Sigma Lithium Corporation (SGML) Earnings Call Transcript & Summary

April 1, 2024

NASDAQ US Materials Metals and Mining earnings 82 min

Earnings Call Speaker Segments

Matthew DeYoe

executive
#1

Thanks, Dennis. Earlier today, prior to the market opening, we shared a final investment decision regarding our Phase 2 expansion, along with preliminary, unaudited financial results for 4Q and the full year 2023. Ahead of getting started, there are a handful of things I want to address. To start, throughout this presentation, you'll hear some forward-looking statements about our plans and expectations. We'd note that actual events or results could differ materially due to shifts in market conditions and or our operations. Also, earnings mentioned in this presentation might exclude certain non-core and non-recurring items, and they've been based on unaudited financial statements. Reconciliations to the most direct comparable IFRS, financial measures, and other associated disclosures are going to be made available. The slides will be posted on our website, and after the call, we'll post additional slides containing added financial performance information. With that said, I'll hand the call over to Ana.

Ana Cabral Gardner

executive
#2

Okay, hello everybody, and good morning. We're really thrilled to share that we've made the final investment decision and are starting construction to double our output capacity, going from 270,000 tons of lithium concentrate annually to 520,000 tons of lithium concentrate annually. For us, 2023 was a truly transformational year. We became a major lithium producer, and as an investor operating team, we hold over 50% of Sigma. So we're fully committed alongside all of you, our shareholders. I'll take you through the main points — the five key competitive advantages that give us such strong confidence to make this investment decision. First, we operate at a large scale. We now rank as the world's fourth biggest integrated lithium industrial mineral operation. And we're the number six producer globally when you add up brine and rock. That gives us scale. What matters even more is that our costs sit low. Within the industry peer group, ours is the second cheapest. Meanwhile, we turn out a product that can command a premium, and we call it Lithium 5.0 — the Quintuple Zero. Setting aside environmental and social sustainability, when you look at physical and chemical quality, no other chemical grade compares, and it stands as the most sustainable lithium found anywhere on earth; its metallurgical behavior is one of a kind. As a result, we reached our final decision to invest in constructing at twice the capacity so we could supply more of this substance. The second phase is going to rely on the identical construction crew that handled phase one, and that crew completed phase one well, within the budget and according to schedule. Perhaps most significantly — and this strikes me as the closing point — one major reason we felt assured about this investment choice was that, given how well the 2023 drilling effort went, we managed to lengthen the project's lifespan beyond 25 years. At this point, we've achieved durability and a long mine life, backed by 109 million tonnes of mineral resource, and our projection is 150 million tonnes. Moving to the following slide, assuming it's visible to you, our goal is to demonstrate through figures that every record in the lithium sector has been surpassed by us, plus we achieved maximum output capability immediately, during only our second quarter of operation. From September 23 through September 24, we moved 270,000 tonnes of material. This translates to hitting 12-month capacity when measured on an annualized basis — and once more, just six months after commissioning. Over that half-year period in 2023, our output and shipments of this material totaled 105,000 tonnes. We were able to capture a substantial share of the upside from the exceptionally robust market seen the prior year, and thanks to the material's superior properties, our average price came in at $1,333 per tonne — a premium price for the material. After everything nets out, we're getting $1,160 per ton for this material. Once again, that outcome stems entirely from the product's outstanding metallurgical and chemical properties. At the plant, we've achieved a cash cost that ranks as the second lowest among the hard rock lithium producers. On top of that, our cash expenses decline as our scale grows, since a bigger output spreads our fixed costs across more units. Even more significant, we accomplished every bit of that while producing and preserving money in the disciplined Sigma manner we always follow. Put differently, our balance sheet holds a cash position of $109.4 million. That means, in theory, a whole Phase 2 plant already exists on our balance sheet, waiting to be put to work. Consequently, we are beginning to raise our — kicking off Phase 2 to lift our scale by 100%. We kicked things off with every construction activity, mobilization, contracting promo, and capacity will double to 520,000 tonnes. So it amounts to more of the same, since it works, and it works remarkably well, no matter what the lithium price cycle does. And then, last but not least, I believe we've once again hit 109 million tonnes in audited mineral resources, with a lithium oxide grade that's exceptionally high — which means we've got more than 25 years of project life ahead, and honestly the resource lasts even longer than that because the lithium oxide content is that much greater. So we're now the fourth biggest producing industrial lithium complex in the world, and it's 100% known. On top of that, we're the only one to pull off this 5 times — 5.0 carbon lithium, and that makes our entire team proud, because for us — as team investor operators — getting to this point wouldn't mean a thing if we weren't staying aligned with the supply chain we're honored to be part of. That green supply chain, the one delivering these green electric vehicles. Take a look at this picture of an industrial facility — it gives you a sense of how everything comes together. The dotted red area represents the plant's third module, and that's where the Cleantech innovation lives. Getting that module built was a massive undertaking, but it's truly what made it possible to produce Quintuple Zero lithium — affordable, environmentally sound lithium destined for green vehicles. And I want to stress again: it's green lithium headed to green cars, not brown lithium headed to green cars. Why? Because our dense media separation centrifugation process involves no toxic chemicals whatsoever. Our carbon footprint is zero. Not a single drop of potable water gets used — we've made do with water of sewage-grade quality. The lithium we produce generates no tailing dams, and every bit of electricity we pull in is clean. Our power is clean and renewable. The following page shows an illustration of us within the lithium world at large. And the numbers are plainly visible. Those numbers are pretty simple. Our beginning point sits at 85 million tonnes, equal to 2.7 million tonnes of LCE resources. After that we completed the first leg of the mineral resource update, bringing us to 3.3 million tonnes of LCE resources. And after that comes the anticipated additional rise to 4.8 million tonnes of LCE equivalent resources; on this page, it's obvious where we stand in scale. In brown, you see our peers, every one of them in Australia, every one of them lithium industrial mineral complexes in production; in purple are the non-producing. Basically, we rank as the fourth-biggest lithium industrial mineral complex by output. That's the size we operate at. And this marks only our inaugural year running. So it demonstrates we have staying power, since we're as big as the largest projects anywhere located in Australia. We've entered that group. Here's where we measure ourselves against every producer, brine operations included. And once more, the chart pretty much explains itself. We became the sixth-largest manufacturer on the planet, but because we launched our business right when the lithium cycle's toughest challenges were at their lowest point, we never got the opportunity to be valued again as the major producer that we actually are. And we're going to demonstrate that gap visually right here. The dark green you're looking at represents 2024 output measured in LCE equivalent. The gray shows what these businesses are currently worth in market cap. It's obvious that when you consider Sigma, which produced 37,000 tons of LCE equivalent in 2024, just like now, and then look at what our market cap is, we're essentially being valued as a developer. So the mismatch tells the story on its own. Our top priority for this year involves narrowing that distance, essentially continuing our current approach and proving we remain a major supplier for the long haul.

Ana Cabral Gardner

executive
#3

The slide you're looking at backs that up. We've kicked off our ninth shipment. It's been demonstrated that we can handle the pressure, and that this material's metallurgical quality is outstanding. At about the five-month mark after commissioning, we established a cadence for shipments by reaching capacity on an annualized basis. All of this happened even with really tough headwinds. So what we have now is a track record showing we're a reliable, large-scale supplier into the EV battery supply chain. And just so everything's out in the open, we're showing every shipment and the price per tonne that each one implies. Okay, so this was something we earned on our own merits, and it came with a modest premium compared to what our competitors get, because the product has what we call value in use — better metallurgical characteristics that create cost savings customers can actually measure and count. So we plan to stay in that position; we're a producer operating at a large scale. We're a positive force within the industry. Turning to the following slide, here's a bit more on premium pricing. We've secured a final premium price that's significant. During this month, we were able to fully eliminate that gap and put an end to provisional pricing. So that serves as another confirmation of the exceptional metallurgical and chemical attributes this product has. The product is superior. It generates savings; therefore, we aren't capturing the entirety of those savings. A portion of that value is coming to us, and that shows up in the premium we charge. For the eight shipments we've just completed, the nameplate price came to $1,333, VAT included. Strip out VAT and you get $1,160 per tonne. For a newcomer to the market, that's a pretty solid premium, and this price is final, not provisional. Compared with the premium prices we've already secured — the ones shown on the earlier pages — this is a substantial step up. Put it in variable terms, or against a benchmark, and it works out to 8.75% of the London Metals Exchange lithium hydroxide CIF quote. That tells you we're capturing a sizable share of the value in the supply chain. We handled price discovery in an open way. It came about by way of tightly held private bidding, and the aim behind it is a working partnership with Glencore — the partner handling our marketing and commercial needs — so that Sigma gets the greatest possible value from this outstanding product. Moving to the following slide, we go deeper into the reasons our value in use exists. Which chemical and physical traits let us command a premium, even when conditions turn against us? The first reason is that this product has high purity. By high purity I mean minimal iron oxide, minimal potassium oxide, and minimal sodium oxide. Those three, you could say, are obstacles standing in the way of delivering ultra-high pure lithium chemicals to our clients at a low cost. The product also contains little mica, which is yet another hurdle during refining. One thing that stands out, though, is the product's physical characteristics — ours is a dry coarse material. During calcination at the keel (ph), this dry coarse material performs really well, transforming into beta-spodiumine as it gets hot. That means you get efficiency gains through energy that isn't wasted, so the overall package produces a quantifiable savings. In what way? To produce ultra-high purity lithium hydroxide, the people downstream need just 7 tonnes of our material. With the comparable product, you'd be looking at 9 to 10 tonnes. That means our customer saves 3,000 tonnes for every tonne of lithium hydroxide, which technically works out to roughly $330 per tonne in savings for us, based on just 7 tonnes. And once more, it's something you can see. Take a look at the images and the contrast is obvious. Ours has this pale greenish hue, signaling purity, a coarse substance, unlike the muddy, talc-like wet stuff coming from our rivals. And once more, here's the Quintuple Zero — I'll keep it short — but we take great pride in stating that we accomplished all of it while remaining faithful to our purpose, regardless of whether it counts, regardless of whether a green premium comes our way; that isn't our motivation; we do this because 12-years ago, we embarked on this path of being investor operators at Sigma to deliver precisely that. To sit at the forefront of sustainability. Zero carbon, zero chemical — zero toxic chemicals, no tailing dams, no cannibalization of the community's portable drinking water with clean power; so we did precisely what we claimed we did. Our production cost didn't rise because of it, yet sadly we don't receive a green premium. But once more, our product is superior. So a little on — alright, a little on the figures, correct? We're built to last. I mean, we assembled this company with draconian financial discipline across 12-years. Oddly enough, this may be one of the best points in our history, because it marks the first year in which we've had revenue, and what matters even more is that we can now demonstrate our low cost in measurable terms. So we have revenue, we have low cost, we have cash flow, and the steady way our Greentech plan delivers and produces continues to push revenue upward, continues to accomplish that at extremely low cost, and creates what we refer to as commodity cycle resilience. That means no matter what happens with commodity cycles, we keep generating cash and our business remains very strong. As Jim Collins used to put it, we're built to last. So during 2023, our dollar revenues for the full year came to $135 million. We shipped 102,000 tonnes of material. We ended up with 105,000 tonnes of output, and on average we realized $1,321 for each tonne sold. At the plant, our FOB adjusted cost came to $427 per tonne. When you look at FOB adjusted cost at the Port of Vitoria — that means subtracting the expense of getting material to Vitoria — it worked out to $485 per tonne. Then once you go all the way to a port in China, the figure reaches $565 per tonne. That lands us extremely close to what we told the market to expect for the entire year, especially as we continue decluttering — or, as our friend Joe put it, taking the noise out of our financials, since this year was a hybrid of commissioning and production. As for margins, they are quite spectacular. When you look at our margins, the FOB plant figure stands at 67%, the port comes in at 63%, and on a cash cost CIF China basis, we're at 57%. Some folks view this point as the lowest part of the cycle, and really, it comes down to math. The math behind staying resilient through a commodity cycle. Like we often put it, math doesn't hold opinions. It's simply a factual matter. Turning to the following page, you'll find additional math. For the entire year, we've already shared the revenues, the tonnage shipped, and the price for each tonne. Let's now shift to EBITDA. We recorded an accounting EBITDA that was cluttered — that is, affected by the noise from commissioning — totaling $24 million across July through December, since that's the period when we generated it, which is under six months. Then we made adjustments for non-recurring items, covering things like RSU expenses and commissioning costs. That gives a pure EBITDA margin of 18% on FOB revenues, while the adjusted EBITDA margin, after accounting for non-recurring items and non-cash items like stock compensation, reaches 36%. To repeat, a very robust EBITDA margin is what you'd anticipate from us during our initial year; so it is — and it happens to be this low — the minimal production expense, which powers our ability to generate free cash flow. Like I said earlier, we are extremely strict regarding expenses.

Ana Cabral Gardner

executive
#4

We consistently achieve greater results while using fewer resources. Why is that? Well, every one of us holds an ownership stake. Each of us functions as an investor and an operator. This isn't anyone else's capital—it belongs to us. Every single employee and every senior manager owns shares. That's why we guard our money carefully. We watch our spending the same way we watch the cash that goes into our own wallets. So for the full quarter, the cash unit operating cost at Vitoria comes to $442 per tonne. Non-recurring commissioning expenses total roughly $94 per tonne. That brings the pro forma four quarter cash unit operating cost of concentrate to $455 per tonne. My partner Matt will walk you through a bridge with far more detail shortly. So for the third quarter of '24, we're aiming for an average very near the guidance of $420 per tonne FOB Vitoria and $370 per tonne Plant Gate; these cost initiatives cover several items, including bringing in a wider range of suppliers and service providers. We're bringing on contract labor, which mattered a great deal when we commissioned, and that was among the expenses we removed, meaning the engineers from the construction firms and the engineering firms who remained to assist us in running the plant and commissioning it. Those people have left. We have our own crews now, and we've streamlined maintenance schedules while operating this like clockwork. We enjoy predictability along with umbrella maintenance contracts with our primary parts manufacturers. So, I'll now hand things over to Matt DeYoe, my partner, to review the bridge on cost. Matt, the floor is yours.

Matthew DeYoe

executive
#5

Thanks, Ana. So, the FOB costs we reported for Q4, as we pointed out in the release, came to $549 per tonne. Inside the fourth quarter, there were several costs tied to commissioning expenses, which really were more of a 3Q event, though they got booked during October and November. Those are genuine costs that we did incur, but looking at it pro forma, they didn't show up again in December, January, or February; so we're quite confident those are, as we've said, non-recurring. That would bring us to a pro forma FOB Vitoria cost of roughly $455. When we take out the high-grade freight of around $70 per tonne, we arrive at a 4Q pro forma Plant Gate cost of approximately $385 for the fourth quarter; that's not too distant, as we mentioned, from the $370 we flagged as the 3Q average. And once more, we really haven't started to see any benefit yet from shifting contract labor over to salary, domestic labor, diversifying some of our suppliers, or the optimized maintenance schedule. So we believe there's ample room, or a solid line of sight, to reach that $370 figure. Naturally, as you reconstruct this to arrive at what we hope will be a recurring reported COGS all in, you add back spodumene, freight, royalties, and DNA, and that ought to get you into a rough ballpark of where we're aiming to be, at least on a pro forma basis, if you consider 4Q. Other things that weighed on the fourth quarter: low-grade trucking and warehousing. We're not hauling our tailings to port right now, given where the market stands, so we don't anticipate those costs carrying on. As we noted, those commissioning expenses pop up here and there, and we did get some tailwinds from equipment, tax, and credit, so that roughly bridges the remaining line items from a quarterly impact standpoint. So again, I think we're feeling fairly good about the direction we're moving in. Ana, I'll hand it back over to you.

Ana Cabral Gardner

executive
#6

Sure, here we go. On to the following page. Once more, what you're seeing is the bridge over to EBITDA. It's a pretty simple bridge, again. Sales is where we begin, and we move right through until we reach adjusted EBITDA. Let me be clear that our adjustments cover non-cash items as well as commissioning costs. What we call adjusted EBITDA came in at $49 million. That means our inaugural production year closed with positive cash adjusted EBITDA and positive cash operating profit. Given how lithium prices fell, this is something all of us take real pride in. So here's how it looks: we begin with sales of $135 million. After that come operating costs, non-recurring items, transport and warehousing, and that brings us to gross profit, correct? From gross profit, we then subtract SG&A, ESG and others, arriving at cash EBIT. Then we begin adding back the adjustment items. That means stock-based compensation is added back, since it isn't a cash item — it's an IFRS accounting item — after which D&A is added back, and we arrive at EBITA. All of this comes straight from our non-audited financial information, accounting-wise. That takes us to the $25 million of EBITDA I showed you on the prior page. To that, we add back the non-recurring SG&A, which is partly mixed in with the operating cost line there. Commissioning costs account for most of it. Take commissioning engineering costs by themselves, for example — that's roughly $6 million. There's a whole series of these one-off items, and they won't recur — they won't be repeated on an ongoing basis — so they shouldn't factor into how you model the company. That brings us to the $49 million figure we call adjusted EBITDA; so here you get a bit of a breakdown of those non-recurring general and administrative expenses we talked about earlier. What do these items consist of? What's inside? It's a combination of things; take, for instance, as you can see, 25% of these numbers tie to the commissioning team on Phase 1 construction. Legal accounts for 29%. We had litigation, we had a strategic review. Excellent lawyers advised and guided us very well, but these are one-off. More significantly, we had a substantial amount of consulting work, which we label audit and accounting services, essentially helping us get our SAP back on track and classify costs properly. Various consulting firms kindly supported us in getting our back office in order. So that's another investment — a one-off investment in that side of the business; we had non-recoverable VAT taxes of 7.4%. And then transaction cost and commercial development — achieving the premium price costs travel, costs money — we spent a great deal of time in Asia working with clients, working with refineries, working with battery makers, working with end users to test product and establish ourselves. Once again, keep in mind that our starting point was nothing. There was no client roster in place. What we did was assemble a remarkable client base that assigns a premium to what we offer, since we collaborate with those clients to grasp, to trial, and to prove the value they get from using it. That accounts for the 28% non-recurring portion; so we gave you a sense of what these things are — we refer to them as investment items. What this represents is our putting money into making the business more resilient across the coming couple of quarters; and that was on the slide before. So to sum up, going figure by figure; this breakdown is — when you examine that $24 million, it bridges the $25 million accounting EBITDA and the $49 million of adjusted EBITDA. The following page essentially lays out for you how that $24.5 million in non-recurring G&A expenses breaks down. Our aim is to provide you with the greatest possible clarity and insight regarding a figure that constitutes an adjustment and is non-recurring. So next we turn to what things will resemble once we reach steady state. Well, we began with today's prices, using the guidance we gave, and we're holding to that guidance. So once more, the projected — well, the net concentrate price we've just secured stands at $1,160. No matter where we sit in a cycle, that's irrelevant, since our CIF costs in China come to $510. We figure recurring SG&A lands at roughly $48, and maintenance CapEx comes to roughly $18. That puts the projected run rate cash operating margin per tonne at $584, which tells you we earn money on every last ship, correct? So subtract, as you know, $510 from $1,160, take off $48, take off $18, and that's what you get. It's a hefty gross margin — pardon me, a hefty net operating margin — cash margin; so after that, once we shift to mid-cycle, this figure becomes — this figure grows still larger, since we reach a run rate cash operating margin per tonne that's even greater. So we handed you the per-tonne figures, enabling you to model using whatever cut-offs you prefer. That means we produce cash even at the bottom of the cycle. During mid-cycle, we produce a great deal of cash. So this simply illustrates how uniquely efficient our operations are. And I should add that on this front too, we're completely aligned with the direction the electric vehicles sector is heading; everything now revolves around making batteries less expensive, cars less expensive, cars at lower price points. So we rank among the low-cost producers; so we're not going anywhere; and these low costs stem essentially — chiefly in fact — from the lower processing costs at our Greentech plant. It's dense media separation, it relies on centrifugation, it draws less electricity. True, our electricity is clean and costs less, but our process essentially involves seven — six main DMS', seven main steps, along with the crusher. So we don't even crush the powder. So it's an industrial process with lower costs, plain and simple. That's the source of our competitive edge. We made the choice to put money into this technology. Back in 2019, we adopted a position that went against the grain, and we demonstrated that dense media separation technology isn't just more environmentally friendly — it also delivers better economics. That aligns it with where the industry is headed, on both of its defining fronts. Batteries need to be inexpensive, and in our view the materials inside them need to be sustainable. That's who we are. So if you look at projected cash flow for 2024, assuming output of $270,000 to 270,000 tonnes annually, we're looking at the equivalent of $158 million in anticipated run-rate cash from operations at today's pricing. At mid-cycle, that figure reaches $249 million — so quite strong cash generation. Moving to '25, with capacity doubled, we're able to spread certain fixed costs, like recurring SG&A, across a larger base. That pushes the number up somewhat. It rises by more than twofold, reaching $304 million. And again, as the bridge my partner walked through shows, it's clear that actual costs landed where they did. The actual costs we're delivering are nearer to guidance, since we assembled that guidance from the ground up, supplier by supplier, prior to releasing it publicly. With all of that, I hope I've given you some reassurance that this is a highly resilient business.

Ana Cabral Gardner

executive
#7

Our cash generation is strong. So we're moving ahead with the final investment decision that our board approved, and we're kicking off construction to double production capacity to 520,000 tonnes per year; on the following page, a picture worth a thousand words. It's obvious that the only thing we need to do is build one more Greentech line; that runs roughly $100 million and adds 250,000 tonnes of lithium concentrate production capacity. With the cash we hold, meaning $109 million on hand, in theory, we could build a plant immediately just by drawing down our cash position; why is that the case? That's exactly what the next slide will demonstrate. This comes up and we haven't laid it out that clearly. We do have trade finance, yes. It revolves since it's tied to our capacity to deliver what we just showed you, cadence. Each month, each tonne produced creates permanence of trade finance. Over in Brazil, the term is advancements of export contracts. ACEs, they run around 180 days, yet they're connected to our ability to generate cadence of production. The catch, though, is we didn't draw down these lines. So meaning, sorry, we did draw it down, but we didn't apply it for trade finance. To put it plainly, we have the trade finance, we drew down the lines, but we didn't use it to fund the working capital until the client pays us. Why? Because this is where Glencore comes in. Beyond being a fantastic commercial and trade partner, they also serve as our financing backstop. As you saw in the previous shipment, they advanced on a final and non-provisional basis, now, 85% of our boats, of our shipments; so we depend on Glencore not just for their incredible marketing and commercial expertise, but also for supplying us with the actual trade finance. So the trade finance lines we hold in the banking system here are sitting untouched on our balance sheet. So they're drawn and they are untouched. And what will we do with them? Will we build an entire plant with them? No, we won't. But they are going to be the cash that advances the funds for construction as it progresses because the development bank lines of BNDES work on a reimbursement basis. So we pay, we get reimbursed; and the cash position is the proof that we have the ability to green lights this entire construction right now, today with the snapshot you have in front of you; so, as we keep generating more cash with every shipment, we're extremely comfortable financially. So again, we approved the initiation of construction of Phase 2, because, well we have a track record building on schedule, on budget. We actually broke the record of this industry of getting there fast. Alright, so if you look at the total CapEx, that’s $100 million to add 250,000 tonnes of capacity, and basically with P2 we’ll have enough lithium for 850,000 tonnes of EV. That’s why we say Sigma belongs to the world. What I mean is, we can supply this to a lot of markets far outside our own borders. In this industry, we’re a global force for good. The EPCM is bringing in the fleet for earthworks. We’ve got activity underway in construction, mobilization, and preparation. When it comes to the Phase 2 flow sheet, it lines up with the processing sheet. The technology for handling the material simply gets better, so it matches everything we learned from Phase 1. That means we have a great deal of technological progress, improvements, and lessons learned that we are incorporating, or already did incorporate, into Phase 2’s engineering, so Phase 2 is an improved version of Phase 1. And that comes from engineering savings, design optimization, and offsetting material costs. Take dry stacking, for instance — it didn’t work in June, so we figured out how to make it work. We’re now going to build a dry stacking operation that will work right away alongside Module 2, the dense media separation plant. So we have technological gains across the board, and that’s why we qualified for the Brazilian Development Bank innovation line, since there is innovation throughout this flow sheet. And again, as all of you innovators understand, innovation isn’t some eureka moment. In industrial settings like ours, it’s the accumulation of many optimizations across a processing plant. So all those innovations combined, all those optimizations combined, get us to the amazing production cadence and consistency we managed to achieve. Now, the next slide has a lot of substance. This slide contains a lot of information and a lot of detail, but that’s exactly what we wanted. We wanted to put Phase 1 and Phase 2 side by side and show where the savings are. This is public information, so you can go back and look at it. I won’t spend much time on it. But really, where are we saving? It’s a bit of everything, right? We save on spare parts, since we’re an operating entity, so there’s no need to build up an inventory of spare parts. We save 50% on engineering because we have a plant that works. So essentially we’re designing a plant we already have, but with the improvements. There are some environmental savings too, to the extent that, for instance, we don’t need to build a whole sewage treatment station the way we did previously, because we use sewage water from the Jequitinhonha River. So it’s a combination of various savings that gets us to a plant that will cost roughly 20% less than Phase 1. Looking at total construction CapEx, that comes in around 10% lower, and that 10% reduction applies to a plan that was already quite cheap. With the history we have, with the fact that we've been through this process previously, with the very same group in place — everybody who was involved in building this is still here. Keith Prentice is heading things up. I'm still here. Felipe, who served as Chief Controller of Procurement, has returned; so essentially we're putting that identical crew back out there to do what they're best at, which is delivering on schedule and within budget. We're also bringing Promon back on board, and they did a tremendous job for us on an earlier project. And Parex is being brought back as well, and they did a tremendous job putting this together in record time. The following slide has a bit more substance; we'll add labels to it, but the point is simply to show that once construction begins, you don't actually face all the costs in month one — it builds up like a crescendo, correct? You begin with earthworks, civils, foundations, and those run roughly $10 million, not $100 million, so the costs are weighted toward later stages. Disbursements begin rising as equipment is ordered with prepayments or progress payments, and then afterward gets delivered to sites. So this slide more or less demonstrates that building a plant carries backloaded costs.

Ana Cabral Gardner

executive
#8

We've got the cash on the balance sheet, and in theory we could front-load the whole thing, but that's not how it actually plays out — and that's exactly why we're feeling so comfortable. That said, with normal financial discipline, we'll put up one plant at a time. That's a key takeaway I want to leave you with. This year we're constructing a plant, and then the following year we'll construct another one. So, moving on to the construction process: site activities kick off this month — earth civil works, foundations, infrastructure installation, equipment mobilization. We'll have roughly 200 additional workers tied to the Jequitinhonha project. That means more of the prosperity we've delivered to the region, and we'll likely house them in Itinga, which is a city closer to us. The first step — the very first step — was licensing, and we've already been granted a license. So we're fully licensed both to build and to operate. That's a remarkable achievement: we already hold the LO, the operating license for this plant. Why? Because of our track record — we proved we're impeccable. We received something typically given to industry in Brazil, but seldom to industry tied to mining. So we've got the same industrial standing as a high-tech industry, since we showed we're strong players in mineral transformation. Our plant is innovative — it's Greentech. It shifted the conversation in the sector. So we secured the operating license right from the start. We're fully licensed. Once construction wraps up, we can begin selling products. Then we obtained the financing. As we've shown you, we have the cash balance, and it's connected to trade lines. Trade lines are based on production — a 180-day revolver — so we're ready to go. Then we completed the engineering work. We're FEL3-quoted, and Promon led it. So we have number two precision. It's $100.5 million. BNDES has honored us with an innovation line. We're very proud to be part of this club of companies that has received development bank financing in this country. We plan to honor the taxpayer money given to us by delivering this on time and on budget; and this is backstop financing because, again, it's a reimbursement line. So we need cash on hand to submit the reimbursement that BNDES then covers. So we made the FID. This is basically what leads us to the final investment decision — there've been months of work, months of effort going into the ninth month of work that brought us to this moment of starting mobilization. It wasn't overnight. The next page is again completed detailed engineering, CapEx with FEL-3 accuracy; this is how we keep it on schedule, this is how we keep it on budget. This is the secret sauce of building responsibly. We don't get it wrong because we quote suppliers. We are licensed. For that area, we hold a perpetual mining permit; as a result, we revised the plan for carrying out the project. Procurement is underway. Import logistics are underway. The final investment decision for Phase 2. Our board's comfort level could not be higher. Do you recall the last occasion we approved a final investment decision? That happened during 2020. COVID was at its peak and we had no cash generation. That's sort of why we come across as so at ease; on the following page, we're at ease, yet we stay vigilant. We're at ease, yet discipline was not abandoned. So we'll proceed the Sigma way. A single step at a time; this chart contains plenty of information, yet it's an adjusted version of one you're already familiar with. Year by year, sources of cash flow appear in dark green. Which industrial capacity modules do we have operating, correct? So in '23, we generated cash flow from 105,000 tonnes of lithium concentrate, right. Construction finished, we're done. In '24, shown in orange, is what we're currently building, while in the greenish section is what has been approved for construction. So capacity is nearly doubling. From 270,000 we move to 520,000; and the reason we present it this way is that's nameplate, right? Going higher is probably possible, but nameplate is what it is. We'll enjoy the advantage of Phase 1's cash flow. So cash flow from a single industrial plant module, plus construction of a second module that's been approved; in brown appears what hasn't been approved, yet this is our destination. This is the industrial plant we handed to BNDES along with the full development strategy for the lithium valley, as far as Sigma is concerned. In '25, we'll enjoy the advantage of Phase 1 generating cash flow, Phase 2 generating cash flow. Depending on our position, we might or might not even pay out a dividend, let's see; but Phase 3 will most likely be approved for construction, integrated with a lithium sulfate plant. Why? Well, on account of that meaningful gain, the value in use, that right now we're delivering to clients for a very small premium. So if you remember, at today's prices of $14,000 per tonne of lithium hydroxide, whether you quoted technical grade doesn't matter, since our $3,000 stays intact. A tonne of, say, lithium sulfate or full chemical intermediates requires 7 tonnes of our material. Fewer units, less quantity of our material is needed. So what's the reasoning? If calcination and the acid wash can be done by us, which is what intermediate chemicals, lithium sulfate, are called, we capture that $3,000 ourselves, so it turns into additional cash flow. So in '25 the decision gets made, since we have an entire year to determine whether we can premiumize to that value in use. If that proves impossible, we'll simply handle it ourselves, since calcination is a kiln and acid wash is an acid wash; these are intermediate chemicals. It's fundamental chemistry. Brazil is an industrial nation. Thus, the human capital and the capabilities are in place. We will not enter specialty chemicals. What we will do instead is deliver reduced volumes to specialty chemical refineries worldwide, among them our most valued Chinese clients, who have already committed to purchasing this material from us. Therefore, we will send lithium sulfate intermediates to China, Texas, Europe, Japan, South Korea — everywhere around the globe. That is the plan for '25. After that, in '26, we will take a seat and take pleasure in the industrial site that we constructed. These, then, are our plans covering the coming two years. So we will be extremely busy. Another thing I wish to tell you is that nothing connected to the strategic review has affected in any way our capacity to think, to formulate a strategic plan, to execute, to deliver, to keep doing what we do best, and that is to execute. And this brings us to our closing remarks. I mean, we have entirely transformed Sigma from — and the picture tells the story. A picture is worth a thousand words. In March '23 it was a construction site. You can glance at the left.

Ana Cabral Gardner

executive
#9

At this point, we rank as the sixth biggest lithium producer globally in every category—brines, hard rock—and we're home to the world's fourth largest mining industrial complex. Everything within our power was accomplished: DMS commissioning wrapped up, production kicked off in April '23, and we reached nameplate capacity within four quarters. Dry stacking was implemented, meaning no tailing dams exist and not one drop of water is wasted. Water gets reused; net zero was achieved, something four years in the making, plus the Quintuple Zero lithium everybody here adores was delivered too. Mineral resources were boosted considerably, providing longevity for our ambitious industrial plants. As a result, those industrial plants are now supported by 104 million tonnes of reserve—resources, mineral resources, 43 to 101 audited, along with an expanded expected mineral resource of 150 million tonnes. Converting part of the 109 million tonnes into additional reserves is happening rapidly, and consistent monthly shipments have been secured. What should you anticipate from us in 2024? Mobilization, for one—construction is starting. Mineral reserves will be delivered. An increase of 40% is what we expect. We hold 54 million tonnes of mineral reserves. Those will grow by 40%, and once more, this simply adds longevity, solidity, and permanence to our industrial plant. Further auditing of the 150 million tonne mineral resource is planned. Phase 2 will be commissioned; so 2024 has us extremely, extremely enthusiastic. And once again, far less anxious than during our first attempt, since one execution is already behind us; we understand our successes, we understand our failures, and we'll aim to avoid repeating the same errors. To err is human. The same mistakes won't happen a second time. So off we go, twice as seasoned, a producer holding cash, advancing toward doubling this company's size. And ideally, ideally, being valued at minimum in step with what we generate currently. Let me return to this slide—if only the market would grant us recognition for the producer we are today, we'd be quite pleased, since presently we're sort of valued below a developer; that's precisely what fuels our confidence to be, you know, over 50% owners of this company within the management team and labor around the clock to hit these 2024 milestones for our investors; and to each of you, I want to finish with enormous gratitude for backing us, cheering us on, remaining with us, and having faith in us. This is my accountability to you; we're delivering precisely as pledged on every element within our control. Now, let's proceed to the Q&A. Matt?

Matthew DeYoe

executive
#10

Thanks. Yes, I'll pass it to Dennis to open up the Q&A.

Steve Byrne

analyst
#11

OK, thanks. Would it be reasonable to say that your net cash position declined by $30 million during Q1? Does that sound right? If that's not the case, then which typical factors could have caused the cash to go out the door? My reason for asking is that you're proceeding with a forecast of producing free cash flow over the coming quarters, and I simply want to confirm that this aligns with what the first quarter's results showed.

Ana Cabral Gardner

executive
#12

Matt, would you like to answer that, or should I handle it?

Matthew DeYoe

executive
#13

Ana, this one's yours. Yeah.

Ana Cabral Gardner

executive
#14

Sure, Steve. Okay, at this moment we're handing you the cash picture. The March 30 cash position sits at $109 million, correct? That's a key thing to note. As for what took place in between, we pulled down — and that's the reason we wanted to give you visibility into the trade lines. We drew on the trade lines, yet we didn't put them to use. So what you've got is drawn trade lines combined with unused trade lines. Then, looking at the cash page right here, you'll notice we have — there it is. Are you able to see this page? Right, so we have $88 million from those trade lines, which were drawn but unused, correct? The rest is simply cash we generated. Now, looking at the year-end cash on the back, a $12 million advanced interest payment had been made on the long-term loan from a shareholder on our balance sheet. So that's likely the — what we'd call the clutter when you examine the December cash position. I'm not certain whether that answers your question.

Steve Byrne

analyst
#15

when you mention those two...

Matthew DeYoe

executive
#16

we could also discuss this outside the call. The calculation is somewhat — your calculation, I believe, is somewhat incorrect.

Steve Byrne

analyst
#17

All right, perhaps just...

Matthew DeYoe

executive
#18

Between the close of '23 and March, our net debt would have gone up only slightly. And then, clearly, as we've managed to explain in greater detail lately through our press releases, at this point we are securing pricing under fairly favorable conditions; therefore, assuming markets continue at these amounts — which as of now we believe they are — we'd anticipate cash building up rather substantially. Still, we could — we could discuss that further away from the call.

Ana Cabral Gardner

executive
#19

Right. And, — yeah, if you look at where things stand as of today, and that's a simple picture, correct? There's $100 million in long-term debt owed to shareholders. Then we have $10 million from BDMG, all in US dollars, so that's long-term debt as well, and it's not amortizable. However, interest on that long-term debt must be paid in advance. So the cash position as of December 31 went down because of it. It wasn't paid at that point. Payment happened in January. After that, what we did was draw down all the trade finance lines, but we haven't used them; we received $90 million, and $88 remains unused. So if you consider the total net debt picture, we have approximately $110 million sitting in long-term, and that's quite benign — shareholder plus development bank. And then we have those trade finance lines, which are located in Brazil, somewhat of a unique creature, functioning sort of like a revolver, and their only purpose relates to our capacity to produce. So we wanted to demonstrate that when you examine the cash position, if you subtract $109 million minus the trade finance, cash was actually generated, correct? And if you attempt to triangulate that against the cash figure in December, the big item probably absent is the payment of roughly $12 million in advanced 2024 interest for the long-term shareholder line.

Steve Byrne

analyst
#20

All right, I appreciate that answer. And perhaps a quick second question regarding the possibility, at minimum, of moving further along the chain into lithium sulfate. Are there any early-stage figures you can share regarding the likely expense of such a project? And would you build it at the mine itself, running a calcine right there, with a portion of that output subsequently returned to the areas that have been dug out?

Ana Cabral Gardner

executive
#21

Honestly, this sits at the heart of what BNDES has laid out as its industrial plan. We'll locate it wherever natural gas can be supplied to us at the cheapest price per BTU. In all likelihood — Brazil, after all, is a huge offshore producer of oil and gas. That gas exists in what are known as pre-salt ports, and the Vitoria port, where we already are, is among them. So provided we can secure an affordable dollar-per-BTU natural gas price at the port where we already most probably sit, we'll site it there, since that's the location that makes the greatest sense. One of our partner clients has essentially gone public with plans to carry out precisely what we intend to do, alongside one of our peer companies in Australia. It's plainly the right move, and we were the ones who first raised it. Moving into lithium sulfate represents the logical next step for anyone producing lithium concentrate, and we showed the reasoning behind that; so then, what does Brazil offer? Clean, inexpensive electricity. Electricity, I mean, runs $0.02 per kilowatt hour; we're able to secure a highly attractive gas contract at $1 per BTU at a pre-south port, to put it briefly. And we do possess a study which, as you know, closely mirrors what our peers are set to unveil in Australia concerning the expense of building this plant. I'm not able to reveal it at this point, but it formed one of the core elements of our discussion with BNDES. That's the goal, and it's fairly uncomplicated, since it comes down to basic chemistry. An intermediate facility amounts to a kiln plus an acid wash. The kiln converts spodumene into beta spodumene, while the acid wash yields the sulfate. So then, what's the actual crux? And that's a crucial competitive edge we designed into this business: residues, meaning the tailings. How do you handle 12 tonnes of toxic sulfuric acid tailings produced for every tonne of lithium sulfate? That's the dilemma, and only a handful of locations can resolve it in a sustainable way. Here in Brazil, though, we have a solution. Why? Such materials are recyclable within construction, since Brazil's construction sector is cement-based. These materials turn into concrete binding number one and number two; they are aluminum sulfate, meaning the cleaning products sector uses them, and in Brazil that sector operates at enormous scale. We have 230 million people who are obsessed with cleaning; as a result, we hold one of the biggest cleaning products industries anywhere in the world. So we're able to take in every bit of the tailings. That means we can achieve zero tailings. And globally, only a handful of sites are capable of achieving zero tailings. In most operations, those toxic sulfuric acid tailings get loaded onto ships and sent to some developing nation that has plenty of people, plus a cement-based construction sector and a sizable cleaning products sector. Yet that market exists right where we are. We're already on the ground here. That's another major competitive edge when it comes to intermediate chemicals, since we fix an essential part of the puzzle for everybody, China included; for China, we're able to supply what's known as intermediate negative. The carbon credits we provide let China produce zero carbon chemicals; as for the West, we'll provide a chemical to chemical supply chain with zero carbon and zero tailings; that way the West need not fret about licensing, or about storage, or about whatever else must be done with 12 tonnes of toxic sulfuric acid-loaded tailings that the intermediate chemical process creates. Where these industries end up locating hinges on waste. The question is how to responsibly recycle and reuse that waste from an environmental standpoint. And as it happens, China excels at exactly this today. Thanks to these factors, that's precisely what we're capable of too, because a large cement-based construction industry is required, and a large cleaning products industry is required to absorb all the aluminum sulfate.

Steve Byrne

analyst
#22

Pretty good. Thank you.

Ana Cabral Gardner

executive
#23

You're welcome.

Joel Jackson

analyst
#24

Morning, Ana, and hello to everybody else. There are a handful of things I'd like to ask, and I'll go through them individually. First off, could we discuss SG&A? Earlier in the year, you mentioned an effort to bring SG&A down to roughly an $11 million annualized run rate. In Q4, I believe you achieved something close to a CAD10 million run rate — CAD10 million, pardon me, in the fourth quarter — so you're getting close. What are your expectations for how SG&A will appear in Q1 and Q2 of this year? In Q1 of this year, what did it come in at, and what portion of that — how much of the burn rate could sit within SG&A tied to the strategic review?

Ana Cabral Gardner

executive
#25

Yes. So, taking a look at this slide — Matt, feel free to jump in too and help me out here, okay. As you can see, we posted $42 million, correct? Then looking over to the right side, you'll notice the $24 million; deduct $24 million out of $42 million, and we remain at double the guidance we provided to you. We're attempting to explain to you folks why that is. Our belief is that this cluttering within SG&A won't persist in its entirety during Q1, though a portion of it will remain, including the legal. Our teams are still working on our SAP. That means Q1 will continue to be work in progress. We're still going to get there. Matt, looking at the bridge, and this connects back to your point, Joel, regarding operating cost — we're nearly reaching it, right. So SG&A turns into a work in progress of decluttering and evolving toward what we refer to as steady-state SG&A; however, on the operating side, we're nearly at the guidance we provided at BMO's conference for what we call a run rate operating cost. Matt, would you like to add anything?

Matthew DeYoe

executive
#26

Absolutely, Joel. Look, a portion of this involves trimming expenses wherever it's necessary and possible. Clearly, this tends to be an ongoing figure. So if we end up with litigation or that strategic review, those costs would pile on top. Yet, looking at it from the ground up, considering what it actually costs just to keep the company running, our back office is quite streamlined. We're hoping, though, that extra scale comes our way once Phase 2 ramps up, since doubling capacity won't require us to bring on anywhere near the same number of people, correct? As we double, operating leverage will mainly come through SG&A and port traffic. That said, from where we sit, if we adopt a stricter stance on expenses — maybe aligning them more closely with, let's say, what the market's economics dictate, rather than how things looked back in the first half of the year, when pricing hopes ran much higher and we were investing to get the facility up to speed — then we believe there's a fairly solid route to reach that point. On the operating cost side, though, it might demand somewhat more effort, yet regardless, Ana and the team are quite at ease with those figures.

Joel Jackson

analyst
#27

All right. So how much are we spending each month on this strategic review?

Ana Cabral Gardner

executive
#28

It fluctuates. That's the issue. This is what people call aiming at a target that keeps moving. You know, it genuinely shifts, and that's among the things beyond our control. That's part of why we can't completely clear this up. It's one of those elements you can't predict. It depends entirely on how quickly documents get drafted, how structuring goes, and whatever comes at us. Still, I'd say it's been significantly eased in 2024. It's very, very much eased, since we no longer have to handle structuring. We no longer have to carry the heavy lifting of figuring out what a transaction will look like, with documents already marked up excessively; so it's not the same, It's far simpler, yet it's still there, correct? It's still muddying the numbers. But it's one of those unpredictable items, entirely outside our control.

Joel Jackson

analyst
#29

Alright. You mentioned that spodumene output in Q1 came to 53,000 tonnes. During Q4 it stood at 60 to 59,000 tonnes, meaning we see a sequential drop of roughly 7,000 tonnes for the quarter. Can you explain the reason utilization ran lower during the first quarter?

Ana Cabral Gardner

executive
#30

Honestly, the first quarter in Brazil is a strange one. We have something like our very own take on Chinese Lunar New Year. It's known as Carnival, and during that time getting folks to run at full capacity becomes quite difficult. So we tend to lose — the majority of companies lose 10 days. Since we rallied our crew the way we did, our loss was roughly five, six days, when workers turn up not precisely sober, not completely productive, and that's just how it goes, it's part of the culture. These folks had been grinding incredibly hard, correct? So Carnival creates difficulties. On top of that, we also hit what we refer to as the pressure valve during the opening week of the year, since we went all systems go to get the final 2023 shipment delivered, and that vessel sailed. I don't know if this sticks with you, but it actually departed on the 30th, correct; so during the first week of January everyone felt like, oh! yes, time to unwind. No, that's not happening, since we still had to produce for the first quarter. So it amounted to a mix of what we call collective vacations, where operations run at reduced pace during the year's opening week, along with Carnival; and that pattern tends to repeat; this is — it's Brazil's equivalent of the Lunar New Year. You may want to factor that into your scheduling. Carnival falls in the first quarter and so does the new year aftermath. For us, that aftermath hit especially hard. Because, I'll tell you, to get that shipment out, we pushed people to labor 24/7 at an intense pace. The general manager overseeing our plant sacrificed Christmas and New Year with his family and his newborn granddaughter in South Africa — that man remained here. He went without meeting his granddaughter so that shipment could happen. That shows just how dedicated this team was. They truly gave everything to get that boat off in December and hit the cutoff for the year, right?

Joel Jackson

analyst
#31

All right, and last thing—you provided some context, so clearly you've shared Q4 pricing. You mentioned what the April shipment will ultimately be; regarding the two shipments in Q1, could you share some sense of how pricing is shaping up and what portion remains provisional?

Ana Cabral Gardner

executive
#32

Yeah, so I'd say what's shown on the screen gives a fairly solid picture of where we stand on the first—on the first—on a Q1, with some ups and downs, though we're roughly at the industry average, perhaps a slight premium, but honestly not much. From an industry standpoint, Q1 was a difficult quarter, since you can see what took place in Q1—clients had inventory piled up, yet they continued purchasing our product. What's the reason? It comes down to this slide. Because life was so hard for the clients, they set other products aside and ran our product simply to capture that margin we're essentially handing over to them. And that's exactly what we were told. So the mere fact that we had buyers filling entire boats and paying us—I mean, not the whole premium, just a small premium—mattered to us. But what they were actually doing was pocketing a great deal of additional margin, which comes from the product's metallurgy. That's essentially something we provide at no charge. So it was a really interesting quarter. We picked up a great deal, and we just had a team return from China—they spent 32 days there—and they heard precisely that. So, a portion of that substantial premium we managed to secure in this very—what we term the price discovery process, through which we brought 18 clients into the auction bid for that boat, came about because clients had now gone through this across six shipments, seven shipments, and confirmed on their own that they truly require 2 tonnes less, at times 3 tonnes less, of our product compared with the alternative. So they're pocketing that gap, correct, which sort of connects back to the question. Steve was asking why lithium struggled. Well, we'd like that money as well. So that's—this is value in use, drifting about. Either we'll capture it via a premium, or we'll simply pocket it ourselves through a lithium sulfate plant. We won't leave it sitting there too long, but one step at a time—right now the goal is to double.

Joel Jackson

analyst
#33

Sorry, so would pricing in Q1 be comparable to what we saw in Q4, or is it more like — would your actual average price for deliveries be about the same, or would it be greater or less?

Ana Cabral Gardner

executive
#34

You could go with…

Ana Cabral Gardner

executive
#35

Yeah, whatever's there works fine for you. That's fine — this particular indication.

Matthew DeYoe

executive
#36

Joel, yes — glide 1Q specifically.

Joel Jackson

analyst
#37

That’s exactly the point I was raising. You’ve provided figures for Q4, and you’ve also given something like April, yet what you haven’t given is the mark for February and March…

Ana Cabral Gardner

executive
#38

Right. The gap comes to roughly $100, meaning $100 is still up in the air. So feel free to choose either one, though — the final figures aren’t in our hands yet, correct, since those remained provisional; even so, it will land somewhere between this figure and what we got in the most recent auction, in that range.

Joel Jackson

analyst
#39

Okay, thank you. That's excellent. Really appreciate it.

Ana Cabral Gardner

executive
#40

I'd just like to say thank you to everyone for your support, your patience, and for remaining with us. What I mean is, I think we're on course to build what may be among the most resilient lithium companies in the sector. We're creating the next major player. The arithmetic shows it; the figures make that clear. Numbers don't have an opinion, and we're committed for the long term. When you take a look at this situation, what we have now is longevity, and that was the missing component in the sustainability equation for Sigma's project years, since we had put cash flow first, and it's now clear why that was so important, because we were able to capture the end portion of the bull market and generate a substantial amount of cash. Then, in this year, we shifted our priorities toward lengthening the project's life; as a result, we're among the strongest players in the industry. The fourth complex, if you match the project names to the owners, ranks as the third biggest hard rock lithium industrial mining complex. We are on the verge of becoming the fifth-largest producer. Next year, we'll likely surpass both the fourth and third positions. So it's a positive force. Here we are, targeting the number three spot shortly, with a product that is clearly superior in metallurgical terms, from a physical and chemical scientific perspective; it comes down to the math of what our clients save, the math of use value—numbers speak for themselves. So thank you very much for joining us, for your support, for your encouragement, and for partnering with our team; and all I can say in closing is that we're in this together. Not once have I ever sold any shares in this company. We aren't going anywhere, and we intend to walk this road alongside you the whole way.

Operator

operator
#41

That wraps up the Sigma Lithium call covering Q4 and the complete 2023 fiscal year results. We appreciate everyone joining in. At this point, you're free to leave the line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Sigma Lithium Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Sigma Lithium Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sigma Lithium Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.