Absolutely. Thank you, Jason, and good morning to all of you; we appreciate your joining us. Earlier today, we released a press release announcing results for the fiscal 2024 second quarter, which ended September 30, 2023. The press release and the presentation can be found in the Investor Relations section of ReNew's website at www.renew.com. Joining me today are Sumant Sinha, Founder, Chairman, and CEO; Kailash Vaswani, our newly appointed CFO; and Vaishali Nigam Sinha, Co-Founder and Chairman of Sustainability. Once the prepared remarks are done, we'll open the call for questions. Please be aware that our safe harbor statements appear in our press release, presentation materials, and materials available on our website. Those statements matter and are integral to our remarks, and risks and uncertainties exist that could cause our results to differ materially from those expressed or implied by such forward-looking statements. We therefore encourage you to review the press release we furnished in our Form 6-K and the presentation on our website for a more complete description. Our press release, presentation materials, and annual report also contain certain non-IFRS measures that we reconcile to the most comparable IFRS measures, and those reconciliations are likewise available on our website in the press release, presentation materials, and on our annual report. It is now my pleasure to hand it over to Sumant. Sumant?

Sumant Sinha

executive
#2

Yes, thanks, Nathan. Morning, everyone. It's good to have all of you with us for our second quarter of fiscal year ended 2024. This year has brought fresh opportunities in areas that fit perfectly with our competitive strengths. The environment for Indian renewable energy developers is the strongest we've ever witnessed, characterized by a big jump in power demand, gaps in energy supply, a substantial rise in renewable energy auctions, which represent the cheapest electricity supply without subsidy, softer solar module prices, and a move toward complex projects that are best served by wind, where we hold the position of largest developer in the country. My conviction is strong that ReNew is set up nicely to capitalize on today’s market, given how disciplined it is about seeking out the opportunities offering the strongest returns. As we go along, we continue to hold to capital discipline while steadily advancing toward the objectives we’ve set. Our confidence in meeting the financial guidance we set earlier this year has grown, and we're lifting the bottom end of our EBITDA guidance by roughly 3%; for FY '24, we now anticipate adjusted EBITDA in the range of INR 62 billion to INR 66 billion; in our biggest projects slated for commissioning this year, most of the wind turbines and solar panels are already installed, which positions us well to hit our guidance of 1.75 to 2.25 gigawatts of projects finished by the close of this fiscal year; we expect that added capacity to translate into per share EBITDA growth of approximately 35% or more next fiscal year; we keep looking for a steady pipeline of auctions, since central agencies like NTPC, SJVN, SECI, NHPC, and certain states have announced RE auctions totaling 65 gigawatts this year — the highest we've ever seen in our industry's history. One thing worth highlighting is that auctions totaling 18 gigawatts have already wrapped up during this year, which is more than the entire prior year's figure, and we still have roughly four months or so remaining. The growing share of intricate auctions points to a pattern: distribution companies are seeking particular electricity supply profiles, and those call for tailored solutions. Factors such as the complexity involved and the constrained development capabilities within India have meant fewer rivals are taking part. On the whole, auction tariffs have moved higher over the last 12 months, and the auctions held recently suggest this direction will carry on going forward. We've signed a Power Purchase Agreement—a PPA—with GUVNL, the Gujarat distribution entity, covering 400 megawatts of capacity that we won earlier this year. We've also received letters of awards for an additional 2.9 gigawatts that we've won. As a reminder, projects with LoAs aren't included in our portfolio until there's a contract, a signed PPA, which points to another step up in our long-term earnings potential as the 3.1 gigawatts of projects won receive PPAs over the next three to six months. Investors and strategic partners keep showing interest in our assets at favorable valuations. We just closed the sale of 100 megawatts of solar assets, and it produced a gain. Over a span of slightly more than two years, asset recycling has brought in roughly $565 million, with about $93 million of that coming year-to-date. Being able to recycle capital and put it to work in opportunities with higher returns is still a major part of how we allocate capital and create value. For this quarter, we posted a profit after tax of US$45 million — among the highest figures we have ever reported; and during this quarter, for the first time in quite a while, the wind resource came in at roughly normal levels. Wind PLF rose to 41.3%, up from approximately 33.7% in the same quarter a year earlier, and that makes three consecutive years in which we have seen an improved wind resource, which could be a sign of more normal weather ahead. Although we stay optimistic that long-term wind PLFs will return to normal levels, we have chosen for now to stay conservative in our guidance regarding weather expectations for the rest of this year. If you turn to Page 5, in September 2023 we saw an unprecedented jump in power demand, reaching 240 gigawatts during peak hours, along with a spike in power prices traded on the exchange, which reflects strong overall growth in the country's power demand. Power demand overall has climbed consistently at 8% over the past several years, and we still anticipate continued expansion in the years ahead. The Indian government has set ambitious goals for its 2030 renewable energy targets, including an annual auction calendar of 50 gigawatts for renewables, and our standing as a leader in wind development continues to set us apart. With the market moving beyond straightforward wind and solar auctions, there is a growing preference for round-the-clock and more intricate auctions — a major advance toward serving the distinctive power demand profiles of distribution companies, with wind serving as a crucial point of differentiation. Having built complicated offerings ourselves, we hold a real edge over rivals lacking their own wind EPC teams, digital or AI tooling, and solid grasp of supply chain rhythms — and those strengths let us lock in returns better than our peers. Now to Page 6: the opportunity here is large, yet we stay absolutely firm on capital discipline. With wind and digital work done internally, we can construct, run, and service renewable projects without friction, which gives us marketplace advantages and delivers returns exceeding both our competitors and our cost of capital. We recently finalized a power purchase agreement with GUVNL for 400 megawatts of solar at 2.71 per kilowatt hour, and we've secured letters of award for the bulk of the 3.1 gigawatts we auctioned earlier this year, all at appealing tariff levels. With intermittent generation rising across the country, demand is strong for power supplies that satisfy tougher delivery and reliability standards. Of the 37.2 gigawatts of auctions still to be completed this year, over 60% are complex power solutions. Thanks to our best-in-class wind EPC expertise and the sheer size of our operations — which counts for a lot now that complicated projects have to be so much bigger — along with our ability to procure equipment through vertical integration, our outstanding access to the cheapest capital, and our large land holdings, we enjoy competitive edges in getting these intricate renewable energy projects delivered quicker and at lower cost than any other player in India. To sum up, this is one of the best environments for Indian renewables that we have seen in a really, really long time. Turning to Page 7, our work on the ground remains on schedule as our projects enter their last stages of construction. Cheaper solar modules have allowed us to buy panels at close to 50% of last year's price at this time. In the past we delayed projects because the CapEx at those levels would have yielded IRRs below what we consider acceptable. As we've said repeatedly, capital discipline remains our sharpest focus, and waiting has worked in our favor; we figure that by deferring selected projects we've spared shareholders about $100 million in CapEx. We have regularly invested modest sums in adjacent businesses, which brings still stronger competitive benefits to our main business of developing renewable energy. To give you an example, about 10% of our CapEx went toward building up solar manufacturing capabilities, because the central government has been imposing sizable cuts on imports; that bet has paid off, enabling us to win high IRR projects in recent auctions where competitors may have struggled to line up supply. Transmission investment is another case in point. At present, interconnection hubs that allow new projects to hook up to the grid face persistent completion delays throughout India. Rather than let our large projects sit idle, we decided to put in a modest amount of capital — less than 5% of our equity — to establish a transmission EPC business. On top of that, capital recycling has allowed us to recover the bulk of this equity, and those transactions produced gains. This quarter we brought our inaugural transmission project into service; it acts as the interconnection for our sizable peak power facility and delivers 138 circuit kilometers of connectivity. Ahead of passing the discussion to our recently named CFO, I want to say how delighted I am that the Board decided to elevate Kailash into that position. A number of you have dealt with Kailash previously and are aware of his expertise and his deep familiarity with debt markets in the renewables sector. Kailash has been part of ReNew from the very start, coming aboard in 2011 as one of the company's founding members, and he has played a key role in every one of our fundraising efforts, across both debt and equity. To date, he has helped ReNew bring in close to $15 billion from a range of sources, including roughly $565 million generated through asset recycling. I really do feel we're fortunate to have found someone from within our own ranks for this position — a person with deep knowledge of the business and a proven track record. With that said, I'd now like to turn things over to Kailash, who will take us through the latest financial results.

Kailash Vaswani

executive
#3

Thank you, Sumant. It's a pleasure for me as well to be here and to engage with all of you. Before I start talking about the quarter, I wanted to share a bit about how I see my commitment to capital discipline — something I believe in firmly. We spend only what we can afford and put capital to work only when the returns on our investments sit comfortably above our cost of capital. Since I've served on ReNew's investment committee for a while now, I gave my full backing to the $250 million share buyback authorized in February of last year, because at that time I viewed buying our own shares as among the most appealing opportunities of scale for investment. Even now, at the present share price, I remain of the view that there is a broad range of options available to finance growth without issuing shares. I have led every capital recycling effort to date and I see substantial demand for our projects. I will also take the lead on bringing down leverage on our balance sheet over time. As for the accuracy of the numbers we report, I stand behind them completely. Moving to Page 9, although global markets have felt the effect of rising interest rates, we have managed our portfolio actively — refinancing debt that carries higher cost and making sure our overall cost of debt stays in check. In India, as the sector matures, the yield spread on Indian money debt has narrowed considerably; through large Indian financial institutions, we can raise debt for our projects today at sub-9%. Importantly, if interest rates hold at present levels, we anticipate refinancing $850 million of maturing debt across the next several years at a lower rate, which would save 25 to 50 basis points on average. We have substantial access to debt from a range of sources, among them PFC and REC — the Power Finance Corporation and the Rural Electrification Corporation — which are known for offering some of the most competitive project debt costs in the industry; we signed an MOU of $8 billion with them recently. We still expect to manage our interest costs effectively and to keep project IRRs inside the targeted range. Moving to Page 10, our asset recycling program keeps drawing interest from international players looking to offset their carbon footprint. In our view, asset recycling will give us a long-term edge by helping us scale more quickly, and it also opens avenues for us to optimize the build process and improve returns on invested capital. During the current period we closed the sale of 100 megawatt of solar assets and have raised almost US$93 million through asset recycling year-to-date — about $565 million in aggregate. Beyond what’s already in the pipeline, we believe our operational development capability lets us build roughly 2.5 to 3 gigawatts of assets per year. From that, we plan to recycle assets — including farm-down sales of net interest of about 1 to 1.5 gigawatts annually — which would produce the cash flow needed to fund growth alongside our internal sources. That should give us enough equity to grow without issuing shares. On Page 11, we’re pleased to report our highest quarterly profit after tax ever, at US$45 million, and our highest first half profit after tax to date, at US$81 million. Wind patterns returned to normal in the current period, and the wind PLF for the quarter came in at 41.3%, versus 32.7% in the same quarter a year ago. We remain cautiously optimistic about long-term wind PLF recovering toward long-term normal levels. Our operating capacity rose by roughly 600 megawatts compared with the same quarter last year, up about 8%. For the full year, we expect interest cost to be slightly higher than the prior year because of new project commissioning, with that offset by savings and interest rates from refinancing. Naturally, this depends on volatility in the foreign exchange market. Taxes appear likely to be about 20% to 25% higher in FY '24, as more of our subsidiaries turn profitable. On Page 12, we reported adjusted EBITDA of US$256 million for Q2 FY '24. The higher EBITDA mainly reflects additional revenue from projects commissioned during the period and higher wind PLFs, offset by lower late payment surcharges of about $11 million as more customers pay on time, plus higher operating costs reflecting more headcount supporting our growth. On Page 13, our DSO keeps improving year-on-year, with an improvement of 119 days since September '22 — 26 days better since the start of this fiscal year. We continue working with states and still believe our DSO will keep improving over time, as we stay focused on collecting overdue receivables and on a favorable mix shift, with more revenue coming from central government and corporate customers who pay on time. Moving to Page 14, we’re focused on strengthening liquidity and leverage. Our cash balance was close to $1 billion — almost US$985 million — and net debt on operating assets was US$4.7 billion. Of gross debt, about 59% carries a fixed interest rate. Only about US$325 million of debt matures within the next 12 months, which we expect to refinance at an average rate lower than what we pay now; we have good visibility into how we anticipate refinancing the remaining 600-odd million maturing in FY '25 and FY '26. Having said that, I'd now like to hand things over to Vaishali, who will discuss our ESG initiatives.

Vaishali Nigam Sinha

executive
#4

Thank you, Kailash. If we move to Page 16, and building on last year's momentum, we stay firmly committed to setting fresh benchmarks in every dimension of our ESG vision, performance and transparency. In our sector, we are setting the pace on ESG. A sustainability report covering fiscal year 2022 to 23, titled Driving Decarbonization, has been published by ReNew. That report follows GRI, SASB and TCFD frameworks and has external assurance from DNV. Among the report's main highlights: ReNew's clean electricity generation came to 17,386 gigawatt hours — enough for close to 5 million households in India. Its operations have also avoided 14 million tons of carbon emissions, roughly 0.5% of India's total emissions. The carbon intensity of ReNew's power generation is approximately 92% below the Indian power sector's average. Through robotic cleaning and condition-based monitoring, ReNew conserves around 318,708 kiloliters of water, an increase of about 48% year-on-year. For a third year in a row, ReNew has reached carbon neutral status for Scope 1 and 2 greenhouse gas emissions. As I said before, the net zero targets for 2014 were validated by SBTi and involve cutting greenhouse gas emissions across all scopes by 29.4% in 2027 and by 90% by 2040. Second, clean energy procurement for operations, electrification of fossil fuel based equipment, encouraging suppliers to set SBTi aligned targets, low carbon footprint raw materials and green logistics for transportation; so as you can tell, we are deeply committed. Social responsibility remains an integral part of our business as well. Our CFe journey started in 2014, and since then we have touched the lives of more than 1 million people in over 500 villages across India, spanning 10 states in the country's most remote areas. Now, if you would turn to Page 17, I'd like to get into specifics of some of our efforts during the first half of fiscal year 2024. Lighting Lives, one of our flagship programs, is an initiative through which we electrify schools that have less than three hours of electricity, using solar off-grid. Electrification of 50 schools, and we have also set up 50 digital learning centers, and all of this is in progress and going well. On the climate curriculum, we are in the process of rolling it out to about 9,000 students across the country. Women4Climate is another program we care deeply about; it is our effort to bring more and more women into the energy sector, and we have green skilling programs in partnership with UN organizations, and we are also working on re-skilling some salt pan workers in Gujarat to become solar technicians now. Nearly 60 women salt pan farmers have been trained and have secured employment. About 48 trainees have secured employment. Employee engagement matters greatly in our work; at ReNew we run programs that employees both design and lead, including our annual volunteering campaign — the right bucket challenge — through which roughly 40,000 kgs of rice were distributed across India. We have begun the fiscal year 2024 disclosure cycle by submitting the CPP Climate Change 2023 disclosure. Additional progress will be shared in our upcoming sustainability report; with that, I'll hand things back to Sumant to discuss our annual guidance.

Sumant Sinha

executive
#5

Thank you, Vaishali. Now, regarding our guidance for the year, I'm pleased to share that we've raised the lower end of our FY '24 adjusted EBITDA outlook by INR 2 billion, bringing it to a range of INR 62 billion to INR 66 billion, reflecting an H1 performance that came in better than expected. In the appendix of this earnings presentation, we've included some further detail on how results stacked up against our original guidance; and we reaffirm our completed capacity guidance for this fiscal year, which sits between 1.75 and 2.25 gigawatts. As for our buyback, we have repurchased a total of 38.6 million shares to date since February last year, amounting to roughly 35% of the free float at the time of listing. We have $11 million of authorization left, equal to approximately 4% to 5% of the total free float; with that, we'll be glad to take any questions. Thank you.

Puneet Gulati

analyst
#6

Yes, many thanks, and well done on the strong figures and the solid profitability too. My first question concerns the win PLF. This quarter came in particularly strong at 42% PLF. Should we treat that as a normal level for 2Q, or do you believe it came in above what's typical?

Sumant Sinha

executive
#7

Yes, Puneet. Hi, and thanks. The PLF for Q2 this year was, I'd say, a little — though only very marginally — above what would be normal. But bear in mind that Q1 is in fact significantly lower as well. So taken together, Q1 and Q2 combined come in below what should have been the case.

Puneet Gulati

analyst
#8

All right, got it. So the first half looks normal, but Q2 comes in higher while Q1 is lower.

Sumant Sinha

executive
#9

Right, the first half runs slightly below normal, whereas Q2 runs slightly above normal, and Q2 was lower. And because of that, when you put it all together, we land a bit under what the overall H1 expectation would have been.

Puneet Gulati

analyst
#10

Got it—and second, could you give us an update on one of those acquisitions you announced a few quarters ago? How is that coming along?

Sumant Sinha

executive
#11

Sure, I’ll have Kailash cover that.

Kailash Vaswani

executive
#12

Yes, Puneet. Regarding the acquisition we announced, there was significant delay in securing approvals, because those assets were held within a partnership firm and needed to be demerged into a company, and the approvals for that demerger took considerable time. So that deal hit its long-stop date, and we decided we no longer wanted it, since the whole market had taken such a long time for this process to finish that we didn't want to wait any further, and we found better opportunities on the bidding side. So we chose to allocate capital more toward the organic side.

Puneet Gulati

analyst
#13

Got it. And we didn't have to pay any penalties for that?

Kailash Vaswani

executive
#14

No, there weren't any penalties. There were certain transaction costs involved, an initial cost of under $1 million. That was the total cost we ended up incurring on it.

Puneet Gulati

analyst
#15

All right. And second, Sumant, you announced during this year that many bids came out, tendering took place, and some PPAs were signed. Can you give a comparable figure for FY '23? What sort of bids were announced, how many PPAs got signed, and what's the backlog on that?

Sumant Sinha

executive
#16

Well, FY '23 — you see, Puneet, giving you a number is really difficult, since in FY '23 we barely won any capacity at all. Last year our market share was just 3%. And — but I should mention that our SECI 8 solar, which is the outstanding one, which actually we haven't included anywhere in the presentation, so therefore, Nathan, you need to tell me whether I'm allowed to discuss that or not.

Nathan Judge

executive
#17

Yes, please proceed, Sumant.

Sumant Sinha

executive
#18

All right, so the SECI 8, which came to a remarkable 200 megawatts — that PPA has now been signed as well. So out of the 13.7 or 8 that we currently hold, all of it is fully signed PPAs. Nothing remains unsigned at this point. What I'm really trying to get across is that the older PPAs are now being converted at a pretty quick pace. With power demand rising, there's clearly interest among the discoms to approach SECI and attempt converting some options into firm PPAs; however, you know, Puneet, this is a lengthy process, since the distribution utilities must first, naturally, address the commercial implication; after that they need to approach their local regulator and secure tariff approval. That step alone may take a month or two. Then they return to SECI and essentially proceed to sign the PPA. Following that, SECI signs the balance PPA. So that entire process may take several months to be consummated; and in auctions having a central acquirer, they must go to the central regulatory authority; so, for instance, a couple of bids we won back in April-May are currently pending with the central regulator, CERC, for approval. Honestly, it's simply a process. It just requires a bit of time; and so, the conversion of these bids into PPAs is underway; and I believe gradually, as some of these regulator approvals come through, you'll see some of that being announced.

Puneet Gulati

analyst
#19

And of those 2.9 that are left, what's a reasonable expectation — how many do you think should get PPAs signed during this year itself?

Sumant Sinha

executive
#20

My guess is that the majority of them ought to —

Puneet Gulati

analyst
#21

I'm certain that's difficult to predict.

Sumant Sinha

executive
#22

Indeed, it's tough to predict, though my guess is that the majority ought to get signed. For sure, a number of the more plain vanilla ones should; however, there are also some complex auctions in the mix. Complex auctions, as you're aware, need a longer lead time before they convert to PPAs, purely because they are complex by definition; and so this storm will likewise need more time to understand them and afterward secure their own internal approvals. And to that extent, regulators also take longer to understand them. Thus, the entire conversion process for complex auctions is simply a bit longer; but, you know, the reality is that on our side there's no urgency whatsoever at present on some of these, since for the capacity we've won, these are things we're going to construct only in FY '26. And so, you know, time is on our side to get them signed. In the meantime, I should mention that for every project where we've got LoAs, we've already blocked transmission capacity. So, transmission capacity has been blocked. Land, we have, obviously, we're working on that right now. But ultimately, we will convert them into actual, sort of deals when the PPAs do get signed as we go forward. And keep in mind that our clock to execute starts ticking only once the PPAs are signed.

Puneet Gulati

analyst
#23

All right. Still, you do hold land for the whole 3.5, and that's a positive.

Sumant Sinha

executive
#24

Yeah. What I mean is, there's no need for us to buy it at this moment, provided we can see clearly enough where that land sits; sometimes you're able to reserve the land without really spending any meaningful sum. The key point, though, is that once you've secured the interconnection rights, that becomes, you know, the single most essential piece. And since we hold the LoAs, we can in fact secure those interconnection rights. So across every bit of capacity we operate, the full 3.1 gigawatts, we've secured the interconnection rights for all of it.

Puneet Gulati

analyst
#25

Got it. That's really useful. And one final thing — how are things going with asset recycling? Was there anything you completed in Q2, and what's in the pipeline for the second half?

Sumant Sinha

executive
#26

Yes, Kailash, could you handle that one?

Kailash Vaswani

executive
#27

Yes. So to date, we've closed deals totaling roughly $93 million. We do have a few more in the pipeline that we're working on; however, when it comes to the timing of asset sales, you know, it's genuinely difficult to predict, because it depends on when the deals close, so how much will be completed in Q3 as opposed to Q4, we're working toward that.

Puneet Gulati

analyst
#28

And does that $93 million figure take in the Gentari acquisition along with its results?

Kailash Vaswani

executive
#29

Correct. It covers the two deals — or actually three deals. Those are the Gentari deal, the 100 megawatt sale to Technip Solar, and the third is the amount we received from the Northland solar transmission assets.

Puneet Gulati

analyst
#30

All right. Got it. That covers it all. Thanks very much, and best wishes.

Kailash Vaswani

executive
#31

Thanks.

Justin Clare

analyst
#32

Yeah. Hello. Thanks for taking our questions. I'd like to ask specifically about the capacity volume here. It looks like there's a considerably bigger chance for renewable projects when it comes to the auctions anticipated each year. So I was wondering whether you might address the possibility of bottlenecks arising because of that higher capacity volume. And after that, perhaps you could address how you plan to handle those possible bottlenecks.

Sumant Sinha

executive
#33

Justin, many thanks for that question. But, as you know, you've raised something I could talk with you about for hours, as I'm sure you can imagine, since this is clearly central to what we do. To offer a fast overview of that, in my view the main requirements for carrying out a project are, naturally, PPAs—and as we noted, there's plenty of chance for us to secure capacity in that area. Transmission comes second. At present it isn't a constraint, since the government is constructing transmission capacity at a fairly swift rate. As I mentioned, when we secure an LoA—or win a bid and receive the LoA—we can then reserve the transmission capacity. Should no transmission capacity be available, the execution timelines shift forward automatically. So transmission won't turn into an obstacle we have to eliminate, and it shouldn't. The third item is land. Naturally, we're continually working on land, always examining what the forward pipeline looks like, and we try to reserve land for projects three or four years ahead. And clearly, we're also establishing a number of net marks in various regions of the country. We've got 700 met masts that are now up and running to measure wind; and on the solar side, we've secured access through three — through a variety of mechanisms to transmission capacity in Rajasthan, which lets us carry out projects even two, three years past our current pipelines. So in Rajasthan there's plenty of land for solar projects. Land is therefore dealt with on that basis; and then, naturally, there's the matter of people and organization. That's something where, you know, we possess our own in-house execution capability in both wind and solar. We keep revisiting that and are considering expanding it, though gradually, since we clearly want to create a top-quality organization, and that ability to execute ought to keep getting better in a lasting way instead of merely rising once. Then, naturally, capital comes into play. Regarding capital, I believe we're considering a combination of our own funds and recycling assets in order to generate money for financing a few of these projects. So that, I think, is our approach to those five main areas. The sixth is really the supply chain. And there, clearly, as the biggest wind participant in the nation, we hold really important ties with the major OEMs, extending out a few years. So we lock in, you know, the best possible terms from those wind OEMs, given that we actually purchase more wind turbines than anyone else in the country. Now on solar — as I've discussed with all of you many times, that's an area where government policy is constantly changing and shifting. And so we've tried to stay one step ahead of government policy by making sure we've invested whatever is needed to have that supply security. That also means we're able to keep bidding with real confidence that we can source and procure our own modules. That's in fact turning into a meaningful competitive advantage. Those are some of the efforts we're making to make sure we can keep executing — you know, two to three, and then we extend that out to a year, and then look to grow it in the years ahead. I hope that answers your question.

Justin Clare

analyst
#34

Understood. All right. Yes, no, that's quite useful. And then, I suppose, regarding the supply chain—you currently have your own in-house module manufacturing. Could you share what the cost structure looked like for the modules you produce in-house, and how that might compare with what's available on the market, including the import duty cost, and how this could give you a relative advantage where your cost structure is concerned?

Sumant Sinha

executive
#35

Yes. Nathan, we haven't released those figures at this point, correct? But please confirm again.

Nathan Judge

executive
#36

Not at this moment, no. Still, if you'd like to offer a few ranges, that works.

Sumant Sinha

executive
#37

Alright, thank you. So yes, Justin, the situation is this: as you're aware, India's import duties on solar modules stand at roughly 40%. That level gives us ample protection against modules brought in from abroad. When it comes to the cost gap between what we make here in India and what gets manufactured in China — for the module alone, by our estimate, it's somewhere around 10% to 15%. So that 40% protection is enough to keep this from being a problem for us. The second point to bear in mind is that we also have the approved list of modules and manufacturers, which is genuinely a tough barrier against imports — the government brought it in from this April, though it was pushed back by a year. It returns in April of next year, and at that stage it will stop any imports from entering at all, regardless of duties or anything else. So at that point, it won't merely be a matter of cost. It will turn into a question of availability, since anyone with access to modules will be able to keep executing projects, and those without obviously won't. Our view is that module supply next year will run a deficit, because clearly, while capacity is being added, getting it to a level where quality is good and production is stable genuinely takes time. That said, our sense also is — though there's no specific data we can point to, only what we hear from people working with us and so on — that our production cost is highly competitive relative to other Indian companies. So that's really another area where we'd like to benchmark ourselves.

Justin Clare

analyst
#38

Okay. I appreciate it. Thank you.

Sumant Sinha

executive
#39

Thank you.

Nathan Judge

executive
#40

And Samant, an email question has come in from Girish <<inaudible>> over at Morgan Stanley that ties into that, so let me just raise it. Essentially: would we consider selling a minority stake in our solar manufacturing? And with what looks like overcapacity set to come online in India, plus the strong response to PLI, what's our thinking on all that?

Sumant Sinha

executive
#41

Yes, so no, we are definitely open to that. Holding on to 100% of the solar plant is not something we're willing to do. As we've said on many occasions, the purpose behind setting it up was to give us confidence in supply security. And provided we can achieve that, you know, that satisfies our main goal. Regarding overcapacity in the Indian market, that's a matter we'll simply have to wait and see about, since clearly, although plenty of parties have announced plans, how many of them actually follow through is something we'll need to monitor. And the second point is that a lot of the capacity established earlier is in fact going to turn uncompetitive, because those facilities just won't possess the efficiency, the production capability, or the ability to manufacture the latest generation of modules. So to some degree, some of that earlier capacity will need to be discounted when calculating the capacities that are coming up. Yes. So that's my answer on that, Nathan.

Nathan Judge

executive
#42

Thank you. Jason, go ahead to the next question. Thank you.

Sumant Sinha

executive
#43

Actually, let me just jump in here…

Nathan Judge

executive
#44

Sure, Sumant, please go ahead. Go on, Sumant, finish what you were saying.

Sumant Sinha

executive
#45

Right. Yes. No, no. The only further point I'd add is to remember that many of those modules get exported — they're shipped from India to the U.S. and elsewhere — so that too contributes to the deficit, and it will contribute to the country's deficit next year.

Nathan Judge

executive
#46

Please proceed, Jason. Thanks.

Nikhil Nigania

analyst
#47

All right. Thanks a lot. Nice work on a solid set of numbers. My first question concerns the RTC and Peak Power projects. It's encouraging that their guidance has been kept intact. I simply wanted to confirm that transmission won't be a constraint for these two assets when they come online in Q4, and that power evacuation as well as grid evacuation will begin.

Sumant Sinha

executive
#48

First, Nikhil, I can state with absolute certainty that transmission will not be a constraint. That's mainly since we're building quite a lot of it on our own. In the very first RTC project to opt in, there are three separate wind projects plus one solar project. The first wind project links to a substation that we are constructing ourselves. That one is now commissioned and has been charged. So at this point we're just waiting — working through the connectivity protocols to hook the first project into that Koppal substation that we built. We're also constructing the second one, which is a separate substation; so as a result, we obviously have a clear picture and control over when those substations come online. The third one connects to a substation built by a third party, which we're watching closely and staying in contact with them about. That one also appears to be on track, so it shouldn't create any issues either; therefore I don't expect any transmission-related problems when commissioning these projects.

Nikhil Nigania

analyst
#49

All right, that's good to hear. So I suppose a question that ties into that is transmission — something that was touched on a bit in the earlier discussion. As India scales up to 30, 40 gigs of renewable installation now, is transmission being viewed as a constraint? Do you see it as an obstacle to hitting those higher renewable installation figures, perhaps?

Sumant Sinha

executive
#50

I'd say the government has so far been fairly proactive when it comes to building transmission capacity. And I think there's a lot of transmission capacity in the country that can support the 50 gigawatts of commissioning. The only thing is, of course, that transmission capacity isn't necessarily located in areas where people would want to set up, or maybe there's some constraint in places like Rajasthan or Karnataka and so on; and there, bottlenecks might arise as we move forward; but when I say bottlenecks, I mean that the bottleneck will show up after 30 gigawatts or 40 gigawatts of connectivity rather than 10 or 15 gigawatts. So there's a lot of room to go before we actually start having constraints really, really emerge; so I'd say that at least for the next two, three years, we shouldn't be seeing any transmission bottlenecks. And the government is, as you very well know, trying to really speed up the construction of transmission projects and the auctioning of transmission projects. So they are very closely evaluating what the issues are and are trying to debottleneck that.

Nikhil Nigania

analyst
#51

Understood. Thanks; and so my final question is this — there was that one large tender, the RTC-2 tender, I believe for over 2 gigawatts, that I think has been circulating for a fair while now. Is there any update you could share on it from the news side?

Sumant Sinha

executive
#52

I'm not certain which tender you mean specifically. There's one. There's RTC-2?

Nikhil Nigania

analyst
#53

Yes. The one involving coal as well, which was not meant for blending — coal-fired generation.

Sumant Sinha

executive
#54

Okay, okay, okay. No, listen, I haven't come across any news on that tender in a good while. So I can't say for certain whether it's currently active; but as you're aware, several other RTC auctions have taken place in the interim. Techie 6 was the earliest of these; it covers 200 megawatts of headline capacity, which, as you know, works out to roughly 3.5 gigawatts of real RTC capacity. Then SJVN ran another 200 megawatts capacity not long ago, which isn't actually fully subscribed — of that, we've taken 184 megawatts. And the REMCL tender is out there too. So three such tenders have come along over the past few months. And as you know, a further number are expected to arrive in the months ahead.

Nikhil Nigania

analyst
#55

Understood. Understood. Many thanks; that covers everything I wanted to ask. Thanks.

Angie Storozynski

analyst
#56

Thanks. I have just a couple of straightforward questions. First, you undertake a great deal of capital recycling across current and upcoming projects. So I am simply curious whether the gains you book from that show up in your EBITDA. That is the first one. And second, when you present EBITDA and debt projections to us, I just want to confirm that these are proportional EBITDA and proportional net debt — that is, the share of each that you retain as renewed, net of those divestitures or asset recyclings.

Sumant Sinha

executive
#57

Yes. Kailash?

Kailash Vaswani

executive
#58

Sure. Yes. So the profits from selling those assets aren't showing up in the EBITDA line yet. My understanding is that the accounting entry took place after the prior quarter had already closed. That's why I believe it will be recorded in the following period. On your second question, in cases where we consolidate the entire EBITDA and hold a 51% majority stake in the assets, the full debt is also consolidated onto our balance sheet; we don't consolidate proportionally, since when we control the asset, the whole EBITDA and debt essentially remain with us. We strip out the minority interest to reflect the joint venture partners' stake in the project.

Angie Storozynski

analyst
#59

Got it, but I’m only asking you — right.

Nathan Judge

executive
#60

Yeah. My apologies. Just to be clear, what you’re seeing in our guidance there is only our net figure. So when you look at the debt -

Angie Storozynski

analyst
#61

Right, that figure is after minority interest has been accounted for.

Nathan Judge

executive
#62

Correct — so in fact those amounts belong to shareholders on a net basis.

Angie Storozynski

analyst
#63

All right.

Nathan Judge

executive
#64

Well, I mean, well — but regarding — yes. In fact, we are recording this. We'd be removing the net, or the minority position, from that minority interest line. However, where projection and our guidance are involved, everything is net of what we own at present.

Angie Storozynski

analyst
#65

All right, that's fine. And now, circling back to the gains from capital recycling. So, once more, I mean, you've completed a few of those deals previously. And I'm just curious, I mean, have they contributed meaningfully to EBITDA? I get the difference in when the gain gets recognized for this most recent transaction. But I'm just curious how large a component of EBITDA this has been or could be. Again, I realize that's an ongoing business. But I'm, once more, curious how big a piece of the EBITDA this represents.

Sumant Sinha

executive
#66

So, look, again, there's an accounting value attached to it. What usually happens is that we record costs basis and accounting calculation on the capital expenditure. We're also going to add some margins at the EPC levels. When we consolidate them, they get eliminated. When we sell those assets, those assets are carried at a higher value in our books because of the — because we are sort of selling those assets. So to that extent, the gains are smaller, but the cash flow impact is larger.

Nathan Judge

executive
#67

All right. So if those gains aren’t especially material — and keep in mind too that the bulk of the bigger transactions involved projects still under construction, correct? That means our Peak Power projects and our RTC projects, right. And those gains would be, well, commercial gains, but the accounting gains are de minimis, since they haven’t actually been selling operating assets. That’s the place where you’d see gains. So up to now, there hasn’t been much.

Angie Storozynski

analyst
#68

All right. And finally — and once more, you can likely tell by this point where I'm heading with this. I'm attempting to put you alongside other renewable power developers. There have been a few discrepancies in the way, you know, that's, and EBITDA get presented. So, you know, your company does project financing and I'm simply asking whether there's any reason for your — for you to alter that position. Like, I'm not sure, as the balance sheet expands, might you look at balance sheet financing? Once more, any, any shifts in the way you finance a new build?

Sumant Sinha

executive
#69

Yeah; so once more, what occurs there is that, you know, clearly we've got a portfolio in place, and it's fairly large; we carry existing debt, and that's fairly large too. So switching all of it over to balance sheet would take time, and it calls for a particular sort of market environment — one with relatively easy money policy, where rates sit lower; in such a market you can clearly complete transactions by borrowing against the balance sheet. And afterward pay down the debt at the core levels; but since market conditions are what they are, investors are heavily focused on obtaining security over specified assets. And then the lenders generally wouldn't want to consolidate or hold within their entities the security subject to construction risk. Because at that point the risk weightage shifts for them as well. So we aren't shifting to a balance sheet style of financing any time soon. For us, this model genuinely works. And across most of the Indian context, lenders are project finance lenders tied to specific assets; and they want complete security over that asset without sharing it with any other lenders. So from a bankruptcy remoteness standpoint too, that is the favored model in India. So it appears we'll need to more or less keep going with that.

Angie Storozynski

analyst
#70

Great. Thank you.

Operator

operator
#71

At this point we have no more questions. That brings today's conference to an end. We appreciate your participation. You're welcome to disconnect now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ReNew Energy Global Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.