Hi everybody, and thanks for joining this Sheffield Resources webinar, where we'll be going over the quarterly results for the quarter that ended on 31st of December 2024. I'm Peter Gadsdon. With me are Bruce Griffin, our Executive Chair, and Mr. Mark Di Silvio, Sheffield's CFO. Bruce is going to take us through a short presentation covering the quarterly results, and after that we'll move on to a Q&A. Please go ahead and send in your questions through the Q&A. Just keep in mind that time is limited, and nothing should be submitted that would put the company in breach of an ASX Listing Rule. Beyond that, though, please do fire away with your questions. Bruce, over to you.

Bruce Griffin

executive
#2

Thanks, Peter, and thank you all for being with us today. As Peter mentioned, I’ll concentrate primarily on the quarterly results. Before we begin, a quick recap for those — if you’re on this call, you likely already know, but I’ll go over it anyway. So, mineral sands is very much centered on our half interest in Kimberley Mineral Sands, the Thunderbird project located in the north-west of WA. We also have a — or rather are earning an option on a project in Brazil, and we hold an interest in Eastern Mineral as well, a small — a small interest in Eastern Mineral, which owns a project in Sri Lanka. Just before we sort of dive into the quarterly charts, et cetera, and discuss performance, a couple of pictures to orient everyone again. On the left-hand side, as usual, the mine, so DMU probably about halfway through that block. You can see the Dry Mining Unit in the center of the block, with the dozers pushing in. There’s a bit of water around, since we’re in the wet season. Then, it’s worth pointing out, if we look at this area up here, that’s the drill pattern from the first drill and blast area.

Bruce Griffin

executive
#3

This was captured in late December, and we've actually now started blasting — drill and blast work — in the overburden, and so far we're pleased with what it's doing for the diggability of the ore. There will be a bit of time and a few trials needed to perfect the exact blast design. But there's no question that blasting has significantly improved how diggable the material is for our waste mining. On the right hand side, the process plant, loading ilmenite. So the process plant is in the background, the zircon stockpile, and then up front are the very extensive ilmenite stockpiles. We use fingers to dry the material and then we're loading retainers up front there before they're taken to Broome. As for production itself over the quarter, again we're very much mining in the 2.5 million to 3 million tonne range. For the quarter we were just on the 2.5 million. In the December quarter we had some mechanical failures in the DMU, mostly related to exciter bolts. We've seen those reduce again and we continue working with Piacentini on design modifications to improve the reliability of that equipment, and we are seeing progress there.

Bruce Griffin

executive
#4

Also, though it may not be evident in this data, we're observing higher hourly push rates too. So we're working to remove the mechanical error—mechanical failures—over time. Thus, with the existing setup, we'd anticipate being able to push gradually nearer to 3 million tonnes a quarter as time goes on. Regarding what that means for ore production and so forth, this is Rougher Head Feed, which is, you know, after removal of oversize going to the first spiral in the process plant. Once again, we keep seeing this—our actual production versus the design. We're converging on the basis for design. But we still have that gap tied to the oversize, and we're getting much nearer to having a view of what the final solution will be for us to close that gap. And the grade—the Rougher Head Feed grade, meaning the grade of material we're presenting to the roughers—is consistently above what the block model expected. We're very much of the view that this is because we're removing lower grade material as we remove oversize. So that pleases us.

Bruce Griffin

executive
#5

We've kept working on the block model and the mine plan as part of the updated plan we're moving forward with. From that work, we don't anticipate any meaningful change to the resource itself. Our process plant is still performing very well. Looking at zircon, recoveries are at or above design. The design called for a slow ramp-up spread over an extended period. So expectations stepped up a little this quarter with some variation in recovery, but ultimately it keeps performing very well. We're also seeing grades improve progressively. So the process plant, certainly from a zircon standpoint — and we'll get to ilmenite in a minute — keeps performing very well. And on grade and recovery, we're getting performance better than design. Similar story for ilmenite, with actuals above design. There's some optimization going on. We've had — you do see a bit of variation in TiO2 content. However, again, we're consistently making a good quality product at recoveries above design. So overall, what does that look like in terms of where we stand versus the DFS or BFS? On total ore production, we closed out 2024 still above design.

Bruce Griffin

executive
#6

So despite the ramp-up happening gradually across the year, we still ended up producing more ore mined for the year than we had anticipated. I'll return to this and discuss what we're doing to reduce oversize and so on when I get to the business improvement section. But on the whole, I keep tracking, or have kept tracking, ahead of BFS on ore mined. On product volume, we're a little bit behind on a combined basis. The reason is that the ramp-up assumed more, and this really comes down to delivering less than design Rougher Head Feed rather than less than design ore. And that -- yes, so we've recovered more concentrate than we would have expected given how much Rougher Head Feed we had. But on the whole, we're now slightly behind where we would otherwise be, which is why the focus is ultimately on addressing the oversize. Turning to ilmenite production and sales here. This is a quarterly view. A very good quarter in Q4 for both production and sales. We had record production and record shipments. We're forecasting production around that. We've got a range here. But we're effectively forecasting the same again on production, and potentially a little bit more, and then sales in a similar range again.

Bruce Griffin

executive
#7

We feel quite confident about keeping up that kind of output — both producing and shipping ilmenite — definitely for the first quarter and likely across this financial year and beyond, given the current setup before we implement any modifications under our broader business improvement plan. On zircon, the December quarter is clearly encouraging. Production came in strong, but even more significant is that we got back to selling. We landed at the lower end of guidance, with 1 shipment slipping from December into January. Still, we've clearly witnessed a meaningful strengthening of our customer base. This shows 10 — actually it's 11. We've obtained what's known as an MEP, a Mineral Export Permit, covering 11 separate customers, which widens our buyer pool, with most located in China. That said, we have at least 1 customer based outside China. The upshot is that when a given customer comes under pressure regarding acceptance of a shipment, we can redirect our sales to another party. By contrast, we lacked such flexibility in Q3, and that is precisely what held back our selling ability. For zircon in the present quarter, we are projecting a substantial rise in sales on a quarter-on-quarter basis.

Bruce Griffin

executive
#8

A shipment has already gone out. We have several more shipments lined up across the coming month or 2. So I'm quite confident about the guidance. The width on that guidance always comes down to the fact that timing issues can arise here. So we are definitely seeing very strong interest in our product from customers, both new and existing. I think people are getting a better grasp of how to process it and what to use it for. And we do represent probably the biggest single source — I don't think probably, actually we are the biggest single source of zircon concentrate that contains — or non mag concentrates that contain all of the zircons. So regardless of the final product quality that can be recovered from it, there are markets in China for that product. Obviously, that's a very large market with a number of different offtake, a wider range of offtake uses than other markets. And being able to contract with someone who has — can supply large volumes regularly in bulk is a point of differentiation. And so I think we're seeing that interest come through from customers. Now that doesn't change the overall market, which has been reported by others as being quite soft.

Bruce Griffin

executive
#9

We have observed that in pricing. That said, customers are showing interest in purchasing that product at a price point comparable to what we saw in the final quarter of last year. Therefore, in contrast to certain other players, we do not anticipate any meaningful quarter-on-quarter price movement. So I believe this is — yes, this represents a — maybe it wasn't visible during the fourth quarter, but for the business this marks a substantial shift compared with the situation when we were providing this update in early October. A considerably larger number of customers are now in place. We are receiving solid interest from those customers, and our visibility has improved — we can identify who will take the product, and so forth. So we definitely feel considerably more confident in our capacity to place zircon in the market on a consistent basis. Regarding total cash flow during the quarter, we were negative on cash flow. Once again, this stems mainly in part from the timing of certain cost payments, but it is also still below. We sold only half of the — roughly half the — or approximately half the zircon that we produced, and that is not — yes, in simple terms that is basically not enough cash to cover costs. Certainly, if what we produce is what we sell — I realize this sounds somewhat repetitive.

Bruce Griffin

executive
#10

However, when we sell the product we make, we generate positive cash flow. So, given the guidance we have now, we'd anticipate being operating cash flow positive during this quarter. The other major item on cash flow, I'd say, is the offtake prepayment. Yansteel, our partner, made 2 prepayments during the quarter. The one we mentioned at the beginning of the quarter came to roughly USD 14 million. Then in December we got a second prepayment of USD 8 million. That essentially closed the working capital shortfall for us. These are prepayments against ilmenite. Both should be unwound during the first half of this year. That's basically how they're structured. They're set up as 6-month facilities. You draw them, hold them for around 3 months, and then unwind. We can put them back in place again if needed. Still, as things stand, the expectation is that we'll be able to unwind these. So it's very pleasing to have that support from our partner — as both a JV partner and an offtake partner. They remain highly supportive of the business and do whatever they can to make sure we can manage through this transition.

Bruce Griffin

executive
#11

We deferred that interest payment once more. So the December payment was made, and we are making it in January — or it has already been made in January. And again, our lender group — we are in touch with them constantly. The debt, in effect, stays in good standing, and once more we have a highly constructive relationship with both of our lenders. On the business improvement initiative: to recap, the context for it is unchanged. We do have lower than expected Rougher Head Feed per tonne of ore, along with higher than expected oversize costs — higher particularly around mining — and weakness in the zircon market. Now, clearly shipments have improved, which is good. And our process plant recoveries keep performing exceptionally well. So the underlying context for the business improvement has not changed dramatically. What we have been doing — and have done — is a big focus on costs, not surprisingly, as we announced in the December update. As a result, we reduced head count at KMS itself by about 20%. That is never a pleasant thing to have to do, but ultimately it is about putting the business on the best possible footing.

Bruce Griffin

executive
#12

As I mentioned earlier alongside the photograph, we've moved to drill and blast and completed our first blast. In our view, that will substantially improve diggability. We're also in the midst of replacing the overburden contractors. Consequently, we anticipate cost savings once drill and blast is in place and the contractor has moved onto a new contract, something that is happening right now. So that's likely the first meaningful operational change of that kind. The overarching aim is to lift mine production so that the process plant runs full. The process plant is performing very well. When it's full, you'd expect what we're seeing, which is recovery better than design. So if the plant is full, there's a chance to generate concentrate volumes beyond the original design. We've kept reviewing the ore mining method and input processing. I'd say we're beginning to converge on a view of how that looks, and we expect to make a decision on it during the current quarter. On the whole, we definitely see the ability to — and I think the way to frame it is, as we've moved forward, our thinking is that, collectively, the thinking is that we know the oversize material is preferentially lower grade.

Bruce Griffin

executive
#13

So pushing everything through the DMU, or running it deep into the process, isn't sensible. What we're focused on, then, is finding ways to take oversize out earlier on, so that for the most part the DMU receives material with a decent likelihood of turning into Rougher Head Feed. Oversize that won't get there we'd pull out early, and doing that would let us raise the DMU's effective capacity. We keep examining the mining method — is this the optimal approach, is it the best means of freeing up the material, and so forth? And, as I mentioned, we're converging on a view there. Beyond that, with the extensive drilling completed last year, we're examining — as ever, drawing on what we've learned and what that shows us — the potential to optimize the mine path too. So all of this is coming together. Once combined into the implementation plan, it remains on track for finalization during the current quarter. The exact timing of when we share it with the market will hinge on when it's finalized, and so on. Still, we're definitely on track to have that plan in place, which I believe gives a clearer basis for how our business will look going forward regarding production cost along with our ultimate production and cost.

Bruce Griffin

executive
#14

There are quite a few small—well, maybe I shouldn't call them that—modest process enhancements here and there. In certain instances tied to production, we've managed to carry out fairly inexpensive adjustments to the occasional component of plant equipment, mostly done in-house. So the cost is very low. And those have made a real difference when it comes to cutting mineral loss and similar issues. So there's also an ongoing set of somewhat lower-level business improvement efforts. And we continue making those changes as we move forward. So overall I believe—personally, I feel far more confident that we'll end up with a solid, clear plan that demonstrates—how should I phrase it—a future that looks quite different from the last few quarters. And I think that's probably a good spot to wrap up, Peter.

Peter Gadsdon

executive
#15

Great, thank you, Bruce. Now we’ll move on to questions from the audience. A good number have been arriving at this point. But first, just to kick things off from my end. Clearly, today is Chinese New Year here in the U.K., or so it is. Yes, it’s Chinese New Year. What sorts of things are you hearing? Obviously, you mentioned there that you’ve grown your customer base quite a lot during the past few months. I believe it has risen from 4 to 11, correct? Does that indicate some stimulus is beginning to come through in China? Are people there feeling optimistic? What’s your view on all of that?

Bruce Griffin

executive
#16

Yes. Look, it's interesting. There are probably a couple of observations I would offer. We definitely saw a great deal of interest after TZMI Congress, and we've had people interested, but getting the MEPs in place has taken a while. It was interesting — we had a number of customers who were seeking supply either loading just before or around Chinese New Year. Hence we've been shipping a bit in January. And you do see this each year. It's a typical behavior in China, sort of generically is a bit of a runoff in stock at the back end of the prior year. Whether that's calendar year or Chinese year depends a little bit on the state of the market. There tends to be a bit of a buying activity to restock around it. There's always a little bit of a -- it's a new year, it'll be better and then you sort of have to see what happens. But I think, certainly there has been some very -- there were some specific measures in the stimulus that are interesting for mineral sands. So one of the most recent packages -- I think everybody -- most people will be familiar that there are government programs for, the classic sort of scrappage same as replace your refrigerator, replace your air conditioner type things.

Bruce Griffin

executive
#17

One was to redecorate your house or your flat. And clearly, redecoration creates classic demand for paint, tiles and so forth. So there are encouraging signs there, certainly. Another phenomenon—and I think we observe this in other commodities too—is that in China especially, behavior shifts when the market is soft, meaning prices are low and demand is weak. What you see is that we in the west generally assume that's a good moment to purchase high-quality product cheaply. Their philosophy differs: how can I afford to buy lower quality, lower grade, keep my plant full, and minimize my cost? So, for instance, anecdotally, someone told me that at the TZMI Congress in November, the strongest selling grade of zircon in China was 50% ZrO2, because it was cheap and you could blend it with other things. So I think some behaviors like that are also at play, where there's really a desire to take volumes of lower—of what would be large volumes, probably slightly lower grade material, and that lets them optimize their plants.

Bruce Griffin

executive
#18

I'd say it's too soon to know for sure, though customers are definitely signaling that they anticipate a solid beginning to 2025. The real question is always how long that holds up. Still, what we've observed up to now has us quite encouraged. And as I mentioned earlier, we now have what's probably a somewhat distinctive value proposition, since we can consistently supply large volumes of a concentrate holding the complete zircon suite. Nothing has been taken out of the zircon, so customers know they'll receive every bit of it.

Peter Gadsdon

executive
#19

Chris Baker has a question, Bruce. Zircon sales have shifted a lot—from 0 in September to perhaps as many as 60,000 in the quarter we're currently in. Is the driver more customers, or is it greater demand from your existing core customers, or some combination of the two?

Bruce Griffin

executive
#20

I'd describe it as roughly half and half. So one portion comes from our current customers regaining their capacity—in terms of that broader outlook. I'm not tying this to any particular quarter, but on the whole it will be a mix of existing customers who are able to return, process the material, and want more, along with new sign-ups. The new—some of the new customers are already taking product. To be very clear, we haven't shipped product to 11 zircon customers, but we now have 11 customers we can ship to. So it's a combination of both.

Peter Gadsdon

executive
#21

Great, thanks. Here's another question. Inventories are elevated right now. What would you view as typical levels for zircon and ilmenite?

Bruce Griffin

executive
#22

Yeah, mineral sands is always somewhat complicated since it hinges on when the final shipment of the quarter falls. For us, I'd say typically we'd anticipate holding total inventory of roughly 1 shipment — once you've shipped, you've got another one sitting in inventory, and that doesn't have to be at the port, just within the system. So a normal zircon inventory, in my mind, sits at about the 15,000 tonne mark. It might be somewhat lower right after you've shipped, and somewhat higher while you're waiting to do the next one. On ilmenite, roughly that 40,000 tonne mark would be — our vessels usually carry between 30,000 and 40,000 tonnes, so we'd anticipate having about 40,000 tonnes. That gives you a sense of how much we might, for a quarter or 2, ship above production as we return inventories to normal levels.

Peter Gadsdon

executive
#23

All right, good. So a point that came up from Luke Matthew. It sounds — this is from Luke. It sounds as though the business improvement plan will concentrate more on screening out the low VHM portion of the oversize instead of adding a second DMU, which means modifications rather than new equipment. Is that correct? And would that in turn point to a low CapEx requirement for the business improvement plan?

Bruce Griffin

executive
#24

Yes, I mean, we're still sort of working our way through that, and that does look like the most probable scenario right now. Depending on what we choose regarding mining method too, there could be CapEx consequences if, say, we needed to change how the ore gets presented to the DMU. So I think — I still believe it's too soon to say. Broadly, though, it feels like plant modifications, plus potentially — there can be some working capital effects if you make that kind of change. But we do have a plan as of today. There was always the expectation that a second DMU would be needed at some point, though that feels less probable as the answer today. But broadly, as of right now, we haven't reached a final determination on what the — I'm just reflecting what we're seeing. But we haven't reached a final determination on what those changes are. And until you know what they are, it's quite difficult to state definitively what they will cost. But we — I don't see — it's certainly not going to be an entirely new plant — an entirely new — sorry, an entirely new plant, an entirely new type of in-pit processing equipment and so forth.

Bruce Griffin

executive
#25

My view is that this outcome is simply not probable.

Peter Gadsdon

executive
#26

Could you spend a moment on zircon pricing? Clearly, it has been some time since the BFS, but the price has fallen considerably. Could you speak to roughly where you see it right now?

Bruce Griffin

executive
#27

Yes. I mean, you basically have a general idea of what the market price is, combined with — we sell a concentrate. So most folks on this call have heard me discuss this before: what you're paid for concentrate comes from a mix of recovery, quality, processing costs, and so on. And then ultimately, the market price. Now, for those — a number of our customers are considering acid wash on at least some of the streams. But if you aren't acid washing our product, the zircon will mostly be sold as standard type grade for non-ceramic applications. So that will determine — which means you're not — we're not — generally, our customers won't get a premium price for ours. They'll get standard. So that's where we stand today. Recoveries — they now understand how to process the material better. So I think you're getting reasonable recoveries. As for the overall market price, zircon prices have fallen quite a lot from the earlier peaks. I think from — certainly since the DFS was completed, prices are down from over $2,000 a tonne zircon to now — in China for premium, probably $1,800, roughly.

Bruce Griffin

executive
#28

So that market has moved quite a bit, in a sensible way. Zircon is balanced — balanced because the producers with the capability, Rio and Iluka and Tronox in particular, keep matching what they supply to what's demanded. If all of them were operating at maximum output, we'd have oversupply. Not all of them are at maximum output. So broadly, the market sits in balance. But it isn't a — people aren't — it's not a — it is a balanced market. Nor is it one where buyers are tripping over each other to get product. And a meaningful volume of concentrate comes into China from locations such as Mozambique, and that material is mostly mined and shipped by companies that are Chinese-owned. So China has a sizable supply chain that involves none of the western miners of any kind, whether small or large. It got somewhat disrupted by — I believe most people are aware there was, and still is, a degree of unrest in China — in China — in Mozambique. But on the whole that market feels fairly balanced right now. Yet that, in my view, is ultimately what pricing is more or less doing. The consensus forecast looks to be roughly flat, with a slow recovery around '25, '26, and it isn't until 2027, when we begin to see meaningful supply fall away from existing mines, that we'd expect a substantial rise in prices.

Bruce Griffin

executive
#29

For us, I think one thing we'd anticipate seeing—and probably already have seen—is that having more customers lets us build somewhat more competitive tension around our own offtake. So we likely did a bit of discounting early on. New product, limited customer base. Probably one reason we're holding prices in the current quarter is that we're probably a little ahead of the market, and the market is catching up to where we are.

Peter Gadsdon

executive
#30

There's another question coming in from the audience — just a quick one about the oversize. The drill and blast, obviously you're mainly using that for waste mining and stripping, correct? But do you think it will be of any help at all with the oversize?

Bruce Griffin

executive
#31

Regarding drill and blast, the overburden won't be. Since, as you rightly pointed out, we are blasting the overburden — that's what the person is asking about. We will almost certainly conduct a production trial. Given that at some stage we'll have the capability to drill and blast on site — not right away, but at some stage — we are likely to carry out a trial blast in the ore to determine whether that approach is a better way to prepare the ore than, say, ripping and rolling with the D11s. It's possible that blasting only needs to be done. Potentially, you'd be targeting areas where particularly indurated layers exist. So I think there's an open question there about whether — I think in terms of mining method, we're doing dozer push. We could do drill and blast and still push with dozers. I guess, ultimately, we could do drill and blast and move to a truck and shovel type mining method as well. But I'm not — at this stage, we'll trial it, but it isn't clear that drill and blast is the — is required for the ore. Not required — it's not required, but would be an improvement over just mechanical ore preparation.

Peter Gadsdon

executive
#32

We have a few additional questions arriving at the moment. I was actually on the verge of asking about the wet season, so that works out well. One has just come in. Clearly, from what I recall, there was hardly any disruption caused by the wet season last year, which was obviously your first year of production, or your first full year of production. How are you finding the wet season this year? Is the weather being equally kind?

Bruce Griffin

executive
#33

Yes. So you're absolutely right — last year, there really weren't any cyclonic events. This year, there's only been 1 actual cyclone, and that was on the west side, in West Australia. Two systems merged roughly 10 days ago, and while it was a cyclone, it was mostly off the Pilbara coast and tracked to the south and west. So we ended up with plenty of rain as a result of that system. But not cyclonic conditions. It's fair to say this wet season has been wetter. We do routinely get — we're getting a lot of — you get rain nearly every day, that sort of thing, or patches of rain. What would count as really heavy rain in many places is just rain up there. So we've only had — I believe we've had 1 — up to now we've had 1 weather system where it was wet enough that we actually suspended operations for a couple of days, just to — really for the safety of people and equipment. It becomes very difficult to operate in extreme events. But we haven't had a cyclone, touch wood, yet this season. So I think we always expect the wet season as a fact of life.

Bruce Griffin

executive
#34

We are ready for that. Generally speaking, we can handle it — you can picture how, with drill and blast, things get harder for us during wet seasons. It's not the drilling that's the issue; it's the blasting. When weather comes in, lightning usually comes with it, and lightning plus explosives is a poor combination. So that's likely one of the more long-term considerations — even asking whether you adopt a more seasonal approach to blasting-type work. Still, on the whole, we're coping, and coping well. We keep gaining knowledge on getting through the wet season. It's a different set of difficulties, sure, but no material impact has shown up for us.

Peter Gadsdon

executive
#35

Bruce, at this point I believe we’re down to very few questions—pretty low, in fact. So perhaps, Bruce, you could maybe take just a quick 2 minutes or so to offer any closing thoughts you may have, and then we can…

Bruce Griffin

executive
#36

Yes. So how I see it is that Q4 was a solid quarter on the production side, even though we were sitting at the low end of our mining. That tells us there's room to generate additional material with what we're doing right now. We're getting nearer to a clear picture of how we lift mine output to fully feed the plant. So we are definitely — we're in that. There is momentum on the production side and we anticipate that continuing. And then the really big shift for me, when I compare where we sit in the market with where we were coming out of the September quarter — no zircon sales, a limited customer base — it's transformational. We have far more customers now. We have new and existing customers both performing. Marketing to 10 or 11 people is much, much simpler than marketing to 3. So I certainly feel far more confident about volumes from a market standpoint, and that's ultimately the thing we can control. I mean, the market price isn't something we control. I think we are seeing the market price and that's what we would expect. But I feel that, certainly in the current quarter, the quarter we're in now, the March quarter, we'd certainly expect we should begin to see that flow through into actual sales performance and so on.

Bruce Griffin

executive
#37

We anticipate that shipments during this quarter will be quite robust for ilmenite as well as zircon concentrate.

Peter Gadsdon

executive
#38

Okay, Bruce, we truly appreciate you taking the time, and thanks to all of you for being here. You can find contact details on the screen on the website too. If anything else comes up, reach out to the team. Bruce, many thanks.

Bruce Griffin

executive
#39

I appreciate it, everybody. And thanks to you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Sheffield Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Sheffield Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sheffield Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.