Thanks so much, and good afternoon to all of you joining us for Solaria's 2022 First Quarter Earnings Webcast. I'm David Guengant, and I serve as Head of IR at Solaria. With me today is Arturo Diaz-Tejeiro Larranaga, who is our Chief Executive Officer. On this call, we'll talk about how our business is looking going forward and we'll be making forward-looking statements. All of these remarks reflect our predictions and expectations as of today. As part of this presentation, we'll start with a review of the results and the key developments from this period, which our CEO, Arturo Diaz-Tejeiro, will present. After that, we'll go into a Q&A session. One more thing I'd like to point out: all of your questions need to be submitted through the web. Thanks again very much, and at this point I'll turn things over to Arturo.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#2

Thank you, David, and thanks to each of you for being on this conference call. I trust that you and your loved ones are staying healthy and well. For Solaria, the first quarter of 2022 was a record quarter when it comes to energy production, profits, EBITDA and generation. And if you like, we could get started. We'll walk through our strategic plan and the updates we've made very quickly, and after that we'll move on to the Q&A session. First of all, I believe it's worth discussing the situation, the macro situation in the European Union. As all of you are aware, things are shifting extremely fast, particularly after February. You know that the Ukrainian war is changing the rules and is changing the situation of the European Union. And you know that today, energy is probably a strategic issue, it's not only a financial issue for European Union today. Energy is something completely strategic. And as you know, over the last month, European Union is changing completely the view that they have about generation and outsourcing of generation. And they have understood that they need to cut the strong dependence of Russian gas and they want to develop its own generation system. The result of this is the abnormal, the amazing increase on targets around renewables that they have done.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#3

If you look at the past 3 years, the whole time, they keep shifting their thinking and shifting the targets — global targets. Right now, the European Union's new goal is 600 gigawatts, which is extremely ambitious. 45% of generation is going to come from renewable energy. To me, that's extremely ambitious and extremely hard to pull off. But naturally, the European Union has made its decision, and they're putting a lot of weapons in place so as to develop and to achieve it, and we'll walk through countries and targets during this presentation. Naturally, as we've said on many occasions, for us this has been the case since renewables began developing, particularly in southern Europe. And 1 year ago and 1.5 years ago, we told the market that the south ought to sell energy to the north of Europe. Today, I believe that message makes more sense. And it's an even stronger message than it was a few months back, it sounds better, and I think we keep telling the market the same thing. I believe it makes sense to develop renewables, above all in the Iberian region — Spain, Portugal — to develop solar, to develop wind, and to supply electricity to the north of Europe. You know every country, Spain and Italy and Portugal included, all of them are raising their global renewable targets.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#4

And with luck, in Spain we'll be seeing short-term gains against the overall targets. Naturally, to discuss Solaria's figures and where we stand, as of today, of course, we've got 1 gigawatt under construction. As planned, over the course of this presentation we'll walk you through the 180 megawatts we've finished and that will be hooked up in June. And with luck, we'll close out this year with 2 gigawatts tied to the grid. Naturally, there are key points we want to put in front of the market. First, plainly, we've doubled our results. These days that sounds like a standard thing at our company. Because over the last 4 years, we've been doubling each quarter. And naturally, with luck, we'll keep up that pace in 2022, 2023, 2024. It's become something standard at Solaria, but trust me, doubling both the size of the company and its results every quarter is no easy feat. It's a big effort that the entire staff has put in over the last month, the last year, I'd say. And naturally, it's standard yet incredibly hard to achieve. And the results speak for themselves: solid revenues, solid EBITDA, solid net profit and growth near 100%. New growth drivers are coming in the quarters ahead.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#5

Hybridization is a topic we had doubts about during the previous year. What hybridization means is adding extra power at the same connection points—power that complements the connection point. As you know, in our case we build solar, and the usual hybridization pairing would be with wind. At certain of our sites, wind conditions are excellent, and we have carried out plenty of studies. Our plan is to add wind technology at some connection points—not on a massive scale, but at specific, selected connection points. And we'll go through the reasons why during this presentation. Naturally, a new pipeline in Spain. We keep expanding. As you know, Spain has completed an update regarding its electrical system—the future electrical system and the infrastructure they intend to build—and we are arranging bank guarantees. We are securing land near this new infrastructure that is going to be constructed. And of course, as you are aware, we are putting money in and we are assessing opportunities in Spain for the medium and long term. And clearly, we aim to be the leader. In this instance, we must keep growing our own pipeline. Italy. When it comes to Italy, I believe we are extremely enthusiastic about the Italian market.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#6

As we've consistently said, it remains premature, yet Italy stands among the governments most supportive of renewables. They're driving the European Union hard on renewable goals. And in my view, Italy will experience robust expansion in renewables, particularly solar. Our team is performing excellently, and I believe they're substantially expanding our pipeline. The pipeline, as you're aware, is the lifeblood of the company. It's always the starting point. But with luck, during 2023, we'll witness construction at solid volume—huge volume—and Italy ranks among our key nations going forward. Germany, naturally, Germany is an entirely distinct market, in the north with reduced irradiation, yet I believe Germany is transforming, much like the European Union. Over the recent month, they've been completely altering their stance. They intend to commit seriously to renewables, particularly solar. We have strong conviction, we believe Germany is a wonderful country. It sits centrally, like the heart of the European Union. And naturally, you're aware that historically, they relied heavily on Russian gas. I think, like the entire European Union, collectively we've made numerous errors regarding energy.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#7

But the crucial thing is always whether you can make the change, and every country is changing. In this huge shift that the European Union is going to carry out, Germany will be the leader. We have plenty of experience in the German market, and we want to remain there. You know they have approved a global target of 215 gigawatts. That is an enormous target, enormous target, but I am completely sure, because I know the country, that they are going to accomplish it. And obviously, Solaria needs to remain there, needs to support the country's growth around solar. And of course, we will discuss this during the presentation. GENERIA is the last part that we have introduced, and land. Land is like pipeline for us. Land is another part of pipeline. Today, if you don't manage or you don't control the land, you will have problems, because you will not be able to grow, because you don't have good pipeline, and I will explain to you in the presentation. But GENERIA will give all of our shareholders a lot of good news. Of course, production sales. I'm not going to spend a lot of time here because, as you know, like always, I have explained, it's a standard in our business but normal growth.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#8

Keep in mind that this is our weakest quarter — it's winter, the weakest one of the year. In the quarters ahead, you'll likely see improved figures and stronger growth. Why? Because of the sun, solar radiation, additional connections, and more PV power assets in operation. And naturally, I think the positive takeaway is that these figures on that day are the response — they probably represent the weakest quarter of the year. Naturally, we — on this slide, I just want to state that we've raised even the percentage of transformation EBITDA net profit, since we keep cost control extremely tight. This matters because in this business, at times, it can sound as though burning cash isn't an issue. That isn't what we intend. What we always intend is to keep an extremely strict internal policy of cost control. That's essential for supporting our growth. Cash flow, naturally, we keep on investing. This quarter is probably a soft one where investment is concerned; over the coming quarters, we'll see a huge volume of new investments tied to the massive developments we're carrying out. And naturally, as always, we keep a solid cash position, tied particularly to our CapEx.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#9

This matters a lot for understanding: our cash position stays strong because our CapEx position stays strong. Ultimately, this business hinges on the money you put in, and money you could invest excellently can do serious damage to your cash position. I think we're genuinely proud to be, probably, the most efficient company around when you look at it from the CapEx and OpEx standpoint. Of course, where do we stand? Where are we right now? We are — Solaria is a 1 gigawatt player. Not bad. But I'd say that 1 gigawatt in the Iberian region probably means we're one of the leaders there. And the good part is that we're going to add more megawatts in the extremely near term. And we keep up a good pace of connections, even with all the issues, all the licensing issues, sometimes all the connection issues we run into with utilities, with, of course, all the plans that, as you know, involve building this kind of infrastructure asset being extremely difficult — not because of construction or because of licenses and permits. The good part is that we're improving the pace a great deal.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#10

We're adding more assets at this point. And naturally, our goal, as you're aware, is to wrap up at 2 gigawatts by year-end, with 3 years under construction. We've got additional capacity being built. It's like we're feeling at ease. Even on September, 30th of September, we'll hold our half presentation in Trillo. I believe it will be really helpful since that will be the biggest PV power plant function in Europe. And if you'd like, you could view one of the largest PV asset developments worldwide. It'll be interesting. And that's going to take place in September of this year. Naturally, the 6.2 gigawatts target. I won't devote much time to this because, as you know, we have solid visibility on our global goal of 6.2 gigawatts. As you're aware, that hinges on the pipeline law approved by the government. We have a solid pipeline across various regions of Spain — Castile-León, Castilla-La Mancha, Navarre, Basque Country, Catalonia. It's like we've got a solid split and solid proportion of assets across different parts of Spain. As you know, Garoña, probably for September's presentation, we'll have environmental permits on site.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#11

And we'll likely see construction kick off, hopefully, during this year's final quarter. It stands as one of the biggest developments this company has undertaken. Villaviciosa, the second one, is slated for 2023. And it's like we enjoy a high degree of visibility across all our developments. What does that mean? We enjoy a high degree of visibility on our growth, or financial growth. It's like I could say we're going to keep up the same pace over the coming years, because we enjoy a high degree of visibility on the assets we are going to connect. New drivers I've mentioned, but I'll devote more time to this here. Italy, I've said. For us, I think Italy is critical. I think that Italy, you have -- our perception regarding the Italian market is that renewables will be one of the key growth -- areas of growth over the coming years in Italy, because they need it. And honestly, I think that Italy, they have a great opportunity. They have really good interconnection with Austria. It's like they could supply electricity from south to north. It's like in Spain. If they develop renewables and they are obligated. And if they develop renewables seriously, they will have not only the opportunity to reduce the bill of consumers, of Italian consumers, they will have the opportunity to sell electricity to the north.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#12

The key part is this: I've been spending considerable time in Europe making the case that we must create a global market — a global market. The South has to be linked with the North, and we need to share the electrical market. Because the answer for the European Union, particularly over the short and medium term, will only arrive if certain countries back other countries. Now is the moment to seek global solutions for Europe. And those global solutions will emerge from south and north together. To explain our situation in the country, our pipeline keeps growing. We have solid land, solid connection points, an exceptional team. We're very enthusiastic about this, and we've issued an update. As I said on the previous conference call, this comes as no surprise — 3 gigawatt looks good for us. 5 gigawatts fits better with Solaria's pace of growth. And naturally, we'll see — as I've said — in 2023, we'll begin construction in Italy. Wind. It's likely still premature to discuss wind. For us, wind means hybridization. Over the past month, we've heard many wind players speak about hybridization. Ours is the reverse situation: solar players discussing hybridization in order to carry out wind.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#13

We’ll begin with the licensing side. It’s somewhat like the benefit of hybridization. You cut down on certain permits. It’s more that you don’t have to go through the entire process, the whole permitting path. You’ll save some time, though that isn’t the key piece. At the same time, you can improve connection costs, since obviously we’ve already built and constructed infrastructure. It’s that they share common infrastructure. And at the same time, that is, for us, the essential partner. And we’re fortunate, because where we’ve developed our PV power assets, particularly in Castile-León, we have excellent wind conditions. And we say we’re fortunate because initially, it wasn’t — it wasn’t our plan. But wind studies showed us that we have excellent conditions for wind, and we’ve opened the door to beginning hybridization. It isn’t a near-term path, because it’s something we’re starting now and probably will be developed over the coming years, but it requires time for licensing, especially. But I think it’s interesting, and it’s a good path that could open up for us EPA-based load concepts. And of course, we could cover more hours of the day with generation.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#14

It's quite interesting. We've opened the door, and this is the future—this whole thing with storage. Solaria intends to remain in the future. And clearly, that's an opportunity we want to hold onto. Spain. As I said, Spain has approved a new infrastructure—an electrical infrastructure map, right? It's like over the coming year, Spain will spend—it's going to put money into plenty of substations and fresh grid investments. Our job is to be there now. It's like we have to be the first ones attempting to secure land, attempting to secure the finest land with environmental conditions suited to PV assets for PV plants. And our task is to be first in line trying to lock in a good position around these new infrastructures and the new grid that Spain is going to build. I believe it's smart on the part of the Spanish authorities to put money into new grid because, as I've said, for us, the future lies in the interconnection of Europe. Obviously, with a good grid, you'll be in a position to supply from here up to the north. And it's a good thing to invest in infrastructure, and I think we need to be there now. Germany. As I mentioned, we have prior experience in Germany across 2009, 2010, 2011, 2012, 2013, 2014.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#15

We put a lot of time, effort, and money into Germany. As you know, Spain halted renewables investment entirely, so we had to go to other countries. Germany was one of those countries in the past, and we made a lot of money there. We really appreciate the country's philosophy and mentality around renewables. Unfortunately, over the last years, they decided to shift toward gas applications—especially, they moved heavily toward Russian gas supply. And as I said, I think the entire European Union, if you don't want to make mistakes—they picked the wrong path, and they're moving toward the right point. And I think the right point today is that smart people fix mistakes, and the European Union is changing entirely. And Germany, I think, will be the focus of solar in the coming years, and we trust in the country. We want to invest there. We want to stay there. And of course, 215 gigawatts is a lot. It's probably the most ambitious solar target among European Union countries, and we want to stay there. And we have experience, as you know, in medium, small, and large PV assets.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#16

Right now, the discussion centers on small systems, and probably medium ones. But I have no doubt whatsoever that if they intend to hit global targets, they'll shift toward large PV assets. And naturally, we're tracking the market. We're tracking the new rules Germany is approving, and we'll see how it goes. Of course, innovation here isn't just about technology. I think that in tech companies generally, we tend to link innovation with something odd or novel on the technology side. And I believe that in renewables — in renewables, our surprises over the last 20 years, we've found opportunities that the market either didn't see or had no interest in. And land is one of those opportunities. We've now observed that land can sometimes be a constraint around pipeline, and I could give you a few examples. You've read it in the newspapers and you've seen that new players — oil companies and international groups, utility groups — are buying up enormous amounts of pipeline in Spain — not just in Spain, but globally across the entire European Union. I think they've grasped that renewables is a solution. They need to remain there, and they're pouring massive investment into renewables and into pipeline. But at times I'm genuinely taken aback, because they're acquiring pipeline.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#17

And to be honest, I believe they're picking up a huge amount of pipeline that relies on third parties. Take land, for instance — land is a great illustration of GENERIA's business model. These are folks who've bought up pipeline and they have to come ask our view and negotiate with us, since we hold title to the land. And — or at minimum, if we don't hold title, we've got a land purchase option in place. In my view, this company is a new one for the market, though not new to us, because it has 3 years, a 3-year track record. We hold plenty of land options. We could buy land that gets rented out to third parties — utilities, infrastructure funds. And naturally, for us that's another infrastructure business with a different profitability profile: 8% estimated project IRR, 30 years of contracts, contract life with inflation built into every one of the contracts. It looks like it could be a genuinely strong business going forward. And I'm only offering a few guidelines here on where the company stands, but I believe it will bring really good news to shareholders down the road.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#18

We recognize and get that GENERIA and Solaria are not the same kind of business. GENERIA is drawing plenty of interest from some prospective partners. Which prospective partners? Sovereign funds, infrastructure funds, and we don't rule out the possibility of M&A within this company, a percentage of the company's shares. That's something that in every case could deliver enormous profits to Solaria and, as I said, good news to Solaria. Naturally, if you'd like, we could hand things over to David and to the Q&A session.

David Guengant

executive
#19

Thank you, Arturo. I'll open the floor to questions now. And again, many thanks for spending this time with us. We'll hold for just 1 minute. Thank you. Our first question comes from Oscar Nájar at Banco Santander. His first question concerns hybridization and new technology. Will it be 100% Spanish in Spain? Have you already identified a location? In that case, what might the load factor be? Places that are good for sun aren't always good for wind. Are you considering some PPAs for wind or base load wind? And his second question is about Germany. Are you going to attend the auction? Are you already looking for a location? And are you looking for the PPA coming from the German government?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#20

To start, I owe everyone an apology, since I said hybridization and David corrected me, noting it should be this hybridization. I'm sorry — I'm no Shakespeare. My English isn't the greatest. But to address hybridization, hybridization — of course, this isn't a brand-new technology. In the end, it's perhaps something new in Spain, but it amounts to combining different technologies at a single connection point, and it's not very sophisticated. Ultimately, why are people announcing hybridization applications, storage and all sorts of things now? Of course, the connection point is a constraint today. Many wind players need more capacity, and they don't have many connection points available. One route they could take to raise capacities is this hybridization route. That isn't Solaria's situation, as I said. For us, connection points — we have plenty of connection points growing, and I believe that isn't the main issue on the table. We have a substantial pipeline and connection points. That's not our case. But as I explained, we have truly good locations for wind. And our studies indicate we could achieve quite good IRR levels for wind reasons, not for other reasons.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#21

And we also have the grid connections in place. We hold the land. It's a bit like — it's a solid game. Everyone benefits. It's like the connection infrastructure is there, the land is there, and the wind conditions are genuinely strong. When it comes to PPAs, whether we're discussing wind or baseload PPAs, it's still too early to say, yes, tomorrow we'll sign a PPA-backed load. No. That's something we'll see. It will happen over the coming 3, 4 years. Time is needed. We'll observe how the market looks over the medium term. By medium term I mean 2 years. This market is wild, with prices fluctuating constantly, and we'll see. As for location: right now we're heavily concentrated on Spain when it comes to where our postural growth goes, following this path. Because, as I've laid out, we've completed the studies in Spain. We don't rule out other countries down the road, Italy or Portugal. But as of today, our focus is very much on Spain for this application. As for Germany, if we end up participating in the auctions, we'll see, since the German government is still going to pass new laws that they'll announce, or technically speaking.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#22

We've gotten this message that they need to approve — they have to approve quite a few new laws if they want to build out those 215 gigawatts. Naturally, if the auction looks appealing, why wouldn't we? We've taken part in the Spanish options. We've taken part in the Portuguese options. So why not in Germany? We'll look at the conditions and simply remain positioned there. On locations — yes, we currently have an in-house team in Germany working on sites, solid sites, strong grid connection points much as we do in Spain, plus a local internal team as in Italy. And naturally, as always, our aim is to keep expanding organically and to develop our entire pylon from 0 to 100. That's something that takes considerable time and effort, and our staff has devoted considerable time and effort to executing this pipeline, yet it also brings us substantial money since our cost is extremely low.

David Guengant

executive
#23

And we have a question from José Ruiz at Barclays. For this hybrid project, what kind of return could you get by going into onshore wind? With hybridization, how much can you save on the upfront investment in a wind project? And the final question: in your European expansion strategy, will you follow that same approach of using low-cost solar panels?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#24

On returns—always—if we can't hit a double-digit return, it simply doesn't make sense for us, since that's one of the core pillars of our strategy, and do we believe we can get there? As for savings, putting a figure on what we could capture at the connection point or on the land is extremely hard, because each case has to be studied individually. That said, in every case, we're enduring a great deal today with the solar assets, with infrastructure and interconnection problems. What does that mean? It's like obtaining the substation to secure the final connection permits. Sometimes we expend considerable time, money and effort with utilities—local utilities—and building substations, which hinges on local authorities, the approval, the final approval, the license approval. In this instance, we will save all of that money, because the work was already carried out for the solar asset and we could put it to use. And regarding the land, obviously, as I've explained, when you contract solar land, when you contract land for a solar asset, obviously, you can't match it perfectly to the size of the solar asset. It's like you contract 200 hectares and sometimes you use fewer than that number for your solar asset.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#25

Then there's the remaining portion of the land that you aren't using, and clearly, money is being lost when it sits idle. In that situation, we'll put it to use. Still, it's hard for me to commit today to a specific figure or a specific order. Low-cost solar panels — that's not really something I'd frame that way. We don't go with low cost. Project finance participants, in particular, obligate us to always rely on tier 1 solar panel suppliers, and tier 1 refers to the official tier 1 list. That isn't tied solely to Solaria — every market participant who wants favorable project finance, favorable terms and favorable pricing uses tier 1s. And as we expand into Europe, tier 1 solar panels will remain what we use. If you're asking about a connection to solar module manufacturing in Europe, there aren't many European players in that business right now. No, I can't say what happens down the road. As of today, though, the bulk of solar module volume originates from Asia — China, Korea and Taiwan.

David Guengant

executive
#26

We'll take the next question from Jorge Guimarães at JB Capital. For the first one, could you give us some update — also on CapEx for next year? Second, how do we intend to fund as a new land company? And third, when do we expect a project in Italy to reach ready-to-build status?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#27

Starting with the CapEx question. As we said, CapEx for 2022 is going to be EUR 0.4 per watt. When it comes to 2023 and 2024, sitting here today it's hard to give you a number, because I know everyone is very on edge about material costs. Personally I'm not concerned, but my message stays the same as in prior years, since it comes down to your expertise and what you know about solar. And I believe that after 25 years, we have solid knowledge of solar. My view on CapEx is that we won't face a worse situation than we do today. In our view, the worst case would be staying at EUR 0.44 or EUR 0.43. And I think that quarter by quarter, we show the market our CapEx and our OpEx record. We hold on to our cash, we put money to work. We even invest in land exotic. Yet even after investing EUR 60 million in land, all with full equity. It's like money. We generate money. Why? Because our CapEx is really extremely good. This is the critical part. Why aren't you burning cash? Because your CapEx is good.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#28

That's the answer. And I have no doubt whatsoever that going forward we'll keep the new land company in place, since that's what we intend to do. As of today, we've gotten a great number of proposals — some parties even want to buy this company outright. I believe I get why, because I suspect that at present the value isn't visible to everyone. It's still too soon for this company's value to show. From where I sit, it will amount to a revolution — though naturally, I'm an extremely optimistic person at all times. Still, as I see it, it will be an evolution for us. I'm not alone in holding that view, since I've had discussions with infrastructure funds and sovereign funds, and their enthusiasm for this concept exceeds even mine. In their opinion, control of land is going to be critical, particularly within the European Union. Having control of land will be critical for pipeline — and not just for pipeline. This is only the start, and it isn't solely about pipeline. My belief is that without it, developing renewable assets would be extremely difficult. But to address what you asked regarding how we plan to fund the new land company, there's a good chance we could open the door to one of these eager partners, who might remain alongside us over the medium and long term.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#29

This operation—this M&A move—could deliver profits to us in Solaria and could also provide, of course, funds to grow this company. I've lost the last question. When would you expect to have projects in Italy? Naturally, at the end of the year, hopefully, we'll reach the ready-to-build concept in Italy. And hopefully, in 2023, we'll begin construction of volume in Italy. The key question here is—and I've spoken with the Italian team, and I've said, "I need a massive volume in order to start with the construction." And I know that they're going to achieve it. I know that in 2023, we'll surprise the market with a massive volume of construction in the Italian market, and we'll see. But our target is to start with the construction in 2023.

David Guengant

executive
#30

The following question comes from Eduardo González at Banco Santander. His first question: can you provide additional detail on GENERIA? Will you lease that land to third parties, or will you use it for your own project? And is your intention now more toward purchasing land or renting it? The second question matches the one from Manuel Palomo at Exane BNP. Could we explain the quarter-over-quarter decline in the achieved price per megawatt hour? Perhaps I should address this one, since it stems from the older assets. As you know, Solaria still holds some subsidized assets. So every quarter, as more and more new assets move to merchant, that average price declines each quarter. In this case, even if the pool price shows EUR 200, and remember we have the claw back in Spain, we therefore receive only half of that EUR 200. So for that reason, our achieved price may fall each quarter, because we may connect more and more assets.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#31

Now, about coloring on GENERIA. To me, GENERIA is similar to other business opportunities. I can give you an example, since GENERIA ought to serve everyone, not Solaria — clearly, everyone. Why? Let's say we are vetting, or we want to understand why we created GENERIA. Because previously, we saw the opportunity. We attempt to secure a connection point and we lose it. Why? Because a different competitor got it. And they phoned us, saying, "Sure, you could hand over your land to me, since I have no land and it would be useful for me." And we handed it over to them at no cost. Why? Because, naturally, I lack the connection point. It's as if I will earn nothing here. I don't have the connection point. And naturally, the land — what the land is worth to us in that situation is 0. And I negotiate. I spend time negotiating the rent agreement or the acquisition agreement with the owners. And in the end, I won't be able to develop my PV asset. But I got calls from oil groups, utilities, international groups. And naturally, I have got, I want your land. And naturally, we decide why we won't get money here.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#32

We possess solid expertise. Our land is solid. We’ve put in work. So why wouldn’t we lease to these parties, or why wouldn’t we secure a fee for the work we’ve developed? That is exactly why we created GENERIA — to capture money from all the efforts we put into developing land that we own. Take this case: if we purchase, fine. It might be a long-term agreement, and we would hold ownership of the land. But imagine we lease the land — we could get a fee or something along those lines, and then we’d hand it over to other players. That isn’t what we intend. What we intend is to acquire, though we don’t rule out the possibility that we have signed a favorable lease agreement, to get a fee or something from the player that will develop the PV asset. Going forward, you’ll see plenty of connection points, people. Unfortunately — not — Solaria will not secure every connection point in Spain. And today you have many different players attempting to obtain them; sometimes they post bank warranties. They — sometimes they have no idea whether it’s sound from an environmental standpoint, whether it’s sound from a land standpoint.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#33

We're going to try to back this sort of thing, providing these kinds of services to those new entrants, the new international players. That's something we've already done in the infrastructure business and the substation business, and now we're bringing in a lot of money from it. I have no doubt at all that with GENERIA, we'll see the same result.

David Guengant

executive
#34

The first question comes from Fernando Garcia at RBC, and it's about how profitable the GENERIA business is and how its debt and equity are structured. He also asks whether we have any debt-related items for GENERIA. The second question is whether there's any news on the environmental permit for Trillo. And the third question is whether we're seeing permitting speed up.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#35

On the debt-equity structure, David already addressed that question. However, at present we've funded the investment entirely with equity. The reason is that, as you're aware, we carry no corporate debt, and clearly we have no wish to alter that internal policy. That's why, down the road, GENERIA will probably become a spin-off of Solaria involving a private player on the company's cap table, which will produce profits at Solaria and, naturally, operate under different rules, since it makes sense to put in place a sound financial structure of debt and equity. Right now it's all equity. At Trillo, as you know, every permit is in place except the one for Peralveche. With luck, in the coming weeks we'll secure the final Peralveche permits. As for speeding up permitting, I think this is the sort of question that comes up every quarter. You're aware that Spain has passed a new fast-track procedure, yet I'm not hopeful about this acceleration process from the Spanish government, because at this point they don't know precisely what it will look like. I'm not optimistic about acceleration. In my view, acceleration of the projects ought to come from our own efforts. It's a matter of experience and the staff we have, who are doing a great job. It's the people who need to accelerate.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#36

I don't put much faith in fresh legislation that governments might pass, since it could alter the whole picture entirely. That's the rumor that's constantly circulating in the market, as you're aware. Within the European Union and in the Spanish government — you know Spain has passed a new law. Italy has passed a new law. The European Union keeps saying all the time that a new law will be approved. Yet ultimately, so much rests on national, local, and regional agencies, and forcing them to act is extraordinarily hard. Naturally, of course, given the European Union's current targets, if they don't implement anything new, the pace probably won't pick up. And as for the futures, I'd imagine they'll attempt to pass new laws or something along those lines that will bring change.

David Guengant

executive
#37

Jorge Alonso from Societe Generale has a question. The first one concerns installing wind capacity: is that aimed at 2030, or should we expect some capacity in place by 2025? The second one is about our PPA market — could we offer an update on that? And the third question: is it possible for us to speed things up in Italy ahead of 2030?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#38

To start, yes — with any luck, during 2025 we might get partway toward our wind capacity target. Right now we've got a team, an in-house team, working on the licensing side of things. With luck, within 3 years we'll see some results. And how many megawatts? That's still premature to pin down. I'd say we'll have a clearer picture by next quarter. As I said earlier, I believe it's simpler than the permits we deal with today, since you skip a few of the final steps, though the license itself has to be developed. On the PPA price and how the Spanish market stands, the price, as you're aware, keeps climbing — it's on the rise. At present, PPA pricing is wild compared with 1 year or 1.5 years back, since nobody knows precisely where things will stand in 1 year or 1.5 years. On that note, sorry, but I'm 100% pessimistic regarding where prices are heading. Fine for Solaria, but not for the market. Why? Because every remedy governments are putting on the table — LNG gas, supply from north of Africa, Qatar, Algeria — in my view, none of these are genuine remedies. They might work, but only at prices far higher than what we see today.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#39

It's likely that in Europe, over the coming month, you're going to see prices — enormous prices — and volatility. I think that's unfortunate for Europe. It's probably good for Solaria. But for Europe, or the European Union, we depend on Russian gas, and I don't see solutions in the short term. By short term, I mean about 1.5 years or 2 years. Being realistic, because it's important to be realistic at this point, because the European Union during recent years wasn't realistic about energy supply. I think LNG gas will be a solution in 2025. In the short term, if you want to receive LNG gas, you're going to pay incredible bills. It will be extremely expensive. Shipments are one of the problems, but not the only one. Logistics and transportation are a kind of problem. And finally, if you want to obtain these shipments, you will pay more — you need to pay more than Japanese players or Asian players like China. It's like you're going to compete ship-by-ship with third countries that need energy. We will have an extremely took winter this year and next year. For all these reasons together, it's difficult to say today whether this is a good price for a PPA or not.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#40

My view is that we have to look at this quarter by quarter. As I said, discussions are underway with certain oil companies and near-oil companies, and a new deal might be announced. But to be honest, I have held off on signing because the situation keeps shifting constantly. And as you're aware, over the last 3 months the Spanish government has been announcing a new law. They intend to remove the gas, obviously, for signing up PPAs and to alter the rules. Signing after that is not a good idea, and we are awaiting the final resolution from the Spanish government, which they have not approved and have not presented to the market. And once this new law is approved, we probably could announce new deals, but we intend to wait. Regarding Italy and the acceleration process, naturally, we are striving to speed things up. They have passed a new law that accelerates small developments below some megawatts and 20 megawatts. And naturally, we are optimistic about 2023. As I said, in 2023, we will begin with construction.

David Guengant

executive
#41

Bosco Ojeda from UBS has a question. First, he asks whether we have analyzed wind conditions at our plants and whether they are suitable for a wind project. Second, he asks whether we could consider new capital to finance this new expansion project in wind, Italy, Germany, and real estate.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#42

On your first question, yes, absolutely — and it isn’t just about wind considerations tied to wind plants. Historically, whenever you build a solar facility, the structure and the tracker Orica are always among the critical factors, since you have to withstand strong wind conditions. Sadly, several of our PV plants experience a great deal of wind — sadly, I say, because we’ve invested heavily in iron and truckers. One of the first studies we must carry out is, naturally, determining the wind conditions at that PV asset. My first question is always: what are the wind conditions? Unfortunately, we do have plenty of wind, yes — and I always say, please do something in southern Spain, because there you get lots of wind, always nearer the north, naturally. Today that works in our favor, because while strong wind is bad for solar, for wind assets it can be extremely beneficial. That’s why we have opened the door. As I mentioned, we were skeptical about hybridization, and this is the reason we have opened the door to it.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#43

Regarding our expansion initiatives in Italy, Germany, and wind, I'll cover Solaria first and then GENERIA. Solaria required capital since, as you've heard many times, we enjoy solid project finance structures that sometimes cover over 100%. We intend to keep going. To my mind, Italy and Germany aren't a different case. We'll see. Naturally, the issue in Germany in years past was electricity pricing—if you set Spain's power price beside Germany's, they were utterly different. Today, sadly, every European Union country faces the identical difficulty. Frankly, I don't believe Germany's position beats Spain's when it comes to price, and that price sets how much project finance you can obtain. The e-banks backing Solaria nowadays originate from Germany. They seem to possess deep project finance expertise. The lenders providing over 100% coverage on our projects hail from Germany. And from, say, European Investment Bank—with European Investment Bank we maintain a truly strong relationship. So naturally, we feel optimistic about the debt share we can secure.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#44

Now, GENERIA is a separate matter. No, we have not gone into the debt side there. As I said before, our investment was done with full equity. And I believe it makes more sense in GENERIA — in the shafts of GENERIA — to bring in an investor, likely a sovereign fund, or an infrastructure or insurance group, that would remain with us over the medium and long term.

David Guengant

executive
#45

Fernando Lafuente from Alantra has a couple of questions. First, what CapEx figure should we expect for 2022? Second, beyond the 2 gigawatts that will be in operation by the close of this year, what is our estimate for capacity currently under construction?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#46

Naturally, the first quarter—which I already noted—is the company’s weakest quarter. And we put EUR 70 million, not bad, roughly EUR 70 million, into new assets. During this quarter and the next one, you’ll witness huge growth, an acceleration across all our investments. It’s hard right now to state the exact figure, but you’ll see a tremendous sum of money that we’re going to spend and invest in the second and third quarters. And naturally, yes, our commitment is to reach 2 gigawatts connected to the grid by 2022. Naturally, that’s a solid target. As I—as you probably know, with 2 gigawatts, Solaria will rank among the global leaders from a solar standpoint, and those 2 gigawatts will produce a tremendous amount of EBITDA and profits. And probably by the end of this year, as I said earlier, we’ll have Garoña under construction, which is 600 megawatts. And hopefully, additional PV assets that we’re going to add. Plenty of different number—names, sorry, in various locations.

David Guengant

executive
#47

Manuel Palomo from Exane BNP has a question. First, do we have any view on what the potential impact could be from the cap on gas price that's going to be implemented in Spain? And the second question is, can we give an update on the main bottlenecks, or on delivery of new installations?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#48

Certainly, Manuel — you asked before about the typical price we pay, and David responded to that. The explanation is that, frankly, at times even I find myself entirely confused by the figures, the cost per megawatt hour, since the Spanish government has passed numerous new laws over the past month. There's the gas claw back, a fresh restriction. At present they're discussing a new cap on the gas price, and they intend to revise simultaneously the gap on the gas price and the claw back. And I consider that complicated. Because as of today, my strategic view on this — and afterwards we'll add a few points regarding the numbers, but first my strategic view — I hold a significant doubt regarding the European Union's approval of this gap on the gas price. Throughout all my conversations, European Union, we shall see. We shall see, frankly. On this we keep a neutral stance. The utilities, as you're aware, are being extremely forceful regarding this, this gap on the gas price. We have chosen to stay neutral. But I keep regular contacts with every utility in Europe, every single utility, and that I always with the whole series of major utilities across Europe.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#49

I have a lot of discussions with the European Union. In the coming weeks, we'll find out whether they give approval to the gas price cap or not. The Spanish government is expressing support, and also regarding how long this gas price cap will last. And sorry — I think that to add to that, David, if you'd like.

David Guengant

executive
#50

Yeah, perhaps a brief note on that. As you’re aware, at present our mix is 30% merchant and 70% PPA, and on that 30% merchant portion, with the gas clawback in place, we’re getting roughly 50% of the pool price. So if the pool price sits at about EUR 200 in our accounts, under this new regulation—which could come in June—we’re receiving EUR 100, and it’s possible we might reach an effective price of somewhere around EUR 85 to EUR 90. In the worst case, our merchant exposure could get about EUR 85 to EUR 90 between June 2022 and June 2023.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#51

When it comes to getting new installations delivered, the bottlenecks tend to be the same every time, in my view. Permitting, licensing, connection, and final connection are the biggest constraints. That sometimes rests with the utilities, and at times they aren't doing the most efficient work. And naturally, the ELA always comes tied to permits. Materials, construction, and other matters don't concern me, since the materials are arriving on schedule. That's not something we're worried about. We're — we have solid construction crews on site. As ever, the core issue is licensing. And that, of course, is the standard problem in this business.

David Guengant

executive
#52

Henry Tarr from Berenberg has a question. Do we have sufficient resources and enough management time within the company to oversee all these various strategies? How many people are you bringing on board to deliver on this strategy? And do you believe that this new REPowerEU strategy will actually assist the permitting process?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#53

I believe that at Solaria right now, we have a genuinely strong management team — and I'm leaving myself out of that, since the growth this company is seeing comes from the truly outstanding people we have within the organization, not just in Spain but in Italy and Portugal, across every country where we operate, including Germany. And I feel that as things stand, we're in a comfortable position, because we have individuals with genuinely strong capabilities and a high level of expertise — keep in mind, 25 years in this business. That's a long stretch, a long stretch, 25 years, and I'd say Solaria is probably the oldest company in the solar markets. That may sound bad, but it's the truth. It's the truth. And I think we're constantly bringing on new people. We're expanding, but we don't want to go the utilities route — you won't be seeing a huge staff of people at Solaria. I believe we have to be extremely efficient. We need genuinely capable people with clear objectives and sound management. And I'm extremely proud of the company's management team. And I think that, yes, the different strategies we've been pursuing in the past — remember, this company has grown a great deal over the last 4 years.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#54

From where I sit, going from EUR 5 million to EUR 7 million or EUR 8 million in revenues is harder than shifting the company at its current scale. Right now, we're discussing EUR 400 million of project finance or massive development of 600 megawatts or 700 megawatts. Years ago, this was incredibly tough, since we're talking about 6-megawatt, 10-megawatt, 5-megawatt developments. Whether you're developing 6 megawatts or 600 megawatts, the same team is needed and required.

David Guengant

executive
#55

Apologies for that — perhaps we can just address the final 2 questions. And should you have additional questions, feel free to reach out to me tonight or tomorrow. One of the last questions comes from Mikel Zabala at Bank of America. He's asking about the new criteria for the upcoming grid capacity auction in Spain. Specifically, how does Solaria plan to compete in those new auctions against other participants — in this auction, in the wake of disconnection, for instance, of old thermal plants?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#56

It’s hard to give a clear answer, because the Spanish government keeps changing its position on this. As you know, in the first quarter — actually, not in the first quarter; earlier, I believe — they set up a tender process for the Andorra connection point. Andorra is north of Spain, and there’s an Endesa thermal plant there that they have closed and demolished. They set up a tender process. We took part, as other projects — or other players — did. I believe 8 large players participated, and we are still waiting for the answer. And honestly, who knows whether we will get an answer during this year? Hopefully, we will obtain it. But what does that mean? It’s as if the tender process is efficient. If you want to reach 600 gigawatts of capacity in the European Union, spending 1 year waiting for the answer sounds like it is not the correct way. Probably new capacity — new capacity that the government is going to approve, probably, because nobody knows exactly. Probably they will follow the rule of first in, first out. The first projects at present are the first that get the project, and we will see. Obviously, we are going to participate in all the options.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#57

We're going to take part in every one of the new pipeline regulations that the Spanish government is going to approve.

David Guengant

executive
#58

Our final question this session comes from Alberto Gandolfi at Goldman Sachs. By 2025, how much profit would leasing land generate for us?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#59

Tough to pin down precisely, though worldwide we're aiming for EUR 250 million in global EBITDA — EUR 300 million of recurring EBITDA, adjusted for inflation across 30 years. That's the approach that possible farmers take. That figure is what possible numbers rely on at present when assigning value to Solaria — to GENERIA, apologies — and when assigning value to GENERIA's shares. Many thanks for joining this conference call. As ever, our Investor Relations team will be on hand for any further details. Thank you, and best regards.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Solaria Energía y Medio Ambiente, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Solaria Energía y Medio Ambiente, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Solaria Energía y Medio Ambiente, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.