ReNew Energy Global Plc (RNW) Earnings Call Transcript & Summary

August 21, 2023

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 43 min

Earnings Call Speaker Segments

Nathan Judge

executive
#1

Thanks, Jason, and hello everyone. Good morning, and I appreciate you being here. On Friday evening, a press release went out from the company announcing the results for fiscal Q1, which closed on June 30, 2023. You can find a copy of that press release along with the presentation in the investor relations area of ReNew's site, renew.com. Joining me on this call are Sumant Sinha, our Founder, Chairman, and CEO; Kailash Vaswani, our CFO; and Vaishali Nigam Sinha, Chairman, Sustainability. Once we finish the prepared remarks, we'll take questions from participants. Keep in mind that our safe harbor statements appear in the press release, the presentation materials, and the materials posted on our website; those statements matter a great deal and form an essential part of everything we say. Various risks and uncertainties might lead our actual results to diverge materially from what those forward-looking statements express or imply. We suggest you look over the press release we filed in our Form 6-K as well as the presentation on our site to get a fuller picture. Our press release, presentation materials, and annual report also include certain non-IFRS measures, which we reconcile against the closest comparable IFRS measures, and those reconciliations can likewise be found on our website within the press release, the presentation materials, and the annual report. At this point, I'm happy to turn things over to Sumant.

Sumant Sinha

executive
#2

Okay, thank you, Nathan. Good morning, everybody — it's wonderful to have each of you join us for the Q1 FY24 earnings call. Only a few days from now, we will reach the two-year mark since listing on the Nasdaq, a significant journey that has been possible because of backing from all of our stakeholders and the dedication of our hardworking staff. As this anniversary approaches, I'd like to offer heartfelt gratitude to everyone involved: our investors and analysts, the members of our board, the banking and lending community in India as well as abroad, our business partners, regulators and government authorities both domestic and international, the many customers and off-takers we are honored to serve, our suppliers and technology providers, global rating agencies, the countless contractors and agencies whose efforts enable project execution on the ground, and of course, our employees, who have stood at the center of everything we have accomplished to date. This milestone offers an opportunity to reflect on the path behind us. Substantial growth has come over these last two years. Despite every major challenge — COVID, supply chain constraints, and inflation — our operating portfolio has grown from 5.7 gigawatts to 8.4 gigawatts since Q1 FY22, an increase of approximately 47%. During this time our portfolio added over 3 GW, and importantly, we signed PPAs covering virtually every megawatt in our portfolio, which significantly reduces off-take risk on our growth outlook compared with two years ago. Trailing 12 months Adjusted EBITDA has risen 41%, while our run rate Adjusted EBITDA increased by an even greater margin, roughly 60%. Additionally, our DSOs have improved dramatically — the time required to collect payment has been reduced by more than half, dropping from over 260 days to about 114 days. That is one one four. We believe there is room for further gains there. Moreover, several rating agencies have ranked us among the highest-rated ESG companies globally. Now to the quarter's highlights on page 6. I'll begin with the strategic partnerships with global industry leaders that are fueling our growth. We recently signed an MOU with Gentari, the renewable energy arm of Petronas, to assess jointly developing 5 gigawatts of renewable energy assets; this deal, together with other partnerships we've finalized over the past two years with globally recognized industry leaders, we believe showcases our differentiated competitive advantage; this endorsement also underscores how collaboration advances sustainability while bringing lower-cost capital. We have just signed MOUs with PFC and REC — both financial institutions owned by the Government of India that fund the power sector — covering debt financing of roughly $7.8 billion between the two. In addition, we've secured a $250 million financing arrangement from the State Bank of India for our peak power project. Through these financial partnerships, we continue to obtain access to some of the lowest-cost project debt available anywhere in the country, and we can secure it much more quickly and in larger amounts. During the first quarter of the fiscal year that wrapped up in 2024, our B2B segment added 415 megawatts of capacity, and across the remainder of this fiscal year we anticipate bringing somewhere between 1.3 and 1.7 gigawatts of projects into service. The largest and most intricate undertakings we've ever pursued are our peak power and RTC projects, and next year they will serve as key engines behind the 35%+ EBITDA expansion we're expecting. Construction on these projects, I'm pleased to report, is moving forward exactly as scheduled, and we have full confidence in reaching the guidance issued together with our Q4 FY 2023 results. Conditions in the auction market remain favorable, and as more auctions take place, the outcomes continue to look good — we're securing bids that carry appealing IRRs. Roughly 3.5 gigawatts of capacity have been added so far this year, representing an additional 25% on top of the 13.7 gigawatt portfolio we already hold, which positions us for yet another phase of growth past the 45% rise in Adjusted EBITDA we're delivering this fiscal year. This momentum ought to continue as we selectively engage in auctions presenting opportunities for attractive returns. Bear in mind that these megawatts have not yet entered our portfolio, though we do anticipate incorporating them and reflecting them in our portfolio and Adjusted EBITDA run rate guidance during the coming 6 to 9 months, once these PPAs are signed. The platform's value is also beginning to show up in tangible outcomes. We recorded profit after tax of $36 million — one of the strongest single-quarter performances in our history — and we remain on course to reach roughly breakeven on an annualized profit after tax basis going forward, provided currency and interest rates hold steady. Taking everything together, Q1 results landed slightly above our internal EBITDA budget and well ahead of it on tax. Turning to page 6, I'm pleased to share with our investors that our asset recycling program continues to trend favorably, and it is effectively funding our equity capital requirements for the wins secured recently. One significant development on that front, as I noted, is the MOU signed not long ago with Gentari to investigate joint development ventures spanning 5 GW of renewable energy assets. Through this partnership, we gain far better visibility into the source of future growth capital, and it demonstrates the capital discipline we committed to our investors. Our resolve to advance energy transition solutions for our partners has not diminished. On top of the 403-megawatt agreement signed with Gentari earlier this year — the equity proceeds from which arrived during the quarter just reported — this strategic partnership represents an additional element of the overall picture. Our plan envisions building 3 to 4 gigawatts each year, and we're confident the necessary equity can be supplied both by cash presently held on our balance sheet and by cash flow generated internally, including the USD 230 million we have available. Let me reiterate one point: issuing shares is not something we intend to do. Like we said earlier, the growth we're pursuing next ought to be funded by recycling assets. If you put that next to issuing shares, recycling gives you a lower cost of equity, and looking further out it hands us better returns on capital employed too — and it shows the actual value inside our portfolio sits well beyond the multiple the market is presently applying to our stock. The money that comes to us from recycling assets continues to propel the expansion trajectory we've kept up over the past several years. That's why our focus remains firmly on this route, designed as it is to reinforce our balance sheet and raise returns for shareholders. To date, we've secured $550 million in equity through strategic partnerships, a sum that takes in Gentari's equity support for the 403-megawatt project. The funding has arrived by way of partnerships with global participants — Gentari, Mitsui, Northland, plus additional investors we appreciate. Beyond that, we're exploring a sale of 100 megawatts of solar assets in Karnataka, and in our books those assets are classified as held for sale; we expect to close that deal ahead of the end of the calendar year. This approach also aligns with our broader aim of unlocking roughly USD 230 million in value.

Sumant Sinha

executive
#3

Turning to page 8. During the earnings call for the previous quarter, we noted that a major event took place earlier in the year. The Ministry of New and Renewable Energy introduced a bold schedule. It sets out an intention to hold auctions for 50 gigawatts of renewable energy projects annually. It's worth noting that auction announcements have become much more frequent across different renewable energy segments, especially for complex projects. In many auctions held recently, we're observing reduced competition. That leads to greater implied IRRs for bids that clear. This pattern stands out even more in auctions involving complex projects. Thanks to our in-house wind and solar EPC expertise, along with the supply reliability that comes from our solar module plant now in operation, we hold a clear advantage. As proof of this, we have managed to win auctions for 3.5 GW of projects beyond our existing portfolio, at expected IRRs that sit at the upper end and perhaps even exceed our current portfolio at our target range. Among these wins is a 400 MW project with SJVN at a tariff of INR 2.71. We signed the PPA for it a few days ago, and this project has not yet been added to our committed pipeline. Moving to page 9. During the current reporting period, we successfully commissioned 415 MW of projects, mostly tied to our corporate PPA business. Regarding our RTC and peak power projects, which account for roughly 3/4 of the 35% EBITDA growth we expect next year, I'm happy to report that these projects are about 2/3 complete. We remain confident in the commissioning timeline we provided in our guidance earlier this year. We do anticipate hitting our commissioning guidance of 1.75 to 2.25 gigawatts by the close of FY24. Now to page 10. Our manufacturing plant began producing modules in June 2023 and has reached full production. This 4-gigawatt facility gives us assured module supply, makes our project construction work smoother, and delivers a competitive cost edge over imports or tooling. Additionally, the plant helps us manage output quality, achieve self-sufficiency by reducing dependence on OEMs, and potentially lower O&M costs. For the majority of our competitors, securing solar modules is a problem right now. At present, the country faces a considerable supply shortfall relative to existing demand. Most of what gets produced is either shipped to the US, reserved for internal use, or consists of outdated technology at a high cost. Importing isn't a viable path either, since import taxes are substantial, or the non-tax import barrier of ALMM blocks it, which, as you're aware, has been pushed to early next year. Finding modules locally is difficult for almost every one of our competitors. Our solar module plant will guarantee steady supply and ought to give us a cost benefit as well. Having said that, I'd now like to hand things over to Kailash so he can walk us through the most recent financials. Thanks.

Kailash Vaswani

executive
#4

Thank you, Sumant. If you'll turn with me to page 12, the Indian government continues to stand firmly behind its pledge to build a solid framework that supports funding for large-scale projects at very attractive interest rates. As you're aware, closing financing on schedule plays a vital role in keeping project timelines and costs efficient. The MOUs worth $7.8 billion that we signed with Power Finance Corporation and Rural Electrification Corporation matter a great deal to us. They don't just strengthen our credibility within India's renewable energy sector — they also demonstrate the strong ties we enjoy with these institutions. We anticipate debt financing on terms more favorable than what the market currently offers. On top of that, these agreements should open the door to raising considerable funding for projects needing larger capital, and working alongside these entities reaffirms our dedication to optimizing financing avenues, which moves our projects toward timely completion with better cost effectiveness. Let me now go to slide 13, which covers the highlights of Q1 of the fiscal year 2024. On the whole, quarterly performance came in line with — and actually slightly above — our internal budget. We remain on track to hit our guidance for the fiscal year. We posted a profit after tax of $36 million, versus a loss of $1.2 million a year earlier. That reported profit ranks among the highest we have ever posted. Our installed capacity grew from 7.6 gigawatt in Q1 FY23 to 8.4 gigawatts in Q1 FY24, a 10% rise versus the same quarter last year. Wind PLFs came in at lower comparable levels than those achieved in the prior data, though we had captured this in our FY24 guidance. Moving to page 14, our Adjusted EBITDA for Q1 of fiscal 2024 stands at $227 million, which is 8% below last year, mainly because of lower merchant revenues, wind PLFs, and higher expenses, all of which were planned. As mentioned earlier, Q1 FY24 EBITDA is marginally ahead of our internal budget and had been factored into our fiscal 2024 guidance. Now onto page 15 — our work to improve collections and past due receivables from the state distribution companies keeps delivering results. DSO improved further to 114 days, down from 232 days in the same period a year ago, which means our collection cycle got better by more than two months. Our push to cut the amount of time it takes to get paid produced roughly $108 million in cash flow across the past 12 months. As state discounts keep making payments on overdue amounts, and since all our growth is with entities that pay on time, we do expect DSO days to shrink further as time goes on. Walking through a summary of our balance sheet on page 16, we hold close to $834 million in liquidity, including cash and bank balances. In the current quarter, we raised close to $397 million in debt, and our current net debt stands at INR, at $5.8 billion. The next slide gives you a closer look at where the money is coming from and where it's going to cover the capital spending needed to finish building out our 13.7 gigawatt portfolio. Just to flag, we believe we can cover this portfolio using cash we already hold on the balance sheet plus cash we generate internally. Issuing equity to develop the pipeline we have today is not something we plan to do. With that said, I'll hand things over to Vaishali, who will walk through what we're doing on ESG.

Vaishali Nigam Sinha

executive
#5

Thanks, Kailash. Let's move to page 19. A lot of you are already aware that ReNew has a board-level ESG committee, and that reflects just how central sustainability has been — and still is — for us. ... When it comes to disclosing Scope 3 GHG emissions, ReNew was among the first in this industry to do so using an inventory-based method covering every relevant category, both in our annual report and our CDP submission; during fiscal year 2023, thanks to robotic cleaning and condition-based module cleaning being deployed, we conserved roughly 313,000 kiloliters of water — an improvement of roughly 48% compared with the prior year. Across every site we operate, our operations have now reached carbon neutrality 3 years running. On our SPPI net zero target, we recorded a 4.8% cut in Scope 1 and 2 emissions during the 1st year of disclosure. Avoided emissions have advanced considerably, with clean energy powering roughly 4.8 million homes during fiscal year 2023, which represents a 20% rise versus the previous year; biodiversity has lately become a central issue for the renewable energy industry, so with that in mind, we're pleased to share that ReNew's biodiversity policy has now been released. Our CSR work started back in 2014, and from then until now, we've touched the lives of more than 1 million people in 500+ villages throughout India, reaching over 10 states nationwide. Let's go to page 18, where I'd like to get into the details of a few of our initiatives. Lighting Lives; under this initiative, we bring electricity to schools that get under three hours of power a day, using solar offsets. So far, 120 schools have been electrified and 54 digital learning centers set up. Not long ago, we signed a long-term partnership with HSBC aimed at electrifying 70 to 75 schools within our areas of operation. Women for Climate. Through this program, we work to bring more women into the energy sector. We run green skilling programs together with UNEP, the United Nations Environment Programme. In Gujarat, we are skilling traditional women — for, for farmers — to work as renewable energy technicians. Community-based water management. Under this program, in the arid parts of Rajasthan and Gujarat, we've desilted 10 lakes, built 120 tankas, and dug 18 waterfalls throughout these regions so communities can access drinking water, which is a critical need for them. The FY24 disclosure cycle has begun with our CDP climate change submission. In the next couple of months, our fiscal 2023 sustainability report will also come out, and we look forward to sharing its highlights on our next earnings call. With that, I'll turn it over to Sumant for his comments on our fiscal year 2024 guidance.

Sumant Sinha

executive
#6

Thanks, Vaishali and Kailash. Our first-quarter results matched what we had budgeted internally, and we remain on pace to hit the guidance for FY24, plus we feel good about our run rate figures. Even though our attention is on completing projects during this fiscal year, we've already begun carrying out the plan for the rest of the pipeline, which is scheduled to wrap up near the close of FY25. As for our buyback programs, we've bought back 34.5 million shares so far, amounting to roughly 32% of the free float when we listed; we still have around $35 million left under authorization, which works out to somewhere between 5 and 7% of the overall free float; having said that, we're ready to answer your questions. Nathan, the floor is yours.

Justin Clare

analyst
#7

Hi there, and thanks for taking our questions. To start, I wanted to ask about the projects that were finished in Q1. It seems those were done ahead of their targeted COD dates. I'm just curious what might have allowed you to get those projects done sooner than anticipated. And looking at some of your other project timelines, it appears that 300 MW of utility scale solar projects had their COD dates moved up by about a year. Maybe you could just address project timelines more broadly. Are you finding that they're getting shorter, and what could be causing that?

Sumant Sinha

executive
#8

Sure. Thank you, Justin. It's always good to talk with you. Look, I'll respond in general terms first, and then when it comes to that particular project you mentioned, I'll hand it over to Nathan or Kailash. As far as timelines for executing projects go, I wouldn't say there's been any dramatic shift when it comes to pulling things forward broadly or timelines getting shorter. I think so much depends on the overall availability of transmission, land, and so forth. That, I'd say, is proceeding according to plan right now. There may be a few projects here and there where perhaps we managed to accelerate the land acquisition process or something similar, and so we might have sped those up. There is no — I wouldn't say there's a systemic improvement in timelines right now. When it comes to the projects commissioned in Q1, yes, we made a significant effort to ensure we completed those within the month of June itself, before the monsoons truly set in, since as you know, once that happens, construction gets somewhat more difficult; we put in some additional effort to make sure those projects would be commissioned within Q1 itself. One — just to shift into another topic — of course, one important development is that module prices have dropped quite considerably. In some ways, this really, I think, strongly reaffirmed the plan we had of postponing execution from last year, because now we're seeing module prices falling very, very sharply, and that's actually helping us reduce CapEx on our solar plants very substantially. As you know, we're now getting Mono PERC modules per watt at roughly $0.16-$0.17, which is, you know, just unbelievable, because compared to last year, we were getting modules at $0.24 to 0.25 — prices have come down very dramatically since then. That really, really, I think, just serves as a stark affirmation of the fact that we made the decision to postpone some of the plants, and that's really benefiting us now. And separately, I'd note a figure of $0.15 that's relevant here.

Justin Clare

analyst
#9

All right, that's helpful. So now let's turn to the 3.5 GW you've secured at auction so far this year. I was hoping you could walk us through the schedule. When might you be able to execute the PPAs, and when would the COD dates for that capacity probably land? This represents a really substantial amount of capacity to capture in such a brief window. Does it change your bidding strategy going forward? I ask because you're aiming for a run rate of 3 to 4 GW annually, and essentially you're already at that level given what you've won at auction. I'm just curious how we ought to think about things from here.

Sumant Sinha

executive
#10

Yeah. As you're aware, this 3.5, we secured over the past few months, and the bulk of it is scheduled to reach commissioning in FY 2026. Consider our present pipeline of roughly 5 gigawatts that's already committed, which will mostly be under construction during FY 2024 and FY 2025. The entire 3.5 will be completed in FY 2026. In effect, it simply pushes our execution pipeline ahead by another year. As you know, these are merely the initial projects auctioned this year; the government's 50 gigawatt program for the year has only just begun. Another 43 gigawatts of auctions have been announced but haven't taken place yet, and they'll occur over the rest of the year. Assuming our typical market share of 10 to 12% or so, you'd expect us to capture considerably more capacity from that. The question for us, naturally, is, as you correctly noted, when will that reach commissioning, and when will we be prepared to execute? Projects arising later will likely fall toward the second half of FY26 or into FY27. To that degree, we may choose to win additional projects selectively from now on, over the coming months, simply to ensure we have enough capacity build-out underway into FY27 as well. On your question about PPA signing, that does require a few months. It also hinges on what kind of project it is. Of that 3.5, as you know, 400 MW with the Gujarat government has already been signed. That one should enter our committed pipeline. There are another three separate projects making up the remaining 3 GW. Two are straightforward solar projects, for which tariff adoption by the regulator is currently in progress. The third is a project that ranks among the complex ones and accounts for roughly 2 GW. This particular item is going to require somewhat more time, since it is inherently a complicated undertaking, and utilities need to complete additional due diligence prior to moving forward and putting their signature on the PPA; getting that finished will in all likelihood take an additional few months; that essentially describes where things stand right now. The timeline of 2 years begins on the date the PPA is signed. If these PPAs do get executed sometime between now and the close of the year, we would then have until FY26, the second half of that year, to complete the bulk of these projects. As I mentioned, we will, we hope, secure additional bids that we win as we move into FY27 afterward. The, the, the, the key thing is that for us the market opportunity remains extremely strong; what we face now is simply a matter of deciding how much capacity we wish to take on and at which point, so that our execution timelines are managed effectively. The IRRs attached to these projects are quite healthy as well, since clearly, given how many auctions are currently underway, you know, everyone is securing as much as they, you know, are capable of executing or have funding available for, and frankly speaking, that is pushing IRRs higher.

Justin Clare

analyst
#11

Okay, that's helpful — thanks.

Nikhil Nigania

analyst
#12

Hi there.

Sumant Sinha

executive
#13

To start with, regarding that standstill agreement, could you give us a bit of background on what the thinking or motivations were behind it? ... the standstill agreement that involves the company and CPPIB.

Nikhil Nigania

analyst
#14

CPPIB, that's right.

Sumant Sinha

executive
#15

The thinking behind it, I believe, was that CDP, as you're aware, already holds a 52% economic interest in the company's shares. Under the shareholders agreement, they were seeking one more board seat. Basically, the board's response was, "Look, we need to ensure that you don't keep raising your stake in the company without making some kind of broader offer to all shareholders." It was purely for that reason that the standstill agreement came into being. Honestly, Nikhil, this sort of thing is fairly typical across many companies — when you have a largest shareholder, such standstill agreements get put in place. That's really why our counsel advised our board that an agreement of this kind with our biggest shareholder would be both standard practice and also protective of minority shareholders.

Nikhil Nigania

analyst
#16

Alright, thanks a lot. Then the next thing I wanted to ask about is what's coming down the road for 3 activities, mostly wafer production: number 1 is the PLI program, number 2 is merchant capacity, whether there are any plans there, number 3 is pump storage. Could you give us your thoughts on what's planned for each of those 3?

Sumant Sinha

executive
#17

Yes. Regarding manufacturing, as you're aware, we've discussed how our 4 gigawatt module facility has been commissioned at this point and is operating at full capacity. In addition, we're building 2 gigawatts more of module capacity at Dholera, plus 2 gigawatts of cell capacity. The module capacity should be completed by early next year, which brings our overall module capacity to 6 gigawatts. Our cell capacity should be completed around the second half of next year. The PLI bid we won, as you're aware, covered 6 gigawatts of wafer, cell, and modules. So for the remaining portion, the wafers and the cells, we're currently evaluating that, and when the timing is right, we'll, we'll think about moving ahead with it. That's the situation on the module side, on the, on the solar manufacturing side. The second thing you brought up had to do with. Sorry, could you say that again, Nikhil, please?

Nikhil Nigania

analyst
#18

Understood, sir. That relates to merchant capacity. Are there any intentions regarding merchant renewable capacity?

Sumant Sinha

executive
#19

Yes. Yes, the third item concerns PHP. Regarding merchant capacity, the truth is that merch— as everyone knows, expectations in the Indian market suggest we will face considerable shortfalls in peak power. As we are all aware, power demand growth in India remains extremely strong. We also recognize that although new thermal capacities may be planned, they will require several years before they can actually begin operating. Our view is that a rather substantial shortage will exist in the market over the near term. Merchant capacity is something we will pursue through two approaches. First, we will establish specific dedicated merchant projects up to a certain percentage of our portfolio. Second, we will maintain merchant exposure in our peak power project, where some overflow will go to our RTC projects. In fact, a third approach involves setting up projects that we may later, depending on the PPA situation, apply to PPAs, whether corporate or SECI. For a period, we will benefit by commissioning them early and, essentially, gaining exposure to the merchant market, where we anticipate prices will be considerably higher than in the PPA market. Through a combination of those mechanisms, we expect to obtain exposure to the merchant market, which we believe will be substantially value creative for us in the short run. Now that SECI is expressing the view that one can construct a project and then essentially later incorporate it into a PPA, we possess the flexibility, as we believe over time, to potentially shift those from merchant to PPAs there. That is a decision we can make later, depending on how the market develops. I think the merchant, the merchant exposure will, in our opinion, provide us with some reasonable upside on our PPA revenues over the next few years; that is why we will boost our exposure to the merchant market via these three mechanisms I described above. As for PHP, look, I think a general perception exists in the market that PHP is absolutely essential for cheap RTC. I would like to state that this is not the sole method to obtain the cheapest RTC power. We have secured several projects for RTC bids by employing a combination of solar and wind plus a small amount of storage; now, this requires; so, the solution one can achieve is either solar and/or pumped hydro, or one can achieve solar, wind, and batteries by upsizing the wind in the project and having, as I said, a small amount of batteries; we have discovered that this solutioning or this different alternative construct brings us to highly competitive RTC prices. All right. Since we handle every part of the process ourselves — wind, solar, and batteries alike — we can guarantee that building schedules line up and get executed as efficiently as possible. Right? So, for everyone's benefit, I'd simply like to point out that this genuinely hands us a rather considerable edge in the marketplace relative to the other approaches that exist, in which pumped hydro sits separate from the renewable energy side, meaning everything must be assembled as one piece. That said, we're convinced pumped hydro has a major part to play in India's grid moving forward, particularly when it comes to the long-duration storage that might be needed. So, just like plenty of others, we too are examining the possibility of building a few pumped hydro facilities across some timeframe. The majority of these pumped hydro facilities currently being built or developed will need several years before they start operating, and they won't be, in any sense, matchable with or aligned to certain RTC bids now emerging, which demand completion within the next 2 years. I believe that even near term, you'll observe more RTC projects getting built using wind, solar, and batteries rather than pumped hydro. As time passes, as I mentioned, pumped hydro has a part to play, which is why we're likewise creating pumped hydro projects while considering what the grid's future holds.

Nikhil Nigania

analyst
#20

Great, thanks a lot. That's very clear. I have just a couple more questions. The first one concerns the receivables from Andhra Pradesh. To start, it's really good to see them drop to this kind of level, down from more than 200 a year ago. Now, looking ahead at Andhra Pradesh, please tell me if I've got this right — they still show a receivable DSO of 371 days. Should we take it that although they've paid the installments, they've ceased paying for future billing generated after those installments began? The fundamental problem hasn't gone away — is that a correct reading?

Sumant Sinha

executive
#21

No, Nikhil, that isn't right. What they've actually been doing — and not only them, every state — is that besides clearing their old outstandings in line with the agreement they struck with the central government under the Late Payment Surcharge scheme, all the states have also been clearing their current dues, meaning the current billings that have been raised. So then the obvious question is why Andhra Pradesh carries such an old outstanding, or one that's been outstanding so long. That's a reasonable question. The answer is that a few years back, when they had in fact disputed the contract, at that time they had also disputed certain clauses of that contract. Although they paid most of it, those 2 or 3 items that remain outstanding still need to be settled. What are those 2 or 3 items? The first is that they claimed that for GBI, which stood for the Generation-Based Incentive, since the center was covering it, an amount equal to roughly INR 0.50 per unit, they shouldn't have to pay it; that, for instance, represents a reasonable amount of capital that remains stuck. We require court, some sort of court processes on these couple of items so as to get them to pay the old outstanding. That truly is the crux of it. Our feeling is that all of it will be resolved; it's simply that we must go through court process to get some of it done, since those payments they had placed into dispute some time back. As I said, legal proceedings are under way on those. Eventually they'll be resolved, and those payments will come through too; it's not that they aren't paying the current billings. They are, and every other state is doing the same.

Nikhil Nigania

analyst
#22

Thanks, and that's encouraging to hear, Sumant. One final thing from me, and it's about headcount. I believe I overlooked this previously. Looking at the annual report, the average number of employees seems to have risen from roughly 1,000 in FY21 to 2,000 at present. I get that this is mostly because ReNew is moving into manufacturing and other segments while capacity expands, but how should we think about it going forward? Should we expect it to keep climbing as hydrogen scales up and additional opportunities emerge? What's your view on that?

Sumant Sinha

executive
#23

Yeah, so the first thing I'd say is that cost discipline is a big priority for us, since manpower productivity and manpower costs clearly matter; we watch those things extremely closely, all right? It's true that the bulk of the headcount growth is coming mainly from manufacturing. The reason is that these areas need far more people than the projects businesses do, so a large share of future expansion will occur there. As we ramp up the module business, followed by cells and ultimately wafers, the result will be considerably more employees joining us; the precise figure, though, hinges on how quickly we roll things out. I'm unable to provide a specific number on that. That covers manufacturing. On something like green hydrogen, naturally we have a team handling development and business development — a project development and business development team for it. That group isn't large, since most of the actual execution will ultimately sit within the RE arm of the company, as you're aware. Because most of the capital will be directed toward the renewable energy side, and then some toward the electrolyzer side, we'll bring those people on only once we reach the execution stage in those areas. Clearly, we won't be recruiting them right at the start; we do have a few people on project development and business development, but that's in the tens. It isn't even in the hundreds. It's a very small number. That's essentially where we stand today. After that, based on how the business rolls out, and in a fairly cost-conscious manner, we'll consider bringing on more staff.

Nikhil Nigania

analyst
#24

I really appreciate it. I'm grateful you gave me the chance to pose these questions. Yes.

Operator

operator
#25

That wraps up the Q&A portion, and with that, today's conference comes to an end. We appreciate everyone for joining in. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ReNew Energy Global Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.