Peak is fully committed to delivering it. And I think we're going to put some solid results on the board as we move through that project in the months ahead. The second, or third priority, is delivering the Federation Project. So obviously, as we discussed, the contract has been remobilized. Projects are now progressing quite nicely on the surface and holding to the timeline we've committed to. And clearly, the next major milestone for us will be the raise-bore contractor getting mobilized in December 2023. And the fourth, the Peak improvement program, is really focused on, yeah, how to extract more efficiency from Peak, in terms of overall efficiencies.
Bryan Quinn
unknownSo really, it's about reducing costs and making better use of our mill over the coming 18 months, ahead of Federation ore showing up. There's substantial work underway on the Cobar province model, and for us that's centered on how we best optimize material flow across the Cobar region — using our assets as we ramp up the broader business with Peak, hopefully delivering improved returns going forward, with Federation joining, the Great Cobar study wrapped up, and whatever other commercial options we examine, so that we fill our mills and deliver superior value. Andrew is essentially heading up that effort and reviewing the entire growth model for the region. We'll remain open to opportunities that emerge when it comes to commercial possibilities with other players in the fields. We genuinely want to be the catalyst that integrates that region and delivers superior returns to our shareholders. And finally, optimizing the management structure of the organization — really, managing the organization's risks and opportunities will be a very big focus.
Bryan Quinn
unknownWe're already well along in getting the organization to fit and be ready for our future, including parts of the several key roles, as we sort of settle the organization into the future phase we need to be in. I also want to give a big thank you to the relay team, as Martin did, for their response over really the last six months of stepping in and improving the performance of the company and really helping us set up for financial year 2024. As Martin said, I know there's a lot of people online from the company. We're going to do a staff call out after this as well, but to sort of provide a sense of the feedback and engage with our teams. But I really want to call out to those people. They're the ones sort of making this change and coming on a journey with us to improve our business. So that's all. So I'd like to now hand it over to questions and answers to the adjudicator, please.
Operator
operatorThank you. Should you like to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, press star two instead. In case you are using a speakerphone, please lift the headset before asking your question. Our first question is from William Taylor at Ord Minnett. Please proceed.
William Taylor
analystHello there, and good morning, Bryan and the team. I appreciate you hosting the call. I have a couple of items I wanted to concentrate on myself. First, regarding the FY 2024 guidance, it is certainly a stronger outlook than the one we previously had, which is encouraging to see. Turning to Peak, would you be able to give us some specifics on, I suppose, the factors driving the All-In Sustaining Cost expectations? So, aside from by-product pricing and sustaining capital, I suppose, are there any additional assumptions regarding cost initiatives that have been incorporated?
Bryan Quinn
unknownMartin, do you want to take that question?
Martin Cummings
unknownYeah. Thanks, Bryan. Morning, Will. I think deliverability is really the main thing we're focusing on for guidance this year. So we've put guidance together across the whole business, and it's all underpinned by our budget, a budget that our teams are behind, and that budget includes a deliverability component. So we haven't been too aggressive on the cost structure at either Peak or at Dargues, but we do see the opportunity there. So we've probably taken a different path, and instead of building that into guidance, we've put it into our incentive plans so people actually go after those savings. So really, the key at Peak next year is going to be getting development rates back up to where we want them. And that, in turn, opens up the headings so we can increase all mined. Obviously, we're looking at mining and milling rates that are above FY 2023. In the end, the medium-term objective is to fill that mill at Peak. The Federation is a significant ore source for that, but at the moment Peak is concentrating on those operational improvements. You know, Peak is a site that's very sensitive to volumes, and you'll have picked that up in the model. So anything we can do to lift that is going to flow through naturally to all-in sustaining costs.
Martin Cummings
unknownTo sum up, though, we haven't pushed particularly hard on expenses, and we've built in that softer zinc price as well. So yes, we feel pretty good about it.
William Taylor
analystAlright, that's great — thanks. So I'm just reflecting on what Andrew said regarding how we ought to view Peak when it comes to the copper side and the lead-zinc side of the operation. Could you give us any sense of what the tonnage might look like, say either as between copper and lead-zinc, or alternatively between the North mine and the South mine, across FY 2024?
Bryan Quinn
unknownAndrew, would you like to take it from here?
Andrew Graham
unknownThat aligns nicely with Matt or Martin, though it’s worth pointing out the pack on slide 17. I’m not certain whether you’ve seen that. We give somewhat more granular detail backing part of that guidance, and it does contain some information regarding Peak. Matt, that’s probably something you’d want to discuss in terms of how 24 unfolds? Just noting, Will, that we keep pursuing the high-grade zinc material, especially at South Mine, in the near term—broadly speaking—before we move to really pursuing copper at North Mine. Part of that comes down simply to NSR. It’s worth going after that material now. We know it’s there. It keeps growing as we drill. So we’ll keep pursuing it, which explains why we’re placing Federation, for instance, ahead of Great Cobar, and that we know there’s good material at Peak that we’ll keep pursuing, and afterward we’ll develop Northmine. But I might just hop over and hand things to Matt here from Peak. He might speak briefly about what he’s targeting for the year.
Martin Cummings
unknownYeah. Thanks, Andrew. All right, Will. So yeah, at New Cobar, up in the northern operations, we saw a drop in FY 2024 compared with FY 2023, and the main reason is that we mined out the developed stocks in Jubilee, which is the upper portion of the New Cobar system. So output there is heading from roughly 120,000 tonnes last year down to 65,000 tonnes this year. That's going to be offset by more lead zinc production coming from the South mine. So like Andrew said, even though over the long term we're transitioning from lead zinc to mostly copper, in the near term, FY 2024, we're actually turning out more lead zinc than we did copper in FY 2023. So that fall in copper from the northern operations gets offset by a rise in lead, mainly at Chronos, moving from 124,000 tonnes last year up to 195,000 tonnes this year. That covers most of the gap. Chronos will stay steady as a lead zinc feed at roughly 80,000 tonnes. We've got a small copper stope in the Hulk, picked up in the recent drill program, and it'll come in at about 20,000 tonnes at 3%. We're ramping up S400 production as well, even though that's mostly a gold lens.
Martin Cummings
unknownSo we had 20,000 tonnes last year, and this year it's 50,000 to 60,000 tonnes at 4.7 grams. That ore body truly is assessed stope by stope, depending on whether it's routed to the lead-zinc circuit or the copper circuit. So the grades are 0.7, 0.6, and 0.5 for copper, lead, and zinc, respectively. As a result, certain stopes run a bit richer in copper and are directed to the copper feed. Others carry somewhat more lead and zinc and go to the lead-zinc side. It also serves as an excellent blending material. The other major shift this year, which is bringing copper down, is the winding down of Perseverance Deeps. It was 67,000 tonnes last year, dropping to 40,000 to 50,000 tonnes this year, and that might just extend slightly into FY 2025, and that will mark the end of production at Perseverance. Thanks, Matt. Thanks, Andrew.
William Taylor
analystGreat, and many thanks for that. That was excellent. If I can just fit in one final quick question about Federation: is Redpath now at full staffing for that project? And regarding the long lead items, is anything among them currently on the project's critical path?
Bryan Quinn
unknownOn the Redpath side, they now have the resources needed to carry out the development work. So all the equipment is in place, and the shifts are essentially staffed to get that work done. Right now, obviously, that sits on the critical path. As for the long lead items, obviously, those are on the critical path as well. That's just how the project runs. But nothing points to us having any scheduling impact on the project rationale.
William Taylor
analystAll right, great — that's excellent, and I really appreciate it. I'll hand it over now.
Bryan Quinn
unknownAppreciate that, Will.
Operator
operatorIf you'd like to pose a question, just press star one on your phone once more and hold until your name is called. We're going to take a brief pause now so that participants can register their questions. Daniel Roden from Jefferies has our next question. Please proceed.
Daniel Roden
unknownHello Bryan, Andrew, and the Martin team — good day, and thanks for taking my question. I was just hoping you could speak to the Federation capital profile. The FY 2024 guidance of AUD 70–AUD 80 million is likely somewhat below the CapEx figure I had been pitching for the year. Are there any read-throughs from that capital profile that we can carry forward? Or is that, in a sense, larger within expectations?
Bryan Quinn
unknownMartin, could you take that question?
Martin Cummings
unknownOkay, thanks Dan, and good day. If we go back to April, we discussed capital of AUD 143 million. Working backwards from that, roughly AUD 108 million was what it took to reach commercial production, and about AUD 73 million got us to first ore. At that time, we said first ore — that stope ore — comes roughly 12 months following the restart. So on that basis, you'll remember what I said earlier: the guidance of AUD 70 million to AUD 80 million was broadly consistent with that capital profile. And bear in mind we mentioned 73, sort of, in this year. So there are no read-throughs here. We're on track as per April.
Daniel Roden
unknownYeah. All right, Matt, thanks. And I suppose I just want to pick up on what you were saying too, about — you know, clearly there have been shifts in costings, and metal prices have moved, I suppose, since the project was restarted. Is that — you know, it's probably still too soon to obviously be making any changes, but has that altered the way you're looking at the development timeframe, and also the schedule, and, like, where you're, you know, expecting to move into development, any of the, you know, timeframes that you're aiming for? Is any of that being affected?
Bryan Quinn
unknownLook, I'll take that one first. Right now, the plan hasn't changed at all. The project is essentially about delivering this on schedule and on cost. If you mean the Federation project, the plan remains the same. Beyond that, as we proceed with normal due diligence work, we'll keep revising the scope and optimizing the project so as to maximize value. But there's no kind of diversion of the project driven by current short-term pricing. Martin, any other comments from you? No, probably the only other thing I'd add would be to go back to those doughnut charts that Andrew spoke to then. So, we are gold dominant at the moment, and we have a very balanced revenue profile for the group. So, this year, the lower base has been supported by the higher gold. So, at the portfolio level, the portfolio is working for us. But no, we're not going to make changes based on any sort of short-term price action at the moment.
Martin Cummings
unknownI appreciate it.
Daniel Roden
unknownYes, thank you, everyone. I appreciate you taking the time. Thank you.
Operator
operatorThe following question is from Bill Murray of W. Murray Super Fund. Go right ahead.
Bill Murray
unknownCould you share a bit more detail on Chesney and Burrabungie—or maybe not the operations as they stand now, but rather where you expect those to head going forward?
Bryan Quinn
unknownAppreciate that, Bill. Andrew, do you want to address that yourself, or should we hand it over to Matt?
Andrew Graham
unknownMatt, perhaps you could start us off, and then I can talk a little about Burrabungie and what we're observing.
Matt Nuttall
unknownYeah. Thanks, Andrew. Yeah, morning, Bill. So Chesney is part of our FY 2024 production profile, and development there will kick off again from September. Jumbo's moving over next week, then. Happily, at Chesney, we've found the Eastern Gold lens sitting behind previously mined copper stopes up in upper Chesney, between the life of mine early this year and the budget pack. So development will begin in that area, we'll bring it online, and then there's some additional development in FY 2025 in both Chesney Upper and Chesney Lower. Output from the stopes this year is targeted at 24,000 tons at 0.4 grams gold and 2.2% copper.
Martin Cummings
unknownThere's actually a diamond drill sitting over there this month, so we're doing more drilling right now, especially at depth.
Andrew Graham
unknownThanks, Matt. I'll just continue from that point, focusing on the drilling. We had a drill at Perseverance Deeps, and once that wraps up within the next week or so, it'll be relocated to Chesney. The plan is to drill along strike as well as at depth, testing the strike extensions and the strong potential that continues at depth at Chesney. So that's a key priority for the very near term and for this year. We drilled Burrabungie from surface last year, and more recently we did some work from underground, which is really about trying to examine the connection between Chesney and Burrabungie. It suggests they aren't connected. They're separate lenses, which is what we anticipated, but we're really just trying to understand what surrounds it. We certainly haven't reached the bottom of Burrabungie. Another thing to note, and I'll mention it briefly, is the work to the south. So past Burrabungie, you come to Mount Pleasant, and then you reach Young Australian. Both have had some historic drilling. Both have items there that are interesting. So in our exploration plan for this year, we have some surface work on Mount Pleasant, which is a sort of mixed potential extending to the south.
Andrew Graham
unknownAnd then the year after that, we've got some funds budgeted in the forecast for Young Australian, which is the next one in line as well. So look, as usual with Peak, none of these ore bodies shows any sign of ending. One thing we're doing somewhat this year is attempting to wrap up certain sections, and assets such as Burrabungie, Mount Pleasant, Young Australian, and Chesney find, you know, that upside potential, which, you know, is definitely something Peak is recognized for.
Bill Murray
unknownYes. I have a couple more questions. Over at Federation, you had some nice gold intercepts. Do you plan to tackle that first in the production schedule, more or less?
Andrew Graham
unknownSure, Bryan, I'll take that question myself, if that works for you. The...
Bill Murray
unknownAll right.
Bryan Quinn
unknownYes, we did have some solid gold intercepts. The team has been focused on figuring out the gold and what governs it—so whether it’s the base and what governs that—and that will remain a focus when we carry out the underground drilling. That isn’t a gold hit and a gold lens as such. It’s tied to portions of the basement. So how it fits into the overall mining sequence is something my planning people will work through. But yes, the plan is to do additional work on gold at Federation. Over the last 12 months we did some fairly scientific work with UTAS aimed at understanding that, along with laser ablation and other techniques. And we’ll apply some of that this year as we try to gain a better understanding of that gold. But yes, certainly as you point out, it’s good to have those very high-grade gold intercepts, and we will definitely add to the NSR of that material.
Bill Murray
unknownAnd finally, regarding Dargues — that's a fairly modern plant. Once it eventually shuts down, could there be any chance of relocating it up to the Peak area?
Bryan Quinn
unknownYes, so essentially, the goal is that with Angus leading at Dargues, we’ll assess the options around what we accept, what we remediate, and what we bring up into the Peak area. Angus is heavily engaged in determining the kinds of projects we’ll pursue in the Peak region and in evaluating what makes sense to bring up versus what makes sense to sell versus what makes sense to simply demolish in some respects. So that’s a project we’ll be working on in detail over the next 12 months. Thanks for that question, Bill.
Bill Murray
unknownAll right, that covers everything. Thanks so much.
Operator
operatorThat brings us to the end of the question-and-answer portion. I'll turn things over to Mr. Quinn now for his closing comments.
Bryan Quinn
unknownI want to thank everybody for being with us today. I appreciate the questions that came up during the session we just finished. I hope the details you've received truly allow investors and the others listening in to grasp where our business is headed with respect to guidance, and to recognize the turnaround that has been under way over the past six months. We look forward to giving you more updates, of course, as the year unfolds, on the deliverables quarter by quarter. We feel quite confident that a solid plan is now in place. The team owns that plan and the budget, and they are strongly committed to delivering against it. Hopefully, we can uncover some upside too as we move through the year. Many thanks to all of you. I appreciate it, and I look forward to talking with everyone next time. Thanks so much to the Aurelia team, both those on the call and the wider group, for the continued support and deliverables.
Operator
operatorThat brings today's conference to a close. Thanks for joining us. You're welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.