Riot Platforms, Inc. (RIOT) Earnings Call Transcript & Summary

July 31, 2024

NASDAQ US Information Technology Software earnings 68 min

Earnings Call Speaker Segments

Phil McPherson

executive
#1

Thanks, Zico. Hello everyone, and welcome to the earnings conference call for Riot Platforms covering the second quarter of 2024. I'm Phil McPherson, and with me today from Riot are Jason Les, our CEO; Colin Yee, our CFO; and Jason Chung, Executive Vice President and Head of Corporate Development and Strategy. Our second quarter 2024 earnings press release, along with the earnings presentation that goes with it, is available on the Riot Investor Relations website; these materials are meant to complement today's prepared remarks and they contain a discussion of certain non-GAAP items. The non-GAAP financial measures we provide should not be viewed as a replacement for, or as better than, financial performance measures prepared in accordance with GAAP, and they are included as additional clarifying items to help investors gain a fuller understanding of how the company performed in the second quarter. On this call, we will be making forward-looking statements about potential future events. Such statements rest on management's current expectations and assumptions and carry risks and uncertainties. Actual results could differ materially because of factors covered in today's earnings press release, in comments and responses given during today's call, and in the Risk Factors section of our Form 10-K and Form 10-Q, including for the quarter ended June 30, 2024, which will be filed today after this call, along with other filings with the Securities and Exchange Commission. With that, I'll hand the call over to Jason Les, CEO of Riot Platforms.

Jason Les

executive
#2

Thanks, Phil, and good afternoon to all of you. Riot's main strategic priority has centered on growing a top-tier, vertically integrated Bitcoin mining business founded upon three essential pillars: first, creating and holding operations at a substantial scale; second, producing Bitcoin at a low cost; third, constructing a robust balance sheet. Throughout the second quarter of 2024, we showed achievement across each of those three pillars. Riot managed to energize our Corsicana site, boosting total deployed hash rate from 12 EH/s to 22 EH/s — a 77% rise quarter-over-quarter — and surpassing our quarter-end goal of 21 EH/s. We additionally lifted our 2024 deployed hash rate goal from 31 EH/s to 36 EH/s, along with our 2025 deployed hash rate goal from 40 EH/s to 56 EH/s. Thanks to our ongoing emphasis on preserving a solid balance sheet, these expansion plans stay completely funded. The second quarter of 2024 marked the initial quarter of Bitcoin production that mostly took place after the halving event, which happened in late April and brought about a cut in the Bitcoin block subsidy from 6.25 to 3.125 Bitcoin per block. On top of that, global hash rate climbed 6% quarter-over-quarter. When it comes to mining costs, both of these developments generated bearish headwinds for Bitcoin miners. Even with these developments, Riot's direct cost to mine during the second quarter stayed highly competitive and sat far beneath the average price per bitcoin for that quarter. Our distinctive power strategy helped produce these exceptional results, generating $13.9 million in power credits during the quarter, which led to an all-in cost of power of $0.027 per kilowatt hour for the quarter while simultaneously aiding the Texas grid when supply and demand faced disruption. After the second quarter of 2024 closed on July 23, Riot revealed the acquisition of Block Mining, a privately held Bitcoin miner that operates in Kentucky. This deal instantly contributes 60 megawatts of operating capacity, with room to rapidly grow to 110 megawatts this year by utilizing current infrastructure and a pipeline to reach more than 300 megawatts overall in Kentucky. That brings roughly 16 EH/s of total hash rate capacity and gives us a plainly defined growth path toward 2 gigawatts of potentially accessible power and 75 EH/s of potential hash rate deployed; we stay concentrated on growing and improving our Bitcoin mining business. Riot's emphasis is on maximizing Bitcoin mining results, and our strategy lets us carry this out at an unprecedented scale. At this point I'd like to hand the call over to Colin Yee, CFO of Riot Platforms.

Colin Yee

executive
#3

Thanks, Jason. It's great to be here to walk through Riot's Q2 2024 financial results, a quarter in which Riot hit several important milestones. To make things easy to follow, you can see a summary of the key financial and operating metrics for the second quarter of 2024 on Slide 5, so let's review a few highlights on the pages that come next. Riot is the owner and operator of the world's largest dedicated Bitcoin mining facility, Rockdale, and there we kept deploying miners and growing our self-mining capacity throughout the second quarter. On top of that, this past quarter Riot successfully energized our new Corsicana facility, which once fully developed will take Rockdale's place as the largest dedicated Bitcoin mining facility in the world. Thanks to the successful energization and development of Corsicana along with continued development at Rockdale, Riot closed the second quarter with an installed hash rate of 22 EH/s, which is up 106% compared with the second quarter of 2023 and above our earlier guidance of 21 EH/s. With additional growth in Kentucky coming from our acquisition of Block Mining, we now expect to reach a total self-mining hash rate capacity of 36 EH/s by the end of 2024, higher than our previous guidance of 31 EH/s. In the quarter, Riot mined 844 Bitcoin, down 52% from the 1,775 Bitcoin mined in the second quarter of 2023. That decline came mainly from the block subsidy halving event in April 2024 and the large rise in Bitcoin network difficulty, which was up 68% versus the second quarter of 2023. Still, because of the substantial growth in our hash rate capacity we expect over the rest of the year, we expect to produce more Bitcoin per day by the end of 2024 than we did in the first quarter of 2024, despite the halving. Riot finished the second quarter of 2024 holding 9,334 Bitcoin, 28% more than the 7,265 Bitcoin we held at the end of the second quarter of 2023. Riot kept retaining 100% of all Bitcoin produced in the second quarter; in the second quarter of 2024, Riot reported total revenue of $70 million, compared with $76.7 million in the second quarter of 2023, a 9% year-over-year decline. That drop was mainly due to lower revenue at the company's engineering division. In the quarter, Riot reclassified third-party hosting revenues and costs into other from Bitcoin mining, as previously reported in the first quarter of 2024. Non-GAAP gross profit for the quarter came to $30.3 million, versus non-GAAP gross profit of $26.2 million in the second quarter of 2023. Non-GAAP adjusted EBITDA for the quarter was a loss of $75.2 million, compared with non-GAAP adjusted EBITDA of $24.3 million in the second quarter of 2023. Riot adopted FASB's final crypto asset standard, which came out in December 2023, and now Riot records its Bitcoin at fair value, with fair value movements flowing through income. For reference, the Bitcoin price closed the first quarter of 2024 at $71,333, while the second quarter ended at $62,678. That produced a mark-to-market write-down of $76.4 million during the second quarter. The quarter's net loss came to $84.4 million, or $0.32 per share, versus a net loss of $27.4 million, or $0.16 per share, in the comparable 2023 period, which included a $76.4 million loss from the change in fair value of Bitcoin held, $32 million of noncash stock-based compensation expense, and $37.3 million of depreciation and amortization. Keep in mind that starting in the first quarter of 2024, we changed our mining hardware depreciation schedule from a 2-year to a 3-year schedule, reflecting our assessment of market practice and our own operating history. Bitcoin mining revenue for the second quarter of 2024 came to $55.8 million, up 12% from $49.7 million in the second quarter of 2023. Bitcoin mining cost of revenue is mostly made up of the direct production costs of Bitcoin mining operations, such as electricity, labor and insurance, but it leaves out depreciation and amortization. Bitcoin mining revenue above Bitcoin mining cost of revenue for the quarter was $20.5 million, a 37% margin, compared with $26.1 million, or a 52% margin, in the second quarter of 2023. The margin decline came mainly from the halving events and the big quarter-over-quarter jump in global hash rate. Had power credits been allocated directly to Bitcoin mining cost of revenue, that cost of revenue would have fallen by $13.9 million, lifting our Bitcoin mining margins to $34.4 million, or 62%, on a non-GAAP basis. Even though the global network hash rate rose from an average of 568 EH/s in the first quarter of 2024 to 604 EH/s, a 6% gain, and the Bitcoin halving occurred in April 2024, Riot's cost to produce Bitcoin in the second quarter rose only 9% per Bitcoin, and costs in dollar terms actually fell to $30.5 million from $36 million in the third — in the first quarter of 2024. Direct cost to mine this quarter was $25,327 per Bitcoin, with direct power costs making up $14,890, or 59%, of the total direct cost to mine a Bitcoin. Meanwhile, direct non-power costs, which include direct labor, miner insurance, miner and miner related equipment repairs, land lease and related property taxes, network costs and other utility expenses, totaled $10,437, or 41% per Bitcoin. As noted earlier, the halving's effect of raising the global network cash rate, along with a matching rise in network difficulty, were the main reasons behind the modest increase in Riot's average direct cost to mine Bitcoin in the second quarter. Power credits rose versus the first quarter of 2024, which helped counterbalance that. Revenue for Riot's engineering segment, which operates via its fully owned subsidiary ESS Metron, came in at $9.6 million during the second quarter of 2024, versus $19.3 million across the identical 3-month stretch in 2023 — a drop of $9.7 million. That decline stemmed mainly from supply chain constraints that cut receipts of materials, pushing back completion of some custom products and, as a result, the timing of revenue recognition. Switchgear and power distribution centers — our custom electrical products — serve as key components in data center development plus power generation and distribution facilities, and demand for them has grown given the steady rise in data center construction by developers along with ever-growing global demand for power. Gross profit for engineering this quarter reached $1.4 million, compared with $1.1 million of gross profit in the second quarter of 2023. We expect a robust second half of 2024 for our engineering business, fueled by continuing demand growth chiefly from data center customers and by wrapping up complex legacy projects. I'll hand the call back to Jason Les now.

Jason Les

executive
#4

Thanks, Colin. Now that Riot has moved into Kentucky, our total power capacity stands at 2 gigawatts, and we're making solid progress toward locking in the power needed for our 100 EH/s self-mining hash rate growth goal. The pipeline behind that growth is made up of 700 megawatts at our Rockdale facility, 1 gigawatt at our Corsicana facility, and over 300 megawatts of operating and potential capacity in Kentucky. After the second quarter of 2024 ended, Riot announced it was acquiring Block Mining, a private Bitcoin miner operating in Kentucky. This deal is Riot's first major acquisition since 2021 and its first strategic move outside Texas. Buying Block Mining instantly boosts Riot's hash rate while considerably enlarging our development pipeline of new growth opportunities, extends Riot's national footprint and brings our operations into new mining-friendly jurisdictions, adds exposure to new energy markets beyond ERCOT where Riot can keep applying our distinctive power strategy while helping support local grids, and brings in a seasoned management team that will keep running existing assets and draw on strong local relationships to generate further growth opportunities. Through our acquisition of Block Mining, Riot picked up two more operating data center facilities in Kentucky. The first is Commerce Drive, which right now runs 35 megawatts of capacity in Paducah, Kentucky. The second is Blue Steel, which currently runs 25 megawatts of capacity in nearby Calvert City, Kentucky, plus a greenfield expansion site also located in Kentucky. Both operating facilities already present immediate expansion opportunities. Commerce Drive could potentially be expanded to as much as 100 megawatts by leveraging existing infrastructure, and Blue Steel could be expanded to as much as 55 megawatts. Also, although roughly 18 megawatts of capacity is presently being used to host third-party miners on site, 8 megawatts of that capacity falls under change in control provisions that Riot plans to exercise, while the remaining hosting contracts will wind down across the next few quarters, adding further to Riot's self-mining capacity. Combined, both operating facilities currently run 1 EH/s in self-mining and 60 megawatts of power capacity, which we expect to grow to 4.8 EH/s of self-mining hash rate and 110 megawatts of power capacity by the end of this year. Coleman Road, Riot's new greenfield development site, has the potential to be developed to as much as 150 megawatts, which would raise the total expansion capacity from our Block Mining acquisition to 305 megawatts, a significant share of the extra capacity we need as we pursue our goal of reaching 100 EH/s of total capacity. Under Riot's existing MicroBT ASIC miner purchase option, which has a $16.50 per terahash price cap, Riot can fully develop these assets for about $345 million, or $30 million per EH/s deployed, inclusive of total consideration, or $21.8 million per EH/s when excluding the purchase consideration. When you look at what we spent historically during Phase 1 at Corsicana, it was roughly $40 million for each EH/s deployed, so this stacks up well against that. As a builder of Bitcoin mining infrastructure at low cost, and as a low-cost bitcoin miner, the Block Mining team has demonstrated real capability over time. Within the Midcontinent Independent System Operator, the MISO Power Grid, Block Mining's average power cost across the last year came to about $42 per megawatt hour, while average CapEx build-out cost was $210,000 per megawatt a day at Commerce Drive and Blue Steel. Being clear about our growth plan, and equally clear about where that growth will originate, has been something Riot has worked hard to deliver. In our view, showing visibility not only into overall growth plans but also into the particular sources behind that growth matters greatly if a Bitcoin miner wants to prove its growth forecast is credible. Because of the foundation we've built in recent years while concentrating on developing Corsicana, we now enjoy a clear route to substantial growth over the years ahead; that route takes in expansion possibilities at Rockdale, further development at Corsicana, capacity being added in Kentucky right away and in the near term, plus pipeline opportunities stemming from buying Block Mining. If we carry out all of these opportunities, together with our low-cost fixed price purchase options with MicroBT covering latest generation ASICs, total capacity will reach 75 EH/s, keeping us firmly on the path toward our longer-term target of 100 EH/s. Riot's fleet efficiency keeps getting better under our long-term purchase order with MicroBT, and it now stands at 24.5 joules per terahash. So far, new miners ordered from MicroBT have arrived on time or early, with about 77,734 miners now received and the great majority of them already deployed. Once more new generation MicroBT miners arrive and go into service, fleet efficiency across Riot will rise to 21 joules per terahash during 2025. Should Riot exercise its long-term purchase option covering 265,000 M66S miners, fleet efficiency would then go below 20 joules per terahash. Keeping a strong balance sheet, with substantial financial resources such as cash, marketable securities and Bitcoin holdings, remains a priority for Riot so we can create long-term value for shareholders. Thanks to our financial position, we are able to move decisively and keep scaling the business to capture the expanding opportunities within Bitcoin mining; with $639 million in cash and marketable securities plus 9,334 Bitcoin, that balance sheet strength lets us plan growth funding needs confidently in advance; indeed, capital expenditures of $694 million required by growth plans through the end of 2025 are already fully funded. The vision at Riot is to stand as the world's leading Bitcoin driven infrastructure platform. What we've been carrying out for a number of years is now producing outcomes that put us in position to make this vision a reality. Because of the approach we take, where we own and control each layer, we've built a growth pipeline of infrastructure that has no equal, allowing us to lift our hash rate 193% to 36 EH/s before this year wraps up, and in the end to hit our target of 100 EH/s in total self-mining hash rate. The strength of Riot's balance sheet is what makes it possible for us to meet those growth targets. Consequently, both our 2024 and 2025 growth plans have their funding secured in full. We couldn't be more thrilled about what Riot is getting done in 2024, and we're eager to deliver on the goals we've laid out. Thanks to each of you for tuning in to our presentation; at this point we'd like to turn the call over to your questions. Operator?

Phil McPherson

executive
#5

All right. Our first question comes from Greg Lewis at BTIG. Operator, could you please connect him?

Greg Lewis

analyst
#6

Greg, congratulations on getting Corsicana half fit — that was a long time coming. But my question concerns what comes after Corsicana. When we consider that next 600 megawatts, what else needs to occur to reach it — for example, obtaining more equipment, perhaps expanding the substation, and likely also, when we think about it, are any further approvals or permits required to get to that gigawatt in Corsicana?

Jason Les

executive
#7

Thanks for that question, Greg. First, we're quite encouraged by the results we're seeing at Corsicana. We're excited to scale up and take advantage of these benefits across the base of operations we've established. What makes Corsicana so valuable is that 1 gigawatt interconnect, which is already fully improved. We have 1 gigawatt approved with a large flexible load task force. We have the required FDA to access all that power, and all the required regulatory approvals are in place. So the next step toward building that second phase — that 600 megawatts — would involve procuring the transformers and equipment needed to expand the substation, plus all the equipment needed to construct an additional building. That means switchgear, medium voltage transformers, low voltage gear immersion tanks, et cetera. Now that we're starting to get some operating time under our belts at Corsicana, we can identify which products we prefer most for the second phase. We're very excited to monetize that full capacity of 1 gigawatt at Corsicana; we're making the development plans now for that second phase. We're going through the process, putting these together, getting bids from vendors; and I think in due course, we'll be able to share an update on what those plans look like in terms of timeline, cost, and other particulars about that. But we're very excited about taking that full site to the full 1 gigawatt.

Greg Lewis

analyst
#8

All right, wonderful. Then shifting direction slightly, when I consider ESS Metron and the deal to acquire it, I recognize that Riot is ESS Metron's number 1 customer. When we consider the possible capacity to expand or fill down, well, obviously, demand exists for ESS Metron's services equipment, and it appears only to be climbing alongside grid increases, growing need for data centers, and, clearly, growing need for Bitcoin mining. I suppose, when we consider the ability to grow that business across the next 2 to 3 years, how ought we to think about the possible opportunity to, say, put capital to work in that vertical in order to kind of obtain and perhaps release the potential ESS holds toward a wider market?

Jason Les

executive
#9

Yes; so to begin, as far as I know, Riot is in fact not ESS Metron's biggest customer. They have a — we're a small cost customer overall. As you're pointing out, Greg, with the growth of the AI HPC data center space, enormous demand exists at present. Their results, which we sort of mentioned briefly last quarter, have lately been affected by supply chain constraints and some significant legacy jobs that have been consuming all of their capacity. So we've taken a number of steps to ease that. During the second quarter, we believe the supply chain constraints — and we — once this job finishes, which is anticipated to occur in the second half of this year, now we'll be able to begin doing all these jobs in the data center AI HPC space. So we're quite enthusiastic about that. We are also — we've been working to obtain extra floor capacity, so they can complete more production simultaneously. And we have been examining other opportunities to grow that business too. So I lack a definitive number or any kind of guidance like that to provide you, Greg; yet I can say, beyond growing our Bitcoin mining business, we are concentrated on ensuring ESS Metron is prepared to seize the opportunity in the data center space too.

Phil McPherson

executive
#10

All right. We're ready now to take the following question, and that comes from Darren Aftahi of ROTH MKM. Operator?

Darren Aftahi

analyst
#11

Can you all hear me?

Jason Les

executive
#12

Yes, Darren, I can hear you.

Darren Aftahi

analyst
#13

Great. Two things, if I can. First, when we consider 75 EH/s rising to 100 EH/s, given that you folks acquired Block Mining and mentioned the cost per EH/s being better than Corsicana. I'm somewhat curious — with the entry point, perhaps during the prior halving cycle, there are just as many parties pursuing power assets, and now we sort of have a fresh category there. How are you fellows approaching reaching that target? And do you find it harder to secure bigger power assets, meaning organically above 100-plus megawatts? Will your expansion approach include additional acquisitions? Second question, clearly, all of us returned from Nashville. There's a significant presence on the conservative side. And I know there was some Democratic presence too; so Jason, I'm curious to hear your perspective regarding how you believe crypto and Bitcoin will factor into the election past simply the Republican party and even RFK, and then what your overall views are regarding Democrats, I think will eventually embrace this, you'll perhaps have an even stronger tailwind than what you currently enjoy?

Jason Les

executive
#14

Thank you, Darren. Okay. So first question on how we view reaching 75 EH/s? The basis of our business has been this vertically integrated approach in which we concentrate on obtaining access to power. So that's why we put Corsicana first beginning more than 2 years back, locking in that capacity so we'd possess that 1 gigawatt pipeline. So that remains our top priority at all times at Riot, how can we lock in this power capacity and we've succeeded in doing so organically by showing our results and our community benefit in Texas. And as you pointed out, Darren, we're doing so inorganically too. I believe Riot possesses the finest corporate development and M&A team within the industry. We are racing through every deal at all times; we're examining deals in extraordinary detail. And we're proceeding with those we consider accretive and those that will bring capacity to Riot; so you'll observe us doing both to reach our final goal; we're going to keep chasing organic opportunities, utilizing Riot's internal development and sourcing capability and we're going to be in the market reviewing deals. But as always, being extremely, extremely selective. Top priority, I'll just leave you with at Riot, is locking in this power capacity and obtaining the equipment required to build out that capacity. On to your second question regarding Nashville and public policy. So Riot had — we started investing in our public policy effort roughly 2 years back because we perceived the threat on the horizon around this whole space. We perceived an entire governmental tax on this industry. Regardless of whether it's Congress, the SEC, the White House, or the Treasury department, we've faced attacks from every direction; so we understood that to safeguard our company and the entire sector, we had to put money into this effort and collaborate with our peers, team up with industry organizations to inform and push this sector forward. We've achieved wins with both parties. Even though Nashville, as you're aware, was mostly Republican in attendance, we at the conference itself—plus before it and continuously—cooperate with several very committed Democrats who understand this matter and are simply attempting to move it ahead. What I believe we're witnessing unfold is the game theory folks use regarding Bitcoin and many other perspectives; it requires just one party to start adopting Bitcoin more within a regulatory structure and backing the sector to demonstrate to the opposing party why that matters. And I believe we're already observing that happen. Well-known Democrats who are friends to the States have been sending letters to the national party urging a change on this matter. There have been media stories about Vice President Harris's campaign seeking to connect with the sector and mend ties. So we view this as our approach succeeding in real time. As additional well-known politicians and legislators support Bitcoin, there's a motivation for other politicians to follow suit. And ultimately, Bitcoin will be a nonpartisan matter, since Bitcoin matters to everybody; that's what we're striving to achieve.

Phil McPherson

executive
#15

Our next question comes from Lucas Pipes at B. Riley Securities. Operator?

Lucas Pipes

analyst
#16

Thanks a lot, Phil. Good afternoon, everybody. Jason, I'd like to dig a bit into the HPC angle and how much focus it's been receiving across the industry. Several of your competitors are mentioning things like using gigawatts, megawatts to host GPUs. So how does Riot view this? First, when it comes to the portfolio of power that you hold? And second, on a wider level, how could it shape the industry?

Jason Les

executive
#17

Thanks, Lucas. Well, our plan for the business is to be the top Bitcoin miner in this space. Our thesis, roughly, is that no Bitcoin miner has yet nailed this, Riot included. Each company approaches it differently, and everybody is still working it out. So our aim is to put our time and our resources toward optimizing our Bitcoin mining operations, growing those operations, and becoming the strongest Bitcoin miner we can be. We think that across the long term, this foothold in Bitcoin mining, together with the price appreciation projected for Bitcoin, will deliver long-term returns. That will represent the most valuable use of our power. Although there's talk in the industry about some players securing contracts or getting into AI, that genuinely requires a different development capability. So from our standpoint, that would be a distraction. We would be splitting our operations in half; we'd be constructing a different kind of infrastructure that would be expensive or time-consuming to convert back to Bitcoin mining, or perhaps not feasible at all, if that — commercialization of that capacity didn't pan out. So we believe it matters to remain committed to our long-term strategy. Riot has always stayed consistent in building and developing Bitcoin mining assets. Now, how will this impact the entire industry? This recent AI HPC phenomenon? Well, I think what we're seeing is enormous competition for energy assets; these AI data centers are seeking capacity wherever they can locate it throughout the country. Honestly, for these assets to hit all of their capacity goals and their growth goals, they'll require more generation; we believe that in the end, loads such as Bitcoin mining help drive additional generation. But Bitcoin mining loads can be flexible, while AI HPC loads aren't necessarily flexible; so Bitcoin miners help supply that dependable baseload demand for energy generators, with the ability to shut off during peak time. And Bitcoin mining will serve as a tool to bring more generation forward. I still believe we hold an edge given what we can accomplish in various communities, operating in more rural areas where perhaps these other data centers aren't able to operate. I'd say it's tough to construct as well — and definitely pricier, to put together AI HPC infrastructure in an extremely warm climate where Bitcoin mining can be viable; so competition for power capacity is greater, and I believe that's demonstrating Riot's approach of putting priority on securing capacity right now — we've got this 1 gigawatt we're able to build upon; we possess the organic pipeline that already brings us quite near to reaching our final objectives.

Lucas Pipes

analyst
#18

Jason, I really appreciate the insight, and congrats on what you announced about Block Mining plus the information you gave us on the M&A approach. I'd like to hear about what comes next concerning your Bitfarms investment. Is there anything you're able to tell us right now?

Jason Les

executive
#19

Certainly. As things stand today at Bitfarms, there's no active proposal from us. I'm aware we went public with one some time back; it never went to shareholders for a tender; we put it out there essentially to illustrate the difficulties we're encountering with Bitfarms. Honestly, we're noticing certain corporate governance issues at Bitfarms. We hold the biggest single stake, and given the way their proposal was dealt with, given the way they dealt with our dealings with them by putting in place an off-market poison pill, we believe that Board is putting its own interests ahead of what it owes shareholders. Therefore, the sole item on our agenda for the immediate future is that special meeting set for October 29. We shifted that meeting's positioning, and Bitfarms has that meeting on the schedule. We've put forward 3 nominees whom we consider extremely well qualified and independent from both Riot and Bitfarms. Our belief is that getting those shareholders onto the Board will deliver the governance changes that are so badly needed there. So apart from that shareholder meeting, there's nothing else planned at this time.

Phil McPherson

executive
#20

Our next question will come from Regi Smith at JPMorgan. Operator?

Regi Smith

analyst
#21

Congratulations on the Corsicana deal and the Block Mining acquisition. I suppose this follows up on what Lucas asked. And I definitely understand the capital intensity and the risks involved in pivoting to HPC. What I want to ask you, Jason, is whether some kind of structure or price exists that might reduce those risks, or a partner that could reduce them? Do you envision a situation where you might look into this if the right deal structure or the right partner came to you?

Jason Les

executive
#22

Thank you for the question, Reggie. Clearly, at some price, things would become interesting. What we find challenging, I think, is that the pricing generally available out there is possibly below what we view as the long-term upside in Bitcoin once you account for uncertainty. Another challenge we're seeing in going after these contracts, I think, is their duration. If we look at the space today, I think Core Scientific has an excellent deal with CoreWeave. That deal is what has the whole industry excited about this. But nowhere yet have we seen it replicated. So my question becomes, is there demand out there for that same kind of deal structure, one that's very favorable to Core over a very long period? I think we're hearing industry chatter about whether there's even enough capital behind all the AI HPC development plans out there at the pace these applications are being commercialized. Around that, I think there's a lot of uncertainty. So, we are rational economic actors. So if at some point there was something that went incredibly beyond anything we could ever potentially do with Bitcoin mining, adjusted for the risk of that business line succeeding, yes, we would take a look at that. As things play out, I'm skeptical that, that's going to be the case.

Regi Smith

analyst
#23

Got it; that clears things up quite a bit, and I appreciate the additional detail. If I may squeeze in one more question, and this might not be a fair one to ask. We follow a number of miners, and we attempt to assess how efficiently they operate; and obviously, your company enjoys a cost edge. But what I was wondering is, from the inside, how do you measure your own operations when it comes to uptime? And is there room to make that better? Are you satisfied with where you stand — or, if not, what does the road toward better performance look like?

Jason Les

executive
#24

Yes, Reggie. Honestly, when you examine what we've posted in recent operating results, our uptime has not made us happy over the historical period, and that's the reason we've put so much emphasis on fixing it. That mostly shows up through what's happening at Corsicana; the infrastructure has been upgraded there. What we're seeing gives us a lot of optimism. It's still extremely early. We brought a huge amount of EH/s online all at once. We're fine-tuning it, getting it optimized as it ramps up across July. But what we've seen so far has us feeling very encouraged. And over time, we believe that will get better. And get better still. At the same time, at Rockdale, we've got many initiatives in motion. We've discussed swapping out certain miners that were causing problems for MicroBT units, and the operating results we're seeing there have us quite encouraged. So we hold ourselves to an extremely demanding standard. Reggie, honestly, that's likely the top priority at Riot at this moment, together with constructing the new capacity at Corsicana. And I believe that as we grow and apply this direct energy cost per Bitcoin across a broader and broader scale, paired with better operating uptime, we're going to see some — we anticipate seeing some materially better results here; our monthly update for July comes next week and you'll be able to see some of the progress we've already made on that front.

Phil McPherson

executive
#25

The following question is going to be taken by Joe Flynn from Compass Point Research & Trading. Can we get the operator on the line?

Joe Flynn

analyst
#26

I'd like to follow up on what Reggie asked regarding uptime. When we think about Q3, could you perhaps give us an update on the power strategy, and possibly any curtailment you expect given the hot summer months ahead?

Jason Les

executive
#27

I can't give you specific percentages for what we anticipate during the summer months. When it comes to the power strategy, during Q2 of 2024, we got — we hit a cost of power of $26 per megawatt hour at Rockdale; that figure includes our power strategy. And at Corsicana, simply purchasing power at spot and curtailing when demand is high, we hit a cost of power of $39 per megawatt hour. So taken together, our cost of power in Q2 was $27. August tends to be among the tougher months in ERCOT, both when it comes to heat and also — I mean as a result, the volatility that shows up in the power market. So if — up to now, Texas has had a fairly mild summer. I believe that's due to the fact that we've had both mild weather and a big increase in renewal generation brought online this year in Texas; so I think you ought to expect a solid cost of power for July, and then as we head into August, we'll find out whether this mild summer keeps up or not and how much curtailment results from that.

Joe Flynn

analyst
#28

That's useful. Could you also give us some detail on why cash SG&A went up sequentially? And how ought we to view that moving forward, particularly as Corsicana starts to scale?

Jason Les

executive
#29

Sure. The quarter-over-quarter rise in SG&A truly had nothing to do with Corsicana. The key number we feel great about this quarter is that our direct cost per Bitcoin, net of our power strategy, climbed just slightly, from roughly $24,000 to $25,000 per Bitcoin, even with the halving and even as difficulty kept rising. What explains that is our cheap energy; energy is the piece that grows linearly as we expand, while the remaining costs stay steadier. As for G&A, what drove that cash cost higher versus the prior quarter was mostly one-time advisory fees tied to M&A activity. So we continue to view our G&A run rate as roughly $25 million. These temporary expenses could push it higher should M&A opportunities pan out down the road. We also incurred some M&A advisory fees during the last quarter. Those, however, are not part of our ongoing cost operations.

Phil McPherson

executive
#30

Our next call comes from Martin Toner at ATB Capital. Operator? Martin?

Martin Toner

analyst
#31

Martin, apologies for that. A quick question regarding miners. Do you have any perspective on how we plan to obtain the miners needed to move from 70 EH/s up to 100 EH/s?

Jason Les

executive
#32

Through the MicroBT purchase option we already hold, Martin, we've got enough capacity locked in to reach that 100 EH/s. That assumes we exercise that MicroBT option in full for roughly 266,000 M66S miners. Naturally, the contract also lets us upgrade those machines, and thanks to efficiency gains, that would take us to an even higher hash rate. On top of that, we're constantly watching what every manufacturer is bringing to market. We test what's happening; we pose questions, we hold negotiations. Every piece of Riot's business is always open to competition, and we're pleased with the outcomes we see whenever manufacturers of any product are vying for our business. We've witnessed those advantages directly. So, Martin, the brief answer to what you asked is that the MicroBT purchase option we already have provides sufficient supply to reach 100 EH/s, though we're also exploring ways to go past that.

Martin Toner

analyst
#33

Great. My understanding is that you also reported some other revenue, which came from what's left of that hosting client. Could you provide a brief update on the current situation there?

Jason Les

executive
#34

Absolutely. I'll hand this over to Colin Yee, our CFO.

Colin Yee

executive
#35

Appreciate that, Jason. So Martin, when you look at where things stand with the hosting agreements we have with third parties, management, along with conversations we've had with our auditors, reached the conclusion that putting those revenues from third-party hosting, plus the costs tied to hosting, into others would give you more helpful information — so that's where you'll find them. As for where things sit right now on that front, those contracts, as you're aware, are mostly tied up in litigation. That means there's nothing further we're able to share.

Phil McPherson

executive
#36

Our next call is from Bill <<inaudible>> at Stifel.

Analyst

analyst
#37

Congrats again on the Block Mining deal that just closed. First off, I was wondering if you could give us your view on the economics of Bitcoin mining for the near to medium term. And how are those market dynamics affecting the M&A pipeline or the growth opportunities you already have? Riot clearly has a strong financial position in this market. Hoping for a bit more detail on that.

Jason Les

executive
#38

Yeah. Thanks, Bill, for asking. Bitcoin mining economics have been squeezed more than at any point before; during Q2, the industry hit a record-low hash price, and even now we're sitting at $46 per terahash per day — that's $46 per terahash per day. So it's certainly a tough period for Bitcoin mining economics. The halving happened, price hasn't risen much since then, yet network difficulty keeps climbing. That's exactly why we prioritize an extremely low cost of production and put the power strategy at the very front. I believe this sets up a situation where M&A opportunities can emerge. Some miners may be leaning on debt or have a financial structure such that these hash prices leave them unprofitable and unable to keep operating. That's the opening for a better-capitalized company, such as Riot, to step in — to locate opportunities. Another thing we see is miners who, because of these tight economics, must upgrade their fleets; their fleets are outdated, but they lack the capital to make the change. There, a partnership with Riot via an acquisition becomes a major win for both sides. So we're watching any opportunities that arise very carefully. As I mentioned, I'm extremely proud of the corporate development team we've built at Riot and the depth with which our entire team can assess transactions routinely, and we remain constantly interested in chances to keep expanding our operating footprint.

Analyst

analyst
#39

I appreciate you taking that question. Jason, it's clear your team holds an extremely optimistic view when it comes to Bitcoin and what lies ahead there. So I'd like to pose something from a broader perspective. Considering what took place during Bitcoin 2024 conference just last week, it's obvious this sector is now front and center and has built up considerable influence within politics. Trump <<inaudible>> all put forward certain versions of a proposal aimed at creating a strategic reserve and assisting with safeguarding the network hash rate here in the United States. I'm just wondering whether you foresee possible alignment eventually between the government and Bitcoin miners? Any thoughts on that.

Colin Yee

executive
#40

Yeah, I believe that's already happening, at minimum in foreign markets. Riot — a number of our rivals have formed alliances with sovereign wealth funds, which clearly represent an arm of the nation state, in order to turn excess capacity into revenue. Whether that will occur within the United States remains uncertain. My sense is we generally find the lowest energy prices and strongest energy markets in places where the ties between the government and power producers and utilities aren't as tight. Still, our core belief is — we're — is that Bitcoin mining serves as the perfect mechanism for stacking Bitcoin; when your energy cost is low — that being your primary input expense — an efficient operator can stack Bitcoin below what the market charges. So should a state possess underused assets along with the capability to do so, combined with a wish to stack Bitcoin, that strikes me as a sound approach. My guess is the United States would be somewhat slower to reach that point. I think and other countries, possibly those that are less democratic, can act more swiftly given the governments currently in place there. Yet over the long run, I believe we'll witness Bitcoin mining combined with energy assets across every layer of the stack. And naturally, that is going to — involve some form of partnership with government.

Phil McPherson

executive
#41

Our next question comes from Brett Knoblauch from Cantor Fitzgerald. Operator?

Brett Knoblauch

analyst
#42

Great. Perhaps one more thing regarding M&A. When you assess the chances that are sort of being presented to you, what exactly are you looking for? Is it the location? Could it be the size? Does it involve access to power? Or is it every one of those? Also, to what degree would you give priority to potentially bringing in more assets in the U.S. or ones internationally, where electricity expenses could be lower but, I suppose, the political climate might be somewhat less stable? And how do you all approach, I guess, just looking at that whole picture?

Jason Les

executive
#43

Thank you, Brett. I'll hand that over to Jason Chung, our Executive Vice President and Head of Corporate Development.

Jason Chung

executive
#44

Brett, I appreciate that question. That's a good one. I suppose I'll address it piece by piece. Regarding the initial aspect — what we examine whenever we evaluate M&A possibilities — power comes before anything else. Power is always the primary concern. That means both getting access to power and what that power costs, correct? Ours is a cyclical sector, and we aim to adopt a really long-range perspective regarding what that involves — what power costs represent for us at various moments in the cycle that we're aware will inevitably arrive. So locating access to power on a massive scale at a rate that makes economic sense is genuinely the foremost consideration, I'd say, for us whenever we assess opportunities. As for jurisdictions — moving into new U.S. markets — what makes the Block deal intriguing, for instance, is that it marked our initial purchase beyond ERCOT. Naturally, we know ERCOT extremely well and understand how its power markets function. However, our team has less familiarity with certain of these newer markets; and through Block, rather than merely buying operating assets, we additionally gained a team that constructed the Block business and possesses local ties plus regional knowledge in MISO; and that was genuinely another highly compelling element of that specific deal, which made it more appealing for us to chase and ultimately complete. So I'd say that regarding new markets, we clearly need to confirm we have the proper team and proper knowledge available to pursue that too. And to feel at ease functioning in an environment that will be — that will remain cyclical moving forward. On the international side, we — considering where we stand in this industry, we likewise observe plenty of opportunities beyond the U.S. I want to think we're among the initial calls folks place when they're looking to contact the major public miners regarding fresh international possibilities. The difficulty there resembles what happens even when simply stepping into new jurisdictions beyond ERCOT: how acquainted and comfortable are we with entering that unfamiliar market? Who are the counterparts we're engaging with? And in the end, even when it appears to offer a cheaper power price, do we believe the benefits exceed the possible dangers; so that's genuinely our method for assessing international opportunities; we aren't near that point, yet I believe the bar from a risk standpoint sits higher, meaning the benefit needed to counterbalance it must be proportionally higher too.

Brett Knoblauch

analyst
#45

Then possibly a single brief additional question regarding — I'm unsure whether you had any impression about the capacity auction that took place today within PGM. Do the Kentucky assets fall inside PGM, or not?

Jason Les

executive
#46

No. Our Kentucky assets sit in MISO as well as in the TVA, Tennessee Valley Authority. Therefore they are not in PGM.

Phil McPherson

executive
#47

Our next question is from Mike Grondahl at Northland Securities. Operator?

Mike Grondahl

analyst
#48

I've got one more question about that Kentucky deal. From your perspective, what operational hurdles does it present? Right now it's fairly small, though the growth appears quite substantial. What would you say those operational hurdles are?

Jason Les

executive
#49

I'll hand that one back to Jason Chung.

Jason Chung

executive
#50

Thanks, Jason. At this point, the team at Block Mining is running roughly 1 EH/s in self-mining capacity. Our goal is to raise that to reach the 15.8 target by the end of next year. And I believe one advantage — a strategic advantage of this transaction for both parties — is that what we're linking together is a tremendous opportunity for the team, expansion capacity that's available, combined with Riot's solid balance sheet and the capital we can put toward it. So I think near term, the emphasis will really be on expanding at the existing sites and also seizing the chance to secure additional power via new PPAs. They contribute the local relationships, while we contribute the capital and the capabilities to help get those done; so viewed that way, I think there's a genuinely compelling pairing of the two companies. But ultimately it will depend on simply executing the buildout and capitalizing on the growth opportunities we have in place.

Phil McPherson

executive
#51

Our next question comes from Mike Colonnese from H.C. Wainwright. Operator?

Mike Colonnese

analyst
#52

Congrats on everything moving forward in Kentucky, obviously. That represents a huge amount of hash rate over a brief period, so it's wonderful to watch. This is my first question. As you expand and transform Block Mining's opportunity pipeline over the near and longer term in Kentucky, are you planning to use air cooled or immersion infrastructure? And could you also tell us what you're observing in today's market regarding cost per megawatt for building air cooled compared with immersion? We've been hearing discussions that immersion is truly beginning to decline on a price per megawatt basis, and since you're experts here, I'd like your perspective.

Jason Les

executive
#53

Sure. So in Kentucky, Mike, we're going to construct a combination of air cooled and immersion. Right now, every one of their operations is air cooled. We do think, however, that immersion will probably be used for expansion, but we — I don't believe we'd seek to retrofit any existing air cooled operations, at minimum in the near term. I think those assets have demonstrated quite robust operating results with air cooling. When it comes to cost per megawatt, as with many items I think you encounter in this sector, it hinges on what you're factoring into that figure. And I think you might remember that at our Corsicana Investor Day and in our deck there, we provided a breakdown of cost per megawatt and the items included. So when we consider developing something like — for instance, Corsicana, what we factor in is the substation expansion required, since at that scale, we want to own that substation and capture the benefits it provides. Other operators, if they're developing at a smaller scale and don't need to build a substation, and instead are leasing capacity access, which lowers your upfront expense but carries its own risk just like whenever you lease rather than purchase and own, then you'll have a reduced CapEx cost. Regarding immersion, I think more and more participants are coming into this space. Some of the equipment — there's a lot of equipment involved; so perhaps you might get a better price, say, on a dry cooler, but maybe something else I think costs more, or perhaps the fluid is becoming less expensive while pump equipment costs more; so there's plenty of equipment there. I don't think we've observed too meaningful a shift in that market so far. But we're still working through receiving bids and figuring out what we'll assemble for a phase 2 expansion at Corsicana. So what that final pricing will be is somewhat to be determined. Once we've worked through that process, we'll be in a better position to respond to what you've asked.

Mike Colonnese

analyst
#54

Understood. Thanks for that detail. Now, in what way will you bring the Block Mining leadership group into Riot? Also, which notable assets and capabilities does this wider group genuinely deliver to the organization? I realize you pointed out the on-the-ground local ties with MISO. Yet are there additional significant capabilities or assets this group might contribute?

Jason Les

executive
#55

Right. The people at Block Mining have built that capacity extremely fast and shown really solid operational uptime. Thus they've proven themselves to be superb Bitcoin miners when it comes to both development and operations, and that benefits us greatly. Combine that with their regional connections and the capacity they've managed to lock in for expansion, and they're able to be there in Kentucky, continuing what they've already accomplished, excelling at their craft and scaling capacity in that area. In essence, they slot into Riot as our Kentucky division; naturally, we have the heart of our operations located in Texas. And now we also have this Kentucky branch as an operating foundation; the wonderful part is that every one of these groups can collaborate to exchange expertise. Bitcoin mining is a matter of accumulated knowledge built up over time. No manual exists for this; therefore everybody can trade what they've discovered succeeds and what fails and improve every team's performance; so we're delighted to have Block Mining aboard, or rather no longer Block Mining, but now Riot, Kentucky.

Phil McPherson

executive
#56

We've got one more question from John Todaro at Needham & Company. Operator?

John Todaro

analyst
#57

Nice work on the hash rate increase. I've got two things to ask. First, can you picture a scenario in which HPC and AI operations begin creating competitive strain on Bitcoin mining? Have you heard that even sites in Texas could work for those kinds of facilities? So do you envision a longer-term scenario, or perhaps Bitcoin mining gets forced out of the United States, or into even more far-flung places? That's my first question. Then for my second, I'm just curious whether you've looked into Jack Dorsey's new mining rigs — they struck that major agreement with Core Scientific. I'm just curious whether you have any opinions about that chip inside that rig.

Jason Les

executive
#58

Absolutely. I appreciate the question. Taking the second one first, I'll say that we're in conversations with every manufacturer and we assess things continuously. We've got an excellent team in place here. I won't offer remarks about any specific company's offerings while talks are still underway. So I'm aware Block has put substantial resources into reaching this objective. It's going to be quite fascinating to watch their progress. So we communicate with them just as we do with everybody else, but I'd rather not provide any direct remarks regarding anything that isn't already out in the public domain at this point. Regarding rivalry with AI and HPC, yes, I genuinely believe Bitcoin miners are going to be in competition with AI and HPC over power access. My view is that Bitcoin miners are somewhat simpler for the grid to grow comfortable with compared to AI HPC, thanks to how flexible our operations are; so I'd say it's a bit simpler. Bitcoin miners hold an edge in that regard when it comes to securing approval for capacity. Since Bitcoin mining remains our central priority, should additional capacity go toward AI and HPC, or should other miners redirect their capacity toward AI HPC rather than Bitcoin mining, the result is that network hash rate — and therefore Bitcoin mining difficulty — climbs more slowly, which benefits us; there's reduced competition.

Phil McPherson

executive
#59

All right. That brings us to the end of the question-and-answer portion. Everyone, thank you for being with us on Riot's call about our results for the second quarter, and we're eager to share how things are going when we speak again in November. Thanks so much.

Operator

operator
#60

Thanks so much. That brings us to the end of today's call. At this point, please go ahead and hang up your phones. We appreciate you joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Riot Platforms, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Riot Platforms, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Riot Platforms, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.