operatorWe appreciate everyone being on the line, and we're glad to have you join Resolute Mining Limited's conference call for the June 2020 quarter. <<operator_script>> At this point I'll turn the call over to Mr. John Welborn, our CEO and Managing Director. Go right ahead.
John Welborn
executiveThank you so much, Cameron, and a good morning to all of you. We really appreciate you being with us for the June Quarterly Conference Call. Here at Resolute's headquarters in Perth, I'm joined by Stuart Gale, our Chief Financial Officer; David Kelly, our Chief Operating Officer; and Jordan Morrissey, who serves as our General Manager of Sustainability. It's a pleasure to put out the quarterly report this morning. The highlight we led with was the 64% rise in Syama Underground production, reaching 35,000 ounces during the quarter, which comes on top of a 54% gain recorded in the March quarter — a significant boost at Syama's key ongoing gold producer, namely the underground mine. And notably, in this quarterly we have made clear that the 35,000 ounces coming from that production base ought to be viewed as the new foundation, with additional gains anticipated as we push toward a steady and sustainable 40,000 to 45,000 ounces of gold output each quarter. As we noted during the previous quarterly conference call, we anticipated 80% recoveries for the June quarter, and that is exactly what we delivered, forming part of that stronger performance. You'll be hearing more from David Kelly regarding what took place during the quarter and what lies ahead. The Syama oxide mine turned out slightly more than 28,000 ounces.
John Welborn
executiveThat puts us well ahead of where our 2020 guidance implied we'd be running, and we remain excited about both the exploration upside and the stockpiles available to keep that operation going for the next 2 or 3 years, while the other part of that production base is being advanced and updated reporting comes through on the Tabakoroni Underground feasibility study, which is set to wrap up very soon. Mako delivered another very strong quarter, with output above 43,000 ounces and very stable, robust cash flow generation from our gold mine in Senegal. Those who follow Resolute will know that earlier this week we released a very positive updated life of mine for that asset, which showed 39% more gold across the total expected life of mine and, importantly, demonstrates an average of 140,000 ounces from that mine over the next 5 years. And life of mine from here is a further 900,000 ounces of production at an all-in sustaining cost of USD 900 an ounce. The June quarter also marked the completion of our recent refinancing activities. And when discussing the quarter, Stuart will also cover that. We were pleased to complete the acquisition of the third-party financing royalty early in the quarter over Mako.
John Welborn
executiveAnd I think the recent strength in the gold price, along with our extended mine life, shows that this was a sound strategic move. And obviously, we also finished the equity raising that had begun in January, and we have now firmed up our debt structure, the low-cost syndicated loan facility and its associated hedging. And our focus now in the second half is very much on carrying forward the positive operations from Mako, the Syama oxide, on improving the Syama sulfide performance, and on using operating and strong corporate positive cash flow to pay down that debt. A key part of our June quarterly performance is obviously how we responded to the COVID-19 pandemic, and I'm really proud and pleased with how our operating team and our management performed in our primary responsibility of keeping our people safe. Given that our operations are in remote parts of Senegal, Mali and Ghana, we also have a responsibility to the broader populations and communities where we work. And we've been very active in supporting government at all levels — country level, regional level and the local communities around where we work. And that is absolutely part of our ability and our confidence in maintaining the safety of all of our people and therefore, keeping our mills running.
John Welborn
executiveAnd that's reflected in the solid dedication we've shown toward our yearly targets. And clearly, we're midway through the year and have generated a bit less than 218,000 ounces of gold. On costs, we're a touch ahead. Our guidance was USD 980 an ounce against total annual output of 430,000 ounces, and right now we're a little above 1,000. Still, we anticipate better output and cost results from key sections of the mine during the second half, and we incurred certain COVID-related expenses in the first half of the year that should normalize in the second half. To go into more detail regarding how we've responded to COVID, I'll hand things over to Jordan, General Manager of Sustainability.
Jordan Morrissey
executiveThank you, John. As John noted, during the quarter the company put in place a wide-ranging response to COVID-19, and that was mostly shaped by a risk-based approach adopted by the CMT and EMT. That approach has put the health, safety and well-being of our workforce and our people first, while at the same time placing strong emphasis and priority on keeping business continuity going and embedding business resilience. So we set up a set of controls that we rolled out across both the corporate and West African environment. Those controls took in health and hygiene measures -- a set of health and hygiene measures -- followed by a comprehensive health surveillance program. We have invested in validating those controls over a period of time, and we have witnessed a tremendous response from all sectors of the workforce when it comes to their compliance with those controls, to the point where our teams, particularly in West Africa, deserve commendation for their response and for how seriously they have taken this challenge. We have put in place comprehensive operating escalation protocols, and the main purpose there is to make sure we take a planned and considered approach to the ongoing and evolving challenges that COVID-19 presents.
Jordan Morrissey
executiveOur confidence in those controls is strong enough that they've enabled us to establish that business resilience, and despite these challenges, we keep running our mines in both Mali and Senegal.
John Welborn
executiveMuch appreciated, Jordan. To go into greater depth regarding how we performed operationally during the June quarter, I'll now hand things over to our Chief Operating Officer, David Kelly.
David Kelly
executiveThanks, John. So, on the whole, it was a good quarter — actually a very good quarter. And pleasingly, every one of our operations came in at expected levels and in line with guidance, just as John said. As a result, we managed to generate 107,000 ounces during the quarter, which, as noted, matches our guidance for the full year of 430,000 ounces. I would be failing in my duty if I didn't recognize the part our workforce played in delivering that result, given the major obstacles the COVID-19 pandemic placed in our way. In particular, it's worth pointing out that our expatriate workforce — both our own employees and contractors — has had to work longer rosters than usual, since aviation services to the mines in West Africa have been limited. And even so, as Jordan said, our safety record has not only held steady but improved, which speaks to the professionalism and dedication of our people on site. Now to the individual assets. The Syama sulfide operation, as many of you know, went through a major disruption late last year. And really, the first half of this year has involved rebuilding capacity in that business, which essentially began with recommissioning the sulfide plant after the roaster repairs at the end of 2019.
David Kelly
executiveI'm really happy to share that during the June quarter, we began seeing plant throughput, roaster throughput, utilization, and overall recovery at levels that matched that guidance. As was noted, gold output from the sulfide quarter rose 64% to 35,000 ounces, after a 54% gain in the previous quarter. The driver was better performance everywhere in processing — crusher and mill throughput, head grades, and recovery. The recovery improvement is especially encouraging and shows the extensive optimization effort that has gone into the concentrator, roaster, and calcine leach circuits in particular, since those form the heart of the recovery process at the Syama plant. We held surface stockpiles of roughly 500,000 tonnes. That represents close to 2.5 to 3 months of ore supply, and it has let us dial back underground production while simultaneously raising throughput over the last quarter. So we have considerable operational flexibility, both in how the cave is developed and in the surface stockpiles we hold, which means we can comfortably fill the mill using underground production together with those stockpiles. Higher gold output brought a matching drop in unit costs, a trend we clearly intend to continue through the final 2 quarters of the year.
David Kelly
executiveAnd as John mentioned, we're moving toward a steadier goal of 40,000 to 45,000 ounces each quarter going forward. So 35,000 ounces is a great result. It's a stepping stone toward where we want the operation to sit more continuously from here on in. Turning to the other assets. The Syama oxide plant had another very solid quarter. As previously advised, we completed the current phase of open-pit mining at the Tabakoroni complex in the June quarter. In fact, that finished in May. As a consequence and as anticipated, the process grades were lower in the March quarter, but this was partly offset by some of the highest recoveries we've achieved in that plant over its 5-year life during the quarter and in a very consistent plant throughput once again. Mining is in a hiatus at present. So we're processing accumulated stockpiles for much of the current quarter, and then we'll restart the operations in September with the mining of the Cashew satellite deposit, which is located about 8 kilometers south of Syama. We've got stockpiles of over 3 million tonnes, and we expect to supplement those with a number of mining campaigns from additional oxide resources at Cashew, Tellem and Paysans, which are both located -- which all 3 are located in the area sort of 5 to 10 kilometers south of the Syama plant.
David Kelly
executiveAnd there are additional opportunities at Tabakoroni — we actually think there will be at least one further phase of open-pit mining there, especially around the northern pits and the Splay pits, and drilling done during the past few quarters is showing that this ground can deliver more ore across roughly the coming year. Also, at the northern satellites, exploration results have been quite encouraging. That area was the original foundation for our open-pit oxide satellite operations during the 2015 to 2018 period — 2014 to 2018, sorry. Those areas are still highly prospective. So we expect the oxide business to keep contributing strongly through at least the end of 2022, and that contribution will come from a mix of the stockpiled ore we have built up in mining campaigns so far, plus other sources during that time. And last but certainly not least, our Mako Gold Mine in Senegal remained a stellar performer for us in the last quarter. It is a very consistent deposit in terms of grade, metallurgical characteristics, and ore presentation. As a result, you will have noticed that we have produced between 42,000 and 44,000 ounces each quarter since acquiring it in the middle of last year, and we expect that performance to continue for the rest of this year.
David Kelly
executiveSo because of that, we're really happy to say we've now locked it in for those 2 years of mine life, thanks to the redesign and reoptimization effort done across the past several months. And a key reason we've been engaged with AMS across the last -- via our mining contractor at Mako during the last several months, bringing in a bigger class excavator, has been getting us ready for that waste CapEx and also -- which we'll require in order to reach the final pit dimensions. It will additionally let us speed up waste movement and boost ore presentation in the existing pit across the coming couple of years. It's good to note that we'll average 140,000 ounces across the next 5 years, and a total mine life of 7 years gives us a window in which to find further resources in the region. And we're quite confident our exploration package surrounding Mako holds significant potential to accomplish that. So on the whole, from the operations side, truly a good, solid quarter. We achieved a lot of progress, especially in the sulfide business. We believe there's more remaining in both recovery throughput and mining and processing rates at Syama, and that will be the focus for the rest of this year.
David Kelly
executiveOver to you, John.
John Welborn
executiveThanks, Dave. Now, to build on that operational recap with some financial specifics for the quarter — covering both the operating side and the balance sheet — I'll hand things over to our Chief Financial Officer, Stuart Gale.
Stuart Gale
executiveThanks, John, and good morning, everyone. As John mentioned, I’ll just concentrate on a handful of items relating to the balance sheet and cash flow, and those can really be pulled out of the cash flow graph that appears in our quarterly activities report on Page 8, or, if you’re looking at the presentation, on Page 18 of the presentation. I’ll also give a quick update from a tax standpoint as well as on our hedge book. So I think what stands out right away when you look at our cash flow graph is that quite a bit of clean-up is still continuing through this June quarter following the December challenges that both John and Dave mentioned regarding the roaster crack. So when we look at this, there are a number of things I don’t expect to see as we move forward. Specifically, what we’re seeing is that, when we look at our working capital movement there, we had roughly a $28 million working capital outflow, and that outflow is essentially about normalizing our accounts payable balances and bringing them back to a position we’re comfortable with for running forward on a normal operating basis. So at 31 December, we had approximately AUD 150 million worth of accounts payable.
Stuart Gale
executiveAnd we've now, over the March quarter and this June quarter—more specifically this June quarter—moved that into a more sensible space. The next item I want to address here, which John also mentioned and which can be combined with this, is the equity raising and the Mako royalty payment. So the equity raising is again just a tidy-up from the equity raising announced in January, the $195 million that was split basically across 3 tranches. So the wrap-up of tranche 2 was essentially received during April. It was about 23 million shares. And then we also issued another 23 million shares to provide the funding for the Mako royalty acquisition. That totaled around $28 million worth of equity raisings, and of course, those raisings were done at $1.10 and around $0.85 at a very low Aussie dollar exchange rate. So if you do the numbers there, that's ultimately where we end up flowing through that $28 million of equity raising. A portion of that was then used to repay the Mako royalty, and that completed the—essentially the Mako acquisition transaction that occurred in July last year. So now we're all done and dusted with Mako in terms of acquisitions, purchase price accounting, royalty payment and debt refinancing.
Stuart Gale
executiveSo it's good to have that all cleared up. And just to remind everyone again, that Mako royalty came to USD 12 million. It was calculated using the life-of-mine plan that was in operation before and a gold price quite different from where it sits now. So looking back, I think that royalty purchase was a particularly strong deal. The next item over there is net debt repayment. We made a few repayments on our Bank of Mali loan and also on some Sandvik financing that came up during the quarter. We will of course stay focused on directing capital toward paying down debt. That's going to be one of the key priorities going forward. So only some minor movements happened on that during the quarter. Exploration and CapEx came in at $18 million. The quarter before was $25 million. As we mentioned in that earlier quarter, the March quarter, our capital spending is fairly weighted toward the front end. So our guidance for the year is to put $70-odd million of capital into exploration and development on nonsustaining CapEx, plus sustaining CapEx of $30-odd million.
Stuart Gale
executiveRight now we're at roughly $43 million out of that $70 million, and that matches what we expected. Net interest simply reflects the interest payments made during the quarter, so there isn't much to add there. Turning next to royalties: we recorded royalty payments of approximately $10 million, calculated using our royalty rates of just about 6% applied to the gold sold. Probably the most important item is VAT and tax. The $17 million in VAT and tax consists of a $3 million tax payment made to the Mali government relating to our oxide operations in 2019. If you revisit our 31 December accounts, you'll have noticed a tax expense and tax liability of about $20 million. All of that is fine. It pertains specifically to those oxide operations and has been agreed. So a further $17 million of tax will go out in the September quarter, which will meet the tax obligations for our oxide operations. The remainder is essentially VAT. That VAT is an amount we should be able to recover. You'll also remember from our 31 December accounts that we carried a VAT receivable of about $40 million, which we can recover in Mali.
Stuart Gale
executiveTurning now to the tax matter and how things are advancing with the Mali tax authority regarding certain claims filed against us covering the 2015 through 2018 years. All of those claims have been answered by us. And to remind everyone listening, we are defending every one of those claims vigorously, even though a provision of roughly $50-odd million has been booked against them. So our responses have been submitted. We're cooperating closely with our advisers and have a plan that we believe will lead to a favorable result. We simply need to await a reply from the Mali tax office on the matter. And clearly, Mali presents some political difficulties at present. So regrettably, we will simply need to wait and observe how matters develop over the coming short stretch of time. But once more, we feel our position is very strong on every one of those claims. Finally, I'd like to briefly address the hedge position. Our latest hedge position appears on Page 9 of the quarterly activities report. Currently we hold contracts amounting to approximately 213,000 ounces running through to December 2021 at an average price of USD 1,624 per ounce.
Stuart Gale
executiveWe're clearly quite pleased that those Australian dollar hedges have finally rolled off — or, sorry, the ones we sold into during the June quarter. For that period, they averaged a bit above AUD 1,800. Because of that, the average price we received during the quarter came to USD 1,446 per ounce, and naturally, when you look at spot of roughly — a bit more than $1,700, $1,700, $1,600 during the quarter, we're clearly somewhat out of the money on that front. Still, we're steadily enhancing this hedge book. Our policy is fairly flexible and discretionary, and it backs the funding obligations we have to satisfy, and from a hedging standpoint those obligations mean that at all times we must have a minimum of 30% of forecast production hedged across the next 18 months. So looking at this table, we're somewhat over-hedged, but we've recently put some hedges in place so that we're well positioned as our July and August positions roll off. So John, with that, I think I'll hand it back to you.
John Welborn
executiveMuch appreciated. Cameron, I'd be interested to know whether anyone in the audience has questions.
Operator
operator<<operator_script>> Our first question now is from Matthew Frydman of Goldman Sachs.
Matthew Frydman
analystAbsolutely. I have two questions. First, regarding Syama Underground, I suppose we had anticipated — we noticed a reduction in certain development expenditures during the quarter, and clearly a reduction in lateral development. You also mentioned the healthy position with respect to broken blasted stocks. I was wondering whether you could provide some context on whether we should expect that reduction to persist. And how significant is that decrease in the development requirement as a factor in bringing your all-in sustaining costs down to their targeted levels?
John Welborn
executiveMatthew, I appreciate the question. I figure you've probably got a few more lined up. So let's knock that one out fast. The brief response is yes — you should anticipate that carrying on. And clearly, though our attention is on production and the total recoveries, it matters that we acknowledge the sublevel cave at Syama is performing very well and precisely as we anticipated. We're observing the cave propagate and stay under control in the way we expected. The control center and the technology we've deployed is fantastic when you set it against some of the difficulties we encountered in the sublevel cave we operated with great success at Mt. Wright in Queensland. And so the tonnage and control of the cave is going very well, particularly dilution and grade elements. And that's letting us cut back, as you mentioned, that development and CapEx expense. The other item you'll spot in the quarterly obviously is that we've — owing to the roaster issues in the September and December quarter of 2019, we still have almost 0.5 billion tonnes of underground ore sitting on the ROM pad. So the ROM pad is essentially entirely full. And that lets us manage the underground mining rates so we can maintain total processing.
John Welborn
executiveHowever, when it comes to that development CapEx and lateral development, I'll hand things over to Dave so he can give you a bit more detail.
David Kelly
executiveYes. Look — and John is right in the sense that there's been a material step-down in the required development rates. We've typically, through the last couple of years, been running between 700 to 800 to even 900 meters a month, but we will now settle at about 500 for the next couple of years, and that has a material effect on unit cost. So nearly half of total outlays in the mine were on development capital — sorry, development advance. And so as we reduce development advance, that has a proportional effect on overall outlays in the mine. The other thing that's noteworthy in respect to development cave, as John has mentioned, is that we have to blast — drill and blast less material to generate the same volume of ore as the cave advances. So whereas — and I think we've repeated this a few times in previous quarters, whereas in the past, for every tonne we blast, we've only drawn about 0.5 tonne as we've been effectively creating the ore blanket and allowing the cave to propagate safely and appropriately. The situation is starting to reverse, and we will, by the end of this year, be getting about 0.8 to 0.9 of a tonne of draw for every time we blast.
David Kelly
executiveWhat that means is there's simply less work needed to produce the tonnage we're aiming for from the mine. So that plays a major part in bringing unit costs down steadily. The other significant factor — not tied directly to mining, even though mining does consume this particular resource — is that next year our power cost is going to drop by roughly 40%. That clearly flows straight into processing costs, and it also affects mining costs for maintaining ventilation and pumps, and so on. We see that more during the wet season, obviously, when we're pumping more water, but the bulk of the benefit shows up in the processing plant. And that ought to save us more than USD 1 million a month in direct outlays on it. So there are several things we're doing at present that will begin to impact unit costs in the back half of this year, and to a still larger degree next year.
Matthew Frydman
analystThat’s wonderful.
John Welborn
executiveIt seems like you’ve got additional questions, Matt.
Matthew Frydman
analystYes. Dave, many thanks for all that detail and the figures. That helps a lot. Yes. Just a few other quick items. First, regarding the Syama life-of-mine update that we expect later in the year, could you perhaps share a little more on what that update might contain? Is it simply an extension of the work underway at the Tabakoroni Underground? Or are we also taking a look at the Syama sulfide underground too?
John Welborn
executiveThanks, Matt. Yes, we're eager for that. As we've said, the Tabakoroni Underground feasibility study is nearly finished, and the quarterly activities report contained a few specifics. We've said that we do not expect the capital requirements for that possible new ore source at the Syama processing complex to be large. We're eager to publish it, and doing so will let us release a revised life of mine for Syama. So you're right that it will cover the Tabakoroni Underground. Another important piece you'll see us advancing through exploration is additional detail on the future oxide mine, and David addressed that in his operational summary. But with the stockpiled material and the opportunities we're developing at Tellem, Cashew, Paysans or nearby satellite deposits, the life-of-mine goal is to show that we have a solid 3 years of oxide processing, and that gives us ample runway to move that portion of Syama's production toward a longer-term future with the Tabakoroni Underground mine. And clearly, the feasibility study and the other work we're doing must resolve all the related processing questions surrounding that. So that work is scheduled to be updated in the current quarter.
John Welborn
executiveThis lets us release a full life-of-mine update that, as you requested, will also cover revised expectations for the Syama Underground Mine — referencing the 2016 feasibility study and the 2018 update we published — and showing that those life-of-mine costs, originally near the USD 750 mark, are being refreshed. We'll update those figures to show the benefits Dave mentioned, most of which were built into that 2018 update: higher recoveries, lower energy costs, and lower mining costs as you move through the cave. We'll revise them and make clear what people can expect from Syama across its life of mine. Our particular focus is the next 5 years, and our ambition is to keep production steady and sustainable, similar to this year's guidance, going forward.
Matthew Frydman
analystThanks, John. And one last quick item, perhaps directed at Stu. Many thanks, Stu, for the figures you provided, especially those concerning working capital during the quarter. That particular point really caught our attention. So, to put it briefly, my question concerns the hedge book. You mentioned that, from a funding standpoint, there is a need to hedge a minimum of 30% of production across the next 18 months. As you repay debt, generate cash from operations and apply it toward debt reduction, how should we view the way that policy could evolve? Would that, perhaps, lead to a change in how you think about hedging, or possibly to a lower requirement to hedge that 30%?
Stuart Gale
executiveYes, Matt. There are a range of triggers embedded in the funding documents. And clearly, as we pay down debt, you move nearer and nearer to some of those triggers being hit. But right now we're still somewhat distant from that, though it's definitely something we'll bring the market up to date on regarding where we stand when that moment arrives. That said, you can clearly see that one of the things we've aimed to do is become somewhat more near-term focused when it comes to the hedge book. So looking at that table, you'll notice that across the coming couple of months we have 60,000 ounces hedged. That simply means less variability — or at least it should — between today's pricing and the pricing we'll realize across those next couple of months. So that's really where the attention has been. It's simply about tidying up some of those kinds of factors. As you'd expect, the debt documentation contains triggers that cause a step-down in those requirements. And naturally, there's also the possibility of renegotiating certain of those conditions as we move nearer to that point.
Operator
operatorPaul Howard from Hartleys has the next question.
Paul Howard
analystI have just a couple of questions. The first is for Stuart. Stuart, could you provide me with any kind of update on the schedules for debt repayment, please?
Stuart Gale
executiveYeah. Paul, ultimately everything is going to hinge on the free cash flow we generate at any given moment. So giving you the schedules right off the top of our heads is a bit difficult. But the fact is, we have amortization built into the funding documents currently in place, and those documents lay out roughly $25 million of amortization that begins next year, occurring every 6 months, tied to our syndicated loan facility of $150 million. So essentially, you'll see a natural debt repayment start next year, roughly every 6 months. Beyond that, with the free cash flows available, we definitely have flexibility in our funding structure through our revolving credit facility to repay that quite easily with no cost impact.
Paul Howard
analystAlright. Great. Regarding the second question, it was somewhat a continuation of the prior one about the Syama life-of-mine plan. And maybe Dave is the right person to take that one. Should we anticipate seeing something like Nafolo? That's the name, I believe — the discovery made a couple of years back. Are we expecting that to enter the picture? Or what's your thinking on it?
David Kelly
executiveSee, the sulfide business's base production from the reserves we already have at Syama is more than enough to carry us through our life of mine. So Nafolo, if you like, is an upside case or an enhancement to those reserves that underpin our life of mine. So it probably wouldn't feature in, if you like, the base case production projections for the next 5 or even next 10 years. Obviously, it hands us a growth option that we're looking at as part of optimizing the asset at Syama overall, but right now it isn't part of our base case. But obviously, in a sense, it's a great demonstration of the resource potential that's still there at Syama. One interesting thing about the business is that we keep identifying oxide deposits and extensions of oxide deposits, which will grow and extend our oxide operations. And as John is saying, we're after a minimum of sort of 3 full years of production from that source. But what that shows is how much deep exploration we actually haven't done. Nafolo, as you may remember, was found beneath the waste dump immediately north of Syama -- immediately south of Syama, sorry.
David Kelly
executiveIt shows — much like what we're finding near the northern satellites and what we're uncovering to the south — just how limited deep exploration has been so far. So I'd say there's a larger province, a bigger opportunity, at Syama that we still haven't tapped. That said, the core life-of-mine plan rests on the sulfide reserves we already have, supplemented by Tabakoroni and the oxides, and of course with Mako run separately over in Senegal.
John Welborn
executiveYes. I think -- I’ll just jump in there, Paul. I think the two questions you asked tie together, because on the debt question, lowering our debt is definitely something we’re focused on. And as Stuart mentioned, free cash flow that’s positive and above our amortization profile will go first toward paying down debt. I’d also add that the strategic review we have underway at Bibiani, along with the upside sharing payments and the gold future payment from our Ravenswood sale, all are possible ways to cut that debt faster than relying only on free cash flow and amortization. And that connects to what we spend at our discretion on things such as exploration. So you’re right that we haven’t pursued the exciting opportunities at Nafolo and the lateral opportunities off the sublevel cave, because, first, that would mean exploration investment we aren’t making right now; and second, we aren’t expanding with additional development capital while we focus on proving the long-term future benefit of the operation we already have, and that operation is a 2.4 million tonne per annum sublevel cave running at 85%. That’s the main operational focus right now, and the main financial focus is reducing debt.
Operator
operatorThe following question is from Warren Edney of Baillieu.
Warren Edney
analystI have just a couple of questions regarding stockpiles. First, on the oxide stockpiles, there is clearly plenty to pick from there. Should we be assuming an average grade of 1.36 across the year? Or is there some flexibility in where you pull the stockpiles from — material from the Tabakoroni oxide mill?
David Kelly
executiveFair enough, Warren — we can play with it a bit. Within that total 1.36 volume, grades span 1 to 2 grams, though a few other complications come with that somewhat lower-grade material sitting next to the mill; it may make more sense for us to run that than material 30 kilometers away at Tabakoroni carrying slightly better grade once haulage costs are counted. So we'll likely draw from stockpiles at an average of roughly 1.5 grams this year, with that figure falling as time goes on. And clearly, our intent is to add as much higher-grade supplementary feed as possible from the oxide open pits we'll be exploring across the coming couple of years. The goal is holding an average head grade of <<inaudible>> grams or better through '21 and '22. The re-optimization design work, additional drilling, and extra exploration effort we're putting in right now all back that ambition at present. So we'd aim to keep the overall average head grade near 2 in '21 and '22.
Warren Edney
analystMoving on to underground now. Clearly, the surface stockpiles you hold also contained a proportional share of development ore, and the grade is getting better. Will that grade keep improving, or is it likewise going to serve as a blended feed into the mill during this year?
David Kelly
executiveLook, I think if you look at the reserve grade, it's 2.7, and we ran last quarter at 2.8. So clearly, we're at <<inaudible>> grade, and I'd expect us to stay there, give or take modest fluctuations as you get from time to time from here on in. So it's not an ore body that we would expect to see dramatic fluctuations in grade from quarter to quarter and now that we're up and running.
Operator
operator<<operator_script>> We'll take our next question from Kate McCutcheon at Citi.
Kate McCutcheon
analystNice work on the quarter. You mentioned Syama would reach 80% recoveries, and that's exactly what happened. I have a couple of questions on Syama. First, what comes next for the remaining items needed to reach those recovery figures in the mid-80s? And should we be watching for that in '21? Second, could you speak to the automation? Are you still pursuing autonomous haulage? And a quick update on how all of that is progressing.
David Kelly
executiveI think I'll take those in the sequence you raised them. The next steps are likely a mix of continued optimization, especially in the flotation and calcine leach circuits and in how the roaster runs. At the concentrator, our plan is to bring in an onstream analyzer, likely within the next 6 to 9 months. That will let us get better control over sulfur grades and mass pool and, as a result, improve the product heading to the roaster and hopefully boost recovery at the concentrator stage. And it's at the concentrator that we lose the most gold in the whole process. So that's where the grade gains are. And interestingly, over the last several years, that's the area where we've probably had the least instrumentation and ongoing process control. So we see a really easy win there. The other thing we're doing is working on a whole lot of sensors around the plant to improve, in particular, density control from the concentrator into the roaster. How the slurry density combines is very critical to the operating temperature of the roaster. And so we've finally taken possession of a series of nuclear densitometers, which we ordered some time ago and which will give us much more precise, minute-by-minute control over feed densities into the roaster.
David Kelly
executiveAlso, densities coming out of the calcine regrind circuit — the one that feeds into the CIL circuit. So all of those are, in a sense, incremental gains from which we anticipate squeezing an additional 1% or 2%. Another item we've set aside — currently on the shelf — is our float tails leach circuit. We chose to put that on hold early in the year, allowing us to concentrate on the other 2 core circuits, which produce most of the 80-plus percent recoveries we are achieving at present. That circuit is therefore the next one in line, and it would deliver a meaningful recovery increase — likely a further 2% or 3%. However, we want to make sure a couple of things are right before we commit to that circuit again. Specifically, our carbon regeneration circuit likely struggles to handle the carbon volume we must manage when all 3 lead circuits are running. So work is needed on that to make certain we have enough capacity. It's therefore a matter of steady, step-by-step improvement. I mean, we're genuinely delighted to exceed 80% from what is a highly complex ore body that poses real metallurgical challenges, and I believe it's a strong testament to what the team on-site has accomplished in delivering that over a quarter.
David Kelly
executiveSo from that point, we'll bring things together and keep moving ahead. Regarding automation, where we ended up at the close of last quarter is that we ran a fairly successful set of trials, especially in trucking, from late 2019 into early 2020. Those trials showed we could autonomously load trucks and operate them as a service, dump their loads at the ROM, and send them back underground without any hindrance from someone sitting in the driver's seat. The one constraint on that circuit is that it has to run fully segregated from the remainder of the mine, which requires a dedicated decline with passing bays and so on to handle that traffic. Due to COVID restrictions, we've paused those trials for now, and the trucking fleet is running in manual mode. Obviously, that has given us reasonably solid comparative data across the 2 operations. And thanks to manual operations and the advantage of running a twin decline, we're still, for the time being, achieving faster speeds and therefore greater volumes of trucked material through that process and through automating that specific element of the mine.
David Kelly
executiveOur stance has really been to push that responsibility back onto the suppliers and ask, "Is there a method by which you can run efficiently with automated trucks mixed in with the other traffic in the mine," so they capture the advantage of the looped twin decline rather than the single decline. And I think that will evolve over the coming period. What's interesting regarding the trucking fleet is that moving 2.4 million tonnes per annum still requires just 6 trucks. So the machinery inventory needed to run that operation isn't especially big. As it goes deeper, there are clearly greater benefits in lower haulage numbers. Other aspects of automation are progressing very well. Production drilling is essentially fully automated, and we're achieving good — very good penetration rates and very good accuracy from that drilling, and that shows up in the performance of the K, which, following the usual teething troubles, is doing very well from a drilling and blast standpoint. We're also aiming to bring in wireless blasting. That cuts both time and the work of setting up and charging rings but lets us keep several rings sleeping, so to speak, through the cycle, meaning we'll gain more productivity from that part of the mining cycle.
David Kelly
executiveAn interesting element is the full drill-and-blast cycle, a key component of the production setup, and charging actually consumes a disproportionately big share of the time. So we've brought in a new emulsion supplier, Orica, which has been seeking to supply this WebGen wireless blasting system, and we believe it will deliver speed, efficiency, plus safety advantages as well. We're quite eager to move ahead with that. Automation therefore stays a very significant piece of the overall improvement possibilities at Syama. It carries over into the mill too. At one of the 30-year old plants, we're actually adding many new sensors and many new systems that give us far tighter minute-by-minute control across various parts of the circuit. So automation, and technological enhancement, should always be viewed, I think, as spanning the whole value chain, rather than just the underground mine.
Operator
operatorThat wraps up the question-and-answer portion. Now I'll turn things back over to Mr. Welborn for his closing remarks.
John Welborn
executiveThank you so much, Cameron, and I appreciate all of you for being on this call. It was a solid quarter for Resolute, and there are clear indications that Syama Underground is establishing new production standards. Recovery has climbed from 75% in the prior quarter to 80% in this one, and we're now still aiming toward the long-term goal of 85% — that's an area we'll keep monitoring and enhancing, and we expect it to contribute to lower ongoing costs tied to the power plant and other parts of the mine. To sum up the quarter, I'd like to share some thoughts on where we're headed, focusing on six points. The key one, which I've already touched on, is that we anticipate additional gains at Syama Underground, which is now mostly stable. The mine is performing well, and the processing plant keeps getting better and running in line with what we expect. Syama oxide remains a dependable contributor, and we're looking forward to providing a life-of-mine update later in this quarter. And Mako, as David noted, has been extremely consistent, and we're pleased with the life of mine we released during the quarter.
John Welborn
executiveAs we look ahead to this quarter, we will be releasing a feasibility study for the Tabakoroni Underground mine — an exciting organic growth opportunity — and that study will let us refresh a comprehensive life-of-mine plan for Syama. That plan will incorporate the updated cost outcomes and forecast production from the Syama Underground Mine, and then the transition from the Syama oxide business to a longer-term Tabakoroni Underground business, giving clear clarity for the Syama mine. And when paired with the Mako life-of-mine update we published recently, we will be able to give people a very clear outlook on what to expect, from both a production and a cost point of view, from Resolute across our Mako and Syama operations over the next 5 years and beyond. The team remains focused on resolving our Mali tax issues. And we have some exciting exploration, ongoing exploration, and all of it is driven around improving our existing business. And we're pleased that the exploration crew is now back in place at Mako. And in addition to continuing our extensions of the existing Mako ore body, that exploration is also going to look, for the first time in Resolute's case, at some of the really exciting regional opportunities we have in our tenement package in a very prospective part of Eastern Senegal, which provides opportunities for even more mine life extension and value creation from our Senegalese asset.
John Welborn
executiveSo with that said, the remainder of the team along with me is going to keep working extremely hard to protect the safety of our people and to create value for every one of our stakeholders at Resolute. Thank you so much for spending time with us today.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Resolute Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Resolute Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Resolute Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.