executiveHi, good morning.
Matthew DeYoe
executiveHi, Ana. Yeah; we'll have, Dennis is gonna lead with some comments.
Ana Cabral Gardner
executiveOkay, thank you.
Matthew DeYoe
executiveI'll take it from here—thanks, Dennis. Hello, everyone, and good morning. We appreciate you being with us for the conference call on our earnings for the first quarter of 2024. Joining me today is Ana Cabral, who serves as CEO of the Company. Earlier this morning, prior to the market opening, we issued our 1Q earnings release and made our financial results available, and those can be accessed via SEDAR and the SEC. There are two things I want to address before we get started. To begin with, throughout this presentation you will hear some forward-looking statements about our plans and what we expect. Please be aware that actual events or results might differ materially because of shifts in market conditions and in our operations. In addition, the earnings discussed in this presentation might leave out particular non-core and non-recurring items. You can find reconciliations to the most comparable IFRS financial measures, along with other related disclosures—among them descriptions of adjustments—at the back of the release. Having said that, I'll hand things over to Ana. Ana?
Ana Cabral Gardner
executiveHello there, and thanks, Matt. Good morning to all of you; it's a pleasure to share our results for the first quarter of 2024. Let's move straight to the next page, if you would. Our outlook makes us very excited, since we've kept moving forward on the important catalysts within our pro- plan, which aims to double production capacity by 2025. This quarter brought four main deliveries. The first was increased premium pricing, through which we secured a fixed floating formula of 9% of the London Metals Exchange lithium equivalent, essentially arriving at a $1,290 pricing. That's an 11% rise over the April 24 realized pricing, the figures we published for the first quarter of 2024; so it's clear the pricing direction is upward — an 11% gain versus the previous month and nearly 30% higher overall than the average pricing of the prior quarter. The second catalyst concerns how we've kept hitting our targets on achieving a low cost of production. During this quarter we became the world's second lowest cost lithium concentrate producer, with a reported cost of $397 per ton. Even more significantly, we've also succeeded in extending the operating life of the company to 25 years; we lifted mineral reserves by 40%, auditing 77 million tons, 43 to 101. In addition, we reached a final investment decision on a fully funded expansion that doubles production to 520,000 tons annually, equal to 70,000 tons LCE. Turning to the next page, we show how we've been fulfilling our vision of pairing this large-scale production with low cost and the highest standards of environmental and social sustainability in lithium. Those three elements seldom come together. Frequently, scale and cost come at the cost of traceability and high environmental standards. On the other hand, scale, traceability, and high environmental and social standards come at the cost of a resilient business that maintains the lowest production costs. Here, somewhat paradoxically, we're delivering on all three fronts. The following slide shows one of our key deliveries for the quarter, illustrating how we became the fourth largest producing lithium industrial mineral complex in the world. Sigma is now the first non-Australian within the top five. We sit behind Greenbushes, Pilbara, and Wodgina. Grota do Cirilo now stands at 4.8 million tons of LCE equivalent, with a very high-grade average of 1.4%, and that stems from exploration, development, and feasibility deliveries that were very well concatenated across the last 12 months. During this quarter, we delivered feasibility, and so we declared mineral reserves of 77 million tons, which rose by 40%; that's a significant milestone. Why does it matter? Because it extends the project's life to 25 years, and so, as we expand to double capacity, we now have an operation sustained for 25 years. That is a moving target. To put it another way, as our expansion plans progress, we'll keep unlocking and converting our existing mineral resources into mineral reserves, which supports a comparable length of operational life. So, by carrying out this mineral resource work, we show that Sigma Lithium faces no constraints whatsoever from the size — the enormous size — of the mineral resources present on its properties. What we're doing here is simply showcasing the mineral resources at just one of our four properties. With that, let's go to the next page, page 7, where once again we let the math of our figures speak. We're fond of mathematics since numbers don't carry an opinion with them; in 2024, as we've discussed, we're hitting every operational target we established for ourselves. A number of those were fairly ambitious. And once again, the figures show the resilience and the longevity of our project, essentially bringing together scale, costs, and the highest global standards of environmental and social sustainability. We are maintaining nameplate capacity. Nameplate capacity has been sustained by us since December 2023. During the first 10 months of production, we already hit 178,000 tons, which makes all of us delighted, given our pioneering dry stacking circuit at the dense media separation industrial plant, the Greentech plant; at the same time, the top premium and the top quality our product shows translates into premium pricing, and we've managed to do that consistently. For our ninth shipment, the economics again hit our target of capturing a 9% share of the lithium hydroxide value posted at the London Metals Exchange, which right now equals $1,290 per ton. That figure follows a fixed floating formula, and it will be adjusted according to that lithium metals exchange price, one month after delivery. We managed to achieve that while also delivering on our very low marks, on our very ambitious marks of a low cash cost at the plant. So we reached $397 per ton at industrial plant gate, which essentially positions us as the lowest cost producer among all lithium concentrate hard rock producers, all of our peers in Australia. So we're showing that even without yet reaching that scale, we possess the cost discipline to be in the second position, which makes us incredibly resilient to lithium cycles. So we're here to stay. Meanwhile, we've also preserved our liquidity, so our cash position on March 31, at the end of the quarter, stood at $108 million; so phase 2, the second Greentech plant construction that will deliver double capabilities, is fully funded with cash at hand on the balance sheet, and we'll keep working on improving the capital structure to fund that construction. But regardless, the funding is in the bank as we speak, so we'll keep going with the construction project to meet our delivery timetables of around this time next year. We've kicked off building with earthworks engineering, design, and the teams involved. Our second construction crew is now onboard, so we split our teams apart to guarantee that the second GreenTech plant gets delivered dependably, on schedule, and within budget. Once more, this takes us to twice the capacity, roughly 70,000 tons of LCE equivalent, or 520,000 tons of lithium concentrate. And finally, as we've already mentioned: we provided the longevity supporting an operational life spanning 25 years, backed by a 77 million ton proven and probable mineral reserve. And again, it always — it fills us with a lot of pride to remind everybody that among global producers, we're the sole one to have hit that highly coveted zero carbon goal, meaning we deliver lithium products matching the philosophy of the electric car sector we serve. So moving to the next page, I'll begin this part, and after that I'll pass things to my partner, Matthew DeYoe. We want to restate once more just how resilient, how dependable, and how steady our business has proven to be from the moment we made our first shipment; we achieved scale over the course of 2023, and we've been shipping roughly 22,000 tons of lithium concentrate materials every 35 days, regular as clockwork. Even more significantly, when the market hit its lowest point, we actually launched a premiumization push that has kept delivering those premium prices via auction/price discovery discussions with our customers.
Ana Cabral Gardner
executiveWhat this shows is that our commercial leverage has kept growing as customers attempt and see the savings our product delivers, and those savings came in at 20%-30% versus rival offerings on the market. And that turns into commercial leverage. If you run the math, we show it through a 25% bump over the realized prices from Q1, in this May shipment. So the page also shows, in the two colors, yellow being what we consider the market benchmark, and blue being what we consider our own pricing benchmark. So as you can see from the arrows starting at February, which is Lunar New Year, at the industry troughs and going forward, we managed to premiumize our prices by 25%. In last month by itself, we managed an 11% price increase. So once again, that's a mathematical, numeric proof of greater commercial leverage; and it produces a partnership, a win-win partnership with our customers, since our product does deliver to customers a chemical savings that can be measured, when set against other competing products available on the market. So this is in no way a win-lose game; it's simply commercial partnerships with our customers flourishing. And on the chart, we also show how our prices translate into value capture for the lithium hydroxide as priced on the London Metals Exchange, where we moved from 8.75% of it to 9% of the index. So, greater value capture over the lithium hydroxide chemical, and once more, a mathematical demonstration of this, a partnership with customers who win as they obtain our product. Usually, the average premiumization we've achieved sits at around 10% over comparable competing products, which once again, since we deliver 20%-30% of cost savings to our customers, clearly shows that customers still get a 20%-10% savings. So clearly a win-win relationship with our valued customers. On the following page, it gets interesting when we put cost in perspective. We show that Sigma is among the lowest cost producers worldwide; we clearly locked in our position in the global supply chain. We have a low-cost, traceable, sustainable product. And even more interestingly, we show that this market depends on a, shall we say, delicate balance, since the trinity we mentioned earlier is not always easily attained by lithium producers. Put differently, combining low cost, sustainability, and scale is really the one thing that is rare in the lithium industry. Put differently, exceptional execution. So that's what we've managed to deliver. And here in green, you can see Sigma as this, you know, the second lowest cost producer. This is in fact a benchmark minerals standard cost curve, and we're also highlighting in brown the producers located in the traceability zone of producing countries. So once you tally up those participants, what you get is a tough rock cost curve combined with the remaining brine feedstock coming out of the traceability zone, and that leaves you with only 900,000 tons of LCE equivalent that's projected for 2025. When you total everybody sitting in that low-cost traceability quartile right up to where the cost curve hits its midpoint, the figure comes to 1,000,000 tons of LCE. What's the reason I'm bringing this up? If you'd kindly flip to the following page, page 11, it becomes obvious that with lithium demand staying robust and the medium to low-cost supply situation being what the prior page showed — and once more, that comes from a Benchmark Minerals cost curve — looking at 2024, the current year, we're perched on a delicate balance. I should note these demand estimates also come from Benchmark Minerals. Then as you examine 2025, barring some miraculous development, we will be hitting a moment of mild tension. What's the implication? It's something quite similar and straightforward. Prices are going to need to shift once more, this time upward, creeping toward the zone of higher production costs, which would draw out product from producers with higher costs in order to satisfy the supply/demand equilibrium. Therefore the figures shown on this page must be read alongside the figures from the earlier page, so that in examining the gap, we can work out mathematically the reason the gap has been filled, or will increasingly be filled, by high cost product — unless another Sigma emerges; and regarding that, it matters to recognize that should the 2030 projections, or the 2027 projections, prove accurate — and our belief is they are, grounded purely in EV, EV expansion within China by itself, as the charts on the right demonstrate — the world is going to require somewhere between 30 and 50 new segments appearing from now through 2030. That once again shows that when it comes to low cost, traceable, and large scale operations, there's plainly a scarcity of operating companies. So prices will ultimately need to shift in order to make viable the high cost, you know, traceability hurdle of products at the right end of the cost curve that appeared on the prior page. Having said that, I'll proceed to the next section, and I'll hand things over to Matteo, my partner sitting here, so he can go over some of our financial first quarter 2024 earnings highlights.
Matthew DeYoe
executiveThanks, Ana. So during Q1, we moved 52,857 tons of lithium concentrate — that breaks down into two complete shipments plus a partial sale of inventory we'd been warehousing, made to Glencore near the end of the period. Output came to a little more than 54,000 tons. Revenue as reported for the quarter came to $37.2 million, and that figure carried a $12 million hit from provisional adjustments tied to earlier shipments, especially the one in November. That's a reduction compared with the $30 million we saw in 4Q. For business done in Q1, we put revenue at $49 million, and measured against our volumes, that points to a realized price of $930 a ton for that Q1 business. Operating cash costs came in at $462 a ton at plant gate, roughly 16% lower quarter over quarter, and that yields a 50% FOB margin against the $930 per ton price. Adjusted EBITDA as reported was $6 million, giving a margin of almost 16%, though once more, for business conducted in 1Q — leaving out the provisional effects — we assess EBITDA at about $17 million, an EBITDA margin nearer 35%. One thing we want to stress: as prices climbed during Q1, the effect of those provisional adjustments faded. With our fixed April shipment and the significant correction in market prices we've witnessed, such adjustments ought to be immaterial from here on. Let me turn, I suppose, to the cost bridge; we feel our guided targets are well within reach. And importantly, now that we're past a good deal of the noise tied to commissioning activity, that's genuinely helping us post a cleaner quarter and give a cleaner view of this company's advantaged cost structure. Cash cost per ton, as Ana noted earlier, came to $397 in Q1, which produces an FOB cost at Vitória of $462. The gap to COGS here reflects only royalties, non-cash D&A, and a minor stocking effect from concentrate produced in 1Q that will be sold in Q2. Still, as we've said, guidance is plainly within reach. From our prior discussions, you'll remember the company anticipates reaching $370 a ton at plant gate and $420 FOB Vitória in Q2 for 3Q. On absolute dollars, costs are already there. The chief obstacle to hitting these figures in 1Q, as you can see, was production, since normalizing the cost base for 4Q production would put plant gate costs at $359 during Q1. Production got better as Q1 went along, which leaves us confident we can reach these targets — and that would place us comfortably at the second-lowest cost hard rock project worldwide, at least among those we're aware of, though we already hold that position. Moving on now, let's look at where our cash stood. As Ana referenced earlier, we closed the first quarter with $108 million, a figure driven largely by money brought in through trade finance, or trade facilities, and partly reduced by an annual interest payment along with a slight increase in working capital. On the operations side, things came out flat relative to our earnings formula, since revenue gains were canceled out by a partial adjustment to operating costs. Looking ahead, as we noted before, once prices strengthen, we ought to get beyond those provisional headwinds and start accumulating meaningful free cash. On the following slide, we show what we see as the cash flow potential on a recurring basis. The model, or the column at the current price of $11.60, broadly captures today's market, while our cost targets, as I said above, remain within reach. This should not be taken as explicit cash flow guidance for this year, since these figures simply illustrate performance at capacity and may not capture what 1Q actually looked like, but it does offer a solid sense of what this company could achieve going forward. As you can see, we sit comfortably above the $100 million needed to fund our expansions; with that, I'll hand things back to Ana.
Ana Cabral Gardner
executiveAlright, picking up right where Matt stopped on doubling our production capacity — once more, we've got that drone shot showing how uncomplicated this project really is. In the background you can plainly spot the expansion zone marked in red, where the truck maintenance patio has already been put in. No vegetation grows there. It's pretty much — these are essentially old pasture lands, so it's very simple, sitting perpendicular to the terrain's elevation, ideal for a ROM pad installation that will supply a second Greentech production plant. That second line train is going to match the one currently out there, the one highlighted in yellow, and the existing infrastructure shown in green will support it — and that same infrastructure could also support a third Greentech line expansion, which we intend to carry out as soon as we commission that second Greentech plant. The infrastructure, costing us roughly $40 million-$45 million, is no longer needed since it covers two extra Greentech plant expansions. With that said, we'd like to restate once more that the cash needed to build it is available. Thanks to our steady, resilient performance in production, shipping, delivery, and customer acceptance of our product across the first 10 months of operation, we've managed to lock in strong and dependable trade lines. That track record opens the door for us to trade line mandatory funding. In Brazil it goes by the name ACEs, Advancements on Export Contracts, and right now those are the primary funding source for this construction. That's cash already sitting in our treasury. We'll keep working on strengthening the capital structure for building the project. We've got some quite compelling plans to tap debt capital markets and debt loan markets over the coming few months; yet absent that, or regardless of it, or regardless of whatever other financing source appears, we're confident we can proceed and pull off our plans to double production capacity. Once again, commercial demand is clearly there. We'd be selling significantly more boats if we had enough material to deliver. At this point, ultimately, we occupy a very comfortable place in the industry. So our aim is to keep relying on the, you know, reassurance of our business standing within the global lithium industry right now; so here, the next page simply illustrates once more the sole thing that's scarce in lithium, and that's exceptional execution; so we're going to do it again. The industrial plant licensing is already done. We've gotten the initial financing by securing those trade lines. And we finished the engineering, FEL3 CapEx quoting, over the course of the past year, basically. We've actually been at this for over a year now — 12 months plus, as things stand. We feel good about the capital structure we've got in place. We're going to keep refining it and making it better, but then again, on average, trade lines come at a 9.3% cost, and given what we'll get back in terms of returns from volumes and production on a cash generation basis, that's a fairly sensible cost. So with that confidence, and with confidence in how our team executes and their execution prowess, our board of directors cleared it and handed us the final approval and final investment decision during the quarter for building phase two. With that, I'll move to the next page. So Matt, over to Matt.
Matthew DeYoe
executiveAlright, so once more, looking at it through the lens of our organization, correct? We possess a distinctive history of delivering projects within schedule and without exceeding the budget, and that's precisely what we intend to repeat. Therefore, as Ana previously stated, on the first of April, Sigma's board of directors gave the green light for the phase two FID. Like we mentioned, the CapEx allocation comes to roughly $100 million in order to introduce 250,000 metric tons, an amount of lithium equivalent sufficient for approximately 850,000 EVs. The EPCM crews are wrapping up engineering for earthworks while mobilization continues, and crucially, the phase 2 flow sheet mirrors phase one. Our aim is to minimize risks to the greatest extent possible throughout this undertaking. The same local EPCM group remains in place. The identical parts design crew is involved. We're progressing through phase 2 armed with the insights and lessons from phase one, which ought to translate into a quicker ramp-up and a speedier route to free cash flow going ahead. This merely represents a broader outline of our trajectory, and as Ana noted, a third phase lies ahead at the tail end, already backed by the existing infrastructure.
Ana Cabral Gardner
executiveOkay, let me give you the whole picture here. What you're looking at is the industrial plan we gave to our development bank and our investors earlier this year. It shows you visually exactly where we are, what we hold, and how methodically we've been growing our production capacity — mostly driven by one hard-to-get input: our ability to deliver on time, on budget, and without strain. That's because we keep operating everything at the peak performance standards we set for ourselves. So we arrived at this point in 2023 — here's what we've done over those 12 months. As of today, 2023 sits at 175,000 tons produced, and that carries us to now. That cash flow then propels us and gives a foundation — call it our cushion, if you will. And if you annualize 24 from now, we'd be looking at 270,000 tons of output, which further strengthens that cash-generation cushion. So we're basically doubling capacity — roughly doubling it — with another Greentech line at 250,000 tons. That means we're currently building what comes to 35,000 tons LCE. And past that, we'll add the third line, as I showed you earlier with those drone images — it's supported by infrastructure already in place — and that gives us another 250,000 tons. So that brings us to 770,000 tons of yearly capacity. Roughly speaking, that's what we call the magic figure: 100,000 tons of LCE per year. Ladies and gentlemen, very few companies out there can truly deliver and operate at this kind of level — those are the ones we call super majors. Through our careful and disciplined approach, we intend to get there, in all likelihood by the start of 2026, with three Greentech production lines. We're already underway, with earthworks construction happening right now for the second one. One thing worth noting — if it's justified, and again, this depends on premiumization — we do have plans, in 2026, to potentially build an integrated intermediate chemicals line tied to that third line. Once again, that's already in progress; we've been searching for sites for where this industrial facility might go. And given that, as we often say in our business, 2026 is practically right around the bend when you're talking metals industry timelines. Just 18 months off. With that said, let me move to my closing remarks. Basically, the future is already here. Sigma ranks as the sixth largest producer worldwide. We're on track to become the fourth, once we finish building that second Greentech plant. Same team, same execution, same engineers, even the same suppliers. That's how cautious we've been. So the one regrettable thing that hasn't occurred is that we haven't been repriced from developer to producer — but we're confident that through our resilience, our cadence, and our continued successful execution, that will come about in due course. This slide makes it clear that Sigma, along with other manufacturers operating in the same segment, is marching to a different beat. Over on the following page, we push that same visual even further using fractions, which happens to be a very simple way to pro-rate valuation relative to production. If we applied that identical exercise to a company in the Americas or one over in Australia, we would arrive at a similar mismatch, outcomes that don't mirror each other evenly. What this whole exercise does is highlight why we stay so firm about hitting our cadence, about executing consistently throughout the entire year, since our strategy is to close that gap through mathematically driven deliveries; and again, it's just a fractional pro-rating of our current market cap versus the market cap of companies in the Americas or companies in Australia, measured against the production they're actually delivering right now, as of today. Consider our output: placed next to an Americas player, it comes to roughly 20%; yet our market cap is not 20% of theirs. Head west, or rather east, to Australia, and our production amounts to half of one very big Australian company, while our market cap sits well under half. It's close to 25% of their market cap, which yet again points to this sort of mismatch. With that said, I'll bring things to a close. And again, with the key valuation, with the key valuation benchmarks we've already put forward, and once more, setting out the targets we've established for ourselves, which are genuinely quite ambitious. I mean, number one, we plan to meet the cost guidance we laid out for ourselves. We already hold the position of the industry's second-lowest cost producer, and we plan to stay there. That said, we still have some further dollars of costs to remove from our C1 plant, plant cash costs; and we plan to pursue those additional cost savings as we build operational cadence, getting to a full year of operations. I mean, again, it truly matters to remind everyone that this is our first year. So in theory, we should have given ourselves some allowance for commissioning, but we didn't, because the lithium pricing environment gave us $62 of breathing room — none at all, no margin for mistakes. So we set out to reach those ambitious low-cost targets almost immediately, and here we are. The next milestone is commissioning the second Greentech production line, and we're already moving ahead with earthworks construction engineering underway. So we do believe we're going to achieve the exact same construction milestones as last time. We have the same team, similar leadership, the same engineers. Everyone is essentially the same, as I mentioned earlier, and we're not even taking the risk of changing suppliers. That's just how cautious we are. So essentially, it's another instance of the same approach we've taken previously, proceeding one line at a time. On the left here is the volume we've delivered, and you can judge for yourselves — I mean, we deliver zero carbon. Our resource base has expanded, with estimated resources now reaching 150 million tons, and out of that we are moving into proven and probable 2P reserves, which we just increased on feasibility to 77 million tons — that's a 40% expansion. Consistently, month in and month out, we've been shipping about 22,000 tons every 35 days. Phase two was mobilized, we delivered the final investment decision for phase 2, and construction got underway. So again, we set a target, we stay focused on execution, and we deliver — which, as I'll repeat at the close, is what this business sorely lacks: outstanding execution, outstanding resilience, precisely what our team has demonstrated, having faced market headwinds in our first year of operations and come out as the industry's second lowest cost producer and sixth largest — second lowest cost, sixth largest producer. Thank you all for your trust, thank you all for your confidence in us. With that, I wrap up our first quarter 2024 earnings presentation, and we'll take questions.
Matthew DeYoe
executiveAlright, thanks. Dennis, if you could switch us over to Q&A at this point, that would be wonderful.
Rock Hoffman
analystI was just curious — could you give us the most recent update on the strategic review, and is it sitting on hold at the moment?
Ana Cabral Gardner
executiveThat's right, it is; we've said openly, more than once, that it's on hold, and the reasons remain pretty straightforward. What I mean is, there's a lopsided gap between the value we think is fair for us and what's reflected, and given how strong and resilient our operation is, we chose to simply keep delivering. Ours is a fantastic business, and from our side there's no pressure whatsoever to run any kind of review. So we'll hit the targets we laid out for ourselves and likely come out two years from now and figure out what to do for the next stage of growth.
Rock Hoffman
analystGot it. As a quick follow-up, about that LG press release on our arbitration — I'm just curious what the timeline looks like there, and whether there's anything new in that process?
Ana Cabral Gardner
executiveSo, our relationship with the LG Group and with South Korea is really quite friendly. There will be additional good news on that front that we'll be announcing at the appropriate moment. What I can tell you right now, though, is that on the commercial side, things genuinely couldn't be stronger with the LG Group overall, and that takes in their trading arms, who were in fact touring our plant facilities at that very time. Arbitration was launched by another subsidiary within the group, and it sort of left everyone pretty stunned. That said, it's since been repaired, and we simply want to stress that our ties are terrific with both the South Korean government and with LG Group overall; and we see no cause for concern about it.
Rock Hoffman
analystOkay, thank you.
Matthew DeYoe
executiveDennis, how about we go ahead and take the following question?
Mac Whale
analystMorning, everyone, and nice work getting those costs down so easily. I had a question — I noticed two sizable line items there compared with Q4, in mining services and consumables. Why did those two specifically drop by so much?
Matthew DeYoe
executiveHey, Mac. Regarding consumables, we became quite efficient with our ferrosilicon, recycling it throughout the process. You might remember too, we put in the magnetic separator back in November, and part of that involved the tailing side of things, letting us boost how much ferrosilicon we can recycle in our process. On top of that, certain purchases can be somewhat uneven, though we're improving at fine-tuning and operating the plant. That accounts for a large chunk of the consumables side. As for the drop in shared services, I'd need to verify, but as we've mentioned, we're eliminating many on-site contractors and swapping them for domestic and local labor. So once that roll-off occurs, you'll likely see costs come down overall, plus some left pocket, right pocket effect, since some of that gets allocated and reallocated across our cost lines, if that makes sense.
Mac Whale
analystYes, that helps. Now regarding G&A—those assorted items below the operations line, especially some of your G&A expenses—it came in lower. Should we treat that as a solid run rate for those line items moving forward?
Matthew DeYoe
executiveYes, so look, G&A is—clearly, like we attempted to show during our four-Q call, correct? The annual SG&A figure contains an enormous amount of noise and clutter, and we felt a lot of confidence that it would decline. If the strategic review stays paused, then obviously additional costs will leave the business, but it's sitting at a fairly good level, much lower than where we had been. And once more, certain productivity initiatives we've been pursuing need a bit of time to work their way through the system. You know, you cannot eliminate every cost right at year-end; some of that stuff trickles. But, you know, the aim is to maintain a very draconian stance on all costs. If you spoke with me lately, what I tell you is I truly love $1,200 a ton spodumene because, you know, we can produce cash, and we can expand in this market, but it also keeps everyone honest regarding costs. And so, you should anticipate the same level of—I can't use the word draconian, but, you know, intensive cost control internally at Sigma to keep delivering on these numbers as best we can.
Mac Whale
analystAs the pricing landscape gets better, do you think we'll see — like, how are those provisional pricing arrangements going to shift as the year goes on?
Ana Cabral Gardner
executiveI'll handle that one. Hi, Matt, this is Ana. In our view, provisional pricing belongs to the commercial past, and for us it isn't really tied that much to what's happening in the market — it's entirely tied to us, essentially, from the moment we enter the marketplace. Much of what our customers had known about our product came through what we refer to as bulk samples — 100-ton, 200-ton samples. But over this past 12 months, they got their first chance to test full tonnages, and it turned out that customers saw a 20%-30% cost savings that our product delivered to them, on their own. So they measured the cost savings themselves in their own refineries; that shifted our commercial discussions onto an entirely different plane, because, as we often put it, lithium prices around the world are still in their infancy. It's as though copper concentrate and iron ore were wedded, and lithium prices for concentrate would take something from each. For instance, you'd take purity from copper concentrate, and you'd take lump size from iron ore, and none of that was showing up in our high-purity, coarse, lumpy product. So we think that once customers try the product and witness for themselves the cost savings it brings to their refineries, they'll be far more open to conversations about non-provisional, final pricing. We proved that first with the fixed pricing we delivered last month. It was fixed and final, exactly like the major industry players, such as ALB and others. And then this month we've now shifted to what we call the best spot, the holy grail of pricing — the fixed floating formula, where we collaborate with our customers. That's why we describe it as a partnership. We aren't fixing at their expense. We're floating to their quote, which is hydroxide LME, while fixing our value capture to their quote. So we're staying on good terms with the industry since it floats alongside them, meaning we aren't squeezing anybody's margins, yet we're capturing what we consider our premiumization in those prices; and that's how we'd like to remain through the year.
Matthew DeYoe
executiveI'd say this, Mac — the final point is kind of a small shift, correct? For April, we had already committed to a fixed price. In May, we've got that 9% firmly locked in, but when it comes to the floating portion — look, we feel pretty good that we're near the low point of this pricing cycle, so we'd like to keep a bit of that flexibility as things get better down the road.
Ana Cabral Gardner
executiveYeah.
Matthew DeYoe
executiveSo we're committing to that 9% while retaining some flexibility when it comes to the cycle. And, you know, since we're a low-cost producer and you're putting money into a lithium company, our aim is to let everyone — and everyone ought to share in the upside economics. So that's the whole story.
Ana Cabral Gardner
executiveRight. That really is the foundation — working alongside customers — and if you look at copper concentrate or iron ore, that is precisely how those sectors moved toward premium pricing over time. So we put our faith in partnering with the people who buy from us, and that is exactly what we are doing.
Matthew DeYoe
executiveThank you. Yeah, Dennis, if you wanna reprompt, but otherwise, we can close down.
Matthew DeYoe
executiveThat's all I've got for now. I appreciate all of you being on this call today. We're eager to share news with you as shipments move forward and the business makes its way through the 2Q build, and we can't wait to connect again when we report 2Q earnings. Have a great remainder of your day. Thanks so much.
Ana Cabral Gardner
executiveThank you. Thank you, everyone.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sigma Lithium Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Sigma Lithium Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sigma Lithium Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.