Thank you, and good morning to all of you for being with us. Last night we issued a press release covering our results for the second quarter of fiscal 2025, which closed on September 30, 2024, and you can find both that release and the earnings presentation in the Investor Relations area of ReNew's site, www.renew.com. Joining me on this call are Sumant Sinha, our Founder, Chairman and CEO; Kailash Vaswani, our CFO; and Vaishali Nigam Sinha, Co-Founder and Chairperson, Sustainability. Once the prepared remarks wrap up — we're figuring roughly 30 minutes for those — we'll take your questions. A reminder that our safe harbor statements appear in our press release, in the presentation materials and in the materials posted on our website; those statements matter and form an essential part of everything we say. Certain risks and uncertainties might lead our actual results to diverge materially from what those forward-looking statements express or imply. We therefore urge you to go through the press release we furnished in our Form 6-K along with the presentation on our website, which together give a fuller picture. Our press release, presentation materials and annual report also include specific non-IFRS measures, which we reconcile against the closest comparable IFRS measures, and those reconciliations can likewise be found on our website within the press release, the presentation materials and our annual report. I'm delighted now to pass things to Sumant, who was recently named in TIME's list of 100 most influential leaders while business climate action. Sumant, the floor is yours.

Sumant Sinha

executive
#2

Yes. Thanks, Nathan. Good morning to everyone, and good evening or good afternoon as well. It's great to have all of you joining our earnings call. Before we discuss our business, I want to acknowledge the severe weather shifts we keep witnessing around the world, which highlight how urgently we need to provide sustainable clean energy sources. Whether it's wildfires in the U.S., sudden flooding in Europe, or the rising AQI levels in Northern India that we're seeing right now, these occurrences increasingly show that climate change is genuine. ReNew, naturally, is contributing to the effort against this massive challenge by transforming India's energy mix — India being the most populous nation on Earth, with rising energy needs and no other options to close the demand-supply gap. With that said, let me move on to news about our business. I'm pleased to tell our investors that we remain on course to achieve the megawatts and value-accretive growth for this fiscal year, while also growing our contracted pipeline. We keep working to lower costs and improve efficiency across our operations. Out of all our competitors, we have brought the most renewable energy megawatts online in India during the first 6 months of this fiscal year, even though our share price has been impacted by U.S. macro factors — those factors really have minimal or no impact on our own business, growth, or profitability, since all our business and operations are tied to the Indian economy, which is, in fact, anticipated to expand by over 7% this fiscal year. Now to the quarter's highlights. We have commissioned 860 megawatts so far in this fiscal year, and we remain on track to fulfill our guidance for installed megawatts. Beyond the 860 megawatts already commissioned, an additional 350 to 400 megawatts are presently installed, and these should mostly be commissioned during the third quarter. Our total operating capacity, net of assets divested in the previous fiscal year, increased by roughly 30%. Our total portfolio, in absolute terms, rose by around 18%, and it would have been an even greater 21% once you adjust for the 400 megawatts we sold last year. Counting the roughly 700 megawatts of capacity signed in October of this year, we have managed to secure PPAs for 2.9 gigawatts of renewable energy capacity in the current fiscal year, thereby extending our current portfolio from 13.8 gigawatts in September '24 to 16.3 gigawatts. That figure excludes 900-megawatt hours of battery storage capacity that form part of our complex projects. So to repeat, our current portfolio stands at 16.3 gigawatts of contracted capacity, and on top of that, another 900 megawatts of battery storage capacity, which comes in addition. Now for our financial performance. We posted a 14% rise in our adjusted EBITDA this quarter, fueled by cost optimization. Beyond that, profit after tax rose by 31%, driven mainly by reduced G&A and lower finance costs, and Kailash will go through this thoroughly during the finance portion. All of our 6.4-gigawatt solar module production sites are running at full capacity now. It's a pleasure to share that our cell plant has lately begun trial manufacturing of cells too. Stabilizing cell operations is anticipated to take up the remainder of this fiscal year, yet we anticipate that both our cell and module plants will be completely stabilized and running throughout the entirety of the coming fiscal year. On top of that, an external order book exceeding 900 megawatts has now been locked in, which guarantees that our excess capacity gets sold into the market. We have also earned a spot as a Bloomberg Tier 1 supplier, which highlights the quality we have managed to achieve. Moving to Page 8. Naturally, we remain dedicated to delivering shareholder value. Across the years, we have established a durable competitive edge in one of the world's quickest-expanding markets by securing capital from the least expensive source; our growth has been responsible, showcasing capital discipline and pursuing projects whose returns sit well above the cost of capital. Beyond that, we have built a platform featuring in-house manufacturing, EPC and O&M, combined with our proprietary digitization and data analytics; we lead in intricate solutions and rank among the handful of Indian IPPs that have brought more than 2 gigawatts of renewable energy assets into commission within one year. Moving to Page 9; we remain among the frontrunners when it comes to megawatts commissioned starting from Q3 of FY '24, having commissioned 2.4 gigawatts, roughly 25% of our portfolio, across this stretch of the past 12 months. After accounting for asset sales completed during the last 12 months, our operating megawatts have risen by approximately 30%. Fiscal year-to-date, we have commissioned roughly 860 megawatts, which keeps us on track to reach our megawatt goal for the year. Furthermore, roughly 350 megawatts of solar projects are presently installed and are being hooked up to the grid; we anticipate that the Peak Power projects will be entirely commissioned during this quarter, and the RTC wind Phase 2 will likewise begin commissioning later in this same quarter. Whereas competitors in the market have dealt with connectivity and supply chain troubles, our approach has guaranteed that interconnection approvals are secured not just for our current bid wins, but past that as well. That applies to our bid wins, not merely the contracted capacity. Our internal EPC crews have made certain that supply chain bottlenecks get resolved, and neither wind nor solar sites face any material shortages. On top of that, we keep proving our capital discipline while auction markets keep shifting at a swift pace. Like I mentioned before, we aren't aiming for market share. Our focus is on generating returns that exceed our cost of capital, with a levered return goal of 16% to 20%. So far in this fiscal year, we've secured approximately 1.4 gigawatts of extra capacity where the anticipated returns satisfied our criteria. Keep in mind that although there remain more than 6 gigawatts of bid victories with letters of award outside our present portfolio, those won't be added to the portfolio until the PPA gets signed; we're timing our construction mainly based on how available interconnection infrastructure is. Moving to Page 10. Now I'll discuss news from our manufacturing sites. Entering manufacturing was a strategic decision to protect our supply chain, since India was starting to limit imports of solar modules into the country. That obstacle made it necessary for us to construct our own plants. The outcomes show in the commissioning we've managed over roughly the past 12 months using modules we produced ourselves. The 2 module plants are completely ramped up, and I'm pleased to share that our cell plant in Gujarat has begun trial production too. Our facilities now appear on the Bloomberg Tier 1 module supplier list and also as a PVEL Top Performer 2024. Our external order book is currently above 900 megawatts and should expand and add to consolidated EBITDA; we can give more detail on the FY '26 projected figures when we report our FY '25 results next year. Besides locking in supply, we're also aiming to reduce capital risk by seeking partners for the manufacturing operation. I'll now pass things to Kailash for more on the financial updates. Kailash, the floor is yours.

Kailash Vaswani

executive
#3

Thank you, Sumant. Moving on to Slide 12. We're still achieving steady expansion when it comes to megawatts and earnings. Compared with the same point a year ago, we've built more than 2.4 gigawatts worth of projects — an operating capacity gain of almost 30%, once you account for the 400 megawatts we divested in the prior year. Beyond that, I'm pleased to share that profit after tax has risen 31% versus a year earlier. We got there by staying disciplined on expenses and by making our operations more efficient. Our contracted pipeline also keeps growing, with the portfolio up 21% after adjusting for asset sales completed this year. That contracted portfolio is now at 16.3 gigawatts. Debtor sales outstanding dropped by 18 days compared with last year, continuing the pattern we've sustained across the last 2 years. Sequentially there was a slight rise, though that mostly comes down to seasonality — mainly because more revenue was booked in Q1 and Q2 that will be collected in Q3. We anticipate lower DSOs across the next 2 quarters. Now Slide 13: alongside profitability, we're focused on pulling cash out of our projects. Cash from operating activities climbed to roughly INR 20.1 billion this quarter — up almost 10% from a year ago. Cash profit, a non-GAAP metric that shows our P&L on a cash basis, rose 31%, reaching INR 9.2 billion — going from INR 9.2 billion to INR 12.1 billion for the quarter. Let's look at Slide 14. At the operating asset level, net debt-to-EBITDA leverage remains under 6x, the ceiling we've established for ourselves; measured on a trailing 12-month basis, leverage came in near 5.9x, leaving out our under-construction portfolio, the contribution from JV partners through compulsory convertible instruments, and our manufacturing and transmission businesses. As our portfolio keeps expanding, under-construction projects should make up a smaller share, which will help these ratios improve, along with our push to stay disciplined about how we deploy capital. On to Page 15. People have asked how we arrive at returns from our financials, given the distortion between growth and other businesses, which we've done. What this slide lays out is that we develop our assets at 7 to 7.5x project cost to EBITDA. Funding for the projects comes 75 to 25 between debt and equity; so project debt levels would typically stay near 5.5x debt/EBITDA during a project's early years. And interest plus depreciation ultimately gives us a tax shield on that. Although our standard practice when competing for projects is to not factor in any asset recycling, we have shown through multiple deals that value can be generated, as we managed to divest those assets at multiples ranging from 9x to 9.5x EV EBITDA, or 2x price to book, which unlocked extra value and brought in inexpensive equity to fund expansion, and that source of equity for growing our pipeline is still the least expensive one available to us at present. I'll pass things along to Vaishali now so she can share her thoughts regarding ESG.

Vaishali Sinha

executive
#4

Thanks, Kailash. Moving on to Page 17. Given how well we did in Q1, plus the fact that our first annual integrated report came out smoothly, we've made meaningful headway on our sustainability goals — so it's a pleasure to share what's new for Q2 of fiscal '25. ReNew is dedicated to being a frontrunner and hitting its net-zero objectives. Let me call out a handful of items. For a fourth year running, we've reached carbon neutrality, and we're showing a 10% cut in Scopes 1 and 2. Improving our ESG ratings is a priority for ReNew. Toward that end, we've bolstered and created important policies — covering Board diversity, engagement with stakeholders, and data privacy — and you can find all of them on our website. Social responsibility has always been central to what we do. Our CSR work started back in 2014. Since that time, we've touched the lives of more than 1.4 million people in 500-plus villages throughout India, reaching over 10 states. Now on to Page 18. I want to move to a few of our Q2 fiscal year '25 initiatives. Women for Climate — that's a socioeconomic empowerment initiative centered on creating climate resilience, through which we've trained more than 450 women solar-panel farmers. Programs driven by employees. We run initiatives led by our staff that guarantee growth which is sustainable, equitable and responsible. Our volunteering camps include the Rice Bucket Challenge — giving rice to those in need and helping build a hunger-free India — through which we've handed out over 2,10,000 kilos of rice. ReNew has earned recognition for its ongoing work on advanced sustainability. On to Page 19. Now let's look at a few standout honors for Q2 fiscal year '25. At RE-INVEST, the flagship event of the Ministry of New and Renewable Energy, ReNew cemented its standing as a market leader in various categories. The coveted Sword of Honour award went to ReNew's Hydropower Plant for safety; meanwhile, we ranked 18th among Energy Innovators on Fortune's well-known Change the World list. Now Page 20, where we show our progress update on ESG targets for Q2 FY '25. As we move into phase two of our sustainable supply chain assessment, which kicks off this quarter, we concentrated on supplier evaluations, recognition efforts and capacity building — all so critical in this sector. Our AA rating with MSCI is intact, keeping us within the leadership band. We've also turned in our 2024 responses for CDP and CSA, and we plan to submit to MSCI and Refinitiv in the coming quarter; so our sustainability journey is moving along and staying on track; in partnership with HSBC, we've also pinpointed 46 schools for electrification in Rajasthan and Maharashtra. On top of that, 4 digital labs opened in Uttarakhand, and 25 entrepreneurs got support via the Greentech Accelerator program. I'll now pass things back to Sumant for guidance. Thank you.

Sumant Sinha

executive
#5

Indeed. Thanks, Vaishali. Regarding what we're projecting, we're holding steady on our megawatts despite certain difficulties with wind execution, along with our adjusted EBITDA outlook. Additionally, we've revised the guidance tied to our refreshed contracted portfolio totaling 16.3 gigawatts. Keep in mind that because of seasonal weather trends, our Q3 figures typically come in beneath those of Q2. With that said, we're ready to address your questions. Ananya, the floor is yours.

Justin Clare

analyst
#6

Alright, my first question is regarding the RTC project. It appears that the target date for finishing it remains the second half of 2025 — that's fiscal 2025 — though it seems dependent on the transmission being ready. So I'd like to know if you could give us a bit more information about whether you expect the transmission to be available on schedule, or whether a delay might occur. Also, I'm curious whether this is a situation where, with this RTC project, you could wind up selling into the merchant market prior to selling under the PPA.

Sumant Sinha

executive
#7

Yes, Arun, should I handle that?

Nathan Judge

executive
#8

Yes, Sumant, go ahead please.

Sumant Sinha

executive
#9

Okay. Yes, Justin. So the RTC project should be completed during the back half of this year. And regarding transmission, no, I don't believe we anticipate any holdup caused by either the transmission or the interconnect. I think that's all essentially on schedule, so I don't see that pushing things back. And insofar as we can bring some portions of the project online prior to final commissioning, we can, to a degree, sell that into the merchant market. But given how the PPA was set up, it meant that for as much as the initial 400 megawatts of delivered capacity, we would need to sell to the end customers. And only once we generate capacities beyond 400 megawatts can we put that portion of the market — that portion of the capacity into the merchant market. So there will be some merchant market sales, but they'll be modest. That is, incidentally, unlike what's occurring with the Peak Power project, where we can sell into the merchant market whatever has, in fact, been commissioned thus far. So the two were drafted in different ways and thus produced different results for party commission capacity.

Justin Clare

analyst
#10

All right. All right. That's clear. I also wanted to ask whether you could share your thoughts on the proposed new limit on cell production, which is meant to end the import of cells. Does that change how you're thinking about your production strategy, or your capacity plans in this market? And I'm also curious whether you believe 2.5 gigawatts of cell capacity will be enough, or whether you might consider growing that?

Sumant Sinha

executive
#11

Yeah. So the government is giving serious consideration to bringing in an ALMM for sales, with a start date of April 2026; that leaves roughly 18 months before it would take effect. So they're providing quite a lot of advance warning that this is probably coming soon. That means we have time to figure out how we'll respond. And the smartest way for us to respond would really be to grow our cell capacity until it covers at minimum — at the very least — what we need for ourselves internally. So we're actively looking at that right now, though no final choice has been made on it as of yet. But yeah, that would really be the wise move for us to think about making.

Maheep Mandloi

analyst
#12

Nice work on bringing costs down, I'd say. Could you walk us through what was behind that, and how we should be thinking about those cost savings going forward? And if I could add one more thing — when I look at the medium-term guidance, it seems there are just 700 megawatts of additional build-outs, yet the rise in EBITDA, or the rise in CFE, is far bigger than that proportion would suggest. So it appears you're anticipating further cost reductions or optimizations over the medium term too; could you speak to that? What's driving it?

Sumant Sinha

executive
#13

Sure, Kailash, would you like to handle that?

Kailash Vaswani

executive
#14

Absolutely, Sumant. So Maheep, when it comes to costs, the thing is we've had a substantial optimization initiative underway inside the organization, and plenty of discretionary spending is getting scrapped, in light of the weak performance we've observed on the wind side. On top of that, we've succeeded in renegotiating quite a bit with a few of our OEMs regarding certain O&M contracts tied to our older wind projects. That has likewise assisted us in bringing down expenses on the projects we already have going forward, and it also let us reverse some provisions we'd set aside as equalization results. So we anticipate that a portion of these gains will carry on going forward; and the aim is clearly to expand the portfolio starting now without taking on any meaningful extra costs on the manpower side and such, while capturing whatever operating leverage is available to us.

Maheep Mandloi

analyst
#15

Understood — thanks for that. And could you also shed some light on that 700 megawatts that’s being added to your medium-term pipeline? Is that PPA pretty much consistent with the ones you’ve signed recently? Or how should we be thinking about the pricing on that PPA? I tried to track down the win but wasn’t able to locate any information about it online.

Kailash Vaswani

executive
#16

Yes. All of these projects were secured over the past 1 to 1.5 years. As a result, the returns fall inside the thresholds we’ve talked about.

Maheep Mandloi

analyst
#17

Understood. Moving on to a different topic, taking a look at the FDRE and hybrid projects. My understanding is that in those wins, there were possibly some shifts regarding the solar and wind mix; could you explain what is causing that? I realize you mentioned transmission as a problem, but at what point would you find that out, and are there other factors behind it? Also — what should we expect regarding the effect on the IRRs? Would utilizing more solar, say, lead to higher IRRs? Or what is the right way to consider that?

Sumant Sinha

executive
#18

Sure. I'm happy to address that if you'd like; Maheep, the situation essentially is that since the moment we were awarded a number of these bids, pricing has clearly shifted and our equipment costs have — especially for solar — dropped rather dramatically, and battery costs have done the same. What this enables us to do is restructure certain of these plants. In a manner that means there will probably be a greater share of solar and batteries within them and a smaller share of wind, which additionally implies reduced variability since, as you're aware, wind speeds and such have shown considerable fluctuation; therefore we are quite pleased to lower the amount of — the proportional amount of wind across some of these projects; and the overall outcome of this, in our view, is that IRRs are in fact getting better as a result of this restructuring and ideally, with reduced variability tied to them. That is what we've carried out across many of our RTC and FDRE projects that we were awarded in the recent couple of years.

Maheep Mandloi

analyst
#19

Understood. Still, as you mentioned, the PPA structure gives us more room to maneuver, so you'd remain at that levered IRR of 12% to 16%.

Sumant Sinha

executive
#20

No, it's actually higher than that. Look, every one of these bids was secured by us within the past 18 months; and honestly, many of them came in during the window stretching from 6 to 18 months ago; and like I mentioned, the price of equipment has been declining throughout that stretch. So at the moment we captured these bids, the IRRs were already appealing, and through this reconfiguration, we're actually managing to push IRRs up further. So my view is that all of them sit at the upper end of our threshold levels.

Maheep Mandloi

analyst
#21

Understood. Then perhaps just one final item from my side, and I'll pass it along to the others; regarding that order for 900 megawatts of cells and modules, I believe it was 600 in the previous quarter for modules alone. What portion of that comes from outside the country? I'm aware you senior folks attend international conferences or trade shows, but I'm simply wondering — is it entirely within India? Or is there some international component?

Sumant Sinha

executive
#22

As of right now, Maheep, it's entirely India.

Nikhil Nigania

analyst
#23

Let me start with the PPAs. I'd like to get a sense — it's encouraging to see what ReNew has secured and the pricing levels coming through — but is the tendering pace in India slowing down, or is the signing of PPAs slowing, considering the large volume we witnessed in the previous year and in the early part of this fiscal year too?

Sumant Sinha

executive
#24

Nikhil, on the bidding side, we have not observed any deceleration as of now, even though there has been a greater degree of conversation about it in government circles. That's something you might witness going forward. Still, right now, everyone keeps putting out capacity for bids. The main question, I think, is how much PPA conversion is actually taking place. As all of us are aware, a gap exists there, and roughly 40 gigawatts of PPAs remain unsigned from all the auctions that have taken place.

Nikhil Nigania

analyst
#25

Understood. There's another thing tied to this — I notice certain older PPAs in our portfolio, say SECI XI for wind, where the rates are significantly lower than what the market is offering today. Could we potentially walk away from a few of those older agreements that haven't been constructed yet?

Sumant Sinha

executive
#26

Right. The truth is many of these agreements carry a great deal of intricacy, since quite often the PPAs were inked only after an extremely lengthy gap. Our position is that it isn't reasonable to make us responsible for charges that may have arisen a year or 2 years before the point when those PPAs are ultimately being finalized. So several of these matters are currently being talked through with the regulator and the bidding agencies, to determine whether they ought to move forward at all. Naturally, the risk on our side is that if we decline and the bidding agencies insist that we should have gone ahead, then there's a PPA amount — there's a BG amount that would count as a penalty we'd owe; yet that, in a sense, caps the exposure on our end; so that's essentially our situation; though naturally, our initial effort is to show that for some of these projects, by the moment they were signed, everything had — circumstances had shifted.

Nikhil Nigania

analyst
#27

Got it. For my third and final group of questions, I want to ask about the module business. Once again, the module plant was commissioned right on schedule, and now the cell plant too. Since the bulk of that output will serve our own needs, first, I'd like to get a rough comparison: if you looked at CapEx per megawatt for a solar plant built with manufacturing in-house against one without it, where would you put the difference — and that would help us gauge what ReNew gains from this? Second, for the full 6.4 gigawatts of module capacity alongside 2.5 gigawatts of cell capacity, is it right for me to think this is Mono PERC rather than TOPCon?

Sumant Sinha

executive
#28

Yes. There's a lot packed into those questions, so allow me to work through them one by one. The module lines were originally built for Mono PERC, but every one of them is in the process of being switched over to TOPCon. That switch is largely complete already. Out of 8 lines in total, I believe 6 or 7 have finished converting. On a module line, moving from Mono PERC to TOPCon isn't very complicated. It only requires around a couple of weeks, so all of that is underway. As for the cell lines, they are Mono PERC, and they'll keep running on that basis; converting them to TOPCon is something we might look at, subject to what it costs and what's needed, and so forth. For the moment, though, Mono PERC is what they are. On your question about the advantage we gain: one way to view it is through the margin we earn on cell manufacturing when selling to third parties. That figure, in a sense, serves as an estimate or a signal of the prices — the benefit — coming our way. To be completely candid, it's a fairly substantial number, since everyone knows solar manufacturing margins are pretty healthy at present — though naturally, how much longer that lasts is another question. Right now, though, they're elevated. If we were purchasing from the market instead, my estimate is we'd face a differential of at least $0.015 to $0.02 that we'd need to cover. Because we own manufacturing capacity, we avoid paying that additional cost. That, I'd say, is what in-house manufacturing delivers for us. Naturally, within the company, the 2 businesses price to each other at arm's length. For internal sales, though, everything consolidates out. One more point: not all of our solar manufacturing output will be used internally. Roughly 50% to 60% of modules should go in-house, with the remainder sold to outside buyers. So as long as prices remain high, our solar manufacturing business will benefit on those third-party sales. As for the outlook, we aren't providing any, since this year has, in certain respects, been a start-up year for us. Therefore, no guidance was given by us for this year; and when it comes to next year, we will — as we move nearer to that time and once we have a clearer picture of our order book and similar items and probable pricing levels, at that stage we will then offer guidance for the solar manufacturing business on its own.

Aniket Mittal

analyst
#29

A handful of things I'd like to ask. To start, I want a bit more clarity regarding the wind PLFs. Once more, the quarter's average PLFs dropped roughly 300 basis points, landing at 38.3%. Could you walk through what's driving that? And normally, how distant would that figure be from P90 levels?

Sumant Sinha

executive
#30

Yeah. So Aniket, when it comes to projecting wind, and hence deciding what the correct P75 is, that's a judgment we arrive at ourselves; someone else's judgment might come out higher or lower, based on the method they choose; our inclination is to stay fairly conservative with these projections, since clearly wind hasn't been favorable for us across the past 4, 5 years; so in certain ways this has influenced or molded how we think about which assumptions to adopt for wind PLFs going forward. Still, to directly address what you asked. To be precise, that 300 basis points sits probably at the P90 level, rather than the P75 we'd have taken as our assumption. A year ago, the 41.3% figure was only 2, 3 percentage points beneath what we'd have treated as the P75; and with this year coming in 300 points under that, we'd land somewhere between P85 and P90. So that's probably how this year's wind will perform based on what we've seen so far. Naturally, another 5, 6 months remain, and we'll need to watch how things unfold. There's also room for that to shift.

Analyst

analyst
#31

Okay, understood, and that's quite useful. Now, regarding my second question, which was focused on the C&I portfolio specifically — I believe you have roughly 1.3 gigawatts currently being built. Could you provide a little more detail, perhaps, about the timelines for execution there? Also, are there any difficulties being encountered right now in the C&I area?

Sumant Sinha

executive
#32

So Aniket, of that 1.3, about half should be commissioned during this year — I'm giving you an approximate figure — and the remaining portion would likely be completed in the following year. In the C&I business itself, we aren't running into any issues. As I see it, things are proceeding quite smoothly in that segment. In fact, demand in the market is strong; we're actually declining many inquiries from parties approaching us, since their projects might be too small or located in states where our development capacity isn't available; and on our end, we're truly concentrating on the bigger offtakers — those generally at the 100 megawatts and above kind of level. And the large U.S. technology firms — I think those are the areas we're presently targeting. And interest and appetite from all these market segments appear to be substantial. And our feeling is that we ought to be able to readily reach as much as 15% of our total annual capacity originating from the C&I segment.

Analyst

analyst
#33

And finally, regarding finance cost. When I check the balance sheet year over year, gross debt has risen by nearly 19%, yet finance costs stayed flat. I realize part of that is probably still sitting in CWIP. Even so, we exercised pretty solid restraint over interest expenses this quarter. Could you explain what's driving that?

Kailash Vaswani

executive
#34

Sure. As for finance cost, we got hit by mark-to-market movements from the open exposure we previously carried on the rupee-dollar exchange rate. What we did after that was convert all of those into firm hedges, which carry no mark-to-market impact. That's playing a big role in stabilizing our finance cost. Second, we've also refinanced some high-cost debt. We'd announced that certain bonds matured, and we refinanced them, which delivered a 200 basis point saving on finance cost, so all of that is now showing up in the numbers on an as-reported basis.

Analyst

analyst
#35

All right. If I could fit in one final question here. During an earlier question, you mentioned something about the other expenses line, where some write-back on particular provisions had been recorded. Might you put a figure on that amount? How much write-back is included within other expenses?

Kailash Vaswani

executive
#36

Since we previously held an O&M equalization reserve, which had been established based on a particular level of O&M cost, and since we were successful in bringing our O&M cost down, we could reverse that provision. That came to roughly INR 60 crores.

Puneet Gulati

analyst
#37

For my first question, I want to ask about the EBITDA guidance tied to 16.3 gigawatts; and several quarters ago, you mentioned reassessing figures given how variable wind can be. When it comes to the 16.6 gigawatt run rate EBITDA that appears in your presentation, has poor PLF on wind already been accounted for? Or does it remain on something closer to a normalized footing?

Kailash Vaswani

executive
#38

Yes, yes, absolutely; so Puneet, we have incorporated a degree of normalization compared with what we originally estimated, yet it doesn't capture how the year has actually performed, for instance, since we continue to observe present results being shaped by short-term patterns that will probably turn around over a longer horizon. That said, certain adjustments have already been included.

Puneet Gulati

analyst
#39

Got it; so — is there possibly space for further tweaking here too?

Kailash Vaswani

executive
#40

So once more, the point is that our planning process starts from an assumption of normal wind conditions. Actual results, though, can differ somewhat. So again, let me assure you that we've built in an adjustment relative to what we previously estimated, so as to adopt a more normal baseline, drawing on how the last few years have performed. Even so, from one year to the next, a certain amount of variability remains, and it might persist.

Puneet Gulati

analyst
#41

That's interesting; regarding your modules, you mentioned that 50% is used internally and 50% gets sold. What's the strategy when it comes to sales? Is there any consideration of looking at the U.S. market too?

Sumant Sinha

executive
#42

So Puneet, when it comes to sales, I mean, if we're able to access that market, naturally, that's something we'd want to pursue. There's no doubt about it; however, everything hinges on how accessible that market happens to be, what the overall — what price levels are achievable there compared with the price levels achievable in India? At present in India, the DCR market is quite appealing too, and it's providing us with really strong margins; and so we're fairly — with whatever small — any excess capacity we've got, we'd gladly sell into that market at this point. That said, like Maheep mentioned, we're keeping our eyes and ears open to selling into the U.S. market too. We're taking part in many of the discussions happening over there. So yes, I believe if we're able to sell into that market and it delivers superior margins to us, absolutely, we'll be exploring doing so.

Puneet Gulati

analyst
#43

So how do you currently assess pricing on the DCR market and on the sales side?

Sumant Sinha

executive
#44

Pricing — what does it look like? Well, it depends on wafer cost. At least when we look at it internally, our preference is to frame it around the conversion margin we're earning. That's a figure we haven't made public up to now. I'm not going to simply toss out a number off the top of my head. My sense is we'll figure it out, take a close look at precisely what and how we'd like to share, and then return to it. The one point I'd make is that the margins we're currently earning, including on modules themselves, are in fact pretty compelling. And as you can observe in the profitability right now of a few of our — well, our peer group companies in the segment, that is indeed showing up. So we're seeing a bit of that benefit in our solar business as well.

Puneet Gulati

analyst
#45

All right. And beyond the 2.6 gigawatts you've already generated, what amount has been sold externally up to now?

Sumant Sinha

executive
#46

Puneet, I'm unable to provide you with a precise figure. Ananye and Kailash, would either of you happen to know?

Kailash Vaswani

executive
#47

At this moment, that figure stands below 100 megawatts.

Macauley Smith

analyst
#48

Most of what I had has already been covered by your responses. My only remaining question is whether you can offer any outlook regarding capital expenditures for the rest of this year?

Sumant Sinha

executive
#49

Kailash?

Kailash Vaswani

executive
#50

Correct, so the bulk of the capital expenditures for the rest of this year has already been spent. I'd say there might be a handful of solar projects where some of that CapEx activity is still underway. That figure would land somewhere between roughly $200 million and $250 million.

Analyst

analyst
#51

Okay. And when it comes to the capacity at year-end, what do you expect for commissioned — total commissioned capacity?

Kailash Vaswani

executive
#52

So our guidance is between 1.8 to 2.4 gigawatts. I think we are still tracking within that range, 1.9 to 2.4. So that will take us to somewhere around 11.5 gigawatt in that ballpark.

Operator

operator
#53

We don't have any more questions right now. That brings today's conference to an end. We appreciate you joining us. You're welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ReNew Energy Global Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.