operatorWe appreciate everyone being on the line, and we’re glad to have you join Resolute Mining Limited’s conference call on the 2020 Preliminary Financial Results. <<operator_script>> At this point I’ll turn the conference over to Mr. Stuart Gale, Interim CEO. Please proceed.
Stuart Gale
executiveAll right, thank you, Amanda, and good morning to everybody. We really appreciate you being with us on this call about our financial results for 2020. Sitting with me in the Perth office this morning are David Kelly, our COO, and Jordan Morrissey, our Head of People and Sustainability. Last Friday, we published our full-year results to the market, which include a presentation as well as the usual preliminary 4E and other documents. Dave and I will take you through the presentation quite briefly, and after that we'll open things up for questions. Looking at 2020, there can be no question at all that we encountered quite a few difficulties over the course of that year. Clearly, COVID was a matter every company had to contend with, and it is very evident as we sit here today that COVID will be with us for some time and that we will need to work alongside it and handle it as best we possibly can. It is genuinely encouraging to witness how our teams performed on-site and the manner in which COVID was handled. Many people travel enormous distances, passing through airports, and have spent extended periods in-country, and they have done a tremendous job keeping our operations running right through 2020, essentially without interruption during the COVID pandemic.
Stuart Gale
executiveThat was especially satisfying. And what made it even more satisfying was watching how everyone performed on the safety front — the way our people navigated the entirety of 2020 while driving our safety figures lower, even though many individuals spent extended stretches on-site. So when we turn to the top-line financial figures on Slide 2 of the deck, those numbers are visible there. Our revenue grew by roughly 15% during 2020, reaching $618 million. That result, naturally, came from steady production output as well as a rise in the average realized price we received for gold, which hit $1,562 an ounce. That $1,562 per ounce, I suppose, presented a bit of difficulty for us too, since we held some legacy hedges that were deeply out of the money and got closed out, especially during the first half of the year. It's a relief to have those behind us. EBITDA climbed by more than 170%, driven obviously by the revenue but also by solid operational results. Once you review the operating metrics that Dave will walk through, it becomes quite evident that operationally we handled our operating costs quite effectively, and making sure we capture those efficiencies will definitely be a priority for us as we head into 2021.
Stuart Gale
executiveUnderlying NPAT came in at $37 million, and that ultimately led to a net profit after tax of $5 million, which also took in our Ravenswood divestment. Net debt fell to $230 million once we'd repaid roughly $90-odd million of debt over the course of the year. I'm on Slide 5 in the deck now, which simply lays out the production profile across the last 3 years. What I think comes through clearly from this deck is the effect of having a full year of both Mako and Syama sulfide operations. So you're effectively watching our production base transition, with Ravenswood, of course, sold at the start of the year. And on top of that, Tabakoroni Underground had a fantastic 2019, but sadly, from an oxide standpoint, those operations wrapped up around the middle of last year. We believe we can achieve roughly that 90-odd thousand ounces of oxide production from Syama over the coming couple of years. And then, clearly, the big tick -- or the major question mark for us -- is sulfide production at Syama, and we can get into that when we move to the 2021 guidance. Turning to the earnings profile. Again, on EBITDA, we delivered a 40% EBITDA margin over the course of the year, which marks a solid step-up versus prior years.
Stuart Gale
executiveAnd we're aiming to extract a little extra from that as earnings get better via an enhanced hedge book plus gains in production and operating costs. Slide 7 is quite crowded—my apologies for that—but I believe it matters that we demonstrate what has shifted in our operations across the year. Obviously Ravenswood sits as a discontinued operation, and several one-off kinds of events took place during the year. Really, the crucial point in all this, as I see it, is that depreciation and amortization rose considerably over the year. That stems from some remaining written-down values at Syama and Mako which must be written off across a relatively short period. And from an accounting standpoint, we also have to handle future underground development costs of roughly $200 million that get folded into our D&A base. That's an accounting obligation. The $200 million is not yet spent. It will be spent over the next 10-or-so years. We also saw a number of fair value type movements amounting to $31-odd million.
Stuart Gale
executiveBasically, those adjustments came from how we value our inventory and stockpiles — through net realizable value adjustments and some write-offs as well. On top of that, we had various FX gains and losses, unrealized, that also ran through. Much of this ties back to historical stocks and historical loan account balances. These aren't cash movements. VAT — VAT has been an issue, and taxes too for that matter in Mali, that we've been working through over the last 12 months. We're making reasonable progress with the government in Mali, but we haven't reached a conclusion on our VAT and our other tax balances in the assessments the Mali government has provided to us over the course of the last 12 months. Right now we're carrying total provisions for VAT and other taxes of $66 million, and we continue to contest those demands. The challenge we've had, of course, is that we're dealing with an interim government in Mali, so it's been difficult to get the decisions we need made to be made over this period of time. I'd love to be able to draw a line under it and say we'll have this resolved by such and such a date, but the reality of the situation is we continue to work with the interim government.
Stuart Gale
executiveSo we'll keep pressing forward. I think the next slide we ought to look at is Slide 8, which lays out how cash moved over the course of the year. Look, we had — if you look at operating cash flows at close to $200 million, that's basically revenue minus the costs of actually running the mine. So it excludes royalties or VAT or other working capital movements. That's a pretty reasonable number there. But from the waterfall you can certainly see we had some fairly significant VAT taxes, plus a government dividend and withholding tax amount. So the VAT and taxes I just mentioned — that's the VAT we keep paying in Mali. We have to pay it. It's like a GST in Australia. Every invoice we receive carries a VAT, and it has to be paid, and we should be recovering that from the government. We spoke during the quarter about the dividend and withholding tax of $16.5 million. That's essentially our remittance of dividends out of Senegal. That's actually a really good story. It's — we've repaid all of our loan accounts in Senegal.
Stuart Gale
executiveThe method by which we distribute money to shareholders is a dividend payment. A 10% stake in the Mako mine—or the Mako company—is held by the Senegal government, and we paid a dividend, which I believe is the first time a dividend has been paid in Senegal by a mining company. That's a positive result, but we must be ready for a 10% dividend leakage plus withholding tax on top. At the beginning of the year, the start of 2020, there were, obviously, a number of corporate transactions that took place. An equity raising occurred. Some debt repayments happened. Some refinancing activities were completed. So all of these things ultimately just help to tidy up our balance sheet, and that will certainly be a focus for us as we move into 2021 and beyond—just tightening that balance sheet up. Our hedge book is laid out on Slide 9. From a hedge perspective, around where we stand now, I think that is reasonably well understood. We keep reviewing our hedges and the requirements we have to make sure we maintain a hedge book that satisfies our funding needs, and we'll examine all sorts of different options to make sure we can achieve that.
Stuart Gale
executiveThat gives you a high-level look at the results as well as our financials and balance sheet. I'll now pass things over to Dave, who can quickly walk through operations and the power station and touch on a couple of those items.
David Kelly
executiveThanks, Stuart. I'll be speaking mostly from Slides 10 and 11 as I go through the operational performance, which of course we covered on the quarterly call a few weeks back. All in all, the sulfide business had a far better year than the one before. Back in 2019 we took a pretty heavy hit when the roaster failed and the repair work that followed. Because of that, our sulfide production essentially doubled in 2020. Tonnages out of the underground mine came to more than 2.1 million tonnes, and in the final quarter of last year we were operating at full capacity. Sulfide processing volumes rose by more than 60%. Recovery improved by roughly 10%. Grade went up as well. So because of all that, we began to see the kind of performance from that asset that we are aiming for, even though we haven't yet quite hit the throughput, recovery and production levels we'd like to see and that we had envisioned for the rest of the mine life. The sublevel cave is now truly running well. The head grade came in at about 2.6 grams per tonne, very much in line with what we expected. What we're seeing now is higher drill rates coming from the cave. That means it takes less effort, in both development and stoping, to pull out the same tonnage.
David Kelly
executiveSo we anticipate that costs will come down and that the operation will become more efficient in the years ahead. And when it comes to the sulfide plant, we're placing a very strong emphasis on throughput uptime and operational consistency so that we can meet our long-term expectations for the asset. The oxide side had another solid year. 2019 was a somewhat stellar year for us, driven by very high grades at the Tabakoroni open pit complex that Stuart mentioned. And obviously it's those high grades that we're counting on to give us an underground mining opportunity in the years to come. And you'll have seen that we now hold 1.3 million ounces of underground resources, and we've declared a maiden reserve there of 430,000 ounces, and we expect that to grow. Tabakoroni is looking like a 2 million to 4 million-ounce complex, and we expect it to grow further. If we turn to Page 11, Mako had a very successful year, marginally exceeding the ounces produced in 2019 and performing extremely reliably and admirably. Processed tonnages and grades and recoveries were all marginally ahead of our internal forecast and guidance. As a consequence, we produced 169,000 ounces. At the same time as doing that, we did a lot of work on increasing the efficiency and capability of the mining fleet through our contract with AMS.
David Kelly
executiveSo because of that, in January of this year we hit the highest level of mining movements ever for that open pit, and that gives us the ability to carry out the pre-strips we need over the next year or 2 to expose the ore across the remaining mine life. That mine life went up thanks to a revised life of mine that came out in July last year. So Mako keeps being a very reliable and consistent producer for us. Those production levels will decline over the next couple of years as we move through a low-grade stage of the pit and while we have a significant cutback of the subsequent pit stages to undertake. But it will keep being a reliable cash generator for us. Our focus now is more on regional exploration to pick up resources to further extend the mine life of this asset. With that, I'll hand back to Stuart. Unless -- do you want me to talk about the power plant?
Stuart Gale
executiveYes, you brought up the pipeline.
David Kelly
executiveThe power plant has clearly been in progress through most of 2020. At this point, all of our fuel systems have been commissioned. The battery system has also been commissioned. Aggreko will be handing over to Wartsila — the supplier of the generating plant — the first of the generating engines, the 10-megawatt HFO units. So power from that plant will be coming online shortly, and we anticipate the first 2 engines, which together produce 20 megawatts and cover most of our site's power needs, will be commissioned by the end of March. What makes that appealing to us is that fuel bills will drop by roughly 40%. There's a reduction of 20-odd percent in usage and a 20% reduction in price, the differential between HFO and diesel. So once that station is commissioned — which, as I mentioned, we expect to be largely finished during March — these substantial savings will be available to us.
Stuart Gale
executiveThanks, Dave. Turning to slide 12, this covers the portfolio consolidation — essentially the Ravenswood sale, which took place in March last year, plus Bibiani, where we've signed an agreement with Chifeng to sell that Ghana asset. Ravenswood is, of course, well documented. One point I'd like to flag on that, though, is that we still hold a $50 million promissory note sitting on the balance sheet, but obviously we haven't yet received that cash. On top of that, there's roughly another couple of hundred million dollars in upside payments, $50 million of which is tied to the gold price. And it would be fair to say that, looking at the gold price when the Ravenswood agreement was signed versus where it stands now — even after a pullback over the last week or so — that's well and truly in the money. We also have exposure to future liquidity events at EMR relating to Ravenswood. So yes, I think there's another couple of hundred million dollars in cash that isn't really reflected in any value for Resolute at this stage. As for Bibiani, the completion process is progressing well.
Stuart Gale
executiveIn January I went to Ghana and Bibiani, and things are progressing well there. Our FIRB approval has come through. At this point we're awaiting approval from the Ghanaian minister as well as several Chinese approvals. So it's coming along fairly well. We've targeted the end of March to finish that, and that's still the goal right now. The $105 million in cash that this transaction will bring in, we're proposing to put straight toward cutting debt. So looking ahead to 2021, our focus is very, very clearly on the fundamentals and on operations. It's really important that we meet our production targets and then concentrate on efficiencies. A great deal of that centers on Syama and on making sure we achieve our targets at the Syama sulfide operations. From the oxide operations at Syama, across a number of the satellite pits we've planned for Syama oxide, we'll produce somewhere around 80-odd thousand ounces. As Dave mentioned, at Mako there's a cutback taking place. That cutback matters a lot, since it adds another couple of years to the mine life at Mako. But it does mean that from Mako we'll produce around 120,000 ounces this year, which is a little bit lower.
Stuart Gale
executiveSo clearly, the 169,000 ounces produced in 2021 — those are really important from an operational standpoint. We keep drilling around Syama. Tabakoroni Underground is looking very promising. Drilling continues there, and we'd expect to be able to define a larger resource. And naturally, oxide matters a great deal to us at Syama too. So if we can find additional satellite pits across the 80 kilometers of Syama, the build we have there will be really significant for us, since that helps us push back any capital expenditure on the Tabakoroni Underground. And naturally, that simply means those cash flows help strengthen our balance sheet overall. So that's a major focus for us, along with improving the balance sheet. As I mentioned, proceeds from the Bibiani sale will go toward reducing debt. We aim to direct another $50-odd million of operating cash flows to debt repayment too. That's our target for next year. Gross debt stands at roughly $330 million. Clearly, if we remove $150 million of that, we're left with a figure that is very comfortably manageable when you consider we hold approximately $100 million in cash and bullion at any given time.
Stuart Gale
executiveSo, Amanda, with all that covered, I think this is probably a good spot for me to wrap up and turn things over to you for questions.
Operator
operator<<operator_script>> Our initial question is from Reg Spencer of Canaccord.
Reg Spencer
analystI have just 2 questions, and they're completely unrelated to the results. First, on the Bibiani sale, it's great to see that it's passed FIRB. But how comfortable are you that you can still complete during the March quarter, given — I guess — what's been drawn out or contracted process elsewhere when we've seen similar transactions like this?
Stuart Gale
executiveYes. Thank you, Reg. So the crucial piece here is securing ministerial sign-off for the deal in Ghana. And as you know, Ghana had an election late last year. Because of that election, the cabinet was dissolved, and cabinet positions have been — or cabinet members have been named, but they haven't been sworn in yet. So we're still awaiting the formal swearing in of Ghana's Minister of Mines. So that's one item where I'd just — I suppose I'd just flag that if delays arise from the Ghanaian swearing-in process or governmental process, that could push things back. But the trip to Ghana was genuinely positive. We had overwhelming backing from, obviously, the local community around Bibiani. We also had very good backing from the other authorities in Ghana for the deal to go ahead. So I think we're in a pretty good place. It just comes down to timing, Reg.
Reg Spencer
analystAll right. And is there any reason to believe that securing approval from the Chinese government for the Chifeng could also run into a problem?
Stuart Gale
executiveNo. Look, I really don’t see it that way. What I’d say is that’s a matter Chifeng has to handle and work through. They didn’t appear — and I shouldn’t talk on their behalf — but they did appear fairly at ease on that side. So this is an asset in Ghana, and my sense is they’re quite eager to expand their footprint worldwide and begin gold production there.
Reg Spencer
analystAll right, great. The final item is the Malian tax. For my part, I’ll describe it as a standoff. What would the worst-case result be here? So would that be some kind of settlement of the government’s tax claim, or would it be that the VAT owed continues not to be refunded?
Stuart Gale
executiveYes. Well, it's quite an interesting situation. The government in Mali owes us roughly $67 million, $68 million in VAT. We've now received a number of historical claims, and against those we've provided $66 million. Naturally, we're contesting the claims that have come in, and we'll keep pursuing that. Our team over in Mali has been making solid progress. So it's worth pausing on that point briefly. We brought in a new country manager effective from around April, May of last year. He is Ousmane Coulibaly. In our presentation there's a picture of him together with Mohamed Cisse. And with the government, he's been achieving some genuinely good progress. Of course, from a governmental standpoint, Mali is a difficult environment right now, since it's transitional. So we had a stretch of coup, and we had a stretch of fiscal uncertainty there, and at present there's an interim government. So we simply have to keep chipping away at it. As I mentioned, I would love to draw a line under it and state a date on which everything gets resolved, but doing that, I think, would be foolish.
Stuart Gale
executiveSo we’ll keep pushing on that, Reg. We believe our position is strong. But the honest reality is that, unfortunately, under normal circumstances, every one of those VAT claims would come back to us. Just like GST. You file your claim, and a month later the money is returned. It simply doesn’t happen that way in Mali, and that’s among the reasons we offset our other taxes and royalties against VAT. So that approach has been working well at Syama, and specifically at SOMISY, our sulfide operations. At SOMISY, since late last year, we’ve essentially begun — or reinvigorated — offsetting our royalty and other taxes against the VAT. The interim government has accepted that process, we continue doing it today, and we’ll keep doing it. So that’s one route by which we can recover VAT we’ve already paid through invoices. But we’ll keep pushing on that, Reg.
Operator
operator<<operator_script>> Matthew Frydman of Goldman Sachs has the next question.
Matthew Frydman
analystI have a couple of questions, and they aren't really tied to the results. First, on Syama, the underground, and sulfide processing: as Dave said on the call, you still haven't hit the full potential on throughput and recoveries there. From the commentary and past quarterly, it sounds like the sublevel cave is mostly where you want it to be. I'm wondering if you can expand on where the bottlenecks are in the system going into the start of 2021, and what the main work streams are at the moment to fix those bottlenecks? And do you have an updated view on when you expect to achieve those long-term aspirations for the asset?
Stuart Gale
executiveYes. Thanks, Matt. And look, I -- during my trip to Ghana, the first location I visited was also Syama, and it was wonderful to reach Syama and get the chance to spend a few days alongside Mohamed Cisse. So one thing we didn't bring up was that a leadership change has taken place at the Syama mine. And Mohamed is a young, energetic Malian who has gained some really solid experience, not only at Syama, but at other operating sites as well. And I believe the changes will bring fresh energy to a few things at Syama. So I'm very optimistic about that and was very optimistic about what the teams are doing simply to give Syama a somewhat fresh perspective and simply to change. So I think that's positive. But when it comes to the detail, Dave, why don't you address that?
David Kelly
executiveYes. Thanks, Stuart. Look, I think we're quite confident about the long-term prospects for Syama and the processing plant specifically, since every one of the plant's individual components is working, and has been working, at nameplate capacity. Consistency of uptime has been our biggest problem, and maintenance and operating discipline are really what drive that. So a big effort is underway that involves no spending, but is really about making sure the mine — and the plant — runs at its optimal level. In any plant, bottlenecks are always going to exist. And since the flow sheet is a bit more complex than what you'd find at perhaps the average gold mine, more of those bottlenecks exist. Ultimately, all the gold we produce, every ounce, must go through the roaster, so keeping the roaster's throughput and availability up is critical. And right now, we're hitting our throughput targets for the roaster — roughly 24 tonnes of concentrate per hour — very consistently. But we've had some frustrating and irritating periods of downtime that we're aiming to eliminate. And that part of our business is really where we believe the opportunity for improvement lies.
David Kelly
executiveI wouldn't say we have many concerns about our ability to operate the plant at the throughput levels we're targeting, across the various circuits at those targeted throughputs. What matters is reaching what you'd call sensible processing uptime levels for the industry, and that's where attention is directed. Considerable effort is being applied to both maintenance and operations to lock in those gains. And they won't — it's hard to give a precise schedule for when we get to nirvana, but this is the kind of effort where you gain 1% at a time. That's what we're seeing. That's what we're working on. So I'm not sure whether that answer's a bit vague for you, Matthew, but that's probably where the business is focused. And being really consistent in hitting those throughput, recovery and operational uptime targets is absolutely the business's focus, and that's what drives performance.
Matthew Frydman
analystThat's useful, thanks. For my second question, I'd like to ask about the Syama oxides, and also about when the work on Tabakoroni Underground will be done, specifically the DFS there. Could you remind us what comes next and when an updated DFS might be released? And how does that connect with the life of mine reforecast you're doing for the Syama District overall? Are the results of those 2 programs tied together? Or might we get a life of mine update for the Syama Underground that comes separately from the DFS work on the Tabakoroni Underground? I'm just trying to understand what the next releases will be for those different work programs, what the timing looks like, and what the scope is for each.
Stuart Gale
executiveYes. Thanks, Matt. So look, Tabakoroni Underground — I thought it was — well, getting that update out on Tabakoroni Underground really matters. So that just helps clarify where things stand with the underground. As I said, we keep working on oxide identification for the next satellite pit. So right now we're working in Cashew. We'll be heading back down to the Splay and gap pits, which are the Northern pits at Tabakoroni, and then there are a number of other satellite options around Tellem and Paysans. So from an oxide perspective, we've got it reasonably well mapped out, but we'd really like to identify a little bit more oxide in — around Syama because, again, that just helps us defer any timing on capital expenditure to convert plants and do those sorts of things in preparation for Tabakoroni Underground. So reasonably well mapped out from an underground perspective. And I think we should, within the next few weeks, I suppose, be in a position where we can provide a life of mine type update for the whole of Syama. So that's Syama sulfides from the Syama Underground operation. It's the Tabakoroni Underground. It's the oxide pits as well.
Stuart Gale
executiveStill, drilling continues, and that zone holds real promise. So my expectation is that Syama's overall resource base will keep changing. Dave?
David Kelly
executiveThe way I see DFS, Matthew, is that the resource just keeps expanding. So right now, honestly, our attention has been on growing that resource. There's a new shoot coming up at the Southern end of the deposit, and it looks quite high grade. So because of that, that's where the bulk of our effort is going — identifying and estimating that resource. We've estimated a reserve based on it. An extended mining inventory will come from that, which, as Stuart says, will be folded into a life of mine update for the whole complex shortly.
Matthew Frydman
analystYeah. Great. Obviously, it seems like drill meter plays a major role when it comes to expanding that resource. I'm wondering, has anything gotten in the way of the exploration work you have lined up for the area, assuming that's a pretty important input feeding into this DFS process?
David Kelly
executiveNot really. I'd say we're drilling at what you could call moderate depths—typically around 200 to 300 vertical meters. What that means is every hole takes a few weeks, and after that you can evaluate what it's telling you, which then informs decisions on continuing exploration. So it isn't fast. My take on Tabakoroni is that it flies a bit under the radar, yet we've generated 250,000 ounces. We've just published a 1.65 million ounce resource there. That's already close to a 2 million-ounce position, spread across 1.5 kilometers. So expanding it and delineating the resources that will support future drilling simply takes some time. On top of that, as Stuart says, we continue to find portions of oxide that we'd actually like to mine in the interim, and those also need drilling and delineation concurrently. So exploration is heavily focused on oxide identification, as Stuart mentioned, at Tabakoroni. But we're also taking another look at the Northern pits at Syama and what you might call the central pits around Cashew and Tellem and Paysans, while simultaneously working to delineate a meaningful underground resource—something that will deliver serious mine life.
David Kelly
executiveAnd we're making solid progress toward that goal.
Matthew Frydman
analystYeah, sure, no problem. I suppose it's a nice issue to deal with — having additional material that has to be factored into the mine plan. Then just one last quick thing, if I could, on dividends. Clearly, no dividend was declared alongside last week's result. But I'm just curious, I suppose, given earlier comments suggesting that when a dividend is reinstated, there'd be a catch-up on all the missed or preferred dividend payments — is that still what's expected? And what would actually trigger reinstating that dividend? Would it be reaching a position of positive free cash flows in the half? Or how are you thinking about it?
Stuart Gale
executiveYes. Look, Matt, obviously that's something we'll take up with our Board the next time we meet — whether that falls at the half, the next full year, or whenever it happens. But really, it comes down to that liquidity position. And like we've said, we intend to retire $150 million of debt during this year. That leaves us with roughly $180 million of gross debt and around $80 million of net debt. We would definitely like to get net debt down to a 0 number. So I think it's really important that we get this balance sheet fixed up first and then move forward, and we'll look at it at that stage. But that's the direction we're going. I think the entire balance sheet is — it needs a lot of attention. And the reason for bringing up the Ravenswood transaction, even though it was nearly finished 12 months ago, is that we still have some meaningful cash flows tied to it. Very hard to value. We have a promissory note worth $50 million sitting on the Aussie — sitting on the balance sheet. And then there's a further $200 million of upside to which we really don't attach any value, and I'm fairly certain that no value is attached to it in the marketplace either.
Stuart Gale
executiveBut once that works its way through, it ends up generating quite meaningful upside on the cash side and leaves the balance sheet in much better shape.
Matthew Frydman
analystYeah, absolutely. From where we sit, we definitely do appreciate the promissory notes and that payment tied to the gold price too. That said, setting all of that to one side, is there any — do you have a perspective on the catch-up regarding the 3% revenue dividends that, I suppose, were missed across the past few halves? Whether that is something for the Board to weigh up at that particular point in time.
Stuart Gale
executiveYeah. Yeah. Look, Matt, I think you've already given a 50% increase on the dividend there. I think it's only 2%, but it...
Matthew Frydman
analystI apologize — there's something of a delay on my end that we need to make up for.
Stuart Gale
executiveThat has to be correct. I will inform the Board. No. We — yes, we are going to examine it. Without question. We will examine it. We will give it consideration. I am not refusing, though I am not agreeing either. At that moment, it is a matter we have to think through.
Operator
operator<<operator_script>> At this point we have no more questions. I’ll now return the call to Stuart, who will offer closing remarks.
Stuart Gale
executiveThank you, Amanda, and good morning or good afternoon to everyone who's joined us. I'm genuinely enthusiastic about what 2021 holds for Resolute. I had the chance to visit Syama early in January, and that trip left me feeling very positive — the team on site has a renewed energy and is eager to demonstrate the true output capability of Syama. The key takeaway from all of this is that we must concentrate on delivery and on the basics of getting gold out of the ground. That is within our capability. We can produce cash flow, and as we discussed previously, that cash flow matters a great deal for paying down debt as fast as possible and strengthening our balance sheet. So over the coming 12 months, Resolute's priority at both Syama and Mako is squarely on the fundamentals and on efficiently hitting our production targets. With that, thank you once again for attending, and we'll wrap up here.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re free to disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Resolute Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Resolute Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Resolute Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.