Good morning, everyone. Terry Holohan here. Joining me on the call is Chris Eger, our CFO, and the two of us will walk you through the results we posted for Q2 and, of course, for H1 of 2024. A presentation is available online. It's dated 29 July 2024. You'll find it posted on our website, so please follow along with it. As I advance the slides, I'll be speaking to each one, so you can track with me. Now to Slide 2, where you'll see the usual disclaimer, and it does include our guidance for the year, which remains unchanged at this point. On to Slide 3. A quick reminder for everyone: we're a gold company focused on West Africa. Our operations are the Syama Gold Mine in Mali and the Mako Gold Mine in Senegal, and beyond those, we hold exploration projects at both operations as well as in Guinea, and all three are at an exciting stage right now. Our resource and reserve base is quite large, and it keeps growing thanks to the work done over the last 3 years. As I mentioned, on guidance we're holding it in the range of 345,000 to 365,000 ounces, at a cost of $1,300 to $1,400 per ounce.

Terence Holohan

executive
#2

We'll get into that with a bit more detail soon. Moving on to Slide 4, when you review the quarter highlights, it was a really strong operational quarter for us, at just about 91,000 ounces. All operations ran well and cleanly. That comes after Q1, if you recall, when we halted the Syama operation, the sulfide circuit, for 2 weeks. And now for the half year we sit at 167,000 ounces, which is precisely where we anticipated being. That's the reason we are restating our guidance. We have consistently said the first half would be somewhat light owing to the stoppage at the Syama plant in Q1, and we now expect a solid run in the second half of the year. One particularly exciting point is our group AISC of $1,402 an ounce. If you recall, not long ago it stood at $1,500. Across the last couple of years, we have driven this down aggressively. And in June, in fact, we comfortably broke through the $1,400 an ounce level. Looking ahead, that is why we feel very comfortable stating that we expect to land in the $1,300-$1,400 an ounce range for the calendar year.

Terence Holohan

executive
#3

If you recall, we wrapped up our syndicated debt during Q1, and cash flow from operations came in at $47 million — a pretty aggressive figure at this point. Gold price is clearly lending a hand, but the timing of all our operating cost work is spot on as well. On exploration, as I said, we're still advancing the Tomboronkoto project in Mali. Some genuinely strong drill hits are coming in right now, and we expect to deliver an upgrade on that in Q3, plus on Guinea, where we're just about finalizing our first mineral resource estimate. So taking all the operations across this half year together, net cash has climbed to $97 million as of the end of June. The Ravenswood deal helped too — they met their targets of 500,000 ounces and paid us a first tranche of AUD 30 million, roughly $20 million, with the following payment due this quarter, bringing the total to about AUD 50 million. Consequently, at the close of June we had a very healthy balance sheet, with cash and bullion at $143 million, and you'd need to go back a few years to find that on our balance sheet.

Terence Holohan

executive
#4

We have basically finished what I view as a three-year turnaround, and at this point we can genuinely concentrate on expansion—particularly the organic growth opportunities sitting right in front of us across the coming two years. On ESG, we continue to check off the boxes. For LTIs, Syama has gone more than 5.5 years without a lost-time injury. Mako stands at 2.8 years LTI free. There were a few recordable injuries, though they were minor—hand cuts, sprains, that sort of thing. Nothing significant that ought to worry us, but clearly we are pressing very hard on safety. Let's turn to Slide 5. Our growth outlook remains one we're comfortable with. We're simply restating it here once more. As you'll recall, we've been saying this for some time. Our guidance for this year is something we feel good about. What matters, I think, is that our costs are trending back down. You can see where we've stood lately. We're now driving hard on the Syama sulfide conversion plant. As you remember, that project will lift Syama to 4 million tons of sulfide. Basically, it will substitute for the 1.6 million tons of oxide we currently process, running at roughly 1.3 grams per ton, using sulfides grading about 2.9 grams per ton.

Terence Holohan

executive
#5

And that ought to get us, without much strain, from midway through next year up to output of 250,000 ounces annually. As I said, at Mako we currently have 5 rigs drilling. There are 3 possible satellite deposits that hold our attention. Tombo is racing along. As I mentioned, we're seeing some truly strong assay results come through. Later this month — within this quarter — we'll release a separate announcement giving you a complete update covering not just Tombo but the other areas too. The Phase 2 expansion at Syama: if you recall, we've consistently described that mine as a tier one asset in waiting. The scoping study is now underway, and later this year we'll bring you some updates on it. Then, as I said, there's the Guinea exploration, where we hold some promising prospects. A first mineral resource estimate will be published at some point this quarter. We've moved ahead to slide seven. Let's dig into some detail. Syama — if you remember, over this past year we've been ramping the mine up toward 2.4 million tons. Its original design was for 2.1. During last year's ramp-up, you'll recall, we hit a few wobbles with the grade.

Terence Holohan

executive
#6

At this point you can see the grades have stabilized. We're sitting comfortably at those kinds of levels. And looking at the sulfide ore process, you'll notice that during the most recent quarter we began increasing that. That came about thanks to all the effort we've put into the crushers, swapping out every crusher in a systematic way over the past nine months, and that has now let us feed more material through the mill. The really exciting part there, as I said, is the grade. When you look at the grades, we're returning to where we believe they ought to be. And despite the higher throughput at the sulfide plant, you can see we're maintaining the gold recovery figures. So the sulfide circuit is genuinely running well. The oxide plant is also running well. We now have a blend of material coming from the mines, roughly 1.56 grams a ton, and we're drawing heavily on stockpiles that we've accumulated over the years, which at 1 gram a ton these days is worth $75 a ton. So it's definitely worth putting through the plant and generating profit from it. So we're excited about the Syama operations. We expect a run-free H2, so we should see solid performance from Syama across the next six months.

Terence Holohan

executive
#7

Let me turn to the conversion project. As I said, this is the point we're going to reach. On slide 8, the photographs show the oxide plant we're focused on. In the left-hand picture you can see the oxide mill on the right. The big concrete slab beside it is the mill foundations. With a mill, that's typically the critical path on an expansion project. They're nearly finished right now. These photos are a few days old. Then in the foreground of that picture you can see the flotation section foundations. Everything is proceeding according to plan. Mill components are beginning to reach the site, and we remain on track for commissioning in the first half of next year. So by Q3 next year, we should be running material through that mill and the mill beside it that will be installed there soon. Through that mill we'll be putting 2.9 gram a ton material rather than the roughly 1.3 we currently put through. So for the future of this operation, this is genuinely exciting. Given that Syama currently produces about 210,000 ounces per year, this should comfortably lift it to 250,000 ounces per year.

Terence Holohan

executive
#8

Turning to Slide 9, Mako. As we've mentioned for a while now, last year we carried out that big stripping program, $25 million, and we wrapped it up during Q1. That has given us the ability now to reach better-grade ores. We've been mining somewhat bigger tonnages of ore, and there are two reasons for that. First, as you're aware, the rainy season is approaching. We want to be certain we have enough material sitting on the ground so that we don't need to run the mill at a slower pace. Second, it improves the odds of feeding the higher-grade material into the mill. Another thing to note is that recoveries are holding at 93%. That comes from the oxygen plant we installed last year, which continues to perform very well and is also contributing to lower costs at the plant. Our operating costs at Mako are now down to $1,100 an ounce, which is what we anticipated, and we expect to keep them at that level from here on. As I said, Q3 will be a bit softer on the mining side, but we anticipate being able to keep production going through the plant.

Terence Holohan

executive
#9

So Q4 ought to be a little stronger, more along the lines of what we saw this quarter. As I said, on group exploration, you'll get an update from us before long. In Senegal — Tombo and Bantaco — we're now running on 2 of our 3 satellite areas. Turning to the Tombo figures, as I mentioned, we'll be looking to add 400,000 ounces to the mineral resource there through some infill plus some extensional drilling. So that number is going to grow. And at Bantaco we're only just beginning to reach the mineralization. Getting in there took us a little while. We're on site right now, and we're just starting to see mineralization coming out of the ground. So we're getting pretty excited about the potential to extend the Mako operation. Over in Mali, we're also doing some work once again at Syama North. We'll be restating that resource shortly. We're also excited about some underground shoots that we're picking up in that Syama North area. Several shoots are coming off that large 3-million-ounce ore body, and they carry higher grades — above the 3 grams a ton — so it looks like they'll be mined economically from underground at some point down the road.

Terence Holohan

executive
#10

At this point it's purely exploratory, though we'll provide more detail on that later in the quarter. We're also reviewing additional prospects located south of the main Syama complex, which our geophysical work over the past 3 years has identified. We're taking another look, and we believe there's a chance we can locate more oxides as we move forward. That's what's exciting about Syama. That oxide plant will have the capability to process oxides or sulfides, whichever delivers better margins for us. Then, as I noted, with regard to the Mansala project, modeling is underway right now, and a mineral resource will be released shortly. With that said, I'll pass things to Chris, who can walk us through the financials and the bottom line.

Chris Eger

executive
#11

Thanks, Terry. Turning to Slide 12 to review the financial results — as Terry pointed out, we had a very strong quarter, and we feel very good about these financial results. Beginning with gold sales: we sold 88,000 ounces, a bit under what we actually produced. Again, Q2 wrapped up on a weekend, so the timing of sales was affected relative to production. But we anticipated those ounces would be sold in July, and they were. What I think is really key to note here is that at this point we're fully unhedged, we stay unhedged, and we plan to keep being unhedged. Also, as Terry mentioned, costs have come down quite nicely, so our AISC came in at $1,402 per ounce, and we expect AISC to keep falling over the quarters ahead. Capital expenditures came in at just under $20 million for the quarter, a little below Q1, but we anticipate CapEx rising in the second half of the year, since spending on the Syama project is really going to ramp up, and that will occur in Q3 and in Q4. EBITDA for the half year, which is unaudited, comes in at $160 million, an increase over last year, when we generated $101 million of EBITDA.

Chris Eger

executive
#12

For the second half of this year, I expect EBITDA to come in substantially above where the first half landed. The real driver there is that we'll be putting out more ounces, and on top of that, the price environment is much stronger than what we saw in Q1. Then, as I mentioned, CapEx through the first half sits at $44 million, which was up versus last year. But the key point is that we expect CapEx to really ramp in the back half, and we remain very comfortable that CapEx will land inside the guidance we laid out at the start of the year. Turning to page 13, looking at cash — and cash is king these days — we're quite excited about how the business is generating cash flow. Operating cash flow rose substantially in this first half compared with last year, reaching $127 million, and we expect that to carry on into H2. I've already covered CapEx and what it means for the business, and look, exploration came in around $10 million for the first half. We're expecting exploration expense of at least $10 million in the second half, and possibly more.

Chris Eger

executive
#13

That's above the $15-$18 million we initially guided for exploration. What's driving it is how encouraged we are by what we're seeing in Senegal, and we plan to spend as much as we can so we can really secure the extension of the Mako mine. Expect exploration spending to keep rising through the year. Working capital gave us a positive impact of just under $2 million for the first half. One of the main challenges the business faces, though, is that our VAT refunds don't arrive on time. In Q2, that hurt our business by roughly $15 million. The VAT refunds are coming, but slowly. In the past, we could get them fairly quickly, and with the government changes we're seeing in both Senegal and Mali, there's an effect on our VAT refunds, and that's having a negative impact on the business as a whole. As Terry pointed out for the quarter, we got AUD 30 million from the sale of Ravenswood, which was a very nice positive for the business, and we expect the remaining AUD 20 million to arrive by the end of September.

Chris Eger

executive
#14

During Q1 we completed the last of the repayments on our syndicated senior facility. That figure of $26.3 million is what appears on the chart. As a result, we closed the quarter holding a very robust cash position — cash and borrowings, I should clarify — amounting to $143.4 million, which gave us a net cash position of $96.6 million. In both of the countries where we run operations, we keep overdraft facilities in place on an ongoing basis. We aim to hold those levels fairly steady, at just under $50 million. They give us solid working capital efficiencies, so to speak, and we intend to continue doing that going forward. To recap once more, it was a very strong quarter, and we anticipate cash will keep growing over the course of the year. With that said, I'll hand things back to Terry for some closing remarks.

Terence Holohan

executive
#15

All right, thank you, Chris. So to wrap up, I believe the figures make it clear that we have worked efficiently across the past three years, and we have also succeeded in building up stockpiles as a precaution from the mine situated ahead of the plant, in case we encounter difficulties during the wet season. The rains have arrived. Within just a few hours we have already seen 150 millimeters of storms occur, and at this point we are handling that fairly comfortably. That said, I want to note that we do have stockpiles ready, which will help should any additional storms of that kind occur. Even so, with what we have, our attention remains on the operation. We continue to drive continuous improvement. There are plenty of items still on order that will arrive to strengthen operations in various areas, whether on the mills, on the roasters, and so forth. So our focus stays on ongoing improvement, and the major advantage for us at present is that we are unhedged moving forward, and we have cleared all our debt, so we can take advantage of the prices we are seeing ahead. So if you consider where our attention lies, the three things we are concentrating on are productivities, cost improvement, and organic growth.

Terence Holohan

executive
#16

That's really all there is to it. So over the coming 2 years, we ought to see a few systematic enhancements as well. Many thanks. With that, Chris and I are ready to take your questions now.

Analyst

analyst
#17

Thanks a lot, Terry and Chris. That's excellent. We've got quite a few questions coming in over the webcast today. The first one asks, "Could you give us a sense of how the CapEx profile in H2 compares with H1?"

Chris Eger

executive
#18

Terry, I might take this one. So look, I believe the results show that we spent, I think it was $45 million on CapEx in H1. With the Syama project ramping up, we expect that figure to double. So look, we expect to stay on guidance. So I'm expecting H2 CapEx to come in at roughly $80 million. That's about how the numbers work out.

Analyst

analyst
#19

All right, moving on to the next question: "Given that you're now accumulating cash, are there any intentions to repurchase stock or initiate a dividend? Also, with the proceeds from the Ravenswood sale now coming in, have you thought about whether those funds ought to go straight back to shareholders?"

Terence Holohan

executive
#20

Yes, this is Terry. As we mentioned earlier, and also earlier during this call, we remain enthusiastic about our organic project pipeline. Right now, my view is that by year-end we'll have a full picture of the cash flow required going forward for our Mako operation, possibly Phase 2 Syama, and if things go well, the Guinea project. So we should be able to provide more detail on that toward the end of the year. But let me be clear, this is something we're watching closely, and plenty of people are raising that same question right now, though I'd say we'll cover it more thoroughly around Q4 this year.

Analyst

analyst
#21

All right. Our last question submitted online asks whether we can share additional specifics about the mining code that has been signed.

Terence Holohan

executive
#22

The main point, I'd say, is that no new mining code was actually signed by us. There's a mining code already in place, and in Mali we reached an agreement with the government to honor it, and at this stage it expires, or requires revision, in 2029. So right now, we have a solid runway ahead, and everything continues as normal. Excellent.

Analyst

analyst
#23

Much appreciated. That covers every question submitted via the webcast, so I'll now turn things over for any inquiries coming in on the conference call.

Operator

operator
#24

Thank you, Rachel. And ladies and gentlemen, if you'd like to ask a question over the phone, please signal by pressing Star 1 on your telephone keypad. If you find that your question has already been answered, you may remove yourself from the queue by pressing star two. Again, it is star one to ask a question over the phone. Our first telephone question comes from Justin Chan from SCP Resource Finance. Please go ahead.

Justin Chan

analyst
#25

Hi, Terry and Chris. Congratulations on all the progress you've made. It's great to see. Just one question on the working capital side of things. You mentioned that the VAT had a $15 million impact in Q2. I guess maybe just holistically, how do you expect VAT or sorry, how do you expect working capital to trend in H2? I know there's a lot of areas you're looking to kind of pick up some cash from reducing your stock levels, but also does that VAT impact, assuming the rates are the same going forward, presumably that number will stay the same, so there won't be any more VAT impact, or am I reading that wrong?

Chris Eger

executive
#26

Hi, Justin. Chris here, perhaps — I'll handle that question. So, a few things. We anticipate additional benefits, let's say, on working capital, since we do expect another $10 million-$20 million of inventory reductions, and we're also planning to work with our vendors on stretching out payment terms. VAT is somewhat trickier, because we usually apply VAT refunds to offset other taxes owed, and that figure has traditionally run about $5 million per month across the board. So we've experienced a slowdown in receiving our VAT refunds. If no further VAT refunds come through, you should expect a negative cash impact of $5 million per month. That said, we anticipate VAT refunds will resume, and so we're hoping to make up for what was lost in Q2, if that makes sense.

Justin Chan

analyst
#27

That's really useful. Then I have one more finance question, plus a broader one after that — but the finance question is only about tax and timing. So I take it the cash tax you're paying at present relates to last year? Meaning the higher earnings you're seeing now will show up in tax next year?

Chris Eger

executive
#28

Justin, that one's complicated, because look, we pay certain cash taxes tied to the current period. We pay certain cash taxes tied to future periods we anticipate. So it's somewhat a blend of all of those. And then, as I said earlier, at times we actually keep our cash tax payments down because we use VAT refunds to offset cash taxes that are owed. So it's all of the above. So it isn't something I can give you one clear answer on, if that also makes sense. It's a complicated one.

Justin Chan

analyst
#29

Right, that makes sense to me.

Terence Holohan

executive
#30

So from a modeling standpoint, I suppose the safest approach would be to just model it roughly in line with the actual underlying earnings?

Chris Eger

executive
#31

Yeah. That one will be the simplest.

Justin Chan

analyst
#32

Alright. Alright. So maybe the broader question here is — you're producing pretty solid cash at this point. And the gold price is sitting at a fairly elevated level too. But on the flip side, I believe your mining convention runs until 2029. So I'm just wondering what your thinking is around de-bottlenecking the roaster and truly unlocking Syama. I mean, with all of those factors — the price and your cash balance — it really does point toward pulling that forward. But then you've got the convention side to consider. So I'm just curious where your current thinking stands on that, and where things are at on the engineering front.

Terence Holohan

executive
#33

Apologies — hello, Justin. This is Terry speaking. Looking ahead, we’re quite enthusiastic. We’re collaborating very closely indeed with the governments, particularly in Mali, which is the one you’re discussing with us right now. They’re genuinely enthusiastic about the prospect of us growing our operations there. They welcome seeing investment, and they’re providing substantial backing for us in that country. I believe that genuinely assists with recovering items such as VAT, and so on. We remain highly optimistic about Syama. We believe we now have a solid working relationship with the incoming government and the incoming ministers. I’ll be traveling there once more in two weeks to sit down with them and discuss the investment. Naturally, the crucial item for us is that we still have considerably more work to complete on Phase 2. We anticipate that we’re currently only at scoping study level, but we have informed the government. They’re genuinely enthusiastic about it. They’ve been familiar with this mine, Syama, as you’re aware, from the 1990s onward, and we’ve truly been anticipating this for a considerable stretch of time. So it’s thrilling for them too. Therefore, we believe we have a solid working relationship, and we simply must keep going. And both parties need to put in serious effort on this.

Terence Holohan

executive
#34

It's clear to everyone that this is a big undertaking if we're all going to bring it to life. We share one objective there.

Justin Chan

analyst
#35

Understood. And what would you consider a realistic timeline — at least from the engineering standpoint — for getting a solid estimate of CapEx and the schedule? Does the end of 2025 seem realistic to you?

Terence Holohan

executive
#36

Yes, the end of 2025 is a realistic target, and for construction, I'd say you're looking at 2027, roughly in that window. So clearly, as you near the renewal of your convention and your mining code, that's going to factor in. It's a significant element of this. So we're getting the work done ahead of time and holding those discussions early, so that later on there aren't any surprises.

Justin Chan

analyst
#37

All right. That's great. Many thanks, Terry. And thank you, Chris. I'll hand the line back now.

Terence Holohan

executive
#38

Appreciate it, Justin.

Operator

operator
#39

Reg Spencer at Canaccord has our next question, so please proceed.

Reg Spencer

analyst
#40

Thank you. Good morning, Terry and Chris. They just got going. That's Sam. Congrats on a cracking quarter. I've got a couple of questions. Some I could probably take offline, actually. I'll just stick to the key ones. Just obviously, you're going to have some weather impacts over the coming few months. You mentioned that mining and processing charges will be lower in the September quarter. You're able to sort of give us an idea of what kind of quantum we're talking about here? I presume we can assume grades to remain at current levels at all of your operations? Correct.

Terence Holohan

executive
#41

Thanks, Reg. Good afternoon. Yeah. Internally, we typically set a budget at roughly 10%, though that really represents a worst-case scenario. A more probably realistic figure is 5%. I think this is probably the year we're best prepared and ready. As we mentioned, we had a sub-level cave that is literally like a sieve. So when rain falls on top of it, the water gathers at the bottom, and you pump it to surface. We've already been through one cycle of that with 150 rain, and it has worked exceptionally well. We've built up stocks of high-grade materials ahead of plants, so we're ready for it. We think we're in a comfortable position, but we're just being cautious. We're essentially a bunch of engineers here just sort of looking for worst-case scenarios. So hopefully, the surprises will be on the upside.

Reg Spencer

analyst
#42

Much appreciated, Terry — that's really useful. The next question concerns the expansion. You've clearly laid out the critical path items, including work on the mill. Looking a bit ahead toward early next year, may we take it that oxide processing as it currently operates comes to an end in Q1 or Q2? Will there be a cutover event, or a stretch of time during which the switch happens? I'm simply trying to grasp how the move from the present setup to what you plan to commission early next year will work.

Terence Holohan

executive
#43

That's a fair question. The important point is we'll have flexibility here, since we figure Q2 is on our schedule — Q2 of next year, with commissioning, reaching a steady state around July or so. But the crucial thing is that if we — and we know some of the — once mining begins, which will kick off in Q4, some 3 gram a ton material is going to come out of the ground, sulfides. What we'd likely do with that material, though, instead of waiting for the mill at SSCP, is probably send it into the main plant, because mining it will be cheaper and the grade will be a bit higher. So I think the important point is we're going to have considerable flexibility starting early next year. The initial plan calls for a full switch to sulfides in Q2, roughly that timeframe. But should we encounter oxides of good grade at low cost, then we can switch back, as we've said all along.

Reg Spencer

analyst
#44

That's really useful. Few operations enjoy that degree of flexibility. All right. One last question on costs, perhaps directed at Chris. Regarding that inventory adjustment at Mako — clearly you've accumulated somewhat of a stockpile there in preparation for the wet season. Considering the material movements, your waste and ore, I had expected that inventory adjustment to come in somewhat bigger than what we observed in your all-in sustaining costs. I was simply curious how we ought to think about the stockpiles at Mako as we progress through the wet season, and what the potential effect could be on your all-in sustaining costs in the second half. Of course, you haven't revised your guidance, but I'm just attempting to get a bit more granular detail on that.

Chris Eger

executive
#45

Yeah. Hi, Reg. So, yes, we do anticipate that larger stockpile adjustments will flow through the system in Q3. When I look at our budgets, our figures, and the forecast, I really do expect AISC to keep coming down substantially at Mako as the year goes on — not just from, say, stockpile inventory adjustments, but also from direct savings on people and contracts, since we're aiming to, let's say, wind down the mining as we move into next year. But I probably need to dig a bit deeper into the numbers and work with your figures to see precisely what you're modeling versus what we have, so we can try to help you out. Still, we probably ought to do that offline.

Reg Spencer

analyst
#46

That would be excellent. That would be excellent. That's everything from my side, guys. Once again, congratulations on a great quarter.

Terence Holohan

executive
#47

Appreciate that, Reg.

Operator

operator
#48

Our next question comes from Richard Hatch at Berenberg. Please go ahead.

Richard Hatch

analyst
#49

Good morning, everyone. Thanks a lot for taking the time on this call, and congratulations on a solid quarter. I've just got a couple of questions that are more for clarification. First off, Chris, regarding that $80 million of CapEx in the second half, is there much of a split from one quarter to the next on that, or would it be best to just divide it evenly?

Chris Eger

executive
#50

No, I'd likely place 60%-65% of it in Q4, with the rest clearly falling in Q3. With the Syama project, it's going to be far more weighted toward the back end.

Richard Hatch

analyst
#51

Alright, that's quite useful, thank you. Then the second point concerns recoveries at the sulfide. They've been tracking fairly steadily around the 79% mark over the last couple of quarters, which is better than what you'd see on average across prior years. I believe you've mentioned before that you'd like to push above 80%. Does that remain the goal? And assuming it does, what kind of timeframe are we looking at to reach it?

Terence Holohan

executive
#52

Thanks. That’s a solid question, Rich. As you’ll recall, what we did was take the roaster offline, and we carried out some work last year plus a little bit this year, and because of that we’ve been able to raise the temperature by just a small amount—to roughly 750 degrees from about 720. That has actually assisted us with the carbon burn in there. So the implication is that leaching is now gradually rising. Leaching recoveries at the back are 91+. But with higher throughputs at the front, flotation recoveries have slipped a little. So a great deal of effort is going into the flotation side right now. We’ve just refurbished all our tanks. We’re examining recommissioning the cleaners. My expectation is that this will run through the end of the year and into early next year. There is a lot of focus and a lot of work there. Over the longer term, I think we clearly see that we can add extra flotation cells at the front end of the plant and creep those up. We should be at 80. In the laboratory—I’ve always said this about the laboratory—you can achieve 81%. It’s easy there. You normally apply a 2% discount to that when you start a plant, so 79.

Terence Holohan

executive
#53

So that's the situation at present. Considering what we've learned, and that's genuinely the point at which you're operating in steady state. My view is that you'll observe a gradual climb toward 80% in a systematic way as time goes on. The remainder of the year, during Q1.

Richard Hatch

analyst
#54

Okay, that’s very useful, thanks. Sorry, one final question. On the Syama expansion, keeping the wet season in mind, are you confident that all the critical items you need to complete before the rain begins pouring and operations become more difficult are in hand?

Terence Holohan

executive
#55

Right. On that plant, the main thing was getting the concrete poured, and that's now finished. We clearly worked hard to have it completed ahead of the rain arriving. So we believe we're sitting in a very strong spot at this point.

Richard Hatch

analyst
#56

Excellent. All right. Excellent. That's my turn. Nice work, everyone. Many thanks. Cheers.

Operator

operator
#57

Thanks, Richard. Thank you. It looks like there aren't any more questions in the phone queue at this point. I'd like to give the call back to Terry for any closing remarks. Over to you, Terry.

Terence Holohan

executive
#58

Much appreciated. All right, and thanks to everyone for tuning in today. As I said, what we've had here amounts to a turnaround spanning 3 years, yet let me be clear — our attention is squarely on making things better. Productivity, cash flow, and organic growth are the heart of it. Those are the priorities we're concentrated on. We're eager to speak with you again later in the year. Many thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Resolute Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Resolute Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Resolute Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.