executiveThanks, Jason. Good morning to all of you, and thanks for being with us. Earlier today, the company put out a press release with the results for its fiscal third quarter 2023, which closed on December 31, 2022. You can find a copy of that press release along with the presentation in the Investor Relations section of ReNew's website, www.renew.com. Joining me on this call are Sumant Sinha, our Founder, Chairman and CEO, and Kedar Upadhye, our CFO. Once we finish the prepared remarks, we'll take your questions. Just a note that our safe harbor statements appear in our press release, in the presentation materials, and on our website. Those statements matter and are a key part of everything we say. Certain risks and uncertainties might cause our actual results to vary materially from what those forward-looking statements express or imply, so we urge you to look over the press release we furnished in our Form 6-K as well as the presentation on our website for a fuller picture. Our press release, presentation materials and annual report also include certain non-IFRS measures, which we reconcile to the most comparable IFRS measures, and those reconciliations can likewise be found on our website in the press release, presentation materials and annual report. At this point, I'm happy to turn things over to Sumant.
Sumant Sinha
executiveAlright, thank you, Nathan, and good day to all of you, whatever time zone you happen to be joining us from. It's a pleasure to have everyone here. Let me begin by saying that India's renewable energy industry remains exceptionally robust, and we continue to see plenty of appealing, high-return investment opportunities lying ahead — segments where we believe we have a competitive advantage, especially when it comes to intricate projects and the corporate PPA arena. The platform we've assembled is distinctive not only inside India but also when compared with counterparts around the globe. Our operational expertise covers both renewables and technology, supported by best-in-class proprietary digital tools that allow us to design optimal, bespoke solutions for our customers. From where we stand, the world is transforming. Increasingly, clients view the climate change imperative as an existential danger and are decarbonizing at a rapid pace. Scarcely any companies globally can deliver that decarbonization solution to customers — something most other firms aren't really emphasizing to the same extent. Because these offerings require technological leadership, complexity, and customization, we're confident we will lead in decarbonization and be better positioned than ever to capture these opportunities. As things look to us at present, we anticipate our EBITDA rising by at least 50% over the current base as we execute our entire portfolio across the coming 2 years. In addition, we expect further growth from a particularly compelling slate of upcoming auctions over the next year, given how complex they are. Beyond that, opportunities are emerging in digitalization and green hydrogen, offering our investors enormous upside potential that many companies aren't concentrating on as much at this moment. We believe our share price doesn't reflect one of the strongest growth stories in renewable energy, combined with equity returns among the finest anywhere — to such a degree that we've already bought back approximately $160 million of our own stock, representing over 15% of the free float within just about the past 10 months. We have another $90 million in authorization remaining, or roughly an additional 20% of free float. And we absolutely plan to use that authorization aggressively, considering where share prices stand today. We believe the company's value has been highlighted by more than $500 million in asset sales over the last 18 months, at valuation multiples consistently exceeding new build multiples. Moving to Page 4, let's review this quarter's highlights. We continue to deliver robust growth. And throughout the first 9 months of fiscal year 2023, revenues from contracts with customers climbed 24% year-on-year. Adjusted EBITDA was 18% higher, and cash flow to equity increased 11% compared with the same period a year prior. We have 7.7 gigawatts of commissioned capacity operating, and currently 5.4 gigawatts of total capacity is under construction, while another 337 megawatts is in the process of being acquired — bringing our total portfolio to 13.4 gigawatts. Looking at where we stand in this fiscal year so far, our core operations—the elements we can actually influence—are performing only slightly below the internal budget we established when the fiscal year began. We've got roughly 6 weeks left before this fiscal year wraps up, and we expect to close somewhere in the range of INR 61 billion to INR 63 billion. The adjustment to our guidance essentially boils down to things outside our control. One of those is that the acquisition announced earlier in this fiscal year has yet to close, and it's still working its way through the process. Based on current conditions, we now expect that deal to close early next year. When we put together our original guidance, we figured this acquisition would bring in about INR 3 billion during this year, and it now looks like that will more likely show up in FY '24 and later. Even though the acquisition hasn't contributed to EBITDA this year, it is contributing to our balance sheet. The lockbox date was set when this fiscal year started, and we retain the economic value and cash generation, which lands on our balance sheet. Beyond that, carbon credit sales of roughly INR 1 billion that we expected to come through during this fiscal year are now unlikely to slip into early next fiscal year, because of the project backlog moving through registration at the various carbon exchanges. Weather has also been a bit of a headwind, and although we baked most of the negative impact from it into our guidance at the beginning of the year, weather, along with a variety of other items, looks poised to add roughly another INR 1 billion beyond what we assumed when the year started. We're keeping our eyes on the long term, and we continue to believe ReNew will achieve adjusted EBITDA of INR 89 billion to INR 94 billion across the next several years — about 50% more than this year. Almost all of that growth is contracted and highly visible. As we've stated many times, our focus is on creating value, and a crucial driver of value creation is maximizing returns, not only through disciplined bidding and product offerings, but through execution as well. Along those lines, SECI began granting an extended construction time line, which may give us an opportunity to improve returns on these projects currently under development. Module prices have also fallen 20% or so over the past couple of months, which allows us to streamline construction schedules for our 5.4 gigawatts under development and potentially bring plants online sooner to capture market sales, which could meaningfully improve returns on our pipeline. We plan to give the market an update within the next two months, though overall we expect the changes will be modest, and every project in our pipeline will be carried out since each one should deliver returns above our minimum threshold levels. We have already brought about $60 million of our own stock. Our receivables are performing well, and payments keep coming in reliably from the state — specifically from those stack distribution companies that hold the biggest share of overdue amounts. Also, during this quarter, we added another 300 megawatts of corporate PPAs, bringing that portfolio up to 1.8 gigawatts, which works out to about 13% of our total portfolio. Separately, we received a number of strong ESG ratings from Refinitiv, Sustainalytics and Carbon Disclosure Project. Refinitiv has just updated its ESG rating for renew, and right now we rank as the second highest among all electric utilities or ITPs globally. Sustainalytics ranked us among the top ESG-rated companies. We also received the highest rating from the Carbon Disclosure Project among all Indian renewable companies. Turning to new PPA signings on Page 5. As I said, we signed an extra 300 megawatts of PPAs this quarter, and we've further reduced risk in our growth since just 1% of our 13.4 gigawatt portfolio still has PPAs pending. Versus the same period a year ago, the corporate PPA portfolio has nearly tripled. And as I mentioned, it now totals 1.8 gigawatts, with a backlog that continues to expand. By a wide margin, we think we hold the largest market share in this market, which shows that differentiated advantage within this business segment. We have already repurchased about $60 million of our own stock.
Sumant Sinha
executiveWhen it comes to corporate PPAs, the returns are better than what you'd get from Plain Vanilla renewable energy projects. That's because entry barriers are higher, we can team up with corporate customers, and we deliver energy solutions to them faster than other players. Our view hasn't changed: by 2025, ReNew should hold a corporate PPA portfolio of 4 to 5 gigawatts. Auction activity for complicated projects — round the clock and peak power, for instance — remains strong. Right now, roughly 12 gigawatts of auctions for these complex projects are in the pipeline. Thanks to our differentiated platform, which gives us advantages on both cost and revenue, we stay bullish about capturing these opportunities at returns exceeding our minimum thresholds. Turning to CapEx: material and module prices that feed into our CapEx have shifted favorably since the earnings call we held last November, and Page 6 covers this. On that point, module prices have dropped roughly 20% relative to November levels. As wafer and cell prices decline, the delivered prices from our captive manufacturing should become even more competitive. Based on where we are today, our confidence is even greater that we can deliver returns inside the 16% to 20% equity IRR range we target at the project level. In our view, additional chances exist to boost returns through capital recycling, deeper rollout of proprietary digitalization, and ongoing pursuit of operational excellence. One reminder: wind turbine prices are already locked in, so exposure on that side is essentially immaterial. Should any additional new project come with an expected IRR under our minimum thresholds, then, as you're aware, we won't move forward. Our capital approach will stay disciplined. With that, I'll hand things to Kedar, who will walk through the latest quarter's financials.
Kedar Upadhye
executiveAppreciate that, Sumant. Moving on now to Slide 8, where we lay out the key points from the third fiscal quarter of 2023. During this quarter we brought online 66 megawatts, taking our operating fleet to 7.8 gigawatts in total; in addition, we executed PPAs for another 282 megawatts, lifting the aggregate volume under construction to 5.4 gigawatts. Customer revenues climbed 24% year-on-year across the first 9 months of fiscal 2023. Over those same 9 months, EBITDA was up 18% versus the equivalent stretch a year earlier, while cash flow to equity grew 11%. Solar generation came in stronger than the previous year, but wind PLF ran roughly 200 basis points beneath the prior year, consistent with weaker output from wind sites seen throughout India. Now to Page 9, where we reconcile adjusted EBITDA for Q3, which came to INR 11.628 million. Wind resources remain under normal levels, though somewhat above the weakest point seen a number of years back; meanwhile carbon credit sales trailed last year, and we anticipate those landing in the following fiscal. EBITDA across the 9 months reached roughly 98% of our internal budget, and for core operations — stripping out weather effects, M&A, and the timing swing from carbon credit sales — the full year appears set to land at approximately that same level. On cash flow generation: measured over 9 months, cash flow to equity came in 11% above the prior year, even though CFe this quarter took a hit from interest payment timing after we refinanced the green bond — which had paid interest biannually — into domestic debt that pays interest monthly. Another point worth flagging is the robust cash generation shown in our cash flow statement. Cash flow from operations for Q3 of FY '23 almost doubled to $261 million versus the equivalent period a year earlier, with a $122 million decrease in receivables from the second fiscal of '23 standing out as one of the biggest positive contributors. Over to Page 10. As we've stressed repeatedly throughout the past year, our attention has been on lifting collections on overdue receivables owed by the state distribution companies, and we're happy to report substantial headway. DSO in Q3 improved by more than 2.5 months relative to the close of Q3 in the previous fiscal, adding roughly $122 million to our cash position as the discounts applied to payments have now been settling up what they owe. To recap, the AP DISCOM — accounting for around 42% of our past due receivables as of March 31 — agreed in June to clear past dues across the next 12 months through equal monthly installments, and has so far made about 6 to 7 payments out of 12. Other states that had fallen behind have likewise been paying down past dues. Looking ahead, we anticipate closing out this fiscal year with additional gains on DSOs, and that should free up roughly INR 6 billion or more in cash from working capital compared with the previous year. Over time, we still foresee our DSOs getting better, since a growing share of what we sell will go to SECI, an entity owned by the central government that settles its invoices quickly and without delay. As things stand, with 7.8 gigawatts in operation, roughly 50% of our assets sit with the 5 DISCOMs that carry 5 DSOs, because nearly all of our committed projects are tied to SECI or to corporate buyers that pay promptly. By the time we finish the exhibition of the portfolio, our exposure to those 5 DISCOMs is set to drop to around 32%. This shift in customer mix alone would translate into a 55-day gain in our overall DSO. Having said that, I will hand things back to Sumant, who will speak about our ESG initiatives and guidance.
Sumant Sinha
executiveAbsolutely. Thank you, Kedar. I'm stepping in for Vaishali, who leads our sustainability efforts, to discuss ESG. If you'll turn to Page 12. Given the momentum we built last year, we're dedicated to establishing fresh standards across every dimension of ESG performance and transparency. Our most recent ESG rating serves as evidence of our work in this area. As confirmation of our dedication and results in ESG, we recently earned a score of 81/100 from Refinitiv, which supplies financial market data globally. This score places ReNew at #1 in India within the electric utilities and ITP category and, as mentioned before, #2 worldwide in that same category. In addition, ReNew was recently added to the top-rated ESG Companies list published by Morningstar Sustainalytics for 2022, '23; in our view, this confirms ReNew's capacity to spot and handle ESG risks that could affect our operations. CDP has given ReNew a B rating for climate change, the strongest rating among renewable energy firms in India and above the Asia average of C; a B from CDP for ReNew indicates that the company is pursuing coordinated steps toward climate change mitigation. To generate collaborative impact for a fossil-free future, we keep collaborating with our employees, communities and partners. With that goal, ReNew has launched the following efforts. We have committed to planting 1 million trees by 2030 as part of the World Economy Forum's 1 trillion trees initiative. Our corporate office located in Gurugram in India has been acknowledged by GRIHA — Green Rating for Integrated Habitat Assessment, India's green building rating agency that parallels the U.S. GBC, United States Green Building Council — as one of the best existing green buildings. Our yearly program named Gift Warmth has helped 275,000 people throughout 11 states in India this year. Another of our efforts, Project Surya, which centers on job training and entrepreneurship development for women and salt pan workers, was featured at COP27 in the India Pavilion and the G20 EMPOWER Inception event. Now to Slide 13. We're continuing our work to meet our ESG targets through targeted initiatives. Earlier last year, we filed our science-based GHG reduction targets, and those have now reached a validation stage with SBTi. As part of our goal to reach water neutrality by 2030, a feasibility study is presently being conducted near our site to find community-based initiatives that can offset the water footprint from our operations. I should also note that we achieved 12% women representation in our workforce by the end of Q3, and we're working to raise that significantly to 30% over the next 2 years. We will be sharing progress on our targets in our upcoming sustainability reports. I encourage everyone to look at our sustainability report '21, '22, which came out in October 2022. Moving on. Regarding our guidance, that falls outside the sustainability section. When it comes to the guidance we laid out on Page 16, as I mentioned before, we're moving our FY '23 adjusted EBITDA guidance to a range of INR 61 billion to INR 63 billion. That reflects the missing expected EBITDA contribution from the acquisition we have underway, the postponement of carbon credit sales, and a bit of weather-related impact that's pushing some of our EBITDA out. Once again, we aren't changing our portfolio run rate EBITDA, which is roughly 50% above anticipated levels for this fiscal year and is basically fully contracted, and it should be achieved within the next couple of years. On the buyback side, like I said, we've repurchased around 25 million shares since starting the program, and that still leaves us with about $90 million of authorization left. At today's share price, $90 million is roughly 20% of the currency float. We keep seeing substantial value in our shares. As all those asset sales over the past year have shown, RNW trades at a meaningful discount to what we're able to sell assets for. Since our shares are among the highest return investments of scale available to us, we've been actively repurchasing stock when we think it offers the best return opportunity for our shareholders. With that, we're happy to take any questions. Nathan, back to you.
Morgan Reid
analystMorgan Reid here, filling in for Julian. To start, could you discuss how the corporate PPAs were executed during this quarter? That area appears to be a portion of the pipeline that is obviously growing more important. We'd like to know what share of the portfolio you believe it might reach over the coming year? I think we're basically attempting to grasp where your growth efforts are concentrated. You've obviously discussed this opportunity a great deal.
Sumant Sinha
executiveYeah; regarding — we inked many of our corporate PPAs over the past 6 to 9 months, and in some cases even less time than that. As a result, quite a few of these projects remain in execution. Still, I think what matters most to note is that we signed the bulk of this 1.8 gigawatts within the past 12 months; that should give you a feeling that momentum in this segment of the market is fairly strong and building. We've said before as well that we anticipate roughly 25% of our upcoming PPAs will originate from the corporate market. Right now we hold a fairly solid backlog. So my suspicion is that we ought to be capable of getting there in the near term.
Morgan Reid
analystUnderstood. Could you also expand a bit on the worth you tie to the drop in module prices? It appears there might be some quicker development possibilities and definitely a reduction in CapEx. Could you just explain how we ought to consider that when we examine the development opportunities we have right now?
Sumant Sinha
executiveSure. Kedar, would you like to handle that?
Kedar Upadhye
executiveRight. So, regarding module prices, I believe we discussed that they've dropped 20% between November and today, and the fresh POs we're putting in place are coming in at a point that leaves us fairly at ease. Should we hold off a bit longer, there could be somewhat more of a decrease too, even though certain of these factors can't really be forecast with confidence. And indeed, I think this lets us handle CapEx effectively. It lets us bring the IRRs back to where they should be, since prices, particularly from June through November, ran quite high, as we're aware; so we are — we keep monitoring and we keep spreading out the orders and deliveries in such a way that we remain very near our desired IRR target band.
Nikhil Nigania
analystRegarding acquisitions, the 528-megawatt amount from before appears smaller now. What's behind this? Additionally, could you provide direction regarding how long an acquisition takes to finish?
Kedar Upadhye
executiveRight. Nikhil, this particular deal followed yet another slump sale approach, meaning the title for the underlying assets must be changed, the PPA needs transferring, the lease needs transferring. Title for every other asset also has to be moved. That process tends to take somewhat more time relative to a straightforward share purchase transaction. Considerable learning has come from this. Still, like we mentioned, the lockbox date was settled as of the start of this year. Thus cash flow from those PPAs will arrive on a balance sheet as a CapEx deduction. Another effect of this is that it let us show the asset quality we're going after. Within the coming months, we'll reach a judgment on what proportion of these assets ought to ultimately be acquired by us. Perhaps we'll finish slightly above half of our earlier target. However, like I said, treat all of this as tentative guidance right now; an announcement will likely come around the full year once we possess a clearer view of the total PPAs being taken over; and possibly by the back month, perhaps when we come to you for the full year results, we'll have a far better sense of both the number — I mean the asset size being taken over — along with the timeline for complete integration.
Sumant Sinha
executiveIf I could just jump in on that. Yeah. What I was getting at is that, as you're aware, the majority of M&A deals — like Kedar mentioned — involve shares being handed over. In this case, it leaned toward an asset sale given the particular circumstances at play, and that whole process has simply dragged on far longer than anyone had planned for or expected, because of all the various items that had to change hands. Still, I'd say we're getting reasonably near the finish line on it now, and this is a matter that ought to wrap up in early next year. Once that happens, we'll be in a position to come back to you with the precise percentage that you'll be picking up. That said, 1 or 2 assets in there may be ones we'd rather not move forward with, or that prove tougher to close given all the regulatory complications. So for that reason, we made the call to trim, somewhat, the volume we were buying.
Nikhil Nigania
analystMy second question relates to reports circulating about a deal involving 1.1 gigawatt being sold to possible buyers such as Torrent and others, which is what the news says. Is there any perspective you could offer on this, including the reasoning behind it, sir?
Sumant Sinha
executiveKedar, allow me to jump in and address that; capital recycling is a strategy we have discussed fairly often before. Most renewable energy firms globally, I believe, pursue this same approach, and we are following suit. The core notion here is that our capacity to build exceeds what we can or wish to retain. Consequently, by building beyond that limit, we get to benefit from value creation or generate value in those assets under construction, and afterward dispose of them at elevated multiples; that strikes me as a thoroughly rational approach for us to adopt. So Nikhil, going forward you will certainly observe us exploring more asset divestments, though that does not mean our portfolio will stay flat. It will expand too. And look, there is plenty of coverage in the Indian media, as you know; therefore you simply need to await a formal announcement from us before — up to that moment, we truly cannot say anything, as you are aware.
Nikhil Nigania
analystLet me squeeze in two more quick ones. First, there's chatter circulating that ALMM curbs could be eased soon. Should that occur, would it assist folks with schedules on any projects? And tied to that, regarding the RTC project, a sizable one, previously the steer was Q2 FY '24 — does that shift as things stand now, or has that blend been altered?
Sumant Sinha
executiveYeah. Well, when it comes to that element, you're aware we occupy both sides of the equation. We're a developer and we're also exploring entering manufacturing; hence we're pretty neutral regarding — regardless of how it turns out. Yet would it let us bring projects online sooner? Not automatically. To begin with, no concrete policy has emerged yet. So we must hold off and observe precisely what unfolds; thus I can't claim it would let us commission sooner since we'll clearly need to determine where modules can be sourced, what the delivery schedules look like, and so forth; yet insofar as we could bring some projects online sooner, absolutely, we'd want that because, as I mentioned during my remarks too, bringing projects online sooner lets you sell a portion of that electricity into the merchant market. And I believe one thing emerging rather plainly it seems is that pricing in that market will stay comparatively strong; so that possibility could arise; yet we haven't examined this in detail; hence I can't offer you any kind of definitive response on it. Your next question about RTC, Q2 commissioning. Well, the RTC project, as you're aware, consists of 5 different or 4 different projects, 3 wind plus 1 solar and then, naturally, a battery element too; these targets ought to be commissioned gradually across the span of basically beginning more or less now through until the close of, I'd say, Q2, Q3. So I think that's what will occur. The entire project — and so the moment the project gets commissioned, revenues may begin, whichever portion of the project gets commissioned. For us to then essentially approach SECI and declare the entire project commissioned could stretch until Q2 or Q3 of this upcoming financial year, FY '24. So from an execution perspective, we're mostly on track.
Nikhil Nigania
analystGot it. That's clear. Sorry — just one final item, and it's a minor one. If you'd rather not respond at this moment, we can handle it separately. It concerns the balance sheet: under other noncurrent assets, there appears to be an increase of roughly INR 1,000 crores, which is around $120 million. Could you explain the cause of that?
Kedar Upadhye
executiveSure, Nikhil — a few line items have increased. As you're aware, an acquisition was completed by us involving a digital entity. Our holding in that business is only 40%. Consequently, a portion of it ends up sitting within the other assets. Additionally, advances have been extended by us to capital creditors in connection with the RTC and several projects. So my sense is that a number of these elements are, in some way, showing up under the other asset heading.
Justin Clare
analystSo I suppose, to start with, you mentioned that you anticipate additional gains in DSOs by the close of this year and then on into fiscal '24. I was curious whether you could simply provide some sense of how much more progress could be achievable. And then, more broadly, might you discuss whether you anticipate this DSO improvement to be sustained? So at this stage, has a durable structural shift occurred in the market such that there will be notably reduced danger of DSOs being stretched out later on?
Kedar Upadhye
executiveThat is our belief, and I think you probably have come across multiple declarations from the regulators, which are assisting us. Look, 2 things are taking place. First, the older amounts owed are being settled and present transactions are being paid promptly without delay. And both of these are assisting us in achieving a quarter-by-quarter decrease in the DSOs. And the second element we referred to is that the mix of off-takers is shifting toward those who pay considerably sooner; therefore the share of corporate obstacles, the share of central authorities such as safety, is increasing. And the share of DISCOMs is declining from 55 to 32. So both the LPS deals in particular and the shift in the mix of the off-takers are assisting us. And we think this is structural, and it will persist for a period. Relative to the December DSO, we do anticipate roughly 15 to 20 days of additional reduction as of March and likewise moving ahead as well.
Justin Clare
analystUnderstood. All right. Then it appears the ALMM was eased not long ago for a 2-year stretch. And we've also observed module, cell, and wafer prices coming down; so with all the shifts that have taken place, could you walk us through how you're sourcing modules? Has anything changed there? My understanding is that right now, you intend to self-supply roughly 60% of your projects from your own manufacturing. Has that shifted at all? Or what's your thinking? Any update at all would be useful.
Sumant Sinha
executiveYeah; so look, right now, we — first off, the ALMM has come as an announcement from the minister, sort of — but it hasn't actually emerged as official government policy as of yet. So we must wait for that to occur and to see whether it does. So I think that's point one. Point two is that we haven't yet managed to assess how this shift could affect us. Bear in mind that the customs duty of 40% on modules and 25% on sales remains in place. That isn't changing, which basically means that imports from China, for instance, are still not going to be possible. From 1 or 2 other geographies such as Southeast Asia, it may be. But it's a matter of determining how much availability exists in those markets given that plenty of the modules from there are being shipped to the U.S. and to Europe; so we'll need to carry out that assessment, which we haven't been able to do so far because this is clearly still not official policy on the government's part. And when it comes to our own supply, look, our module plants will be operational within the next few months. And once it's stabilized, then naturally, we expect that to supply us and for the bulk of our supplies to come from there. But once more, some of our projects are in fact grandfathered because we secured them before this duty and the ALMM were announced. And so for those projects, we can import modules from China or anywhere else, for that matter. And so I think it will hinge on really at what moment the plan becomes stabilized, what the specific rules are at that time and on that basis we make the most optimal decision. I think underneath all of this, you have to remember that the good news is that module prices and cell prices have also fallen dramatically. And therefore, however we look at it, I think our module costs are going to be below what we had potentially anticipated, and that's going to benefit us. At this moment, I'm unable to provide a precise picture of the split between what we'll source ourselves and what we'll bring in from abroad, or specify which regions that will come from, since things remain somewhat up in the air right now, partly because of ambiguity surrounding government policy as well as where supply will originate.
Amit Bhinde
analystTwo things from me. First, on the wind PLF picture as it stands and the reassessment you've been considering — what does the near-term outlook look like? And is there anything new on that reassessment?
Sumant Sinha
executiveYes. Both are fair questions. So here's the thing — in the guidance we put out for this financial year, we'd already baked in a somewhat weaker wind speed, or a reduced wind forecast, for the year. And on the wind speed side, that's more or less playing out as expected, though it is, obviously, well under what you'd think of as the long-term mean. Odds are we keep the same sort of — we hold the forecast at the same level as we move into next year too. It's unlikely we'd shift that in any major way from where it sits now, since I believe it still makes sense to stay prudent. We've now had, as you're aware, 3 straight years where wind hasn't been good, and an event like that is pretty uncommon, though it isn't unheard of. It's occurred before in other geographies too. Usually, when something like that occurs, at some stage it does bounce back, but predicting the timing and the size of that is difficult. So from a prudence perspective, I think we'll simply keep carrying the highly conservative guidance we issued this year into next year as well. On the fuller long-term assessment, we're actively working on that at the moment. We're in discussions with several wind forecasting agencies. And I'd say the encouraging part from some of our initial talks with them is that the technologies, the methodologies and the science used for forecasting long-term wind in India match what's used anywhere else globally. So as we get further into this exercise, I'd expect we should be able to form a solid view on many of these matters; and I think we'll be able to come back to all of you on this quite soon. But there's one more point I should make — given how wind has behaved over the last 2, 3 years, we've already turned very conservative in how we forecast wind going forward, and that applies not only to our current assets but to the assets we'll build later on as well. So a great deal of that conservatism is already finding its way into our future forecast. So my sense is you won't truly observe significant figures coming out of this year moving into the following year and beyond, purely because, like I mentioned, our forecast has already been cut back rather dramatically; plus, when it comes to projects down the road, we're already exercising considerable caution regarding the projections we're putting together right now. Therefore, I don't expect any additional trimming beyond where we currently stand with respect to our guidance. That said, as I noted, we'll simply verify and reconfirm everything alongside the wind agencies, then circle back to each of you with views that are more detailed and solid from them — from those forecasting agencies — roughly when we next speak with you, ideally within a few months from now.
Amit Bhinde
analystOn this point, just to share an observation — the government is preparing an auction of 8 gigawatts for wind. The first thing is that they've set a condition that it shouldn't all be clustered in a few states; instead, it should be spread out among states where wind variability might be greater. So when you consider 2 factors, how do you expect the approximate effect on tariffs? First, wind PLS is already speeding — already affected, and second, you'd need to spread into another state where the wind speed might not be very optimal for the auction. So what's your view on that?
Sumant Sinha
executiveI don't think — yes; so look, frankly, I don't believe that will make any difference, simply because, for instance, as a company we already run operations in most of these 8 states, and therefore we already have solid experience with wind forecasting across all of those states; and look, in the end, even if wind quality is lower in one state versus another, that shows up in the tariff that bidders offer, because the tariff simply winds up being higher in states with lower wind speed. What the government aims to do is bundle all the wind bids — all the wind products together from across various states and provide a single pool tariff to the end buyers of the power; so it actually makes no difference in which state you build the capacity.
Amit Bhinde
analystAll right, that's great. I also wanted to ask about making modules here at home. With cell and module costs coming down, from a money standpoint, what kind of gap would we be looking at? For instance, what would our own produced output cost compared with buying from abroad and paying customs — say roughly $0.20 to $0.25 for a module brought in with that duty? And then whatever the locally made one runs? What's the difference between those 2?
Sumant Sinha
executiveRight. I'm not able to provide a precise figure at this moment, and I'd rather not get too detailed about it just yet. The main point, I suppose, is that, as you're aware, duties on imports stand at 40% for modules and 25% for cells. Anything we produce within India is going to be far, far cheaper than what that duty protection offers. So in the end, the real comparison isn't really against imports, since those will invariably carry a higher price thanks to the duty. Instead, the better yardstick is what other firms are producing inside India. On that front, I believe we'll be extremely competitive, purely due to our size and the reality that our facilities are far newer and equipped with the most advanced technology.
Amit Bhinde
analystAs for that rough figure, would it come to roughly $0.25, the output from manufacturing domestically? I realize, like you mentioned, you're not able to provide this precisely, but just an estimate.
Sumant Sinha
executiveNo, that isn't possible. No, I really don't like making broad statements, since it truly hinges on, say, what you pay for cells or wafers as inputs, which depends on what exactly you're purchasing. Plus, that pricing fluctuates somewhat. So because of that, pinning down a set figure for that right now is difficult.
Puneet Gulati
analystFor my first question — you folks haven't really been taking part much at all in utility-scale auctions. Is there some kind of distinct approach you're now going with, one that leans more toward corporate offtake instead of utility scale?
Sumant Sinha
executiveWell, Puneet, the thing is, the number of auctions out there has been pretty limited, as you're aware. Many of the ones that did take place were either bids at the state level or bids that — for Plain Vanilla, whether wind or solar, we were in them. As we've said before, those are ones we have no plans to join, since taking on a great deal of direct state exposure isn't something we're keen on, or frankly, we'd rather not be in Plain Vanilla auctions at all, because in our view, the place where we hold a competitive advantage is the auctions that are more complex. So our attention, I'd say, is on the more complex bids. And like we said, we anticipate plenty of those coming along; therefore, there'll be sufficient opportunities for us to put in bids; on top of that, the corporate PPA market, which we've brought up repeatedly, is quite busy. So with the RTC/big power bids on one side, plus the corporate PPA market — honestly, we've got plenty on our plate, which explains why we're opting out of the Plain Vanilla auction or the state-level ones.
Puneet Gulati
analystGot it. And just to confirm what I picked up — you mentioned there won't be any changes to your estimates because of the weather, and that your EBITDA guidance already accounts for it in a prudent way.
Sumant Sinha
executiveCorrect, Puneet, and indeed, that's exactly what we stated.
Puneet Gulati
analystAlright, got it. Then moving to the final question — whenever I compare the CapEx guidance you gave this quarter against the prior one, the manufacturing-related spend seemed a bit slower across FY '23, and now it's shifted more into FY '24. What's driving that? Also, what are the current timelines for finishing your module and cell manufacturing capacities?
Sumant Sinha
executiveYeah. So here's the thing — our module plant is roughly a couple of months late relative to plan. The expectation had been to commission it by the close of Q1. Most likely it slips just past that into early Q2 — early Q1 of the coming financial year. So honestly, the delay isn't meaningful. As for the 7 module plants, they're largely proceeding the way they were meant to in Dulahara, the site where we're erecting them; so CapEx shouldn't really differ in any major way — if anything, it's likely just a matter of some payment or phasing timing rather than anything more substantive.
Puneet Gulati
analystOkay, sure. And regarding carbon credits, could you walk us through what actually took place there? You've also lowered your guidance because of carbon credits. Is that a permanent rate? Or is it something more near term, and how much of your EBITDA guidance at the portfolio level comes from carbon credits?
Sumant Sinha
executiveKedar, would you like to handle that?
Kedar Upadhye
executiveOkay, Puneet, so as we sit here today, these are basically RE credits. What we'd like to see going forward is a bigger portion coming from voluntary credits, nature-based solutions, things along those lines; even so, at present they're still RE credits. Based on what we understand, there's a significant backlog at the global agencies that certify projects as eligible for carbon credits; therefore, a portion of this is truly not something we can influence, right? It really comes down to timing that's shifting out of quarter 4 of this year and probably into the first half of next year; and that amount works out to roughly just below INR 1 billion. That said, as I said earlier, RE makes up most of our credit mix as it stands. And going forward, we're targeting a somewhat higher share of voluntary credits, with EBITDA in the range of 92 billion to 94 billion.
Puneet Gulati
analystAnd when it comes to EBITDA across the portfolio as a whole, what kind of contribution are you building in — the INR 89 to INR 94 billion figure?
Sumant Sinha
executiveIt isn't especially large.
Kedar Upadhye
executiveCorrect, correct. So that won't be — it's going to land in the mid- to high single digits, and no higher than that.
Puneet Gulati
analystSomewhere between the middle and upper part of single-digit growth, got it.
Sumant Sinha
executiveActually, Puneet, if I could put it this way — broadly speaking, given that carbon credits tied to the portfolio we already hold are, in a sense, truly tapering off owing to how the Q2 protocol was gradually discontinued, there simply aren't many of those credits we expect to be around going forward. Certain markets are emerging in which such credits might retain value — the Middle East, for instance — yet we have no clarity on how they will evolve as time passes. So as things stand, we have taken a highly cautious stance regarding projecting any income from carbon credits tied to renewable energy projects down the road. As Kedar mentioned, a completely distinct workstream is underway at present focused on generating carbon credits via nature-based solutions, though that is an entirely separate matter. In a way, it does not form part of the INR 89 million to INR 94 billion guidance we provided, which is essentially revenue — or EBITDA — derived from our 13.4 gigawatt portfolio.
Puneet Gulati
analystAlright. So whenever you mention a nature-based solution, is it fair to say that the foreign exchange you might be generating through those efforts would eventually feed into the credits, that sort of thing?
Sumant Sinha
executiveWell — yes, those are 2 distinct matters, obviously. I mean, the trees and everything else we're putting in the ground are truly there for ESG reasons, not really aimed at making money; however, other initiatives are starting to appear that remain at quite early phases, things we're only now experimenting with. So we can't really discuss those in much depth; but if some of them do materialize, that would be additive to any of these things.
Puneet Gulati
analystUnderstood. Then, as a final point, while you're on the line, how do you view expanding beyond India and building renewable projects in other markets? Or is your focus probably going to stay just within India?
Sumant Sinha
executivePuneet, that's quite an intriguing thing to ask. Well, this is a matter we've discussed extensively. Our view is that we possess certain fairly meaningful advantages as an organization that could also be applied in markets abroad. Clearly, availability of equipment, availability of inexpensive project delivery, our approach, our engineering and project delivery skills — every one of those, we feel, would carry worth in other regions when it comes to getting projects built. And beyond that, naturally, we already operate at a considerable size, since worldwide, leaving China aside, we rank among the 10, 12 biggest firms on the planet. That said, I don't believe any firm choice has been made so far about whether we wish to expand abroad. This is a matter I expect we'll assess. Should it prove sensible, then naturally we'll return and talk it over with everyone, and I expect we'll consider it at some future point. However, it isn't something sitting right in front of us today. That said, as all of you are aware, we're likewise examining green hydrogen projects; I'd quickly note that all of those remain at extremely, extremely early phases as of now. So in that regard, for certain projects of that type, yes, we are reviewing development possibilities beyond India. Yet once more, I have to note that those remain at quite early phases. And prior to committing any capital, clearly, a great deal of effort has to go on behind them.
Angie Storozynski
analystI'd like to pose something from a broader perspective. With all the examination happening around Adani Green and how they fund themselves, I recognize there's minimal overlap between your shares and theirs, even prior to the sell-off, when you look at valuation multiples. Still, I'm curious whether the competitive environment has shifted at all when it comes to the inquiries you're receiving from prospective financiers for your renewable power initiatives. Do you get the sense that the turbulence around Adani Green is handing you an advantage when you bid on certain assets? And once more, are there any takeaways about how you might strengthen your disclosures down the road?
Sumant Sinha
executiveRight. Angie, honestly, as you pointed out yourself, we differ greatly from Adani across a wide range of dimensions. Regarding how our operations stand, essentially nothing has shifted. I believe we're already regarded as a company of very high quality when it comes to ESG matters, and that remains true; our ratings all bear this out. No bids have actually taken place following this entire situation that anyone could cite as evidence of how things might shift. What I do expect, though, is growing recognition for companies that are high-quality and well-governed, ones genuinely applying the full ESG approach across everything they undertake. In that regard, I'd hope people might view us with somewhat — how should I put it — a greater degree of appeal, maybe. But I'll stop there, since I can't predict what effect this may have on the Adani Group as their circumstances develop. That's beyond my knowledge and awareness. It's simply too soon to say whether we've observed any alteration in how they behave in the market and similar matters. So I'll end my thoughts there. Kedar, is there anything you wish to contribute?
Kedar Upadhye
executiveNo, what I'd say is that because our listing is in the U.S., we're subject to quite detailed 6K and 20-F reporting requirements. Those cover financials and operational figures as well as what management has to say, and they're fairly thorough in scope. And we'll keep building on those disclosures going forward.
Angie Storozynski
analystAll right; and now, if I can, a separate item; you said that SECI has been giving some of the assets more time on their CODs; and I'm not sure I grasped your point completely. Were you hinting that you might actually start projects sooner in order to earn merchant revenues, simply relying on the possibility that the official COD could be pushed back? Or does it come down to the fact that component costs are coming down, meaning project economics could look better were you to hold them back?
Sumant Sinha
executiveTruthfully, Angie, both are true. And so every situation could be distinct. Wherever we've been permitted to delay, and we believe that through that delay we can secure cheaper prices, that would let us perhaps push the project out, bring CapEx down, and still satisfy what SECI requires for commissioning. That's one possible approach we might take. The other possible approach would be to bring projects into service sooner, sell the output into the merchant market, and then more or less hand them over to SECI under the commissioning extension SECI has provided. So the key thing is this gives us far greater room to optimize either project cost or revenues; and therefore we absolutely plan to exploit the latitude we've received so as to get the most out of our projects' returns. So through either 1 of these 2 approaches, it will let us lift the return.
Angie Storozynski
analystThen, to wrap up, during your prepared remarks you mentioned projects above the minimum return threshold, though you do have a range. So when we say that, do we mean projects with an IRR of at least 16%, or — since that's what you brought up?
Sumant Sinha
executiveYes, yes, yes. Correct. What I'm saying is that every one of the projects, as a result, falls inside our threshold rate; and since we now have this small additional amount of flexibility, that simply gives us a great deal of confidence of — and comfort about being able to satisfy those threshold requirements. And naturally, when it comes to future projects, we stay disciplined, as you're aware, and we won't bid on projects where we believe we aren't likely to achieve those IRRs.
Operator
operatorToday's conference call has now come to an end. We appreciate everyone for joining in. At this point, you're free to hang up.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ReNew Energy Global Plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.