Solaria Energía y Medio Ambiente, S.A. (SLR) Earnings Call Transcript & Summary
November 15, 2022
Earnings Call Speaker Segments
David Guengant
executiveGood afternoon, everyone, and welcome to the Solaria 2022 9 Months Results Webcast. I'm David Guengant, Head of IR at Solaria. With me today is Arturo Diaz-Tejeiro Larranaga, our Chief Executive Officer. On this call, we'll talk about our business outlook and make forward-looking statements. Those remarks rest on our predictions and expectations as of today. In this presentation, we'll start with an overview of the results and the main development during this period, given by our CEO, Arturo. After that, we'll move on to the Q&A session. I'd like to point out that all your questions have to be submitted via the web.
Jose Arturo Diaz-Tejeiro Larranaga
executiveThanks so much once again. I'll now turn to the third quarter results, and after that we'll move on to the Q&A session. We begin with what I think is a great photo — a great picture of the <<inaudible>> substation, which, as you're aware, ranks among the biggest projects currently being carried out by us, and we'll talk about it during this call, but it's a great picture of that substation. We could begin. As you're aware, we have grown all of the company's figures considerably and exponentially, as always, in terms of revenues, EBITDA and net profit. At the same time, we are stepping up our CapEx and our investments. As you're aware, our construction plan is something that will take place over the coming quarters and years. Net profit growth is considerable, above 86%. We have delivered EUR 70 million in net profit. And I believe we are positioned better than our earlier forecast for profits and EBITDA. And naturally, the growth in the figures is moving in the right direction — in an extremely good way, I would say. And it's something that will take place next quarter. In practice, this year we will double the figures and secure a nice number of gigawatts.
Jose Arturo Diaz-Tejeiro Larranaga
executiveThis is significant news. It's the first update we've had in quite a while regarding new connection points. We've reached 1.2 gigawatts of new connection points. Likely over the coming week's month, you'll hear similar announcements, because I believe we'll approach 3 gigawatts of new connection points. That's good news, and it's something that underpins the company's future growth. As you're aware, from a growth standpoint, Solaria is performing really well and obtaining new connection points for free. This matters. -- for free, meaning what exactly? It means we're paying nothing beyond the internal work of the company and the costs of our internal team, but we aren't paying anything to obtain these new connection points. The capacity actually secured stands at 13.9% gigawatts. Yet as I've said, this is something that will increase substantially during the coming week's month, likely before this year ends. And at this stage, we're extremely enthusiastic about the company's growth in the years ahead. These are new connection points that we'll add to our current portfolio and that we'll develop and construct over the next 3 or 4 years.
Jose Arturo Diaz-Tejeiro Larranaga
executiveWith these new connection points, we’ll likely deliver some very positive surprises to the market. But it’s still early to discuss this. In upcoming presentations, we will elaborate on this message. Naturally, as you’re aware, we are currently building a huge quantity of megawatts. And an important portion of that quantity was completed last month using the company’s internal finance and our own resources. But at last, we have closed project finance tied to 285 megawatts that will cover this portfolio — this Castilian portfolio that is under construction today. And we have closed with Sabadell Bank, amounting to EUR 134 million. As usual, we are covering more than our CapEx — and that’s good news, because today we are not allocating equity in these projects. The cost — the interest cost is higher than in the prior deal, as you know, since the interest rate is rising. But at the same time, we are operating on a merchant basis. It’s like here, we will be exposed to merchant electricity prices. Today, we could say that everything we have under construction is fully covered by project finance, or we have linked all of our megawatts under construction to project finance.
Jose Arturo Diaz-Tejeiro Larranaga
executiveNaturally, on the numbers front—energy production, I’ve already talked about sales—we’re seeing growth across every metric, and most notably, of course, in energy production, where growth exceeds 60%, and that’s something set to carry on. As I’ve laid out for the coming quarters, the same pattern obviously holds for sales. On merchant exposure, as we’ve said on earlier calls, our stance is that we’ll keep merchant exposure at 20% to 25%. Naturally, at present we’re at ease with this mix at this percentage, and we’ll watch how things develop going forward. EBITDA net profit—which for us is critical—keeps expanding cash generation, particularly over the next year. My view is that cash generation from all these newly connected assets will be extremely strong. And you’ll see that reflected in the 2023 figures and in EBITDA net profit, as I’ve explained before. No, it’s growing properly—more than 80% growth in net profit—and we’ll probably end this year with numbers practically doubled. Operating cash flow, as you always know and as we’ve repeated, and working capital is tracking the pace of investments, but we hold a really solid cash position. We’re covering, as I’ve explained, every one of our investments through private finance—yet ultimately, we’re covering practically 100% of all our investment via project finance.
Jose Arturo Diaz-Tejeiro Larranaga
executiveAnd we believe that as new assets start producing electricity, the company's cash position in 2023 is going to be stronger, and next year we will see significant gains in the company's cash position. But as of today, we're in a really comfortable spot, a really solid financial position within the company, and, of course. That matters, particularly right now with the current timing in rates and where interest rates stand. As you're aware, interest rates are rising. And at the company today, our average cost of debt is 3%, 85% fixed-rate debt, which matters because it's essentially risk-free, and 15% that could be affected or could rise or might not. But the crucial thing today is that 96% of our debt is nonrecourse debt. Why does that matter? Because it's something that underpins our continued growth, since we don't rely on vans or corporate debt or a refinancing process. Essentially, we've allocated all of our debt according to a project finance structure. We've allocated a long, long lifetime period of debt, roughly an average of 18, 19 years at fixed rate, as I explained, 85%, 3% average cost of debt. It's a really strong financial position for the company.
Jose Arturo Diaz-Tejeiro Larranaga
executiveThe net financial debt to EBITDA ratio in particular is getting better each year — probably next year too, as I said, since the assets are generating more cash, and that should drive further improvement. And the financial — the company's overall financial position is very strong. Many parties are eager to come into our project finance structure. A large number of banks and institutional investors are highly interested in joining with us. And I believe that today, in renewables, in solar, and above all at Solaria, we're set up for a really good stretch from a debt standpoint. One of the key points in the presentation on the status of our pipeline under construction, in particular, is Trio. We're carrying out Trio. We're putting in strong efforts to push forward with Trio's construction. In the coming days, we hope to begin connecting the first portion of Trio. San Andres, as you know, is 130 megawatts. In the coming days, we hope to get started, and we hope to have it connected before this year ends, likely within 1, 2 weeks. The second portion, likewise. We're devoting a great deal of time, effort and internal employees to the construction process at Trigon.
Jose Arturo Diaz-Tejeiro Larranaga
executiveAnd I believe construction at Trio is going really well. What's great is that it's all being done together. We're assigning crews to work in the same location, on the same side, at the same moment. And we're saving money, cutting costs, and we're extremely efficient throughout the build. The interconnection piece — which, as you know, is sometimes the final part of construction — will be finished in the coming days and will be complete. That's one of the key points here. To put it simply, if you've got the line and you've got the substation, you can plug the plants in right away. The easy part is building the PV plants. San Andres, as I said, will be hooking up in the coming weeks, and it'll be the same with Modiano, and we're optimistic about how quickly the project is being built. On the other parts, I think it's the same with the small assets we're building at the same time, outside of Tier 3, in hotels and other parks. But I think at the February presentation, we'll give full visibility on connected assets and the overall situation at Solaria.
Jose Arturo Diaz-Tejeiro Larranaga
executiveStill, we're pleased and enthusiastic about it. As I explained, I believe we've put in a standard amount of work on the construction side. And when it comes to CapEx and timing, I think we'll deliver positive news to the market. Granted, my introduction has been quite brief. If you'd like, we'll be more focused on the Q&A session.
David Guengant
executiveThanks, Arturo. Thanks, everyone. <<operator_script>> Our first question comes from Fernando Garcia at RBC. To start, could you give some commentary on the megawatt <<inaudible>>? Next, on the merchant side: can you share a bit more about our merchant exposure for 2025 and what our merchant exposure might look like going forward in 2023? And finally, from a returns standpoint, how do we view returns now compared with the start of the year, given how CapEx, OpEx, and financial costs have moved?
Jose Arturo Diaz-Tejeiro Larranaga
executiveThanks for asking that. As for the January 2023 deadline, that isn't an issue on my end. I'm aware the market is paying very close attention to it, and I get why, since plenty of problems will come up. Still, in my view, for Solaria it's not a bit. Today we announced 150 megawatts of new environmental permits that we hold in Catalunya. To me it isn't critical, since it's business as usual, but I understand the market is watching this very closely. That's also why we made the announcement, though in my view it isn't significant. In my view, we're going to get it done. Whether we report on it or not — no, that's a decision we still need to make. But as I've explained, in our view it isn't significant. Still, we'll complete the whole pipeline, and we'll get past this deadline, so to speak. And next week, probably from Navara, we'll receive environmental approvals in the coming weeks or days, an important amount close to 300 megawatts. Probably the Garona environmental permit will arrive in the coming days, weeks — that's 600 megawatts — then probably <<inaudible>> will come, the company's entire pipeline. Madrid. It's like we did our homework, because every one of these projects has come through a rigorous test with the regional authorities.
Jose Arturo Diaz-Tejeiro Larranaga
executiveThe government has actually examined this project previously, and we've fielded numerous inquiries regarding these projects from an environmental standpoint. It's similar to how the work continues. It isn't significant for us that we are going to obtain. In my view, it's not — we don't have risk at this point. As you know, today, we have more than 2 gigawatts in the central government, especially the projects that I have mentioned, Villaviciosa, Garona, and you will see results in the short term, as I have explained, we have in local authorities, not local, regional governments. We are awaiting answers at the same time. Navara, for example, or Catalunya, and it will come in the next stage. My comment and I think that the deadline of January 2023, I think that government shouldn't move is something that the people that have done homework we are going to accomplish. And I think that it's a reasonable timeline. And about merchant exposure. As I have mentioned, 2025 is a good mix. We will see the evolution of price of electricity and the situation. As you know, in a few days, we will arrange — we will have a tender process of the Spanish government.
Jose Arturo Diaz-Tejeiro Larranaga
executiveWe’ll take part — not by competing on price, as usual — with high prices, because we look at electricity prices and I don’t see short-term fixes for them. And I believe I don’t see many megawatts coming into the system, and electricity prices — not just in Spain but across all of Europe — will unfortunately stay at a really good level for consumers. But to answer for 2025, it’s a good mix for us. On capacity. Of course, we are returns capacity again in <<inaudible>> parts, CapEx, of course. On CapEx and OpEx. As I said, our CapEx is in a good position, nothing new. The usual situation that in earlier quarterly reports we have discussed — around 0.45, around 0.44. And of course, we have some — we have observed some stability in prices, particularly in modules and inverters. I think the bottleneck in China was sold, and we are seeing some price improvements for next year. We will see. We aren’t worried about this because we believe that in all cases, CapEx will decline from a construction standpoint; as I said, we are extremely efficient today in the construction process.
Jose Arturo Diaz-Tejeiro Larranaga
executiveWe're saving money because, on that same side, while we're building simultaneously, we're being extremely efficient at this. It's hard to give a project IRR, since today, as you know, selling on a merchant basis makes it difficult to say—merchants are surprising even us, and we're in a really good situation. But for the future, we'll see. Given this electricity price, IRR levels could be extremely good. I won't put a number on it, because with this merchant situation, any number could sound strange, if you like. We'll see in the next quarters.
David Guengant
executiveAlberto Gandolfi from Goldman Sachs has the next question. Our preferred path for bringing those 6 gigawatts to market in the future — is it PPA or merchant? What mix would work best? The second question: at what LCOE must we cover equipment cost? And third, when do we expect full permitting for this 6 gigawatts, and is legislation or regulation on permitting shifting?
Jose Arturo Diaz-Tejeiro Larranaga
executiveHard to say, no, because PPA or merchant — it's a key piece of evidence in the Spanish government's tender process in a few days, since, as you know, in Spain right now there are a lot of — I could say I'll explain it properly. Right or wrong, there are plenty of speculating companies, companies that want to put out a press release to the market. Going in today with a low price on the tender process is stupid. But who knows? In a few days you'll see the results. In any case, Solaria will not lower its price. It will not be aggressive on prices. If PPA follows a proper path and they respect the electricity market situation, obviously PPA would be a good idea to sign. And it's true that players today, PPA players, serious PPA players, can sign deals at better prices. But for them and for us, fixing a price is extremely difficult, because — what counts as a good price, 50, 55, 60, 45, 48 merchant prices are fluctuating constantly. Today, we keep in mind the idea of going with 20-80, 20 merchant prices that could be 75, 25.
Jose Arturo Diaz-Tejeiro Larranaga
executiveHowever, we have to watch how the market develops, and we’ll see. Regarding the LCOE price required to cover our CapEx — it is extremely low. Honestly, this isn’t — today we aren’t discussing a profitability issue at IRR levels with a really low electricity price. It’s complicated to state publicly the number that could cover our cost, but it is extremely low. We could be extremely aggressive on price, speaking in terms of cost. But we are not going to be aggressive on price. 6 gigawatts — when will we obtain the full permitting process? Probably in January, February, at the results presentation, we will have strong visibility of an enormous volume of gigawatts and normal volume; it’s difficult to say 3 or 3-something covering an important part of our 6 gigawatts with environmental permits and more permits on-site. And in the first half, in the first half, and Paul saying that in 2023, we will have — we will obtain more visibility about the other part, the additional 3 gigawatts now. I could say that, for example, in some parts of Spain, in Basque Country, even in other places.
Jose Arturo Diaz-Tejeiro Larranaga
executiveThe permitting process is underway for us. We're getting those permits very quickly, and we feel optimistic about it — we'll see how it goes. But to give you a proper answer to your question, likely around 3 gigawatts for February. And after that, we'll bring on another 3 years over the course of 2023 — or 2023, I should say.
David Guengant
executiveOur following question comes from Joe Guimarães at JB Capital. Regarding PPA, I believe we've already covered part of that, but perhaps one more thing to ask is whether we anticipate a new PP announcement in our case over the near term. The second question is whether we can offer some commentary on the financing conditions tied to the most recent financing, for instance. And the third one concerns whether we expect any news on asset rotation in Spain.
Jose Arturo Diaz-Tejeiro Larranaga
executiveOn PPAs, yes, we're in negotiations with a number of PPA players. Our contract terms are at an advanced stage. And even from a pricing standpoint, I think we could say that we have — and as I've explained, we're going to take part, not at cheap prices, but we'll see. We'll watch how it evolves. But yes, we've negotiated. We've held discussions, and from a legal standpoint we've closed in terms of the contract. And yes, we could announce new PPA deals. On financing conditions, yes, the interest rate is rising, as you know. At the same time, on the price of electricity, remember that a few quarters ago we signed a PPA at a price in the 30s. Today, we're not talking about the 30s. Here, the key point is always the price of electricity. The final price at which you sell your product. And this is the key point for defining your IRR levels. And at the same time that the interest rate is rising, at the same time, the price of electricity has risen more in my view — I could say that at least we will maintain our IRR levels, at least. In some cases, I think we're going to achieve really good IRR levels.
Jose Arturo Diaz-Tejeiro Larranaga
executiveThe point we're making is that we'll at least keep our project level at 12%. That's a cautious outlook, though it's also very grounded in reality. On asset rotation, we're actively working on it. As I've said, the funds were necessary. We aim to secure the right price. Our position is comfortable, as I've noted. Many parties are interested in getting into this deal. We might deliver a pleasant surprise to the market, but our negotiating stance is comfortable. What that means from a pricing standpoint is that we could secure a solid, thorough price in any scenario. We closed the deal because we secured truly favorable pricing and terms, since we had to execute, and they need to execute on a timeline ahead of this date or this order. And we hold a very strong position along with new interconnection points, a new pipeline, and new capacity that will feed into our business plan, which is great. We're building, we're connecting. We're achieving very strong cash flow generation. Naturally, interest from third parties is exceptionally strong—not just in assets, but in pipeline assets, in the company, in anything—because, as we've explained on every call, people believe Europe's answer lies in renewables, and particularly in Solaria, and the image reflects that.
Jose Arturo Diaz-Tejeiro Larranaga
executiveAnd likely in the next quarter, this pressure and this idea will even earn positions. And naturally, we’re in a comfortable situation. Yes, we could deliver good news, but today Solaria is in a quiet position.
David Guengant
executiveOur next question comes from Philippe Patio <<inaudible>> and a few analysts. Could we get some clarity on the schedule for connecting the asset and the construction — is that by year-end or by February?
Jose Arturo Diaz-Tejeiro Larranaga
executiveSure — I believe I've already gone through this, but in theory, to give an example, I've said that the initial portion of Trio I referred to, San Andres, will be hooked up over the coming days and weeks. I can't give you the exact date, but it will happen before this year ends. And we're working hard and putting in effort to connect as much as we can — not because of some target we set, but obviously, the sooner we connect, the more money we'll bring in. And trust me, we're making serious efforts to connect before the end of the year — and not just before year-end, but before November ends. And we'll see. I'm optimistic on this. Yes. A certain number of megawatts will come online before this year is out. And I think we'll explain afterward how that plays out. No, I think it's something we'll cover fully at the February presentation. Right now, we're moving fast, building, putting in the work. In my view, all the markets don't expect us to deliver — they don't expect us to connect anything meaningful.
Jose Arturo Diaz-Tejeiro Larranaga
executiveBut I've already laid out my explanation. I've mentioned that likely a portion will be hooked up over the coming weeks, and then we'll see.
David Guengant
executiveEduardo Gonzalez from Banco Santander has the next question. Could you give us an update on where things stand with permitting and construction at Peralveche?
Jose Arturo Diaz-Tejeiro Larranaga
executivePeralveche, as you're aware, since we made the announcement a few weeks back — not in September, I believe. In September, we announced the environmental permit for Praveen's, which was essentially the final piece completed on the Trio project. And naturally, that's the portion of Trio that carries the longest delay, so to speak, from a permitting standpoint. The good news is that we've achieved it, and what we've gotten back, if you will, is something tied to that delay. Hopefully today, Perales, you know, it hinges on the same connection line, the same substation that the remaining parts of Trio depend on — from a general infrastructure perspective, that's something to be completed over the coming weeks. And from a construction standpoint, we have every piece of equipment. We have all the modules and all the equipment. And hopefully, we'll begin the physical construction — the electrical portion, if you will — within the next few weeks.
David Guengant
executiveOur next question comes from <<inaudible>>. Would we ever look at selling pipeline — this ties back to what Alberto Gandolfi at Goldman Sachs asked. With rates having gone up, do you believe you can still finance your growth purely through additional debt or by rotating some assets? Or is something more required, such as equity, for example?
Jose Arturo Diaz-Tejeiro Larranaga
executiveNo, selling pipeline is never going to happen. That is not how we see things. We could bring in strategic investors who join us at the outset on interesting projects — partners that would give us not just financial backing, which is welcome, but could also contribute something special. Obviously, as I said, we will get positive responses on new connection points. I think I'm not sharing every detail about these new connection points. I'm not telling you everything that could materially affect Solaria's P&L in the years ahead tied to these new connection points — we're excited about this. And of course, we could bring in partners or players. But it's still too early to say. No — at upcoming presentations, if we close something or sign a deal, we will inform the market right away. I know that answer as of now: we are not going to sell pipeline. We could bring in players holding minority stakes. They contribute something special to Solaria, beyond just financial backing, and regarding Solaria's future, our plan is to cover it with debt, as we said, and to rotate assets — not a massive asset rotation, because honestly I don't think that's necessary.
Jose Arturo Diaz-Tejeiro Larranaga
executiveLook, I realize that in renewables, firms in this sector typically are specialists at raising capital throughout the year and placing bonds or boosting equity. Our approach is to be extremely efficient on CapEx, aiming to cover it through a project finance structure. And naturally, we might rotate assets depending on financial backing, but also on strategic backing. Partners who could bring more to Solaria than just money. And on that point, yes, we could back the company's growth through debt and asset rotation.
David Guengant
executiveOur next question comes from Margarita Christiana at Citi, along with <<inaudible>> from Redburn. Could you share additional detail on CapEx and how it is evolving in 2023?
Jose Arturo Diaz-Tejeiro Larranaga
executiveFrom a CapEx standpoint, Solaria is probably always going to be the key player. We're among the most efficient players out there. And we're proving it, because, as I said in the previous question, every one of our theoretical competitors raised capital per year, and we need it. I think that's a good answer on CapEx. But when it comes to how our CapEx evolves, our projection after 20 years — because I read a lot of reports, I read a lot of information from all sorts of people, not speaking about solar CapEx, and Solaria has 20 years of experience — and we were positive, I think, that Solaria will be one of the most important revolutions for the world, because from a cost point of view, solar will be taking. And it's — today, we have achieved a really good level. We're at less than EUR 0.45 per watt. But I'm completely sure we're going to improve, and we're going to show this number, and probably not only Solaria — the global market. But in the coming quarters, to speak about the short term, we think that for 2023, we'll see a positive evolution on prices of models. We think the bottleneck, as I've explained, will be solved.
Jose Arturo Diaz-Tejeiro Larranaga
executiveI might describe it as soft, though more capacity coming from China will resolve that, and we're optimistic about how module prices will evolve in the market. That said, this is short term — interesting, probably for next quarter — but I'm not extremely focused on next quarter. My focus is extremely on next year. For me, as a global investor in Solaria rather than as CEO — as you know, my view is a global view, and for the field at Solaria it will be a revolution. CapEx will improve a lot over the coming quarters. And today, in my view, it hasn't got sense to discuss whether gas or solar renewable is better, because at the end of the day the best technology is solar. But if you add storage capacity, solar will be the king. And nobody is going to ask about what — which is the way. And one of the questions I usually talk about with the European Union — which is the gas oil to depend on third countries out of Europe — or the question will be when, because the question is solar is the answer.
David Guengant
executiveOur next question comes from Jorge Lonzo at Societe Generale. Is there anything more you can share about the German market and what <<inaudible>> intends to do? And the second one concerns OpEx — OpEx per megawatt, and how performance has evolved because of inflation.
Jose Arturo Diaz-Tejeiro Larranaga
executiveI think the new connection points we've announced are tied to Spain. In Spain, we hold a really strong position. And we're going to expand further. It's a market we dominate, or where we have a good position, so to speak. But Solaria's future growth is going to come from the European Union. As you know, Italy, Germany, Portugal. In Portugal, we have a good position. Italy is growing a lot. In 2023, we'll be talking a lot about Italy, Italy, because we'll begin construction in Italy. And Germany is one of the promising countries for us. We have a local team working there now. As always, we prefer to develop at the first-stage developed pipeline, not making too much noise, because it's a long-term philosophy. But in Germany, we are growing. It's a complicated country, but I love it. I think they love Solaria. They believe in Solaria, and we want to stay there. And Germany, Italy will give us strong good moments, so to speak — that's the future growth of the company. Always organic growth, always with our internal team, first-stage development pipeline, and the evolution of OpEx. Of course, more megawatts altogether at the same sites, same team for executing the maintenance label.
Jose Arturo Diaz-Tejeiro Larranaga
executiveIt's a fundamental principle, really straightforward, yet it works. -- additional megawatts sharing the same land, greater volume, improved cost. If I may put it this way, project IRR isn't a fixed snapshot of the situation. You've done this with this CapEx. Your project is — that isn't accurate. Project IRR could be enhanced even across all assets if you manage to lower your OpEx. As for OpEx today, it is -- we carry out the OpEx using an in-house team, like everything, because Solara's philosophy is to handle all the work with our internal team. And that same internal team delivers services for more megawatts at the same site. That's the overall idea behind OpEx today.
David Guengant
executiveVictor Peiro from GVC Gaesco has the final question. Solaria and other players are shifting a bit away from PPAs toward the market. So the question is, how does that square with the projection of a low price in the middle of the day going forward? Do you see that low price during those hours as credible? And do you remain skeptical about batteries?
Jose Arturo Diaz-Tejeiro Larranaga
executiveIt's hard to call it a low price—you'll see low prices around midday, or when there's a lot of solar. As you know, over the last 4 years, 3 years, I've heard plenty about this idea that solar prices will drop close to 0. I even recall a bank recommendation saying, "Arturo, in a few years"—that was 3 years ago. Now they advise selling your company, because in 3 years the price of electricity will go to value generation, which will come from Russia, the Middle East—but here in Europe, we don't—we have no need for generation. That's a stupid idea. But of course, unfortunately, today we're having to manage inflation and interest rates. At the end of the day, today interest rates moved in line with inflation, and inflation, unfortunately, depends heavily on the price of electricity. I don't see the normal volume of megawatts that was promised a few years ago entering the system. I don't see a normal volume of gigawatts of solar all entering at the same hour onto the system, unfortunately. Unfortunately, today we have a crisis around the price of electricity, and that's something we at Solaria are making a strong effort on to try to be part of the solution, but we need more people and more gigawatts.
Jose Arturo Diaz-Tejeiro Larranaga
executiveIt's still premature to claim that at 3:00 in the afternoon you'll see an electricity price of 0 storage. My position hasn't changed. I believe I've had extensive discussions with the European Union on this matter. It's comparable to hydrogen and other technologies. Hydrogen survives and hydrogen will expand, since we're going to get robust backing from the European Union founded on hydrogen technology. At the same time, hydrogen technology won't endure because it isn't efficient. As we see it today, storage relies on European Union support. One of the messages — and I'll be traveling to Brussels next week — one of the messages I'm discussing with the European Union is that if they wish to develop their own energy serially within Europe, they must develop storage. They must set aside funds that we'll deploy on a storage basis — not because we're going to improve price, not because we're going to improve price from 3:00 in the afternoon to 9:00, but because we need to deliver a global solution to consumers, and solar could serve as a global solution for consumers. Storage forms part of that solution. And my intention, and in all of our talks with the European Union, one of the key points is typically to back the growth of storage in Europe so as to give consumers a global solution linked with solar.
Jose Arturo Diaz-Tejeiro Larranaga
executiveSupporting hydrogen makes sense — it's a great area — but you shouldn't put additional money into gas technologies coming from outside Europe, from foreign nations that are at times not very friendly toward the European Union. In my view that's not a wise idea; as you've seen, the effort should go toward your own technology.
David Guengant
executiveI’m referring to the final question, which came from Manuel Palomo at BNP, and which also ties into what another analyst asked about permitting. For the industry, permitting looks like a major bottleneck. Has our government already adopted an effective step aimed at genuinely accelerating renewable installation? And perhaps, for this question — there’s also a question arising from the rumor about a new EU regulation that might be approved in Europe within the coming weeks.
Jose Arturo Diaz-Tejeiro Larranaga
executiveOn that point, yes, the European Union does have a draft tied to certain enhancements in environmental permits that might ease the permitting bottleneck. As I said, next week I'll be going to Brussels and to the European Union to look at the details. And we've talked about this extensively with them over the last month. And naturally, they've grasped that if they intend to install solar at massive scale, if they intend to find serious answers to the European Union's energy problem, they have to approve something capable of backing a fast track, so to speak, on the permitting side. And yet, we'll see. I'm aware they have a draft, but we'll see, we'll see. Either way, we must live with the current situation. In the current situation, I believe that despite delays — and you're familiar with the situation over the last 3 years, with delays — we are hitting our targets, and we're extremely optimistic regarding our global target of 2025 and our global target of 2030. And I think that under the current situation we're living in, we're getting results. But clearly, any kind of support would be more than appreciated.
Jose Arturo Diaz-Tejeiro Larranaga
executiveRegarding the European Union, I'm aware they'll be approving something within the coming weeks. And since it's public, an announcement was made a few weeks back, or a few days back. We're also in discussions with European authorities concerning the specifics of this new law. And we'll see, since it's a new law. It should be — not should be, must be — implemented by every country in the European Union, but we'll see.
David Guengant
executiveThanks. Many thanks to everyone, and thank you, Arturo, and thanks to all of us for joining this conference call. As you're aware, you're always welcome to reach out if you have additional questions, and we'll be glad to respond to each of you. Arturo, I'm not sure — perhaps you'd like to say a final word.
Jose Arturo Diaz-Tejeiro Larranaga
executiveI appreciate the call and your attention, as always. I think we're at a genuinely strong point for Solaria right now. As I've laid out for Solaria, next year is going to be excellent, and at this stage — you know I don't speak as the company's CEO; I've told you I usually sound like an investor in the company — we're tremendously excited about what lies ahead for the company. In my view, every bit of the bad news now belongs to Solaria's past history. Going forward, plenty of truly good news is coming. Thanks for your attention, and with regard to any questions you may have, you know that David and our Investor Relations department are always available to respond and to clarify. Many thanks.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Solaria Energía y Medio Ambiente, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Solaria Energía y Medio Ambiente, S.A. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Solaria Energía y Medio Ambiente, S.A. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.