operatorThanks for joining the RWE conference call. Markus Krebber, who serves as CEO of RWE AG, along with Michael Müller, RWE AG's CFO, are here to walk you through how things went during the first half of fiscal 2025. At this point, Thomas Denny will take over the call. Thomas, the floor is yours.
Thomas Denny
executiveThanks, George, and good afternoon, everyone. I appreciate you being on RWE's call covering H1 2025. Markus Krebber, our CEO, along with Michael Müller, our CFO, will take you through the presentation first, and after that we'll move into the Q&A session. Markus, the floor is yours.
Markus Krebber
executiveThank you, Thomas, and hello everyone — great to have you all here. A strong portfolio delivered solid financial results for the first half of 2025, even with weak winds across Europe and a poor trading outcome. We remain on course to meet our full-year earnings guidance. Construction is advancing nicely: roughly 11 gigawatts are being built, and over 3 GW is set to enter commercial operation during the second half of this year. Every one of our offshore construction projects remains on schedule. Investment frameworks across our core markets are beginning to take shape. In the U.K., the market design offers a stable setting for future investment. In Germany, we observe a focused energy policy that places greater priority on security of supply and industrial competitiveness. In the U.S., the Big Beautiful Bill has been signed into law. Should our investment criteria be met, we stand ready to seize the investment opportunities that lie ahead. Our U.K. offshore pipeline positions us well to pursue a selective strategy in the upcoming AR7 auction. In Germany, we hold an attractive development pipeline covering new gas plants and batteries, which will let us capitalize on growing investment opportunities in flexible generation and security of supply.
Markus Krebber
executiveFor the U.S., we see room to keep expanding our build-out program over the coming years. A strong portfolio paired with disciplined capital allocation provides us with clear visibility into growth of earnings per share. Thanks to dividend growth and the ongoing share buyback program, we will produce an appealing return for shareholders. Now let's dig into the details and turn to slide five. In the first half of 2025 we achieved a good financial performance, even with the headwinds from weak wind and low trading. Adjusted EBITDA came in at EUR 2.1 billion, with adjusted net income of EUR 0.8 billion. Adjusted earnings per share reached EUR 1.1, which is 50% of the midpoint of our full-year guidance. At a time when geopolitical events dominated markets more than market fundamentals did, our traders took a cautious approach to position-taking. As a result, earnings are low. So far in Q3, we have observed stronger performance in trading. We stay confident that we will deliver earnings inside our guidance range across all segments. For the full year 2025, we confirm guidance for adjusted EBITDA, adjusted net income, and adjusted EPS. Our construction program is moving forward well. At this moment, roughly 11 GW of capacity is under construction, spread across regions and technologies.
Markus Krebber
executiveBeyond that, over 3 GW will be delivered into commercial operation during this year's second half, primarily onshore wind, solar, and batteries. Every one of our offshore projects remains firmly on schedule. In the U.K., Sofia — our 1.4 GW project — hit a significant construction milestone when the hundredth and final offshore monopile foundation went in successfully in mid-July. We have installed 36 turbines since March, and grid connections plus first power are anticipated later this year. Full commercial operations are set for 2026. At Thor, our Danish offshore project of 1.4 GW and 1.1 GW, foundation and cable installation activities are continuing. To date, 49 of 72 foundations are in place. Turbine installation is anticipated to kick off in 2026. Our 616 MW Northern Cluster A project in Germany has likewise achieved a key milestone. The first foundation was installed in mid-July. Currently, four turbine foundations have been installed. Wind turbine installation is anticipated to commence in 2026, and commercial operations should begin in early 2027. As part of our ongoing portfolio optimization, during Q2 of this year we completed the sell down of 49% of Thor and Nordseecluster to Norges Bank Investment Management. At our OranjeWind offshore project in the Netherlands, foundation installation will get underway in summer 2026.
Markus Krebber
executiveOn this project, we've teamed up with TotalEnergies through a 50/50 joint venture. Across our core markets, visibility into investment frameworks has gotten better in recent months. In the U.K., the developments we've seen have clearly been positive. First, keeping one price zone preserves a stable and certain landscape for investments going forward. Second, the revised AR7 auction rules signal confidence and a strong commitment to the U.K. government's renewable energy strategy. Extending CFD periods from 15 to 20 years further de-risks project cash flows. The higher price cap and better load factor assumptions for offshore are positive developments as well. The key now will be the size of the auction budget, which is expected in autumn before bids are due. We have a strong U.K. offshore development pipeline that can take part. Nine eligible projects totaling as much as 7.5 GW give us a broad range of options. That 7.5 GW still includes a 100% share of the Norfolk cluster. As part of optimizing our offshore portfolio, we'll cut our stake to 50%, and we will project finance these assets. With a versatile and mature offshore project pipeline, we can be selective, prudent, and flexible on timings.
Markus Krebber
executiveEvery investment choice has to meet the rigorous criteria we set, and in the auctions we will keep showing the same discipline we have demonstrated over recent years. Cost efficiency, security of supply, and industrial competitiveness form the core of German energy policy. Auctioning new-build gas capacity is one essential element in safeguarding supply security. We anticipate the auction design being released before this year ends. On that basis, the first assets might be operating by the close of the decade. A second stage is planned: a capacity mechanism that is technology neutral. Clear guidance for a fast-track approval process is now provided by the new EU rules. For German industry — and therefore for our customers — the emphasis on cost efficiency and industrial competitiveness sends a positive signal. Under the coalition agreement, the government is developing relief measures aimed at energy-intensive industry. The EUR 500 million infrastructure package that the German government will implement provides support for the economy as a whole. Once more, we stand ready to seize the investment opportunities ahead, provided our investment criteria are met. Our appealing gas power plant pipeline is well advanced, and should we succeed in the auction, we are prepared to build 3 GW of gas plants.
Markus Krebber
executiveFor our part, the supply chain is mostly locked in, and reservation agreements are already in place covering 2.7 GW of gas turbines and engines. We've likewise stayed busy developing further battery opportunities. In an integrated power system alongside renewable energy, batteries will keep playing a key role and will deliver attractive returns. Right now in Germany, 400 MW of batteries are in operation and 1 GW is under construction. On top of that, roughly 2.5 GW of battery projects are under development in Germany, with a planned COD before the end of the decade. In the U.S., we've kept our strict investment requirements in place given the current market environment. Only projects with tax credits safe harbored, tariff risk mitigated, offtake secured, and all necessary permits in place get brought to FID. Now that the Big Beautiful Bill has passed, we do see continued tax support for further build-outs. We're awaiting final clarity over the coming weeks on tax credit eligibility — things like start-up construction and safe harbor provisions, as well as FEOC restrictions. Our proactive procurement strategy has helped manage and limit tariff risk. The market environment remains positive, as we see overall structural power demand growth in the U.S.
Markus Krebber
executiveThat gives us a way to lock in offtake for our projects before FID. That said, we won't bend on our rigorous investment criteria and risk management requirements. Turning to the conclusions on page 10, we provide appealing earnings growth all the way through 2030. Bottom line earnings are set to rise at a robust 18% EPS CAGR to 2027 and 13% to 2030. Our target is a yearly dividend increase of 5%-10% per annum, and we will carry out our existing share buyback program of EUR 1.5 billion, which runs until Q2 2026. With that, I'll now hand it over to Michael.
Michael Müller
executiveThanks, Markus, and good afternoon to everyone on my side as well. Thanks to our strong portfolio, we achieved a solid financial result in the first half of 2025, even with weak wind conditions in Europe and a low trading result. Adjusted group EBITDA came in at EUR 2.1 billion, and adjusted net income reached EUR 0.8 billion. Adjusted earnings per share amounted to EUR 1.1. We reaffirm the guidance for the full year. Our EUR 1.5 billion share buyback program is progressing well, and the first EUR 500 million tranche is done. Soon after that, we began a second tranche. The entire program will be finished by May 2026, as planned. To date, we have repurchased 19 million shares at an average price of EUR 32. Just recently, Fitch confirmed our strong BBB+ rating with a stable outlook. Given an anticipated higher proportion of contracted EBITDA and a larger share of power generation from Clean Technologies, Fitch has eased the leverage target. Our strong credit rating underscores the successful transformation of our business, the robust and resilient portfolio, and highlights our financial prudence. In June, we successfully returned to the hybrid bond market.
Michael Müller
executiveWe completed a EUR 1 billion green hybrid bond issuance, split across two tranches on attractive terms. Investor appetite for those bonds was strong, and the order book ended up more than 10x oversubscribed. Now I'd like to walk you through the H1 2025 financials in a bit more detail. Even with weak wind conditions in Europe and low trading results, we delivered solid earnings. Adjusted EBITDA in offshore wind came in at EUR 643 million. That was below last year, reflecting wind conditions and lower hedge prices. Versus the first quarter of last year, our offshore wind generation volume fell 23%, caused by lower wind speeds across our U.K. and German offshore wind portfolio. Onshore wind and solar posted an EBITDA of EUR 830 million. The driver was significant capacity additions, mainly in the US, partly offset by weak wind conditions and lower hedge prices in Europe. At the end of H1 of this year, our U.S. capacity stood at 11.2 GW, versus 9.7 GW a year earlier. Adjusted EBITDA for the flexible generation business was EUR 595 million. As expected, earnings came in lower, in line with normalized prices. Our supply and trading business delivered a low trading performance in H1, landing at EUR 60 million.
Michael Müller
executiveDuring periods when geopolitical developments drove the markets more than fundamentals did, our traders took a careful approach to positioning. As a result, earnings were lower in H1. Through Q3 so far, we have observed stronger trading performance. We continue to feel confident about delivering earnings comfortably inside our guidance range. Our consolidation amounted to EUR 55 million. All told, adjusted EBITDA reached EUR 2.1 billion. The adjusted financial result rose compared with a year earlier, thanks to higher capitalized interest during construction. On adjusted tax, we used the general rate of 20% for the RWE Group. Adjusted net income came to EUR 775 million, which gives an adjusted earnings per share of EUR 1.06. Adjusted operating cash flow finished H1 at -EUR 390 million, shaped by seasonal effects. Movements in provisions and non-cash items reflected seasonal patterns in how provisions are utilized. That figure also takes in cash flow from our phase-out technologies. Operating working capital changes were shaped by CO2 emission rights purchased in Q1, partly offset by lower inventories of gas in storage. This year, for the first time, the hand-in of CO2 certificates falls due in Q3 rather than Q2.
Michael Müller
executiveThat produces a working capital balance that's seasonally higher in H1. Net debt came in at EUR 15.5 billion. During the first half of 2025, we put EUR 2.5 billion net into growing our offshore wind, onshore wind and solar, and flexible generation businesses. Disposal proceeds offset gross investments, especially from the sell down of 49% of our 1.6 Nordseecluster project in Germany and our 1.1 GW Thor project in Denmark. Other changes in net financial debt came to EUR 700 million, largely due to timing effects from hedging and trading activities. By year-end, we anticipate net debt will be lower than at H1 and a bit under our 3x leverage target. For 2025, our outlook is confirmed. Adjusted EBITDA should land between EUR 4.55 billion-EUR 5.15 billion. Adjusted net income will come in from EUR 1.3 billion-EUR 1.8 billion, with adjusted earnings per share from EUR 1.8-EUR 2.5. The dividend target for this year is EUR 1.2 per share. Now, I'll hand things back to Thomas.
Thomas Denny
executiveThanks, Michael. At this point we're going to move into the question-and-answer portion. Operator, go ahead and get us started.
Operator
operatorThank you, Mr. For anyone who’d like to pose a question by audio, just hit star one on your phone’s keypad. Also, please check that your mute isn’t switched on, so your signal can get through to our equipment. That’s star one to ask a question. Peter Bisztyga from Bank of America is our first questioner today. Go right ahead, sir, your line is open.
Peter Bisztyga
analystThank you, and thanks for taking my questions. I have two, if I may. The first is on your guidance and the full-year outlook. I understand net income came in at 50% of the full year during the first half, yet in the last couple of years, I believe it was closer to 75% or 80% that you delivered in the first half. Could you help us bridge how you expect to reach the midpoint of your full-year guidance in the second half, please? Then a question on capital allocation, focused on allocation round seven. I think you mentioned that you'll look to sell down and project finance these projects, which I assume will lessen the burden of non-productive capital employed. We had Ernst describing it very much as a buyer's market at the moment. Press reports suggest that their efforts to sell Palmer Three haven't exactly gone smoothly. I'm just wondering how you see this. Is there a risk that there isn't enough demand out there for you to be able to progress U.K. offshore without basically carrying more of that on balance sheet, please?
Michael Müller
executiveAlright Peter, appreciate the question. Let me begin with the guidance. Yes, the shape of it this year is expected to differ somewhat — more of a 50/50 division between H1 and H2. The reason is clear: as you'll remember, at the time we issued guidance in February, we had also observed weak wind conditions during the first month and had already factored that into the guidance. Second, we've witnessed soft trading performance and do anticipate trading returning to a normalized level in the second half. As we noted earlier in the speeches, we've in fact also seen solid trading performance so far in Q3, which makes us quite confident about delivering on our guidance.
Markus Krebber
executivePeter, may I address the second question, on AR7, Norfolk, and the farm down? At our two-year results, when we laid out the farm-down strategy, we already stated that for the large Norfolk projects in particular, we want everything aligned. Only once a farm down is in place will we take an FID and commit further capital — meaning an equity partner for 50%, or two partners, plus project finance. We won't front run. We won't move first and hunt for a buyer afterward; instead, we synchronize the project so all elements land at the same moment. You can assume we are already out in the market speaking with prospective buyers. If the project is attractive — which also hinges, naturally, on the CFD price — getting that done should not be a problem.
Peter Bisztyga
analystThat’s very clear. Thanks.
Michael Müller
executiveThanks a lot, sir.
Thomas Denny
executiveThanks, Peter. George, you’re up next with a question.
Operator
operatorMy apologies — I wasn’t sure whether it had been fully wrapped up. Thank you, sir. Next up, we have a question from Alberto Gandolfi at Goldman Sachs. Sir, the floor is yours.
Alberto Gandolfi
analystThanks for fielding my two questions, and good afternoon. First one concerns earnings. What I've observed is that the softness in 2025 appears largely driven by more recurring items — load factors and trading. So my question is this: if next year, 2026, and 2027, bring a normalization in load factors and trading, that's probably EUR 350 million of upside. First, I wanted to ask whether you believe that's right — the headwinds you've encountered so far this year. Second, could you help us mark to market financial expenses? Your guidance is EUR 500 million for this year, yet you posted just over EUR 50 million in H1, and you keep investing. If work in progress stays elevated to some degree, does that imply your EUR 500 million financial expenses estimate for this year ought to be much lower? Does it also imply that in 2027, your EUR 750 million estimate might be more like EUR 600 million? What I'm really getting at here, without getting tangled in the numbers, is this: if EBITDA normalizes and financial expenses stay lower, are you essentially telling us, implicitly, that there's an upgrade for the bottom line in 2026 and 2027?
Alberto Gandolfi
analystThat was quite long, my apologies. That covers question one. Now for the second one — sorry, I'm getting to it. The second question: some of your peers' share prices and businesses are coming under significant pressure. Do you feel any temptation to act as a consolidator within the European renewable industry?
Michael Müller
executiveOkay, Martin, I'll begin by addressing the financials. I suppose it's a fair summary that the impacts you're seeing in H1 — specifically wind conditions well below average and weak trading results — are among the effects we've observed in H1, and there should be no carryover into future years. Second, your point about financial results is also headed in the right direction. Indeed, some improvements in the financial results are becoming visible. To offer a few remarks: you saw us place a hybrid in a highly attractive environment. We postponed our U.S. bond issuance in April. There have also been certain phasing effects, such as early tax credits that somewhat lower the amount needing to be financed. There are clear effects that you're focusing on. Is there any read-across to 2026, 2027? Look, financing costs depend heavily on the investment program. We need to see how, as Markus mentioned, investments are progressing, and that will then also shape financing costs going forward.
Markus Krebber
executiveRegarding your second question about consolidation, we set out a very clear capital allocation framework at the time we announced the share buyback. I can simply reaffirm that large M&A company transactions do not form part of the capital allocation plans we currently have in place. That is not to say we might not pursue a project here or there, but it could make sense, though that is more organic development activity. There is no big M&A on the table.
Alberto Gandolfi
analystThanks a lot. That's very clear.
Operator
operatorThanks a lot for that question, sir. At this point we'll hand things over to Olly Jeffery, a colleague from Deutsche Bank. Go ahead, please.
Olly Jeffery
analystThanks a lot. I have two questions, please. First, when you compare gross CapEx for H1 with net CapEx, there appears to be a gap of roughly EUR 2.7 billion, and EUR 1.4 billion of that relates to the pass-through by investment of Thor and Nordseecluster. What accounts for the rest of the bridge to that EUR 2.7 billion? My second question returns to the financial cost Alberto raised. You could view this in a couple of ways. One: given your -EUR 50 million for the half year, once the dividend is stripped out, that would suggest the underlying for H1 ex-dividend was EUR 250 million, which, if repeated in H2, could put you at about EUR 300 million for financial costs. Conversely, taking the full-year guidance of EUR 500 million, where the implied underlying net interest cost is EUR 350 million, and adding the EUR 50 million from H1, that would land you at EUR 400 million. Is that roughly the order of magnitude — financial costs for the full year coming in lower by EUR 100 million or more, and potentially below EUR 500 million?
Olly Jeffery
analystI appreciate it.
Michael Müller
executiveYes, Olly, appreciate the question. Let's begin with CapEx. A major factor is the sell-down we've witnessed on Thor and Northern Cluster. Under the accounting treatment here, you also get contributions from minorities toward projects — Mustar on our Dogger Bank project, for instance — and those are counted as their investments, which lowers the net cash investments. On top of that, some optimizations have also fed into that figure. And lastly, on financial results, I'd say solid analysis and, yes, heading in the right direction. Many thanks.
Operator
operatorAppreciate it, sir. Our following question comes from Deepa Venkateswaran at Bernstein. The line is yours.
Deepa Venkateswaran
analystThank you. I actually have two questions, and I wanted to stay on the financial costs — mainly to understand whether there was anything one-off in there that you see, and how much of this can be extrapolated to future years. If it were not EUR 500 million but rather EUR 400 million or EUR 300 million, then just to see how much of a run rate that is — was there anything one-off happening this year that doesn't flow through to next year? That's my first question. The second one is on the U.S. You're expecting the Treasury guidance next week. What are your expectations on how dramatically it might change? Could you also comment about any capacity you have already safe harbored in 2024, which is not going to be impacted by how this Treasury guidance comes out at? Thank you.
Michael Müller
executiveDeepa, I’ll handle the first part. No, nothing one-off exists besides, clearly, the Aon dividend, which belongs to the financial result in H1.
Markus Krebber
executiveThe second question concerns the US for next year.
Deepa Venkateswaran
analystWe're simply pointing out that a sustainable level for financing costs might be somewhat below what you had anticipated at the start of the year?
Michael Müller
executiveWell, no — I mean, look, certain effects do exist. For instance, the more appealing hybrid is plainly having an impact on later years as well. Clearly, it's a question of how FX rates would move going forward. I mean, right now we're seeing elevated U.S. dollars, so obviously that's bringing financing costs down, but that very much hinges on it. Some timing effects also fall more into this year's impact, such as the U.S. dollar bond I mentioned or some tax equity financing where we received cash earlier.
Markus Krebber
executiveDeepa, regarding the U.S., with what we've gone through over the last months, I'd rather not speculate. Our approach is that we take it in when we have it and then draw the conclusion. Same thing on safe harbor. I could give you a figure based on the old assumption, but let's wait for the final rules, and then we'll immediately communicate what we believe is achievable when it comes to build-out. As I mentioned before, safe harbor isn't the only thing. That's probably not even the limiting factor. It's also about mitigating tariff risk, which remains volatile. If that isn't manageable, investment would be delayed as well. I think there's optimism that, given the significant need for power demand, we'll get clarity on those aspects, and then we'll be in a position to tell you exactly how we adjust our plans going forward.
Deepa Venkateswaran
analystAppreciate it.
Operator
operatorThanks for those questions, Deepa. At this point we'll hand things over to Harry Wyburd from BNP Paribas Exane. The floor is yours.
Harry Wyburd
analystHi there, everyone. Hello, Markus. Hello, Michael. I have two questions. First, another one about the U.S., but a point you didn't address in your answer a moment ago. What are you seeing regarding permitting in onshore, especially onshore wind? Clearly, federal permitting has gotten tighter. It's somewhat hard to assess from a distance since it's highly project specific. Do you anticipate any problems with permitting — whether you're crossing federal roads or lakes and so on — that might complicate your FIDs and similar items over the coming few years, on top of what's happening with safe harbor and tariffs? On the second one, obviously there's what's going on in the press and politically — the debate about power subsidies in Germany, or power cost subsidy or grid transmission subsidies and tax cuts. Could you help us understand, as things stand right now, what share of demand or industrial demand will receive these subsidies, i.e., people who don't already get them who will, and how material is that, and how elastic do you think that demand is? What I'm driving at is, do you think that once these are enacted, it might actually begin to lead to a recovery in sort of real-time power demand, which obviously has been pretty elusive so far and therefore has slightly diluted the overall argument on power demand growth in Germany and in Europe?
Harry Wyburd
analystThanks.
Markus Krebber
executiveHarry, thank you for those questions. To start with the U.S.: on federal lands, we have zero development. When it comes to projects located on private land, as you correctly noted, certain elements here and there require a federal permit, while others do not. So far we have had no negative experience, so to speak, but what we have stated clearly is that we will not reach an FID unless every permit is in place. If a federal one is required, then a federal one is required. Naturally, the teams are right now examining the whole development pipeline to determine where things are easier and where they are harder. I can't offer you firsthand experience, since we have not taken an FID in wind so far this year, given the strict criteria we apply across all the aspects I mentioned. Turning to Germany: it is hard to state precisely how much power is consumed by those who now benefit from part of the relief measures that have been announced — things like bridges for everybody, along with permanently lowering taxes to the minimum for the energy-intensive industry. They are also working on additional compensation mechanisms. Roughly speaking, in total it is probably around 20%-25% of power demand that is positively affected in one way or another by some of these effects.
Markus Krebber
executivePower demand isn’t driven by this alone. Probably, this serves as a prerequisite so that energy-intensive industry has confidence when it wants to invest in Germany as well. What I’d say is a bigger driver right now is subdued industrial activity, particularly in sectors such as metals, demand for cars, and so forth. Should we see those areas improve, then over the next few years that likely becomes the more significant factor. For long-term investment, confidence that government backing for the energy-intensive industry will last matters more.
Harry Wyburd
analystAll right, that's quite helpful. Thanks.
Operator
operatorThanks a lot, sir. Our next question comes from Wanda Serwinowska at UBS. The line is yours.
Wanda Serwinowska
analystHi, this is Wanda Serwinowska from UBS. I have two questions. First, regarding the AR7: do you believe the supply chain is prepared for AR7? What level of commitment have you secured from the supply chain? My second question concerns cash flow from the phase-out technologies. It is negative this year. Michael, what run rate should we anticipate for adjusted cash flow from those phase-out technologies across the next few years? Thank you.
Markus Krebber
executiveRegarding AR7, I can't speak on behalf of the industry. What I can verify is that whenever we participate in an auction, we hold pre-agreements with the supply chain, so the pricing is known to us at the moment we trigger the project. We won't go into an auction lacking pre-agreements on the cost of the most relevant components. As for what we intend to bid into it, the supply chain is secured.
Michael Müller
executiveTurning to the phase-out technologies, the key point — and we mentioned this on the previous call — is that our assets' operations generate positive cash flow; if they didn't, we wouldn't keep running them. Also, when we rolled out the KPI, we noted that across the period through 2030, the phase-out business's cash flow ought to be neutral. So 2024 showed very positive cash flow. This year it's negative. As you're aware, we're already getting the business ready for the phase-out. Expect elevated costs in the coming years, which will subsequently decline, and as a result cash flow should get better too. In essence, the cash flow profile of these technologies is strong in 2024. Over the next 1, 2, 3 years, it's likely weaker, and then things improve as we approach the end of the decade.
Wanda Serwinowska
analystThanks.
Operator
operatorMuch appreciated, ma'am. Our next question comes from Piotr Dzieciolowski at Citi. The line is yours.
Piotr Dzieciolowski
analystAfternoon, everyone — thanks for joining. Two things from me. First, regarding the gas capacity auction that's coming up in Germany: how large does the tender need to be, or what form would it need to take, for the auction to be profitable in your view? There's a fair amount of supply out there. It appears you've secured 3 GW, yet some competitors are openly saying they've locked in lower pricing. I'm just wondering — if it lands at 5 GW, do you see that as a profitable tender, or would it need to be significantly larger to generate more demand for this project? My second question concerns your 2.5 GW battery pipeline. Could you give a bit of detail on the timing, the CapEx, and what contribution that pipeline might make? How fast can you deliver it? What did it cost? What kind of contribution could it bring? Thank you.
Markus Krebber
executiveSure, Piotr — appreciate the question. Regarding gas capacity: the last time the minister spoke publicly about gas, she said her aim is an auction volume above 10 GW. Going back to what I mentioned, when it comes to us bidding in that auction, because our supply chain is fully flexible, hitting the gigawatt figure isn't the key thing — securing a sound investment is. Should the auction volume come in lower, we'd likely do less early on and more afterward. Given the need out there — and we also expect the security of supply assessment to be released fairly soon — the number is more likely to be higher rather than lower, whatever is required to guarantee security of supply in Germany under present conditions. As I see it right now, an auction volume above 10 GW will come before we reach a full-fledged capacity market, where long-term new builds can of course also be incentivized. I've consistently said we never aim for a market share beyond 25%-30%. On batteries, those projects sit in advanced development, which is the stage where you'd typically also be in discussions with suppliers and contractors. No FID has been taken, so I'd rather not speculate. As I noted, COD for the full 2.5 GW could potentially land before 2030.
Markus Krebber
executiveThe battery case, particularly in Germany, appears quite appealing, and you make a lot of money during the initial years. We'll provide an update on that once we have taken FID. Now returning to the long-term earnings trajectory that we've provided, we require certain investments that remain not yet uncommitted in order to reach the 2030 EPS guidance, assuming we want to accomplish that through investments rather than through additional share buybacks. Please note, the fact that we have the 2.5 GW is also not new positive news, but it is in fact also necessary in order to find solid investment opportunities for deploying capital prudently.
Piotr Dzieciolowski
analystAll right, thanks a lot.
Operator
operatorThank you for the question, sir. Ladies and gentlemen, if you have any questions or follow-ups, please press star one again at this time. We'll now go to Peter Crampton, calling from Barclays. Please go ahead, sir.
Peter Crampton
analystGood afternoon. This is Peter Crampton at Barclays. I have two questions, if I may. First, with the new German government now in place, have you noticed any encouraging indications of change—especially regarding the EUR 500 billion infrastructure fund they intend to establish? And regarding that auction for new capacity by year-end, do you think it reflects a government recognition that returns must be genuinely attractive for the associated commitments? On my second question, the Big Beautiful Bill is now here in the U.S. We still clearly need to hear about these German capacity auctions, but do you feel you are receiving more information that would allow for that capital allocation update early next year—and do you have any initial thoughts on it? Thank you.
Markus Krebber
executiveOkay, let's begin with the German government. This is a pretty high-level question, I'd say. Directionally speaking, we're pleased with the direction they're now taking to strengthen supply security and industrial competitiveness with the grid, and naturally, a build-out of renewables that's more cost-efficient and synchronized with the grids. I believe that's the right direction of travel. What I'm hearing between the lines is that, naturally, for those aspects where agreement with Brussels is needed, such as industrial power prices, but particularly also the gas build-out, they're in discussions with the European Commission on an almost daily, weekly basis. For us, that's also a black box, but I see a lot of engagement there. I'd say that in order to tick the box on energy policy, we, of course, beyond the right direction, also want to see implementation after the summer break. It's probably good to wait another 90 days before saying whether it's good or not. So far, the direction of travel is right. Your second question concerned the one big future capital allocation. I think, as I said, it's not just that we need clarity on the executive order. We also need to see how the tariff situation is evolving.
Markus Krebber
executiveI mean, I think it's too early to say that we have reached more or less a stable situation. You can also be surprised by changes every day. It will probably take some time before we feel confident to give you numbers on capital allocation. Before we said end of the year, early next year, I think that is still the right timeframe because that would also give us full visibility on the German capacity remuneration.
Peter Crampton
analystGot it—that’s very clear. Thanks.
Operator
operatorThank you. What's your question, sir? We have another question now from Olly Jeffery at Deutsche Bank. Go ahead, sir. We'll take the follow-up from Olly Jeffery. Olly Jeffery, could you share — your line is open? Thank you.
Olly Jeffery
analystHi there. I have two follow-ups, if I may. The first concerns flexible generation. For that business, the guidance midpoint is EUR 1.2 billion for this year, rising to EUR 1.35 billion in 2027. In H1 you delivered roughly EUR 600 million. With intraday pricing volatility having picked up, as you're seeing, and the chances to profit from that, do you believe there's a chance you'll land above the midpoint of this year's guidance rather than below it? And if you view that volatility as more durable than it looked when the original 2027 guidance of EUR 1.35 billion was set, do you see a bit more upside to that figure now than when you first issued it? My second question is simply about AR7. It looks to me as though, with your Ascension projects such as Rampion South and Awmuir, you likely hold some of the most cost-competitive projects able to bid into the auction. Would you agree with that?
Michael Müller
executiveLet me begin with FlexGen. Look, it's too soon to say for the whole year, since volatility is, to some extent, hard to predict. Still, we've consistently said that we expect markets to tighten, and that's an area where our flexible generation fleet and our phase-out business are both seeing benefits. Take this summer, for instance: yes, daytime prices are very low, but at night, nearly every unit is running. That's clearly something those assets are gaining from. You're also seeing, so far in H1, a sort of offsetting effect. When winds are weaker in Europe, you do get upside on the flexible generation side. That's a pattern we see, and we expect it to continue going forward. As for 2027, I'd say we're comfortable with the guidance we've provided to date.
Markus Krebber
executiveRegarding AR7, Olly, I’ll frame it that way. I mean, the pipelines we have make us very happy. I’d rather not speculate on how competitive things are relative to one another, but I’ll just offer a comment. I think in offshore, it remains right — it remains the moment to lean more conservative and cautious, given that you’re talking about billions of investments. As we’ve also stated plainly during this call, our projects are moving along well, and I think the top priority is to keep things that way.
Olly Jeffery
analystThanks.
Operator
operatorMuch appreciated for the follow-up. My apologies, Olly. Since there are no more questions right now, I'd like to hand things back to Thomas Denny for any extra or closing comments. Thanks.
Thomas Denny
executiveThanks a lot. I appreciate all of you joining the call. Markus and Michael, thank you for making time today. As always, the IR team is available to help with any additional questions you may have later today or over the next few days. To those of you heading off on vacation over the next few weeks before Labor Day, I hope you have a wonderful break and come back refreshed and recharged. I'm sure we'll be seeing plenty of you at the conferences and roadshows we've got lined up starting in September. Have a great day, and talk to you soon. Bye-bye.
Operator
operatorThanks so much. Everyone, that brings today's call to a close. We appreciate you joining us. We're signing off now. Take care, and goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete RWE Aktiengesellschaft transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to RWE Aktiengesellschaft earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in RWE Aktiengesellschaft or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.