Resolute Mining Limited (RSG) Earnings Call Transcript & Summary

January 22, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 58 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and welcome to the Resolute Mining fourth-quarter 2025 activities and 2026 guidance call. Right now, all participants are in a listen-only mode. Later on, we'll hold a question-and-answer session over the phone lines, and instructions will follow at that time. If you're listening via the phone lines, the presentation is now available in the investor section of Resolute Mining's website. For those watching the webcast, should you wish to submit a written question, you can do so by using the ask question button on the SparkLive page. I'd like to remind all participants that this call is being recorded. I will now hand over to the Chief Executive Officer, Chris Eger, to open the presentation. Please go ahead.

Chris Eger

executive
#2

Good afternoon, and good morning, everyone. Welcome to Resolute Mining's Q4 2025 activity report — we'll also give you some color on our 2025 annual results and our guidance for 2026. On today's call I'm joined by Gavin Harris, our Chief Operating Officer, who is actually at our Syama operations in Mali, along with our CFO, Dave Jackson, and our Head of Corporate Development and Investor Relations, Matty O'Toole-Howes. Let's dive into it. Looking at how the business performed in Q4, I'm very proud to say we hit all of our targets and really stabilized the operations, which sets up a very strong foundation for 2026. On the details: gold produced came in at 66,000 oz, which is 6,000 oz more than our Q3 results. A lot of that work came from what we did in both Senegal and Mali. Specifically in Mali, we have stabilized the supply chain issues that we discussed at the start of last year throughout 2025, and we've now stabilized our explosive situations and are hitting our targets through the end of the year and into 2026. Mako continues to perform extremely well, and we had a very strong quarter in the last quarter of the year.

Chris Eger

executive
#3

With strong output throughout the operations, our all-in sustaining cost landed at $1,877 — once more lower than the roughly $2,200 ASIC we recorded in Q3. That gap between the two ASIC figures stems largely from how tightly we are running cost control everywhere in the business, and above all from the higher production volumes. On a positive note, we also brought our TRIFR down to 1.87 from 1.95 in the prior quarter. CapEx was as expected at $18 million. What makes us proudest is that Q4 operating cash flows reached almost $86 million, compared with $70 million in Q3. On the net cash position for the year, that means we closed at $209 million in net cash — an increase of about $140 million since the start of the year. Q4 was exciting for another reason too: we saw meaningful progress in Côte d'Ivoire. In particular, on December 15th we released an update on the Doropo DFS to the market, demonstrating how robust this project is, with its NPV at $4,000 coming in at approximately $2.5 billion.

Chris Eger

executive
#4

We'll cover Doropo's specific activities in more depth on the slides coming up, but I'm delighted to report that this project is still on schedule and within budget for construction during the first half of this year. Beyond that, we kept advancing our exploration assets right across the portfolio, and most notably, we delivered a La壁 MRE of 643,000 oz at 1.14 g/t. We also began drilling in earnest at the ABC deposit in western Côte d'Ivoire, where exploration results have come in very strong, and I'll walk through those in detail on the slides ahead. Throughout the business, we're likewise continuing to carry out other strategic projects, above all in Mali. Our SSCP project remains very much on track and on budget — again, we'll discuss that on the upcoming slides — and in Senegal we kept moving forward on the life extension projects. For Resolute, 2025 was a truly pivotal year, and a highly transformational one for the business as well. I'm very proud that we achieved gold production consistent with our guidance range of 275,000 oz to 285,000 oz, with final gold poured of 277,000 oz. Production is very much in line with guidance, and so are all-in sustaining costs, as we finished the year at an all-in sustaining cost of $1,843, consistent with our revised guidance.

Chris Eger

executive
#5

On top of that, CapEx landed right in line with guidance at $118 million, and the operational and financial results we delivered were very strong, with EBITDA of $383 million. That said, it's worth pointing out that we closed out the year holding a fairly substantial amount of gold bullion that went unsold. We had approximately 31,000 oz of gold sitting in inventory, and that was sold in January, which had an effect on the EBITDA profile for 2025. Turning to cash flow generation and tying back to the earlier slide, we finished the year with $209 million in net cash, while total available liquidity stood at a little more than $320 million, combining our gross cash and our access to working capital facilities. From a qualitative standpoint, we're really pleased with everything that took place in 2025 to set the business up for continued success in 2026. The most notable item: during 2025 we significantly strengthened the skill sets across the executive team. We added new people to the business — in particular, a project team based in Côte d'Ivoire for construction of the Doropo project. We also restructured many of the principal activities in Mali as a consequence of some of the challenges that came up in 2024.

Chris Eger

executive
#6

We devoted considerable time to engaging with various government entities throughout the organization, and we have been strengthening the ties we maintain with individuals in every jurisdiction where we conduct operations. In addition, we finalized the purchase of the Doropo and ABC projects in Côte d'Ivoire during May 2025. Through this transaction, the company has been positioned for ongoing success by transforming into a West African gold producer with multiple operations. We further recorded meaningful progress on advancing the projects we hold in both Mali and Senegal with respect to the SSCP and MLEP programs, and we will provide more detail on those. Another major activity for the company during 2025 was our sustained emphasis on exploration, which I regard as an essential pillar for building shareholder value over the long term. I will take a little more time on the exploration portion regarding some of the principal activities we anticipate in 2026. What follows is a summary of the organic growth profile for the years ahead. As you can observe, during 2025 we delivered 277,000 oz, yet looking forward, we will be producing between 250 to 275,000 oz over the next couple of years while we keep up stockpile processing at Mako, but we begin construction of the Doropo project.

Chris Eger

executive
#7

I have a lot of confidence that by 2028, we'll be running at a rate of 500,000 oz for the foreseeable future throughout the business. And beyond that, given the exploration work we're doing, I'm quite confident we can expand the production profile organically thanks to some of the success we're seeing on the exploration side of the business. As you can see on the page, our gold production guidance across the group is 250 to 275,000 oz. That's split between Syama and Mako, with 195,000 to 210,000 oz of gold production coming from Syama and 55 to 65,000 oz of gold production coming from Mako. Mako is fairly straightforward, since we'll keep processing stockpiles throughout '26 and into 2027. Syama, though, is going to have an interesting year, as we'll be commissioning the SSCP program, where we're going to begin processing the majority of the ores to be sulfides rather than, as in the past, a split between sulfides and oxides. Gavin will get into very specific details on how this transition will happen in 2026. Because of the high gold price environment, our all-in sustaining costs are rising, and so our all-in sustaining costs guidance across the group is between $2,000 to $2,200.

Chris Eger

executive
#8

One big factor behind the rise compared with 2025 is that royalty costs, in the current gold price setting of $4,000 plus, are tacking on a fair amount to our all-in sustaining costs. CapEx for 2026 comes in much higher than 2025 and, as the page shows, sits in the $310 to $360 million range. Walking through the individual line items should give some context for that CapEx increase. We'll begin with Syama. Guidance for Syama falls between $110 and $125 million. Roughly $40 million of that figure is tied to wrapping up the SSC program relative to 2025. On top of that, waste stripping accounts for about $40 million as well, which is up around $20 million compared with 2025, and that extra waste stripping capital is needed so we can further develop the Syama North deposit and thereby reach higher grade zones down the road. Turning to Mako, we expect CapEx in the $15 to $20 million range, with the bulk of those funds going toward capital projects at Tomboronkoto and Bantako. For Doropo, the projection is $170 to $190 million, contingent on permitting and FID approval. The majority of that CapEx is slated for spending during the second half of the year.

Chris Eger

executive
#9

Once more, we'll get into greater detail on how we envision Doropo being constructed and costed across the slides that follow. Lastly, we keep devoting a substantial amount of capital to exploration, since that is a major value driver for the company, and therefore we anticipate allocating at least $15 to $25 million toward exploration, mostly in Côte d'Ivoire, though we are seeking to grow our operations in Guinea as well as in Senegal. On that note, I'll hand things over to Gavin Harris, who will take you through the particulars of every one of our assets and what we're doing in 2026.

Gavin Harris

executive
#10

Thank you, Chris, and good morning or good afternoon to everyone joining us. Let me begin with Ivory Coast. At Doropo and ABC, both acquired from AngloGold Ashanti in May of last year, we have achieved substantial progress. For Resolute, Doropo is a transformational project, and I was already acquainted with it, since it was first developed while I was at Centamin. During the second half of 2025, we expanded the project team, filling key roles including project director, project manager, and project services manager. Rob Caccini serves as project director and heads a team whose combined experience building projects across West Africa, Asia, and Australia comes to nearly a 100 years, mostly gained with Lycopodium previously. The extensive list of West African projects this team has handled includes Ity, Agbaou, and Sissingué in Côte d'Ivoire; Houndé, Bissa, and Bouly in Burkina Faso; Fekola in Mali; Obotan and Nzema in Ghana; and naturally, our own Mako mine in Senegal. Turning to Doropo's key achievements from last year, they include the following: an updated mineral resource estimate showing a 28% increase; publication of the updated definitive feasibility study, or DFS, which set out an operation larger in scale and longer in life than the earlier DFS completed by Centamin in 2024; the selection of Lycopodium Engineering to carry out the front-end engineering design, or FEED; and the tender issued for engineering, procurement, construction management, or EPCM, with site visits scheduled for next week.

Gavin Harris

executive
#11

Permitting has moved forward with more engagement from government, such as several trips by the Resolute executive team and a meeting with the prime minister. Approval of the mining permit is what we are now awaiting. Late last year, elections caused the permitting process to slow. Those are finished now, and ministers are being appointed this week, so we anticipate the final two permitting stages moving ahead in the months to come. Those stages consist of, first, approval by the interministerial commission, and then signature of the presidential decree. The updated DFS, published on the 15th of December, sets out a considerably bigger project than the earlier DFS version, featuring a 55% rise in gold reserves and a longer mine life. A revised gold price of $1,950/oz has lifted total life-of-mine gold production to 2.2 million oz across 13 years. The present spot gold price sits well above that level, but in order to manage the timeline and permitting, which was submitted using $2,000 pit shells, the updated DFS stays inside those limits. Additional gold production is expected at higher gold prices, and that supports confidence that the Doropo life of mine might be extended past 13 years. We think further exploration targets located between the main Souwéda hub and Kilosegui could extend mine life even more.

Gavin Harris

executive
#12

Upfront capital costs now sit at an estimated $516 million, up from before. That reflects updated pricing—with a significant inflationary component versus the earlier version finished in the first half of 2024; processing capacity raised by 25%, future-proofing the project and enabling further modular expansion; water storage capacity up by 80%; tailings storage facility capacity up by 55% to handle the added processed tonnages; higher costs for land take, livelihood restoration, and resettlement; and some items previously left out now included. Financial highlights from the updated DFS, at a base case gold price of $3,000/oz, include: all-in sustaining cash costs of $1,406/oz; a post-tax net present value of $1.46 billion at a 5% discount rate and an internal rate of return of 49%; a payback period of 1.7 years—payback falls to under a year at a $4,000 gold price, and clearly the gold price is much higher than that right now; very strong free cash flows averaging over $260 million per year across the first 5 years of production. As I said a moment ago, we see considerable upside potential at Doropo, and I believe it will be one of those mines that just keeps producing well beyond initial expectations.

Gavin Harris

executive
#13

For Doropo in 2026, the main workstreams are already in motion, and they're aimed at keeping the project schedule on track while permitting and the final investment decision, or FID, is completed. The FEED work Lycopodium is carrying out means that tender packages for equipment and construction can be readied and released during the first half of 2026. Thanks to that work, procurement of the key long-lead items can get going the moment FID receives approval. EPCM tenders are now out, and a site visit is scheduled for next week. We launched a competitive bidding process, and there's been strong interest from world-class engineering firms with proven track records in building gold mines in West Africa. Submissions and adjudication for the EPCM contract will carry on through the early part of the year, and we expect to make the award toward the end of Q2. Site earthworks are set to begin ahead of the wet season so that access roads are established and the early stages of the water storage and water harvesting dams move forward — these are essential for retaining and supplying water during the project's construction phase. To support that early work schedule, construction will begin on the camp and permanent village, which will supply messing and accommodation for the construction teams. Assuming FID is wrapped up by the end of Q1, the project timeline has construction beginning from midway through Q2 of 2026, with commissioning getting underway in early 2028.

Gavin Harris

executive
#14

We anticipate the initial gold pour near the conclusion of 2028's first half. Once more, if FID is achieved by the close of Q1, project capex for 2026 should land somewhere between $170 and $190 million, and roughly 75%, or $135 million, of that spending will occur in the latter six months of the year. First-half expenditure will cover land acquisition as well as crop compensation for villages impacted by the project. Let's now shift across to Mali and the Syama operation. Syama produced 47.2 koz in Q4, showing renewed momentum following two consecutive weaker quarters, chiefly because of supply chain problems that arose from the end of Q1. That robust quarter meant Syama landed at the bottom end of guidance, with 176.3 koz of gold produced at an all-in sustaining cost of $2,008, once again inside the guided range. Worth highlighting in Q4 was a fresh ore production record at the underground mine, surpassing 250,000 tons of ore within one month. This drove the strong quarter, as we turned to alternative explosive products and suppliers to resolve difficulties faced across the prior 9 months. Upon becoming part of Resolute, I flew to Mali on the evening of my initial day with the company.

Gavin Harris

executive
#15

Over the course of that 3-week visit, it became obvious that the people working at the site required strategic direction to support decision-making at this complicated operation. We've achieved substantial improvement on that front, and we anticipate additional areas for enhancement in 2026. On top of that, I devoted a significant amount of time to going over arrangements with contractors and suppliers, verifying that we are getting the most competitive pricing. To tackle several of the difficulties, I implemented a restructuring of the management team during the second half of 2025. That began with the operation's general manager. While this restructuring was underway, I was present at Syama for 3 months, supervising the operation and putting in place a reset aimed at eliminating long-standing inefficiencies, while also capitalizing on numerous opportunities that were readily available. The Syama team was strengthened with skilled, seasoned professionals who brought direct experience in rehabilitating troubled assets. We ran an operational review that began in Q3, concentrating on optimizing the underground assets and on cost-reduction initiatives throughout the entire site. It produced a substantial quarter-on-quarter decline as those benefits started flowing through to the bottom line in Q4, and that is visible in the all-in sustaining cost of $1,779/oz. This review is ongoing today under the new leadership team, with still more opportunities being assessed that should generate shareholder value across 2026 and beyond.

Gavin Harris

executive
#16

At a minimum, these continuing actions should help counter inflationary pressure. Capital spending for the full year came in slightly under the guidance range, mainly because the Syama sulfide conversion project—SSCP, as we refer to it—pushed roughly $5 million of costs into a later period under a revised sulfide processing schedule. That happened while we were finishing the Tabakoroni oxide reserves in Q4. The main supply chain problems centered on moving products within Mali. Explosives and fuel requiring government escorts were hit hardest. Fuel levels are stable at present, and to address the explosive transport difficulties we encountered, we did what our in-country peers did and will build an explosives manufacturing plant at Syama in 2026. We expect this to boost operational stability and explosive availability throughout the operation. While I have been at Syama on site steadying operations, Chris, the CEO, has been occupied improving dialogue and strengthening the relationship with the government, including a meeting with the Malian prime minister in Bamako in Q4. In Q4, we finished oxide mining at the Tabakoroni deposit, located roughly 40 km southeast of the Syama processing plant. Since almost all economic high-grade oxide deposits near Syama are depleted, open-pit ore output will concentrate on the Syama North A21 district for fresh sulfide ore in the years ahead.

Gavin Harris

executive
#17

Syama’s processing capacity right now is 4 million t/a. That capacity is divided across two processing plants. One is a sulfide plant with 2.4 million t/a, and it handles the underground sulfide ore. The other is an oxide plant at 1.6 million t/a, which processes open-pit oxide ore. The Syama sulfide conversion project began in 2023 as essential infrastructure so that sulfide ore can be run through the oxide plant that already exists. The project covers installation of the following: a secondary crusher placed after the primary crusher to shrink the tougher sulfide-rich material and transitional ore before it goes into the existing SAG mill; a pebble crusher for scats, meaning the oversized material discharged from the existing SAG; a closed-circuit secondary ball mill that treats cyclone rejects and produces the proper grind size for flotation; a column of flotation cells that recover sulfide material ahead of roasting; two more CIL tanks; and a roaster upgrade featuring a new electrostatic precipitator, or ESP, which will raise concentrate throughput by more than 15%. All of that will let the plant handle sulfide feed while preserving the flexibility to continue processing oxide ore as well. The SSCP remains on time and on budget. Stage 1 — the oversize pebble crusher and the sulfide flotation plant — is set for commissioning in Q2 2026.

Gavin Harris

executive
#18

At that point, the SSCP can operate at 50% capacity — roughly 110 t/h — in Stage 1. When we get to Stage 2, the emphasis there is on the secondary crusher, building the ball mill, and the roaster upgrade. Commissioning and full operation for that are set for Q3. After it's fully commissioned, throughput is projected to rise to 215 t/h. Syama's output is going to be higher in 2026 than in 2025, delivering 195,000 to 210,000 oz of gold, with an all-in sustaining cost between $1,950 and $2,150/oz. Gold production is weighted heavily toward the back half of the year, with H1 and H2 accounting for 42% and 58% of gold produced, respectively. That split comes from the review and optimization of open-pit mining that's ongoing, which wraps up during Q1. Because of that, mining will be confined to the Syama North A21 waste stripping with the contractor already appointed. While that's happening, existing oxide stockpiles will be processed, and sulfide ore will be stockpiled, ready for SSCP commissioning in Q2. From the Syama North A21 open pit, we expect to mine 1 million tons of sulfide ore averaging 2.3 g/t. H1 will center on waste and low-grade oxide stripping before ramping up into full-scale sulfide ore production in H2.

Gavin Harris

executive
#19

We expect the underground operation to build on the optimization work that was completed in the second half of 2025, and to deliver more than 2.6 million tons of ore to the surface. Underground production includes 300,000 tons of development ore, with total development rising 74% compared to 2025, and 8.2 km of underground development planned. The highest grades from underground will be processed, giving an average head grade of 2.4 g/t. Lower-grade material will be stockpiled, rebuilding the stockpile volume that was depleted during 2025. Once the open-pit optimization review is complete, oxide mining will occur during Q2 at the Paysans open pit, completing the oxide high-grade reserves of this ore body ahead of the rainy season. This oxide will be stockpiled while SSCP Stage 1 commissioning takes place, and it will be processed later in the year. The second and third quarters focus solely on sulfide processing and the ramp-up of SSCP during Stage 2. By the middle of Q4, sulfide concentrate stocks will be sufficient to meet roaster throughput, and as such, any further sulfide processing in the SSCP would defer ounces to be poured in 2027. As a result, there is excess capacity on the SSCP to revert back to oxide and add additional ounces while stockpiled concentrate feeds the roaster.

Gavin Harris

executive
#20

So that's why ounces are so heavily weighted toward H2, and we expect 12,000 oz of oxide gold production in Q4. The existing sulfide plant — the one fed by ore from the underground mine — will put through more than 2.2 million tons in 2026, a slight decline versus 2025, because a 3-week essential maintenance program is scheduled in the second quarter on the primary ball mills and the roaster. Once the SSCP is fully commissioned, we expect it to raise overall gold production by 5% to 10% relative to 2026 levels. With oxide resources running down, oxide output should decline over the next 2 years, and from 2028 operations shift to 100% sulfide processing. CapEx at Syama this year should come in around $120 million, divided across three main areas: roughly $40 million to finish the SSCP and roaster upgrades; a further $40 million for waste stripping at the Syama North A21 pit and the underground development; and about $40 million covering equipment replacements and maintenance in the processing plant and the underground mine, plus additional tailings storage facility studies and construction. A full life-of-mine review that was commissioned in H2 2025 is under way with the aim of increasing production in subsequent years. We'll report on that in H2 of this year.

Gavin Harris

executive
#21

Turning now to Senegal and what we’re doing at Mako. Mako had an excellent 2025 in Senegal, hitting an upward-revised guidance target of 100.3 koz while all-in sustaining costs came in lower at $1,270/oz. Gold output in Q4 reached 18,755 oz, helped by stockpile grades that ran above forecast. We delivered that strong result even though open-pit mining wrapped up in H1 and we shifted to stockpile material in H2. As you’d expect, once mining stopped and we began processing stockpiles, the overall feed grade declined through the second half of the year. Processing throughput of 604 kt improved both year on year and quarter on quarter, reflecting continuous improvement. That means we’re still achieving recovery above 91%, even with feed grade down to 1.04 g/t and higher throughput rates. The main drivers were metallurgical testing at coarser grind sizes and optimization of the gravity gold circuit. All-in sustaining costs rose in the second half of the year, and Q4 all-in sustaining cost was $1,666/oz as overall gold production declines, with no higher-grade run-of-mine ore available to process, higher royalty payments, and non-cash stockpile movements of roughly $143/oz. Capital expenditure was just $0.3 million in the fourth quarter and $2.9 million for the full year.

Gavin Harris

executive
#22

In line with our continued push to establish solid ties with the governments of the nations where we operate, Chris also held a meeting with Senegal's president during Q4. There is potential for the Mako life extension project, or MLEP, to add as many as 10 years to the current life of the Mako mine. Two principal areas fall under the MLEP: the Tomboronkoto and Bantako deposits. The Tomboronkoto deposit, a thrilling find located roughly 20 km from the Mako mine, currently holds a resource of 377 koz at an average grade of 1.7 g/t. The Tomboronkoto ESIA has been pre-validated by Senegalese technical agencies and is awaiting ministerial approval. Importantly, the Tomboronkoto village and surrounding communities have backed and approved this. The resettlement action plan, or RAP, along with the DFS, is close to completion, and the cut-off date — the point at which no further compensation can be claimed — has passed. A full survey of the affected houses and livelihoods has been finished and is now crystallized for the purposes of this project. The overall process has been carried out with a detailed approach to stakeholder engagement, underscoring our commitment to regulatory compliance, transparent community consultation, and responsible project execution. The application for the Tomboronkoto mining permit will follow the issuance of the environmental permit, with all permitting anticipated to be received by the end of 2026, assuming no major revisions are required.

Gavin Harris

executive
#23

Once the mining permit is in hand, we'll have the authorization required to carry out the RAP and begin the work of relocating the village. Detailed engineering is anticipated to get underway in Q2, and long-lead items will be procured ahead of the end of 2026. As a result, mining at Tomboronkoto is planned to commence in the second quarter of 2028. At Bantako, exploration is presently underway on two further deposits. Resources recently published for the Bantako South and Bantako West deposits come to 266,000 oz at 1.1 g/t. Across 2025, workstreams covering infill drilling, technical studies, and metallurgical analysis moved forward, with $4.1 million in capital expenditure directed to this portion of the project. That figure includes advancing the ESIA submission along with community engagement activities, which are considerably less demanding than those at Tomboronkoto. Bantako's 2026 workstreams concern technical studies, further infill drilling that is needed, and moving the permitting process along. Pending a full economic analysis, delivery of Bantako ore is slated to begin in Q4 2027, bridging the interval between when Mako stockpile processing wraps up and when ore delivery from Tomboronkoto starts. Capital expenditure across the MLEP as a whole is anticipated at $10 to $15 million in 2026. Mako production will be lower than in 2025, since stockpiled material gets processed in 2026, and guidance is for 55,000 to 65,000 oz of gold at an all-in sustaining cost ranging from $1,600 to $1,800/oz.

Gavin Harris

executive
#24

The rise in all-in sustaining costs reflects processing lower stockpile grades in an inflationary setting, including increased royalties stemming from the higher average gold prices anticipated for 2026 versus H2 2025. Gold output is a bit tilted toward the first half, with H1 accounting for 52% and H2 for 48% of gold production respectively. Still, it's worth noting the possible variability when processing stockpiles. A total of 2.2 million tons of ore will be processed at an average grade of 0.9 g/t, with gold recoveries exceeding 90%. At present, Mako holds enough stockpiled low-grade ore to keep processing through the end of 2027, though grades will decline as processing advances from low grade into mineralized waste stockpile. With that, I'll turn things back to Chris to walk through the exploration activities.

Chris Eger

executive
#25

Thanks, Gavin. Let's turn now to exploration. Exploration remains a really key strategic priority for the business going forward. On slide 21 you can see that in 2025 we invested a little under $25 million in exploration work, and we had quite a lot of success. Out of that $25 million, about $15 million went to Senegal, $5 million to Côte d'Ivoire, and $5 million to Mali. Among the main highlights for 2025 were a maiden MRE at Bantako, plus ongoing exploration at Ladji and Doropo. Looking ahead to 2026, though, we intend to keep spending at roughly similar levels, but with more emphasis on Côte d'Ivoire rather than Senegal, since most of the drilling in Senegal is now finished. We will still put some money into Senegal at Bantako and Tombo for infill exploration drilling. As I mentioned, most of this year's cash spend will be directed toward Côte d'Ivoire, because we see genuine value in the ABC and Ladji projects. I'll cover that in more detail on the slides coming up. Another important area of focus for the business, one that has been overlooked, is Guinea.

Chris Eger

executive
#26

We hold quite a few permits in Guinea, yet we've also been pursuing applications for additional ones, and I'm glad to report that we obtained first reconnaissance authorizations covering several permits in the Siguiri Basin, where our time and effort will begin in 2026. The triangle shown on the right-hand side of the page illustrates that we're building a solid pipeline toward a fourth asset inside the Resolute business. Exploration, once again, sits at the heart of what makes us successful, and we're devoting considerable time and effort to growing further projects in the portfolio. Turning to page 22, I'd like to focus a little longer on our ABC exploration project, located on the western side of Côte d'Ivoire. As the map shows, ABC is in fact made up of four key deposits. There's the Farakan-Nafana permit, visible at the very northern portion of the deposit, along with the Kona permit, the Windou permit and, most recently, the Bonanza permit. The majority of the initial resource sits entirely on Kona. That is where the 2.2 million inferred ounces at 0.9 g/t appear. During Q4 of 2025, we launched an extensive drill program covering all four of those deposits, and the results we're seeing are very exciting.

Chris Eger

executive
#27

For the Farakan-Nafana permit, located up in the northern section, we received some really exciting drill results — one hole came back at 31 m grading 2.4 g/t, starting 13 m down from surface. We've also begun drilling at Kona with the aim of growing that deposit, and the results there have been very strong. Drilling at least 20,000 m across the four separate areas is what we'll focus on this year, so we can expand the footprint. That said, we do want to establish economics for this project, and a scoping study has been commissioned; our hope is to put it out near the end of H1 2026, though it could slip to H2 of 2026. As soon as those figures are ready, we'll share them with the market. Much like the ABC project in Côte d'Ivoire, the Ladji project in Côte d'Ivoire has us very excited as well. It sits roughly 400 km northwest of Abidjan, and we picked it up in 2024. Considerable time and effort went into drilling out this deposit during 2025, and the MRE came in very successfully at about 643,000 oz at 1.14 g/t, published in Q4. That followed 16,000 m of drilling wrapped up in 2025. If you look at the map on the right-hand side, the resource sits in the northeast portion of the deposit, within the G3S and G3N zones.

Chris Eger

executive
#28

Those zones are showing gold that continues both at depth and along strike, so in 2026 we'll begin a little more drilling to prove out how large that deposit is and keep expanding it. We're also seeing some interesting anomalies over at the G1 area, which sits kind of in the middle, so we'll be putting time into drilling out that deposit too. The aim is to try and get this to at least 1 million oz, and much like ABC, we'll be looking to put out a scoping study report toward the end of H1 2026, possibly into H2, that will show the economics of this asset. So, to sum up, I do believe that with Ladji and ABC together, we have the makings of a fourth producing asset in the Resolute portfolio. With that, I'll hand things over to Dave Jackson to walk through the financial summary.

Dave Jackson

executive
#29

Thanks, Chris. Today I'll take you through the headline financial results for Q4 and the full year, with a focus on the key performance metrics. All in all, we finished the year on a strong note, and our Q4 metrics came in as expected. We keep strengthening the balance sheet and building cash within the business. Turning to the financial highlights, our year-to-date EBITDA came in at an impressive $383 million, a substantial rise from the $319 million reported in 2024. That performance was supported by revenue of $863 million, generated from selling 259,000 oz of gold at an average realized price of $3,338/oz. As mentioned previously, Resolute stays fully unhedged and keeps selling all of its gold at spot prices. At quarter end, net cash was $209 million, which marks a $72 million increase from Q3. The net cash figure includes $135 million of unsold bullion, representing nearly 31,000 oz of gold that were sold shortly after the quarter closed. We had $57 million drawn on overdraft facilities at quarter end. Those facilities continue to be used locally to optimize working capital. At present, the group has in-country overdraft facilities of approximately $113 million available, as we continue to maintain financial flexibility for the group.

Dave Jackson

executive
#30

For Q4, the group's all-in sustaining cost came in at $1,877/oz — that's $328/oz lower than what we saw in Q3. The main reason behind this drop was the anticipated rise in gold output at Syama. Looking at Syama on its own, all-in sustaining cost was below the Q3 level, helped by greater production and reduced sustaining capital expenditure. As I noted earlier, we've managed to work through the supply chain challenges in Mali, and because of that, Q4 ended up as Syama's second-strongest production quarter in 2025. Now let me take you through the main elements of our cash flow summary on the next slide, which produced a net cash position of $209 million at the close of Q4. During the quarter we generated a solid $86 million in operating cash flow, and $314 million for the full year. That marked a substantial increase over the comparable periods in 2024, mainly thanks to the rise in the gold price throughout the year. CapEx came to $118 million for year to date. That figure includes $24 million on exploration, $70 million in project capital across Syama and Mako, and $24 million on the SSCP. On the whole, both CapEx and exploration spend landed within guidance. As we noted before, during Q2 we made the initial $25 million payment for the acquisition of the Doropo and ABC projects.

Dave Jackson

executive
#31

These projects are exciting growth opportunities for the company and should deliver meaningful long-term value for our stakeholders. In 2025, VAT outflows came to $66 million across Mali and Senegal. We're pleased to report that we secured $34 million of VAT mandates in Senegal in 2025, which were applied against government payables. That said, VAT is still a source of cash leakage in Mali, and we keep engaging actively with the local government to recover those amounts. Our recent discussions have been positive, and we remain encouraged by the progress being made. Turning to working capital, we recorded a $29 million inflow for the year to date. That was driven by a $6 million reduction in consumable inventory across the group, a $10 million reduction in stockpile balances at both Syama and Mako, and a $13 million change in supplier payments, which are settled in the normal course of business. Our ending cash and bullion was $266 million, marking a $165 million increase from the beginning of the year. This leaves us with ample available liquidity of over $322 million at the end of December. As noted on our last call, we hold a stake in Loncor Gold worth approximately $31 million, which is currently being sold.

Dave Jackson

executive
#32

Those funds should come in during the first quarter of this year, and once we have them, we don't anticipate any tax effect on the proceeds. With a robust cash balance and plenty of liquidity behind us, the company is in a good position to cover all of its 2026 capital expenditure needs in full, including Doropo, using the cash we already hold along with the strong cash flows we anticipate in 2026. Right now we're talking with lenders about raising extra capital for the Doropo project, and we expect that to wrap up in 2026. The schedule for locking in any financing won't affect the Doropo timeline, since we expect to start construction as soon as the permits and FID are in hand. To sum up, our financial position is very solid, and we're enthusiastic about the growth potential of the business. With that, I'll turn it back to Chris.

Chris Eger

executive
#33

Thanks, Dave. All right, we've got just a few more slides to finish up the story. First, let's begin on page 28, which gives a qualitative overview of some of the key milestones we anticipate over the next few years. Let me focus specifically on 2026. Starting first in Côte d'Ivoire, the most significant item is that we expect to secure the mining permits and reach FID for the Doropo projects within the coming months. That will, obviously, formalize and launch the construction period for Doropo, but as Gavin indicated, we aren't slowing this down, and we believe we have the financial resources to carry out construction of the project without missing a beat, and to begin full construction and initial commissioning at the start of 2028. In addition, we're going to deliver economic studies on both Ladji and at ABC. Turning to Mali, we will be commissioning the SSCP and transitioning to almost 100% sulfide production and completing an optimization study. Then, looking at Senegal, the key activities center on permitting for both the Bantako and Tombo projects. We anticipate kicking off those permitting applications in 2026, and we'll keep the market updated. We have a lot on our plate.

Chris Eger

executive
#34

We're genuinely enthusiastic about the work we're doing. We likewise see enormous opportunities to keep pushing cost reductions throughout the company and to keep building and growing relationships with the governments in the places where we run operations. So, to sum up, once again we're extremely proud of what the business accomplished in 2025. We hit our production guidance. We kept costs in check across the company. We produced a significant amount of cash flow in the business, though that came with the backing of an environment of rising gold prices. Above all, we carried out our strategy by turning into a geographically diversified producer via the acquisition of the Doropo project in Côte d'Ivoire. We also delivered substantial gains in exploration by making it a key strategic priority for the business. I implemented a number of executive changes and strengthened the skill set of the people in the business, which matters incredibly for any mining operation. With all the pieces now in place, I have great confidence that 2026 will be very successful for us. Above all, we are well on track to become a half a million ounce producer starting in 2028. With that, I'll hand things over to the operator for questions. Thank you very much.

Operator

operator
#35

Thanks. We’re moving into the Q&A portion now. If you’re on the line and want to pose a question, please let us know by hitting star and then the number one on your phone’s keypad. We’ll take a brief pause to put the queue together. Our first question comes from Justin Chan at SCP. Go right ahead.

Justin Chan

analyst
#36

Hello, Chris, Dave, and the team. I appreciate your hosting this call. Since this is my first one, I mainly want some clarification on the explosives situation in Mali. I read that you intend to install an emulsion plant and that explosives are no longer a problem, so I was hoping for a little more detail — do you currently have a stockpile? And what is the timeline for the plant? Could you give us some additional color on that situation and, I suppose, how it develops over the course of the year?

Chris Eger

executive
#37

Good morning, Justin, and thank you for asking. Perhaps the simplest approach is for me to hand things over to Gavin. He's likely able to provide somewhat more detail on that than I could. Thanks.

Gavin Harris

executive
#38

Appreciate the question. Essentially, what we're doing right now is that any explosives arriving at site must be accompanied by Malian government forces, clearly because of the security conditions in Mali. What has been going on is that the government has been talking with our in-country team about setting up a brigade in effect to back the mining operations. We are now receiving considerably more escorts at the site. As things stand, the inventory held on site is sufficient for us to keep producing, and clearly to be somewhat more at ease regarding the difficulties we faced before. Beyond that, we've held talks with various suppliers about effectively constructing their own plants at site so they can make the products we require down the road. We've had a productive conversation with two suppliers on this, and we are awaiting final proposals before these get built. We anticipate construction during 2026. Clearly, bringing in raw materials that serve as precursors to explosives won't require government escorts, which makes matters much simpler. That really ought to resolve the problem we've experienced with explosives across 2025.

Justin Chan

analyst
#39

Understood. So to put it another way, the short-term problem is taken care of thanks to those convoys running more often and supplies arriving more frequently, while the emulsion plant is really the longer-term fix — though the timing for that in 2026 still has to be determined?

Chris Eger

executive
#40

Precisely — I think you've captured that well.

Justin Chan

analyst
#41

Perfect, thank you very much. So perhaps turning to Mali more generally, a couple of significant developments have taken place. Barrick reached an agreement with the government regarding Loulo-Gounkoto. And then there was considerable press coverage about the fuel blockades and so on around November last year. That situation appears to have improved a great deal, it sounds like, and I'm curious about the situation with Barrick reaching an agreement with the government. I believe previously companies were struggling to implement terms they had already agreed, simply because the government was preoccupied. Could you perhaps give us an update on what you're seeing in the country on both of those fronts?

Chris Eger

executive
#42

Yeah. Justin, I believe that, much like the others have noted, sentiment has shifted considerably compared with 2024 — it's far more positive and constructive now. We genuinely think that the resolution of the Barrick situation benefits both the industry and Mali. In my view, the government grasps what took place and the reasons behind it, and they're attempting to collaborate with the operators that remain in order to keep things more stable. Clearly there was somewhat more noise around security when Q4 began, and we've watched that kind of turn around. Sadly, it's more of the same, to some degree. We keep holding open and constructive talks with the governments, and we're trying to educate them about how we can collaborate on future investments — which is why we're conducting the phase two studies that we do alongside the government, to show that if we can work together, we believe there's growth in our business. Sadly, somewhat like 2025, I remain cautiously optimistic. We continue to be very cautious, since we need to witness a few more indications of reversal. A key activity we haven't been getting is VAT refunds coming back, and I think achieving that is a key milestone for future investments.

Chris Eger

executive
#43

Overall, sentiment feels considerably better and keeps moving that way. Things remain fragile, though. To put it briefly, I'd say security is likely holding up well, and fuel has not posed a problem since we have again been coordinating very closely with the government on convoys and on keeping our mine supplied, which has not been affected — yet it is still delicate.

Justin Chan

analyst
#44

Understood. Thanks, Chris. No, I appreciate it. That's genuinely useful context. Just one final question, and then I'll get off the line. I just want to clarify something about CapEx and exploration at Mako this year: the $10 to $15 million cited for CapEx — is that allocated to studies, and is it separate from the exploration budget for Mako this year?

Chris Eger

executive
#45

Yes, that's right. Most of it is study-related work. As I mentioned, we'll do somewhat more drilling at Bantako and less at Tombo, since we've essentially finished there. We'll spend more if additional areas turn up for exploration and expansion. The main thing is to finish the studies so we can submit our mining applications. After that, based on our cash requirements in '27 and '28, we might open things up a little. We hold two other deposits in Senegal, at Sengola and Laminia, and we'll be doing some work there. Given the resources we have, our focus will shift more toward Côte d'Ivoire.

Justin Chan

analyst
#46

Understood. So that would mostly be studies — not things like early site works or relocation, correct?

Chris Eger

executive
#47

Some capital expenditure is expected later in the year, and it hinges on when the mining applications come through—if they arrive near year-end. We'll begin what we'd describe as early site works, and that's mainly tied to the RAP, the relocation process at Tombo. Roughly $3 to $4 million is anticipated in Q4, assuming exploitation permits arrive as expected, though that could shift and slip into '27.

Justin Chan

analyst
#48

That’s great, Chris. Thanks — I really appreciate it.

Chris Eger

executive
#49

Appreciate it, Justin.

Operator

operator
#50

We'll take our next question from Jasper Mainwaring, who is on the line from Berenberg.

Jasper Mainwaring

analyst
#51

Go right ahead. Hello, everyone. I appreciate the updates. I only have two brief questions. Thank you for the detail on the CapEx at Syama this year. I simply wanted to ask how we ought to view that CapEx moving forward once this year's $170 to $190 million outlay is behind us?

Chris Eger

executive
#52

Good morning. That's a solid question, since I'm aware the figure is up this year — the reason being that we chose to direct somewhat more capital into the plant in practical terms, because, well, the plant has been running for more than 30 years and clearly a new TSF is needed. That accounts for the extra roughly $40 million in what we term capital projects, which is likely closer to a one-off item. My expectation is that next year, 2027, will come in nearer $30 million. Then, as I mentioned, we have over $40 million in waste stripping this year, and a substantial portion of that — half, in fact — is fresh stripping at the A21 Syama North zone. Looking ahead, I'd say runway CapEx sits nearer $30 to $50 million. For '27 it will likely land somewhat at the upper end, and after that it should begin to settle in the $30 to $40 million range.

Jasper Mainwaring

analyst
#53

Thanks. One more quick question: why did Syama's sales come in below what was produced during Q4, and were those ounces sold early in Q1?

Chris Eger

executive
#54

To sum things up once more, we closed the year holding roughly 30,000 oz of gold bullion — 31,000 oz, to be precise. The reason comes down to 31 December falling on a Wednesday, while our habit is to send gold out on Fridays. We had accumulated inventory equal to about 2 weeks' worth. Effectively, all of that metal went out during the first 10 days of January. That was a major factor behind EBITDA coming in below the guidance overall. It simply reflects the fact that a portion of those gold sales slipped into January, and that will affect the '26 figures.

Jasper Mainwaring

analyst
#55

Perfect, thanks a lot. I'll return it to the line now.

Operator

operator
#56

William Jones from Canaccord Genuity has our next question. The line is yours, go ahead.

Will Jones

analyst
#57

Good evening, Chris and Dave, and congratulations on a pretty good quarter. Most of my questions have already been answered. Perhaps just one, on trying to understand the grades going through the plant at Syama post '26. I know you quote a sort of 5% to 10% step-up. I gather grades are going to be impacted just by oxide feed. Just if you could provide some color on the grade of those oxide stocks going in at the plant over the 2 years. If that'll step up towards the reserve grades once those stockpiles are used? Probably firstly, and then secondly, just a bit of the strategy around utilizing those stockpiles.

Chris Eger

executive
#58

Yeah, thanks, Will. Gavin, perhaps you could take that one, just so we can see as we're going over the mine plans.

Gavin Harris

executive
#59

Appreciate the question. So, regarding the grades at Syama — clearly the sulfides we’re encountering are fairly solid grades coming from the Syama North A21 district. We anticipate improvement in those as we move ahead. Right now, for this year, they’re at roughly 2.3. There’ll be fluctuations in that over the course of the mine life, but we figure around 2 g/t is reasonable for what we’re currently looking at. Then for the underground, realistically grades will decline toward the end of the mine life, though certainly across the next few years, they’re at approximately 2.4 g/t as we move forward.

Will Jones

analyst
#60

Thanks for that. Look, I know there's only so much you can share here, but I'm curious how you're approaching the funding or the capital stack for Doropo. Is there some target leverage you have in mind, perhaps?

Chris Eger

executive
#61

That's a fair question, and honestly it keeps shifting as we go, given how much cash the business is throwing off. As Dave showed you, we're sitting with more than $300 million of liquidity right now. With gold where it is today, we're bringing in somewhere between $30 and $50 million of new cash each quarter. That leaves us well placed to cover most of the CapEx out of our own pocket, though we figure it makes sense to layer in some debt. The reason is that we'll need cash down the road for the MLEP program. I'd describe our thinking as roughly a 50 to 50 target split between equity and debt, though it could tilt a little more toward equity — and by equity I mean our cash — versus debt. Ultimately it's the cost of capital on that debt that decides it. What matters a great deal to us, given the cash generation in this business, and when I built her, is that we'll arrange a debt facility with plenty of flexibility, one that lets us repay it pretty fast without excessive penalties and costs. Look, we've been flooded with term sheets for funding Doropo, which reflects how attractive the project is and where it sits in the world.

Chris Eger

executive
#62

To echo Dave's point, we're moving through these steadily and there's no urgency on our side. Everything is progressing just as we anticipated, and we'll likely aim to have something set up near the close of H1, perhaps slipping into the start of H2, since either way our cash will be covering the project's front end.

Operator

operator
#63

Thanks a lot, everyone. I'll hand things over now. Just a reminder — if you'd like to pose a question, hit star and then the number 1 on your phone's keypad. Up next, we have Richard Knights from Barrenjoey on the line. Go right ahead.

Richard Knights

analyst
#64

Hey Chris, appreciate the call. I’ve just got one question about ABC. It seems like somewhat of a sleeper within the portfolio. You said there’s a scoping study that you’re aiming to release in H2. How fast do you believe you could convert that into a DFS and, in the end, an FID decision?

Chris Eger

executive
#65

Honestly, I'd say realistically we're looking at late 2027 for that. And I do agree with you — it's somewhat overlooked within the group. It's a great asset, and the footprint we hold there is really substantial. Depending on what the scoping study shows on the economics, we could look to accelerate it, though infill drilling still has to be completed. Since the permit contains multiple deposits, we'd have to work through where to begin and how we'd go about constructing that mine — a nice challenge to face, but the ore bodies differ considerably across the various zones. We simply need to get a better handle on that, yet we do see considerable strategic value in ABC and the way it sits contiguous with other deposits nearby. A mine at ABC will certainly get built at some stage.

Richard Knights

analyst
#66

Alright, thank you. I have one more question about Doropo. Regarding the $170 to $190 million in CapEx that you're aiming to spend this year, am I right in assuming that the entire amount is part of the $516 million total project CapEx build?

Chris Eger

executive
#67

You've got that right.

Richard Knights

analyst
#68

All right. Sounds good. Excellent. Appreciate it, Chris.

Chris Eger

executive
#69

Thanks, Richard. I appreciate it.

Operator

operator
#70

That brings us to the end of the Q&A portion — there are no more questions at this point. Today's call is now finished. We'd like to express our appreciation to all of you for joining us. You're welcome to disconnect your lines at this time. Have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Resolute Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Resolute Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Resolute Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.