Red Hill Minerals Limited (RHI) Earnings Call Transcript & Summary

February 28, 2024

ASX AU Materials Metals and Mining earnings

Earnings Call Speaker Segments

Operator

operator
#1

At this point, I'd like to pass the conference call to Mr. Bryan Quinn, our Managing Director and Chief Executive Officer. He has the floor.

Bryan Quinn

unknown
#2

Hello, everyone. This is Bryan Quinn, Managing Director and CEO of Aurelia Metals. Speaking for the whole team, I want to share several key points from our results for the first half of FY 2024. Thank you very much for being on the call today. With me are Martin Cummings, Aurelia Metals' Chief Financial Officer, and Andrew Graham, our Chief Development and Technical Officer. During today's presentation, we will reference the slides that came out earlier today, and we will devote some time — extra time, in fact — to the financial waterfalls and the exploration details that both Martin and Andrew will address. Across the first half of FY 2024, the business stayed on course to carry out our strategy, which involved Peak lifting volumes and meters compared with the prior corresponding period, the first half of FY 2023. Development meters at our Federation project keep advancing, and we remain on schedule for first stope ore in Q1 FY2025, while we aim to deliver that project inside the approved budget. Our cash position is still solid. We produced operating cash flow of AUD 34.3 million in H1 of FY2024, cash held in the bank stood at AUD 108.7 million, and overall liquidity came to a strong AUD 163 million. I will hand over to Martin, who can walk you through some of the specifics on that.

Bryan Quinn

unknown
#3

Broadly speaking, we’re in a solid position as we build out our growth portfolio, and we’re self-funded at present in H1. Hopefully the results we’ve released today will shed some light on why Aurelia Metals represents good value for our investors when compared with our peers. That said, we also recognize there’s still a lengthy road ahead before we deliver what we’re aiming for over the periods to come. Our operational discipline in bringing unit costs down to counter inflationary pressure remains a priority, and that effort is continuing across every area, including capital projects, operations, and corporate costs. We are beginning to see some of the benefits come through from that focus, but we recognize that substantial work is still targeted in H2 FY 2024 and also H1 into FY 2025, in order to deliver the sustainable step change we are aiming for. Right now, our focus is on lifting efficiencies and productivity in mining and maintenance, and on getting our uptime at the processing facility for the rest of H2. Our exploration team keeps drilling in the Cobar region with 4 rigs within H1 FY2024, and to date, and to date, delivering excellent and exciting results for the Aurelia business. In fact, we published some of those results from the Chesney North region at the Peak Mine and, more recently, Nymagee results last week.

Bryan Quinn

unknown
#4

That strengthens our belief that this region—and the leases inside the Aurelia portfolio—offers strong prospectivity for expanding upon our resource. Andrew will cover that in greater depth shortly. Still, it's obvious we're extremely pleased with these results and with the choices they give us for short- and medium-term business planning. Safety performance for H1 has fallen short of what we expect. We've seen slips, trips, and hand injuries, which has been disappointing—people haven't been going home the same way they arrived at work. We've implemented several measures. First, a real emphasis on front-line leadership, collaborating with our teams to spot hazards, and retraining staff in fundamental processes so the job is safer for them while they work. Second, we're putting substantial effort into fatal risk controls at every site, so we can genuinely grasp what those controls are, make sure people are trained in them, spot hazards far more often, and improve safety for everyone. Finally, we're examining significant risks too and determining how to establish the appropriate controls there as well.

Bryan Quinn

unknown
#5

We're taking a multi-pronged approach to really make sure we prevent injuries and also prevent fatalities, which obviously we don't want to see. So I'll just hand it over to Martin to walk through the next couple of slides on the group operational summary, and then I'll refer to some more detail around the operating business and the projects. Over to you, Martin.

Martin Cummings

unknown
#6

Thanks, Bryan. So first, we went through our operational performance and outlook in detail on the December quarterly call, but I'll give a quick recap of the outcomes, moving to slide four. Our production volumes were lower in the half versus the comparative period, including production from Hera. We closed the Hera Mine in March 2023, and the processing infrastructure was put on care and maintenance. You'll see throughout the fact that we've taken Hera out of the charts, excuse me, to highlight the impact after Hera. So excluding Hera, gold production was lower this half, driven by a 23% lower grade at Peak, and Dargues grade was also marginally lower. In addition, Peak processed about 10% less tons during this half. On the base metal side, though, production was the opposite story, with zinc and lead grades around 15%-17% higher. As we outlined in the quarterly, we expect higher production to finish FY2024, with higher grade and tons at Peak. Gold is expected to be in the upper half of the guidance range, with zinc and lead in the lower half of the range. And for copper, while it isn't a large production volume for us right now, we did reset that guidance lower in January, given the likelihood we would not achieve the original guidance.

Martin Cummings

unknown
#7

Gladly, we anticipate our all-in sustaining cost will come in inside the guidance range, and our operations are handling their costs effectively, which means spending is below what we had planned internally. Now if we look at slide five, covering the group's financial performance, it's encouraging that we've carried on the trend of better financial metrics right across the board. Without question, the comparative period shown on this slide — the first half of FY 2023 — was a disappointing one for the business, so some improvement was to be expected. During this half, our focus has been on lifting operational efficiencies and cost at Peak, along with producing solid cash returns from Dargues. That has delivered the material improvements visible on this slide. As I mentioned, we expect to build further on this in half two, with ongoing production growth at Peak and cash generation from Dargues. With all the mine development at Dargues now finished in the December quarter, we anticipate that strong cash flow will keep going. Moving along to Slide 6, this provides a little more detail on the revenue movements, which in total came in AUD 45 million below H1 FY 2023. We've broken out Hera. AUD 40 million of that variance was attributable to Hera.

Martin Cummings

unknown
#8

However, the other AUD 5 million came from shifts in volume and price. When it comes to gold, the drop in gold output was more than compensated for by stronger gold prices at Peak and Dargues, and the average price we received during this half stood at AUD 3,060 an ounce, compared with AUD 2,570 an ounce in the comparative period. On the base metals side, it was the blend of everything processed at Peak that truly drove the increase in lead-zinc output and the decrease in copper output. This half, Peak's mill feed was made up of 72% lead-zinc ore and 28% copper ore, while in the comparative period that blend was somewhat more balanced, at 55% lead-zinc and 45% copper ore. As I said earlier, lead-zinc grades also rose during this half. On volume, these differences basically cancelled each other out, so the primary effects here came from the weaker zinc prices we received this half. The realized price in the prior period was AUD 4,678 per ton for zinc, while the average realized price this half was roughly AUD 850 per ton lower, at 3,822 per ton. The final variance on this chart, as you'll see, concerned zinc treatment charges, for which we had lower contract rates in calendar year 2022 than in calendar year 2023.

Martin Cummings

unknown
#9

Looking ahead, we anticipate that those elevated gold prices will keep benefiting us through the second half, given an average hedge price of $3,072 an ounce on the rest of the production coming from Dargues. Lead and zinc are trading near the levels we realized in the first half, though the additional volume should translate into greater revenue. Moving now to slide seven, covering EBITDA and NPAT. As I mentioned, we did expect to show better EBITDA this period compared with the prior comparative period, and we have isolated the loss from Hera and added it back into the comparison in the chart at top right. On the earlier slide I discussed the reduced revenue from Peak, but what has really been pleasing this half is the progress we are making on operating costs. This variance sits within our mining costs. Mining unit costs decreased to AUD 125 a ton this half from AUD 164 a ton in H1 2023. As we presented in the quarterly, the December quarter unit rate came in at AUD 123 a ton. Our focus is on pushing that further down toward AUD 100 a ton, supported by both volume and cost-saving initiatives.

Martin Cummings

unknown
#10

Dargues kept up its robust and steady EBITDA output and performance, which let it capture the advantages of stronger gold prices during the half. As I said a moment ago, every bit of mine development at Dargues wrapped up in the December quarter, so we anticipate that cash generation and margin will carry on through to when operations end in early FY 2025. On corporate and other, the biggest shift in this chart for the first half is that the care and maintenance costs at Hera are now being included within corporate and other. And as I noted when we issued guidance, those costs come to roughly AUD 500,000-AUD 1 million each quarter. Turning to net profit, it was gratifying to bring the business back to a positive profit before tax, and that resulted from lower depreciation and amortization charges together with the higher EBITDA. D&A was somewhat lower this half, reflecting reduced production from Peak, and, since most of our assets are depreciated on a units of production basis, we would expect that to rise marginally in the second half. I should also point out that you'll see the income tax expense of AUD 2.7 million for the period came in a bit above what you'd anticipate as a normal tax movement.

Martin Cummings

unknown
#11

The primary factor behind that is a AUD 2.4 million adjustment we recorded, reflecting the gap between the tax refund we had anticipated at the 30 June accounts and the AUD 17.8 million we ultimately received — and I walked you through that during the quarterly. Lastly, on the subject of tax, you will see that we hold a deferred tax asset of AUD 9.2 million for carry forward losses as at 31 December, which has benefited, I suppose, from our having received AUD 27 million in actual tax refunds tied to tax losses across the last two years. We will likely recognize some further tax losses once Dargues is completed in early FY2025, and that calculation is something we are working through right now ahead of mine closure. I should be able to update you more fully on the tax position at Dargues when our full year accounts are released. And finally, let's move to slide eight, covering the balance sheet — clearly this has been a transformational stretch for the balance sheet, given the equity raise was completed and the refinance with Trafigura was closed. It is worth pausing to reflect on where the balance sheet stood at 31 December.

Martin Cummings

unknown
#12

So we finished the refinancing with Trafigura, and those facilities are now in place for developing Federation. Apart from a few equipment leases, we carry no debt, and we hold a substantial cash balance of AUD 108.7 million at the bank. In January we got another AUD 17.8 million from the tax refund, which brings our pro forma cash to roughly AUD 126 million. Under our finance facility there are no repayment obligations or cash backing requirements until the middle of calendar year 2025, and it runs for a four-year term. As of today, we are just six months into that term, the interest rate on our loan note is competitively priced at 6% over the benchmark, and we have no financial covenants. Something else I found pleasing during the half was that Peak and Dargues were able to fully fund our growth expenditure, which means the proceeds from the refinance remain largely untouched. Thanks for your time — I'll now hand the call back to Bryan.

Bryan Quinn

unknown
#13

Thanks, Martin. So I'll walk through how the project is running operationally, and after that I'll pass things over to Andrew, who can go into greater detail on the exciting exploration results that have been coming through. First, if you turn to slide nine, on Peak. Peak, as you'd expect, is centered on achieving that growth in volumes along with growth in meters, which puts us in position for a strong finish to FY 2024 and equally positions us well going into FY 2025. We have a set of projects already well advanced that will safely bring down unit costs while also examining ways to get the most value out of our production. Some of these — when you add up the productivity and efficiency initiatives currently before us — come to more than AUD 10 million. Development performance at Peak during H1 has come up in line with what we expected, and the focus now is on delivering that consistently, quarter after quarter, and clearly on finding ways to lower unit costs on those development meters. It's really good news for Peak that we've managed to bring those meters back to where they should be, and as a matter of fact, that has given us helpful room to have access to stopes — roughly several months ahead of where we were — so the preparation work for stoping can get done.

Bryan Quinn

unknown
#14

That does help lower the risk on the full-year production plans overall, but obviously we still have to get it to the surface, process it, and deliver that complete process for the organization. We rolled out the regional Cobar model — the leadership model — with Peak and with Federation in H1, and it has been implemented in H2. There are obviously opportunities around standardization, having one set of management team focused in the region. It's optimizing our mine plans, looking at how we think about trucking, optimizing the plant throughput, both from Peak and from Federation, going forward. And, you know, really setting up our crews and staff at Peak and Federation to align to one plan that can optimize the value out of that complex in that Cobar region that we call our Cobar regional model. At Dargues, the focus for the H2 period is really to safely and reliably retreat out of the mine, with production finishing in Q1 FY2025. While obviously safely maximizing cash from the operations, especially on the back of some very attractive high gold prices that we've been able to lock in. The work is well underway in parallel to the sale of the complete site, including the mill or just the mill, and in parallel, there's closure planning being well advanced in terms of the work in the actual site itself.

Bryan Quinn

unknown
#15

What matters a lot is that we’re figuring out which components from Dargues could be shifted over to the Cobar region, and that will generate capital savings for Cobar operations down the road too. Equipment like loaders, trucks, and light vehicles are examples of how we’re thinking about incorporating those into how we run things at Cobar. Naturally, all of this is being considered with an eye to how we get the most value back to shareholders from the sale and closure process, while also satisfying our provisional obligations to remediate the site in the proper sequence. At the same time, we’re collaborating with the Dargues workforce to explore how people might be redeployed into the Cobar region and/or, you know, working through completion timelines and the various close-out arrangements with team members who wish to depart when operations end. Also at Federation — the Federation project, obviously, the critical path has centered on developing the decline, and clearly on getting us into the stope area for Q1 of FY2025. Other critical-path activity has really been the infill drilling, obviously to settle where our stope location and setup will be. The first shaft raise bore was finished safely, and we’re just over 70% done on the second one, which ranks among the larger shafts.

Bryan Quinn

unknown
#16

The Burthong Road upgrade has been progressing extremely well, all things considered with the weather events and, you know, in effect, more than 8 km has been sealed and finished for that section of the project, which marks a significant milestone for Federation. Other important milestones during the period included underground electrical substations being set up in the decline and commissioned, and as I mentioned, the underground infill drill rig was positioned in one of the cutouts and has been drilling since early January. Every one of those events, clearly, all those activities kept going, even though we reported rain effects on development and potentially causing a halt to our development, for a stretch of time. We managed to keep most of the other activities going, running in parallel, and they have advanced to, as I said, the first shaft raises being finished, shot creted, and the second shaft is being raised with 70% complete. Just one final remark on Federation. You know, we clearly did report the pause in development because of the water and the rainfall, the impacts we had, and we later reported that we don't see this affecting our first ore in FY 2025, quarter one. All the equipment in terms of pumps and pipelines and still some work that was underway both before the event and during the rainfall event has now all been put in place.

Bryan Quinn

unknown
#17

We still have water management project work underway as we keep advancing our project, and that falls within both the project and operational scope needed to prepare the business for what lies ahead. On the strategic side, our growth team is continuing to examine optimization alternatives for our portfolio in the Cobar region so we can make use of our infrastructure as we keep configuring our operations to run our mills at full capacity. Naturally, that will depend on where we can maximize value and how we allocate our volumes. We're working through a number of options, and we'll share some insights on that down the road. It's plainly evident that we're considering what we hold internally as well as what our neighbors may potentially hold, and how we can capture synergies between each other to optimize our value. A great deal is happening in the operations and project space, and in the strategic space too, regarding how we optimize value going forward. I'll now hand over to Andrew to cover the specifics of our exploration plans and results.

Andrew Graham

unknown
#18

Thanks, Bryan, and for anyone following along, we're now on page 12 of the slide pack, where we highlight a bit of what we've been doing. And since the financial year began, we've issued three exploration releases, which really show how strong the tenement package is that we have there in Cobar, and also the prospectivity in mine and near mine. So the first of these releases featured amazing grade at our South Mine at Peak, in the Percy Deeps, which, you know, we got, for example, 13 meter at 17.6 grams gold, which is a fantastic hit in anyone's book. We also, on that same release, put out some information about Chesney South drilling, 11.5 meters at 1% copper and 1.9 grams gold. Again, a great hit. You know, testing that piece between Chesney South, or Chesney and the Burrabungie, opportunity. So some excellent results there for the Peak Mine. Also at Peak, we followed up in January with the results of our Chesney North exploration program. Six holes completed there, all hitting mineralization, copper mineralization. Just to call one out, 17 meters at 1.8% copper and 0.4 grams gold. Certainly fantastic from two points of view: great copper, great grade with a credit there of gold, but also very, very close to planned workings there at Chesney North, and giving us the potential to think about how we time grade Cobar, as we mine Chesney North ahead of it.

Andrew Graham

unknown
#19

For those of you following along, there’s a great photo in the slide of Dinesh, who’s part of our Cobar district team — in that instance, he was logging hole 81 of the Chesney North program. We really do have a great team on the ground there delivering these results. Then, to cap it all off, last week we put out a four-hole program at the historical Nymagee deposit. Just to highlight one example, hole 102-2 — you know, very strong intercepts of about 30 meters at roughly 2% copper, and that’s fantastic. But in addition to that, 7 meters of more than 17% zinc in the Western Lead Zinc Zone. And beyond that, some great copper grades in the Inter-lens stock work. So if you haven’t taken a look at that release, I’d encourage you to hop onto the ASX website or our own website and check it out. Some excellent drill results from our first four holes there at Nymagee, and we’ll certainly be following that up through FY 2025. So it’s great that these exploration programs are yielding results — really evidence of the strong prospectivity in and around and across our exploration package in Cobar, in Cobar — but also, you know, a fantastic showcase of the people we’ve got on the ground doing that exploration.

Andrew Graham

unknown
#20

So, turning it back over to Bryan to close things out.

Bryan Quinn

unknown
#21

Thanks, Andrew. As we've shown throughout the presentation, the management team is clearly very focused on hitting our full-year guidance and executing our growth plans. And as Andrew pointed out, there's some genuinely exciting work underway in unpacking, or uncovering, our prospectivity. And as Martin discussed when he walked through our financials and balance sheets, there are some really strong indicators that we're taking the team in the right direction. Like any business, we have our ups and downs, but our focus is squarely on developing and operating this premier base metals business in the highly prospective Cobar region, which by any measure is clearly tier one on a global basis. To sum up, for us it's really... What we want to do is highlight what underpins our vision going forward. We have this very strong, extensive resource base, and we're clearly uncovering more as our exploration program advances. We have established infrastructure in place, we have the 1.2 million-1.3 million tons, and really, we're examining how we can optimize that as we build, keep running Peak to extract maximum value from Peak, and start up Federation Mine in FY2025. How do we use our infrastructure to truly maximize throughput, while also maximizing cash and value for our shareholders?

Bryan Quinn

unknown
#22

That chance is sitting right in front of us, ready to be taken advantage of. As you can see, at the Peak Mine we're making a shift to become more copper-focused over the medium term — moving away from a base business centered on lead and zinc toward a greater copper emphasis, which is really exciting given the direction our company is taking. Going forward, we'll have several mines and several ore sources across both Peak and Federation, and that gives us the chance to optimize throughput through our mills and, clearly, to optimize cash flow for our shareholders as well. Federation is a fully funded high-grade project, and it remains on track for first ore. As we've highlighted, we're steadily moving forward through the scopes of work. At the end of January, commitments against our FY 2024 budget stood at 83%, and at the end of January, in overall terms, our total project sat at roughly 43% of the total project plan, which clearly carries into FY 2026. Beyond development, the priorities really center on electrical engineering works, the power station, and stage two construction works on site as we move into FY 2024 and FY 2025 for the Federation project. But again, it is fully funded, and we've more or less got a clear path toward reaching our first stope wall ahead of us.

Bryan Quinn

unknown
#23

I suppose, on the whole, if you take a look at our—there are plenty of initiatives in motion aimed at steadily boosting our productivity and bringing unit costs down, and those efforts are already well along. As I mentioned, we remain on a journey. There is still a great deal of work ahead of us, and that will carry on developing as we move forward as an organization. With any luck, all that effort will begin delivering results for us in H2 and on into FY 2025 too. So I'll stop there and hand things over to Betsy so we can begin the Q&A, and after that I'll return with a few closing remarks.

Operator

operator
#24

Thank you. To ask a question, press star one on your phone and wait for us to announce your name. Should you want to withdraw that request, press star followed by two. In case you're using a speakerphone, please lift the handset before posing your question. Our first question comes from Daniel Roden at Jefferies. Please go ahead.

Daniel Roden

unknown
#25

Hello, and thank you to Bryan, Martin, and Andrew. Congratulations on today’s results. I’d like to begin with you, Martin, on a few of the financial points. Regarding how you use your tax losses, you have AUD 9.2 million. There could be additional amounts arising from Dargues once that transaction closes. What is the expectation for when those will flow into the income statement? In other words, when will those tax losses be utilized going forward?

Martin Cummings

unknown
#26

Regarding the profile — hi, Dan. With Federation, the way we'll obtain the tax deductions is, as you're aware, mining development gives us immediate deductions. So early on at Federation, as ore begins being mined, there's something of a tax shield. And then, as you mentioned, we have those AUD 9.2 million in carry-forward tax losses. So given that starting position and the natural shield from the higher development early in the mine's life, our models show no tax payments in the near term. I spoke about commercial production coming out of Federation. A life of mine process is underway right now, but after stope ore, that commercial production window — on the old plans — was roughly six to nine months following first stope ore. So that's approximately the timeframe in which the operation won't be cash positive. But commercial production will land at around about the point when it starts to break even. I hope that gives you a bit of color. So really nothing in the short term.

Daniel Roden

unknown
#27

Yep. No, that's perfect—great. I also wanted to touch briefly on depreciation. This may be somewhat a matter of semantics, but even after accounting for Hera being removed, the figures I was arriving at on a units-of-production basis showed depreciation for the past year somewhat higher. So I was just wondering—how should we think about the outlook for the rest of FY 2024, and also going into FY 2025, once Federation comes online? Similarly, what's the expectation for depreciation over the next two years, I guess?

Martin Cummings

unknown
#28

I’m not going to provide guidance for year two, but I can offer some direction for this half. As I said, many of our assets sit on a units-of-production basis, so production was lower in the half, and as a result depreciation unwound somewhat more slowly, consistent with that. The other item we’re addressing is the Dargues assets. A substantial amount of work is underway right now to determine the remaining values and how those assets will unwind, and part of that was actually run through in this half. That relates to recalibrating Dargues to the expected completion date of the first quarter of 2025. For the remainder of this year, as I think I noted, I expect depreciation to be modestly higher than in the first half, simply because production is higher. Then I’ll provide some guidance on how Federation depreciation looks over time.

Daniel Roden

unknown
#29

Great, thanks. And I might put one more question to the group as a whole. With the Cobar Basin optimization projects slated for FY 2024, I wanted to unpack where things currently stand, I suppose, on Great Cobar — and there was some mention of organic and inorganic synergies in exploration, and perhaps from some of your neighbors, around what that profile might look like. So, yes, I just wanted to, I suppose— ...ask and get a bit more understanding of the current thinking on the Cobar Basin strategy and how Great Cobar fits into that profile?

Bryan Quinn

unknown
#30

Andrew, would you like to take this one?

Andrew Graham

unknown
#31

Yes, I will. Thanks for that question, Dan. Look, I believe the most important thing to start with is that we have a highly robust plan that we are capable of delivering, and that is the very plan we have already shared with the market. Building Federation, and moving a portion of that Federation material along the road up to Peak. We hold a permit allowing us to do so, and after that, switching on Hera at the appropriate moment. From there, a natural order exists at Peak: mining South Mine, high NSR materials, which is mostly the case right now. As Bryan mentioned, it is in a sense shifting toward North Mine and copper over time. How that order works and the timing of it is the central element of our life-of-mine planning work, and that effort is underway right now. You know, for Great Cobar it genuinely comes down to a choice between carrying on mining the ores directly in front of us at North Mine, or else spending the time, the effort, and then the money to reach the other Great Cobar when it makes sense. So that will be a key output of our life-of-mine work currently. You know, obviously it is a shifting picture as we drill holes and obtain excellent results, as we have been doing, so it is really about factoring in all of that latest information.

Andrew Graham

unknown
#32

On the second part of your question, specifically regarding third parties, I discussed this during last quarter's call. Given that we have two excellent mills in the Cobar Basin, it would be a mistake for us not to consider the potential for collaborating with others. However, at present, we have an exceptionally robust supply and pipeline of material coming from both Federation and the Peak Mine. So our main focus right now is really on sequencing those to maximize value.

Daniel Roden

unknown
#33

Okay, thank you.

Andrew Graham

unknown
#34

I hope that addresses what you were asking, Dan.

Daniel Roden

unknown
#35

Yeah. Yeah, no, it certainly does. That's great. Appreciate it, everyone. I'll turn it over now. Thanks.

Operator

operator
#36

Our following question is from Adam Baker of Macquarie. You have the floor.

Adam Baker

analyst
#37

Hello, Bryan and everyone. Appreciate you fitting my question in. I just have one about Federation. From what I can tell, your growth CapEx for this financial year is weighted toward the back half, roughly AUD 40 to AUD 50 million. How much of that CapEx will carry over into FY 2025, until that project's development, I suppose, shifts over to sustaining? Thank you.

Martin Cummings

unknown
#38

Hi Adam, it's Martin here. So yes, we're still keeping that 70-80 guidance for this year. So your assumption about the spending rate in the second half is right. You may remember that when we went through the feasibility study update, the shift in capital from what we referred to as first stope ore through to commercial ore came to roughly AUD 30 million, a little above AUD 30 million. That included some capitalized production. So some operating costs were beginning to come through, and we were capitalizing those, and capitalizing the revenue too. So through to commercial production, which is about, as I mentioned, 6 to 9 months after first stope ore, it was a net of approximately AUD 30 million. And then it will begin to transition to... There will still be heightened mine development taking place during that period, but some of the other costs will end up sitting in production activities, so and operating costs. That's probably the best color at this point. Obviously, we'll provide you with some more as part of next year's guidance on how it looks.

Adam Baker

analyst
#39

Appreciate it. And just to confirm, both the raised bore shafts and putting in the ventilation stands — all of that is included in the FY 2024 guidance, right?

Bryan Quinn

unknown
#40

Right, on ventilation — the raise boring for one shaft is finished, and it's been shocked, obviously. The second shaft we're working on is at 70% complete; its work will be done, and the third shaft will also be raised during this financial year. Clearly, the various activities — ventilation fans and so forth, or egress ladders — will generally be installed in this financial year, ready for our first stope ore in Q1 FY2025. So, and, and—

Adam Baker

analyst
#41

I appreciate that.

Bryan Quinn

unknown
#42

Regarding the financial side, those items already have commitments attached, so in a sense it is already out there in the market, and the funds are being spent during FY2025 and FY2024.

Adam Baker

analyst
#43

Understood. And just to follow up on that, regarding Federation's first commercial production and the six to nine month ramp-up from first stope ore, is it fair to infer that puts you at the 600,000 ton per annum run rate by the March quarter of next year?

Martin Cummings

unknown
#44

No, no. So at that time it was roughly 20,000 tons per month, and then obviously we ramp up gradually after that to the nameplate capacity of 50,000 tons a month.

Adam Baker

analyst
#45

Understood. So yes, there’s still some additional ramp-up ahead beyond that point.

Martin Cummings

unknown
#46

Correct.

Adam Baker

analyst
#47

Okay, thank you so much, and cheers.

Martin Cummings

unknown
#48

That's a huge jump, honestly — moving from 20 up to 50. Yeah.

Operator

operator
#49

Paul Kaner of Ord Minnett has the next question. Go ahead, please.

Paul Kaner

analyst
#50

Hello, Bryan and everyone. Thank you, appreciate you taking my questions. No, I don't have any financial questions, but perhaps just a few about operations. So first, at Chesney, you filed your first stope, a production stope there. ... was that always planned to come into the mining sequence this early in FY 2024, or, or are you simply being somewhat more opportunistic given those, recent drill results?

Bryan Quinn

unknown
#51

When you mention Chesney, do you mean the Chesney operations specifically — the ones that are part of the operations?

Paul Kaner

analyst
#52

Yeah. Yeah.

Bryan Quinn

unknown
#53

Right, so the sequence — essentially, the order of things at the Peak Mine has been, as we mentioned during the quarterly, we shifted a number of stopes out of Q3 and into Q2, and then clearly some stopes moved from Q2 into Q3. Those stopes are being mined progressively at this point. And when you consider the full year of FY 2024, well, the goal, the intention is to stay reasonably near that sequence, obviously including the Chesney area too, which we had built into the plan from that period. But the exploration results Andrew is referring to will, of course, go through our own processes and then be incorporated into the LOM moving forward. I believe that addresses your question. It's just a little difficult to make out what you said, that's all.

Paul Kaner

analyst
#54

Right, that's clear. I only wanted to confirm nothing had been moved up in the schedule, and you covered that regardless. Then, second point, regarding the recent rain, it's encouraging to hear the first stope bore at Fed remains on schedule. Would you be able to expand a bit further on the tailings facility at Hera and how it handled the recent rainfall?

Bryan Quinn

unknown
#55

Right, so about the rain — the rainfall up there is really localized, as you know. Hera can get a lot of rain while Federation gets very little, and the reverse also happens. Some of it may not even hit the Peak at all, since that's almost 100 km away. We had a plan to put in additional pipelines linking Federation and Hera so we could pump water from Federation over to Hera. Those pipes are sitting on the ground, but they simply weren't installed in time. We're also partway through building a spillway in the TSF to handle any big rain events that could push past the dam's levels — that was to safeguard the dam against any possible overflow or event down the track if we got heavy rain. So all of that work has now been completed. The spillway is done and the pipelines are done. There are still a few small jobs left on them, and four water cannons have now been installed in the TSF. The whole point of that design is essentially to get the water in there and evaporate it using the cannons.

Bryan Quinn

unknown
#56

And additional plans are coming that will bring in other large evaporators too, to assist with that. So the work was… much of it was planned, and much remains to be done when it comes to getting the operation fully set up so it can run at full capacity down the road. But since it's a project, we simply didn't have all of those things in place that we'd love to have in place if it were operating.

Paul Kaner

analyst
#57

Right, that tracks. Nothing else from my side. Appreciate it.

Operator

operator
#58

Our following question is from David Coates at Bell Potter Securities. Kindly proceed.

David Coates

unknown
#59

Thanks. Thank you, Bryan. I appreciate the presentation and the call this morning. I just have one quick question about the unit cost savings you're aiming for — that target of AUD 100 a ton. Where do you see the opportunities to achieve those savings? Is it economies of scale, or perhaps more jumbo headings or something along those lines, or what are the main things you're looking at?

Bryan Quinn

unknown
#60

Sure, thanks David. That's a reasonable question. There are a few factors here. Clearly, volume is one of the drivers. Greater volume is among the advantages where unit cost is concerned. But to achieve that volume, development meters need to be ahead, so you have places where you can actually mine and produce the stopes to make it happen. So clearly, bringing our jumbo performance up to the right level matters, and we've recently relocated a jumbo from Dargues to Peak. That means we now have two machines of the same type operating at Peak, which suits the conditions there. So getting those two jumbos performing really well, getting the meters, getting us three or four months ahead when it comes to stope options, clearly lets us examine ways to bring the volume on. So that's clearly a major metric. The other items really concern unit costs around maintenance, having the correct strategy for our equipment. It concerns mining costs, what we're doing in the mine, the use of contractors versus owner-employees, and making sure we have the right number of people carrying out the right activities.

Bryan Quinn

unknown
#61

There is a great deal of effort underway aimed at becoming more efficient, and additionally on the premise that we can achieve improved productivity too by having those development meters out in front and genuinely, thoroughly enhanced. It also boils down to simply having a sharper emphasis on the availability and utilization that we possess. For those — you know, across several years, our cage riding facility has not been operational. Getting it operational down the road will allow us to bring people back into the mine and use their time far more efficiently too, and it provides us with hours on equipment and clearly can lower our costs indirectly as well by having the correct count of people operating their equipment the correct way. Right through to items like, Dave, you know, even simply ensuring the proper load sits on every truck, moving between the bogger and the dump. So ensuring we are employing what it was designed for delivers better productivity gains for us too, and brings our unit costs down. So those are all the generic kinds of items we are concentrating on at the site, but it is a target we are aiming toward. You know, you have witnessed the kind of decline that has occurred up to now, and we think there is further to go, and the team is pursuing it.

David Coates

unknown
#62

You brought up people as being a piece of that equation. With the difficult circumstances the fellas at the nickel mines out west are facing, are you seeing greater availability of skilled labor, or does that not really filter through?

Bryan Quinn

unknown
#63

So at Peak, we've clearly been hiring, and as part of what changed last year when Pybar demobilized from the mine, we built up an owner-operator setup and have steadily been bringing people into those roles over the last 12 months. I'd say we've seen somewhat more people becoming available and raising their hand from the west. That said, the East Coast — Victoria, New South Wales, and Queensland — is really our core market. We recently put a charter in place starting December to create opportunities in places where we can't source labor locally, so we can bring people in from Brisbane or other eastern suburbs, eastern state areas, and simply add them to the roster of our charter, which gives us more efficiency while also opening the market to people who might have been flying west and are now glad to fly a much shorter distance and work on the East Coast at a sort of mine that we believe has good growth potential.

David Coates

unknown
#64

Great. All right, many thanks, everyone. Thanks.

Operator

operator
#65

Just a quick reminder — if you'd like to ask something, hit star and one to get into the queue. Our next question is from Bill Murray, a private investor. Go right ahead.

Speaker

unknown
#66

A few years back, when drilling at Nymagee was halted, the main issue was seen as metallurgical. Has that been resolved now?

Bryan Quinn

unknown
#67

Andrew, do you want to take that question?

Andrew Graham

unknown
#68

Absolutely. Thanks for the question this morning, Bill. Look, we haven't done any further metallurgical test work over the last six months. What we've done is exploration drilling. We are fully aware of Nymagee's history and some of the question marks around deleterious elements and other things. In the drilling we completed, we certainly didn't see any arsenic, which is good. That's certainly been reported in the past. The talc — we did see talc, but it was just within that lead-zinc zone. And if you think historically, when they were doing the original study and thinking about bringing the mine on, they were looking at bringing that lead-zinc material in early in the piece, and it made up a fair portion of the feed. So I could kind of see why, you know, talc was front of mind at that time. And talc is resolvable, metallurgically, but it's about understanding what we have first, then think about how we, we do that. And similarly with pyrrhotite. We definitely saw pyrrhotite, with the copper lens. Again, it can be resolved metallurgically, but our focus at the moment, Bill, is, is to understand the ore body, drill it out, get additional inventory, understand what that inventory looks like, and then think about, in a study phase, how we would then treat that material once we have sufficient inventory at good grade.

Speaker

unknown
#69

Here's another one: for the Hera upgrade at the mill, do you have any timeframe for when it would treat the Federation ore? And any sense of what that's going to cost?

Andrew Graham

unknown
#70

I might continue for a bit, Bryan, if you don't mind. So essentially, under the base plan we have, the high-grade lead-zinc material, the high-grade gold material, and the high-grade copper material from Federation are taken up to Peak, and they get processed through Peak, which suits products like that far better — a plant with the gold-lead circuit, so it's very well matched. The plan as it stands then leaves the lower-grade material, the lower-grade lead-zinc material, to be treated through Hera, and under the current plan it runs through the plant essentially in the way we had it when we switched it off. That then produces the bulk lead-zinc concentrate. To restart it — obviously the plant was shut down operationally, the way it was when it was running. So restarting is a matter of bringing it back to how it was. We had a contract crusher on site, and that has since been demobilized, so the crusher will need to be remobilized. But apart from that, the plant, aside from the work needed to return it to its original state, in its base form, shouldn't require a huge amount of work and shouldn't be particularly expensive. One of the pieces of work we're doing as part of that Cobar optimization, though, is asking: where could we spend or deploy targeted capital to improve what we're doing there at Hera, in a go-forward sense?

Andrew Graham

unknown
#71

That effort is still underway. But as you know, the foundation we discussed before and shared publicly amounts essentially to restoring Hera to its prior operating state.

Speaker

unknown
#72

I've got nothing further to add. Appreciate it.

Operator

operator
#73

That brings us to the end of the question-and-answer session. At this point, I'll return the floor to Mr. Bryan Quinn, who will offer some closing comments.

Bryan Quinn

unknown
#74

Thanks, Betsy. And to close things out, thank you all for being on the call, and many thanks for the questions, which let us share those answers with everyone listening. Look, as a team, we obviously understand that we do have a solid value proposition ahead of us, and it falls to us to grow our base metals businesses in this tier one location so that value is truly maximized. Right now, four of our key focus areas are making sure our people stay safe, making sure we do all the right things to deliver peak performance wherever it can be achieved, and making sure we get the first stope at the Federation project underway and keep it a focus for Q1 FY2025. Importantly, we also need to keep safely maximizing the cash coming out of Dargues, and in parallel prepare for closure, making sure we look after the people, and also making sure we have a clear path to demobilize and remediate that site. And obviously, get some value out of what is actually there on site. So in terms of where we're headed, in our base position, we do have a resource, and we're continuing to unpack what that prospectivity looks like, as Andrew described.

Bryan Quinn

unknown
#75

As we also mentioned, we are clearly examining very closely how to get the most value out of the infrastructure. The infrastructure is in fact ours, and the question is how we deploy capital in the right place to ensure we can maximize it. You know, the high-grade Federation project is actually under construction, and we are progressing through all the critical path items and kind of working our way toward the point where we can reach this first stope. Importantly, as Martin pointed out, you know, on the financial side, we are in a good position, particularly compared with our peers. We have very much a strong balance sheet. Cash is funding our growth at the moment, and obviously, we need to maintain that focus going forward. And we have significant work underway, sort of, to try to improve our performance, both on the productivity side and the efficiency side of things, and that is happening at the sites as well. So we have a lot to do, and we have a plan to get there, but it is important that we sort of, you know, quarter by quarter, keep pushing for our performance and be credible in what we are trying to achieve. So thank you very much. I do appreciate the team, the Aurelia team and all the contracted partners working with us.

Bryan Quinn

unknown
#76

All of our people are dedicating themselves to achieving these outcomes. I also want to acknowledge our investors' backing, along with the feedback they have provided us each quarter. Betsy, that covers everything from my side—thank you all for joining, and I appreciate it.

Operator

operator
#77

That brings today’s conference call to a close. We appreciate everyone joining us. You’re welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Red Hill Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Red Hill Minerals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Red Hill Minerals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.