Redwire Corporation (RDW) Earnings Call Transcript & Summary

March 29, 2023

New York Stock Exchange US Industrials Aerospace and Defense earnings 45 min

Earnings Call Speaker Segments

Jeff Zeunik

executive
#1

Appreciate that, Shari. Morning, everybody. Glad you could join Redwire's call covering the fourth quarter and full year of 2022 results. Ideally you've already looked at our earnings release, sent out earlier today. That document is also available on the investor relations page of our site, redwirespace.com. I want to point out that throughout this call, Redwire management could issue forward-looking statements expressing our beliefs, expectations, intentions, or predictions about what lies ahead. Such statements carry risks and uncertainties, which get spelled out more thoroughly on slide two. Also, where non-GAAP metrics come up during this call, please refer to slide three, our earnings release, or the investor presentation posted on our website to see how these metrics are calculated and reconciled with GAAP. As noted earlier, I'm Jeff Zeunik, serving as Redwire's Senior Vice President of Financial Planning and Analysis. Alongside me today are Peter Cannito, our Chairman and Chief Executive Officer, plus Jonathan Baliff, our Chief Financial Officer. Now I'd like to hand things over to Pete. Pete?

Peter Cannito

executive
#2

Thanks, Jeff. On this call, I’ll walk everyone through what we achieved in Q4 and the entire 2022 fiscal year, and then Jonathan will cover the financial results for those same periods. After that, we’ll share some thoughts on how we’re approaching 2023, and then we’ll take questions. But first, for anyone joining us who’s new, let me begin by describing where the space sector stands right now and how Redwire fits into it. We’re in the opening chapter of a new worldwide space race that will span many decades, and agencies in the United States, Europe, and elsewhere are placing growing emphasis on space as an arena of competition. On top of that, the wider commercial marketplace wants space capabilities right now, rather than a promise for some later date, and we think Redwire sits in an ideal spot to benefit from both of those forces. Go to slide five, please. Go to slide six, please. Redwire is a pure-play space infrastructure business, delivering Mission Solutions and payloads to civil, commercial, and national security space clients. Our purpose is to speed up humanity’s growth into space by providing dependable, cost-effective, and sustainable infrastructure for generations to come. Thanks to decades of demonstrated flight heritage, paired with inventive products and an inventive culture, Redwire holds a distinctive position to help customers work through the intricate difficulties of upcoming space missions and industries. Three main priority areas make up our business. The first is supplying space mission providers — government agencies and major prime contractors among them — with an extensive portfolio of space infrastructure, systems, subsystems, and components. The second is delivering the infrastructure and technology required so that people can live and work in space on a permanent basis. The third is helping allied space-faring nations build their own indigenous space capabilities; across 2022 we showed many achievements in these three priority areas, among them having Redwire products aboard nine launches during 2022, and five of those launches took place in Q4. Right now 15 payloads are in operation on the International Space Station, and we’ve expanded to more than 700 employees across 11 facilities in the United States and Europe. Go to slide seven, please. Looking back, Q4 of 2022 stood out as the strongest quarter Redwire has ever had. Revenue came in at $53.7 million, the largest figure for any quarter so far. We finished both the quarter and the entire year with total backlog of $465.1 million. We completed our purchase of Space NV, which was our second acquisition globally. Our adjusted EBITDA for Q4 2022 rose by more than 47.5% compared with Q3 2022. Across those five Q4 launches I just referenced, we sent up 11 products and capabilities. That quarter was excellent. Go to slide eight, please. Beginning with backlog, I’m delighted to say that backlog increased 71.2% between the close of 2021 and December 31, 2022. So, at the close of 2021, our total backlog stood at a highly respectable $271.6 million, as you can see. Driven by robust demand for what we offer in products and services, that backlog figure climbed to $465.1 million by the end of 2022. That represented a remarkable accomplishment whether you look at it in absolute terms or as a percentage, and it has handed us considerable momentum as we enter 2023. Now please go to slide nine. Redwire enjoyed a record-setting year in 2022. Across the entirety of 2022, we increased Redwire's total revenue by 16.7%. That top-line expansion came from a highly varied mix of long-term government contracts alongside marquee commercial customers possessing strong financial backing, names like Boeing, Lockheed Martin, and numerous others. Such variety and resilience provide Redwire with a dependable base for growth going forward. Please go to slide 10. What generated this revenue? At Redwire, we serve as a crucial mission enabler for our customers throughout their most significant missions. During our latest quarter, Q4 2022, the slides that follow will spotlight only a handful of examples of wins that demonstrate how vital our capabilities are. To illustrate, during Q4, two more Redwire Roll-Out Solar Arrays, also known as ROSAs, were mounted on the International Space Station, which raised the count to 4 four of our ROSAs, delivering essential power to that vital international asset. Additional units are coming during 2023; that stands as a superb illustration of how we deliver results right now, rather than only down the road. At the bottom of slide 10, we call attention to how existing flight heritage opens doors to upcoming opportunities, since we have been picked to serve as a trusted power supplier on the lunar surface going forward. As we announced previously, during Q4, the Astrobotic VSAT program chose Redwire to supply a retractable vertical solar array that will extend to a height of 32 ft. This effort is central to delivering critical power infrastructure on the Moon's surface. Please go to slide 11. On November 16th, 2022, the United States made space history yet again by launching Artemis I. Naturally, Redwire participated as a member of this history-making team. Redwire supplied the Orion capsule with a combined 11 internal and external cameras, which explains why we call Redwire the Eyes of Orion; those cameras supported the whole 268,563 mile journey without fail. That marked the farthest distance ever traveled by a spacecraft built for human transportation up to now. Redwire's cameras plainly showed why we are the trusted optics for the mission; those incredible images returned from the Redwire cameras aboard Orion will inspire generations ahead, and we look forward to joining the team on upcoming Artemis missions. Please go to slide 12. As I noted when this presentation began, Redwire leads when it comes to enabling humanity's ability to explore, live, and work in space. By doing this, we sit at the forefront of microgravity study, which could dramatically transform life right here on Earth. Take Redwire, for instance — we have the very first bioprinter that's permanently housed on the ISS. During Q4, we sent up a mission to utilize our BioFabrication Facility for printing a meniscus, which is a vital component of the knee. That meniscus will undergo a total of 14 days of culturing through a sophisticated scientific experiment procedure that Redwire also supplied. This kind of investigation represents a major move toward grasping how microgravity might hold the answer to future creation of bio structures capable of transforming healthcare, and Redwire leads the way in this area. Now, please go to slide 13. If we want humanity to gain the capacity to explore, reside, and labor at great distances from Earth across extended timeframes, successfully establishing agriculture in space is essential. Redwire is tackling this essential challenge. In Q4, on Northrop Grumman CRS-18, a commercial resupply mission headed to the ISS, 240 seeds were dispatched into space as part of our Plant Habitat-03 study, and they will spend 91 days developing within the habitat. What we learn from this trial is aiding in laying the groundwork of understanding required to scale up space agriculture into mass production. Gaining insight into farming under microgravity conditions matters for creating a lasting human footprint in space.

Peter Cannito

executive
#3

I'm sure that by learning how to cultivate plants in orbit, we'll pick up information that also assists us in raising crops more efficiently down here on Earth as we go. Kindly go to slide 14. Space, naturally, is a worldwide undertaking. To shine a light on the remarkable initiatives and the ways our newest Redwire colleagues' skills fit together, I want to call attention to a Space NV initiative named T-PAOLA, which went up in Q4 on the SpaceX CRS-26 mission headed for the International Space Station. T-PAOLA is a test conceived and assembled by Redwire Space NV in Belgium, aiming to uncover fresh rules governing how solid particles behave within liquids. It draws on the Space NV Selectable Optic Diagnostic Instrument, which has studied more than 30 liquids in orbit across the last 13 years; that's truly remarkable space heritage. Kindly go to slide 15. As is evident, buying Europe's Space NV during Q4 2022 has greatly broadened Redwire's worldwide reach and the range of what we do. Space NV holds a rich lineup of core space infrastructure products that are deeply synergistic and complementary, and it brings substantial heritage through more than 100 missions spanning human spaceflight, satellites, and interplanetary exploration, plus upwards of 35 years of experience in orbit. Space NV's revenue for 2022 came to roughly $58.9 million, contributing $11.7 million toward our yearly revenue from the deal's closing on October 31st through the close of 2022. Kindly go to slide 16. As I noted, Q4 capped off a record-setting year at Redwire on a strong note, positioning us for ongoing success in 2023. During 2022, our book-to-bill ratio reached 2.04, and contracted backlog better than doubled, rising by 124%, which brought total backlog to $465.1 million at the close of 2022; this bolsters our assurance about future expansion and steadiness; with that, I'd like to hand the call over now to Jonathan Baliff, Redwire's Chief Financial Officer. Once Jonathan finishes his comments, I'll share a handful of closing reflections, then we'll take questions and answers. Jonathan.

Jonathan Baliff

executive
#4

Thanks, Pete. If you could go ahead and pull up slide 18. Just like we did last quarter, I'm going to walk through some of the financial specifics behind the commercial and operational points Pete just covered. First, I'll hit the key financial takeaways, beginning with quarterly revenue on the chart to your right, then move through the rest of the quarterly financials. Second, I'll cover the main takeaways for the full year 2022. A few things worth repeating from what Pete said as part of this financial highlight. One, Redwire keeps delivering for our government and marquee customers on critical improvement space infrastructure and payloads, which includes the Space NV T-PA OLA science experiment, iROSA Power Solutions, Artemis Camera Systems, and the BioFabrication Facility. Those infrastructure solutions, systems, and payloads, along with others, drove record revenue for the fourth quarter of 2022 and for the full year, and that's even before counting anything from Space NV. Two, turning to Space NV, Redwire completed this financially accreted transaction in under a month, on October 31st, 2022, which broadens our revenue diversification with additional government and marquee customers and lifts our financial performance as we keep scaling and generating more operating leverage in this business for 2023. Third, Redwire's infrastructure offerings are fueling unprecedented expansion in our overall backlog, and particularly in the contracted portion of that backlog during this quarter. Finally, having brought in approximately $81 million of capital while achieving stronger free cash flow in Q4, Redwire strengthened its balance sheet and entered 2023 with the highest liquidity level on record. The chart to the right illustrates that Q4 2022 revenue reached $53.7 million, up from $37.2 million in Q3 — a 44.2% quarter-over-quarter gain; this demonstrates our ongoing quarterly revenue improvement and yielded a 63.4% increase in Q4 2020 revenue relative to Q1 2022. As Pete noted, starting October 31st, Space NV added $11.7 million to what we earned in the fourth quarter. We also saw our Q4 revenue lifted by contract additions worth $91.2 million during that quarter, which fed into total backlog. Those arrived in addition to $109.8 million in backlog acquired through Space NV. To give one example of this growth, among the biggest power supply infrastructure contracts ever won by Redwire, one alone brought in $5.5 million of revenue in the fourth quarter; and even without counting the $11.7 million that Space NV provided, our fourth quarter revenues still reached a record $42 million. Now please go to slide 19. For the entire 2022 fiscal year, our top-line results improved compared with the prior year — $160.5 million versus $137.6 million for all of 2021, a rise of 16.7% year over year. Growth in revenue compared with the previous year was driven by each of our three main customer categories: civil, national security, and commercial, and government plus marquee customers accounted for 86.2% of what we brought in. Contributions to that year-over-year revenue gain came from the Indiana business unit at Redwire, along with infrastructure-related revenue tied to the deployables and engineering solution area. As we noted previously, Space NV contributed $11.7 million to our growth versus the prior year beginning October 31st, 2022. Excluding that, the improvement would have come in at 8.2% relative to the earlier year. That figure could have been higher still, though inflation and supply chain challenges we discussed during our third quarter call held it back somewhat. That led to an unfavorable EAC adjustment, mostly within the Mission Solutions reporting unit. Having a diverse customer base lets Redwire handle downturns in one category of customer because another category picks up the slack, particularly since customers from Europe now make up a bigger share of our mix. And even taking the Space NV contribution out of 2022 revenues, treating it as though the acquisition never happened, Redwire still would have posted $148.9 million in revenues, comfortably inside our full year 2022 revenue guidance range of $140 million-$155 million. This also reflects substantial expansion under US GAAP over the past few years. One thing worth noting: from the end of 2020 through now, our GAAP revenues have grown at a 98.3% compound annual rate. Let's move to slide 20. Before I discuss how adjusted EBITDA improved this quarter in fiscal year 2022 — shown in the chart on the right side of this slide — I'd like to say a few quick words about our net income and net loss figures. In Q4, our GAAP net loss increased to $25.9 million, largely because of a $16.2 million non-cash impairment charge. Beyond that, for the full year 2022, the net loss came in at $130.6 million, compared with a net loss of $61.5 million for the full year of 2021. That difference reflects a $96.6 million non-cash impairment expense that was not present in the full year of 2021. Most of that non-cash impairment expense related to our Mission Solutions unit. Turning to the quarterly improvement in adjusted EBITDA in 2022, again shown on the chart on the right, you'll see a 47.5% sequential quarterly increase in adjusted EBITDA during the fourth quarter, which reflects the positive momentum we talked about last year. We additionally posted an 83.4% gain compared with how things stood when 2022 began. A number of factors fueled that, among them: one, increased sales stemming from freshly signed deals. Two, an improved blend involving bigger contracts that carry stronger gross margins, a large portion of which came from our deployable and components business lines. Three, trimming our company-wide overhead following the spending we'd undertaken across the prior 18 months, which continues to drive SG&A lower whether measured in absolute dollars or as a share of revenue. That figure currently stands at 30.8%, compared with 50.7% during 2021's fourth quarter and 63.7% in the first quarter of 2022. The same inflation and supply chain issues that led to negative EAC adjustments and elevated production costs — mostly within our Mission Solutions reporting unit — also weighed on this adjusted EBITDA gain. Our fourth-quarter EBITDA would have improved by an even greater amount otherwise. Space NV added $0.6 million to adjusted EBITDA. If you removed what Space NV brought to 2022 adjusted EBITDA, as if that acquisition had never occurred, Redwire would still have reported an adjusted EBITDA loss of $11.6 million — a figure that sits within the 2022 guidance range of -$13 million to -$6 million that was given. Please move on to slide 21. Moving on, I'd like to cover how our free cash flow, liquidity, and balance sheet all improved during Q4. As with our Q3 call, the chart on the left shows free cash flow. A quick reminder: this metric reflects our operating cash flow and CapEx as they are, with no adjustments made for one-time items—cash is simply cash. In Q4 2022, our free cash flow consumption got 56% better, landing at a $5.5 million use of cash, compared with $12.6 million in Q3 2022. Much of that quarter-over-quarter gain stems from the sequential increases in revenue and adjusted EBITDA I mentioned earlier. Redwire's leadership continues to prioritize accelerating the positive momentum in our free cash flow. As we've mentioned, we are consistently enhancing our free cash flow as we carry out expansion efforts tied to our $465.1 million backlog. The chart on the right displays our available liquidity as of December 31st, 2022, which came to $53.3 million—a quarterly and year-end record—thanks to strong cash management and the $81.25 million equity financing, which both funded the Space NV acquisition and reinforced our balance sheet. With $28.3 million in cash and $25 million accessible through borrowings under our credit facilities, Redwire began 2022 with an improved balance sheet and unprecedented liquidity. If everyone could move to slide 22, I'll hand things back over to Pete so he can walk us through what to expect for 2023. Pete?

Peter Cannito

executive
#5

Thanks, Jonathan. If you could move to slide 23, we'll give a quick look at what Redwire Management anticipates for 2023, which we view as a continuation of the performance momentum from 2022. We had a strong close to the year in our latest fourth quarter, with record revenues, gains in gross profit, adjusted EBITDA and free cash flows, plus a strong backlog at year-end. So for 2023, we're expecting full year revenue in the range of $220 million-$250 million, which at the midpoint works out to 46% growth year-over-year; with that, I want to thank every Redwire employee for a fantastic year and a record quarter. Thank you for your hard work around the world to accelerate humanity's expansion into space. Thank you all. We'll now open the floor to questions.

Greg Konrad

analyst
#6

Morning.

Peter Cannito

executive
#7

Morning, Greg.

Jonathan Baliff

executive
#8

Hello, Greg.

Greg Konrad

analyst
#9

I might begin with a few items regarding the guidance you concluded with. To begin, when it comes to Space NV, what is your view on the additional amount it will add during 2023?

Peter Cannito

executive
#10

Hello, Greg, how are you doing? It's great to have you join the call. Right, we don't actually separate that figure out as we move into 2023. What I'm able to share is that when the acquisition closed on October 31st, Space NV's contracted backlog stood at $109 million. By December 31st, at the close of 2022, that contracted backlog had already increased to $128 million. We're pleased with the path Space NV is on, and our belief is that it will be a robust contributor to Redwire as a whole as we move through 2023.

Greg Konrad

analyst
#11

Continuing with the topic of revenues — how do you view the conversion of backlog? Looking at organic revenues for 2022, the starting point of contracted backlog was actually exceeded by them. The 2023 outlook falls somewhat short of the backlog, and that includes what the acquisition adds. Could backlog conversion have moved somewhat because of the acquisition, or perhaps due to certain contracts that came in during 2022?

Peter Cannito

executive
#12

Yeah, no, that's a terrific observation and a terrific question. Part of this stems from having a book-to-bill that's really high. This year we've been booking a great deal of revenue at a quicker pace, and part of it comes from the character of our contracts, which we've discussed on earlier calls. Compared to our revenue, Redwire can win big multi-year contracts. What I believe you're also beginning to notice is a shift toward some bigger contracts sitting in backlog that cover several years.

Greg Konrad

analyst
#13

And after that-

Jonathan Baliff

executive
#14

Greg, if I could, Pete, just have a look at the backlog we had over the past 12 months. When 2022 began, that figure was roughly $1.2. Today it sits at $2, and we're beginning to observe as well. Once more, let me stress, during the third quarter, we stated delays were coming, you know, heading into the fourth quarter. That indeed occurred. You're witnessing a somewhat faster conversion from backlog into that fourth quarter. Again, you know, we see this as a far stronger way to start 2023 than the way we started 2022, from a backlog perspective and then, clearly, from a revenue perspective too.

Greg Konrad

analyst
#15

That helps. So, you provided EBITDA guidance last year, but not for this year. You did mention some improvement in gross margin and operating leverage. Looking at 2022, there was a solid progression toward breakeven. Does that continue into 2023, or what's your view on profitability for this year?

Peter Cannito

executive
#16

Yeah, no, excellent question. That momentum absolutely continues into 2023. We're highly focused on managing our costs, boosting our gross margins, and while we don't issue a forecast for 2023, we anticipate keeping that trend moving forward.

Greg Konrad

analyst
#17

For 2023, should we anticipate it being positive at minimum, or are you avoiding a commitment there?

Peter Cannito

executive
#18

Yeah, avoiding a commitment, since, as you're aware, plenty of various investment opportunities could emerge over the course of 2023. As an overall company, profitability is something we're highly focused on, and by now we've shown—just like you mentioned regarding 2022—that we can keep moving toward that goal, and we don't plan to ease off on it.

Greg Konrad

analyst
#19

So, kind of linked to that — I realize you folks don't provide guidance on cash — but if we consider what growth costs, you mentioned the robust liquidity we're entering this year with. How might you view the various things that move cash, like working capital needed to fund expansion, CapEx broadly, or simply how are you approaching the different components of cash?

Peter Cannito

executive
#20

Let me respond briefly, and then I'll hand things over to Jonathan. Again, we remain highly committed to managing cash wisely, particularly given today's conditions; at the same time, there are investments we're pursuing. We monitor it carefully. Basically, given how Redwire has been assembled — with revenue reaching hundreds of millions of dollars, substantial space heritage, long-term agreements, a large number of which are government contracts — we're fairly confident in our capacity to preserve liquidity, and that's essentially our perspective moving forward. Jonathan, not sure if you'd like to add anything...

Jonathan Baliff

executive
#21

Right. I'd say there are three points to cover. Take a look at the cash we generate from operations and how we handle it. We actually reduced AP substantially. On a net cash basis, we finished with a significantly stronger balance sheet. We'll keep at that, along with our contracts and how we work them. As we manufacture the infrastructure and several of our other solutions, we want a big chunk of the cash paid up front; so we're intently focused on securing much of that money in advance, which means we aren't just turning backlog into revenue and, clearly, positive adjusted EBITDA, followed by free cash flow, and then net income. That's what we're zeroed in on going forward. We showed it in Q4, and we'll keep pushing toward it throughout the year.

Greg Konrad

analyst
#22

Apologies for piling on the questions, but let me slip in one final one. That $1 billion of submitted bids you mentioned during the presentation — is that the amount still outstanding? I mean, what's your thinking on bidding strategy, and can you give any color on win rates or what you're seeing out there? And related to that, is there any target for book-to-bill for 2023?

Peter Cannito

executive
#23

That $1 billion represents the count of bids we submitted, across the different stages. We don't really track precise win rates, but considering that out of $1 billion, we've contracted a backlog of somewhere between $300 million and $400 million, our win rates are sitting at approximately 30% to 40%. That's more or less what we'd anticipate from a company such as ours; we don't actually have a firm target for book-to-bill, but for us to hit our forecast, you can run the numbers, and we need to book-to-bill at a minimum above 1.2.

Greg Konrad

analyst
#24

Thanks.

Jonathan Baliff

executive
#25

That figure would apply using a last-twelve-months calculation.

Chris Griffin Boss

analyst
#26

Hello, and thank you for fielding my questions. I believe I may only have one. Looking at the bigger picture, could you provide some insight into the possibilities presented by commercial space stations, and are you presently talking with the companies constructing those stations to take over from the ISS? Or is it still too soon to tell?

Peter Cannito

executive
#27

We truly appreciate your participation on this call; commercial space stations are definitely an area where we are involved. When you consider Redwire's track record, with 15 facilities and payloads right now in operation aboard the International Space Station — a few of which I mentioned during today's call — we rank among a very small number of businesses that genuinely possess expertise in equipping space stations with substantial content. We do not tie ourselves exclusively to any one commercial space station provider. A number of them exist, and all are quite credible; for Redwire, we view this as an outstanding development, since once those stations reach orbit, we will be the party holding the substantial content — the microgravity research, the biotechnology capabilities, the materials, the 3D printing — that will ultimately drive those stations' success. That covers only our payload side. Beyond that, I pointed out that we have ROSAs — Roll-Out Solar Arrays — aboard the International Space Station. We are likewise in active talks with commercial LEO space station providers regarding essential mission-enabling subsystems such as ROSA, to supply power for their systems, along with other crucial subsystems that will make those commercial space stations viable too.

Chris Griffin Boss

analyst
#28

Understood. That's great. Thank you, Peter. Perhaps I can quickly ask something. Sorry if this was already covered. Did you disclose the breakdown by end customer category for the backlog figure? Will that also lean mostly toward government buyers?

Peter Cannito

executive
#29

We haven't provided that breakdown, though we typically work with quite a few government contractors. Much of the expansion in the space sector is happening there. Jonathan, would you like to chime in on that?

Jonathan Baliff

executive
#30

Right. So clearly, what stands out is that government and marquee accounts make up more than 86%. For the whole year, I want to separate this out: you're looking at close to 40% civil, meaning the government side. And here I'm referring to revenue. National security posted solid growth, reaching 27.4%. Commercial then accounts for 34%; and with those commercial customers, a lot of the end contracts still sit with the government. We're enthusiastic about these standout government and other accounts. That backlog keeps expanding. And once more, part of why those percentages differ is that in Q4 you only witness a reduced share because of Space NV. Space NV, once again, is largely a government and marquee customer tied to EASA — or rather ESA, my mistake; that tells you something about how our backlog is building toward that quite premium kind of client. And even the commercial customers themselves are, as you know, multi-billion-dollar, large-scale accounts.

Chris Griffin Boss

analyst
#31

Understood. All right, that covers everything on my end. I appreciate you fielding my questions.

Jonathan Baliff

executive
#32

Thank you.

Peter Cannito

executive
#33

Appreciate it.

Austin Moeller

analyst
#34

Morning, and congrats on a solid quarter.

Jonathan Baliff

executive
#35

Thank you, Austin.

Peter Cannito

executive
#36

Hey there, Austin.

Austin Moeller

analyst
#37

Hello. To kick things off, could you describe which particular offerings within the revenue mix should fuel the gross margin gain during 2023? My assumption is that you've built inflation-related cost adjustment clauses into the freshly signed contracts so that margins come out better compared with anticipated inflation.

Peter Cannito

executive
#38

Yes. To begin with, Austin, I appreciate you being on the call. Happy to have you here. Without a doubt, correct? Inflation is on our minds when we bid, and naturally, our clients recognize they face that identical challenge. When it comes to better gross margins, we're truly pushing that improvement everywhere, correct? As we keep innovating and we possess technologies such as ROSA, such as the cameras, which have consistently carried flight heritage, yet today hold genuinely outstanding flight heritage aboard the Artemis. These count as truly distinctive offerings, and that grants us greater pricing leverage in the market. Across essentially every one of our product categories, we're beginning to steadily lift our margins. Jonathan, would you like to.

Jonathan Baliff

executive
#39

Alright, let me take you through what's going on here. This is an important thing to understand. We didn't just post a record revenue quarter — you could watch the progression happen. In Q1 of 2022, gross margin started out at 15.7%. During the course of that quarter, we pushed it up meaningfully, and that number was still weighed down by some EAC adjustments. Getting to all-in gross margins of more than 20% is what we're aiming for. As we get into 2023, we'll share more specifics. One thing I want the investor community to note: given the way our ISA contracts with Space NV are set up, those contracts typically allow them a very attractive EBITDA margin, while some of their gross margins will land somewhat lower, purely because of how their costs and sales are categorized. Keep that in mind. On the U.S. legacy businesses, what you're witnessing is a very significant gross margin improvement. Combine that with the operating leverage that comes as the business scales, and you've got a business progressing toward profitability — not just on an adjusted EBITDA basis, but on a net income basis and a free cash flow basis as well. Revenue came in at $225 million.

Austin Moeller

analyst
#40

All right, that clears things up. Now, when we look ahead to 2023 — you're carrying $272 million of backlog, and your revenue projection sits at $235 million. Given that 74% of next year's revenue is already visible, should we assume the bulk of that backlog gets recognized as revenue during this year, or what's the right way to frame the timing?

Jonathan Baliff

executive
#41

Sure, Austin — let's nail down the figures first. Your general direction is right, but we should correct the specifics. Contracted backlog grew by 126%, more than doubling, reaching $313 million. On a total basis, backlog came in above $465 million. Those are the figures we're publishing, Austin. Once again, that's a fairly substantial jump. Without question, our attention is squarely on turning that backlog into revenue — not only in 2023. As Pete has mentioned previously, the pattern can be somewhat uneven, all right, folks? Even so, we're pushing a large number of those contracts toward revenue the way we managed in Q4, and ultimately toward cash flow and profitability.

Austin Moeller

analyst
#42

All right, just one final item. Could you give us a bit more granularity on which particular programs are behind the growth in backlog we're seeing? Is it primarily iROSA and deployables, or how ought we to think about the general percentage split across each program and product line?

Peter Cannito

executive
#43

Yes. I appreciate that, Austin. This is really a central matter when it comes to Redwire. A major reason we enjoy steadiness and resilience is that no individual program, product, or solution accounts for more than 10% of the revenue we bring in. We have a fairly varied set of programs that together fuel the increase in both our backlog and our revenue. Jonathan, would you like to chime in with something?

Jonathan Baliff

executive
#44

Actually, I did provide the percentage splits across civil, national security, and commercial. Those three are roughly on par, and the composition of our backlog largely mirrors that same pattern.

Austin Moeller

analyst
#45

All right, excellent. Yes. Thanks for that information about the impressive diversification. I appreciate it.

Suji Desilva

analyst
#46

Hello, Peter. Hello, Jonathan. Congratulations on a robust 2022.

Jonathan Baliff

executive
#47

Thanks a lot, Sujit.

Suji Desilva

analyst
#48

There are plenty of things I could bring up. Sure. We've already covered quite a few topics. I'd like to focus on production capacity and how you're thinking about it at a broad level for the business. Are you adding more? Do you already have enough? Is capital expenditure going toward that? For 2023, the CapEx plan looks fairly modest. I just hoped to hear some detail on that.

Peter Cannito

executive
#49

Yeah. No, it's wonderful to have you join the call. I'm grateful for the question. Our CapEx spending is ongoing. During 2022, we launched a very sizable site in Goleta, California. As for this site, I'm not sure, Jonathan, whether you know the precise square footage? It's the biggest site we have.

Jonathan Baliff

executive
#50

It's 352,000 square feet.

Peter Cannito

executive
#51

Right — that one in Goleta is going to be home to the wings for the Power and Propulsion Element tied to the Gateway project. It's a huge production site for our solar arrays; we're also continuing to put money in; we're examining an investment in Longmont. There we're making a CapEx investment in a facility for antennas, featuring a genuinely cutting-edge RF chamber, and that will let us keep carrying out antenna testing for big constellation efforts such as the SDA tranches and so on. You know, by and large, we're in solid shape. You know, given how we expanded via acquisitions, each of the various pieces of Redwire arrived with substantial facilities already in place, which works well for us since those capabilities already exist internally, and there's no need for us to spend heavily on expanding manufacturing so that we can deliver on our backlog.

Jonathan Baliff

executive
#52

Another key point is that a significant portion of the cost is covered by our customers. Since a lot of what would typically be viewed as facilities—and the work of getting those facilities ready for manufacturing and assembly of power systems along with other solutions we deliver—is funded through our contracts, we aren't a company with heavy CapEx needs. Given that more than 86% of our business comes from government and marquee clients, many of those contracts wind up covering it, and then, again, these facilities aren't the kind that depreciate heavily, so they can be utilized repeatedly. That's what delivers the operating leverage we've been referring to.

Suji Desilva

analyst
#53

Okay, Peter, that's really useful. Maybe one final question about the power supply ROSA business. Should we be looking at any metrics, sort of ASP unit metrics such as kilowatts, that kind of thing, to model this business going forward? Or is that just not the correct lens for these large solar array contracts?

Peter Cannito

executive
#54

That's right — that is not the correct lens for the large solar array contracts. The lens I would use for the large solar array contracts is the advantages of the capability that comes with having solar arrays flexible enough to be deployed in a small package and then rolled out into a much larger package. If you consider some of the excellent questions we received regarding commercial space stations, that represents a key advantage from a logistics and implementation standpoint. If you consider things such as Gateway and the PPE wings that we're building, if you consider the win we had with Astrobotic for VSAT, and you consider what the future of power infrastructure is gonna require on the lunar surface to sustain a human presence there, this Redwire IP tied to the rollout solar arrays is drawing a lot of demand. Particularly since it has... I mean, what better use case and flight heritage could you have than having it on the ISS? I think people are... When a lot of these very power-hungry solution providers come out, they look to Redwire and our proven capabilities. That's how I think about it, because it's not a mass manufacturing play of solar arrays, across, you know, huge constellations.

Suji Desilva

analyst
#55

Alright, I appreciate you answering my question. Thanks, everyone.

Peter Cannito

executive
#56

You're welcome.

Peter Cannito

executive
#57

Yeah. Once more, I want to express gratitude to each Redwire employee across the globe for the dedication they bring daily on behalf of our customers. My thanks go out to our customers for placing their trust in us, and I appreciate every one of you for being here on today's call. That said, we're wrapping up. Go Redwire.

Operator

operator
#58

Appreciate it — that wraps up the call for today. At this point you're free to hang up, and thanks for being with us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Redwire Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Redwire Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Redwire Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.