Sempra (SRE) Earnings Call Transcript & Summary

August 6, 2024

New York Stock Exchange US Utilities Multi-Utilities earnings

Earnings Call Speaker Segments

Glen Donovan

executive
#1

Good morning, everyone, and thank you for being on Sempra's call about our second-quarter 2024 results. A live webcast of this teleconference and the slide presentation are available on our website under the Events and Presentations section. Joining us today are several members of our management team: Jeff Martin, our Chairman and Chief Executive Officer; Karen Sedgwick, Executive Vice President and Chief Financial Officer; Trevor Mihalik, Executive Vice President and Group President, Sempra California; Justin Bird, Executive Vice President and Chief Executive Officer of Sempra Infrastructure; Allen Nye, Chief Executive Officer of Oncor; and Peter Wall, Senior Vice President, Controller, and Chief Accounting Officer, as well as other members of our senior management team. To start, I'd like to note that our remarks today will include forward-looking statements, which are defined by the Private Securities Litigation Reform Act of 1995. What actually happens may differ materially from the projections in any such statement we provide now. The company's latest 10-K and 10-Q, as filed with the SEC, describe the factors that could cause actual results to differ materially. Per-share figures for common stock shown in our presentation are on a diluted basis, and we will be referring to certain non-GAAP financial measures. A reconciliation to GAAP measures is available in the presentation slides that accompany this call. We also suggest that you look over our 10-Q for the quarter that ended June 30, 2024. I should mention as well that any forward-looking statements in this presentation reflect only where things stand today, August 6, 2024, and worth noting is that the company takes on no duty to refresh or amend such forward-looking statements later on. That said, kindly move to slide four, and I'll now pass things along to Jeff.

Jeff Martin

executive
#2

Thanks, Glen, and I appreciate everyone joining us today. With the first half of the year now behind us, safety and operational excellence continue to be our top priorities, and we're pleased with the strength of our financial results. That gives us a solid foundation going into the second half, and it strengthens our confidence in a projected long-term EPS growth rate of 6%-8%. Even more importantly, we see plenty of reasons to be enthusiastic. At Sempra California, we continue to play an essential part in helping the state meet its safety, reliability, and decarbonization goals. That is why we keep making significant investments to enhance safety, modernize the grid, and better support delivery of cleaner forms of energy. We also look forward to moving our general rate cases ahead here in the state and expect a proposed decision later this summer, with a final decision anticipated before the year is over. The outcome of the GRC is expected to help our utilities better satisfy the state's public policy goals, further reliability and community safety, and improve visibility into our plan of execution through 2027. At Sempra Texas, Oncor keeps experiencing remarkable growth, and it's coming from a broad range of industries, including manufacturing, technology, and digital infrastructure. As one example, annual premise growth continues to run at about 2%, which is close to twice the national average. Allen will explain how demand for electricity is impacting the Texas grid and also creating the need for additional capital investments across Oncor's service territory. With that as context, you'll remember that Oncor is presently executing a record five-year capital plan totaling approximately $24 billion, along with a pending regulatory filing aimed at enhancing system resiliency through incremental capital investment of as much as $3 billion between 2025 and 2027. Given the extraordinary growth in Oncor's service territory, we still anticipate greater capital spending going forward, and that will be a major factor in our financial planning this fall. To wrap up, Sempra Infrastructure continues concentrating on pushing forward essential infrastructure projects that bolster the energy transition and strengthen energy security, and across multiple key development efforts we keep witnessing headway. Moving to the quarter's financial figures, this morning we posted Adjusted EPS of $0.89 alongside year-to-date Adjusted EPS of $2.24. Keep in mind that a final California GRC ruling, anticipated before year-end with rates applied retroactively to January 1, is not reflected in those numbers. From where I sit, the first half of the year has gotten off to a strong start. Consequently, we are reaffirming our full year 2024 adjusted EPS guidance range as well as our 2025 EPS guidance range. Moving to the following slide: our company strategy, in our view, creates a chance to secure a competitive edge across energy markets, and executing it rests on three main components. First, we have situated our portfolio within a number of North America's most attractive economic areas. Consider California and Texas—through these states, our utilities gain considerable exposure to growing demand for new infrastructure spending, while Sempra Infrastructure benefits from strong tailwinds generated by industry reshoring to North America and by global demand for enhanced energy security linked to exporting liquefied natural gas from the United States. Second, we narrowed our investment focus onto a more targeted portion of the energy value chain—namely, investments in transmission and distribution. By doing this, we aim to make both our profits and our cash flow more reliable and of higher quality, while also reducing the risks we face and how much price volatility affects us. In our view, this provides our owners with an improved balance of risk and reward. Finally, we deploy capital aggressively throughout our entire company across all three growth platforms, which helps ensure we generate the strongest possible returns overall for our owners. At the end of the day, managing capital is among our highest priorities, and it has allowed us to continue delivering attractive returns after adjusting for risk. As an example, since 2018 we have posted a 10% compound annual growth rate in Adjusted EPS. I'll now turn the call over to Allen, who will discuss the strengthening growth story that is still unfolding in Texas. Kindly move to the following slide.

Allen Nye

executive
#3

Thank you, Jeff. To begin, I want to note that Texas is experiencing swift expansion in every region, and that is particularly true within Oncor's service area. During the second quarter by itself, we constructed, reconstructed, or enhanced roughly 1,050 miles of T&D lines, added about 20,000 premises, and obtained around 100 fresh transmission POI requests—lifting the number of active interconnection requests in our queue by 13% versus the same period a year earlier. It also matters that we keep advancing the 5-year capital plan introduced earlier this year, totaling approximately $24 billion. As Jeff noted, that figure excludes capital expenditures that could be authorized under our system resiliency plan, or SRP. We submitted our initial SRP to the PUCT in May of this year. Now looking at the operating environment: Texas, much like the rest of the country, is encountering more frequent and more severe weather events. Extreme storms—whether ice, intense heat, or extremely high winds—have demonstrated that we need to concentrate even harder on reliability, resiliency, and response. That is the reason our SRP lays out seven measures, each with detailed programs and activities, to tackle the broad spectrum of resiliency events occurring throughout our service territory, such as extreme weather, wildfire risk, physical security threats, and cybersecurity threats. In addition to strengthening our system against outages, the plans we're putting forward carry substantial potential to bring distribution automation into older parts of our network. This is what we call our flexible and self-healing distribution grid measure. Right now, newer facilities on our system already have this technology, and it enables us to automatically move load over to undamaged sections of our grid whenever extreme weather or other events hit, sharply cutting down—and at times fully avoiding—extended outages for a large number of our customers. We recently presented examples to the PUCT demonstrating how this technology helped hundreds of our customers steer clear of outages that might otherwise have stretched through the entire day as a result of the severe storms we experienced in May. Our SRP, among other things, also calls for fitting older portions of our system with this technology. Beyond that, we've put forward an expansion of vegetation management programs totaling about $90 million annually, which includes expanded reliance on remote sensing and other emerging tools to more precisely target rapidly growing vegetation. That growth ought to more than double what we do in distribution vegetation management. Along with the SRP steps specifically targeting wildfire risk, these investments will accelerate our efforts to help tackle wildfire mitigation in a comprehensive way. Such work will continue to build on partnerships with the Texas A&M Forest Service and our peers at San Diego Gas and Electric, each widely viewed as a subject matter expert possessing deep experience in mitigating and responding to wildfires. I should also mention that our SRP filing is just one of the measures we're taking to build greater resilience and readiness for severe weather. Over a 21-day period spanning May and June, tornadoes hit the Temple-Killeen area. Winds of 95 miles per hour, blowing in a straight line, swept through the DFW Metroplex, while additional storms affected our East Texas region. I want to express my gratitude to the 12,000 Oncor employees, contractors, and off-system personnel who labored around the clock so that service could be restored to our customers as soon as safety allowed. In addition, we recently sent 500 mutual assistance workers to the Gulf Coast to assist with recovery efforts following Hurricane Beryl. Those storms made clear that this industry has to keep improving how we plan for prevention, response, and communication—so we deliver on, and go beyond, what customers expect for safe and reliable power... I can tell you our team makes that a top priority. At Oncor, we're dedicated to safe, reliable operations and to helping secure a resilient grid—something that matters even more with the growth occurring throughout Texas. Let's move to the next slide. The growth in our capital plan is driven mainly by interconnection requests from large CNI customers, together with the additional transmission expansion needed to bring power to these high-demand customers. With the capital plan we currently have in place, Oncor's rate base should expand at roughly 11% per year on average between 2023 and 2028. To support the magnitude of these fresh investments, we've taken meaningful steps to broaden our supplier base, signed multiyear agreements, placed advance orders for a range of critical inventory, and started procuring the equipment we need, backing that with considerable spending on warehousing and laydown yards so our capital investments can roll out on schedule; we likewise see room for considerable growth ahead within our service territory. As we announced earlier this year, ERCOT forecasts peak load of 152 GW in 2030, which is almost twice the present record of 85.5 GW, established in August 2023. Looking at the share of ERCOT load we currently hold and what our own forecasts show, we anticipate Oncor will serve roughly 40% of that future load. ERCOT's projections for load growth take into account the ongoing electrification work in the Permian Basin. Lawmakers passed House Bill 5066 during the 2023 legislative session to tackle this growth, and in response ERCOT submitted a plan to the PUCT in late July identifying $13 billion-$15 billion in new transmission investments through 2038. Because of how extensive our operations are in that region, we expect to construct a substantial share of the projects that ultimately win approval under the Permian plan. Jeff mentioned that capital spending could rise down the road. We're still going over our projections for upcoming capex, and once the PUCT finalizes our SRP filing and our review is finished and looked at by Oncor's board, we plan to give everyone an update on the Q4 earnings call. In closing, I'd say everyone here is truly excited about the possibilities in Texas, and we'll keep working tirelessly to provide reliable, reasonably priced electricity to those we serve, while remaining intensely committed to the safety of every individual working on our system. Now let's turn to the next slide, where Karen will walk everyone through the business update for Sempra California.

Karen Sedgwick

executive
#4

Thanks, Allen. Within the U.S.'s biggest economy, Sempra California occupies a strategic spot, and it benefits from favorable regulation that supports investment chances focused on cutting carbon and making the grid safer and more resilient, plus forward-looking rate cases, a mechanism for adjusting the cost of capital, and an established wildfire fund that protects the financial strength of the state's utilities. At SoCalGas, we're involved in numerous decarbonization efforts that advance California's goals across the state. Recently, ARCHES — with SoCalGas as one of its partners — turned into the first hydrogen hub in the nation to finalize an agreement with the DOE to lock in its funding. According to ARCHES projections, California will require 17 million tons of hydrogen annually to support the state's 2045 climate objectives. These cleaner molecules are anticipated to be essential in assisting Los Angeles — among the country's biggest manufacturing centers — with reducing emissions from heavy-duty transportation as well as other sectors that are difficult to electrify. That is the reason the Angeles Link proposed by SoCalGas will serve as a crucial element of California's regional hydrogen hub. Now regarding SDG&E, keeping our communities safe remains our top priority. Across the past 20 years, we have invested substantially in wildfire mitigation and have hardened 100% of transmission lines throughout our Tier 3 high fire threat districts. We have taken proactive measures to strengthen our predictive tools, training, and resources even more by carrying out major upgrades to SDG&E's Wildfire and Climate Resiliency Center. I got to visit this state-of-the-art facility recently, and it is impressive. If you can, I invite you to come see the facility. Among the substantial innovative features of the facility are AI-enabled solutions, high-resolution cameras, enhanced drone data, and line conductor fault detection; this facility ranks among the most technologically advanced of its kind anywhere in America and plays a central role in helping to ensure SDG&E is prepared for and actively mitigating risks related to its operating environment. All of this supports a broader SDG&E push to satisfy the state's public policy objectives while constructing an energy grid that can withstand climate impacts. Turning now to regulatory developments for the California utilities. SDG&E filed a notice of termination with FERC in June for its fifth transmission owner formula rate mechanism, known as TO5, and is getting its TO6 filing ready. Our expectation is that SDG&E will submit in the fourth quarter, with an effective date in 2025; through that filing, we anticipate revising our formulaic rate and presenting a constructive argument for a competitive ROE that mirrors current market conditions. Finally, regarding the California GRC, a proposed decision is expected later this summer, with a final decision anticipated by year-end. Just to reiterate, that ultimate determination applies retroactively back to January 1 of this year. Moving on to the following slide. Sempra Infrastructure's approach over the long haul centers on seizing the rising need for energy that is both cleaner and more secure. According to Wood Mackenzie's projections, worldwide LNG demand is expected to rise by close to 70%, hitting over 700 million tons annually come 2050. Our project pipeline is advancing considerably toward serving those requirements. On ECA LNG Phase 1, we stand at roughly 85% finished. Even so, during recent months our contractor encountered difficulties involving workforce retention and productivity. As a result, the date for commercial operations has been moved to the spring of 2026. We're working closely with the contractor to move the project forward, and capital expenditures for this project will rise, reflecting additional carrying costs along with reduced estimated commissioning revenues, which are derived from forward price curves. Even with this delay and possible capital changes, we still anticipate keeping strong integrated financial returns in line with the original forecasts we had when we took FID in 2020. That comes from a mix of factors: optimization opportunities, stronger long-term LNG demand, and inflation protection built into the SPAs. Turning to Port Arthur LNG, Phase 1 is progressing steadily, and we remain on budget and on schedule. FERC recently granted us authorization for 24/7 construction, which should boost the overall efficiency of construction activities. At Cameron Phase 2, we keep collaborating with our partners to improve cost efficiency via value engineering. Lastly, construction has started on Cimarron Wind, a 320 MW project, and we expect commercial operations there in the first half of 2026. What we've learned in Mexico shows we can collaborate effectively with regulators and legislators alike, and we look forward to supporting their growing energy needs as industrial reshoring keeps fueling economic expansion. Please turn to the next slide for an update on progress at Port Arthur Phase 2. We're quite enthusiastic about several recent developments at Port Arthur LNG Phase 2. During the summer, we executed a heads of agreement with Aramco for 5 million tons per annum of offtake capacity plus a 25% stake in project-level equity. We also entered a fixed-price agreement with Bechtel last month, which lets us keep working alongside a top-tier EPC company and gain the advantages of uninterrupted construction; along with the shared facilities under construction in Phase 1, we anticipate strong investment returns throughout the entire Port Arthur Energy Hub. We are working with every stakeholder to advance the project, and all material permits have been secured apart from the DOE non-FTA export permit, which remains under review. Even so, our development schedule shouldn't be impacted by the DOE's pause. Keep in mind that Port Arthur Phase 2, along with all other projects not yet at FID, are additional opportunities beyond what's in our current capital plan. Moving to the following slide, I'll take you through Sempra's financial results. Sempra this morning announced second quarter 2024 GAAP earnings of $713 million, or $1.12 per share. That's versus GAAP earnings of $603 million, or $0.95 per share, for the second quarter of 2023. Adjusted second quarter 2024 earnings were $567 million, or $0.89 per share. Compare that with $594 million, or $0.94 per share, earned in the second quarter of 2023. The key takeaway is that we're happy with how our finances look. Over the first half of the year, we're exceeding our financial projections and are well positioned to deliver another robust year of financial results. Please turn to the next slide. Here's how adjusted earnings for the second quarter of 2024 compare with the same period last year: At Sempra California, we recorded $26 million, driven largely by a greater CPUC-based operating margin, net of operating costs, including an increased authorized cost of capital; this was outweighed by $49 million, primarily due to reduced income tax benefits, fewer regulatory awards, and greater net interest expense. Just a quick note before we start: because our GRC is still pending, the base revenues the CPUC has approved for Q2 2024 are set at the levels authorized for 2023. The reason that's important is that when the final decision gets approved, any true-up made later in the year will apply retroactively back to January 1. Turning to Sempra Texas, we booked $42 million in higher equity earnings, driven by rate updates, more invested capital, and consumption, which was partly offset by greater interest and operating expenses. Over at Sempra Infrastructure, equity earnings and revenues in the transportation business came in $48 million lower, which includes the cumulative effect of new tariffs in Mexico from the prior year, along with $8 million of higher income tax expense, increased O&M, and reduced revenues, partially offset by lower net interest expense... and at Sempra parent, the $10 million net change is mainly attributable to lower taxes stemming from the interim period application of an annual forecasted consolidated effective tax rate, partially offset by higher net interest expense. Please turn to the next slide. As we wrap up our prepared remarks, I'd like to reiterate a couple of key points that contribute to the overall success of our corporate strategy. With North America's energy demands expanding and changing, our steadfast dedication to safety and operational excellence underpins how we provide energy that is safer, more dependable and more resilient. Being a leader across several of the continent's biggest economic markets offers investors clear sight of the growth ahead of us, since we intend to put greater amounts of capital into essential new energy infrastructure from now through the rest of the decade and past it. To wrap up, this marks an exciting moment for our company, and we anticipate carrying on with delivering robust financial and operational results. We appreciate your participation, and at this point I'd like to invite your questions.

Jeff Martin

executive
#5

Good morning, Shar.

Shar Pourreza

analyst
#6

Good morning there, Jeff. How's everything with you?

Jeff Martin

executive
#7

Things are going really well, thanks.

Shar Pourreza

analyst
#8

Great, so Jeff, about those ECA COD delays—I realize you'll be tightening up the 25 Guidance from a timing standpoint later, but how are you viewing offsets as we move into next year? Is it possible to soften the impact of the project delay, or should we expect a certain amount of timing drag? Obviously you reaffirmed guidance today, but there's also a sense out there that the 25 Guide leans conservative, so how should we think through the various moving parts? Thanks.

Jeff Martin

executive
#9

Yes. Shar, thank you for raising that. Let me begin with the schedule change, and then I'll get to the 2025 guidance. First, I'd say we're disappointed about the schedule change at ECA. Our practice, when working with contractors, is that projects should be completed on time and within budget. That's the Sempra standard, and here it hasn't been achieved, though I have confidence Justin's team will put it right. Here's the key point, which gets at the heart of what you asked. At Sempra Infrastructure we aim for mid-teen equity returns throughout the portfolio, and with our forecast updated, we still believe ECA aligns with those original targets. As you know, we've made financial commitments to our owners through published EPS guidance ranges for 2024 and 2025, and this morning we've felt confident reconfirming those ranges. I'd point out that we have ample opportunities both to grow and to cut costs where appropriate, and we'll keep working hard to surpass expectations for how our business performs; but I'd also like to hand this to Karen to discuss 2025 a bit, if you would, Karen.

Karen Sedgwick

executive
#10

Right, and as Jeff said, our portfolio is varied and gives us a lot of ways to hit our guidance. So given the schedule change at ECA, we're pursuing multiple actions to make sure we meet our financial commitment. At SI, that involves optimizing assets — for instance, making use of the pipeline capacity we have available — along with finding some operating efficiencies within the business. We keep seeing substantial growth across our utility platforms. To illustrate, the business updates Allen shared on today's call indicate added opportunities at Sempra Texas that we expect will help us next year and throughout our planning period. Beyond that, companywide we always concentrate on generating efficiencies and boosting productivity. So this work will carry on, and we look forward to refreshing our plan later this fall and giving updates on our fourth quarter call.

Shar Pourreza

analyst
#11

All right, great. So turning to the GRC result — the CPUC has been somewhat slower in taking action on matters lately, with assorted proceedings and all. So how are you viewing the prospects for getting a timely GRC outcome in 2024? And suppose a final vote slips, say, to late in the year or even into 2025 — how should we think about the timing of that financial update you mentioned for 2025? In other words, do you have to have an order in the PD, or does the PD alone give you enough to firm up 2025? Thanks.

Jeff Martin

executive
#12

Sure, let me offer a few thoughts on that. Clearly, the California Public Utilities Commission has had an extremely full docket, especially across the last 12 months. So we recognize that the schedule for our rate case has slipped into this year. A couple of points I'd make, Shar: we assembled what I believe is a very solid GRC filing for both San Diego Gas & Electric and SoCalGas. And our confidence stems partly from the fact that both filings line up closely with the state's main priorities — which, as you'll remember, center on safety, and in particular community safety, reliability, and clean energy. I'd also remind you that last fall we secured a settlement covering roughly one-third of the rate cases at each of those businesses with a subset of interveners, and we expect a proposed decision later this summer, with a final decision anticipated before the year is out; so our confidence remains very high that a rate case gets voted this year. And I'd remind everyone listening that our rates would apply retroactively back to January 1, 2024. Then, on the broader question, I'd close by noting that we have a very solid record of collaborating with our regulators and stakeholders to reach good outcomes. We feel comfortable that we can deliver a strong update on our forward guidance, including the capital plan, on our Q4 call. With luck, our Q3 call will offer more visibility into possible changes to that capital plan.

Shar Pourreza

analyst
#13

All right, that works out really well, Jeff. Many thanks. I appreciate the extra detail. I'll be seeing you before long.

Jeff Martin

executive
#14

We're grateful you could be on this call, Shar.

Jeff Martin

executive
#15

Morning, Durgesh.

Shar Pourreza

analyst
#16

Hi, good morning, Jeff. I appreciate you taking my question. So, following up on the ECA discussion, I believe the early cost estimates came in at roughly $2.5 billion, and you noted some construction delays, clearly. So how is that figure—the total project cost, more or less—tracking against $2.5 billion? Any color you could share there?

Jeff Martin

executive
#17

Absolutely. I'll give some returns on the capital changes, and it might help, Justin, if we offer a bit more color on the ECA schedule for everyone listening. First thing I'd say, Durgesh, is that because of the schedule change, we now expect the estimated capital increase for Sempra's net share to come to roughly $300 million. Karen mentioned this earlier, but we still anticipate keeping our targeted delivered returns in the mid-teens across the integrated project overall, and as you know, that definitely includes continuing to optimize our transportation position. You'll also remember that the schedule change gives us opportunities to keep managing that transportation position. For those of you hearing about our transportation, keep in mind that we hold positions linking us to the producing regions in both Texas and New Mexico, and they let us serve what has become an increasingly constrained market in the western United States, including Baja California, where natural gas demand has risen by more than 30% over the last 10 years. Another thing that's benefited us on this project, Durgesh, is that our SPAs include certain inflation protections, and that has also helped us achieve our expected original returns. So from my perspective, the key takeaway is that we're well positioned to keep managing this project, deliver it in line with the new expectations in the spring of 2026, and still hit our targeted financial returns.

Durgesh Chopra

analyst
#18

That's really useful. Thank you.

Jeff Martin

executive
#19

Yes, and I'll let Justin go ahead and talk about some of the extra detail on this schedule change.

Justin Bird

executive
#20

Hi, Durgesh. First off, I want to echo Jeff and say that I'm disappointed about the schedule change at ECA. I'd also add that, considering the work we've been doing, I'm confident about two things: first, we will achieve commercial operations in spring 2026, and second, we will hit our return expectations at ECA. Let me share a bit of detail on where things stand. The project sits at approximately 85% complete. Steel construction is finished. Piping work is moving along at full pace and is 65% complete; we've pulled about 87 miles of cable, and 95% of the main equipment has arrived on site, with close to 80% of that equipment now delivered. The key problem has been that, during the busiest part of our work cycle, because of certain craft labor constraints in Baja, our contractor could not retain and secure the labor resources needed to keep to the schedule, and losing that labor has shifted the schedule. Looking at the bigger picture, I still see this as a chance to demonstrate how we can work constructively alongside our partners and contractors to deliver a quality project safely in spring 2026, with strong returns over the long term.

Jeff Martin

executive
#21

Thanks, Justin.

Durgesh Chopra

analyst
#22

Thanks to you both. That's very clear. Let me switch topics to Texas — good to see a settlement on the System Resiliency Plan. I'm just wondering whether there's any pushback, from the PUC or other stakeholders, you know, considering what we've all seen in the media in reaction to the hurricane. Any thoughts on that? Just thinking about what risks could exist for your potential settlement here.

Jeff Martin

executive
#23

Yeah. Let me offer a couple of comments. First, the timing of this agreement in principle — which is an all-party settlement — strikes me as very, very good. When we think about our industry broadly, Durgesh, we keep seeing extreme weather conditions, and that's underscoring how important it is — not only in Texas, but in California and other jurisdictions — to keep investing in resiliency. Our company has a history of more than a 100 years of handling these kinds of events, and I think Oncor's recent storm response pleases us. If you followed Oncor back in May, they experienced some very severe weather and did a great job restoring their system. So I think our opportunity is to pair the dedication to operational excellence and storm response that Oncor has built its reputation on with this forward-looking SRP program. The good news is that, since it's been structured as a settlement in principle, those dollars will begin flowing in Q4 of this year, which lets us get after continuing to harden that system. So I think it's the right outcome at the right time for the customers of Oncor.

Durgesh Chopra

analyst
#24

Great, thanks for taking my questions.

Jeff Martin

executive
#25

No problem at all, Durgesh — thank you.

Jeff Martin

executive
#26

Hey, Julien, we want to welcome you back.

Shar Pourreza

analyst
#27

Hi there — many thanks, Jeff and Steve; it's a pleasure to talk with both of you. ... You two continue to deliver solid momentum across the board, and that includes what's happening right here in Texas. With that in mind, regarding this SRP, I'd like to, if you'll allow me, probe a little deeper: how are you viewing the SRP in light of what took place with Beryl, and perhaps any growth intentions involving mobileGen or other areas? The situation around us is constantly shifting. Requirements are changing too. Clearly, this was something considered during the most recent legislative session. Got any thoughts on where we go next with the SRP, and on what we might expect from the legislative session coming up next year?

Jeff Martin

executive
#28

Sure, I'll cover a few things. First off, let me share where I stand on the SRP. Then I'll turn things over to Allen for some of the procedural steps ahead. But Julien, I'll say this right at the start: I've spent close to 30 years in the utility industry, dating back to 1992, and throughout my career I have never seen a growth story that keeps developing the way Texas does. So as you know, the investment we made back in March 2018 was a strong one. Our capital went into a company that at the time held an 80% ownership stake and had gone through bankruptcy. We saw a chance to put money to work in a manner that delivered better service to customers. So my view is that we've backed a management team and a growth story, and that has certainly turned out very well; and I'll say that the story keeps developing, and my optimism about the capital opportunity in Texas is stronger today than it has ever been. Let's turn to the SRP for a moment. You remember that back in May the Oncor team filed that case; it laid out close to $3 billion in capital investments, and you remember that this comes on top of the record campaign they're carrying out at present, which lands at roughly $24 billion. As we shared on the call, we're glad that Oncor has managed to reach a preliminary settlement; it involves all parties, and we see the settlement in principle in a constructive light and hope to get to a final settlement over the next few weeks. I'd like to add a word of caution here: we don't intend to discuss the settlement's specifics, and Julien, as you know, we also don't want to get ahead of the commission's review, though our feeling about it is very positive. To my mind, it's a strong indication of our capacity to move forward and keep assisting Texas rate payers. And Allen, it might help Julien if you could say a bit about the procedural steps coming up.

Allen Nye

executive
#29

Absolutely, and thanks, Jeff — good morning, Julien. As Jeff mentioned, we're genuinely thrilled to be announcing this settlement in principle of our SRP today. I also want to express appreciation to the parties involved, and especially to PUCT staff, for being willing to collaborate with us in reaching this result, which we believe will deliver some meaningful benefits for our customers. Now, regarding what comes next: since we've announced that we filed with the PUCT and let the judge know about our preliminary settlement, we are currently drafting a definitive settlement agreement along with supporting testimony. That will be filed by August 16, and once that happens, the details become public and we can discuss them further. After that, the next step is getting the case remanded from the State Office of Administrative Hearings back to the PEC, and we'll try to have it scheduled for PEC consideration as soon as is reasonably possible. As Jeff said, I never like to get ahead of the commissioner or presume anything, but if approval comes through, we expect to be in a position to start making the SRP-related investments and expenditures late this year, in 2024. Importantly — and I want to stress this — we believe this settlement will let us achieve all of the benefits we laid out in our original filing. And considering some of the challenges our state has dealt with over the past few months, we see this as a very positive development for both us and our customers.

Jeff Martin

executive
#30

The one more point I'd make, Julien, regarding the latter portion of your question is that later this week I'll be in Louisiana to meet with the governor there, and then on Friday I'll sit down with Governor Abbott; and one aim of that trip is to keep reiterating how strongly Sempra is committed to investing in Texas. And I believe we may be the biggest investor in the state right now, on top of the $27 billion of spending we've circled at Oncor. You know, we're putting $13 billion to work at Port Arthur Phase 1, and we're aggressively seeking to bring forward a similar project of comparable scale for Port Arthur Phase 2. As you think about next year's legislative session, you know, my personal view, Julien, is that public policy in Texas is favorable toward new investment in reliability and resilient infrastructure, and I'll tell you that is right in Oncor's wheelhouse. So we'll keep expecting constructive regulatory and legislative outcomes in Texas. And I think you've witnessed that, Julien, over the last year or two, and we're committed to partnering with stakeholders to keep achieving outcomes that directly support our customers in North Texas.

Julien Dumoulin-Smith

analyst
#31

Great. Thanks a lot, everyone, for those specifics. And just briefly regarding SI, clearly, we saw the ECA developments here. How — just to verify here, that doesn't create any reads here or worries for PA, you know, when it comes to the on time, on budget discussion, and then afterward-

Jeff Martin

executive
#32

Yeah

Julien Dumoulin-Smith

analyst
#33

... regarding what you see ahead for PA Phase 2, given that continuous construction approach you've mentioned before, and also what you expect on cost.

Jeff Martin

executive
#34

Yeah, you've really got two questions in there. Let me address the read-through to Port Arthur first, and then Justin, I think it would be genuinely useful for you to share your enthusiasm about Port Arthur Phase 2. So very briefly, the short answer to what you asked is: Port Arthur LNG Phase 1 is not affected. Julien, as you're aware, that's a separate market, a separate craft labor pool, and a fully wrapped EPC contract with who we regard as the top EPC contractor in the industry, namely Bechtel. So that's something we're not especially worried about. What we ran into at ECA was specific to the craft market in Baja California. We're feeling quite confident about Port Arthur Phase 1. But Justin, I think it would help Julien if you wouldn't mind taking us through where things stand on Phase 2.

Allen Nye

executive
#35

…Certainly. Hi, Julien. As Karen noted in her prepared remarks, we've made several exciting announcements lately. As you pointed out, we signed a fixed-price EPC agreement with Bechtel. Bechtel is performing incremental pre-FID work, and we're eager to advance this project while aiming for cost and construction efficiencies by having them continue without interruption from Phase 1 to Phase 2. Second, we announced the execution of an HOA with Saudi Aramco covering 25% of the project equity and 5 million tons per annum of offtake. That shows the worldwide demand for LNG from Port Arthur and, more broadly, how valuable low-cost and secure US LNG is. I'd also note that commercial discussions are going very well, and there's a reasonable likelihood that the rest of our volume will be under similar HOA-type agreements in the months ahead. I hope we'll be able to report continued positive progress on our third quarter call. On permitting, we've already received our FERC permit and FTA export, and we're now waiting on the non-FTA export permit, which, again, we don't expect to affect our FID decision timing. As a reminder, under Sempra's planning convention, since Port Arthur Two has not reached a positive FID, it isn't included in our plan and represents significant new growth opportunities. Julien, we couldn't be more excited about what we're seeing at Port Arthur Phase 2.

Julien Dumoulin-Smith

analyst
#36

Nice work, everyone; we'll be seeing you shortly.

Jeff Martin

executive
#37

Thanks, Julien.

Carly Davenport

analyst
#38

Hi, thanks very much for taking the questions. I wanted to ask about a couple of points on Texas. So I appreciate the updates on the growth outlook there. I wanted to ask about the $13 billion-$15 billion of transmission CapEx that you referenced that was proposed by ERCOT in the Permian. Could you help us think about, you know, how large a share of that spend Oncor could help execute on as we think about that time frame?

Jeff Martin

executive
#39

Thank you, Carly. I think it would be helpful, Allen, to answer that question directly and then go back. I think you've got some additional color on overall growth in the state, but maybe to tackle the Permian plan first, and then talk about the broader opportunity.

Allen Nye

executive
#40

Sure thing. Jeff and Carly, thank you. Right now, Austin is where the Permian plan is under discussion. It's been put out, and the PUCT has released questions. As I recall, responses are expected by Friday. More question rounds may follow. A workshop is likely, in my view, and the goal is to issue something in the coming two months or so — possibly September. Right now, before that plan is finalized, the only real thing I can say about what we might potentially build from it is this: when you consider how large our operations are—and I bring this up often when discussing system-wide growth—look at what's taking place in West Texas, along our Stanton Loop and our Culberson Loop. Given how extensive our footprint is in those areas, and the number of substations or endpoints we own that a 1938 analysis could put to use, we'd expect that under essentially any plan emerging from this process, we would play a major role in that $13 billion to $15 billion, wherever it ultimately lands. On the Permian specifics, that's about as far as I can go today. Jeff, should I cover growth more broadly? Looking back — and I realize some of this has already been shared, it's in our earnings release, and I typically report on roughly the same categories each quarter — this time I'll try to split it into four buckets. Jeff already brought it up, and we've discussed our really robust premise growth, which keeps coming: 20,000 added in the second quarter, still running near 2% a year, roughly double the national average. Category two is transmission points of interconnection — new requests this quarter came to eighty, sorry, 98 new. That figure represents roughly a 7% increase versus the comparable quarter a year ago. Overall requests have climbed 13%, and we typically split those into generation and LC&I. Generation is higher by 7.5%. On the retail side, meaning LC&I, the gain is 22%, and as I noted previously—though I have a small update now—approximately 25% of the overall figure, currently 341 requests, comes from large load customers, which for us means more than 100 MW apiece. That group right now adds up to roughly 80 GW of possible load. Around 74%, or 59 GW, of that would come from prospective data centers, while the remainder is pretty varied in terms of customer type. So from a transmission POI standpoint, on the LC&I or large customer side, growth is incredibly strong. I brought up West Texas earlier. Growth there remains strong. The Far West Texas weather zone peak is already 9.3% above the 2023 peak this year. Culberson and Stanton are two transmission loops we serve in the Permian and Delaware Basins. Culberson is 15.5% above the 2023 peak. Stanton is up 1.3% this year versus the 2023 peak. Now, the fourth category I mentioned at the start—I believe those items carry real weight given the challenges we face and the opportunities emerging in our system. The fresh ERCOT research—the load projection stemming from House Bill 5066—indicates peak demand reaching about 152 GW come 2030, up from the 21 GW they had forecast through 2029. As I've said before, we think—and our own analysis suggests—that about 40% of that load could fall inside our service territory. And then the Permian Basin study we opened with, as I noted, totals $13 billion-$15 billion by 2038. Given where our facilities are located and how that analysis should be done, we'd anticipate capturing a significant portion of any projects that come out of that plan. So clearly, all of this involves CapEx. Jeff has already explained how we'll manage it—probably with an update in Q4. But I think the important part of our CapEx, looking at our $24.2 billion plan over the next five years, is that, as I've mentioned before, roughly 70% is growth and about 97% is recoverable through our trackers. All of that comes before the SRP, on which we announced a settlement in principle today, totaling approximately $3 billion. Again, details will come around August 16. That figure also comes in above a good portion of the capital outlay required to serve those big load customers I mentioned earlier. It arrives prior to anything we would receive from a Permian plan, and it largely precedes the spending needed to meet ERCOT's updated load projection of 157 GW by 2030. So we will continue to evaluate it; we'll collaborate with our shareholders and our board the way we always do, and provide that update during the Q4 call; but what we're seeing on our system has us very, very excited. We think there are enormous opportunities for investment throughout our system, and we look forward to working to satisfy those needs.

Jeff Martin

executive
#41

Thank you, Allen. Carly, there's another item I brought up, and Allen highlighted it too: approximately 80% of that capital program is directed at growth, and that matters because it eases upward pressure on rates tied to infrastructure investment. And second — something that's really almost unheard of in our industry — about 60% of that capital plan relates to transmission. So, just as in California, where we have the TAC, and transmission costs get socialized across all state consumers, the same situation applies in Texas. So it's a strong capital plan. It's a plan expected to keep growing, and the good news is that it directly serves growth without much pressure on affordability and truly meets the needs of Texas consumers.

Carly Davenport

analyst
#42

That's excellent. Many thanks for providing all of that background. Perhaps, staying with Texas for just one follow-up, I suppose, what's your thinking on the timing for returning with another rate case? Just when you consider, you know, the recent rate cases in Texas, the CapEx updates, the various insurance developments, quite a few things happening, so we'd really like to hear your latest views on that.

Jeff Martin

executive
#43

Yeah, there are several moving parts. I'll check whether Allen would like to contribute anything here. And one of them is, for instance, the rise in insurance tied to wildfire towers, which I believe is a widespread issue throughout the state; this is something we keep assessing. The good news is that we have the chance either to file for certain of these selective cost increases on a one-off basis or to return with a rate case. I believe Allen's team has not reached a definitive decision on that, but, Allen, if you'd like to add anything, please, please go ahead.

Allen Nye

executive
#44

Absolutely, Jeff. To put it briefly, we review matters with our board every year—including the sorts of topics you brought up that could create pressure on us—but we aren't obligated to return until the summer of 2027. We'll keep working through this process alongside our board. Should circumstances shift, we'll make a decision, but as things stand, we don't have to—we are not required to come back in until the summer of 2027.

Carly Davenport

analyst
#45

Excellent. I really appreciate all the feedback and the detail.

Jeff Martin

executive
#46

Many thanks, Carly, for being on this call.

Jeff Martin

executive
#47

To close things out, I want to review a handful of main takeaways from today's call. First, I think it matters that everyone listening recognizes we're finding greater investment opportunity in Texas. Allen did a solid job outlining several of the growth drivers in that market. I'd add that in my view it's the top growth story within our sector, and our enthusiasm about what we can do in Texas hasn't faded. Second, we're quite happy with how strong our financial results came in for the first six months of the year. Karen mentioned this earlier, but we're running ahead of the forecast we set internally for planning purposes. Third, under Trevor's leadership, together with Scott Drury and Caroline Winn, our outlook on the opportunity ahead of us in the California general rate cases remains quite positive, since we keep making investments that we believe are strongly aligned with the state's public policy mandates; all told, we have great confidence in our financial commitments and are reconfirming our guidance ranges for both 2024 and 2025, as well as our long-term growth rate of 6%-8%. It remains an exciting time for our company, and should you have any questions or follow-ups from today's call, please reach out to our IR team. We're also eager to connect with lots of you at the Citi and UBS conferences coming up over the next few weeks. If that's of interest, we'd welcome you to get in touch and arrange a visit to SDG&E's new Wildfire and Climate Resiliency facility. We believe you'll find the time worthwhile and leave with a clear, strong impression of how deeply our company is dedicated to safety and operational excellence. That wraps up today's call.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Sempra transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Sempra earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sempra or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.