Thanks so much. Morning, everybody, and I appreciate you being here. Last night we issued a press release sharing our fiscal 2025 third-quarter results, which closed on December 31st, 2025. You can find that release along with the earnings presentation in the investor relations area of ReNew's site, www.renew.com. Joining me on this call are Sumant Sinha, who is our Founder, Chairman, and CEO; Kailash Vaswani, our CFO; and Vaishali Sinha, Co-Founder and Chairperson, Sustainability. Once we finish our prepared remarks — we figure that'll run roughly half an hour — we'll take your questions. Just a reminder, the safe harbor statements appear in our press release, in the presentation materials, and in the materials posted on our site; those statements matter and apply to everything we say here. Various risks and uncertainties might make our actual results come out materially different from what those forward-looking statements express or imply. So please take a look at the press release we filed in our Form 6-K and the presentation on our site to get a fuller picture; additionally, certain non-IFRS measures are included in our press release, presentation materials, and annual report, and we reconcile those to the closest IFRS measures, with those reconciliations likewise posted on our site within the press release, presentation materials, and annual report. I'm happy now to turn things over to Sumant.

Sumant Sinha

executive
#2

Alright, thanks, Anunay. Hello everyone — good morning, good evening, or good afternoon, depending on where you're joining from. We're happy to have all of you with us for the earnings call covering Q3 of fiscal 2025. Before we dive into the business and the updates for the quarter as well as the 9 months, allow me to briefly walk through the macro backdrop for our industry over the last three months. In India, GDP growth, which had fallen to 5.4% in Q2 fiscal 2025, should start rising again beginning in Q3. Inflation remains tame as well, and earlier this month the RBI lowered rates by 25 basis points — the first such move after quite a long stretch — and more cuts are expected over the course of the year. Our expectation is that domestic Indian banks will hand down these benefits to borrowers such as ourselves, which would lower the cost of borrowing for infrastructure players and make projects more appealing. Power demand has picked up too since December 2024, and the latest Union Budget placed a strong emphasis on lifting consumption, which is a positive signal. The renewable energy landscape appears promising, since over 50 GW of renewable capacity has already been auctioned this year. So even though U.S. equity markets for renewable energy firms stay difficult, the fundamentals underpinning renewable energy in India remain very strong. Let me shift now to news about ReNew. ReNew has just begun its 15th year of operations, and we marked our anniversary with pride not long ago. Starting from humble roots in 2011, we've grown our footprint to nearly 11 GW of commissioned capacity. My sincere gratitude goes out to every one of our shareholders, employees, customers, lenders, and advisors — your steadfast backing has been vital to our journey from the very first day. Now let me move to business highlights, which you'll find on page six of the presentation. Through the years, we've kept our leadership position in executing and commissioning greenfield projects. I'm happy to share that we've posted one of the strongest year-to-date MW commissioning figures, at roughly 1.3 GW, plus another 150 MWh of batteries brought online in this fiscal year so far, and 2.6 GW in total delivered since December 2023. As a result, our operational portfolio is now 10.8 GW, up 26% year-on-year. Our total committed portfolio now reaches 17.4 GW — a strong 27% growth year-on-year — and that's an extra 1.1 GW compared with the prior earnings call; we've locked in 3.9 GW of renewable energy capacity along with 600 MWh of BESS via auction in this fiscal year to date, which pushes our overall pipeline to roughly 24 GW plus 2 GWh of batteries — one of the biggest renewable energy portfolios in India. One notable pattern this year has been a deliberate move toward more complex projects, and most of our auction wins this fiscal came from that category. Although we aren't chasing extra capacity aggressively right now, we're sticking with a disciplined strategy, going after auctions that present attractive return profiles. As battery costs have come down, we've seen more and more auctions for solar combined with batteries in the market. We're pleased to share that this year we secured our first-ever tender for a solar plus battery energy storage system. We still feel confident about hitting the MW installation targets we've set for the close of the year. That figure covers roughly 600 MW, contingent on getting regulatory approvals on schedule and on transmission infrastructure being built out. Our manufacturing plant keeps growing toward reaching its maximum capacity, and at this point it's turning out modules at a rate of approximately 10 MW each day. On top of that, we've managed to lock in an aggregate order book of roughly 2 GW so far, which is twice what it was a quarter ago. Delivery of these modules and cells should take place across the coming fiscal year. As of now, our manufacturing plants have collectively turned out around 3.6 GW of modules along with approximately 300 MW of cells. As we keep advancing along the path toward world-class ESG practices, S&P also named ReNew the highest-rated pure-play renewable energy company in India. I'll now pass things over to Kailash for the finance section and other highlights.

Kailash Vaswani

executive
#3

Appreciate that, Sumant. If you'll move with me to page seven, our focus is on driving operational efficiency and cutting expenses, all while still achieving profitable growth. In the quarter just reported, margins improved by 500 basis points, largely the result of our cost optimization efforts along with reduced provisioning versus the same quarter a year earlier. Our DSOs — that stands for days sales outstanding — came down by 22 days compared with Q2 of this year, which strengthens our balance sheet and boosts our cash flows. Wind PLFs came in lower this year versus last year, and because of that we've trimmed the FY25 EBITDA guidance range down to INR 74 billion-INR 78 billion, and the cash flow to equity guidance down to INR 11 billion-INR 13 billion. In setting guidance for the present fiscal year, our assumption was weather comparable to FY24, but in reality we've seen weaker wind PLFs in nearly every quarter, and Q4 also trailed the equivalent quarter of the previous year up to now. Finally, a non-binding offer has been made to ReNew shareholders by a consortium made up of CPP Investments, Masdar, ADIA, and Sumant Sinha. A special committee of independent directors, with Rothschild and Linklaters serving as advisors, has been holding discussions with the consortium about this offer. We recognize our stakeholders are keen to learn what's happening, but you'll understand that as of now we're unable to say anything about the timing or status of the process, and we'll inform the market the moment there's any development on our side. At this point we can't say anything more about the offer. I'll hand it back over to Sumant.

Sumant Sinha

executive
#4

Yes, thank you, Kailash. If you'll look at page 9, I'm pleased to share that our operating MW has risen roughly 26% compared to a year ago, bringing our total operating portfolio to 10.8 GW. Over the past 12 months, we brought more than 2.6 GW into commission, and roughly 1.3 GW has been commissioned in this fiscal year so far; on top of that, our contracted portfolio has expanded by approximately 27%, reaching 17.4 GW. Across the year, we executed PPAs covering about 3.8 GW of RE capacity, and our committed capacity now totals 17.4 GW, plus 800 MWh of BESS. Although the auction market offers plenty of room to grow, we remain disciplined when it comes to bidding. Our bidding approach is selective and conservative, and in the current fiscal year to date we've secured 3.9 GW of RE, together with an additional 600 MWh of BESS. It's clear to us that batteries will be important for grid balancing going forward and will give us flexibility to expand with greater certainty on returns. We've won our first solar plus BESS bid in this fiscal, and we'll keep concentrating on such bids too. Our capital recycling program is continuing as before — we signed an agreement to divest a 300 MW SECI solar asset, and that transaction should close by March 2025, with valuations consistent with our prior capital recycling deals. If you turn to page 10, execution continues to be our core strength, and we've shown repeatedly that we can build large-scale projects efficiently and within budgeted costs. On the solar construction side, 1,120 MW has already been commissioned this year, while an additional 175 MW is in the final stages of regulatory approvals. Beyond that, 400 MW of solar projects are fully erected and will proceed toward COD approvals. The peak power project has been commissioned under the PPA as well, and we've also commissioned nearly 800 MW of our RTC project. In wind, we've commissioned 140 MW year-to-date, and another 500 MW of turbines is already installed and ready for grid connection. Although most of the work on our end is finished, last-mile connectivity and administrative hassles might have a minor impact on commissioning timelines. Our manufacturing business is proving to be a significant competitive advantage. On one side, we gain access to an uninterrupted supply of high-efficiency modules. On the other, external sales help generate cash for the company and assist in de-risking the business. That business delivered an EBITDA of approximately INR 560 million in Q3 of fiscal 2025. Our manufacturing facilities have produced a cumulative 3.6 GW of modules to date and are nearing an average daily production rate of almost 10 MW each day. As production ramps up, our sales team has been crucial in securing contracts for surplus capacity. As of now, we've locked in an external order book totaling 2 GW. That figure covers 1.1 GW in cells plus modules — a volume we intend to deliver across the coming fiscal year. And finally, commercial production at our cell facility kicked off this year, during this very quarter, and it has already turned out more than 300 MW of cells. We've reached an industry-leading efficiency of 23.2% on our cells, which underscores how committed we are to quality and high standards. At this point I'll turn things back over to Kailash so he can walk us through the finance section.

Kailash Vaswani

executive
#5

Thanks, Sumant. If you go to page 12, you'll see that our operational portfolio's MW has grown 26% compared with a year ago, which speaks to how strong our EPC execution capabilities are. The work we've done on cost optimization is paying off, and EBITDA margins have widened considerably, going from 75%-80% in the current quarter, and for the 9-month period that ended December they improved by 240 basis points. Adjusted EBITDA went up 11% versus a year earlier, mostly because wind performance came in weaker than we'd expected. We're also still seeing DSOs get better. At 72 days, our DSOs are the lowest they've ever been, and that's a 22-day drop from the prior quarter. When you look at the year-on-year EBITDA walk, newly commissioned projects added another INR 2.8 billion in revenue, but wind resource coming in below expectations meant revenue for the quarter was INR 1.6 billion lower than guidance. On top of that, asset sales during the period brought about a comparative revenue reduction of roughly INR 900 million, which was partly offset by the INR 1.1 billion we saved in the quarter through our cost optimization initiatives — things like bringing O&M in-house that had previously been outsourced to wind OEMs, cutting SG&A, and trimming discretionary spends, plus a smaller one-off impact. Now let me move to page 13. Compared with last year, all of India has dealt with poorer wind resource in fiscal 2025, and you can find the details on page 23. We'd set our initial guidance assuming weather would be similar to fiscal 24, but wind PLFs have come in under fiscal 24 levels, and solar PLFs have been a bit lower as well. Our cost optimization initiatives have helped offset some of this, but we still need to revise our FY2025 EBITDA guidance because of the INR 4.7 billion weather-related impact; in Q3 FY2025, portfolio-level wind PLFs were 13.5%, down from 17% a year earlier. Over the first 9-month period, absolute wind PLFs have dropped by nearly 240 basis points. Even though wind performance fell short of what we'd anticipated, our cost optimization initiatives have helped soften part of the blow, with INR 2 billion in savings across the first 9 months of this fiscal year. Moving to page 14, despite EBITDA performances coming in below expectations, we remain committed to keeping our leverage disciplined. Our operating project leverage ratio is still under 6X, calculated using trailing 12-month EBITDA rather than run rate figures, and under normal weather conditions it ought to improve a little. I'll now pass things to Vaishali for her comments on ESG.

Vaishali Sinha

executive
#6

Thanks, Kailash. Let's move to page 16, where I'll walk through the progress ReNew has made on its ESG initiatives and goals. The year 2024 served as a harsh wake-up call about the state of our climate. Global temperatures have now crossed the 1.5 degrees centigrade mark, which makes clear just how critical sustainability has become. Here at ReNew, our dedication to this mission does not waver. During the quarter just ended, we achieved meaningful progress on these fronts: ESG ratings. One standout moment this quarter was how ReNew fared in the widely respected S&P Global Corporate Sustainability Assessment; by posting our best score ever — 73 out of 100 — we became the top-rated pure-play renewable energy company in India. On top of that, we set a precedent as the inaugural firm from India's electric utility sector to earn a place in the esteemed S&P Global CSA Yearbook. Green certifications. Our manufacturing facility in Jaipur earned the well-regarded LEED Gold certification, which further cements our dedication to running green, sustainable operations. Leadership awards. During the previous quarter, ReNew earned recognition on a national scale from prominent publications and organizations. FirstView named us Company of the Year, citing our business excellence, innovation, and renewable energy leadership. Our solar, wind, and hybrid plants took home the CII Performance Excellence Awards, and Financial Express recognized us as winners in the Clean Energy Champion category at the Green Saarthi Awards. Let's now go to slide 17 to go over how we're doing against our ESG targets. ReNew stays dedicated to hitting its SBTi-validated net-zero goal. We are in the process of developing our decarbonization roadmap for manufacturing, and we continue pushing forward on cutting Scope 3 emissions via an ongoing evaluation of a sustainable supply chain, encompassing thorough supplier ESG assessments, target setting, and sophisticated monitoring. Social responsibility sits at the core of our business, fueling community stewardship, volunteerism, and equitable development. That dedication moves us toward our aim of touching 2.5 million lives by 2030, and our programs have already surpassed 1.4 million lives impacted; during quarter three, we made substantial headway on this front; we handed out 163,000 blankets to those in greatest need. Solar electrification work at 46 schools is in progress, and 55 digital labs have been set up nationwide. Through our salt pan work program, we are building skills among women, and 595 women in total have received training so far, with 150 finishing their training during quarter three. As part of our sustainability targets across the whole company, we remain on course to meet both our near-term and long-term rating objectives; these ratings highlight the effect of our inaugural integrated report, and we look forward to sustaining this momentum and sharing our progress when our second integrated report comes out in 2025. I'll now hand things over to Kailash to walk through guidance.

Kailash Vaswani

executive
#7

Thanks, Vaishali. Turning to what we're projecting, our MW outlook for this year stays the same, and that figure includes 600 MW whose coming online hinges on getting regulatory approvals on schedule and on transmission infrastructure being built out on time. Though execution is something we've got a solid grip on, weather and its seasonal patterns do affect us. We're bringing down the lower end of our expectations for full year 2025 regarding adjusted EBITDA and cash flow to equity. Conversely, it's a pleasure to share an update on the run rate guidance tied to our target portfolio of 17.4 GW, a figure that has grown by 1.1 GW compared with the prior quarter. With all that said, we're ready to take your questions.

Justin Clare

analyst
#8

Hello, and thank you for allowing us to ask questions. To begin, I'd like to focus on the wind PLF. During Q3, that metric came in below its typical historical level. Is that simply because wind speeds across India were weaker overall? Or were there additional problems or elements affecting how your particular projects performed? I'd also like to hear your thoughts on how wind PLFs have been moving as we head into Q4, and whether we might be going back toward the usual averages.

Sumant Sinha

executive
#9

Yes, yes. Hello, Justin. Well, the drop in PLF came completely from wind. Q3 wind speeds were much lower, so you can take it that the whole gap in PLF resulted from wind speed differences relative to the long-term averages. That is truly what drove the revenue decrease together with it; as for Q4 wind speeds, it is of course still too soon to say, but they are moving nearer to normal again, so I'd describe them as not fully back to normal yet, though definitely far less poor than during Q3, and that's the situation at present.

Justin Clare

analyst
#10

Justin, thanks for the question.

Sumant Sinha

executive
#11

Let me handle that. When it comes to reductions in rates, the transmission from lenders down to their actual lending rates hasn't shown up yet. However, for any facilities tied to short-term benchmarks — such as three-month treasury bills — we're already seeing gains, since short-term rates have begun to come down. That said, this represents only a modest slice of what we hold. On the whole, for the variable-rate portion of the portfolio, some decrease should materialize — roughly 30 to 35% of what we hold consists of borrowings from domestic institutions, and part of that benefit will show up there. But the extent of transmission, and its timing, will only become clear as more time passes. As of now, no bank has meaningfully lowered its marginal cost lending rates — the MCLRs — so on a substantial portion of our portfolio we've seen no advantage. On a smaller piece, possibly under 10%, which was pegged to very short-term rates, that gain has already started appearing. In any event, that piece served more as an early signal. Those rates had already declined regardless, so we captured that benefit even before the rate cut took place. And Kailash, what about the longer-term view?

Justin Clare

analyst
#12

Understood.

Sumant Sinha

executive
#13

If you'd like, we can discuss what the outlook looks like over the long term.

Kailash Vaswani

executive
#14

When I look at the longer-term picture, once more, given that inflation is being brought under control and the government's attention is on promoting additional growth as well as promoting additional consumption, my view is that rate cuts would keep occurring, and that is probably going to take place. The single thing to watch out for there is clearly the currency, since, to a certain degree, because the rupee had weakened rather dramatically versus the dollar, that might be one factor weighing on the government's thinking regarding the extent of the reduction and the speed of the reduction. Since clearly, that would then lead to capital fleeing.

Justin Clare

analyst
#15

Understood. All right, and that brings me to my final question. I'm interested in the battery plus solar offerings. Could you discuss what project returns you expect, and how they stack up against straightforward solar projects or the more complex round-the-clock ones? How appealing do those returns look to you?

Sumant Sinha

executive
#16

Yeah. Much depends, I believe, on what assumptions you use regarding battery pricing, clearly, at the time you place your bid. As everyone is aware, battery prices have kept falling rather significantly; therefore, any place we have batteries, and whatever batteries exist within our portfolio, appear appealing since the pricing assumptions we used were fairly conservative. Given that prices have come down, we're looking at what I'd consider appealing returns from those. Straightforward solar, I'd say, likely delivers the weakest returns among the three. After that comes solar plus storage, and then the FDRE bids, which likely carry the strongest return. The gap among them, in IRR terms, is roughly 2%-3% or so, with solar plus BESS sitting in between, though ultimately, once we carry out these projects, it's possible BESS prices will have dropped enough that we do quite well on those projects too.

Justin Clare

analyst
#17

Understood. That logic tracks. All right. Thanks very much.

Maheep Mandloi

analyst
#18

Hi there. Good morning, everyone. Appreciate you taking the questions. To start, regarding solar manufacturing, I believe during the previous call, you mentioned a run rate of 10 MW each week. Would you remind us where the run rate stands for both cells and modules, and how should we think about the backlog? What portion of that do you anticipate recognizing as revenue each quarter moving ahead? Thank you.

Sumant Sinha

executive
#19

Sure. Here's how I'll handle it — I'll cover production, then hand it to Kailash for the revenue piece. On production, at present we're running somewhere in the range of 10 MW to 11 MW daily on modules. That's the pace we're currently achieving. If you'd like to work through the math, take 350 working days and you'll get a picture of the total MW figure. Ultimately, we aim to push that above 12 to 13 MW per day. We're progressing toward that quite nicely, especially since a portion of our module capacity came online relatively recently. On the cell side, we're turning out 3.5 MW to 4 MW daily at the moment. That figure is likewise approaching what was anticipated, or what's required, on a steady-state footing. Perhaps more significantly, cell efficiency levels currently rank among the best in the nation. Our team has managed to truly steady the plant at a rather elevated operating efficiency. So that's encouraging. Turning to revenue, Kailash, would you like to handle that?

Kailash Vaswani

executive
#20

Right, okay. So to be clear, Maheep, the bulk of the revenue that comes from captive sales — those go to ReNew's renewable energy arm — all of that gets capitalized onto the balance sheet, since naturally, being inside the group and consolidation, it's eliminated. So third-party is what we've reported our figures for the first time this time around. So for the 9-month period, during which most of the sales occurred in the quarter, we had INR 3.4 billion in revenues and roughly INR 600 million of EBITDA for the current period. And moving ahead, naturally, whenever third-party sales take place, comparable amounts would then be reported, but only for the third-party portion.

Maheep Mandloi

analyst
#21

Understood. Then perhaps one more question regarding the module business. A number of Chinese firms, and possibly American ones too, are asserting rights over TOPCon patents, along with numerous legal disputes — not within India, though, in other areas. Does that worry you at all? Have any of those carried across into Indian markets?

Kailash Vaswani

executive
#22

Yeah, I believe so.

Sumant Sinha

executive
#23

Right. What I was mentioning is that, regardless, the bulk of these measures targeted businesses shipping goods to the U.S., since we had zero exposure on the export side to the American market; nothing of that sort showed up for us, nor do we anticipate it will.

Maheep Mandloi

analyst
#24

Understood. And then, only one more thing: regarding that 300 MW sales run—I’m not certain whether you addressed it—but might you discuss the multiples you anticipate on those, or whether they align with, or exceed, what we observed in your previous sales?

Sumant Sinha

executive
#25

Yeah, Maheep; clearly, it was mentioned in the presentation we provided, but essentially, it matches our earlier recycling efforts.

Maheep Mandloi

analyst
#26

Understood. My apologies for overlooking that. Regardless, I appreciate your remark. Thanks.

Nikhil Nigania

analyst
#27

Thanks for giving me the chance to ask. To start, my question concerns the renewable sector's periphery. The government keeps advancing its initiatives, yet we keep picking up on certain obstacles — land for wind projects, grid interconnection rights, which the presentation appears to hint at too, and even the execution of PPAs. Could you provide some insight into these areas? Is ReNew encountering comparable difficulties, or what is this company's perspective on them?

Sumant Sinha

executive
#28

Yes. Hello. The hint we gave regarding grid interconnection problems is genuinely quite minor — specifically, a bay we are hooking up to at one of our sites is running one month behind schedule, and given the March 31st commissioning cutoff, that creates a small degree of uncertainty over whether it will be completed ahead of March 31st, even though on our end we will be entirely prepared. Whether it occurs on March 31st or otherwise, it would then occur 10 days afterward. So from a broader revenue-generating perspective and so forth, that is not a major concern. The more significant matters you are bringing up, I believe, relate to land along with overall grid connectivity, its availability, and the signing of PPAs; allow me to tackle these swiftly. Regarding transmission, as far as we are concerned, we hold all the connectivity for our entire pipeline of roughly 24 GW completely secured; so at present we face no connectivity problems; in fact we possess excess connectivity, as I believe you yourself noted in a report at some point; we have connectivity to spare, and thus any future bids that arise, we will genuinely be well placed to leverage a portion of that land-based connectivity we hold in order to prevail in those auctions. Additionally, we can, on the basis of connectivity commissioning dates, also to some extent even out how we carry out this roughly 24 GW across the coming years; certain connectivity may now arrive a few months late in one place or another, yet on the whole, the slippage does not exceed that, and so if you schedule your execution sensibly regarding which projects feed into which substations and so forth, on the whole, they do get completed. Like I mentioned, you might see a delay of a couple of months in some cases, but nothing beyond that. So in my view, connectivity has turned into an issue for businesses that failed to take preemptive action to secure it earlier — and luckily, we were among those who did take that step. That means connectivity itself is not a concern on our end. When it comes to land, though, land is a real obstacle in wind. It has consistently been an obstacle for wind projects; that's exactly why, if you look at our commissioning growth, most of it is coming from solar rather than wind. We don't see wind surpassing roughly 5 GW annually in this country in the coming years. Perhaps over the next 2 to 3 years, the industry as a whole will likely just manage around that much wind capacity, I mean. Our portion of that will depend on our own commissioning schedules. So land is unquestionably an obstacle. Especially over the past 6 to 9 months, when many projects were underway in Maharashtra, there were particular complications related to certain Ministry of Defence matters, because of upcoming elections, plus local law and order difficulties that I'm certain you've come across in the news. Honestly, that has affected our commissioning schedules too. If not for that, we would hopefully have had some wind projects commissioned by now. That's always something we must factor into our planning — wind projects frequently take longer to reach commissioning than solar ones do. Now regarding PPAs, on the subject of signing them, I'd say there's been fairly decent movement this year on PPA signings, considering the substantial backlog or the huge volume of bids over the past 2 years. The thing is, out of roughly 120 GW to 130 GW of bids placed during the last financial year and the one before it, only about 30 GW to 35 GW remain unsigned. The rest has all been signed. So I'd say a significant amount of headroom has now accumulated in terms of signed PPAs, if you want to view that as yet another signal of what capacity additions could occur soon. So my feeling is that the remaining PPAs will get signed too; and I believe right now, the government is contemplating — not just contemplating, but actually considering — reducing the speed of bids, potentially, to let older bids get signed. That's totally okay, since the speed of bidding has been incredibly fast. So I believe it will provide everyone with some space to breathe and simply reevaluate our position, examine our execution pipelines, and so forth. So in my view, that would be a beneficial thing. Thus, my feeling is that ultimately every one of the PPAs will be signed, or at minimum the greatest number of them will be signed.

Nikhil Nigania

analyst
#29

That makes sense. Thanks for the industry detail. My second question concerns the solar cell business. I mean, the manufacturing plant has been commissioned right on time. But looking at some peers, we understand you have captive use, yet when we look at some peers, they mention cell prices, domestic cell prices, sitting at roughly $0.14-$0.15 per watt-peak per cell, domestic cells. We had anticipated a somewhat bigger impact from that. So in the quarters ahead, do you think it could be a meaningful figure that the manufacturing business could contribute toward profitability?

Sumant Sinha

executive
#30

Absolutely, I'd say cell prices in the market at present are quite attractive. And we aren't selling any cells to ourselves; what we're selling to ourselves right now is modules. And we're selling cells into the market outside, into the external market, purely because the majority of our projects don't need domestic cells at this point; so every one of our cells will be headed into the external market. And to that degree, we will in fact benefit from the pricing that exists in the market right now. And that will, naturally, begin showing up in our P&L as we move forward.

Nikhil Nigania

analyst
#31

There's just one additional item I wanted to raise.

Sumant Sinha

executive
#32

And incidentally, what we're billing sits under where the market is priced, so that's not the situation here. Roughly 30%, 35% of our portfolio — you can therefore assume we're essentially right where the market is.

Nikhil Nigania

analyst
#33

Understood, that helps. One final thing from my side: the dollar's movement has been quicker than a lot of us expected. On hedging, I'd like clarity on both debt and CapEx. For debt, is everything covered through swaps, or do options play a part too? And regarding CapEx, any exposure we carry there — is it hedged against currency movements?

Sumant Sinha

executive
#34

Yes, Nikhil. When it comes to hedging, we rely on a few instruments. The bulk of what we borrow from foreign commercial banks or DFIs is completely hedged via swaps. As for certain bonds, when we recently got a chance to lock in cheaper hedging costs while the rupee stayed quite steady for an extended stretch under 83, we shifted the majority of that into full swaps, full currency swaps. There are two bonds. The first carries a call spread providing complete coverage up to a set threshold, and past that point there's exposure — that cap, if my memory serves, sits around 90 or 92, and beyond it we carry some exposure. Then a second bond exists where we're exposed up to the 90 or 92 mark, and past that we have exposure. So it's a diversified hedging approach we stick to, and we're aware of our maximum possible exposure. This aligns with our stated hedging policy, which the Board and Audit Committee have approved.

Nikhil Nigania

analyst
#35

Understood. I appreciate it. That covers what I wanted to ask. Thanks, Mahasin.

Sumant Sinha

executive
#36

Thanks.

Puneet Gulati

analyst
#37

Yes. I really appreciate the chance to ask. To start, wind has provided backing for some time now. When you put together your 17.4 gigawatt guidance estimates, are you including that as well?

Sumant Sinha

executive
#38

Puneet, the way we see it, that figure is clearly a long-term guidance, so we don't fold long-term adjustments into it; what we've mostly aimed to do is take a long-term forecast, one that's been adjusted according to what we've seen over the last few years, rather than something that mirrors each year-on-year result, for instance; and through that approach, we've attempted to arrive at the long-term guidance. We still expect that wind goes through cycles, and this one has run long, which we hope will turn around, and we ought to reap the benefits from that as well.

Puneet Gulati

analyst
#39

Number two, there are also many LOAs that haven't been signed yet. Although somebody hinted that a large portion of them could still be executed, a guidance note is also circulating that indicates unsigned LOAs past 12 months may be permitted to expire. Would you share your perspective on this?

Sumant Sinha

executive
#40

Well, Puneet, I believe there are clearly numerous discussions taking place within the government. Another viewpoint exists as well, which holds that scrapping any PPAs would inflict substantial reputational harm on the government. After that, another issue arises: what becomes of the connectivity tied to those bids? In what way would it be assigned? So this is a somewhat complex matter. Furthermore, what will occur is that these LOAs, or these bids that have taken place, are bids that came before the ALMM for cells; consequently, any bids occurring later, which would need to factor in domestic cells, are going to be pricier. As a result, it's likely that discoms will come to see those prior bids as genuinely more appealing and will aim to possibly sign them instead of letting them be canceled.

Puneet Gulati

analyst
#41

Yeah, that's a valid observation. Thank you. Also, at this moment, if you're able to say anything about how the buyback will proceed — I realize you'll probably keep it brief — what should we expect as the upcoming steps regarding the buyback?

Sumant Sinha

executive
#42

Puneet, strictly speaking, this isn't a buyback. What it is, rather, is an offer from a set of shareholders to acquire the stakes held by investors — the public ones — with the goal of making the company private. So, to repeat what we mentioned in our comments earlier: we have received this offer, and the special committee is currently assessing it, with Rothschild and Linklaters serving as advisors. As soon as anything develops, we'll make an announcement.

Puneet Gulati

analyst
#43

All right, so is the independent board going to step in here, or is there something?

Sumant Sinha

executive
#44

Yes. A special committee has been put together, and it consists solely of independent directors.

Puneet Gulati

analyst
#45

All right, and for the final question, could you share some detail on what capacity you're planning to add in FY26, and more specifically, on the projects that could reach commissioning before June 2025?

Sumant Sinha

executive
#46

Prior to June 2025, in terms of — well, I suppose the months have shifted. Right. So there's a 600 MW block, and if that ends up slipping, it would come online during April of FY26, meaning April 2025. Beyond that, clearly, we'll be providing our long-term guidance when we report our June results. What I mean is our March results, which should be released by early June.

Vaishali Sinha

executive
#47

Nikhil and Puneet, at this point I'd say putting a number on it right off the bat isn't really feasible. My suggestion would be to hold off until we share our FY26 guidance, which Kailash mentioned will be released at the same time as our March results.

Puneet Gulati

analyst
#48

Understood. Alright. Excellent. That covers everything I had. Many thanks, and wishing you the very best.

Sumant Sinha

executive
#49

Thank you, Puneet.

Anunay Shahi

executive
#50

I believe there's a question from Aniket Mittal at SBI Mutual Fund. Aniket, would you like to proceed?

Anunay Shahi

executive
#51

Sure.

Aniket Mittal

analyst
#52

Thanks. I have a few things to ask about the news. Although O&M prices have declined, in control, our average wind PLF has been quite stark. Is this an examination of every region, or particular details that you're seeing for certain areas where there's impact or the chance of greater volatility?

Sumant Sinha

executive
#53

I wasn't able to hear that question at all. Anunay, I'm not sure if you folks managed to. But it would be wonderful if you could say it again.

Aniket Mittal

analyst
#54

Alright. Can you hear me clearly?

Sumant Sinha

executive
#55

You're kind of fading in and out a little.

Aniket Mittal

analyst
#56

All right. Let me have a moment, please. This is something I was also looking at once more.

Sumant Sinha

executive
#57

Aniket, if I may — for the benefit of anyone listening — I believe I have a general grasp of what you're asking. Please set me straight if I've misunderstood. The point is that our PLF has fallen more than it has for certain other companies. So it's a matter of comparison. Does that stem from the geography in which we operate, where the drop has been larger? Is that what you're asking?

Aniket Mittal

analyst
#58

Yes, that's what I'm asking. And once more, simply so I can grasp it, are these PLFs going to end up nearer to P90 levels now? Those are the follow-ups.

Sumant Sinha

executive
#59

Yeah. They're likely nearer to P90, even though we haven't run the precise calculation. I'm not aware of what guidance or estimate you have received from the other companies, so a comparative remark is genuinely not something I can offer. What I can say is that during October and November, wind levels were far beneath what they had been in earlier years, and maybe that happened because the monsoon stretched on, and we experienced rather warm stretches of time back then, which is why the customary shift of wind from the southwest toward the northeast took far longer to occur than anticipated, compared with how it usually goes. December came in nearer to average, though still short of fully reaching average, and January has looked much like December, while February, naturally, is unfolding as we speak, so it's tough to say. One more point I'd add is that in North India at least, this winter has been exceptionally warm, and for the northwest winds to flow, temperature differentials between land and sea must grow, and in my view that too has contributed to this absence of wind over this stretch of time.

Aniket Mittal

analyst
#60

Got it. The second thing I wanted to ask is, when I look at what you've got coming down the line, it's increasingly tilted toward FDRE and hybrids. In your deck, you mentioned that the amount of capacity you're aiming to build could shift, which suggests you're weighing batteries against storage in this case. Could you give us a rough sense of how we should think about capacity being added for the incremental hybrid project? What kinds of setups do you have in mind when it comes to wind, solar, and hybrid? Take SJVN and the FDRE, for instance — it really looks like the PPA side is re-examining wind there. So any detail on that would be quite useful.

Sumant Sinha

executive
#61

Yes. The setup depends on what the bid calls for, and at times, in certain bids, you also have the option of procuring some quantity from the market, plus it depends, clearly, on how wind, solar, and storage are priced. So each of those factors shapes the setup; back when we submitted bids for some of these, prices stood at a particular level, and we arrived at a particular setup drawing on that, the pricing, and naturally all the other elements I mentioned before — namely the bid's requirements and specifications. As time has passed, or is passing, certain of those relative price levels shift. And like I said, to begin with, solar prices have fallen very sharply across the past couple of years. So any bid that took place two years back, say, would today call for a different setup, since solar's price has dropped. Same story with batteries. Battery costs have likewise declined very sharply over the last year or so. Consequently, what might previously have needed more wind can now actually be better optimized, or produce stronger returns, through a greater share of solar and storage and a smaller share of wind. So within each bid, this is a fluid situation. And clearly, the moment we execute the PPA is when the final setup has to be locked in. So right then, we redo the models, and from that, we determine which model is best, which setup is best at that specific moment, taking into account all the costs and so forth. And that shifts, as I mentioned. So since solar and storage costs keep declining, we are therefore leaning further toward solar and storage in these FDRE bids and away from wind.

Aniket Mittal

analyst
#62

Got it. My next question concerns O&M. I believe Kailash said during his comments that internalization efforts we've undertaken rank among the causes behind the drop in O&M. Could you shed some light on this—what portion of O&M is currently handled in-house, what will that scope look like moving ahead, and how should we think about the O&M expense line?

Kailash Vaswani

executive
#63

We handle everything.

Sumant Sinha

executive
#64

Yeah. Yeah. Sorry. Okay. Carry on, Kailash. Please go ahead. Yeah.

Kailash Vaswani

executive
#65

No. So once more, simply to address what was asked: when it comes to solar, essentially all operations and maintenance is handled by our own team. With wind, in any instance where we held legacy assets, we had long-term O&M agreements in place from earlier days with the OEMs. In quite a few of those situations, the contracts were extremely sticky, which meant exiting them proved rather hard. So in any case where exiting wasn't possible, our approach was to bring the pricing down, go back to the table on pricing, and as a result we captured some savings. And in every situation we could, once the no-cost O&M window had ended and no such long-term arrangement existed, we began performing O&M with internal resources for those projects. As for specific figures, we can follow up on that later, but by and large, this is what we're observing. This year, what we've witnessed is that the gains mainly came about from two things: the lowering of O&M expenses that we had, and also because we had established certain O&M equalization reserves previously, purely to smooth out the gap between the free O&M window and the period when O&M is paid for. Since our O&M cost went down, we could release a portion of those reserves back because they were no longer required, and that is why we saw that upside during the current 9-month period.

Aniket Mittal

analyst
#66

Understood. I've got just one final item. Regarding the sales of external modules that you completed during this quarter, what would the volume quantity be?

Sumant Sinha

executive
#67

Pardon me. Could you repeat what you asked?

Vaishali Sinha

executive
#68

Maybe I can tell.

Sumant Sinha

executive
#69

Yeah. Go ahead.

Vaishali Sinha

executive
#70

A question that comes up is this: how many external modules did we sell during Q3?

Sumant Sinha

executive
#71

All right. You can take it from here, then.

Vaishali Sinha

executive
#72

So, Aniket, during Q3 we booked external sales that came in a bit above 200 MW. Fine. That covers what I wanted to ask. Thanks.

Operator

operator
#73

Thanks so much. Right now, we don't have any more questions. That brings today's conference to a close. We appreciate everyone for joining in. You're welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ReNew Energy Global Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.