RWE Aktiengesellschaft (RWE) Earnings Call Transcript & Summary

August 12, 2021

Deutsche Boerse Xetra DE Utilities Independent Power and Renewable Electricity Producers earnings 60 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for joining the RWE call. Michael Muller, who serves as CFO of RWE AG, is going to bring you up to speed on how things developed during the first half of fiscal 2021. At this point I'll pass things over to Thomas Denny. Thanks.

Thomas Denny

executive
#2

Thanks, Jessica, and good afternoon, everyone, and thanks for being with us today as we discuss RWE's results for the first 6 months of the year. Our CFO, Michael Muller, is here with me, and he'll take you through the presentation before we move on to Q&A. Before we begin with H1, let me remind you to save the date for our Capital Market Day on 15th of November. I would have loved to meet you in person, but given the uncertainties caused by the pandemic, we have opted for a fully virtual event. Even so, I'm sure it will be a highlight in your H2 calendar, and I'm looking forward to our CMD in November. And with that, let's kick it off. Over to you, Michael.

Michael Müller

executive
#3

Yes. Thanks, Thomas, and good afternoon to our investors and analysts. The most interesting piece of news was likely already put out 2 weeks ago, regarding the raise of our guidance for the full year. So let's begin there. Following an outstanding trading performance during the first half of the year, we have raised the guidance not just for the division itself but also for RWE Group across all KPIs, from adjusted EBITDA to adjusted net income. That is great news, particularly given the difficult start we had to the year. In H2, adjusted EBITDA for our core business came in at EUR 1.2 billion, helped by high earning contributions from Supply & Trading. Adjusted EBITDA for the RWE Group came to EUR 1.8 billion. Net debt fell significantly, to EUR 0.9 billion, driven mainly by a strong adjusted operating cash flow, lower pension provisions and margin inflows. Another great success was the issuance of our first green bond at the start of June. The issuance drew strong interest in the market and was more than 3x oversubscribed. The bond carries a volume of EUR 500 million and a tenor of 10 years, with terms producing an annual return to maturity of 0.655%.

Michael Müller

executive
#4

These funds are going toward wind and solar projects. There's another new development as well: while extending our syndicated credit line, we tied the credit terms to 3 sustainability criteria. The first is the proportion of RWE's renewable assets within the overall generation portfolio; the second concerns lowering the carbon footprint of other lease assets; and the third is the percentage of green investments under the EU taxonomy. That makes our commitment to decarbonizing our portfolio very clear. Our construction program is more good news too. Every project is on track to surpass 13 gigawatts by the end of 2022. That said, 90% of the investments we made in the first half of the year qualify under the EU taxonomy. Now to the operational news. We have a couple of very interesting offshore auctions coming up, and for those we have teamed with experienced local players to build competitive consortia. In the New York Bite auction, expected in Q4, we will join forces with Natural Grid ventures. In Norway, we have partnered with Equinor in Hydro Rhine for the tender covering the SM-2 area, announced for Q1 2022. On Page 4, you can see the H1 performance at the EBITDA level.

Michael Müller

executive
#5

Core business adjusted EBITDA came in at EUR 1.2 billion, and that figure reflects the exceptional results turned in by Supply & Trading. In H1 2021, the earnings contribution from that segment reached EUR 525 million, which even exceeds last year's very strong showing. Even so, adjusted EBITDA is still feeling the impact of negative one-off items stemming from the Texas cold snap, and those items produced a loss of roughly EUR 400 million within the onshore wind solar division. On top of that, during H1, wind conditions came in weaker than usual for both wind divisions, especially when set against the very strong Q1 of last year, which ran well above average. Our hydro biomass division delivered a good earnings contribution, though it was slightly below last year's. Group adjusted EBITDA, which includes a solid performance from Coal/Nuclear, came in at almost EUR 1.8 billion. That is comparable to last year's numbers and represents a good result. Moving to Page 5. On the operations side, our installed wind and solar capacity reached 9.3 gigawatts at year-end. That follows commissioning of the 250-megawatt secured rich onshore wind farm and an increase at Rampion of an additional 80 gigawatts thanks to our larger stake. As we already announced on our Q1 earnings call, the Rampion transaction closed on the 1st of April, and both economically and in terms of capacity it is fully reflected as of Q2.

Michael Müller

executive
#6

Raymond West, our onshore wind park, came online at the close of July, which means the added capacity and the farm down will start showing up in the Q3 figures. I'm genuinely happy to share that we currently have 3.9 gigawatts of capacity in construction, with completion slated by 2022. That puts us on track to hit our build-out goal of more than 13 gigawatts by 2022. During Q2, we made investment decisions covering 400 megawatts, mainly solar projects in the U.S., along with solar and wind projects in Europe. Among these is our 150-megawatt fifth standard solar project in California, co-located with a battery exceeding 100 megawatts. In addition, a further 23-megawatt onshore wind project in France has reached final investment decision, as has the 17-megawatt Sanbostel onshore project in Germany. Every one of these projects should be fully commissioned in 2022. In light of the recent talk about rising component prices, I can assure you that all of these projects clear our internal hurdle rate. So let's move on to how the individual divisions performed. Ladies and gentlemen, adjusted EBITDA for offshore wind came to EUR 459 million after the first 6 months. Earnings came in lower because wind conditions during H1 were much weaker this year, both against normalized wind conditions and even more so against last year's very strong wind levels.

Michael Müller

executive
#7

The full consolidation of Rampion provided a slight offset to this. Gross cash investments came to EUR 1.1 billion, mainly spent on building the Triton Knoll offshore wind project in the U.K. Construction at Triton Knoll remains well on track. By the end of Q2, 13 out of 90 turbines in total had been commissioned. We expect earnings from the commissioning phase to begin in the third quarter and to ramp up over the remainder of the year. Beyond that, we have also directed investments toward the Sofia and Kaskasi projects. Offshore construction for the 342-megawatt Kaskasi project is set to begin at the end of the year. And finally, the deposit payment for the 3 gigawatt offshore seabed lease awarded in the U.K. around 4 has contributed further to cash investments. For the division, we confirm the full-year outlook of EUR 1.05 billion to EUR 1.25 billion. Turning to the onshore wind solar business on Page 7. At the end of H1, adjusted EBITDA for the division stood at minus EUR 42 million. The primary factor is the negative one-off tied to February's Texas cold snap. The financial impact is unchanged from the guidance we issued back in Q1, at approximately minus EUR 400 million.

Michael Müller

executive
#8

The book gain from writing down the Texas assets in Q1 partially offsets that. Both are flagged as nonrecurring items. Earnings were pushed down further by wind conditions in H1 of this year that were below normal, versus a very strong prior year. Added capacity was unable to fully make up for that. Gross cash investments came to EUR 665 million, distributed across a range of projects, including the 200 megawatts Hickory Park solar project with co-located storage, plus a number of smaller European projects. Gross investments derive mainly from the farm-down divestments — mainly the Q1 farm down of the Texas projects. All in all, we can confirm the full-year outlook of EUR 550 million to EUR 250 million. Adjusted EBITDA for our Hydro/Biomass/Gas division reached EUR 297 million in the first 6 months of '21. Earnings from the Dutch biomass operations were lower year-on-year in H1. That is a timing effect stemming from the subsidy scheme, which will reverse in this year's second half. On top of that, we receive no income from Georgia Biomass this year, since we divested that asset in summer 2020. By contrast, margins improved, thanks to slightly higher income from the British capacity market and very strong earnings from short-term optimization of our assets.

Michael Müller

executive
#9

Overall, the division turned in the results we anticipated, and we are able to affirm the full-year guidance of EUR 500 million to EUR 600 million. Now on to Supply & Trading. In H1, the Supply and Trading division delivered a standout trading performance, beating the already very strong results of the prior year. At an adjusted EBITDA of EUR 525 million, this division has already exceeded the financial year 2021 outlook that was provided in March. For the full year, as announced at the end of July, we have raised the division's outlook to significantly above EUR 350 million. Ladies and gentlemen, now that the core business has been covered, let's turn to Coal/Nuclear. Adjusted EBITDA at Coal/Nuclear came in at EUR 545 million. Earnings rose versus the prior year thanks to a higher realized hedge generation margin. That said, costs tied to the German phase-out have to be taken into account and are anticipated to rise gradually over the course of the year. Because of the flooding in Germany in the middle of July, we saw damage at the Inden mine, and consequently operations were temporarily restricted at the Vicevila power plant. In the meantime, work at the mine has restarted, and the mine has resumed delivering coal to the power station at full capacity.

Michael Müller

executive
#10

We estimate the EBITDA effect will come to roughly EUR 25 million this year and EUR 10 million next year. Even with that financial blow from the flooding, we are able to confirm our outlook of EUR 800 million to EUR 900 million for the full year. Now turning to what drives earnings down to adjusted net income. In H1, adjusted net income reached EUR 870 million, consistent with the favorable trend in adjusted EBITDA. For H1, the adjusted financial result is a bit above expectations, largely due to negative interest and elevated interest costs on FX derivatives. Included in the adjusted financial result is the E.ON dividend of EUR 186 million, paid during the second quarter. Compared with a year earlier, the adjusted financial result has improved substantially, since we booked a negative one-off last year. A general tax rate of 15% is used when applying adjustments in tax. By the end of June, adjusted minority interest had turned positive, thanks to an extraordinary effect tied to deferred taxes in the U.K. Once the higher U.K. tax rate from 2023 onwards took legal effect in Q1 this year, deferred tax liabilities had to be raised, which weighed negatively on minority shares of earnings.

Michael Müller

executive
#11

Looking at the whole year, we anticipate adjusted minority interest will come in near the guided figure of roughly minus EUR 100 million. Moving now to adjusted operating cash flow, which you'll find on Page 12. This measure captures how operating activities affect net debt. It gets adjusted for special items along with other effects that even out over time. During H1, adjusted operating cash flow came to EUR 1.7 billion, driven by the change in provisions and noncash items plus favorable working capital effects. That working capital benefit stems largely from lower trade receivables tied to energy sales, following the elevated levels seen at year-end 2020. Now turning to net debt details on Page 13. Net debt fell considerably, down to EUR 0.9 billion. Alongside the strong adjusted operating cash flow, this reflects timing effects, including variation margins stemming from hedging activities among other factors. Given the recent run-up in commodity prices, we've fielded questions about anticipated margin inflows over the years ahead. We'll broaden our disclosure going forward, offering specifics on net variation margins for our power generation activities across the liquid tenor and the corresponding cash outflows.

Michael Müller

executive
#12

That covers margins from selling generated electricity, plus margins on the fuels involved and on CO2. In H1 2021, we booked a net inflow of EUR 0.4 billion in margins for power generation hedging, versus the prior year. At June 30th, we had built up a net position of EUR 1.9 billion from variation margins on our power generation, and that lifted net debt positively. That position will reverse out across the coming 5 years. Naturally, every one of these figures rests on the premise that commodity prices stay stable. A further factor is the movement in provisions, including pension provisions, of roughly EUR 800 million, driven by higher discount rates. Assuming commodity prices and interest rates hold steady, the leverage factor ought to sit well below 3x net debt to core adjusted EBITDA by year-end. Last, let me turn to the outlook for the fiscal year. As I said earlier, unusually strong earnings from Supply & Trading have pushed up the earnings forecast for fiscal year 2021. So in July, we raised our outlook for this year. We now expect adjusted EBITDA of the core business to land between EUR 2.15 billion and EUR 2.55 billion. Adjusted EBITDA for the group is now expected to fall between EUR 3.0 billion and EUR 3.4 billion, with adjusted EBIT between EUR 1.5 billion and EUR 1.9 billion.

Michael Müller

executive
#13

In addition, we raised our guidance for adjusted net income, and it now sits in a range of EUR 1.05 billion to EUR 1.4 billion. For this year, we reaffirm the dividend target of EUR 0.90 per share. There will be an update on dividend policy at the CMD in November, and it will center on the need to strike a balance between growth and dividend payments. That update will rest on group earnings, and we have to take into account the drop in coal and nuclear results over the next years, which calls for significant green investments to offset it. Since we also got many questions about the effect of the further -- of the future higher U.K. tax rates, we anticipate our general tax rate rising in line with that to 20% in 2023. That brings my remarks to a close, and I am now happy to take your questions.

Thomas Denny

executive
#14

Thanks, Michael. Operator, could we open up the Q&A portion now? Let's take the first question.

Operator

operator
#15

<<operator_script>> Our initial question is from Peter Bisztyga at BofA Securities.

Peter Bisztyga

analyst
#16

To start with component price inflation. What you said about IRRs before came across as a bit cryptic. So I'm trying to work out whether you mean you're observing some cost inflation but still keeping IRR steady, or whether you aren't observing any cost inflation at all. Could you clarify what your exposure is? Are any turbine OEMs attempting to renegotiate contracts? Any detail on that would be very helpful. Then — my second question concerns your variation margins. Thank you for the extra disclosure. That's very helpful. But I'm wondering whether you could break out what happened in Q2 versus what we saw in Q1, please, on those numbers?

Michael Müller

executive
#17

Yes. Peter, thanks for that question. So regarding component prices, what we'd like to convey is that you have to view this across various time frames. First off, every project currently being built is covered by fixed contracts, so we face no commodity price exposure there. Clearly, for those projects still in development, there are possible negotiations with suppliers about pricing. Clearly, not every one of those ideas ultimately comes to fruition. And second, clearly, steel prices also represent just a minor share of total CapEx. And when you examine the investments, the return calculation includes other significant elements beyond merely component prices. And what we'd like to convey is that you should not worry about any effect from this on our returns. So they remain within the guided range of 100 to 300 above our cost of capital, as we have guided. And clearly, for any projects in the foreseeable future, we need to observe what actually happens with commodity prices, whether they stay at this elevated level on a lasting basis, and that probably then also affects auction prices and so forth.

Michael Müller

executive
#18

Right, when it comes to variation margins, I’ll pass it over to Thomas so he can provide the exact figure.

Thomas Denny

executive
#19

Yes. Thanks, Peter. I don't actually have that figure on hand right now, but I'll look it up once the call wraps and send it your way later this afternoon. Does that work?

Peter Bisztyga

analyst
#20

Okay, yeah, thank you very much.

Operator

operator
#21

Moving on, our next question comes from Alberto Gandolfi at Goldman Sachs.

Alberto Gandolfi

analyst
#22

Alright, I’ve got 2 questions, please. The first one is again about cost inflation — I just want to dig a little deeper here. Would you agree there’s somewhat more risk in the offshore business than in onshore? On onshore, I’m not referring to the 3.9 gigawatts you’re developing at the moment. I understand that on those costs, procurement costs are fixed. But would you say, for example, on Sofia that between the time you’re bidding and the time you’re actually paying the bill for the equipment — or perhaps you haven’t fully contracted all transport vessels — that leaves some exposure? Am I right in thinking that? And maybe, I don’t know if you can quantify any of it. The second question is theoretical. I hope you can answer; if not, I have a backup question, if you don’t mind. But the question is, we’ve been reading in the press about the possibility that, perhaps with the new government coalition, your lignite activities could be shut down in 2030 instead of 2038. Considering the very successful financial hedges you’ve already put in place on carbon, under that scenario, do these contracts give you the possibility of sitting on a long carbon position that you may be able to monetize before 2030?

Alberto Gandolfi

analyst
#23

Could you sell a portion of those surplus allowances at 57%, 58%, and perhaps pay 20, 25, 30, and record monster capital gains for a few years?

Michael Müller

executive
#24

Yeah, thanks for that question. On the first one, offshore versus onshore and which carries more risk — well, yes, offshore does have a somewhat greater exposure, purely because those projects use more steel. That's a fair point to make. And you're also correct that there's some timing mix between the auctions and when you actually reach the financial — the investment decision. On the other side, I'd say offshore projects also give you more chances to optimize things. So when you're talking about turbine size or O&M activities, those aspects matter much more for offshore relative to the overall business case. So going back to your hypothesis that offshore is either more or less exposed — I wouldn't go along with that argument. The second question concerns the coal exit. You framed it as future assets, but that's clearly speculation at this point. The contract itself provides for coal closure by 2038, and it includes an option to move that up to 2035 — that's what the contract states. The contract says nothing, though, about our carbon certificates. So that's essentially our own matter. But keep in mind that the hedges we have in place right now are meant to match the implicit exposure coming from the fleet.

Michael Müller

executive
#25

Basically, to put it briefly, what I was trying to convey is that we are, of course, discussing internally what possible alternatives might exist. But it's premature to comment on anything at this point, and we simply have to see how things actually unfold. That said, overall, I think we're quite pleased with the hedges we've got in place, considering how development prices are currently moving. That's certain -- regarding commodity prices. That's certain.

Operator

operator
#26

Our following question is from Rob Pulleyn, who is with Morgan Stanley.

Rob Pulleyn

analyst
#27

Rob Pulleyn at Morgan Stanley. Let me build on the inflation question, and I guess this is a question with several parts. My assumption is that you carry CapEx contingencies for each project. And I was wondering what percentage of CapEx that tends to be? And where does cost inflation begin to eat into that — in other words, are those contingencies holding up? Or have they already been used up. I think that would give us considerably more color on how much risk sits around the IRR targets. And I guess the second question tied to that, as you said in your prepared remarks, Kaskasi will, I suppose, begin spending in 4Q. I was wondering whether any of those costs get locked in ahead of the framework agreements, warehousing steel, et cetera, et cetera.

Michael Müller

executive
#28

Yes. I mean, let's begin with Kaskasi. So yes, everything was locked in. And as you rightly said, it will kick in during the second half. Speaking of the contingency — obviously, I can't reveal right now what contingency we typically have in those projects. But I mean, yes, we do have contingencies in there, and the contingencies are — I mean, one of the reasons for having contingency is also a price volatility. So that's for sure. So therefore, what I definitely can assure is that there is sufficient contingency in the project to cope with price increases, but exact numbers, I obviously can't reveal yet.

Rob Pulleyn

analyst
#29

No, that makes sense. And I appreciate the detail — that's great. If I could slip in one more question, and it's actually about something else. But I think all of us have noticed the quite striking gap that has opened up between coal spreads and gas spreads in Germany. From where you sit, I'm curious how long you think this will last?

Thomas Denny

executive
#30

My view is that no crystal ball is needed for us to respond to that. Of course, we do hold a view. That said, a second issue arises as to whether we're able to share it with you. So please understand that on this call we really cannot comment on future or commodity prices.

Operator

operator
#31

Our following question is from Deepa Venkateswaran with Bernstein.

Deepa Venkateswaran

analyst
#32

Alright, I have 2 questions. First, regarding the variation margin, could you help me make sense of a few figures I'm struggling with? I believe you said there was an inflow of roughly EUR 400 million in H1. How does that square with the EUR 3.3 billion shown as other changes in financial debt on Page 13? And I also read in your note that fair value adjustments to OCI have offset impairments in the lignite assets of about EUR 800 million. So I'm just trying to reconcile this EUR 400 million, EUR 800 million and the EUR 3.3 billion. That's the first question on variation margin. And maybe there is something else going on as well — if you could just help me understand what the delta is between the EUR 3.3 billion and the EUR 0.4 billion. And I think the second question is on your stake in E.ON. I believe we're probably at the point where maybe you are permitted to basically go down to whatever level you want. How are you thinking about the E.ON stake? Or do we sort of need to wait for your CMD to have more clarity on where the stake sits in the bigger picture?

Michael Müller

executive
#33

Yes, Deepa. Let's walk through what else is driving the change in net financial debt. Several components sit inside that figure. The first concerns margins coming from our generation hedging. As I said, that covers not just CO2 but also the fuel and the power that we sell, right? We think it matters to spell this out, since it has to be viewed alongside the guidance we give for the conventional segments, because that guidance naturally factors in the hedging. So our aim is to prevent this item from being counted twice. What else is in there? Well, there are variation margins stemming from our trading business, and those are inherently quite volatile. That volatility means it is plainly unrelated to performance — it simply reflects the positions. So volatility shows up there. Then you correctly — or at least implicitly — brought up CO2, the strategic CO2 position, and that too is part of it. On top of that, there are effects such as the cash returned to us from a tax audit covering earlier periods, meaning before 2012, and that likewise sits within the numbers. Your second question, on the E.ON...

Deepa Venkateswaran

analyst
#34

Sorry, may I ask a follow-up to what you said? So the EUR 800 million is sort of additional to the EUR 400 million. And regarding the middle portion, right, the trading business, should we expect that to unwind, because clearly, when we think about net debt for next year and so forth, I suppose we'd like to know how much of this would unwind in the normal course of business, so within roughly the next 6 months. And as a result, should that be adjusted for in valuing you?

Michael Müller

executive
#35

The trading part, like I said, is quite volatile. So that will likely reverse over the next -- this year or in the years ahead. So fairly near term, but you never know how commodity prices will move, so it could just as well go the other way. And regarding the figures you derived from the OCI, you should also be somewhat cautious, since that isn't directly tied to those 2 numbers. Then the next question about the E.ON stake. As you're aware, the E.ON stake in itself carries no strategic importance for us. So we've always stated that should attractive investment opportunities arise, we would also deploy the proceeds -- at least the excess proceeds from the E.ON stake, because you know that we have also set the E.ON stake against our lignite provisions. So a portion of it is tied up against that. So there is certainly some headroom we could deploy for investments. But if you look at -- our financial position, there's currently no necessity to divest that asset. And as we also said, there is currently a tax benefit as long as we retain 15%.

Michael Müller

executive
#36

So in the end, that's the trade-off. We have to decide what our view is on the stake. Do we have investment needs? And is that the best financing at that moment in time or not.

Operator

operator
#37

Our following question is from Sam Arie at UBS.

Sam Arie

analyst
#38

I'd like to pose one question about coal and another about renewables, if that works. Regarding coal, I believe Alberto said earlier that there's been press discussion about certain political groups possibly wanting to move the coal exit target to an earlier date. From what I understand, your existing signed contract gives you some protection against that. Could you comment on what that contract says concerning state approval? I think it's correct that the contract remains valid even if there were an issue with state aid. But could you take us through the specifics of that so we can understand it? And then second, on renewables — let's focus on the positives as well. I was wondering whether you could share your current thinking on the U.S.; we've clearly seen the large infrastructure bill pass, and there's talk of an extra EUR 3 trillion, EUR 4 trillion reconciliation bill containing a lot of money for the clean energy sector, which is starting to make the U.S. look like a really exceptionally interesting market. It would be really interesting to hear how you're thinking about the U.S.

Sam Arie

analyst
#39

And how big a role do you expect the U.S. to play in your plans?

Michael Müller

executive
#40

Yes, thank you for asking. So, regarding that EUR 2.6 billion, as you're aware, the European Commission is in the middle of reviewing it right now. That's just how the process works. Of course — I should say, we aren't taking part directly in that review, since formally it's the federal government of Germany that's involved. That said, we are certainly engaged and we are providing support. Regrettably, I'm not able to say anything about that process. It's still ongoing, questions are being exchanged at this point, and we'll have to see where it leads. Still, as we've said before, we feel very confident about the EUR 2.6 billion. And the contract contains provisions that, should we not receive the EUR 2.6 billion, require us to identify measures that would put us in a comparable position to where we were before. That's the state of the contract, and at this point we need to watch how this approval from the year commission unfolds. But as I mentioned, we're confident in our arguments on this. The other thing I'd like to bring up is that, clearly, there are quite a few discussions happening in Berlin right now about the path ahead for conventional generation and renewables. And what politicians are genuinely coming to see is that the key lever for reducing coal is expanding renewals.

Michael Müller

executive
#41

Their focus is clearly also on finding ways to speed up and guarantee a sufficient build-out of renewables. And once that takes place, the effect on coal will follow automatically. And I mean, given our business model, you can obviously understand that this is what we are pushing for. So we are giving the government support on which relevant levers need to be pulled to accelerate the build-out, because I think, first, it is good for the decarbonization of society. And second, it also fits our business model perfectly. So that is the direction we should be looking at. On the question about the U.S.: one aspect is the strategic one — we clearly regard the U.S. as one of our core markets. And I think the whole sentiment there, as in Europe, is shifting toward more renewables, and the infrastructure is an important element too, because it leads to investment into grid infrastructure, which also matters to cope with the greater volatility you get from the renewable build-out. So it is definitely heading in the right direction. But it is too early to comment on the exact impact, because it is not yet clear how legislation and the impact on renewables will exactly be.

Michael Müller

executive
#42

That’s something we’re watching carefully, but one clear strategic direction for us is to keep building out in the U.S., since we believe it’s an attractive market going forward.

Sam Arie

analyst
#43

That's really useful on both of those topics. If I could just offer one observation from where I sit, it strikes me as quite remarkable how little value the market assigns to your renewable business, particularly once you take into account the exposure you have to the U.S. and to Europe, and the fact that you aren't exposed to some of what some people might regard as lower-value geographies around the world — Latin America, Africa, certain parts of Asia, and so on. So I think it's great to have that conversation with you about the U.S. alongside these other points.

Michael Müller

executive
#44

That's great. Well, I appreciate that remark.

Operator

operator
#45

We’ll take our next question from Lueder Schumacher at Societe Generale.

Lueder Schumacher

analyst
#46

I have a couple of questions. The first is pretty simple. Did I understand correctly that you stated the variation margin at June's close was EUR 1.9 billion? If that's not right, could you confirm the total variation margin at the end of H1? My second question is also fairly simple. On Slide 10, you said higher realized hedge generation margins were among the drivers of the performance. Is that only compared with 2020? Or has the old hedge of EUR 32-megawatt hour actually gotten better?

Michael Müller

executive
#47

Yes. Lueder, thank you for that question. So, first, regarding variation margin — and this also addresses the question Deepa raised — the EUR 1.9 billion figure represents the cumulative value of hedge variation margins tied to our power hedging in the liquid tenor. That covers power, the fuels, and CO2. That said, within the accumulated position of other changes in net financial debt, there are additional margin payments — as I mentioned, for the trading business, and also for our strategic position — but those are positions we cannot disclose, for, well, market-competitive reasons. Yes. But the first one...

Lueder Schumacher

analyst
#48

If you’re unable to disclose details on that, that’s fine—completely understandable. Still, to calculate the relevant total net debt figure, having total variation margin across every business line—not only power hedging—would be quite useful. Could you share that with us?

Thomas Denny

executive
#49

Yes. I think you have to decide what your model needs to capture. What we can share with you is essentially the margin, or what gets inflated to our liquid tenor over the hedge period, where we're also providing some earnings guidance. That's what we've disclosed so you can make an apples-to-apples comparison. I think it matters here, and it can differ, including in how you consider the other piece as well. We've also had an inflow of margins, but that really hinges on how you've constructed your models and how you capture it in your valuation. So I think a general answer isn't possible, since this is a very specific question, but of course we can dig into more detail, we understand how you're approaching it from the formulation perspective. Then I'll see how I can assist you with that. But I think it's hard to answer on this call.

Michael Müller

executive
#50

Yes. And on your second question, Lueder — you've got it right. That rise is tied to the prior year.

Lueder Schumacher

analyst
#51

So it's still at EUR 32 per megawatt hour?

Michael Müller

executive
#52

Yes.

Operator

operator
#53

Vincent Ayral with JPMorgan has the next question.

Vincent Ayral

analyst
#54

I believe the questions about suppliers and <<inaudible>> have already been covered. In any case, much more of it relates to CO2, since those prices are the mission, which is the hedging. It's material information that needs a better understanding of its exposure going forward, whether from the profitability outlook or from a balance sheet perspective. So it's a straightforward question, and I'll ask it just in case this time it works: how many allowances do you have? And otherwise, you say you fully hedge until 2030. So does that also include the CCGT fleet? What load factors for lignite and CCGT do you assume, so we can try to do some work with this?

Michael Müller

executive
#55

Apologies, I missed the initial question.

Vincent Ayral

analyst
#56

To put it simply, I'd like to know the exact count of CO2 allowances you hold. If you'd rather not disclose that, then here's my alternative: you've said you're hedged through 2030, so I'm asking whether the CCGT fleet is part of that hedged position. And if it is, what load factors are you applying to your fossil units — lignite and the CCGTs? That way we can build an estimate along those lines. I already have a few figures in hand, but it's hard to be certain about them.

Michael Müller

executive
#57

Yes. So please realize that I’m not able to disclose how many CO2 certificates sit on our balance sheet. But what matters, I think, is grasping our hedging approach, and you need to separate 2 distinct aspects. The first one — and this is where we provided guidance on the variation margin — is the liquid tenor. Clearly, within the liquid tenor, each time we sell power, we simultaneously purchase the CO2 needed to generate that power. So during that period, there’s a clean hedge between power and the CO2 you require. And that’s obviously also where you have larger CO2 volumes, but those must be surrendered for the days that — in the year after you produce it. So that’s one element. The second element is then in later years, where our strategic position sits. And what we’ve hedged there serves only to align our portfolio with the market. Because if you examine our portfolio, we do carry a higher carbon exposure than the German portfolio. And that’s why this delta is hedged with CO2, so that effectively whenever CO2 prices rise, that should offset the delta that is not — the power price is not rising, so that financially, our position always remains the same.

Michael Müller

executive
#58

And based on what we've seen over recent months, that hedge is in fact performing exactly as intended.

Vincent Ayral

analyst
#59

So what you're describing is the approach you previously framed as medium-term, where essentially you remain exposed simply to how the synthetic fossil evolves?

Thomas Denny

executive
#60

Like Michael mentioned in year one—I mean, during the first 1 to 3 years we're always fully hedged, and after that we're implicitly hedged. We simply carry the exposure for gas spreads or <<inaudible>>, it depends on what the market looks like. But that takes care of—let's say—the liquid tenor of the hedging. And that's also where we've received an earnings forecast from us. For this year, for next year, for the nuclear already the year. Yet that is clearly kept apart from, let's say, the illiquid tenor, which covers the second half of the decade, where—as Michael said—we've only hedged our excess carbon intensity versus the market. Of course, though, you can't hedge any power or fuel or carbon emissions, because it's still too far out and there's no liquid power price available for the year. So that's why you actually need to separate both topics from each other. And that's also why we've clearly disclosed the valuation market tied to the earlier parts of the illiquid tenor, where we've likewise given you the earnings guidance for that.

Operator

operator
#61

Our next question is from John Musk of RBC.

John Musk

analyst
#62

Yes, I have 2 questions. First, taking a step back, with the balance sheet in a stronger position—and we can talk about variation margins at a later point—how are you now approaching capital allocation between organic opportunities and the potential need to build a bigger foothold via acquisitions? I realize this may be something you'll address more at the CMD, but should we still regard acquisitions as very much part of your strategy? And second, maybe simpler: could you just separate out, from the H1 numbers, the negative effect that lower wind speeds had on EBITDA?

Michael Müller

executive
#63

Yes. John, we'll take the simpler one first. That's the effect. On offshore wind, I believe it comes to roughly EUR 150 million versus a year earlier. And for onshore, it's EUR 50 million compared with the prior year. That's in the segment, driven by weaker winds relative to the unusually strong winds during the earlier year. Now, on your question about the balance sheet — to give you a sense of how we see things — obviously, our entire organization is built to expand the business organically. Organic growth is therefore the priority. That said, should appealing opportunities appear in the market — as we showed with the Pegasus pipeline, which in our view is a perfect fit for our portfolio — and if you can obtain them at a good price as well, that is certainly something we're examining. But the clear perspective — the clear objective — is to grow the portfolio organically, and that is also what we need our balance sheet for. And as I mentioned, we're well positioned to go after that.

Operator

operator
#64

<<operator_script>> Our following question is from Olly Jeffery of Deutsche Bank.

Olly Jeffery

analyst
#65

I have two questions as well, please. My first one is simply about build-out. So in the full year results, the residual target needed to reach 13 gigawatts by 2022 was 1.1 gigawatts, and obviously you've now found that within 6 months. Is that roughly a suitable run rate that we could expect to carry on in the second half? And when you're finding products in 2022, for example, at what point do you expect that they will be built by the end of the year? Or are they more likely to contribute to 2023, just to help think about where you might end up for 2022 in terms of assets constructed. That's the first question. And the second, please, just on Supply & Trading. I know you've been asked before, but I just want to go back to it again. I know your long-term guidance for this is EUR 250 million EBITDA a year. I guess is there any level of profitability that you'd see in the business that would make you change that, because the number of quarters in a row now where we've been in excess of what you see as normalized levels. It's gone up for quite a long time now.

Olly Jeffery

analyst
#66

Is there any circumstance in which you could revisit that guidance regarding what you anticipate that division will achieve?

Michael Müller

executive
#67

Yes, thanks for that question. So, first on the build-out. Of course, you're correct to assume that we keep developing projects and taking FIDs. In fact, the figures we report reflect where things stood at the close of the half year. And since that point, we've already taken further FIDs. So that work is ongoing. But of course, the nearer you move toward the end of 2020, the lower the likelihood that those projects will feed into the number by the close of 2022. What we've guided toward is reaching 13 gigawatts plus. We stated that when we bought the Pegasus pipeline, we would add a further 100 megawatts per annum on top of that. That brings you to a figure closer to 13.2 gigawatts, which I think is a reasonable number to assume for the end of 2022, yes? And of course, the remainder will then keep contributing in later years. And these are subjects that we -- of course, I want to talk through with you at the Capital Market Day, since there we want to give you a longer-term perspective. And referring to the Supply & Trading business, as a former CFO at Essen, I'm of course very pleased with the consistently strong performance.

Michael Müller

executive
#68

But we still feel — since this is a volatile business — that we're very confident in the guidance we've issued of between EUR 150 million and EUR 350 million. That said, you probably understand how trading operations function. There's an asymmetric profile, correct? So downside protection exists thanks to the limits in place and stop losses in place. But clearly, if the right positions are in place and the market moves in the right direction, you let it run. And then you get a kind of significant upside, which in fact happened over the last years, right? So in a nutshell, we remain very confident and happy with the guidance we've issued, and that's also what you should assume for the years ahead. Yes, not increase fund, right.

Operator

operator
#69

Tancrède Fulop of Morningstar has our next question.

Tancrède Fulop

analyst
#70

I have two questions. The first is about the dividend. At your Capital Market Day last year, you guided toward steady dividend growth in line with the core business, so excluding coal and nuclear. And today you made fairly cautious remarks, saying we need to factor in the earnings decline from coal and nuclear plus the investments required, which could suggest cuts to the absolute dividend amount. So my first question is: what has changed between now and last year at the Capital Market Day, when you issued that dividend guidance? And the second one concerns your CCGTs — given the current commodity environment, with very high gas and CO2 prices, and given your hedging, what kind of profitability evolution should we expect for your CCGTs next year and the year after?

Michael Müller

executive
#71

Yes. Thank you for asking that. Regarding the dividend, it's good that you've paid close attention to what I said. Still, to make things very clear, no reduction in the dividend is expected from us. So you can rule that out. On the other hand, we do foresee appealing opportunities for investment ahead. As a result, we also aim to ensure we hold enough investing capacity to pursue those opportunities. That's the reason we want to convey: watch how the core business develops. There will be no reductions, though investment in new projects will likely be somewhat more restrained. And clearly, with a business performing well, that ought to mean greater potential upside for the dividend in subsequent years. On the CCGTs, well, with CCGTs you need to be somewhat cautious, since several distinct value streams feed into a CCGT. Clearly there are wholesale margins on the spreads, there's ancillary income, and there's also the capacity market. And most of our CCGTs sit in the U.K., and the U.K. capacity mechanism is built to essentially cover the missing money. So earning more along certain of those dimensions will, in the end, offset that through the other components.

Michael Müller

executive
#72

So for the CCTGs here, I’d expect incomes to stay stable rather than rise.

Operator

operator
#73

Piotr Dzieciolowski with Citi has the next question.

Piotr Dzieciolowski

analyst
#74

I actually have a question with 2 parts. I wanted to ask about how this cost inflation effect is playing out in the market. Have you noticed some of the PPAs or some auction prices rising as developers try to pass it through? And if not, then when would you -- should we expect that kind of behavior? And then, has this different cost of development on the CapEx changed how some of the smaller players act in the market, maybe they wanted to sell some projects because they didn't get some financing. Has there been any impact on how the market will operate?

Michael Müller

executive
#75

Okay, so let's begin with how cost inflation is affecting the market. I think that ties in quite well with what I mentioned before, as I noted earlier. Ultimately, you have to take a step back and look at the broader picture, right? So one aspect is the pressure on component prices coming from suppliers. But at the end of the day, you need to ask whether that is actually affecting project returns and what the overall economics look like. So because of that, there are more forces at play in the market than simply requests or pressure from suppliers to raise prices. I mean, regarding auctions, we haven't seen many of them recently, so let's watch what happens with the upcoming new auctions, though that's likely a more medium-term effect. And the same holds for PPA prices. I mean, what we've seen with PPA prices is clearly that, at least in Europe, demand for PPAs is higher. I mean, with more decarbonization commitments and our customers making a clear pledge to procure green power, demand for PPAs keeps rising, and that could potentially affect PPA prices as well. So in short, I think there are multiple factors influencing prices going forward, and that's the key point.

Michael Müller

executive
#76

On the smaller developer side, I’m not able to comment. I haven’t observed anything of that kind so far.

Piotr Dzieciolowski

analyst
#77

Right. But have you come across perhaps additional pipelines on the way — since folks aren't able to build them out, or can't keep their margins from getting squeezed, right?

Michael Müller

executive
#78

Nope.

Operator

operator
#79

That wraps up the Q&A—we have no more questions in the queue. So I'll turn the call back over to your hosts, who have some closing remarks.

Thomas Denny

executive
#80

Thanks, Jessica. And thank you, Michael. I appreciate everyone joining us. That wraps up this call for half year 2021. I look forward to our Q3 numbers on 11 November, and of course to our CMD a few days after that. Have a good day. Enjoy the summer. Stay safe. Bye-bye.

Operator

operator
#81

I appreciate everyone being on today's call. At this point you're welcome to hang up your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete RWE Aktiengesellschaft transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to RWE Aktiengesellschaft earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research