Sierra Madre Gold and Silver Ltd. (SM) Earnings Call Transcript & Summary
August 25, 2025
Earnings Call Speaker Segments
Deborah Honig
operatorOkay, thank you all for being here today. We’ve got an update on Sierra Madre, which has just released very strong Q2 figures — that’s the Second Quarter of Commercial Production — so that’s really exciting. Joining me are CEO Alex Langer and CFO Ken Scott. I don’t think we’ll be using a presentation today, but an updated presentation is available on the website, and that’s where you can find forward-looking statements. This session will include forward-looking statements, so please take a look at those. We’ll have a Q&A session, so go ahead and put any questions you have into the Q&A box. With that covered, hello gentlemen, and thanks for being with me.
Alex Langer
executiveMorning, Deb. It's always a pleasure to talk with you.
Deborah Honig
operatorPerhaps you could share a brief update on the quarter first, and after that we can move into Q&A?
Alex Langer
executiveSure, that works. I'm always glad to update everyone, and it's great that Ken is with us for the first time. Greg is on a well-earned vacation—he's fishing, which he loves more than anything, so we're glad he managed to get away for at least 1 week this year. That's good. I'm really pleased with the Q2 figures. We made progress in essentially every category, which is great. The rainy season did start a bit early, and that had some impact, but with the $19.5 million capital raise we just completed, we'll be able to tackle that next year—things like power redundancy systems and backup power generation. We're working on that right now. It arrived a little early for us. Our numbers were still solid, so I'm very happy about that. Progress is happening on all fronts. I think the best approach might be for me to hand things to Ken so he can go through some Q2 highlights, and after that we can move into questions and answers.
Ken Scott
executiveThanks, Alex. So I'll just touch on a few of the larger highlights. Net revenues came in at $5.36 million, compared with $4.84 million in Q1. That works out to roughly a 10.7% increase. EBITDA was $1.46 million versus $1.07 million in Q1, so an increase of about 36.5%, and obviously we're very pleased with that. MTM for the quarter came to $400,000 versus just $120,000 in Q1, and the reason is that our sales are M+1. Silver and gold prices were rising during the period, and that had a positive impact on us. Working capital rose from roughly $2.2 million to $3.3 million during the quarter, an increase of 48.8%. Those were all extremely exciting numbers for us. We're really happy with them. Cash costs did edge up by roughly 2%, from $23.08 to $23.56. All-in costs went from $28.98 to $30.10, an increase of just under 4%. We'd attribute most of that increase to power outages from rainy season, the startup of Coloso, and simply equipment availability. All in all, it was a very good quarter. Back to you, Alex.
Alex Langer
executiveThanks a lot, Ken. So, Deborah, I’m not sure whether you’ve got anything you’d like to ask, or if it’s fine for us to start once that’s wrapped up.
Deborah Honig
operatorAre there any questions?
Alex Langer
executiveAll right, let’s go ahead with that.
Deborah Honig
operatorAlright, so let's begin with the quarterly results and Q2 performance — how did the Coloso ramp-up during the quarter compare with what had been anticipated earlier, and how should we expect that performance to affect Coloso output for the remainder of the year?
Alex Langer
executiveSo regarding Coloso, the key thing there, I'd say, is that it runs roughly 1.7x greater on silver grade and around 1.2x greater on the gold side. At the time the mine was closed in 2017 and 2018, essentially 100% of everything First Majestic was extracting was coming out of Coloso. It's a newly built mine, with very wide entryways and it's in genuinely excellent condition. From our standpoint, we're still in the process of ramping it up considerably. Naturally, costs are going to rise, and that's what showed up this quarter. By the end of the year, the goal is to reach roughly 150 tons per day out of Coloso. The higher-grade material would represent just under 1/3 of overall output coming from Coloso. Right now the rainy season is hitting us pretty hard, so a big chunk of the work involves dewatering. We've got plenty of pumps running to move the water, and we're progressing steadily, bit by bit. We have definitely seen a ramp-up of, you know, 10 tons per day, then 20, 30, 40 tons per day, and there have been days with even more material arriving from Coloso, and that keeps building gradually as we move toward year end, when it ought to be around 150 tons per day, assuming we hold to the 500 tons per day mill scenario.
Deborah Honig
operatorGreat. Could you talk about what happened at Guitarra during Q2 and how that should affect head grades through the remainder of the year?
Alex Langer
executiveThat is a really good question. Development is still something we are working to catch up on. These kinds of things require considerable time. Typically, once a mine has been shut down, restoring underground development to full operation takes a fair amount of time. We moved ahead and got into production fairly fast. There was some ratake material — old mining material that had already been blasted — which we could process, and we have been mining fresh ore ever since the test mining phase late last year. The quantity of fresh ore we are mining goes up each and every month, quite literally. At the start of this year, I believe fresh ore accounted for only around 20% to 30% of commercial production in quarter one. For Q2 we are likely near 50/50, and I expect that by year-end it will be roughly 80/20 — with 80% fresh ore coming from La Guitarra and Coloso, and 20% from the ratake material we have on hand. That is good. The nice thing about fresh ore is that its grade is higher than that of the ratake material, though as Ken never fails to remind me, ratakes cost far less because they are pre-blasted and can be processed immediately. It is a bit of give and take, but once we move into the higher-grade Coloso ore, that will matter a great deal, particularly for the bottom line and revenues.
Alex Langer
executiveI'd say those are the main highlights. On a daily basis, there's only so much development we can achieve. Typically we push hard near the end of the shift. The material needs a couple of hours to settle before you can head in and continue advancing. At Guitarra, we're doing somewhere between three and eight meters of development per day, I'd say. Equipment availability has also been a problem, particularly at Coloso. We had just about enough equipment for Guitarra. A small amount had to be borrowed from Guitarra to get things going at Coloso, but I'm really pleased to report that two brand new — well, two scoop trams that are new to us — arrived last week and are already running. Our equipment situation is now catching up, which had also been somewhat of an issue when moving things around, but we're very happy about that. Development at both Guitarra and Coloso will keep going quite aggressively from now until we've caught up, right around the end of the year.
Deborah Honig
operatorGood. For Q2 at Guitarra, how does the breakdown look between material mined in resource and material mined outside of resource, and how do you expect that breakdown to trend through the remainder of the year?
Alex Langer
executiveIt's largely unchanged, as we discussed regarding ratakes. Ratakes weren't included in the resource. That said, whenever we carry out development, we do encounter interesting visualized material that we can already process, particularly at today's grade, or at today's silver and gold prices, which are much higher than when we began. A lot of material wasn't part of the resource that we're now able to process and actually, you know, earn money from it, which is great. It's roughly consistent with that. I'd say 50/50 right now and then again 80/20, hopefully by year-end. As we develop and discover new areas, we can process that. Subtract 10% of that or something along those lines.
Deborah Honig
operatorAll right. At the mines and the mill, what kind of fine-tuning is currently underway, and how would that affect output during this year's second half?
Alex Langer
executiveWe’re carrying out a substantial amount of testing to evaluate several expansion options. Regarding the capital we raised, I’m sure we’ll touch on that a bit. We’re determining the optimal use of proceeds and where we want to expand first. We’re actively working on that now. One recent change is that we’ve moved from regular ball mills to chrome ball mills, which will affect the grind size and should enable better recoveries. That’s essentially already in place. We’re also examining various mesh sizes for the gravity circuit and similar items. We’re conducting plenty of test work at this very moment, hoping to add some expansion material—whether that involves a combination of a new ball mill, a new crushing circuit, significant air belts, or a range of other things. I’d expect that in quarter three we’ll hopefully put some of that into practice. There will likely be some downtime while we install the new equipment and perform some of the test work. Hopefully, by the end of quarter four and into quarter one of next year, we’ll see higher throughput at the mine site. We should have proper news on that, I’d say, just before Beaver Creek in about two weeks.
Alex Langer
executiveWe're still carrying out quite a bit of the testing work. We have a preliminary concept in mind. We've had that for some time, but we simply want to confirm equipment availability. We are searching through all the surveyors and suppliers of various materials. We'd love to have it in there today, but these things do take a little bit of time when it comes to sourcing the right equipment. It's ongoing, but we hope to have news on that within the next two weeks.
Deborah Honig
operatorGreat. Do you have any plans to get Nazareno running in the near term, the way you brought Coloso on? What would it take to add that mining center?
Alex Langer
executiveNazareno is a different mining hub, and it's actually linked to Coloso. The nice thing about Nazareno is how wide it is — the mains there run as much as 30 m across, which makes mining very cheap. Basically, you blast long-haul rounds, and after that you can muck the material out and, you know, kennel along those lines, since costs stay really low. The grade is somewhat lower, but, you know, when we're planning to move from 500 to 1,000 tons per day, at some point we'll require far more material. I believe Nazareno will be a really big help with that. We'll need it online even before we reach 1,000 tons per day. You're sort of looking ahead there. We're hoping to have news about Nazareno. What we have to do is improve grade control a bit, meaning some underground drilling so we know precisely where to blast from. You want as little waste as possible, particularly when blasting such large volumes. We have to be sure we're up to speed on that. Access already exists, so we aren't too far from Nazareno.
Deborah Honig
operatorThere's a question from the audience that I'd like to pass along. Could you give us some idea of when we might expect all three mines to be operating at full production?
Alex Langer
executiveYeah, that's something we're continuing to work through. I think our guidance to the market has been 2027. Our preference would be to hit 1000 tons per day. What the exact timeline looks like, I can't say for certain. My expectation is that all three mines will be actively producing by next year, and then we'd be at full capacity. That will depend on the mill and on making sure the mill equipment is in place, and also on having tailings space available — whether that's backfill going back in, making sure we stay on top of the filter press for our current tailings deposit, or even moving into phase four, which is a fully permitted 5.8 million ton tailings facility. It's a combination of all those factors. My best guess would be 2027. Everything's up and running and performing really, really well, but a combination of all three of those items being completed now and through 2026 should be on the table.
Deborah Honig
operatorHas the green light been given to you for employing cyanide as a way to boost recovery?
Alex Langer
executiveNo, we haven’t — and we haven’t submitted an application for it, either. Cyanide is an interesting one. The word itself certainly carries a negative connotation in the market, and I honestly believe that’s the whole issue. If we did apply for it, that would mean constructing a cyanide facility, and it would be encapsulated. It would be quite safe. Theoretically — and I know First Majestic did a considerable amount of work on this — it would substantially increase recoveries, particularly for gold. Doing that would also require greater security, because you’d be producing a dory product, and instead of trucking material, you’d be helicoptering it in and out, so costs would rise quite a bit. At 500 tons per day, I don’t think it would make much sense, but once — and I think it’s a matter of when — we reach 1,000 tons per day, it’s definitely worth examining. It would require a good deal of community consultation. I think the local regulators, environmental groups, and permitting groups have been really positive. We speak with them all the time. It’s amazing.
Alex Langer
executiveAt the site, we're now approaching 250 people in terms of employment, so that represents an enormous boom for the local economy. If we were to sit down and have those discussions with them, my sense is it would go over quite well. That's a thought that has always lingered in the back of our minds, and it's a wonderful thing. I'm aware that Ken Scott's figures would certainly get better as soon as cyanide was introduced. It's certainly on our minds, and it's something we will explore down the road.
Deborah Honig
operatorAlright. Since we have a question from the audience, I'll jump forward to the exploration part and begin with that person's question. Could you elaborate a bit more on the possible drilling plans?
Alex Langer
executiveYeah, no, it's genuinely thrilling. You know, that's one of the reasons — really the primary reason — we bought La Guitarra from First Majestic: the exploration upside. We genuinely believe it ranks among the biggest undeveloped silver districts anywhere in Mexico. Exploration on the west side has been somewhat limited, while on the east side it has been extremely, extremely sparse. I think by now we've outlined roughly 60 km of main material at surface. There are plenty of historic, truly massive past-producing mines, particularly over in the east district. One of them is Mina de Água, which employed more than 10,000 people at its peak. That mine closed in 1910 simply because it went a bit too deep and flooded. Back then there was no genuine method for dewatering mines the way we have today. The second one is El Rincón. El Rincón closed in 1937, yet it carried an extraordinarily high head grade — roughly 6.5 g gold and 860 g silver. Truly, truly remarkable grades exist there, along with the potential. With the capital we've just raised at $19.5 million, we've already set aside more than $5 million of it for drilling over in the east district. That ought to deliver 20,000- 25,000 m of drilling.
Alex Langer
executiveDrilling costs are lower in Mexico. Having road access across the whole property is a big plus for us. In fact, we hold a sizable tract there — roughly 800 hectares under lease — where we can drill at any moment. We've drilled from underground as well. That gives us quite a bit of flexibility. To drill the way we should, what we need is to be bringing on exploration geologists at the moment. We'll be putting them out in the field more. We'll tidy up a number of the underground workings and map, map, map, map, map, plus trench, and get set for a proper drill program during the first half of 2026. Greg's major concern is, you know, that he has to hit 80% of his drill holes. If not, you know, he'll fire himself, and we do need him. We're not going to let that happen. We simply have to build up some additional drill targets. We also have to apply for drill permits. We'll do that fairly soon. I'm sure there'll be an announcement at that point that we're applying for permits or that we receive them. You have to be pretty exact these days as well when you apply for permits.
Alex Langer
executiveIn the past, you might have said, you know, this is the spot where the drill pad will go, and you had a fair amount of flexibility — you could shift it around somewhat. That's no longer the case. The location of your drill pad is, quite literally, exactly where you'll be drilling. Accuracy is what we're after. We still need to pinpoint precisely where the aspiration drill holes will be placed. Once you submit the applications for the drill pad permits, then we're underway. As an illustration for everyone, I believe the last time it took roughly six to eight weeks to get drill permits after we applied. That's about the timeframe involved. We also have approximately 54 drill holes permitted in the west district, so we're able to do a bit of both. We're enthusiastic and are working through it at present. In the first half of next year, we expect the drills to be turning.
Deborah Honig
operatorGreat. How fast could successful drilling turn into feed for the plant, and would we need extra permits in order to mine in the east district?
Alex Langer
executiveThat's a solid question. We moved back into production with no feasibility study and no PEA, simply because our understanding of the deposit was very strong. The mining side made sense to us. All the historical data from First Majestic and the earlier operators was in our hands. That helped a lot. And the east district is permitted at this point. It carries a MIA. In certain areas, we could begin extracting that material immediately. Should we locate a little additional material — perhaps at the El Rincón grade of 6.5 g gold and 8.60 g silver — 100 tons per day would be quite useful, right, Ken, in terms of boosting some of the grades. So to address what you asked, we could be pulling material in a fairly short timeframe.
Deborah Honig
operatorAll right, so let's turn to financing. I think you've basically covered this already, given that $19.5 million financing that closed earlier in July. How would that be divided between expansion and exploration? You mentioned $5 million is earmarked for exploration. Perhaps you could say a bit about what the expansion plans look like.
Alex Langer
executiveSure, absolutely. The target is to reach 1,000 tons per day by 2027. Down the road, I think we could likely exceed that. 1,200 to 1,500 tons per day would probably be the ceiling. Eventually, 1,200 to 1,500 tons per day. Of the capital we raised, we actually set out to bring in $10 million. That was purely for the planned expansion. We had a great deal of interest. The order book, I believe, wound up near $30 million, if not above $30 million. We ended up stopping at $16.5 million, which let us carry out the full, full, full drill program, the 20,000 to 25,000 m. There was an investor we were quite keen on, Eric Sprott, who chose to come in, and we felt it would be really beneficial to have him as a shareholder and on the registry. We opened it up again to bring in an additional $3 million. Rough estimates come to about $10 million for the planned expansion. That covers tailings, underground development, and equipment. In fact, a couple million of that goes to the equipment itself. That's for a new ball mill, conveyor belts, a paste backfill facility, everything that is somewhat CapEx related outside the equipment, as Ken will remind me.
Alex Langer
executiveWhat remains there is earmarked for exploration. Thanks to Eric joining, we have something of a slush fund, which provides us a little extra for exploration. Should things turn out well — and we expect they will, and we hope they do — that hands us an additional few million for more drilling, and even beyond that, since we are generating cash flows as well.
Deborah Honig
operatorGreat. Eric Sprott came up. Could you discuss any of the other parties involved in the financing?
Alex Langer
executiveI believe we're in a position to do that now, yes. When we set out to launch the financing, we were quite lucky to receive a substantial lead order. I think it was only filed last week on Bloomberg, and that was Franklin Templeton. They're an enormously large institutional fund, a mining-focused fund. Their track record is really, really strong. This is a group we had pinpointed early on that, if they could come in as an investor, we would certainly welcome that, and it would let us essentially double production and also do a bit of drilling. They were the lead investor. They filed 10 million shares, so we work backwards from that. It's a $7 million Canadian lead order. That's a fairly small order for them as well. Typically they prefer to do quite a bit more, which is a good thing. That's roughly where the awards came in. Management and founders — I think we, management, just ourselves — we did well over half a million. Commodity Capital, which has been one of the funds supporting us from the very, very, very beginning, maintained their 8%. They put in another $2 million. Then a bunch of institutional money came in as well.
Alex Langer
executiveThe amounts were fairly modest, and we got some truly solid names from Toronto, Europe, and the U.K., which was encouraging. Institutional money made up the bulk of it. A big part of that — I believe our institutional holdings climbed from roughly 12% to 24%. On the management side, we held onto a healthy share, going from 24% down to 22%. There was also a fair amount of retail participation. From what I know of the book, nearly everyone trimmed their allocation back to 20%–40%, simply because the order book was, I suppose, oversold or oversubscribed by a fair margin. And I think, if you look at the market today, with shares trading around $0.84–$0.85 against a financing done at $0.70 that's now fully free trading, the demand was substantial — which strikes me as a positive signal.
Deborah Honig
operatorYes, we've certainly observed purchasing activity in the market following the financing, and it's encouraging to see. And speaking of where your stock is trading right now, you have some warrants that are nearing being in the money. Could you say a bit about them, the possible proceeds, and how you might deploy that capital?
Alex Langer
executiveAbsolutely, and Ken, feel free to join in here. There's still a $5 million loan that we owe to First Majestic. We were quite aware of that, of course. They kindly granted us a year extension. The rate is 15%. We're really, really at ease with it. It isn't a massive sum. It comes to $62,500 each month, so truly not a massive sum. Should the warrant funds begin flowing in, and if we hit our targets and things trade favorably, I believe a substantial portion of that would be set aside for it. Again, success at the drill would create demand for further drilling. That's essentially what we're relying on. If the drill bit brings us success, that capital would already give us phase two in the east district.
Deborah Honig
operatorHere's another question from the audience. Can you finish development and keep up exploration by relying on operating cash flow along with cash reserves, with no extra capital?
Alex Langer
executiveKen, you have the floor?
Ken Scott
executiveCould you respond to that briefly? Yes. Alex, feel free to elaborate.
Alex Langer
executiveNo, I think you hit the nail on the head again there. Yeah, no, we should be absolutely fine here, particularly with the capital coming in. Obviously, CapEx money is going to go toward building out the mill a little bit. I think one of the big things we've really been harping on is equipment. We've been renting a lot of equipment, and it's very expensive, especially haul trucks and underground scoops and everything like that. Now that we have the capital, we're able to buy that equipment, and it's going to drop our costs substantially. Ken, do you have a rough estimate of what that might look like on a per-ounce basis? Oh, you're on mute now.
Ken Scott
executiveMy apologies — the amount it falls by will be several dollars for each ounce.
Alex Langer
executiveAnd that gear is going to be arriving?
Ken Scott
executiveRight, exactly. As our grades go up at the mine, that will also mean lower cash costs per ounce, since we'll be turning out far more ounces. It cuts both ways. The mine is always pushing to grow production, while the CFO wants to see improved grades. Once we move into those better grades, that largely drops straight to the bottom line. We're looking for late Q4, Q1 of next year, to bring substantially better results.
Deborah Honig
operatorThanks. I have a few more questions. I understand you discussed how the proceeds would be used and what you'd like to do with the cash. Would you also think about acquisitions? Does that fit into the plan?
Alex Langer
executiveThat's been our approach all along. Yes, we're present in quite a few data rooms. We continuously review projects. Costs have risen, which is what you'd anticipate, simply because silver and gold prices have climbed. An acquisition would only happen if it were highly accretive for us. Mexico is on our radar. Our main focus is silver, though there are some intriguing gold projects too. Nothing right now has us rushing to act immediately, but there's plenty of due diligence underway. We've been examining quite a few projects. We've been making trips to see projects, yet La Guitarra is a unique animal. Our plate is more than full at present with the expansion plan and with the drill program coming up, and we truly want to stay focused on those. Should an opportunity present itself to us, we will certainly devote the time to review it. If it's accretive, we're ready to act on it.
Deborah Honig
operatorI’ve got one final question. For the remainder of the year, what news flow should investors be watching for? What catalysts do you see?
Alex Langer
executiveSure, there are going to be a fair number of them. Personally, the item I’m anticipating most is the expansion plans. What we intend there is to have something ready that we’ll present and then track with a Gantt chart, with deliverables assigned for everyone covering when this equipment arrives and how that plays out, and making certain the underground development has caught up to support it. That ought to land right around Beaver Creek. Whether we move to 640 tons per day or 750, 800, 1,000 tons per day, it will kind of give us a timeline for when I expect, or when we expect, mill expansion to take place and the matching material to be moved to the mine. That’s going to be the next truly major item. That should come right around Beaver Creek. After that, you’ll get some news about equipment as we hopefully eventually transition to a full fleet of our own, no longer relying on rental equipment. We’ll have our — and then after that, there will be plenty of news once the equipment shows up. If we add a new ball mill, we’ll discuss it once it’s installed.
Alex Langer
executiveThere'll be updates regarding tailings, which is positive. The Q3 numbers, and really just growth and making sure things are advancing and truly looking ahead. I think Q4 is shaping up to be a pretty strong quarter, particularly around that time. With luck, some equipment or plant upgrades will also be installed by then. Plenty of news on the way.
Deborah Honig
operatorThat does sound right. Congrats on a strong quarter and a strong financing. It sounds like this year has really been a formative one for the company. Congratulations to the two of you. We're looking forward to the second half of the year. Thanks to the audience for the questions and for participating. If anyone has follow-up questions or would like a one-on-one call, please don't hesitate to reach out. Enjoy the rest of the summer. See you at Beaver Creek.
Alex Langer
executiveThat’s excellent. I really appreciate everyone taking the time. Many thanks to you, Deborah.
Ken Scott
executiveAppreciate it, everybody.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sierra Madre Gold and Silver Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Sierra Madre Gold and Silver Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sierra Madre Gold and Silver Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.