executiveGood afternoon, everybody. Thank you for joining us for the conference call on our financial results for the third quarter of fiscal 2021. Today's hosts are Simulations Plus' CEO, Shawn O'Connor, along with CFO, Will Frederick. After our presentation, there will be time for your questions. Prior to starting, please let me note that apart from historical information, everything we discuss in this presentation constitutes forward-looking statements involving risks and uncertainties. The company's actual results could vary materially from what those statements suggest. Things that could lead to or play a part in these kinds of changes include ongoing need for what the company sells, pressures from competitors, whether the company can fund its expansion going forward, whether it can roll out and sell new offerings quickly enough, whether it keeps drawing in and holding onto talented workers, and whether it maintains or boosts today's output levels. You can find more information on the company's risk factors in its quarterly and annual reports, which are filed with the Securities and Exchange Commission. With that covered, I'd now like to hand things over to Shawn O'Connor. Shawn?
Shawn O'Connor
executiveThanks, Brian. Simulations Plus turned in yet another quarter with gains on both the top and bottom lines. The period stood out because our software solutions kept performing strongly, growing by more than 21%, far ahead of the 10%-15% growth rates we've seen historically. Because of that, we expect software revenues to play a bigger role in driving our consolidated growth rates going forward than they have previously. Our service business ran into a number of project disruptions that weighed on the quarter, producing an 18% drop in service revenue. That decrease stemmed from an unusually large count of projects — nine altogether — that were hit by delays, holds, or cancellations of drug development programs, and every one of those took place in the later portion of the quarter. Even with these near-term issues, we stay confident about the mid to long-term outlook for the service business, since we recorded solid bookings and backlog growth along with overall pipeline expansion during the quarter. Thanks to our strong software mix, we managed to grow our bottom line more quickly than the top line, which our strong profitability in the quarter demonstrates. Actually, looking at our first nine months, the net income we recorded exceeded what we earned across the entirety of fiscal 2020. What's behind these figures is the quickening expansion of our software revenue, the built-in operating leverage our business model provides, and the strides we've taken toward widening our profit margin. As I noted earlier, our software solutions had a really solid quarter. Growth rates kept climbing for GastroPlus and ADMET Predictor, with the drug-drug interaction, or DDI, module and the high-throughput pharmacokinetic, or HTPK, module rising 114% and 58%, respectively. We brought five additional customers into the 100,000-plus license club, and during the quarter we closed 23 sales — clear evidence of how strong our product portfolio is when paired with our cross-selling and upselling initiatives. Monolix kept beating what we had projected, posting a 64% year-over-year revenue gain driven by both strong demand and renewals that came in ahead of schedule. Since we've now marked a full year since that acquisition, all of this expansion comes from our own operations. On top of that, we finished onboarding a fresh distribution partner in China this quarter, which widens the market we can reach by a substantial margin. The money we've put into business development is delivering results — our sales pipeline has grown, and we're seeing chances to sell more to existing accounts while building stronger ties with those customers. Additionally, we keep introducing fresh features and reinforcing our standing as the industry leader through the newest edition of ADMET Predictor, which is designed to deliver better lead selection, stronger performance and precision, greater automation, and an improved experience for users overall. The upcoming MonolixSuite version remains scheduled to launch during the fourth quarter, while GPX10 stays on course to arrive by the close of the calendar year. Shifting to what we offer in services. Because our service revenue does not recur, it can show a certain degree of fluctuation. This quarter, our PK/PD and QSP/QST services ran into project interruptions and shifts in mix that weighed on their revenue growth. PK/PD projects generally fall within the one to $200,000 range. We observe situations where projects speed up to hit tight deadlines, or else get pushed back because of problems beyond our influence. In the past, those setbacks were mostly made up for through fresh projects or work brought forward out of backlogs; in this quarter, though, a number of major customer delays hurt our revenue and will keep doing so through Q4. In today's pandemic conditions, clients are more inclined to drop difficult drug development programs. We encountered multiple cancellations of drug development programs. Thanks to our technology, customers can decide faster whether to keep going with developing a compound or not. Failing fast is what the industry aims for; that can add to the volatility of our service projects. We likewise experienced delays in service projects that originated in Israel during the past quarter, plus delays stemming from the tail end of COVID's impact; regarding that second category, projects frequently get started because the FDA gives feedback asking for further study of particular aspects of a compound. Throughout the pandemic, the usual workflow at the FDA, and at other regulators too, has been disrupted to some degree. That has affected when certain drugs get submitted to the FDA, the schedule for FDA reviews, and the timing of clinical trials. Consequently, we encountered a substantial number of changes, and lots of those notifications arrived near the end of the quarter. Because our sales cycle had already been stretched out somewhat during COVID, our backlog wasn't at the levels you'd normally expect in this business, which limited how well we could backfill and shift resources around to compensate for those changes. On a brighter side, our bookings in the quarter were solid, and service project backlog grew by roughly 5% even with the cancellation; we brought in five new clients too during the quarter, which strengthens our confidence; when it comes to QSP/QST, those projects usually carry bigger dollar amounts, so revenue from that work swings more. Three extremely large QSP/QST projects wrapped up late in fiscal 2020, which pushed revenue above what's typical. Beyond that, smaller toxicology projects typically arise from FDA feedback when regulators want a sponsor to supply extra data about possible liver problems tied to a compound, and in that area we hold the gold standard of capabilities. With COVID increasingly fading into the past, we expect the broader pharma development pipeline to return to normal, and we'll see opportunities turn into backlog and eventually into revenue. Even so, our sales pipeline is still big — actually bigger than usual — with meaningful opportunities. On a separate note, we did bring one more member into the liver model consortium during the quarter, deepening our integration with industry leaders. To wrap up, PBPK Services had a really solid quarter, and our regulatory services team is stretched to the limit. When you add it all up, the service division had a difficult quarter, but the underlying direction is more encouraging than the numbers alone would indicate. Interest in what we offer remains robust, and our pipeline of potential sales is both healthy and growing. Given the nature of project-based revenue, some quarters will come in above plan and others below it. Looking further out, nothing has shifted in how we see services revenue or the contribution it can make to overall growth. As momentum builds in our software business, the impact of service fluctuations keeps getting smaller, and our profitability keeps getting better. Because our services revenue has decelerated, we're now expecting overall revenue growth for the entire year to land between 5% and 10%. The ups and downs in service we experienced this quarter don't signal any kind of market shake-up or execution issues on our end that would change our view of how modeling and simulations get adopted over the long haul, or our company's growth trajectory. We're not giving fiscal 2022 guidance at this point, though we believe that longer term we'll expand at a rate above 15% each year. Looking at our fiscal year 2021 full-year guidance in pieces, software revenue should rise 20%-25% across the full year. This captures the 32% growth we've seen since the start of the year, plus the expectation that Monolix revenue will be flat in Q4 — a result of renewals that got pulled forward into the third quarter. Through the year so far, services revenue has fallen 6%, and we anticipate a 7%-12% drop across the full year. Given how the delays, holds, and cancellations of drug development programs have played out, the fourth fiscal quarter will probably bring in less service revenue, and we currently lack the visibility needed to say when those projects will resume. Once again, we see this as a temporary matter tied purely to the timing of customer projects. I'll hand the call over to our CFO, Will Frederick, who will walk through the financial results.
Will Frederick
executiveThanks, Shawn. As Shawn noted, our consolidated growth rate decelerated to 4% during the quarter because of difficulties in our services business. Combined with software revenue growth accelerating to 21%, compared with 18% a year earlier, we experienced a mix shift toward software, which made up 65% of revenue in the quarter. Those mix shift and growth rate changes also affected our year-to-date revenue growth. Even though the mix shift was less pronounced, with software comprising 61% of revenue year-to-date, growth rose to 32% versus 15% a year ago. As you'd expect, these revenue mix trends helped our total gross margin in the quarter. Software and services gross margins both matched last year at 90% and 63%, respectively, producing an overall gross margin rise from 78% last year to 81% this year. On a year-to-date basis, the mix shift had a bigger effect on gross margin expansion, with software climbing from 86% last year to 89%, while services were about flat at 63%, producing an overall gross margin rise from 75% to 79%. We still benefit from a diverse mix of software revenue in the quarter, with strong growth throughout our whole product portfolio. GastroPlus accounted for 65% of software revenue in the quarter. ADMET Predictor made up 18% of Q3 software revenue, and MonolixSuite was 11%, with other software accounting for 6% of software revenue in the quarter. Year-to-date, GastroPlus accounted for 60% of software revenue, ADMET Predictor was 17%, and the MonolixSuite was 16%. For the quarter, our renewal rate was 91% on a fee basis. One client renewal slipped into the fourth fiscal quarter, which caused the decline from our historic level. If that renewal had happened in this quarter, our fee-based renewal rate would have been 93%, in line with prior years. Our renewal rate was 83% on a customer basis this quarter because of turnover among nonprofit and academic licenses. We provide licenses to these groups at discounted prices or free of charge, and they usually are not renewed past the initial one year license term. This turnover among lower-priced or no-charge nonprofit and academic licenses shows up in the gap between fee-based and account-based renewals; we keep seeing gains in our average revenue per customer at roughly $98,000 for commercial customers and $71,000 for all customers, including nonprofits and academics. The average revenue per customer reflects the success we've achieved in upselling and cross-selling software solutions across our customer base. Year-to-date, our renewal rate was also consistent with historical rates at 91% on a fee basis and 84% on a customer basis. If the late renewal I just referenced had occurred in this quarter, the year-to-date fee-based renewal rate would have been 92%. We also keep seeing gains in our average revenue per customer at roughly $112,000 for commercial customers and $81,000 for all customers, including nonprofits and academics. Now let me turn to our services segment. During the quarter, the way our services revenue split out was like this: PK/PD Services accounted for 43%, QSP/QST Services made up 27%, PBPK Services contributed 17%, and other services came in at 13%. Services revenues on a year-to-date basis showed a similar distribution across those categories. On a few important service metrics, total service projects for the quarter fell 4% year over year against the same period in the prior fiscal year, which came about because of the project disruptions and mix changes that Shawn talked about earlier. We ended the quarter with service backlog of $12.4 million, which was up $0.6 million relative to the same period in the prior fiscal year. Moving to our consolidated income statement for the quarter, SG&A expense came in at $5.1 million, representing 40% of revenue, versus $5 million, or 41% of revenue, in the same period last fiscal year. That slight rise in SG&A expenses was mainly attributable to higher payroll-related expenses. Total R&D costs for the quarter reached $1.5 million, or 11% of revenue, versus $1.4 million, also 11% of revenue, in the same period last fiscal year. R&D expenses during the quarter were $0.7 million, or 5% of revenue, versus $0.8 million, or 6% of revenue, in the same period last fiscal year. Capitalized R&D for the quarter totaled $0.8 million, or 6% of revenue, versus $0.6 million, or 5% of revenue, in the same period last fiscal year. Income from operations was $4.5 million, which represents an 18% increase over $3.9 million in the same period last fiscal year. The main driver of that increase was a higher gross margin on increased revenue, partly offset by a modest rise in operating expenses. The provision for income taxes came to $0.7 million, giving an effective tax rate of 16%, versus $0.8 million in the same period last fiscal year, when the effective tax rate was 22%. That lower effective tax rate was chiefly the result of the tax benefit tied to disqualifying dispositions that we saw once again this quarter, just like last quarter. The effective tax rate for the quarter fell within the 15%-18% range we referenced on last quarter's earnings call, and that's where we expect to finish the year, subject to factors such as profitability and any additional disqualifying dispositions. Net income rose 29% to $3.8 million, versus $2.9 million for the same period last fiscal year. Diluted earnings per share climbed to $0.18, versus $0.16 for the same period last fiscal year. EBITDA grew 15% to $5.3 million, versus $4.6 million for the same period last fiscal year. Looking at our overall profitability metrics in Q3, we showed a significant amount of leverage in the model, since the 2% overall gross margin expansion drove a 5% EBITDA margin expansion along with 13% growth in EPS; in summary, these metrics show our ability to balance revenue growth and profitability so we can deliver continued increases in earnings per share to our shareholders, even when quarter-to-quarter revenue fluctuates. Now looking at our consolidated income statement for the year to date, SG&A came in at $15 million, which was 41% of revenue, versus $12.6 million, or 39% of revenue, during the same stretch of the prior fiscal year. As was the case last quarter, the year-to-date rise in SG&A was mainly attributable to greater payroll-related costs stemming from higher compensation and more headcount, along with growth in contract labor, insurance, and professional fees. Total R&D costs reached $5.1 million, representing 14% of revenue, against $3.7 million, or 12% of revenue, in the comparable period a year earlier. R&D expenses stood at $2.8 million, or 8% of revenue, versus $2 million, or 6% of revenue, in that same period last fiscal year. Capitalized R&D for the year totaled $2.3 million, or 6% of revenue, compared with $1.7 million, also 6% of revenue, in the equivalent period of the prior fiscal year. Income from operations came to $11.1 million, up 18%, from $9.4 million in the same period last fiscal year. Much like Q3, this gain was chiefly fueled by a stronger gross margin on higher revenue, though it was partly offset by greater operating expenses. Net income rose 33% to $9.5 million, versus $7.1 million for the comparable period last fiscal year. Diluted earnings per share climbed to $0.46, from $0.39 in that same period a year ago. EBITDA grew 17% to $13.4 million, compared with $11.5 million for the same period last fiscal year. Our balance sheet remains robust. At quarter's end, cash and short-term investments totaled $119.8 million, versus $116 million at the close of last fiscal year, which reflects substantial cash reserves meant to fund our ongoing expansion via internal investment and M&A activity; we also still carry no debt on the balance sheet. At this point I'll hand the call back over to you, Shawn.
Shawn O'Connor
executiveThanks, Will. So to wrap up: faster expansion in software and a bigger proportion of revenue coming from software are lifting our profitability measures, though some service revenue slipping to later dates will hold down our overall growth rate for now. That's a temporary situation, and with bookings and backlog both improving, we expect service revenue and its related growth rates to get back to normal, which returns us to a place where we can consistently grow above 15%. On strategy, we keep strengthening our position as a leader in the pharmaceutical sector and in model-based drug development tools and techniques. We stay closely tied to academia as well as regulatory agencies, which gives us scientific credibility going forward. The money we're putting into business development is producing the results we anticipated; we have solid market momentum from closing new business, renewals, and expansion of existing relationships, plus important collaborations and grants. Last, I'd like to note that we're starting to celebrate 25 years since Simulations Plus was founded. Throughout the year, the company will hold a number of exciting events to mark our 25th anniversary, among them charitable giving and exciting user conferences. We've traveled quite a distance over the past 2.5 decades. It's heartening to watch the industry increasingly embrace Walt Woltosz' vision of speeding up drug development through software and modeling. With that, I'm ready to take your questions. Operator?
Matt Hewitt
analystGood afternoon, and thanks for answering our questions. We have just a couple. First, regarding the service segment, I appreciate the detail you gave. I was hoping you might expand a bit more on what you're observing among customers. You brought up failing fast and shifting to new projects sooner. In what ways has that evolved across the last 12 months and perhaps compared with before the pandemic? Once they transition to the next project, how rapidly can you get things scaled back up across the different projects?
Shawn O'Connor
executiveRight, Matt. For a while now, "fail fast" has served as both a catchphrase and a goal within the industry, and the modeling and simulation tools and services we offer are heavily oriented toward hitting that goal. Cancellations of projects, and the aim behind them, have always existed; my sense is that modeling-based approaches are speeding that up. In the COVID setting we've had, priorities shifted and focus shifted, certain development programs got delayed, and now that things have calmed down somewhat, those programs are back in the spotlight, and perhaps a handful of additional decisions to scrap those drug development programs have surfaced. These kinds of occurrences have been with us constantly, each quarter, though not to this degree. Nine projects late in the quarter were delayed, placed on hold, or canceled. Our usual method is to shift resources onto other projects — either new ones being closed with near-term start dates, or ones from backlog — re-sorting those project priorities and timelines to the best of our ability. Frequently, projects hinge on data being delivered once a clinical trial closes out. In such cases, although we know that work lies ahead, if the trial isn't finished, we can't begin sooner, so to speak, and push that project along. That leaves us somewhat constrained in how we re-sort project work. Normally, we've managed to pull that off. Here, though, even as backlog grows, it has only just gotten back to its pre-COVID level. Our capacity — how many projects we could sift through in backlog and swap in for the delayed ones — was somewhat constrained. We couldn't respond the way we used to, first, because of how many delays there were, and second, because our pool of backlog projects available to close the gap is still expanding, yet isn't as strong as it might have been previously.
Matt Hewitt
analystAll right, that helps. So you brought up — and clearly hinted at this through the guidance too — that a number of these headaches are likely to carry on through Q4. I believe on a few occasions you said you anticipate this being brief. Do you anticipate that service-side matters will bounce back once fiscal Q1 arrives, or does some uncertainty remain regarding how fast this operation will begin scaling up again?
Shawn O'Connor
executiveYeah, that's a reasonable point. A number of these engagements hadn't been expected to wrap up during Q3, and they were positioned to carry over into Q4 and bring in revenue across the back half of the year. When they get pushed out or called off, that hits Q4 too. We're trying to do the usual thing — find replacement projects, put those resources to work, and generate revenue — but right now we can't do that at full capacity. The cancellation of certain projects will leave some mark. As for the ones that are delayed, the customer hasn't given us a firm signal on whether it's a one-month push or a six-month push. We're taking a careful stance about assuming those delayed engagements will restart quickly and add to Q4. Q4 is going to take a hit. Looking further out, we're not ready at this moment to issue guidance for fiscal 2022. What I can say is that over the long haul, nothing in what happened during the quarter that just passed alters how I view things regarding consulting service usage across the industry broadly, the clients we've served for many years, the activity pipeline we're working on in terms of open proposals and leads, and our backlog, which is climbing. That's to the degree the service business has fed into our expectation of 15%-20% organic growth. From where I sit, nothing has changed. It was a tough quarter given how a number of projects were timed. My expectation is that services will recover in due course — not as fast as Q4, but they will come back and make their contribution toward our 15%-20% growth target. On the bright side, the amount of rebound needed compared with some past situations is smaller, because our software business has truly delivered strong results. That software business historically grew 10%-15%, nearer the 10% mark previously. Now it has accelerated and is expanding in the 20%-25% range while contributing 60% higher percentage of revenues. We've concentrated on being the tool provider to the industry and benefiting from recurring revenue and the profitability that the software model brings. That portion of our strategy is working very well at present.
Matt Hewitt
analystThat's wonderful. I suppose this leads perfectly into software, which clearly had an outstanding quarter. At this point, you've beaten expectations for multiple quarters straight. It sounds like that trend will keep going. How much of this stems from Lixoft and certain new modules, compared with simply wider adoption of simulation software? When we think about next year, I believe at some point, perhaps a year ago, you mentioned plans to roll out certain price increases. Because of the pandemic, those were delayed. Do you now expect that, as we move past the pandemic, you could be in a position to put some of those price increases in place next year? Thank you.
Shawn O'Connor
executiveWhen it comes to where that growth is coming from, it's really been broad-based. All 3 of our main platforms — GastroPlus, ADMET Predictor, and Monolix — are doing very well. For our legacy platforms, GastroPlus and ADMET Predictor, the growth rates have picked up compared with the past. Partly, as I noted in the earnings presentation, the modules — DDI for GastroPlus and HTPK for ADMET Predictor — have powered a portion of that growth, a substantial portion of it. It's either module sales to current customers who are upgrading their platforms to add that new technology, or it's encouraging a new license holder to buy the full suite — the base GastroPlus product plus the module, and/or the complete ADMET Predictor license along with its module. That new technology, which unlocks new capabilities for clients, is a strong motivator both for upselling current clients and for bringing new clients on board. As I mentioned, we reached 5 additional clients that went past the $100,000 mark for our annual software sales. That signals a client who is either building up a number of seats within their company and/or strengthening their instance of the seat by adding more modules to the platform. Monolix has done very well throughout the year. Today, in our reported numbers, it's entirely organic revenue growth as well. They've gained from being part of SLP's business development infrastructure. They've gained from their new releases, both right when we acquired them a year ago and then earlier this year. That has delivered new functionality and drawn more eyeballs to what they can do. We've broadened distribution, both for Monolix into a Chinese distributor capability, and on the GastroPlus side and ADMET Predictor side, down into South America with a new distributor in that direction. The software growth is being driven across the board and is quite strong today. On pricing, while we may not have been as aggressive as we might have been given the COVID environment, there is some element of a price increase in the numbers. Going forward, we'll keep doing that. Every year, we update the price list, if you will. Later this year, with a significant release of the GPX, which presents a larger new platform, price would also be a consideration in its introduction as well. Price is always going to be a contributor. From where I sit right now, most importantly, it's the expanding revenue growth of the products that the price increase sits on top of that is really very pleasing — seeing the fruits of our labor in terms of business development investments over the last 6 to 12 months.
Matt Hewitt
analystThat's great. Thank you very much.
Shawn O'Connor
executiveThanks, Grant.
François Brisebois
analystOkay. I appreciate you fielding the questions. This will be brief. Could you provide additional detail, perhaps finer granularity, regarding the postponements and the cancellations? You cited nine. Could you clarify what portion of those fall under delays as opposed to cancellations? And could you offer any insight into the reasons they occurred?
Shawn O'Connor
executiveFrank, every one of them comes with its own individual anecdote. Whether it's delays versus holds versus cancellations — that precise split, I'm not certain of. My recollection is that cancellations numbered 2 or 3. That should give you a sense of the scale. The bulk fell within the PKPD service portion of our operations, where typical projects run $1-$20,000 in average size. Interestingly, one involved a deal whose contract had only just been executed. A decision to halt the program came within 30 days. Some of these caught us off guard. Each carries its own anecdotal account of what caused what, ultimately driving their choice.
François Brisebois
analystGot it. Given that unexpected element, could you take us back through why you still feel confident about the longer term? You had provided guidance of 25%-30% growth for software this year, and now that guidance has been revised, so could you walk us through how that guidance is actually put together? Does it come from projects? Is it outbound interest, inbound interest? What's the process you use to arrive at your guidance?
Shawn O'Connor
executiveI believe you meant software, but we're talking about the service side. I think service-side guidance is what you intended to reference.
François Brisebois
analystYeah, sorry about that.
Shawn O'Connor
executiveSo the guidance we've given rests on our backlog, our pipeline, and our resources — when you put all of that together, it lets us project revenue based on the order in which projects finish. This quarter was a tough one. Nine projects got hit — nine in total. Look, every quarter we typically have one or two like that, but nine is something we've never run into. I can't point to anything they share. Like I said, every one of them has its own individual story. In the specifics, I just don't see a common thread. A good number of them involved clients we've had for a long time, and those clients will stay with us long term and have additional projects either underway right now or sitting in backlog. Nothing here suggests we've lost any clients; what we had was a disruption tied to a project for a client in Israel given what's happening in the Middle East. Quite a few surprises landed at once, and their size and directness hit us in the quarter we thought we'd come out of. Our guidance reflects how we expect projects to flow and what the pipeline shows us. As I said, given the results on new contract signings, I don't see it — backlog actually rose even with all those cancellations being removed from backlog rather than converting to revenue, which means cancellations and reductions to backlog. We've been through a comparable exercise. Given what we ran into this quarter, we're taking a somewhat more careful stance in the guidance. Maybe, with luck, we can do better than that expectation. Right now, though, let's stay careful. That's the near term, the coming quarter. When I look past that, to next year and further out, once again I don't see anything shifting in the market or in our capacity to deliver that would alter the fairly steady view we've held for a while now regarding growth in service revenue.
François Brisebois
analystGreat. Regarding M&A, with valuations pulling back everywhere, does that make potential deals somewhat more appealing, or do we still view things the same way in terms of what might work, whether that's expanding geographically? Any insight on the M&A approach?
Shawn O'Connor
executiveYeah, I believe you're correct. I believe it genuinely assists. We were in a high valuation setting perhaps during the past year, though under a year. That definitely rendered that portion of the conversation somewhat tough. I'd say there's a slight lag effect. As valuations generally decline, an individual person or company experiences a slight lag effect when they observe the market dropping before they grasp that their company's worth might be decreasing in that same manner. I believe it's beneficial that softening valuations out there have rendered some of those conversations somewhat simpler to carry out. It remains a tough setting out there with elevated expectations and the movement of capital both from other possible buyers and from private equity, venture capital sources for some of the categories of companies we pursue, small private companies that have built a solid software product or service out there that would suit our portfolio. They still possess alternatives that create tough conversations there. I fully expect that they will, as we have previously, successfully locate the appropriate target to add to the Simulations Plus family and keep striving toward that goal.
François Brisebois
analystAll right, excellent. Thanks a lot.
Shawn O'Connor
executiveI've got nothing further. Appreciate it, Frank.
Dane Leone
analystHello, and thanks for taking my questions. Is there any possibility, just so we can get some granularity regarding how the growth rates differ, that you could provide us with revenues broken out by division, similar to how you have historically reported them for Lancaster, Simulations Plus, Buffalo Cognigen, and North Carolina DILIsym, and Paris Lixoft, basically?
Shawn O'Connor
executiveThanks, Dane, that's a good thing to ask about. Providing guidance at a granularity like that isn't something we've done before, as far as I can recall. The truth is, throughout this transition we've been going through for over a year now, we handle operations as one combined entity when it comes to both the software side and the service side. Doing so builds our internal capacity to advance when it comes to allocating resources across divisions on the service side, along with similar matters. So no, that kind of guidance isn't something we've provided in the past, and it isn't something we completely monitor internally at present either, given that we run things on a software service basis.
Dane Leone
analystOh, you folks aren't including that in your reports these days? It was there in the filing for the previous quarter. I wasn't looking for a divisional outlook — I just wanted the current quarter's revenue figures, so we could check how they compare year over year.
Shawn O'Connor
executiveYes, my understanding is that we’ll keep disclosing that segment through the Q, and we expect to do the same in the 10-K when we finish the year. That’s one of the items we’re evaluating—whether we’ll keep providing that segment breakout beyond this fiscal year; that Q will be coming out shortly. Will, when is that scheduled? Is it Wednesday?
Will Frederick
executiveYes, that will be released on Wednesday.
Dane Leone
analystAll right. Could you provide any additional detail regarding, I suppose, how much the software portions or the service portions actually grew? Take slide 12, for instance, since you provide only the year-to-date figure during Q3, which means we aren't able to work out the year-over-year comparison when it comes to revenue generation. Yes, hold on a moment.
Shawn O'Connor
executiveYeah. I believe that every quarter, we've provided the revenue breakdown for that period covering the three main software platforms along with the three primary categories of service revenue. On a quarterly and year-to-date basis, we've disclosed that each quarter. Those details are available. Perhaps Will could follow up to assist with going back and tracing to those earlier slide decks that exist.
Dane Leone
analystAlright.
Will Frederick
executiveYeah. Also, I'd say that slide 8 and slide 9, when you check those for the year-to-date type of splits and the Q3 splits separating software from services, those could be useful, Dane.
Dane Leone
analystRight, okay. So when it came to those contracts or projects getting called off, was that completely arbitrary? Or did they tend to bunch up in particular fields, such as NASH or other spaces where development interest may have cooled off somewhat?
Shawn O'Connor
executiveDane, honestly, they came across as pretty scattered. There wasn't any kind of pattern showing up. Like I mentioned, whether you look at therapeutic area or at customer segment, you couldn't find any consistency between them. One was a COVID program, others were programs in different therapeutic areas by geography, one was international, and some were domestic. Once again, it looks like we hit a perfect storm where quite a few of our projects got delayed, put on hold, or cancelled, yet there's no pattern you can pull from it.
Dane Leone
analystAlright. This is my final question. In what way is the backlog truly determined? Had they been included in the backlog during the earlier quarter or something like that, or had they genuinely been in progress and therefore excluded from the backlog?
Shawn O'Connor
executiveNot at all. As soon as a contract gets finalized, it lands in backlog. Other than that single deal I brought up — which was signed rapidly, had a start date that came almost right away, and then was scrapped inside the first 30 days — I think the remaining eight programs would have already been sitting in backlog when the quarter began.
Dane Leone
analystOkay. How long is your backlog realization, about one quarter or longer than that?
Shawn O'Connor
executiveThe total backlog comes to roughly $12 million. Generally speaking, the planned timing on that falls somewhere between three and six months. That said, a portion of it does stretch as far out as 12 months within the backlog.
Dane Leone
analystAlright, sounds good. Appreciate it, everyone.
Will Frederick
executiveSounds great. Thank you, Dane.
Shawn O'Connor
executiveAlright, thank you all for tuning in, and I’m definitely eager to be back on another call once this coming quarter wraps up. Thanks so much for sticking with us. Stay well, everybody.
Operator
operatorThat brings us to the end of today's call. At this point you're free to hang up. We appreciate you joining us, and enjoy the rest of your evening.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Simulations Plus, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Simulations Plus, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Simulations Plus, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.