ReNew Energy Global Plc (RNW) Earnings Call Transcript & Summary

February 20, 2024

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 51 min

Earnings Call Speaker Segments

Nathan Judge

executive
#1

Thanks, Betsy, and hello everybody, and I appreciate your attendance on this call. Earlier today, we put out a press release with our results for fiscal 2024's third quarter, which closed on December 31, 2023. You can find both that release and the presentation in the Investor Relations area of ReNew's site, www.renew.com. Joining me today are Sumant Sinha, our Founder, Chairman and CEO; Kailash Vaswani, our CFO; and Vaishali Nigam Sinha, Co-Founder and Chairperson, Sustainability. Once the prepared comments wrap up, we'll take your questions. Just a reminder, our safe harbor statements appear in the press release, the presentation materials and the materials posted on our website; those statements matter and are essential to everything we say. Certain risks and uncertainties might lead our results to diverge materially from what those forward-looking statements express or suggest. So please take a look at the press release we furnished in our Form 6-K along with the presentation on our website, which give a fuller picture. Our press release, presentation materials and annual report also include specific non-IFRS measures, which we reconcile against the closest comparable IFRS measures, and those reconciliations can likewise be found on our website within the press release, the presentation materials and the annual report. I'm now happy to turn things over to Sumant.

Sumant Sinha

executive
#2

Alright, thank you, Nathan. Good morning, and good evening to everyone joining us. It's great to have all of you here for our earnings call covering the third quarter of fiscal year 2024, which ended recently. The calendar year 2023 represented a major milestone both for India's renewable energy industry and for our company. India is now the most populous country in the world, and it has seen a sharp rise in electricity demand, which makes the need for additional power unavoidable. Back in April of 2023, the Ministry of New and Renewable Energy substantially expanded its auction schedule, aiming to help the nation reach its target of 500 gigawatts of installed renewable capacity. What the government promised has now turned into real action, and an unprecedented number of auctions have taken place throughout the year. During fiscal 2024 so far, auctions totaling over 40 gigawatts have been held, a substantial jump compared with the prior year, when roughly 12 gigawatts of capacity went to auction. On top of that, we are monitoring an additional 70 gigawatts of central and state tenders that should be auctioned in the coming months. As India has stepped up its Made in India efforts to establish itself as a worldwide manufacturing center more generally, the urgency of obtaining dependable power grows even stronger. This broadening of the addressable renewable market has given developers like us the most advantageous conditions in the renewable sector that we have ever witnessed. Because auction volumes have grown so much, competitive pressure has eased somewhat, which has led to higher tariffs being discovered. Participation rates for new auctions dropped considerably during this fiscal year and hit their lowest point on record in the quarter just past, with less than 100% of offered capacity often being subscribed for complex projects, meaning auctions essentially cleared at the starting bid price. So far this year, tariffs have risen, particularly in wind auctions, where they climbed 14% compared with the same period last year. Our distinctive capability in wind sets us apart in a market where far fewer developers possess that skill. We observe that despite higher tariffs, renewable energy remains the cheapest option for new electricity supply in the country, substantially less expensive than the main alternative for comparison, which is coal-based power. Alongside rising tariffs, we identified several other elements contributing to improved returns, including a record decline in solar module prices, steady foreign exchange, sufficient domestic debt financing, and a meaningful decrease in receivable days. What began as a year filled with numerous difficulties has turned into one of the most advantageous markets for ReNew in our entire history. As we get ready to enter fiscal year 2025, we look forward to capitalizing on the fresh opportunities that emerged over the course of this year, particularly in complex firm power, including round-the-clock power and peak power projects that are presently being built. The growing share of complicated projects and the options tied to them makes this demand unmistakable. During this fiscal year, roughly 38% of the capacity we auctioned came from complex projects — far above the 8% share recorded a year earlier. That figure should climb to 44% of tenders we anticipate auctioning across the coming months. Returns on complex auctions remain richer for us, and a larger portion of our wins now falls within this category. In complex auctions, ReNew holds unmistakable competitive edges. Consequently, our share of these auctions outpaces every one of our peers. To begin with, building models for such projects is difficult. On top of that, pulling off complex projects calls for wind development know-how, the blending of several power sources via digital tools, plus strong project management — capabilities most sector participants simply do not have. Because we handle wind EPC internally, run our own digital labs, and can tap the least expensive capital available, our projects deliver stronger returns. For us, this year should stand as a landmark. On the execution side, our operating portfolio is poised to grow considerably, since nearly all of the under-construction pipeline will come online, driving both top-line and bottom-line growth. I'll now move to the quarter's highlights on Page 4. We are lifting the lower bound of our adjusted EBITDA guidance to a range of INR 63 billion to INR 66 billion. Given a record-setting year for megawatt installations, we anticipate that somewhere between 1.75 gigawatts and 1.95 gigawatts will be producing revenue by the close of fiscal year 2024. On top of the 825 megawatts already commissioned, we have put up 475 megawatts of wind turbines along with a further 620 megawatts of solar module installations. Our asset recycling approach keeps supplying us with inexpensive capital for expansion. A month ago, we agreed to sell a 300 megawatt solar asset that was commissioned 2 years back, and we expect to collect proceeds of roughly $82 million before the year ends. The asset carried a valuation of $199 million. This deal will add to the sizable amount already raised via asset recycling while also lifting returns on the capital we put into projects. We anticipate booking a gain of approximately $30 million to $34 million within our Q4 '24 EBITDA. Keep in mind that our FY '24 adjusted EBITDA guidance of INR 63 billion to INR 66 billion leaves out this gain. Our growth path stays strong, as we captured an extra 3.6 gigawatts of RE projects in the quarter, at a time when tariffs are climbing, costs are dropping, and composition sits near historic lows — proof of our capacity to lock in growth at appealing returns. We bring this up because in the prior year, when every one of those conditions was working against us and new project returns were significantly weaker, our share of the market came in at just under 3% — far short of the roughly 10% we typically hold. Set that against the present year, where returns are considerably stronger, and we have captured approximately 15% of all auctions; this, we should note, comes on an even larger base. In our view, that demonstrates how dedicated we are to discipline around capital rather than to market share alone. We are also glad to share that our DSOs — days outstanding — have dropped under 100 days, landing at 86 days when the quarter closed, which represents a substantial gain of 92 days across one year and an even bigger gain versus the 272-day peak reached merely a couple of years back. Making prompt collection of payables a top priority continues to be essential for us, since it strengthens how we compete in the market and has freed up close to $200 million in cash to fuel growth. Our expectation is that DSOs will keep getting better as time goes on. On top of that, wind PLF has improved noticeably this year. During the quarter, wind PLF reached 17%, a meaningful gain compared with the 14.7% PLF recorded in the same quarter a year earlier. And on a year-to-date basis, wind PLF came in at 29.2%, exceeding last year's wind PLF of 27.3%.

Sumant Sinha

executive
#3

Even though the improving trend in wind PLF is a positive sign, and more and more proof suggests wind speeds are returning to normal levels over the long term, we chose not to factor this into our guidance so we could stay cautious. It makes me proud to report that across the trailing 12-month period we turned a profit, earning $44 million. We know profitability is viewed by many investors as a crucial metric when making investment decisions, and these numbers ought to make RNW more appealing to a wider set of investors. Our cash flow from operations has consistently been positive and rising, and we feel we have now reached the scale required to deliver consistent annual profitability and to demonstrate the complete worth of our platform. Cash from operations came in at $616 million for the 9-month period ended December 31, 2023, up against $595 million in the prior period. Our profit after-tax reached $43 million for the 9-month period this year, versus a loss in the comparable period a year earlier — an improvement of almost $100 million. Moving to Page 5. Growth in electricity demand along with the macroeconomic backdrop keeps favoring RE development in India. First, auction markets keep driving a greater volume of auctions and improved tariffs. More than 40 gigawatts of auctions have already been wrapped up year-to-date, and another 70 gigawatts are likely to be completed over the coming months as various state and central agencies work toward that. On top of that, complex projects' share rose from 8% last year to roughly 38% this year, which points to a lasting move toward complex projects. Moreover, tariffs kept climbing upward because competition was thinner. Among the tenders we are monitoring, we anticipate complex projects' share will rise even more, driven by the country's need for firm power. Second, the cost to construct RE keeps getting better, since solar module prices — which account for 40% to 50% of the total cost to construct a solar farm — dropped by about 55% from the prior quarter, reaching historic lows of roughly $0.11 per watt peak. So let me repeat that: they have dropped to reach $0.11 per watt peak. Also, the supply-related difficulties that held us back last year got resolved when our own manufacturing facility began operating during the year. We would point out that cost of sales has largely tracked the decreases observed in module prices, which makes our manufacturing cost competitive against imports once the BCD or import duty is taken into account. Moving to Page 6. Because we have been patient and selective in auctions, we have been able to achieve superior returns on our projects. With more than 40 gigawatts of projects auctioned this year, quite a few auctions ended up undersubscribed. Weaker competition in auctions lets us secure superior tariffs, and we observed subscription levels below 100% in auctions for complex projects. Having our own EPC capability, plus a supply chain we've integrated that keeps big projects arriving on schedule, lets us place bids that compete hard and still lock in better returns. The digital and AI platform we've built, combined with what we've learned from developing complicated solutions, hands us a real edge over the competition. Market share isn't something we chase, yet ours climbed to roughly 5 times what it was the previous fiscal year. A year ago we held just 3% of the market and saw far weaker returns; now, at around 15% share this fiscal year, the projects we're taking on are expected to generate substantially stronger returns. Being disciplined about growth stays our approach, and we'll keep going after the opportunities offering the best returns available. Let's move to Page 7. What we do best is carry projects through over time, finishing on schedule, staying inside budget, and producing the returns originally anticipated. Progress on the ground is still solid — we've erected roughly 1.9 gigawatts of assets. Out of that figure, COD approval has come through for 825 megawatts of projects; beyond that, 474 megawatts of wind turbines stand erected and 620 megawatts of solar modules are installed. Over the same stretch, we also put in a 150 megawatt hour battery storage facility tied to our peak power project. On top of that, we commissioned 276 kilometers of transmission in the quarter. Access to interconnection hubs is starting to show genuine constraints, and this line of business, still new for us, is starting to give us meaningful competitive advantages when we bid on new projects. With that, I'll hand things to Kailash to walk through the latest financials.

Kailash Vaswani

executive
#4

Thanks, Sumant. Moving on to Page 9. We keep seeing robust interest from lenders here in India for what we're building. Not long ago, we managed to take a $325 million bond and refinance it domestically, locking in a rate roughly 200 basis points beneath what that bond's landed interest rate had been. That refinancing gave us another chance to show how we've delivered long-term financing for our projects, with rates climbing up to 9%. Across India, as this sector has grown up, yield spreads on Indian RE debt have narrowed a great deal. We remain committed to domestic debt markets because they're cheaper than the U.S. dollar green bond market, though we've watched yields on our own U.S. dollar bond come down by roughly 200 basis points over just a bit more than the past 4 months. Worth pointing out too: the typical spread on our bonds sits at roughly the same spot it occupied when the Fed's tightening cycle began in 2022. Now Page 10. Our asset recycling program keeps drawing keen interest from both international investors and domestic players. Last month — I misspoke, last year — we signed a deal to sell a 300 megawatt solar asset and anticipate roughly $82 million in net proceeds by year end, meaning the fiscal year end. We expect to put that money back into projects which, in today's hot bidding environment where project costs relative to run rate EBITDA fall between 6.5x and 7.5x EBITDA, ought to deliver returns even better than the asset we just divested. Depending on how much growth capital we can bring in through asset recycling, we ought to be able to add 1 to 1.5 gigawatts net of asset recycling with no need to issue fresh shares. Asset recycling essentially hands us long-term growth capital at the lowest achievable cost of equity, letting us expand while improving returns on capital. Now Page 11. For the 9-month period ending 31 December, 2023, we posted profit after-tax of $43 million, versus a loss of approximately $60 million a year earlier; that swing came mainly from greater revenues plus savings and finance costs. This quarter brought a big gain in wind PLF relative to the same quarter a year ago. Wind PLF for the quarter reached 17%, up from 14.7% during last year's comparable quarter, which strengthens our belief that long-term wind PLF will recover toward normalized levels, even though our guidance assumes wind speeds matching last year's. Our operating capacity grew by 940 megawatts against the comparable quarter a year prior, a rise of roughly 12%. For quarter 3 FY '24, we reported EBITDA and adjusted EBITDA of $150 million, up about 8%. That higher EBITDA stems chiefly from extra revenue tied to projects commissioned during the period. Higher operating costs, which moved in step with added capacity, partly counterbalanced that. Moving on to Page 12. At present, our days sales outstanding comes in at just 86 days, which is roughly 92 days better than what we saw a year ago. The emphasis we place on making sure cash is collected on schedule and on pushing DISCOMs to settle outstanding matters is now delivering results. Over the year, we managed to free up roughly $82 million in cash flows during the current fiscal FY '24, achieved through on-time collection of current dues along with recoveries on the older ones. Moving to Page 13. Our balance sheet keeps growing and strengthening. Our cash balance came to more than $1.1 billion, leaving out the $325 million that was repaid in January of this year. And our project level net debt came to roughly $5.4 billion. In January of this year, we refinanced our $325 million bond that was maturing in April '24, which saved 200 basis points and pushed the maturity out to 15 years. Given where interest rates sit right now, we will keep assessing situations where we can refinance debt at an interest rate below the coupon on that debt. This year, on top of the $8 billion MOU we signed with PFC and REC, we signed one more MOU with ADB for close to $5.3 billion of debt financing, which brings the total amount of access of capital to more than $13 billion; these MOUs let us build multiple avenues for accessing debt at competitive rates and for lowering the interest rate burden on our profit and loss account; with that, I would like to hand it over to Vaishali to discuss our ESG initiatives.

Vaishali Sinha

executive
#5

Appreciate that, Kailash. Let's move on to Page 15. Following up on the good momentum from the quarter we just closed, I want to share where we stand on several important ESG ratings and awards. Our Refinitiv score came in at 79.25, up from the 77 we had previously in fiscal year '21-'22. Among every electric utility and IPP corporate in India, that ranks first for fiscal year '22-'23, and it places us second globally among electric utilities and peers. Sustainalytics also named us a top performing company, recognizing us as both a regional and an industry leader. On CDP climate change, our rating stays at B, the management band, which sits above the Asia regional average of C and matches the renewable power generation sector average of C. Over at S&P CSA, our score went from 41 to 53. We picked up several awards as well, among them the prestigious Terra Carta Sea, for actively leading the charge toward a climate and nature positive future. For a second time, we earned the World Economic Forum Lighthouse, honoring our leadership in Fourth Industrial Revolution technologies, along with the highest category of recognition, resilient, from the CII Climate Action program, known as CAP2.0. Social responsibility remains a core part of how we do business. Starting in 2014, we have touched the lives of more than 1 million people in 500 villages throughout India, reaching across over 10 states. On the right-hand side of the deck you'll find several key programs, which also involve employee participation. Through the Lighting Lives program, electrification work at 60 schools is underway alongside HSBC. The Climate Curriculum reached 9,000 students. With Project Surya, done in partnership with UNEP, close to 210 women have finished training as renewable energy technicians; previously they worked in the extremely tough solar — sorry, salt farming area in Gujarat. Roughly 200,000 people have benefited from the 9th edition of the Gift Warmth Campaign 2023. Over to you. Thank you.

Sumant Sinha

executive
#6

Sure. Thanks, Vaishali. Now, on to the guidance we give each year. We're lifting the lower end of our FY '24 range by 2%, so FY '24 adjusted EBITDA is now projected at INR 63 billion to INR 66 billion. That figure, as mentioned before, leaves out gains from asset sales; when it comes to construction, we anticipate roughly 1.75 gigawatts to 1.95 gigawatts producing revenue by year-end. Since COD extensions were granted for certain projects of ours, that opens a chance to sell power on the exchange, frequently at prices well above the PPA tariff. Regarding our FY '25 guidance, we remain committed to sharing that outlook with investors on our Q4 FY '24 earnings call. We'd like to remind investors that we divested 400 megawatts of assets during this year, which would otherwise have added roughly INR 2 billion in FY '25, though the EBITDA from proceeds of that sale will be even larger in later years once the capital gets redeployed. Finally, we also expect to stay conservative on weather assumptions within our FY '25 guidance. Even though weather patterns have improved this year compared with the previous several years, we remain focused on honoring our commitments to investors; with that, we're happy to take any questions. Thank you.

Nikhil Nigania

analyst
#7

First thing I'd like to ask about is how fierce the competition is. It's nice to see that easing, but I'm curious about the cause. Is it simply the huge volume of tenders, or is there another factor behind the softer rivalry in these auctions?

Sumant Sinha

executive
#8

Right, Nikhil. Well, I'd say you basically answered your own question there. As we mentioned, roughly 12 gigawatts of auctions took place last year. This year, we're looking at 40 gigawatts. So I'd say the majority of our rivals currently have quite packed pipelines, and so do we. And because of that — plus with so many tenders going on, there's always another one you can win — so taking all that together, the level of competition for any particular project, in any particular auction, has dropped off pretty noticeably.

Nikhil Nigania

analyst
#9

Understood, Sumant. Then my second question concerns the drop in module prices, which works in our favor. I'd like to know what portion of the pipeline has its module price already locked in. And on the remaining portion, how much can we capture from today's cheap module prices?

Sumant Sinha

executive
#10

What you can take for granted is that anything we've purchased over the past three months, and even before that, stands to gain from these cheaper prices. And in fact, stepping back for a moment, our choice to push back project execution during the previous financial year turned out to be quite the right call, since module prices back then sat at $0.26 to $0.28, and across the past 12 months they've dropped enormously. As a result, we can now bring these solar projects online at tariffs — at costs that are considerably lower, in some instances by 20% to 30%, than would have been the case if we had built them sooner. So indeed, from this moment — over the last, I'd say, 3 to 4 months, in fact even now, every module we purchase carries a reduced module price.

Nikhil Nigania

analyst
#11

So is it fair to think that the majority of the capacity coming online in FY '25 should be helped by this?

Sumant Sinha

executive
#12

Yes, definitely.

Nikhil Nigania

analyst
#13

Understood. But there's another angle to that, Sumant. How is ReNew's own module manufacturing facility doing? And can it hold its own against those peak module prices of $0.11?

Sumant Sinha

executive
#14

Since, as you're aware, there's a 40% import duty to start with. That pushes the $0.11 to roughly $0.155, and that's fairly close to the cost you'd face importing modules and paying the 25% BCD on a significantly smaller base. The imported price for cells comes to roughly $0.055. So 25% of that works out to about 1.5 or slightly under, which brings cells to around $0.07 here in India, and then conversion costs lift you to roughly $0.15, $0.16. So you end up basically at the same level as buying modules from China. Also bear in mind that ALMM was meant to kick in starting 1 April this year. So any projects that weren't grandfathered will need to source modules domestically going forward, and as a result, China or imported modules won't be available.

Nikhil Nigania

analyst
#15

Understood, Sumant. Do you also intend to ship out a few modules, the way certain competitors do?

Sumant Sinha

executive
#16

Look, supplying modules to our own operations comes first for us. That's what we'll focus on initially. Then, if we end up with surplus modules — and there's a decent chance we'll have some this year — we'll definitely try to move them wherever we can get the strongest returns. One other thing to remember: our cell plant should be up and running before long. That opens the door to selling into the domestic DCR market, where tariffs run higher, since those buyers need cells manufactured in India too. So we'd have 2 options. Either we sell projects using India-made cells into the DCR market at a better tariff, or we go overseas. Honestly, at this point we aren't providing any guidance on which way we'll go, since our own needs clearly come first.

Nikhil Nigania

analyst
#17

Got it, Sumant. Perhaps one final question from me, then, regarding the pipeline side: I noticed there’s been some delay with the RTC project. It’s good to see a portion of it has been commissioned, but I’d like to understand the reason. And second, is transmission increasingly turning into a bottleneck, as you appear to be suggesting in the presentation, for commissioning future renewable capacity in India?

Sumant Sinha

executive
#18

So yes, I believe one thing that’s occurred this year is that since the quantity of renewables is now passing certain thresholds, the grid manager—which is essentially the Central Electricity Authority—has chosen to become much more cautious about granting connectivity approvals and commissioning approvals for new renewable energy projects. So these commissioning processes are consequently taking longer than they did before. And that’s why you’ll likely observe that the volume of commissioning this year in the RE sector at this stage of the year is below what would have been anticipated for the industry overall, mostly due to these new connectivity and commissioning requirements that grid managers now seek to maintain at a higher standard. And I think that’s reasonable; it’s an entirely legitimate action for them to take. But what it has meant is that the prior process—where, once a project was ready, we could switch it on and have it connected to the grid within just 2 or 3 days—that process is now taking considerably longer. It’s now taking as much as 4 to 6 weeks. And in some ways that is holding up commissioning of new projects for everyone, not only for us. The second development is that connectivity approvals into the grid—and I might get a bit technical here—are likewise taking far longer than they previously did, because now, particularly for these complex projects that are being commissioned for the first time or connected to the grid for the first time, grid managers expect us to meet extremely high standards, which demand very extensive modeling of how the entire plant would operate under a great many different circumstances and situations. And incidentally, that is also a significant learning for us, since we have now been through this process for both RTC and Peak Power. And as a result, we are the only company that has gone through this process of what this connectivity process actually implies and entails. So count that as another kind of strength we now possess on these complex projects—we’ve been through it. And honestly, it has taken us nearly 3 to 4 months to obtain some of these connectivity approvals, which previously took literally a month. As a result, that situation has led to certain holdups when it comes to linking up with the grids; that explains why you'll observe that within roughly the coming month, we're set to hook a great many projects up to the grid.

Nathan Judge

executive
#19

Absolutely. Sumant, perhaps you could also say a few words about the chance to pre-sell a portion of that power during the period before those CODs arrive.

Sumant Sinha

executive
#20

Right. So here's what's going on — one factor at play is that since the commissioning schedule has now been stretched out, we're being permitted to make sales. As soon as the plant is operational, we have the ability to sell electricity on the merchant market while we're waiting on commissioning, the final approvals for commissioning; and given that this process can last as long as a couple of months, during those couple of months, we can therefore secure the merchant tariff instead of the PPA tariff, and as you're aware, in quite a few instances that's nearly twice the PPA tariffs. So for the new projects we're bringing online, we're genuinely in a position to achieve — thanks to this new process that's now been put in place, as I mentioned, for valid reasons, but which also consequently lets us drive greater profitability over a certain span of time by selling on the merchant market.

Justin Clare

analyst
#21

Justin, to start with, you mentioned that for the 5.9 gigawatts of capacity secured at auction so far in fiscal '24, you anticipate signing the PPAs during fiscal '25, with commissioning of those projects expected somewhere around FY '26 to '29, as I recall. I was hoping you could provide a bit more clarity on when those projects are likely to be finished. Should we anticipate an even spread across those years, or is it more probable that a greater share of the capacity lands in fiscal '26 and '27? Also, how should we frame the timelines for projects once a PPA has been signed? Does a complex project allow for additional time?

Sumant Sinha

executive
#22

Yes, Justin. To begin with your initial question about when these projects should reach commissioning, it depends in part on the timing of the PPA signings, since, as you're aware, the clock begins running at that moment. And for complex projects, we typically have 2 years to carry out the work. But it also depends somewhat on when the transmission substations become ready, because clearly, we base our assumptions on the availability the transmission operator tells us about, namely that particular substations will be ready at particular times. So we make those assumptions, and we're able to obtain connectivity into those substations. Now, substations don't always become ready at the specified time. A number of them do experience delays, and some are actually going to be ready past the 2 year window we're granted to commission the project, in which case our timeline does get stretched so that it lines up with the commissioning schedule of the transmission substation. So there's some variability there, and because of that, I'm reluctant to give you a definitive answer. What we will do, though, Justin, is over the coming months, as we give this more thought and as we gain greater clarity regarding the PPA signing dates, we'll be in a position to produce a firmer estimate, and we'll attempt to share it with you, maybe on the next earnings call a few months from now.

Nathan Judge

executive
#23

Correct, Justin — just keep in mind that none of that is included in what we've guided or projected. So, as Sumant correctly pointed out, once those PPAs are signed, we'll then offer — we'll feel more certain about delivery timelines, and so on, and we'll give more detail on that.

Justin Clare

analyst
#24

All right. So, considering that auction activity has picked up and we're clearly seeing a lot more volume, what's your view on how much you can build each year? Previously, I believe you mentioned a range of 2.5 gigawatts to 3 gigawatts annually. Should we still be using that figure now, or might you consider raising it if the chance arises?

Sumant Sinha

executive
#25

Yes. The quantity of megawatts we're able to deliver within 12 months comes down to several factors. Naturally, having PPAs available is among them, but it also hinges, as you're aware, on access to capital and the ability to fund projects, our capacity to execute, and similar considerations. So I'd say that 2.5 gigawatts to 3 gigawatts remains a reasonable figure to work with. Of course, in any particular year, it could end up higher, or somewhat lower, depending on transmission — when transmission becomes available, what the CODs look like across various projects, and so forth. So there will be some fluctuation around it, but it's a fair assumption to make. I think what will also happen, Justin, is that if we keep seeing the number of bids remain elevated and those bids stay reasonably attractive, we'll look at ways to scale up our execution capability gradually. But as I mentioned, that's something we'd really need to put some effort into. For now, I think adopting the assumption based on those figures you brought up is a fair one to make.

Puneet Gulati

analyst
#26

Nice results — congratulations. To start, I want to ask about the CapEx guidance you've given. With module prices having come down, do you feel like revising that CapEx guidance lower, or is this figure still something we should treat as realistic?

Sumant Sinha

executive
#27

Kailash, do you want to handle that one?

Kailash Vaswani

executive
#28

Okay, Sumant. Yes, Puneet. So although we probably will see certain gains coming out of that, we have not yet included it in the guidance, since we want to genuinely achieve those gains first before we build them in.

Puneet Gulati

analyst
#29

All right. Is there any sense of how large that gain might be?

Kailash Vaswani

executive
#30

Well, that gain could fall within a range, depending on where prices remain while these projects are being carried out; and we can figure it out and provide it to you using certain assumptions.

Puneet Gulati

analyst
#31

All right. Regarding the CapEx, is it already secured for all of the remaining capacity, or will that too get locked in gradually over time?

Kailash Vaswani

executive
#32

For most of the capacity we're currently building out — that means Peak Power, the RTC project, plus the solar and wind pipeline we're executing on B2B and SECI projects — it's mostly secured, totaling somewhere around 10.5 gigawatts to 11 gigawatts; as for capacity past that point, it hasn't been secured yet.

Puneet Gulati

analyst
#33

Pardon me, 10.5 gigawatts? You're referring to an extra 2 gigawatts on top of the 8.5, correct? Is that what you were saying?

Kailash Vaswani

executive
#34

Correct. So everything being built at present is already tied up. As for what will be built during FY '25, we're tying that up at this very moment.

Puneet Gulati

analyst
#35

All right. And am I correct in understanding that during this quarter by itself, you could be bringing over one gigawatt online?

Kailash Vaswani

executive
#36

That's right, since, I believe, as Sumant said before, every bit of that capacity stands fully erected and set to be commissioned; it's only awaiting certain approvals. And as soon as those come through, commissioning will happen; so out of the 1.9, 800 has already been commissioned, while a further gigawatt stands ready to be commissioned. It will come online within the coming few weeks.

Nathan Judge

executive
#37

Sure, Puneet — one quick reminder here: roughly 1.9 gigawatts is going to be producing revenue by the close of fiscal year 2024.

Puneet Gulati

analyst
#38

Got it. And then, on the second point, you've picked up 5.9 gigawatts of extra projects so far this year. Out of that, what portion has actually had PPAs executed up to now?

Kailash Vaswani

executive
#39

As of this moment, Puneet, a 400 megawatt PPA has been executed. That one is a project alongside GUVNL, while everything else is still being discussed, yes.

Puneet Gulati

analyst
#40

Got it. And are we talking about the full capacity here, or the capacity that's under contract?

Kailash Vaswani

executive
#41

In certain instances, this represents the RE share of the capacity — where you have RTC-2, say, or projects of a hybrid nature — so to that degree, the contracted capacity would come in lower.

Puneet Gulati

analyst
#42

Got it, that clears things up. And just one more thing — could you share some detail about the situation with ALMM? The ministry has placed it in abeyance, so what does that mean on your end?

Kailash Vaswani

executive
#43

Sumant?

Sumant Sinha

executive
#44

Yeah, so honestly, I believe the government is still kind of working out precisely what the approach for ALMM ought to be. We had issued an initial circular that essentially stated certain exemptions would apply, but we've since withdrawn it, and they're still kind of deliberating over what exactly they'd prefer, since clearly there are conflicting interests at play here. So I think, honestly, we simply need to be patient and hold off until they ultimately settle on what they intend to do. So regrettably I'm unable to offer you any direction on that; however, right now, ALMM is meant to kick in starting 1 April.

Puneet Gulati

analyst
#45

Alright, so if the ministry doesn't make any additional announcement, then ALMM takes effect starting 1 April?

Sumant Sinha

executive
#46

Correct, though in truth something is likely to be released before long. So my view is that we simply need to hold on for that. But look, clearly, since we operate both as a developer and as a manufacturer, we've been communicating closely with the government regarding this entire matter. Now, should they permit some easing of ALMM, then to that degree our ITP business stands to benefit. And should they decline to grant that easing, then to that degree our manufacturing arm stands to benefit. So at this moment, I'd say we're fairly well hedged against this situation.

Puneet Gulati

analyst
#47

All right. Then one final thing, if I could. Solar PLF in this quarter is somewhat below what we saw during the same stretch a year ago. Is irradiation a problem right now?

Sumant Sinha

executive
#48

No, Puneet, drawing any conclusions from a single quarter isn't something I think we can do. Before forming any view, the full year needs to be examined, in my opinion. Honestly, such fluctuations show up in any given quarter.

Maheep Mandloi

analyst
#49

A quick admin point regarding the FY '24 guidance. Can you just verify whether that is predominantly because of the merchant sale ahead of final commissioning that you mentioned, or does something else explain this upward revision?

Sumant Sinha

executive
#50

Regarding the higher guidance, truly, since we are approaching the conclusion of the fiscal year, clearly, we have greater visibility into what we are measuring ourselves against, and because of what we are encountering on both the resource side and the expense side, that is assisting us in adjusting the guidance so it aligns closely with what will actually unfold; therefore, that is the reason behind the guidance going up. At present, it genuinely has nothing to do with merchant sales.

Maheep Mandloi

analyst
#51

And is there any way to think through the additional EBITDA that comes from power sales into merchant markets in the coming year?

Sumant Sinha

executive
#52

Pardon me, could you repeat that? The connection wasn't very clear.

Maheep Mandloi

analyst
#53

Yes. Do you have any outlook on how we should think about merchant, or the additional EBITDA that comes from selling power into merchant markets in the coming year?

Sumant Sinha

executive
#54

So, an outlook regarding the merchant market for the coming year — is that what you're asking, Maheep?

Maheep Mandloi

analyst
#55

Yeah, that additional EBITDA. You mentioned the chance to sell into merchant markets. So I'm just trying to work out what that means for operations in Q4 or the coming year?

Sumant Sinha

executive
#56

Right, so here's the thing — to begin with, like you're aware, we hold our merchant exposure at roughly 10% to 15% of the overall portfolio. What's going on now is that certain of these openings, where we can for a short stretch — or at the start, for 2 or 3 months — sell power into the merchant market prior to selling it under the PPA, those are openings we're attempting to take advantage of wherever they show up. However, given that we haven't provided guidance yet on what the base case for next year would look like, it's quite difficult to give you any idea of what additional revenue merchant could bring next year. My sense is we'll pull all of that together and then offer you folks some view of it, as we stated on the June call, when we report the full year results.

Nathan Judge

executive
#57

And Maheep, let me piggyback on that point too. Something we're clearly pointing out is that when we provide guidance, our preference is to kick off the year with cautious assumptions. So here's what we're saying: that could represent a very significant opportunity, yet with our initial guidance, we'll probably adopt a more cautious stance there.

Maheep Mandloi

analyst
#58

Understood. Then I have one thing to ask about on the production side. As far as I know, your current lines in India are Mono PERC; and we continue to hear about growing oversupply building up on the TOPCon side across Asia. So do you have any views regarding that competitive strain? Even once it takes hold next year, would that mean you'd need to upgrade those lines afterward, or any views on the technology involved?

Sumant Sinha

executive
#59

Yeah. Well, here's the thing: moving module lines from Mono PERC over to TOPCon calls for comparatively minor modification. Plus it's a job that can be completed reasonably fast with no meaningful CapEx. So that's a step we'll be examining and carrying out across the next year. When it comes to our cell line, that cell line today is a Mono PERC one; and naturally our expectation is that Mono PERC will persist for a while longer. To that degree, then, we'll go on running this line as a Mono PERC line. Bear in mind, it's just 2.5 gigawatts of cells against 6.5 gigawatts of modules. And should the market shift further toward TOPCon, at that point we'd think about adding, if we choose to add additional cell lines, which remains to be seen, then those could be steered toward TOPCon; but for now, we'll keep running the Mono PERC line at 2.5 gigawatts of cells; and on modules we'll hold 2.5 to match the Mono PERC line, while the remainder we'll shift, as I mentioned, to TOPCon at negligible cost.

Operator

operator
#60

That wraps up the question-and-answer portion, and with that, today's conference comes to a close. We appreciate everyone for joining in. You're free to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ReNew Energy Global Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.