Regis Resources Limited (RRL) Earnings Call Transcript & Summary

October 20, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 51 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and we're glad to have you at the Regis Resources briefing for the September quarter. <<operator_script>> At this point I'll turn the call over to Jim Beyer, our Managing Director and CEO. Go right ahead.

Jim Beyer

executive
#2

Thanks, Darcy. Good morning, everyone, and thank you for joining us for the Regis Resources September Quarter FY '27 Results. On the call with me today are our CFO, Anthony Rechichi; our COO, Michael Holmes; and our Head of Investor Relations, Matt Collings. At times we'll refer to figures and tables in the quarterly report that was released earlier this morning, so having that document handy may be helpful. As always, I'll begin with safety, which comes front and center. The 12-month moving average lost time injury frequency rate, or LTIFR, came in at 0 for the September quarter — an exceptional performance, and down from 0.3 at the end of June. That's an excellent result and a credit to our people. No environmental noncompliances were reported, and no significant environmental incidents were reported during the quarter. Now, to that end, we keep our focus on leadership discipline and continuous improvement to support safe and reliable operations. A safe workplace for everyone remains our objective. Turning now to production performance. Group gold production for the quarter came to 83,000 ounces. Taking the rain impacts into account, production was in line with our expectations, and noting our guidance for this year, with production slightly higher in the second half.

Jim Beyer

executive
#3

Michael is going to cover that in a bit more depth shortly. For us, all-in sustaining costs came in at $3,617 per ounce, which absorbed a $114-per-ounce noncash charge tied to stockpile drawdown. That figure sits above our full-year guidance, which is what you'd anticipate in the first quarter given the weighting toward the second half. On that, let me restate that we are keeping our FY '27 guidance unchanged. Turning to cash: Regis lifted its cash and bullion by $93 million over the quarter, reaching $1.28 billion as of 30 September. That came after a $53 million tax payment and also reflects receipt of the $51 million break fee from Vault Minerals. In light of how strongly we performed financially in the second half of FY '26, we declared a fully franked final FY '26 dividend of $0.20 per share in total. That figure included a $0.05 special dividend, which handed the Vault fee straight back to shareholders. Note that these dividends have now been paid following the close of the September quarter, with $152 million going out in total. Our messaging and our actions stay consistent. Regis runs quality assets with strong leverage to the gold price. We carry no debt.

Jim Beyer

executive
#4

Every ounce of our gold is sold at spot, and our approach to investment and returning capital stays disciplined. Next I'll cover McPhillamys and the Federal Court judgment handed down last week, as well as the changes to our Board and a couple of other matters before the call wraps up. Right now, I'll pass things to Michael, and after him Anthony, who'll give more detail on operations and financial performance, respectively. Michael?

Michael Harvy Holmes

executive
#5

Thanks, Jim, and good morning to everyone. As Jim noted, the frequency rate for lost time injuries on our 12-month moving average now stands at 0. Our teams deserve real credit for surpassing 1 year with no lost time injury. We keep pushing to improve safety, with attention on critical hazard control, supervisor safety interactions and safety programs led by our workforce. Gold output for the quarter came to 83,000 ounces, comprising 56,100 ounces from Duketon and 27,000 ounces from our 30% share of Tropicana. Heavy rain that came and went through September caused disruption to mining at our open pits and to ore haulage to the mills. Throughout that stretch, we topped up mill feed using low-grade stockpiles, and that brought the head grade down for the quarter. Setting the weather impact aside, the operations did what was planned. With conditions now getting better, we are back in the better grade material, and we anticipate recovering the deferred production over subsequent quarters, keeping in mind that the second half of the year is stronger for ounce production than the first half. Underground mining and ore processing came through unaffected. At Duketon, open pit mining carried on at the King of Creation, Moolart Well Laterites, Baneygo, Mitchell and Ben Hur open pits, delivering 10,100 ounces at 0.89 grams per tonne.

Michael Harvy Holmes

executive
#6

At Garden Well and Rosemont, our underground operations produced 33,800 ounces at a grade of 1.64 grams per tonne, and that came in line with the schedule and the mining sequence. Underground development reached 4,344 meters, compared with 3,803 meters, with 47% of that classified as capital development. The Duketon mills put through 1.96 million tonnes at 0.99 grams per tonne, with recovery of 89.6%. Output came to 56,100 ounces at an all-in sustaining cost of $3,657 per ounce. The primary reason for the rise in all-in sustaining costs was fewer ounces produced during the quarter than in the prior quarter. Unit costs should improve as production rises, especially in the second half of the year. Growth capital at Duketon totaled $76 million for the quarter. That funded the underground development of Rosemont Stage 3, construction of the Garden Well paste fill plant, and mining of the Ben Hur open pit cut back and the BuckWell open pit. The paste plant is set for commissioning in quarter 2, which will enhance overall extraction of the ore body at Garden Well Main. As we move through the production and filling stope cycle at Garden Well Main, we'll examine opportunities for paste backfill at Garden Well South and Rosemont to boost overall ore body extraction ratios in those areas.

Michael Harvy Holmes

executive
#7

Like we said in guidance, this year's growth capital is front-loaded into the first half as we begin a number of new open pits at Duketon. Now moving to Tropicana. Regis' attributable production there came in at 27,000 ounces at an all-in sustaining cost of $3,423 per ounce, versus 39,100 ounces at $2,532 an ounce in the June quarter. That softer production reflected a lower mill grade of 1.35 gram per tonne against the 1.96 gram per tonne recorded in the June quarter, with less open pit ore mined and that ore at a lower grade. Tropicana's all-in sustaining cost was up in the quarter, mainly because of reduced production in quarter 1. Unit costs should come down over the quarters ahead as ounce production improves in subsequent quarters, in line with planned activities. Open pit operations delivered 7,400 ounces at 1.23 compared to 21,900 ounces at 2.02 grams per tonne in the June quarter, as Havana Stage 4 wrapped up and mining moved fully to Havana Stage 6. The underground mines delivered 13,500 ounces at 2.85 grams per tonne, slightly above the June quarter, with development of 1,276 meters. The mill processed 694,000 tonnes at 1.35, with recovery at 89.7%.

Michael Harvy Holmes

executive
#8

Work on the Havana Underground moved forward over the quarter, and we're still on track to reach first ore during the first half of calendar 2027. To wrap up, as Jim said, we're restating our FY '27 guidance for both production and costs. I'll now pass things to Anthony, who will walk you through the financials.

Anthony Rechichi

executive
#9

Thanks, Michael. Morning, everyone. We continued to generate strong cash in the quarter. Operating cash inflow came to $265 million, with $175 million coming from Duketon and $90 million from Tropicana. Gold sales during the quarter totaled roughly 75,000 ounces at an average realized price of $6,088 per ounce, which produced $454 million in revenue. If you turn to Figure 2 in the ASX release, the cookie jar got another $93 million added during the quarter, bringing the total balance to $1.3 billion as of the 30th of September. There are two items in that waterfall chart that deserve separate mention. The first is the $51 million Vault transaction break fee, which we received in the quarter and which shows up within corporate cash flows in this diagram. The second is tax, and we paid $53 million in installments during the quarter. You'll also see that we sold roughly 8,500 ounces less than we produced, and that shows up in our higher volume balance. Bullion on hand at 30 September was approximately 18,000 ounces, valued at close to $6,000 an ounce, or about $110 million in total, up from under 8,000 ounces at the end of June. And keep in mind that bullion holdings turn into cash within a matter of days.

Anthony Rechichi

executive
#10

Moving to capital: growth capital came to $80 million for the quarter, while sustaining capital totaled $50 million. At Duketon, $43 million of mine development spending was tied to pre-commercial production expenditure at the BuckWell and Ben Hur North open pits. Another $3 million was directed toward the Garden Well paste fill plant and the infrastructure connected with it. We likewise laid out $7 million to secure the long-term Banjawarn Station lease, an essential pass-through lease at Duketon that covers roughly 2/3 of our tenement package, which makes it a strategically significant acquisition. At Tropicana, the bulk of capital spending went to mine development and waste removal, with $2 million of preproduction costs incurred at the Havana Underground. Exploration expenditure for the quarter reached $19 million, and $8 million of that was spent at McPhillamys, including $2 million for a land acquisition. Keep in mind as well that, in line with recent years, McPhillamys costs — apart from any land acquisitions — flow through the income statement as expenses. As for the remainder of the year, FY '27 production is weighted toward the second half, as Jim has mentioned. The September quarter results — 83,000 ounces at $3,617 an ounce — reflect that. And September weather at Duketon has modestly added to that anticipated second half production improvement.

Anthony Rechichi

executive
#11

When it comes to costs, diesel is still the input we're watching, and prices went up over the quarter. Our guidance assumed $1.35 per liter. In the September quarter, we actually paid an average of $1.45 per liter. As a rule of thumb, a $0.10 per liter move shifts group all-in sustaining costs by roughly $25 an ounce for gold produced at that diesel price. Turning to tax, which is the biggest one-off treasury cash item in front of us this coming quarter. As I mentioned at the full year results presentation in August, monthly installments are running at about $15 million to $20 million for the first half of FY '27. The upcoming true-up payment for FY '26 covers the period before installments restarted in April 2026 and is expected to be on the order of $220 million to $240 million, and it will be paid in the December quarter. This one-off final settlement of our historical tax obligations is a significant deployment of cash, consistent with the provisions we've been making in our financial statements. But importantly, the strong cash surpluses we've generated over recent quarters have put us in a good position to comfortably accommodate these payments, which reflects the strength of our financial position and our disciplined approach to capital management.

Anthony Rechichi

executive
#12

All right, those are the main figures I wanted to share. Thanks, everyone — I'll hand things over to Jim now.

Jim Beyer

executive
#13

Thanks, Anthony. Now I want to address several additional items beyond the operational results. First, regarding McPhillamys: on 14 October, just a few days ago, the Federal Court handed down its ruling in the judicial review we brought concerning the Section 10 Declaration that covered a portion of the approved McPhillamys project site. Justice Stellios found the Declaration to be legally invalid, and we are pleased with that conclusion. It affirms the stance we have maintained since August 2024 and confirms that stance was right — namely, that the assessment process failed to observe procedural fairness. We anticipate that the current Federal Environment Minister will need to redetermine the application for a Section 10 Declaration. During that process, the findings in the judgment will be taken into account. We plan to engage in that process actively and constructively. There is, however, no certainty regarding the timing or the outcome of this redetermination, so we will keep advancing the alternative development approach. That ensures McPhillamys retains a development pathway regardless of when the redetermination occurs or how it turns out. As mentioned earlier, this alternative relies on the Integrated Waste Landform for co-disposal of filtered processed ore and waste rock, and it steers clear of the area the declaration affects.

Jim Beyer

executive
#14

Even so, and just so we're clear, for a range of practical and operational reasons, we would far rather see an unambiguous positive declaration regarding the original Section 10 application. Yet as responsible managers, we must hope for the best while planning for the worst, and that is exactly what we are doing. I won't dwell on this any further, but clearly a great deal of work is still going on with the project, as the quarterly expenditure shows. Turning now to the Regis Board: last week we announced that our Chairman, James Mactier, and Non-Executive Director, Fiona Morgan, will step down when our AGM concludes on the 19th of November. That forms part of the renewal process we first announced at last year's AGM. On behalf of the company, I want to use this chance to thank James and Fiona for the substantial contribution they have made across nearly a decade on the Board. During that time we acquired our 30% interest in Tropicana, and Duketon also transitioned into a significant underground-based operation. Both have had a material impact on how we have carried out our work, and they have given me support through guidance and encouragement over the years, and I thank them for that.

Jim Beyer

executive
#15

Moving on to new appointments, I'd like to extend a welcome to Ian Macliver, who came onto the Board on 14 October as an Independent Non-Executive Director and Chairman-elect. With his broad experience in the mining sector as both a Director and a Chair, Ian is a strong addition, and I'm eager to collaborate with him. The third matter I'd like to address is capital management. In our '26 financial year, we achieved a record net profit after tax of $715 million. Building on that, with a solid cash increase of $667 million, we distributed a fully franked dividend of $0.35 for the year, amounting to $265 million in total — equivalent to 39% of the group's cash increase. Our approach to capital management is unambiguous and is already being put into practice. As a dividend payer, we are dependable yet prudent. Turning to the current year and this half, I should point out that we'll be making a fairly substantial tax catch-up payment, as Anthony mentioned earlier. So, as I stated in August, after that catch-up is behind us, we'll still be in a very solid position to keep growing cash, and we anticipate that will flow through to our dividends in the future. Regarding exploration, during September we announced step-out drilling at the Rosemont Underground, down-plunge at Rosemont Stage 3.

Jim Beyer

executive
#16

The purpose of this work was to build understanding of and more confidence in the possibility of down-plunge continuance. Four diamond holes verified another segment of the host unit south of the present resource envelope — 600 meters long and, sorry, 20 to 30 meters thick. Figure 3 illustrates this. What we saw pleases us greatly, with the best result a healthy 1.6 meters at 8.8 grams per tonne. Of course, one swallow does not a summer make. Yet as Figure 3 shows, there are now quite a few swallows around, and it reaffirms the strong indicators that mineralization stays open along strike and down dip. So despite what some might say regarding mine life at Duketon, we keep adding life year-on-year. Our exploration team has a pipeline of targets, and we intend to keep chasing them. Other drilling during the period also continued across the rest of Duketon, Tropicana and McPhillamys, and those results will appear in our next biannual exploration update later in this quarter. Now finally, back to guidance. As mentioned earlier, we reaffirm that FY '27 guidance is unchanged. Group production, 360,000 to 400,000 ounces, all-in sustaining cost, $2,990 to $3,390.

Jim Beyer

executive
#17

Turning to costs — and I'm sure everyone across the industry is noticing the same thing — diesel is still a major external input that we need to keep watching, as Anthony mentioned earlier. So, to recap: group production came in at 83,000 ounces, matching what we expected once the September rainfall is factored in. Cash and bullion increased by $93 million, reaching $1.28 billion, following $53 million in tax paid. We reported a record NPAT for FY '26 and paid $152 million in fully franked final dividends for the second half, bringing total dividends to $265 million fully franked — a current yield of 7.2%. FY '27 guidance is reaffirmed as unchanged across both of our operations, with a modestly heavier weighting toward the second half. At McPhillamys, we're pleased that the Federal Court has ruled the Section 10 Declaration issued by the minister in August 2024 legally invalid, and the matter will now go back for redetermination. Meanwhile, we're continuing to advance the IWL pathway in parallel. Drilling at Rosemont Underground has confirmed an additional 600 meters of host units to the south of the existing resource modeling, and our Board renewal is progressing well, with Ian Macliver joining as Chairman-elect.

Jim Beyer

executive
#18

Regis continues to carry no hedge and no debt, and we're in a strong position to keep producing lasting value for our shareholders. Thank you everyone for joining us this morning. Darcy will now take over and open the floor, please, for questions.

Operator

operator
#19

<<operator_script>> The initial question will be from Jonathon Sharp of JPMorgan.

Jonathon Sharp

analyst
#20

Starting off with Duketon Underground: grades dipped somewhat while tonnage rose. You mentioned this matched the schedule and mining sequence, which is encouraging. I'm just curious how the coming three quarters shape up there. Should we expect grades to stay lower with volumes higher, or does grade begin recovering too?

Jim Beyer

executive
#21

Yes. Thank you, Jonathon. Look, I'd caution against drawing too firm a conclusion from how things shift between one quarter and the next. As Michael more or less mentioned, these are simply movements we monitor and observe in our schedules. It wouldn't shock me if, a quarter from now, we saw tonnes lower with grades higher, or tonnes higher with grades higher. That's merely variation. I wouldn't read too much into it, as we've said — consistent with our guidance, we anticipate delivering in line with plan. And that variation is something we view as part of that plan.

Jonathon Sharp

analyst
#22

Alright, no problem. And on my second question, about McPhillamys — congratulations on the court ruling. That's good news for Regis and good news for the industry. But you've mentioned hoping for the best while planning for the worst, which I take it means carrying on with the IWL pathway. What I'm interested in is this: at what stage does it turn into a point of no return, where you essentially proceed with that option?

Jim Beyer

executive
#23

Yes. Look, once we've reached FID, really, when does that become irreversible? As we've said, we anticipate this redetermination process—assuming that's the path we take—will likely take some time. One thing I'm certain the department will want to do—the department that reviews this under the act—is make sure it runs a proper, fair process this time around. So my guess is that will take a while. We therefore don't know how long it will last. Looking at the program and the timeline, since this has been delayed, other developments have occurred in the area. We've had to reroute roughly 10 or 15 kilometers of our pipeline. That needs reapproval. It's all rather frustrating. We're now encountering things on the project that stem from this ongoing delay, because circumstances change, so we have to adapt as we go. My expectation is that, looking at our schedules either way, under the IWL scenario, we anticipate being able to finalize and approve it by the end—later in—probably in the second quarter of calendar '28.

Jim Beyer

executive
#24

So, whatever that timeline turns out to be — roughly 1.5 years out, along those lines — if no declaration has come through by then, meaning a fresh declaration under Section 10, at that stage we'll face a choice between holding off and moving forward. Let me be clear, though: regarding the declaration issued over the mine site, we genuinely need — what we want is to have it resolved, because it has made operating extremely challenging for us. It has carved things up. In effect, it has drawn a line straight through the middle of our mining lease and our farms, and that flexibility is something we truly require. So I don't mean to imply that we're — that we don't want a favorable result on the Section 10. But should it drag on too long, or should an adverse finding emerge, a pathway exists for us, and we'll be prepared to make that decision, as I mentioned, during the second quarter of calendar '28.

Operator

operator
#25

Adam Baker from Macquarie has the next question.

Adam Baker

analyst
#26

To pick up on McPhillamys, if I may. On the slide deck you put out to the market today, you've, I think, drawn attention to some district-scale opportunities at McPhillamys, with the historic intersections at Discovery Ridge and Kings Plains. I'm just wondering whether you've considered lifting exploration spending there over the next 2 years, given the favourable Federal Court ruling.

Jim Beyer

executive
#27

Yes. Look, this is prime country, right? That Lachlan Fold Belt area is extremely attractive, as you can see by just Cadia just up the road and some other. We've got quite a bit of ground there. What we're trying to do is get the balance right behind proving that there's more than just the open pit versus actually spending money on something that's quite a few years away. One thing is for sure, we can see the mineralization continuing at depth. It's not cut off. So I think there's a very high potential for underground alone, although a mill of the scale of McPhillamys of whatever it will be about 6 million to 7 million tonnes, we won't be able to get all of that from underground post the pit completion. So there's certainly a reason to be looking elsewhere. We know we've got Discovery Ridge already down the road, 400,000 ounces of resource sitting there. So we've already got a reasonable amount of assets there that we can look to exploit. But we will certainly be looking to do a bit more on exploration than we have done over the last 5 years or so. It's just a question of how much and how fast we want to run with that, and we're still assessing that against our other exploration priorities.

Adam Baker

analyst
#28

Yes, that's clear. And I suppose the second question relates to your dividend policy—that 25% to 50% half-on-half cash build. How should we think about how the catch-up tax payment of $220 million to $240 million gets treated this quarter? You've got some time to consider this and so do we, since we won't find out what your dividend will be until February next year. But should we treat this as an abnormal item and expect you still to pay a dividend for this half, given your strong cash balance—or, just because of including that catch-up tax payment, your cash actually—your cash build is negative. So how should we think about that?

Jim Beyer

executive
#29

Yes. Clearly, it's somewhat difficult to reveal too much that could be interpreted as a signal of what the outcome might be, since the Board will make that decision in late January and February once we see what we've actually accomplished. But a sensible approach is probably just to examine our policy and how it treats certain of these tax provisions, and we already factored that one in when we paid dividends roughly a year ago, I believe, or probably around 8 or 9 months ago. So that can be factored in. And what I mean by that is excluding its effects on our overall position. So it gives -- it certainly will give the Board some flexibility regarding how to approach the dividend. And naturally, these are one-off, correct? This -- that's -- our view is that this cash and bullion at the close of this quarter will probably be -- unless the gold price really surges, which, naturally, it could do, but it will probably be somewhat more challenged compared with where it stood at September. But that isn't because of the fundamental structure of the business.

Jim Beyer

executive
#30

That's a one-time tax catch-up we will have fully moved past, and we'll be looking at — by then, roughly into January and February, all of that noise should be behind us and in fact we'll be going directly into a stronger second half. So every one of those factors will feed into how the Board thinks about applying that policy and where it lands on the final number.

Operator

operator
#31

The following question is from Levi Spry at UBS.

Levi Spry

analyst
#32

I have two questions, please. One is about McPhillamys again, and the other concerns Tropicana. So, regarding the news that the ruling has been invalidated — obviously, that's great news. Could you walk us through a bit more of what milestones you're expecting from here? Will they provide any indication of how long the redetermination will take? Or are we still essentially looking at June '28 as the next marker in the sand?

Jim Beyer

executive
#33

Yeah. So Levi, that’s a fair question. The brief response is negative. No timeline exists at all. Unlike certain other processes, this one doesn’t involve a fixed schedule that must be adhered to.

Operator

operator
#34

It seems the connection to Jim's line just dropped. Kindly hold on while we bring it back. The line is reconnected now. Please proceed.

Jim Beyer

executive
#35

Is this coming through okay?

Levi Spry

analyst
#36

Jim, I’ll take this if you’re able to hear me.

Jim Beyer

executive
#37

Yes. Yes. Sorry, Levi, I did — clearly, something went wrong with the call. I'm not sure where I got cut off, but whatever you missed was some of the finest prose you'd ever hear in your life. So I think the question was about timing. No, look, we don't — there is no fixed time. And that's why we have to follow the other — the second line on the IWL. The one point I would make, I think that's most important, is that however the department goes about doing it and however long they take, we need to make sure, for the sake of all parties, that it's done in a manner that doesn't involve a repeat of what happened the first time, which was — it just didn't follow a fair process from our perspective. So while we might want it to be rushed, it's probably more important that whatever the updated decision is, it's done in a manner that means it just — it's clean and it's tight and it can't be challenged, or it's not open to this unfair process claim. So we're very pleased to have got the outcome. It's justified our view that we were treated unfairly, but we need to make sure that the process going forward treats everybody fairly so that we can all be comfortable that whatever the new decision is, it is the right one.

Jim Beyer

executive
#38

For now, we’re simply assuming that if it happens early, that’s great. If it doesn’t, we’ll keep going with our IWL scenario. As I mentioned, even if we end up proceeding down the IWL scenario, we really want a positive outcome, because we need access to that ground. We can’t move on to any of that area because of the restrictions — the original restrictions that the manager put on it. We can’t — and it basically runs right through the center of our lease. So it makes life very difficult for us, and it’s important that it gets resolved.

Levi Spry

analyst
#39

Let me follow up on Tropicana for a moment. Could you remind me of the outlook for the rest of this year, or perhaps across the coming 12 to 18 months, regarding where the ore will be sourced from and how I should think about the grade profile?

Jim Beyer

executive
#40

Sure, that open pit operation carries on for another 18 months — at minimum, we'll have both open pit and underground material being fed to the mill. So no significant shift is expected on our side. Just as we're observing right now, quarter-to-quarter swings will occur, as happens at any mine. However, we won't — we don't anticipate open pit feed declining for likely another couple of years.

Operator

operator
#41

Our following question is from Daniel Morgan of Barrenjoey.

Dan Morgan

analyst
#42

It's pretty clear that weather had an effect on you in the September quarter. I just want to get a handle on what, from that, has affected your plans — that is, if I look at the physicals you achieved during the quarter, you moved quite a lot of material at Duketon. Did that go according to plan? Was it significantly affected? Or was it haulage around the site, or ore? Or could you give us a little more detail on where you stand compared with plans from maybe 2 to 3 months back?

Jim Beyer

executive
#43

Daniel, I believe that's essentially what Michael already addressed. Thanks to the rain, we could keep operating in certain areas, and we did experience a decent lift in TMMs — however, that same rain made it difficult to reach ore at the bottom of the pits and also hampered moving ore across the site along the long-haul roads. Once conditions improved, we were back in. What this means is that the lower grade feed we had planned to introduce later in the year simply had to be rescheduled so the mills could keep running. This is a short-term matter with no long-term consequences.

Dan Morgan

analyst
#44

Absolutely — crystal clear. And regarding McPhillamys, I want to add my voice to what everyone else has said: this decision is a great outcome for you and a great outcome for the industry. I'm just curious whether there's anything you're able to do with the project. I mean, 2 years have been lost through no fault of your own. Is there anything you can do to shorten the time lines? Are there any early works or anything along those lines? Or would that be too risky to take on, given that as things stand you don't yet have a permittable project because of the various <<inaudible>>?

Jim Beyer

executive
#45

Yeah. Look, this one is difficult. I mean, it’s a big project. We want to be sure we can get everything through. And I mean, part of the concern you have is that approvals can come and then approvals can be taken away, which is basically what happened whatever it was now 2 years ago, when we had every approval, at both state and federal level, and then the Section 10 decision came, which sort of made life impossible for us. We always ask whether there is anything we can do to speed up the time line. But the reality is that the IWL, for example, is a new concept, and it does take work to get that approved through the planning process. And as much as I would love to be able to say we could speed that up, we have to run the process that the state is reviewing. And I would point out that the state of New South Wales is doing a lot to try to help expedite that as much as it can. But of course, as you would expect and hope, that does not mean taking shortcuts on some -- on important assessments. But it is certainly safe to say that both the state is really trying to help us find ways to progress responsibly through this.

Jim Beyer

executive
#46

It simply requires time. We stated this back when people told us a simple fix existed for locating a new tailings site. Plainly it did not, and it still does not. I believe our estimate was that this would need more than 5 years, and that is likely the schedule we will end up following. So we are hunting for anything possible to speed it up, yet the real issue is tailings disposal — that is the crucial item for us — along with certain adjustments we have been forced to make to the pipeline, since the approvals we held 3 years ago involved different parties who have since changed, and we have had to reroute roughly 10 Ks, all of which demands fresh permitting. It is rather maddening. There is the visible expense plus the concealed expense of postponements, and that is yet another one.

Dan Morgan

analyst
#47

Yes. This is just the last question. I mean, at the margin, that decision clearly makes McPhillamys incrementally more permittable than it was previously, or more of a permittable project. Does that mean — I'm just interested in hearing how you're thinking about growth, because for a while it was potentially a stalled project, and maybe you had to consider inorganic opportunities as a growth avenue. Now it appears increasingly likely that it could be an executable project. Does that alter your thinking about growth in other areas at all?

Jim Beyer

executive
#48

Yes, that's a solid question on strategy, Daniel. Look, McPhillamys is certainly on our — regardless of how you look at it, this project will get built. It's going to be a producer in the '30s, which might seem like a long time off, but that's just 3 years. So that's — and we already have the capacity through our cash and bullion on hand, plus our ability to add to that over the years ahead, to essentially construct it from scratch. I think if we were in a position where we could build it — if we could begin construction today, we could do so without any debt. So we're financially strong enough to seize that opportunity — the McPhillamys project — and we're moving at full speed toward FID in the first half of '28. That doesn't stop us from considering other growth opportunities. It's just that whatever we examine, and that includes inorganic ones, whatever we examine, it simply has to be — we want to be sure it's value accretive for our shareholders and doesn't compromise our ability to execute McPhillamys, because that's a great value add too. So advancing the McPhillamys project and being in this position to do it does not stop us from examining other growth opportunities as well.

Operator

operator
#49

Thiago Ojea from Citi has the next question.

Thiago Ojea

analyst
#50

One quick question from me, and it's still about McPhillamys. If we look back at the earlier design, I realize it's pretty early, but do you have any kind of rough estimate of the CapEx and OpEx savings you might achieve versus the plan you were following before this revocation?

Jim Beyer

executive
#51

Thiago, is your question about how much capital differs between those two scenarios?

Thiago Ojea

analyst
#52

Right, exactly — just a rough overall picture. I realize you'll still spell this out far better, but we just want to get a general sense of it.

Jim Beyer

executive
#53

Yes. I mean, our capital estimates were revised for the IWL scenario. And what we found was roughly $50 million to $80 million in additional CapEx under the IWL scenario. Obviously, there are some fairly substantial savings from not having to construct a tailings storage facility and all the earthworks tied to it. But that gets offset, plus a bit more, by the filtering equipment you need to install to handle the — to dry out the processed ore. So we see — it's a marginal increase in CapEx, that was our view — but still a reasonable chunk of money. What we also found was a rise in operating costs, and that came to something like $150 to $180 an ounce, which covered the power, the maintenance and running of that filtered processed facility plus the trucking and the extra handling needed to properly comingle the dried out processed ore with the waste rock. So there's certainly a difference there, not a huge difference in the capital, but enough to be noticeable and also a change in the operating cost. But nonetheless, whichever way you look at it, I mean, the returns on McPhillamys even with the IWL scenario are still quite impressive.

Jim Beyer

executive
#54

I mean, even with gold at $4,000, the after-tax internal rate of return comes out at almost 22%, with an NPV above $1 billion — and that's assuming AUD 4,000 per ounce. So either way, that project is a cracker.

Thiago Ojea

analyst
#55

Thanks, that's helpful. Jim, one more question from me. Garden Well mineralization is now confirmed, correct? Also, as I understand it, Rosemont Stage 3 stretches roughly 600 meters south of the current design. I realize you have a December reserve update coming, but should we interpret this as possibly moving tonnes into the underground life and perhaps extending the group's 5-year reserve life?

Jim Beyer

executive
#56

Honestly, our level of assurance regarding these ore bodies and the way they develop is pretty strong. What we're aiming to accomplish, though — and the rationale behind this down-plunge extension drilling — is to demonstrate through physical proof that the mineralization keeps going. And so, as a consequence, whether we're warranted in feeling assured that this mineralization, and along with it that mineability, will persist. Naturally, achieving extensions of reserve quality demands considerably more drilling from us. Yet in much the same fashion as we've carried out some deep down-plunge drilling at Tropicana to demonstrate that it continues downward with the same lithology, the same thicknesses, the same grade. We've now accomplished that at Rosemont along with the Garden Well South and the Garden Well Main. So we are drilling — you could certainly drill a handful of holes. But here's what I'd say: I would far prefer having 5 or 6 holes that each intersected thickness and grade in order to build my confidence that such continuity exists. Time will tell, but I would definitely say there's a rationale for why we're doing this, and a rationale for why we're putting it forward for people to examine and form their own conclusions from.

Jim Beyer

executive
#57

It's difficult to dispute the facts.

Operator

operator
#58

Our following question is from Paul Wiggers de Vries at Bank of America.

Paul Wiggers de Vries

analyst
#59

Jim, when we look at the second half, there are several open pit opportunities at Duketon that are getting underway. Is the overall approach to raise material volumes beforehand and to build up stockpiles at that operation?

Jim Beyer

executive
#60

No, it wasn’t a deliberate choice to accumulate stockpiles before processing. What happens is that, like most operations, we grade the stream. We run a pit, and while the mill has capacity, we feed the higher grade through it. And when that mill is operating at full capacity, we’ll stockpile — we’ll keep the pit maintained for efficiency. You don’t want to be switching pits on and off simply according to feed. And we’ll build up low-grade stockpiles while we’re feeding the appropriate — the better grade — feed. Then, over time, once the pits are finished and we’ve run out of higher grade, we’ll begin running that low-grade material through. And really, that’s — we see that in patches across the whole site. We have low-grade stockpiles from old pits, and we do a real balancing between high-grade feed from a pit and the lower grade feed from stockpiles. And frankly, sometimes you can generate pretty good cash from those stockpiles, like we demonstrated at Duketon North last year. We’re processing very low-grade stockpiles there that have been built up over many years, and we made some very good money out of it. Now we’re back at Duketon North running — getting ready to start significant production from BuckWell.

Jim Beyer

executive
#61

A lot of the TMMs are being relocated there. What you'll see is a mix of lower-grade stockpiles going up at the same time as we're putting higher grades through the mill. That's all part of the strategy, but I wouldn't be — nobody would operate a pit purely for the sake of building stockpiles. That's not something we would do. The pit gets run to generate feed, and stockpiles accumulate during that process whenever pit output exceeds what the mills are able to take.

Paul Wiggers de Vries

analyst
#62

No, of course, that makes sense to me. Regarding the stripping ratio at Tropicana, it clearly rose a lot versus the prior quarter. Did that reflect the access issues caused by rainfall, or was it simply a quarter where higher stripping was planned?

Jim Beyer

executive
#63

My view is that it's partly one and partly the other. Quarter to quarter, you simply observe those ups and downs. I wouldn't interpret anything ominous there. It's just that on some occasions the team happens to be shifting considerably more material. I'm aware that rainfall does have certain effects, yet all of it — those ups and downs — will even out as time passes.

Operator

operator
#64

That brings us to the end of the phone questions. I'll now return the call to Jim Beyer, who has some closing remarks.

Jim Beyer

executive
#65

Okay. Thank you, Darcy. And thank you all for the questions you sent in. Sorry that the technology cut out during that Q&A. As usual, if anything else comes to mind afterward, just reach out, and we'll try our hardest to get you an answer. Many thanks, and enjoy the rest of your day.

Operator

operator
#66

Thank you. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Regis Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Regis Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Regis Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.