Sigma Lithium Corporation (SGML) Earnings Call Transcript & Summary
August 14, 2023
Earnings Call Speaker Segments
Ana Cabral Gardner
executiveOn page one, I'm pointing everyone to the disclaimer. A number of forward-looking statements will be made during this call; so please take the time to read that disclaimer about forward-looking statements. Sigma turned into the first producer worldwide of green lithium with zero carbon, zero tailings, and zero chemicals. Put differently, we are driving a transformation within the electric vehicles industry. That is what makes what I'm about to share with you so exciting. Ultimately, we secured the top honor in sustainability by zeroing in mainly on three areas: the ground disturbance caused by tailings dams, lowering airborne effects via reductions to our greenhouse gas carbon footprint, and water protection achieved by keeping hazardous chemicals out of our production facility. What you see here is an overhead shot of our operation. You can spot the dense media separator, and on your right side next to the thickener sits the tailings third module — the earliest unit of its type to dry-stack ultra-fine tailings all the way down to 12%. Now here's another aerial view of our plant. Looking at the ROM pad, that's where the first module—the crusher—gets fed with spodumene ore, which is then turned into a battery-grade Triple Zero Lithium concentrate. Deliveries are shown here, and on all fronts the ramp-up has gone well; and what matters even more is that we're making headway on growing the plant so that capacity becomes three times what it is now; so there are 5 aspects to today's call, and I'll try to go through them in some detail. First, guidance is being confirmed—we're reaffirming 130,000 tonnes of concentrate for ERM. So this target will be hit by December '23. The ramp-up has been a success. The dry-stacking module was the last one to reach full commissioning at capacity, and we've handled that successfully. We're moving toward that milestone now. So at this point it represents a tremendous achievement in innovation—spanning sustainability, plant technology, and lithium processing technology. On top of that, we completed our first-ever shipment of Triple Zero Green Lithium along with by-products near the close of last month. Going forward, we'll be running these on a regular schedule, and I'll share more details with you about that later. Additionally, we're currently deep into advanced detailing engineering, working out CapEx figures up to the FEL3 level as part of our production expansion efforts. On top of that, we're expanding what we have in mineral resources by moving into Phases 5 and 5, where we're examining some early indications from Pegmatite extensions, which could let us push our possible output higher still through a prospective additional line. What matters even more to everyone involved here is that we've been rolling out, steadily and successfully, all of our flagship social development programs, and that brings us a sense of pride while fulfilling our commitment to raise up the community as we hit our targets; so I'll walk through all of those items and afterward address the financial side of where our operation currently stands. Alright, so what you're seeing here is our industrial blind audience — and honestly, there's no better way to show you the night from this month than with a video. Basically, what you just watched was the dense media separation module, known as Module 2. On the right side, that was the Crusher, which is Module 1 — the very first module to be commissioned. So here, we're going to discuss that plant a bit. The ramp-up has turned out to be a success. Guidance is being reiterated; we will be producing 130,000 tonnes of that beautiful material you see to your right. Its purity is very high. We've managed the incredible achievement of concentrating to levels even beyond 6%. In August, we achieved 95% of throughput capacity — another way to say it is that the facility is now running wide open to reach what we call main plate utilization. Remember, main plate utilization is at 85%, and utilization isn't the same thing as capacity. Utilization means the hours the plant stays running — this is a plant that handles 200 tonnes per hour. So using utilization, we can work out production. As for design capacity — with the design it has today, the plant ought to turn out 270,000 tonnes of material. And during August, we in fact got to that number. So we reached it. So, look, the facility exists. Everything from here forward is really just about calibration and fine tuning. That's the reason our confidence is so high when it comes to hitting the guidance we've given for this year. One more really key thing when it comes to ramping up the plant has been getting those main plate recoveries where we need them, and that's what let us make that beautiful material you see on your right. To put it differently, our recovery rate now sits at 65%. And we've kept it at that level over multiple days in a row, now that we've gotten past the cautious, safe approach we took to ramping up the dry-stacking module. So at this point we're reliably turning out very high quality, and we have the capability to produce 6% lithium oxide triple zero. Thus, we're revising the range upward to somewhere between 5.5% and 6%, on account of the commercial specifications that currently dominate the market—since the majority of producers sit right at 5%. Still, this reflects how good the ore is, how good the material is, and how well the dense media technology manages to separate, purify, and concentrate what we've got, and it does so beautifully. Everything is performing the way we anticipated. Even more significant, though, is that we've moved into innovative ground by accomplishing something no one else in our sector has done—a genuine first—which is to dry-stack all of our tailings. Along those same lines, we've also hit daily output records of roughly 150 tonnes. If you take that and multiply by 24, then by 30 days, you can scale it up to get a picture of what this plant can do at full capacity. So we have a lot of confidence that we will likely hit nameplate capacity during Q4, which is what we've been expecting. And I think the key thing about dry-stacking is that we were tweaking the moisture level. The point of dry-stacking is not just to do dry-stacking — it's to do it at a moisture level that keeps those piles cohesive, and therefore stable enough to be stored. So on the right-hand side, I'll show you the circuits, alright? This is where the circuits end for the primary product. So over here we have this — a picture worth a thousand words, as they say — this gorgeous pale green lithium concentrate that's granular. Its granularity averages roughly 6.5%. So basically, it's lovely — a lovely granular lithium concentrate. Moving to the following page, once again, videos and pictures speak a thousand words. So we're going to walk you through the 2 portions of dry-stacking — the 2 essential portions of dry-stacking. The initial one is the portion of the industrial circuit responsible for dry-stacking the ultra-fines; so here it is. And you can observe the cake. Then it travels along the belt the entire way to the pile. And you can see how the pile holds its integrity right at its outermost edge, which shows just how low the moisture is.
Ana Cabral Gardner
executiveAlright, right at the outer boundary there, the top portion of the ultra-fine tailings pile is plainly visible, along with how structurally sound it is — which serves as a straightforward visual proof of the low moisture content and how well the ramp-up of this circuit has gone, correct? Here's the remainder of the tailings. So there are 2 types of tailings you can observe. That matters a great deal, since when we discuss Zero Tailings, the idea isn't that no tailings get produced — they do — but thanks to our innovation and our willingness to take a risk on building a dry-stacking circuit for ultra-fine material and the coarse grade road, we're able to eliminate them. As a result, the by-products get utilized: the left byproduct, coarse grade road, used for staining roads and staining rural roads for our community. Meanwhile, the product on the right genuinely holds value. We've managed to sell it at roughly $350 to $400 FOB, and that covers a meaningful share of our cash costs, plus nearly all in sustaining costs. So it's wonderful that being a pioneer in dry-stacking these tailings has brought us a financial reward. That's the financial payoff from what we've done. Now, this page again shows more of the operational success achieved this quarter. Our inaugural shipment went out in July. We shipped 15,000 tonnes of the Triple Zero Green Lithium and 16,500 tonnes of the Triple Zero Green Lithium; so at this point we have the cadence, and monthly shipments are planned. Once more, to recap why Triple Zero: the plant uses no chemicals. We're very successfully relying on dense media separation rather than chemical flotation. Zero Tailings is possible because, as I mentioned, we truly are eliminating these byproducts; so we're monetizing these green byproducts; and we're now building on this incredible success in mitigating the impact of a tailing dam on land. Keep in mind, not much discussion has happened around tailing dams in the lithium industry, yet they're every bit as hazardous as tailing dams in, I don't know — basically, it's a dam packed with chemicals that, over time, is perpetual. So 100 years from now, those chemicals trapped inside that tailing dam will travel somewhere; and where would that be? Into the water basins of the surrounding areas. So the impact on biodiversity and ecosystems mirrors what tailing dams cause in our floor. By mitigating that and eliminating the byproducts, we managed to zero the carbon; so we could offset the remaining carbon in the operation, which was very small. It came to 0.26 tonnes of carbon per tonne of lithium, a fraction of what the industry produces. So across any part of a source — salars, brine, or hard rock — we were already a very small fraction of the industry, largely thanks to this plant. So we managed to buy carbon credits simply to neutralize and reach zero, since zero is a figure that's really simple to grasp—superior to low, green; zero equals zero. Thanks to the material's quality along with all these characteristics, we've been experiencing incredible commercial triumph. What I mean is, we've assembled an outstanding roster of clients, clients that are essentially extensive downstream—automakers, battery manufacturers, all of them. Thus we possess a really robust and outstanding client roster since it merges environmental sustainability plus essentially indisputable product credentials, yet with premium pricing, with the premiumization of the product owing to the product's superiority on technical grounds by itself. Put differently, the product is granular, with an average grain size of 6.5 millimeters; it extends up to 9 millimeters. Therefore it's granular coarse, boosting productivity for downstream, for our customers. There are notable purity levels present, it's extremely pure, extremely low potassium, extremely low sodium; alkalis, potassium plus sodium combined sit well under 1%. Thus potassium under 0.5%, sodium near 0.5%, and there's iron oxide where we remain well under 1% once more, 0.7%, 0.77%, 0.8%. So extremely high purity regarding these 2 key impurities, which diminish productivity downstream. Consequently the premium pricing of 9% signifies the following. We're capturing 9% top line value from refining, an astonishing feat. Put another way, refining is an operation that depends on our product to supply their product, and we're capturing top line a 9% value. That's the meaning of premium pricing. The index averages Korea, Japan and China lithium hydroxide pricing, yet still, we're price setters right now due to these traits: high purity, high quality coarse, granularity, plus the free attribute, which is the most sustainable product within the industry. Here once more, pictures convey a thousand words; we demonstrated how these tailings get made, how wonderfully that circuit, the dry-stacking circuit, operates. And here you're able to view the product up close. Even the tailings are grainy, they aren't milk, they aren't talc, they aren't micronized, they aren't micron level. So even the tailings are unbelievably, unbelievably efficient in the flotation where they get utilized to turn into more lithium concentrate by our customers from these by-products. The green lithium is gorgeous, it's on your left, and to the right, the employment of these tailings we've been talking about here. I'll discuss somewhat more regarding Phase 1 and the primary milestones and where we're aiming to reach with the product. So you can plainly observe how we've been fulfilling each promise, delivering on all we stated we would. Thus, the crushing circuit was brought online when promised, the DMS was brought online when promised, output began when promised, and we are increasing toward nameplate capacity quite punctually, despite having accomplished something nobody else has ever done, namely dry-stacking tailings, which served as a reason for essentially cautious behavior on our part. Commissioning had to proceed gradually, and ramp-up had to proceed gradually, since that circuit required testing to determine whether it would perform, and perform it does. Still, this demanded caution and patience, particularly during June and July as we approached that circuit. So we moved to circuit 1, located here, the crusher, followed by circuit 2, the dense media separator, which performs superbly, yet the dense media separator links to circuit 3, which comes after the thickener, the dry-stacking circuit here. Therefore these 2 circuits are connected symbiotically. Thus one circuit's performance tied into another circuit's performance, what we refer to as the wet circuit. Consequently, we could not have witnessed the dense media separation plant at full strength unless we had managed to commission the dry-stacking circuit successfully, since that environmental decision was made from the very start. So there it is, correct, so we arrived at this point, and the roof is being installed, and we are achieving shipment cadence. A second shipment and a third shipment will follow on a monthly cadence, so we remain on track to reach our guidance figures. Here we are sharing everything, so transparency as always.
Ana Cabral Gardner
executiveAs you can tell, we’ve been following the data ever since we began commissioning the dry-stacking circuit, which shows why it matters to grasp how those two circuits were linked. The main plant and dry-stacking operated in tandem. That’s the wonderful part. We were delivering steady operations and effective plant recoveries — full stop, correct? So even while dry-stacking was gradually being brought up, short of its maximum capacity, the DMS, the main plant, performed superbly. Put differently, what this shows is us consistently reaching 6% lithium oxide for nearly two months. It’s now early August, so as you can see, from June 13 to August 12, two months of data, and you can see the steadiness. On the right side, you see the head grade — blue for head grade, orange for concentrate — so wonderful consistency in getting the product right. So again, dense media separation was a go. Now, how does the magic operate jointly? How do the processes interact? Because they’re like Siamese twins, and that’s the correct term; we cannot separate them. Why can’t we separate them? Well, the thickener is essentially mud. We lack a tailings dam. If the dry-stacking circuit weren’t operational, we’d have nowhere to place the mud. So we had to commission the dry-stacking circuit gradually so that we could truly let the DMS unleash its power, its full capacity toward that dry-stacking circuit. And it was a mix of several fronts — filters, membranes, filtration, tweaking the thickener — and we achieved this. And here it is, data, and you can plainly see how we’ve been now, right there; so we’ve been reaching — so during the time that plant was ramping up, we recovered at a lower level because the whole plant wasn’t fully at capacity. So as we reached capacity, you can plainly see how we just shot up — dry-stacking works — so as we raised capacity, the entire circuit began to work beautifully; so that’s here, recovery and yield, and that gave us the confidence to basically, you know, just smooth sailing from now on. And it’s a tremendous source of pride. At the mine, also, the same thing. We’ve been executing according to plan. I mean, again, the mine feeds the industry, so it’s a fully integrated operation. So we’ve been consistently hitting the mining cost in the technical report, so no news there; and then once we have this under our belt, we will talk about expansion. So we've been exploring several possibilities regarding growth, since appetite for this material is simply exploding — driven by its sustainability profile, its quality, and the increasing demand for electric vehicles. Plus, since we're the lowest cost producers, pricing becomes a secondary factor for us, in the sense that we'll produce strong cash flows no matter what the pricing environment looks like. So for us, it always comes down to how fast can we deliver more, more, more material into the market, correct? So as you're aware, we hold a substantial reserve base. We've got 86 million tonnes of resource, along with roughly 54 million tonnes of reserve, meaning we can genuinely boost production throughput and production yield by adding more production lines. After that, we'll focus on our 9 former mines to extend the longevity of the project. So once again, for this company, the resources are so enormous that it's simply a question of being able to — or choosing to — construct this line train, and what throughput capacity we think we can truly place within the industry. So at present, we've only completed Phase 1. So we'll hit 270 annualized within a year's time. So basically, on an annualized basis, we've achieved this; so we grasp this circuit. We grasp this media separation circuit and how it performs for our mineralogy, our material. We're about to construct 2 additional lines, which will triple our capacity; and then we're exploring a fourth line; so maybe we'll build 3 more lines by 2025, 2026; we're going to build with higher capacity. So that's the work we're doing here when it comes to Phases 4 and 5. Here, you can see a modification of a slide we've been presenting to you for quite a while. The FEL3 detail engineering is underway. We're fully funded; we secured a shareholder loan, and now we're in full cash flow generation mode. The company's costs, as you can see, are being substantially covered through the sale of byproducts. So this has turned into an incredibly asset creative exercise — producing and selling main product byproducts. And as a result, you can see the analysis being carried out in the context of detail engineering concerning more line trains, perhaps 3 more line trains. Where could you place that given the elevation of the terrain? You can see the ROM pad here. So that's the elevated portion; so we can build them perpendicular to the current circuit. Most likely, that's what will happen, since we have a larger area there with the right elevation, the ROM pad. So these are the discussions and analysis happening right now; they're being led by our Chief Operating Officer, who, as you can see, has been incredibly busy; so here's the view of it, right? This is the second piece Brian Talbot is examining — specifically, how should we approach the elevation area where we could actually run 3 line trains and afterward achieve a third additional capacity, once we construct those 2, or build the 2 right away and then add a third right after. And once more, product demand has demonstrated it can fully back the throughput we'd be adding. Again, Triple Zero, ultra-high quality. Having both of those traits together in the market is something no one else offers. Basically, we're the only company with that combination. So here's a visual, and you can spot where my arrow points. I'm not certain you're able to see it. This is pasture; it's also something our environmental team is happy to see; put differently, we'll skip across this section since vegetation grows there. We prefer not to remove vegetation unless it sits on the pit. Usually, that isn't something we do. So we'll head directly into what we refer to as an anthropophytes vegetation area, where no trees need cutting. So pasture zones, and there we'll construct our 3 line trains; at the very rear, you can observe this was previously a patio used for truck maintenance at the mine; so it's genuinely a spot that already possesses industrial capabilities. Our gas station was located there; our industrial setup was there too. So this is a spot under consideration for expansion. So we'd likely go perpendicular; and here's a little more of that timetable. So what I think counts here is that we're working through all these trade-offs at present, correct? So 2 lines, 3 lines. How should we carry out this construction? We've been putting cash to work.
Ana Cabral Gardner
executiveWe have been spending on this build, on detailed engineering, and on other items. So FEL3 detailed engineering is in full swing. That runs expensive; so we can pay for it through a shareholder loan that came in, and we can also pay for it out of cash flow we generate ourselves. So we are set to keep producing a substantial amount of cash moving forward. So the intention at this point is to anticipate it at this stage. We are placing orders for long lead items during Q4. Once we have a handle on 2 plants, 3 plants. This build takes 8 months. So it is in fact pretty quick given that we are essentially finished with all the infrastructure, such as the substation. So Phase 1 will be a different kind of build, when we must get the site ready and get everything ready. We will simply install 3 line trains; that is the intention at this point. Basically, we anticipate beginning production and delivery; we anticipate beginning commissioning of this plant in September of the coming year; and we anticipate starting to receive equipment early in the summer, in June, July. So everything is more or less proceeding as planned. Here comes more growth, more additional growth, more, more, more. As you can see, to sum up, we hold 9 former lithium mines. This ranks among the richest lithium properties in the Jequitinhonha Valley, the Lithium Valley in Brazil; we began with Grota do Cirilo, which gives its name to our studies, since that was where there were additional former mines, additional large pegmatite formations. As you can see, Jequitinhonha, which is phase 1, lies to the north. At the bottom, we have Phase 2. Everything is interconnected. So as you can see, there is a string of ore bodies and pegmatites that are not necessarily connected to one another, but they are adjoining or they are adjacent, meaning they sit very near one another; so here we have Phase 3 — sorry, here we have Phase 3 and then we have another ore body between Phase 3 and what we call Phase 5, which is called Camboriu. And then we have Lavra, which is part of our current mineral resource and is now being drilled to the level of its potential; and then we have Murial, which is being drilled; so, all of this adjoining; so we essentially intend to announce that once we actually settle our thinking around a fourth line train. So, this will be the — and again, the fourth line train has nothing to do with Phase 4. It is very important to state that. The fourth line train is how we will help deliver the lithium that will in fact support this extremely rapid pace of growth in electric vehicle demand in the Western markets as a result of this incentive plan. So now, beyond China, which was the sole market, we now have Europe moving at full speed. And then the U.S. came forward as the fastest growing EV market as a result of President Biden's green plan. At this point, our industry has 3 markets that need backing. Here's what we bring to the table. A fourth line train is going to be added so that more material actually reaches the market; once more, we'll look at that down the road. As far as we're concerned, demand matters more than lithium prices, correct? That's how choices get made regarding construction and throughput, since our production costs are the lowest. Because of that, nothing we do here hinges on prices being high. Finally, let me add this. Beyond the technical skill of our truly remarkable, truly remarkable technical crew, one thing this company takes great pride in — we're coming through on all fronts, on each promise, when it comes to bringing this community along with us. So, shareholders, we are all benefiting from the prosperity of lithium, and the communities are sharing in that prosperity alongside us. That's why we're renovating the schools. On a per-school basis, we ran this as a test pilot school. Each school costs $70,000; next year we'll likely be doing 10 of those schools. For that school, it's an entirely different situation. Previously this was a rural school with 2 classrooms, where kids aged 3 to 10 were crammed into 2 classrooms. Every one of us Brazilians felt shame that schools like that existed next door, where the facilities seriously held back the children's ability to learn. So our work involves constructing superior facilities for them, complete with libraries, with classrooms, with additional classrooms. To make the rural communities nearby more accessible, we're adding a bridge so people can reach the school, so they can reach the asphalt. Our plan is to turn this into a model school, a pilot, featuring not only the building and the facility, but a strong afterschool program too. Since many parents in that community — the one located squarely amid our areas — are employed at Sigma. The women are employed at Sigma, a great many women employed at Sigma. Therefore an afterschool program is being added as well. So once again, from an academic perspective it's a pilot program. From an installation perspective it's a pilot program, in the sense of doing things fast, building fast, building cheap, which mirrors the mindset behind everything we do; so we'll likely be doing 10 of those, which, once again, is a first when it comes to the speed and comprehension of the program, correct? Now, the financial numbers — where do we stand? Well, we're making solid progress. We're entering the ranks of the super majors. As you can see, we possess the mineral resort and the ore bodies needed to back it; at this point, we can claim we have a fantastic sustainable plan to back it; no other company does Triple Zero lithium, Zero Carbon, Zero Chemicals, and Zero Tailings. So our view is that we've now got the proper circuit in place to expand, and that expansion won't come with any legacy of environmental damage. That's the reason customers further down the chain — car manufacturers, battery producers — handed us such a huge competitive edge when it comes to this material, since it's a way to grow that can be sustained and to serve this sector, which is turning out green vehicles. Green lithium, then, for green cars. Our plan is to add 2 more line trains. That brings us to the complete 37,000 tonnes LCE annualized capacity, equivalent to 270,000 tonnes of lithium concentrate. After that, with 2 additional line trains, we anticipate reaching 100,000 tonnes of LCE, roughly 760,000 tonnes of concentrates. And beyond that, we're toying with a fourth line train, once more backed by our 53 million tonne reserve, given where the industry stands right now. A line train here pays back within months — 2 months, 2.5 months, it depends on what the material is priced at. Extremely brief, extremely effective. So why wouldn't we? And you can also observe that there's a disconnect.
Ana Cabral Gardner
executiveSo, once we get this rhythm down, we're hoping all of you will give us that producer recognition, since we're only now finishing ramp-up, we're about to begin shipping on a regular schedule, and we're stepping into the producer world, where we're positioned to get producer valuations, correct? Here's the thing: for Sigma, prices hardly matter, and the reason is that we rank among the lowest cost producers globally; even more crucially, selling our by-products shrinks our cost dramatically. A large chunk of our cash cost is in fact offset by by-product sales. I mean, we're getting $350 to $400 per tonne for that material. And just to remind everyone, our cash cost comes in at $290 according to feasibility, while all-in sustaining cost is $530 according to feasibility. Clearly, figures will look different while we ramp up; we'll present those next quarter. But really, that isn't where the attention belongs. What matters is demand, since we can supply this low cost, high quality, triple green lithium into any market, at any point in the cycle. And we hold this embedded edge in sustainability; we're simply running scenarios at varying prices, where you can plug in whatever prices you like. So we did it per unit, and we did it full in across the 3 combined phases. This is purely an illustration. That chart on the right matters most, showing forecasted prices in red; and if you trace it all the way down, even at $2,000 per tonne of material, you can see the gap between that and the dotted line. That's our cash flow. So we're generating strong cash flows no matter what, essentially; and that's what's great about being low cost producers. Keeping dense media separation in the process was essential to that. Processing costs represent our biggest competitive advantage. Mining costs are roughly comparable, but processing costs are what set us apart. Our processing costs sit far below our peers'. To give one example, for electricity alone, we pay $0.02 of a dollar per kilowatt hour for green renewable power. So that by itself is a fraction of what renewable power, or any power, dirty or clean, costs anywhere on earth. And here's a key point. I mean, there's a disconnect. We're now gaining credibility as we build, narrowing the gap toward eliminating that disconnect. So as you can see, by the time we reach 270,000 tonnes, we'll get to the 37, which is the yellow colored ball; and we're advancing steadily as we build Phases 2 and 3 toward the expansion; and then possibly Phase 4, we'll reach 104,000 tonnes of LCE, which again aligns with our 3 peers. So where we're headed as construction proceeds is quite clear. The key takeaway, though, is this: we've got a highly innovative circuit that we've spent time tuning, tweaking, and refining on the innovation side — that being dry-stacking. And throughout the dense media separation step as well, our Chief Operating Officer, Brian, has been honing several elements of that circuit. So today, what we have is a purpose-built, sustainable circuit that is essentially a repeatable unit matched to our mineralogy. And again, no two mineralogies are alike. Ours, naturally, is crystals, correct? Since it comes down to the calibre of the material, of what we hold, the coarse crystal mineralization, which suits this dense media separation method exceptionally well, plus the fine-tuning of the circuit — dry-stacking even ultra-fines, right? There are additional figures here, the crowded slide, but the core point I want to leave with you is the Phase 4 fourth-line train, which originally sat toward the back in the plan, and now we're likely moving it to the front, since it's at the front of the project's life that we face the heaviest demand pressure from our clients. We're in the middle of a full ramp-up of EV demand from consumers, and not every project that was pledged to come online actually has come online. So producers — Sigma among them — the producers are pulling out all the stops to serve this industry, given that commissioning and ramp-up of the new projects moves slower than most assume; it's behind schedule. So essentially we're attempting to close that gap with as much material as you possibly can, and sustainable material at that. And as you can see, applying the price assumptions from the original study, which we will revise, the payback came to 1 month; so, really, right? So what we'll basically do now is revise the prices, but here's what happens: if price gets cut in half, so we're talking $2,000, payback would land at something like 2 months; so it's a choice that holds regardless of pricing. That's the point we're trying to demonstrate here. As a low-cost producer, a seller of by-products, for us, putting additional material into the market simply comes down to whether demand exists for this material. And the answer is an emphatic yes, right? And so here's the closing. I mean, we deliver on every, every front. There's a level of consistency here and focus that truly has no equal. I mean, we operate this business like a technology company; it's extremely demanding on all of us executives. I mean, we feel the pressure, we feel that pressure daily, yet it's just steady delivery of milestone after milestone. I mean, with this being an industrial operation, you can only imagine how demanding it is on people. That's why we keep growing our human capital ranks. We keep building our teams. We keep adding more amazing individuals, such as the 2 men who are now jointly heading the finance team, Raphael and Caio. Raphael hails from a lengthy heritage, you know, of businesses that operate in Brazil and list in the United States, among them CSN, a well-known steel producer here. It has had a US listing for nearly 25 years; after that Raphael joins from Cargill, and he will oversee the controls functions as Chief Control Officer, driving SOX implementation and strengthening internal controls; Cargill, then, is a North American firm, SOX commodities, commodities operations; so once more, an outstanding team. And once more, we perform across the board. Finally, you know, first shipment, zero carbon, dry-stacking, zero tailings, eliminated the tailings, selling by-products. I mean, everything, correct? So what comes after? Well, finish ramping up this plant. So once we reach name plate capacity, we're attaining it, right now we're entering 10 days of that, but we will likely reach it in the third quarter consistently and then steadily. And second shipment, third shipment, fourth shipment, and then we're finished. And after that it's on to Phases 2 and Phases 3; so here is Q&A. I'll stop sharing and we move directly to Q&A. So another question. So could we discuss the choice to use trucks rather than heavier mining equipment for pit work and hauling ore?
Ana Cabral Gardner
executiveWas it that we anticipated more downtime for maintenance, or was it OPEC? If you aren't being paid for it through the price of the product, does meeting ESG requirements actually pay off? Well, look, when you set mining costs against the total cost, they're negligible. I mean, you can see it takes $2 a tonne to mine this; and the slides showed you; so this is a key point. The cost elements we're discussing are negligible. Negligible, $2 a tonne. The final product sells for $3,500 a tonne. Even under bear market forecasts, it's a $2,000 a tonne product. So it matters to grasp that mining serves as a feedstock for the industrial operation. So, in the industrial side of the business, what's really under our control when it comes to expenses? That makes our processing costs a key piece. Going with this meter separation approach puts us way out in front — well ahead — when it comes to making progress, just by holding those costs down. The reason is that dense meter separation is a relatively less complicated route than flotation, so by its very nature, its costs come in lower. So when you compare mining with the plant — I mean, the choice to bring in trucks was made for social reasons. And you can see how weak the industry's social license is in Brazil, and how much pushback, even stigma, this company — which is flawless on environmental and social fronts — faced when it started operating. What kind of resistance did we face? Nobody ever gave us the benefit of the doubt. Take Brazil, for example. The moment you start a mining operation there, you're treated as guilty until proven innocent. And within two months of operating, we showed everyone they were wrong — though it wasn't easy. So what advantages did we have on our side? The large number of local residents working for this company. Plus, using fewer trucks and more workers made redeployment simpler — people who'd been driving trucks elsewhere switched over to operating off-pit vehicles. To really understand the unique and extraordinary social license we hold with this community, with the Lithium Valley area, with the nation, with federal authorities, with state authorities, you have to grasp that. In other words, we become a force for positive transformation. This is a positive thing overall. That connects directly to the choice we made. So, addressing what you asked: yes, the benefits justify it. The benefits clearly justify it — and keep in mind I'm only talking about the social dimension. Let me now turn to the environmental dimension. When it comes to biofuels, our smaller haul trucks are designed to run on them, which puts us at 15%. Getting to 50% would be easy for us. These days we bring carbon emissions down to zero regardless, so that part is already handled. Still, the biggest factor driving this was the social one. The reason is that instead of deploying 100-tonne trucks, we deploy 40-tonne trucks, and that adds 2.5 more jobs, right off the bat. As a result, people from the surrounding community have work. No one employs more people locally than the mine does. The overwhelming majority—95%—of the people working at the mine come from the surrounding towns. They were born there, grew up there, and were raised in those communities. That's 95%. Those figures are truly remarkable. So how did we pull this off? We succeeded by bringing those individuals back. We restored the community. We gave those folks training, and we were able to quickly transition their skills toward running trucks at the pits. So basically, if anyone would like to review head grade, concentrate grade, mining cost, along with the progressions and lines once again, that information will be posted on our website. So really, what we've accomplished—as you're able to see, let me go back to this, if that's possible. But let me verify whether I can keep sharing this. All right, here we go. Returning to the question. All right, let me pull that up. Just making sure everything lines up, right? There we go. Okay. Let's look at concentrate and head grade. As you can see with our concentrate — basically, getting it down to 5.5% is a struggle for us. Left to its own devices, this material would run at about 6.4%. So right now we really have to pull it back — meaning we bring it down to 5.5% — because obviously the pricing formula calls for a 5.5% spec, and the contract locks in 5.5%, so shipping at market spec is what we want. Our competitors ship under that level. We ship at market spec. But if the plant were allowed to run wide open, what you'd get is 6.3%, 6.4%, 6.0%-plus material. To put it another way, what really matters here is how good our material is and how good our methods are—you need both working together. Thanks to the way we run things, the particle size stays true, which makes the end product worth more because those particles come in at 6.5 millimeters. That translates into greater efficiency too: downstream, we're about 30% more efficient than the competition, and that's because of both purity and particle size, especially during the initial stage of chemical refining. Now, on the mining side, there's another slide worth checking—the one tracking how mining costs move over time. It's right there in plain view. There we are. Here it is. That's what consistency looks like. This kind of ties back to what you asked before. I get why it seems odd — it really does go against what you'd expect, and I completely understand where you're coming from. But here's the thing, and honestly this is part of why I'm here: to show you just how backwards it seems. The mine isn't where our attention is. Our attention is on the plant, correct? And the mining costs have landed right at the feasibility level with impressive steadiness, right? That's what opened up the possibility for us to think, okay, we genuinely have some flexibility here. We're able to take a different path — whether that's on environmental sustainability, using more biofuels, or on people. By reducing our truck count, we're able to bring on additional staff—every one of those workers, all the community members we value who had left and were operating trucks in other sectors, can be brought back here. Regarding shipping expenses to China: we don't cover those. The prices we quote are FOB, meaning we publish them on an FOB basis, correct? As of right now, I'd put freight costs somewhere in the range of $65 to $75 per tonne. That's a significant decline. Even so, those charges aren't ours to bear. The buyer handles securing the vessel, and after loading is complete at the port in Victoria, Brazil, we get our LCE payment. That means every one of the prices we publish is an FOB Brazil price. So there's more emphasis on the sales and marketing side. What might monthly sales volume look like on a tentative basis moving forward? And what's happening with demand in the spot market right now? Let me be very clear here. We do sell spot, but we are not captives of the spot market itself. What I mean is, we're selling spot into downstream supply chains that are very well known. So the spot element is really about pricing and the sale mechanism; put differently, we sell to end users who are very, very well known. And those end users are beginning to appear as customers of our customers; that's why we disclose our customers' names. Their customers, the automakers who buy from them, show up because in the end there is green lithium, triple zero green lithium, entering that line. So seeing our clients' clients emerge is genuinely something we take pride in. We are now exploring 3-month contracts. So once again, the thinking is to keep the unit intact so we gain flexibility, strategic, downstream, planning to build what we refer to as the basic chemistry potential technical great carbon at all lithium sulfate.
Ana Cabral Gardner
executiveWhen we consider all of this, our units need to stay very near to us, since their strategic worth is enormous. The idea behind spot is basically the way we conduct transactions; we have customers who would choose 3-month or 4-month options within a year. That gives us dependable demand security. And really, this product essentially sells itself, correct? Another point concerns the market — you brought up tremendous demand against carrying capacity in the near to midterm. What about alternative technologies, sodium-based batteries down the road versus lithium-based ones? Okay, so when I look at China, I see CATL's sodium-based vehicles, and honestly, the engineering behind them is impressive. But you have to remember, those were developed during a period when lithium hydroxide was priced at around $100,000 per tonne, and that kind of pricing simply wasn't sustainable if the industry wanted to keep growing. And that's one of the — Sigma has been one of just a handful of companies that has spent the last 2 years saying exactly this: this sector needs discipline in order to produce low-cost volumes, so we don't make ourselves obsolete, correct? And we're not afraid to say it. So ultimately, it's the technology customer who sits at the very end. If the lithium industry loses discipline on delivering supply, pricing, making fair pricing for everyone in the supply chain and so on and so forth, we will render ourselves obsolete. And certainly our end user will innovate somehow. The history of this industry, I've been here like for 10 years, right? I've watched a lot of these battery materials literally rendering themselves obsolete for lack of sustainability, lack of availability, concentrated output, concentrated production locations and all the classic mistakes. The energy transition is not going to happen to deliver the same situation we had before with fossil fuels; so the purpose of this is actually to have a widely abundant, low cost and sustainable. That's essentially the reason we're confident we're being pushed in a positive direction; we make that cheap, plentiful, sustainable option possible. We're positioning Brazil in a different region. So that gives us yet another edge with our customers. It's a different nation, a fresh location, geographic spread, and we're present there; so it makes sense that our customers would buy this product from us. So sodium sulfate doesn't strike me as a danger. What I see is a signal. The signal that came from downstream told the sector to stay disciplined, to be sustainable, to act properly. And that signal, in my view, was received by the bulk of the sector. So we observe the manufacturers doing exactly that. Also, it sent a solid signal to emerging businesses, encouraging them to adopt that same producer mentality, correct? When it comes to the sodium sulfur vehicle, its level of autonomy is extremely, extremely limited. Once more, my view is that these were created with a specific objective in mind, right? Essentially, to demonstrate to the lithium sector that we aren't all-powerful and isolated—innovation sits right at our front door as well. Even though lithium is indispensable, it's remarkable—on the periodic table, it holds the position of third-lightest metal. Technology is still technology. Our customers are extraordinary, and they can accomplish extraordinary things, right? So would you mind giving your perspective on lithium price restraint across the EV materials industry? Is it a sign of soft demand or inventory reduction in China? To grasp what's happening, we must examine supply with a clinical eye. The topmost tier of supply involves an obscure substance known as lepidolite, which is dreadful regarding sustainability. Consider pre-stripping: each tonne of lithium yields 35 to 40 tonnes of waste in a heavily rainy area. That waste ends up in a single destination—the rivers. Thus, it's a stopgap measure until mid-cost suppliers can supply additional material, which is beginning to occur. Consequently, we observe prices declining. Currently, it's roughly 35, 30 to 35 to 30 tonnes, tending toward middle to high levels. It isn't at the ultra-high point to render anything viable, yet it's reaching a level that enables mid-cost manufacturers to be highly profitable while also driving out ultra-high cost, unsustainable participants. So what we're monitoring in the sector right now is that shift back to normalcy, where mid-cost producers, emerging firms, everyone is sort of bringing more material forward. Meanwhile, the very top end of the cost curve is being eliminated, since they'll be priced out. Honestly, at 35,000 tonnes, a significant amount of environmentally unsustainable lithium remains viable, which itself signals robust demand. I mean, lithium is presently priced perfectly to render nearly all operations out there profitable. It's not the kind of margins we enjoy, sitting near the bottom of the cost curve, but they're good enough to justify going ahead with it. Over time, as additional companies on the mid-to-low end of that cost curve—Sigma being one example, sitting right at the bottom—continue to deliver, we'll see pricing ease back step by step. That, in our view, is the mission: supplying lithium that's both low-cost and sustainable, which gives the industry resilience—tying back to the earlier question—and ends up making itself unnecessary, correct? So pricing has to be fair; it has to sit at a point where margins can be had all the way through. And that's a point meant for downstream as well. During the prior cycle, value capture was concentrated in downstream operations, which proved unsustainable—upstream majors filed for bankruptcy across 2019 and 2020. Now we're witnessing what appears to be a different cycle taking shape, one emerging outside the normal timing. Our hope is that it unfolds more responsibly, informed by what we've learned. As for demand, I see no weakness at all—quite the opposite. The issue I'm seeing is that critical materials are creating a bottleneck, preventing demand from being fully unleashed in EVs and government incentives. Regarding new mining jurisdictions? I can't comment on that. I simply cannot talk about the lithium valley, and what I witness right here in Brazil is simply extraordinary. Already 3 publicly traded firms are exploring materials in this location, so there's a tremendous amount of enthusiasm surrounding this area. Once more, extremely inexpensive and plentiful renewable green electricity costs $0.02 per kilowatt hour, so the company's attention ought to be solely on Scope 1, and various businesses are pursuing various initiatives. Yet for investors, this area is outstanding, it's welcoming to mining, it exists. This area is welcoming to mining, and that's the key point, correct? The nation is gradually becoming welcoming to mining, yet this area already is. And that's significant, since you're essentially supplying a region that accepts it; it's their opportunity to escape dreadful degrees of poverty. It's their once-in-a-lifetime opportunity, and they completely accept it. They greet everybody, their firms from Australia, Canada, the United States, plenty of foreigners. Basically everyone is a foreigner, and they feel tremendously welcomed.
Ana Cabral Gardner
executiveThe community really takes to them. It's incredible—genuinely incredible, the things going on in that place. Every one of you ought to make the trip to Hechingen. So Brazil, in my view, is today's mining frontier. Moving on, does anyone have thoughts on how Phase 4 expansion gets funded—off-take agreements, equity, debt financing, all of it? Well, here's the thing: we generate a substantial amount of cash flow, correct? So really it's just a continuation of what we've been doing. If you examine the cash flow levels coming out of this business—let me bring a slide back up so everyone can re-familiarize themselves with our cash generation. People ask me things like, what on earth will you do with all that cash? I'm serious. After-tax earnings margin sits at 75%—that represents an enormous amount of cash flow, an enormous amount. Now, those line trains you see—those are dense media separation line trains. According to the initial feasibility study, each one could run roughly $80 million. So it comes down to simple arithmetic. Internal cash generation plus leverage—we're able to lever up whenever we choose. What's interesting is that a great many financial institutions are eager to lend to us, since clearly we throw off a great deal of cash. That gives us extremely solid credit. Lenders are plentiful. We're sitting in a very, very comfortable position when it comes to generating cash. So at this point, could you give us an update on Sigma's strategic direction? Well, here's the thing—we're a business led by a financial sponsor. That fact must never be overlooked. At the same time, we recognize what this company is worth, and I believe there's a question here around unlocking shareholder value. That unlocking happens through one route and one route alone: what we've done from the very beginning—defying expectations and delivering, delivering, delivering without fail. Not a single milestone has ever been missed. That's the whole story. Within our industry, you'll find a graveyard full of companies that missed milestones, missed everything—promised too much, delivered too little. Our tendency is to promise less. Yes, we lean toward under-promising, and occasionally that's counted as a fault, but we prefer promising less and delivering more. So no milestone ever slips past us. We've done this consistently, and not in just one area. We do it across every front—environmental sustainability, social sustainability. This company has faced excessive scrutiny, and yet here we stand, delivering on every front. So that, in essence, is how we view strategic value within strategy, correct? It's a company held by a financial sponsor, but the central aim is value creation. And the sole durable source of that value is simply people—people—as in, we keep bringing in extraordinary talent, which powers execution, because as I mentioned, executing at the pace we maintain places heavy demands on people. Those are the foundational elements of value. Everything else emerges as a byproduct of that, stemming from our capacity to keep delivering, to keep delivering on the commitments we make, correct? So that's my response on the strategic side. Then somebody brought up interest in M&A. Well, look, in this sector, no company gets talked about more than us. But I'd put it this way: since we don't market ourselves, since we execute. The reason, I believe, comes down to our track record of getting things done. I mean, seriously, everyone — lithium produced with zero carbon emissions. It appears in every slide deck I've seen. We're the company actually making it happen. That's the whole story: zero. Now think about what that does for us strategically within this industry, okay? So the reason people bring us up is that we deliver. And what comes after this for us? We'll continue delivering. And the way we see it, that keeps making us more and more valuable at a fundamental level, because this is a strong business; and generating cash, a strong business, and that will take us as far as our commitment to performing takes us, correct? So hauling expenses per mine support total $40. That gives you the figure for our expense. Great question, and it's a really significant detail. Since we don't have ships available, we move it by road instead. Trucking runs us $40 per tonne. That number plays into the tailings discussion, correct? When you work out the net-net on tailings, the range comes out to $310 to $350 per tonne, and which contractor you use determines where in that range you land, since that $40 expense is baked in. The impact hits the tailings harder than the concentrate does, since concentrate goes for $3,500, right? Still, that's our sole transfer cost. The buyers provide the vessels, right, which really demonstrates how valuable this material is. Basically, they show up to collect it. So then the real question becomes: what makes you confident that the market still isn't giving the company the credit it deserves? Honestly, I'm with you on that. Part of the reason, I think, is that our attention has been turned inward — we've been concentrated on execution. And now we've reached the point where the plant is in proper order, we're delivering dry-stacking, we're delivering across the board. So we intend to get out there and tell that story more often and more regularly. It's August in the Northern Hemisphere, and everyone's away on holiday. But once September arrives, we're simply going to go out and spread the word everywhere we can. We're putting together several significant initiatives. Lifting onto the Brazilian stock exchange was one of them. Within Brazil, the industry holds us in extremely high regard—a fresh model has emerged. Uniting both federal and state authorities became possible since we restored the social license for one whole sector, actually two. Consequently, we're confident that Brazilian pension funds and major institutions previously barred from buying Sigma will represent a compelling demand source. This mirrors how our Chilean neighbors benefited from that type of foundational investor. Here, August isn't a summer month. Therefore, we're arranging many investor relations efforts aimed at getting out there and spreading that message, since we'd been turned inward, consistently executing and producing results. Once you step outside, the reaction is simply astonishment—we pulled it off. We did it. Since adjusting the plant wouldn't accomplish anything for us, there's no reason to do it. Also, placing a tailings bond in some location isn't what motivated this investment on our part; that isn't why we're involved. So from our perspective, delivery must be complete across all dimensions — social, environmental, and technical. That's the reason we undertook this investment. That's the reason we endured the entire cycle. That said, I fully agree with what you're asking, correct? We believe the company isn't being valued appropriately. Now, that affects upcoming choices regarding the asset. Anyone can run the numbers. As I mentioned, this company's biggest strength is its resilience. We're extremely big. Our product is excellent, and we're going to continue delivering it. That represents the value. That represents the intrinsic worth. And people can do the math on that. So if I — everyone, automakers talk about verticalization. Are you seeing the supply chain become shorter? No, I'm not; but I think we're seeing — well, let me — yes, I am. And I'm not, let me put it that way. What you're observing is a greater level of integration; and that is happening. You see GM taking stakes in companies throughout North America, automakers taking stakes in businesses upstream.
Ana Cabral Gardner
executiveThis is great for the sector, particularly for ventures that depend on that kind of credibility to bring in additional funding for delivery; that's something we have faith in. We also have faith that there will be a degree of integration unlike anything else, specific to lithium, owing to many factors all of you are aware of; so downstream players are showing strong interest in upstream. And it isn't limited to refining; it covers the whole chain. What's the reason? That brings us back to the demand topic. Based on what we understand about demand right now, it causes us absolutely no concern. After all, governments possess considerable resources they can direct at encouraging EV demand. What's the reason? It represents the fastest route to achieving carbon goals, the Paris Agreement carbon goals for nations in the Northern Hemisphere. Upgrading a grid for electricity transmission and generation that runs on coal and fossil fuels takes far longer. That process is much more time-consuming. Transforming car CapEx and reaching mobility targets happens much faster. Considering mobility and diesel power across the Northern Hemisphere, it's very clear where sustainability efforts and where the climate action funding from these green initiatives is headed — simply toward grabbing the easiest wins by converting mobility into low carbon, green vehicles, zero emissions mobility, since those are the simplest goals. That allows companies to demonstrate headway in contributing to climate action. So demand is not the problem. The problem is whether the industry can handle that demand without those insane price surges on lithium reaching $100,000 a tonne. The industry wasn't prepared, which explains the price surges. What we're seeing now is a degree of resilience founded on upstream and on midstream that genuinely gets itself ready for what lies ahead in this decade. Consider the scale of EV demand uptake. When we speak with our clients in China, they mention 50% uptake for new car sales by 2025, '26. Those are extremely high figures. They're almost unbelievable figures, correct? And that's just 1 market; we have 2 additional markets in play. These demand levels would have been unimaginable in 2018, at the bottom of the bear market, when we sat here working on this project, conducting feasibility in the lot — unimaginable — if anyone had said to somebody in the industry back in '18 that we'd see 50% uptake in EVs for new car sales in China by 2025, '26, the reaction would have been, no chance, you're out of your mind. That's what we're witnessing now. That's what clients inform us China will look like. Europe is advancing very quickly too. Currently you see 1 in every 4 cars in Europe. Their government targets are very stringent and take effect in 2025. Come 2030, several European nations have very tough carbon bans and carbon emission limits. So the sole path for this to occur is via demand. It's present. We observe the supply chain not being shortened, but instead integrated through cross-participations and so on, correct? And that’s exactly what we’re observing. You can see it taking place everywhere right now. Since lepidolite operations are only a marginal source of supply at present, do you think that creates a better setup in which the auto sector no longer has to lock down raw materials? I mean, no, absolutely not, absolutely not, absolutely not. For automakers, this is about survival; and that point matters enormously. The customer who purchases that green vehicle has no desire to learn that each tonne of lithium produces 35 tonnes of waste, which is permanently ruining land ecosystems and rivers and inflicting terrible environmental harm; those realities don’t fit with what the industry claims; therefore lepidolite is only a stopgap. And let’s be extremely clear about that, at least when it comes to Western markets; so if lepidolite is the solution, it isn’t sustainable for Western market EV adoption to hit the 50% levels we observe in China. That won’t occur, because environmental organizations will not permit it, correct? And Cobalt proves the point. All of us saw what unfolded with Cobalt. So the product alone isn’t the issue. What matters is delivering that product while embodying the same ethos as the car. So, and this is crucial. And now the entire industry is aligned in that direction, which is wonderful, right? So today you witness a degree of concern regarding sustainability that 6 years ago perhaps wasn’t as elevated as it is now, since what’s at stake is the very survival, the very competitiveness of this car. When we attend climate conferences across the globe, among the first slides, those opposing EVs or those who still doubt EVs belong here at all point to how many years these cars must be driven to offset the carbon, the additional carbon embedded in the battery, because they frame it as though the sole distinction between ICE cars and EV cars is the 40% of the car in the battery, which isn’t truly the case, yet those are the slides they present. But obviously there’s a battery in one and no battery in the other. And the carbon inside that battery is being examined by the very people who don’t want EVs to reach 100% of the fleet. So it falls to us to ensure we overcome that resistance toward EVs and demonstrate that EVs are sustainable in every respect. On us, the industry, the critical materials industry, every one of us, nickel, manganese, cobalt, copper, lithium, all of it, right? And that’s the crucial part. So lepidolite simply isn’t the solution. If the industry depends on lepidolite to deliver, it will essentially make itself obsolete, right? Oh, do you intend to pay dividends to your investors? There it is, that’s the cash question. I hear that one as well. No, not yet. We have a great deal to accomplish; we have a great deal of growth to accomplish. Therefore, we have no intention of distributing dividends before we can clearly see our strategic direction, particularly regarding what we refer to as basic chemistry downstream. We have never stated, nor do we currently state, that we intend to develop specialty chemicals downstream. Back then, the whole sector was merely repeating that sentiment. There are highly capable individuals engaged in this work who excel beyond everyone else. They possess years, decades of expertise. What we are capable of doing—and we are examining this quite actively and with great attention—is primarily basic blocks chemistry, namely calcination and lithiation, and that is environmentally sensible. We likely will achieve zero carbon—but basic blocks chemicals, since calcination is achievable using natural gas and can be powered by, the entirety of it can be powered by clean energy. The waste—I mean, there is a ton of, each ton of specialty chemicals produces 12 tons of waste. Each ton of basic chemicals produces 12 tons of waste, toxic waste. We possess a strategy for the waste; these by-products are directed to the cleaning products sector, to the cement construction binding sector, both of which are quite large and quite dynamic in Brazil. Thus, we will accomplish it with zero waste. We will accomplish it probably zero; so we can do better.
Ana Cabral Gardner
executiveWe would only enter a business if we could compete at a world-class level, outperforming the incumbents on sustainability. And regarding basic chemistry, that's certainly something we examine carefully — although never for specialty chemicals. But all of that takes money, which is the long version of the response to your dividend question. I mean, there's a tremendous amount we're developing here. So until we have full clarity on how everything looks — all the line trains, Phase 4, potentially basic chemistry — paying dividends isn't something we plan to do. That makes dividends a 2026 matter. Perhaps 2025, 2026, but definitely 2026, correct? Do you see it as near short in this business? Absolutely. Is this a challenge for the coming year, or is it a ten-year question—how the industry deals with China's total dominance? Well, here's our view: we think this industry can exist anywhere. China, after all, is a huge market. They have to produce for themselves, and that's a big part of it too. Keep in mind that the EV market was, first and foremost, China—correct? Everyone else came later, and now everyone else is huge as well. So you've got this enormous Western European market along with the enormous North American market, which is just getting started. North America is going to blow it away. So then the question is, how do we get there in a sustainable way? Because customers in these markets have different concerns. Which brings me back to what I was saying about people — that simply isn't the solution. Let's just drop it, okay? So right now, that's the biggest problem facing the industry. How do we keep doing more, more, more of this, more lithium, done sustainably, with low carbon, zero carbon, and no tailings? I mean, every one of those factors matters for these 2 enormous markets that have appeared. I mean, Western Europe and the U.S. So, and that carries through the whole supply chain. To put it another way, the supply chain has to adapt, and that involves refining. What will refining look like? I have no idea. I have no idea. But what am I sure of? Here at Sigma, we're going to do our part. Eventually, we intend to provide that zero carbon basic chemicals building block for refining in other locations, which might also allow those operations to reach zero carbon. With that plus the other critical materials, we could arrive at a zero carbon battery, since that is this industry's holy grail — producing a battery with zero carbon, because it feeds into zero carbon emissions cost; then mobility becomes real, correct? Electric mobility becomes a complete reality. So we're making progress. We're contributing our share. And your question I cannot answer, because the answer isn't mine to give. Here's what I can address: we're pushing as hard as we responsibly can, staying prudent the whole way, to deepen an advantage competitors can't easily copy—that's the hand we hold. Whatever prices do, our costs stay the lowest. On technical grounds our offering wins; its sustainability can't be replicated. Nothing like it exists elsewhere in the market. That's how we outdistance rivals—by transforming something that was basically a commodity into a sustainability-driven brand, grounded in reality and in zero, zero, zero; those are numbers. They're just pages in a book, right? So really, we couldn't be more excited about what's coming. Did I get to everything? Well, look, gentlemen, I believe I've addressed every question you raised. There are also some delicate matters regarding strategic moves and strategic initiatives; and I've shared whatever I'm able to share. I mean, and this is my constant refrain, I manage the things within my power. Our company is run by a financial sponsor. Whatever people do, whatever others do, whatever all those interested parties who run to the press announcing their interest do, that's beyond my control. I don't occupy a seat in their boardrooms. I occupy a seat in this boardroom. My role in this, together with the engineering group — Brian, Caio, Raphael, and the amazing people we work with — is to keep on shipping, and by doing that we generate worth that remains within our control; that kind of worth is fundamental and built to last. What makes this business different from others is that what we're building has essentially nothing comparable when you look at it in measurable terms, and everyone here feels tremendous pride in that, since it took six years of genuinely punishing work. So thank you for waiting. Thank you for paying attention. Thank you for remaining with us right to the finish. And please send whatever questions you have to Jamie, who serves as our Chief Development Officer in Canada. We welcome conference calls, and we welcome meeting you one-on-one. We're about to turn to our focus and discuss all these remarkable things our team accomplished. And it's a team, it's a collective effort. Every single one of us here holds a vital piece of the contribution needed to build this company.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sigma Lithium Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Sigma Lithium Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sigma Lithium Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.