Solaria Energía y Medio Ambiente, S.A. (SLR) Earnings Call Transcript & Summary

May 4, 2023

Bolsa de Madrid ES Utilities Independent Power and Renewable Electricity Producers earnings 50 min

Earnings Call Speaker Segments

David Guengant

executive
#1

Good afternoon, everyone, and welcome to the Solaria 2023 First Quarter Result Webcast. I'm David Guengant, and I serve as Head of IR at Solaria. Joining me today is Arturo Diaz-Tejeiro Larranaga, our Chief Executive Officer. On this call, we'll talk about our business outlook and make forward-looking statements. Those comments rest on our predictions and expectations as of today. In this presentation, we'll start with an overview of the results and the main development during last quarter, given by our CEO, Arturo. After that, we'll move on to the Q&A session. <<operator_script>> Thanks again very much, and I'll now hand the word over to Arturo.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#2

Thanks, David, and thanks to all of you for being on this conference call. I hope everyone and your families are staying healthy and well. We'll begin by walking through the key figures from our first quarter 2023 results, and as usual we'll move very quickly, then go to the Q&A session. Naturally, we keep up strong growth. Our figures — every one of our figures keeps rising: production, sales, revenues, EBITDA, net profit. It matters to point out that in this quarter we increased a great deal on the production side, by more than 50%. At the same time, we took a hit. Comparing the first quarter of 2023 with the first quarter of 2022, we took a hit from a lower average electricity price. And on sales — we raised our sales by 16%, though by less than production, and that's because of the average electricity price. Total revenue is up 23%. That's meaningful, as with EBITDA and net profit. Same story on EBITDA. Our EBITDA figure keeps climbing. We went past EUR 40 million, and we delivered EUR 25 million in net profit. Capacity also keeps expanding. As you know, we have a huge amount under construction.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#3

And we wrapped up the first quarter with over 1.5 gigawatts of PV capacity hooked up to the grid. This year we'll keep rolling out our construction plan, and particularly during the latter portion of 2023, 2024, and 2025, we're going to hit rush hour when it comes to building new megawatts, and we're staying on track with our plan to reach 6.5 gigawatts by the close of 2025. Naturally, as I said, right now we have 1.5 gigawatts connected to the grid. With luck, we'll close out this year above 2,000 megawatts. With that figure, we'd likely be the leader across the Iberia region in terms of megawatts hooked up to the grid. And we're continuing with our plan to end 2025 with 6.2 gigawatts connected to the grid. That's exponential growth, and it will keep going through 2024, 2025, and beyond. Naturally, as I noted, over 50% growth in our production. Clearly, the new assets in operation are delivering results, and at the same time, sales are up 6%. I won't go over it again, but the average price, compared with 2022, we've seen a decline in the average price, roughly a 34% reduction. That's why our sales aren't growing the way our production is.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#4

On the positive side, infrastructure revenues are growing. We've secured over EUR 8 million in results coming from the infrastructure division. Why is that? Because in this market today, from the standpoint of competitors and players, we're moving away from a crowded market — many companies want to develop or connect installations to the grid. And obviously, with more competitors, more players trying to connect, we see more results in our infrastructure division, since more people need to use, or are obligated to use, our substation or our grid. CapEx is one of the key points here. And obviously, in the years ahead, we will significantly increase our CapEx and our investments. If you look at the numbers for 2020, 2021, 2022, 2023, the growth is incredible. We're investing a lot of money. We maintain our philosophy of being extremely efficient from a CapEx and OpEx perspective. That's one of the key points, and we'll discuss it during this conference call. But one of the key points in this business is maintaining really good levels of CapEx and really good levels of OpEx. It's the key point of our business. As you know, interest rates are rising, which obviously is something that could affect your IRR levels.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#5

The main thing, though, is always being the most efficient player when it comes to CapEx. And naturally, as I said, we're now past the rush hour on the construction side and in executing our business plan. And clearly, that's something visible in the numbers, in the figures here when it comes to millions of investment. Cash flow. We're holding cash at the same level we ended 2022 with, and our philosophy is as we've explained on every one of our conference calls. We cover all of our CapEx through project finance. At times, when we close the quarter, some bank payments are delayed. And at times, we have fluctuations in — always around EUR 150 million, EUR 100 million, EUR 140 million, EUR 130 million of cash that we hold. And depending on when the banks pay, it will land in April or with a delay of 1 month or something like that. But ultimately, we stick with the same philosophy of covering all of our CapEx through a project finance structure with that, and this matters a great deal to us. As you know, one of the key things we announced a few months back is that we've closed a deal with the European Investment Bank for EUR 1.7 billion that will cover our project finance over the coming years.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#6

And naturally, we'll walk through this during the presentation, but our approach stays the same: we fund all of our CapEx through a project finance structure. That matters a lot, particularly right now when interest rates are high. Nonrecourse debt makes up 96% of our debt. The average cost of debt sits at 3.1%. In our view, that's reasonable. The debt has a 20-year lifetime, which in our view is a solid, sensible project finance structure, and it's one of the core elements of our strategy. Our financial position is healthy. And likely, with the connections we're going to complete over the coming quarters, we'll further improve our net financial debt ratio versus EBITDA, because more assets operating means more assets producing cash and, obviously, more assets producing EBITDA. And over the course of 2023, we will see that ratio come down. It's worth noting — to announce that we have closed the European Investment Bank deal, as we said a few weeks — a few months back. That will cover 50% of the project finance we plan to raise across 2023, 2024 and 2025. Likely in July or June, we will announce a new deal for 1.1 gigawatts that will cover new investment we're going to make during 2023.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#7

Our structure is going to be 50% European Investment Bank and 50% other players that are now taking part in the tender process. Naturally, as you're aware, during that period, especially after January, we've gotten a lot of important news regarding authorization and permitting. In my view, permitting processes these days aren't a big deal. It's like this problem has been solved by us. We've obtained a normal volume of different authorization. From the environmental standpoint, we get full successful, and all the environmental permits have been obtained by us. And additional steps have been done, and we're now in the final part of this long travel that we began a few years ago. The last part is to obtain the construction permitting process, the final construction permit. And it's something that we have -- will happen, and we will receive in the next 2, 3 months. It's like no surprise. We will receive full permitting process for construction, and it will happen before the end probably of July and according with law approved by the government 2 years ago. And all the targets that we defined 2 years, 3 years ago are going to be achieved by us. And we will have more than 4.5 gigawatts approved that needs to be connected before the end of June 2025.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#8

Regarding our construction schedule, I believe the positive takeaway today—especially when you compare it to our presentations from prior quarters and even last year—is that we now have strong visibility into our pipeline. As you know, one of the main challenges was the bottleneck tied to the permitting process, and we can say that it has been resolved. That issue will be fully solved in 2 months, but this matters a great deal because today we are intensely focused on construction, on R&D efforts, and on the generation business, and the paper was planned for the Q&A session and during this presentation, but the first point we need to explain properly—and that it's important to grasp—is that Solaria is not a utility company. Solaria is an infrastructure company that manages and constructs infrastructure and maintains the company's balance sheet over the next 25, 30 years. Our philosophy is to be an infrastructure player. We have a huge volume of PPAs signed with various players, Tier 1 players. Solaria probably began signing a PPA a few years ago. I recall with Repsol, and we have signed with all the key players in Europe. I think that, today, the merchant position versus PPA is something close to 70—or 65-35.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#9

We plan to wrap up at a 70-30 split, then shift in 2024 to 75-25 — 75% under PPA, 25% merchant. And we believe today's pricing, if you set it against 2022 or 2021 from a PPA standpoint, beats what was available 1 year or 2 years back; there are simply more participants now, not just utilities or oil companies. Nowadays you have end consumers wanting to sign PPAs, and they're bidding higher prices than the established players, the traditional energy companies. And naturally, we'll likely announce — as I've said on other calls, we're a patient company. We want the ideal price and the ideal terms, but we will announce fresh deals over the medium and short term. As of today, a substantial volume sits covered by PPA, over 1.6 gigawatts, and we'll keep signing PPA deals. Naturally, tax credits matter enormously to us since the company is producing profits. And clearly, our aim is to pay fewer taxes or at minimum a limited amount of taxes. And this is enormously important. That's one of the reasons we invested in the Basque Country. And today, we have over 2 gigawatts under development in the Basque Country.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#10

A key factor is that they've passed legislation granting certain tax benefits for renewable investments in that region. And in our first project signed with the Basque Country government, they're stakeholders — they hold shares in the company, Indarberri, 30% of the shares; the owner is in the Ente Vasco Energía, the Basque Country government. They've recognized a tax advantage based on EUR 1 per watt. It's as if they've recognized EUR 30 million in tax credits. And our estimate going forward for the 2 gigawatts we're going to develop — it's hard to state precisely, but likely around 30% of the CapEx that will be invested or at minimum that will be recognized. It's hard to say exactly, but we've put an estimate on this slide ranging from EUR 190 million to EUR 400 million. It's an enormous value that we're going to create for the company's shareholders. Ultimately, I view this as a subsidy on the asset's CapEx. When you get a tax advantage, it's like a subsidy, a direct subsidiary that you receive on your investments in the PV asset.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#11

It's as if you lowered CapEx when all is said and done. We've put this in since, from where we sit, it's among the reasons we're currently putting money into new developments in northern Spain. This slide matters a great deal, particularly, as I mentioned, given all the chatter, rumors, and jitters surrounding the solar price outlook, where we stand — where things will land is hard to predict, because after 20 years in this business, I've now heard plenty regarding — plenty regarding coming calamities on prices. And naturally. That chatter is constantly on the table concerning solar price scenarios. As we see it, being the most efficient participant on CapEx and from an OpEx standpoint, plus securing the finest project finance structure, is crucial for us, since if you're highly efficient, clearly, even under the worst case, under the worst solar price scenario, you can produce cash. You can produce solid IRR levels. We've laid out 3 scenarios here, among them a cost of EUR 0.45 per watt. That's above Solaria's current cost, yet I consider it reasonable.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#12

The slide shows every assumption we used — reasonable, I believe: PPA prices below where we're trading now, tax under our tax advantage, load factor. All the scenarios we've laid out here are, I think, extremely reasonable. In the worst case, with electricity prices at EUR 25 and no inflation effect — inflation in that worst case is 0 — our project IRR comes to 11.4%. The medium case could be 13.1%. A reasonable case could be 15.5% — acceptable numbers for us, because, as we've always said, we invest in projects when we get a project IRR of 12%. Even under the worst-case scenario, we could say we'll reach that project IRR level. Honestly, in my view, EUR 25 with no inflation for the next year is not a realistic price scenario, but it's the lower scenario we've put in the slide. This is a resilient business model, tied especially to our OpEx and CapEx. My comment, obviously, is that if you lack this CapEx and you lack this OpEx — and some of our competitors today have CapEx of EUR 1 per watt or even more, some of them, with OpEx that isn't competitive — this project IRR changes completely.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#13

So in this case, I believe a lot of players who aren't involved or aren't professional in the solar energy market will probably reconsider. They have to ask themselves whether entering the solar energy market is a good investment. I have serious doubts about the 40 gigawatts that everyone says will be developed and built over the next 2 years, and whether those projects will obtain project finance. If you assume a CapEx of EUR 0.8 or EUR 1, that works out to something like EUR 40 billion in project finance coming over the next 2 years. And people with no construction experience, no experience signing PPAs, no experience securing project finance, they're going to build flawlessly over the next 2 years. I don't believe it. But as of today, this possible scenario is on the table. We'll see, because it's something that will play out over the coming quarters, and we'll watch how the solar market evolves. Naturally, this is something we've worked on over the last 2 years. It isn't anything new, storage and batteries. The European Union, as you know, wants to focus on this, wants to provide subsidies, and wants to push batteries.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#14

And the storage market is essential. I think that's what they need to do. We've developed 6 R&D innovation projects — innovative projects tied to batteries that could boost our numbers, because ultimately, the battery works like this: when you shift electricity from 5 or 4:00 to 6, 7:00, in theory you'll get a higher price, better prices, since there are fewer solar players and better conditions, ultimately, from the consumption standpoint, the electricity prices standpoint. We'll begin installing these batteries probably in the second half of 2023 and throughout 2024. And it's extremely simple. I think that covers intelligence — artificial intelligence and other applications — but this technology isn't complicated. And we're working on it right now, and we'll execute during 2023, 2024. Of course, in September, we'll talk. We'll arrange a solar strategic update. That's important because one of the key points in our strategy, as you know, is the company's international development. We're in Portugal now, but we're going to expand our activities in Portugal, though it's important to talk about Germany and Italy — new markets.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#15

For us, this isn’t new, since we’ve been working on it for a long time, but we need to share news. We need to explain how our diversification process is going, and we need to discuss new developments for the company outside Spain. I could say — I can say today that in Spain, we are the leader. We hold a strong position. The business plan will be finished during — as I’ve mentioned, over recent years, the key point in our presentation was always, of course, execution of the business plan, paperwork — bottleneck and paperwork. Today, I believe we aren’t worried about that. Execution will happen, and the paperwork issue has been resolved. Spain, I could say we are the leader. We will keep a really good position going forward, and that’s fine for us. New targets should be linked — must be linked to places outside Spain, to Italy, to Germany and other countries. This diversification will deliver a lot of value to Solaria’s shareholders. Of course, if you’d like, I’ll now pass the floor to David, and we’ll begin with the Q&A.

David Guengant

executive
#16

Thanks, Arturo. I'll now begin the Q&A portion. And thank you again for making time for this. We'll allow 1 minute for you to review your questions. Our first question comes from Ignacio Doménech at JB Capital. Ignacio first asks what requirements need to be met to qualify for the tax credit in Spain across the next 4 years. His second question is when we might expect news on a PPA for capacity that will be completed in 2023 and 2024. The third question concerns the average solar price assumed in the scenario in our presentation. Perhaps I'll take that one. The central scenario is 49. The low scenario with CPI is 38, and the worst-case scenario is 29, okay, that's the average price. And the final question is whether we have any updates on a potential asset rotation.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#17

On the requirements you need to meet to be eligible for those tax credits, my understanding is that a law has already been passed by the Basque Country. And once you carry out the project, you get the tax credit. There's no selection process involved, nothing where you have to take part or show up or anything of that kind. No — if the project is executed, the tax credit comes to you. It was legislation approved, I can't recall exactly, 2, or 3 years back. As for the PPA, when will it be complete? Soon. Hard to pin down, but soon. Soon could mean the short term, but soon. Negotiations are underway. We're tracking the market. We're watching how prices move. We're not anxious, since we have plenty of PPAs signed, and all at once we could announce something covering a significant share of our future backlog. But soon — it's hard to say next week, next month, or whenever. No, I'd rather just say soon. On average solar PV prices, I believe, David, you've laid out various scenarios. Predicting the price and how electricity prices will evolve is tough — scenarios for the Spanish market 5 years or 6 years out are complicated to forecast — but we're working with technical and financial advisers who are active in the market.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#18

On the question of possible asset rotation, there are a number of alternatives we're currently examining that we could potentially finalize. Yet, as I've consistently stated, there's no requirement for us to finalize quickly, since we don't need the cash for this. Our attention is on the construction. Our attention is on advancing our paperwork in new countries. And naturally, we could finalize strategic agreements with partners capable of supporting us going forward, and that might involve asset rotation of at least a percentage of our assets. However, I can't specify 1 month or any particular timing. I'd rather say this is something we are actively doing.

David Guengant

executive
#19

Moving to the next question, which comes from Eduardo González Martín at Banco Santander. He first asks what remuneration scheme we expect to finalize for the megawatts that are still awaiting final administrative authorization by the end of July. His second question is whether, following the drop in the pool price in Iberia, our PPA price remains in the mid-40s.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#20

Like we've said before, the goal on closing is 75% with PPA and 25% on a merchant basis. At present, that mix isn't what we hold — it sits near 65-35. We'll land at 70-30, and we intend to keep following this approach. Pinpointing whether it's exactly 70%, 75%, or 65% is hard, but roughly, that's the figure. And PPA prices matter here. Explaining price declines is tricky — whether that touches PPAs or not. It doesn't, actually, because those who know the market and negotiate PPAs understand that in April you might see prices drop, and likely in July, with air conditioning running, you could see a huge price jump, since summer is coming and with summer, sadly, there's no wind. Sadly, the situation for the hydraulic park is extremely difficult — not easy. Sadly, in Spain we're enduring a tough situation where rainwater is concerned, and you've only got gas and solar. Sadly, solar can't cover all the consumption that will come with air conditioning and other uses. We'll watch how merchants evolve, particularly over the summer. Seeing price evolution tied to just 1 month is complicated.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#21

But those of you involved in PPAs are aware of this, since you're relying on price projections derived from the year's average prices. And right now, we're reaching comparable price levels.

David Guengant

executive
#22

We'll now take questions from Fernando Lafuente at Alantra. His first question is: what's our estimate for infra revenue across the full year? The second one concerns CapEx. How is CapEx trending in the first quarter? And what do we expect for the remainder of the year?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#23

For us, infrastructure is really hard to forecast, since it's tied to — we're in a crowded environment around renewables, not just solar and wind, with plenty of players wanting to develop, build, and connect PV or wind assets, and obviously that brings us benefits in the infrastructure space. But we'll watch how this situation evolves in Spain. In theory, if final construction approval comes through in 2 months — not just Solaria, many different players — we'll get more players who need to connect installations, who need to use our substation or our grid, and this business could grow. Still, predicting the next moves is extremely difficult for us. This market is crazy. You have many players who, in theory, are developing projects. But honestly, I don't believe they will execute, and building a business plan around that kind of player could be a mistake, because they're probably sellers, not constructors. They have no interest in the construction process or in the asset. All they want is to sell paperwork. Honestly, in my view, buying paperwork today is extremely risky — more than a few months ago, more than a few years ago — because you're entering the rush hour, 2 years for connecting.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#24

Acquiring paperwork today is extremely risky. I think smart players aren't going to buy a pipeline, and we'll see how the market evolves. CapEx and where CapEx stands. Our intention is to remain below EUR 0.4 per watt. That's one of the key points. To be efficient given project finance interest rates rising and the global interest rate situation rising, I think our job is to be efficient. CapEx is the critical point.

David Guengant

executive
#25

Alberto Gandolfi from Goldman Sachs has the next question. There are many questions about PPAs. I believe Arturo has already responded to that — today the split is 65% and 35%. We could end the year at 70-30, and in 2024 we could be at 75% and 25%. Alberto's second question asks whether we remain comfortable with our capital structure or whether we need more funding from shareholders. The third question is how the administrative approval of those 4 gigawatts with environmental payment is progressing — is it still on track for late July?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#26

Sure — on capital structure, since with PPA we've already responded, I'd say 70-30 is a sensible level for us. It could shift to 75-25 or roughly that, but it's a solid blend and fits what we intend, which is to remain near those figures. Regarding capital structure, we won't be raising capital, as we've consistently said. In my opinion, my position ought to grow, though that's my own personal mission. I should — or rather, from my perspective, this is a good moment to substantially enlarge my personal stake in the company, but I don't think that ties to your question. And on where things stand with administrative approval, within 2 months, I believe we'll get the complete set of construction permitting processes. Roughly 2 months from now, you'll have 4.5 gigawatts fully approved and ready for construction from a civil works standpoint. That's about 4.5 gigawatts. It hinges solely on our work, on our construction effort, and it's the last step, and it will take place in 2 months, ahead of the end of July.

David Guengant

executive
#27

Our next question comes from Philippe Ourpatian at ODDO. Could you share some detail on the German land acquisition or the German project?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#28

On Germany and Italy, I believe I'd rather hold off until the September CMD. We're putting money and effort into growing the company in both of those countries. That, I think, is the finest diversification we can carry out right now — Europe, and specifically both nations, Italy and Germany. Money and effort are going in. The whole company is concentrated on expanding internationally. As I've said, Spain worries us, but Spain is finished, and we have a solid quantity of megawatts there, decent growth, particularly what's set to come out of Basque Country. Still, I think growth within Spain is reasonable. The growth ahead will come from Germany and Italy. Come September, we'll lay out the project's name, the situation, where we stand, our construction plan and how many gigawatts. Both countries, I think, offer a genuinely good setup for solar expansion, and we'll be present there.

David Guengant

executive
#29

Our next question comes from Naish Cui at Barclays and Manuel Palomo at BNP Exane, and it concerns how many megawatts we need to deliver through the end of 2025. So the question is this: the capacity increase between June 2025 and the close of 2025 is enormous — 1.7 gigawatts over 6 months. Could you give us some color on that?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#30

You need to grasp that 1.7 isn't a case where you begin and wrap up within 6 months. A number of these projects — we're actively carrying some out right now. This is something we laid out on every one of our calls. We begin buying equipment. At times we kick off with building the substation, the grid, which consumes considerable time and effort. And in some cases, we've devoted 6 months to putting up substations and grid tied to the project. After that we move into civil works. Typically a project such as Garoña or Villaviciosa means we spend 18 months, or even 20 months, on construction — not just civil works construction, but the overall construction process. And across our entire pipeline today, the 4.5 gigawatts we refer to, every one of them, we're currently procuring equipment. We're developing substations, and not only Solaria. We've signed contracts with, say, Red Electrica to build the substation, and we've made payments tied to this 4.5 gigawatts, and they're now executing substations linked to that 4.5 gigawatts of pipeline. It isn't a matter of starting in June and finishing in December. That's not quite how it works.

David Guengant

executive
#31

Our next question comes from Manuel Palomo at BNP Exane. Since other revenue and infra revenue carry meaningful weight in your EBITDA, could you give us some guidance on those 2 drivers? Manuel's second question concerns the cost and return drivers in the storage project.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#32

On guidance, my preference is to provide a company-wide figure for the 2023 year. EUR 195 million, I believe, is where consensus sits for EBITDA, and that number works for us. It captures everything, since separating infrastructure from generation isn't straightforward. I'd say we have a solid sense of which players will draw on our infrastructure over the coming quarter, though talks with them are still underway. It's also important to grasp that price isn't tied to cost. Pinpointing what some new players will pay for a connection is hard to state precisely. A lot of factors come into play. Still, as a company-wide guideline, EUR 195 million is a figure we're comfortable with. The second point concerns what storage projects return. Storage cost hinges on how many hours you intend to cover — 1 hour, 2 hours, 3 hours. You could lay out every sort of scenario. Say you wish to shift electricity from 6 p.m. to 11 p.m. Then you must hold it in the battery and <<inaudible>> that electricity across the following 5 hours, and no longer.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#33

It's kind of like it's more expensive. But to give you a general sense, the cost we've baked into our projects — the approximate cost we've built into the projects that are waiting on some subsidies from the European Union — is EUR 0.35 per watt for a total cost, meaning the overall CapEx tied to batteries plus every component tied to batteries, the battery application. As you know, the Spanish government set up a tender process — not a tender, a subsidy program tied to projects. They're reviewing the projects right now. And hopefully, before this half ends, we'll get a final answer from the Spanish government. I think we've tried to set aside a good amount of money. I don't remember. It's EUR 30 million or something like that, EUR 30 million that could come in subsidy form from the Spanish government tied to batteries. We'll see.

David Guengant

executive
#34

We have the next questions from Henry Tarr at Berenberg and Margherita Cristiana Sponza at Citi. Could you perhaps provide a bit more detail on the tax credit? In what manner and at what point will that tax credit be recognized? And should we take into account any restriction that applies to a Basque project?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#35

You'll see that recognition once those projects get executed. The first one is the 100 megawatts we announced, the one we have together with the Basque Country government, and that recognition will land during 2023 and 2024. The remaining capacity, close to 2 gigawatts, will come in 2024, 2025 and probably 2026. That's a huge sum of money, because when you consider EUR 1 per watt, it's enormous — the total could exceed EUR 400 million, which is exactly why we're extremely keen on this investment. As for our new projects, remember we secured the connection point a few months back. I believe we announced it in November. Essentially, we've now kicked off the process. We're going to spend 2 years or 3 years on it. But you'll likely see — tied into our P&L, you'll see tax credit tied in during 2023, 2024, 2025, 2026.

David Guengant

executive
#36

Our next question comes from Fernando Garcia at RBC, and also from Jorge Alonso Suils at Societe, about an update on asset rotation — if you could give us a bit of an update on possible asset rotation.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#37

Yes, this is a point we've brought up on every one of our conference calls. Asset rotation is a possibility—it's something we've always kept on the table. It could happen, and we've looked into 3 different kinds of asset rotation. The first, and to my mind the most appealing, is asset rotation in the Basque Country area, since, as you know, we've done that before, and we currently have 2 gigawatts there. For me, the top priority is to rotate that asset. But discussions are still ongoing. It's a huge volume, and we'll see, because it brings an extra benefit that isn't tied only to money and financial return. A second option could be rotating 30% of the shares in some assets. We have certain funds that are extremely interested in this, and the price is good. And of course, we haven't made a decision to move ahead with this, but it remains a possibility. And the other one is selling an asset—a complete asset, a full complete asset. We have strong interest from plenty of players who want to acquire full assets, and of course. But in my mind, if I could choose, I'd pick the Basque Country option, and that's what we're focused on.

David Guengant

executive
#38

Our next question comes from Jorge Alonso at Societe Generale. He asks how attractive the economics of battery are, and how battery will be financed. Banks will only do project financing for battery if they receive regulated revenues.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#39

For banks nowadays, it’s comparable to trackers. It’s a component you attach to the installation, and you end up with something extra. Think of it as a tracker. Naturally, the CapEx looks like this, and you’ll see improvement according to price projections. You’ll gain a few euros. Your electricity rate is favorable, and the return works out like this. And it matters to grasp that, for instance, if we get the subsidies we’ve submitted to the government, they’ll cover nearly the entire battery cost. It’s as if you don’t need to arrange project finance, since subsidies will handle that. The government keeps discussing capacity payments, and that’s something on their agenda—not just Spain’s government, but the European Union’s as well. And they’ll likely approve something tied to capacity payment down the road. They bring this up constantly. You’re aware that they’ll even pass a fresh scheme of subsidies and incentives focused on batteries and storage, and we’ll see, but capacity payment might come through.

David Guengant

executive
#40

Perhaps just one final question here, coming from Henry Tarr at Berenberg. At this point, has the EIB financing already been fully agreed?

Jose Arturo Diaz-Tejeiro Larranaga

executive
#41

Right. The crucial thing about the EIB is that across all of our project finance they will cover 50% of the entire deal, and we've got the term sheet agreed with them. What matters now is the remaining portion — that other 50%. Naturally, hitting European Investment Bank pricing isn't simple for commercial banks, and we're doing everything we can to bring in banks that could remain at rates close to those of the European Investment Bank. That's solid backing, a real plus here, that you have a great uncle covering a significant share of our upcoming deals, and for that reason the success is assured. Now the matter is price, and we're working to secure the best one. Frankly, as of today we don't foresee major difficulties in raising project finance. Plenty of players are eager to come in — banks, institutional investors. In July, June, we'll announce a new deal for 1.1 gigawatts. The essential issue here is the price, the final price we manage to get, and we're pushing hard to land the best price, since ultimately that is what will determine our project IRR.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#42

You can rely on us because previously, I believe we've shown that we can secure very solid project finance on very favorable terms. We're highly appealing to every international player. And I believe we'll obtain very favorable terms tied to our project finance.

David Guengant

executive
#43

Thanks for being on today's call, and I'll hand things over to Arturo to wrap us up. Thank you.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#44

Thank you so much for joining this conference call. I believe the closing takeaway is this — I realize the market right now is likely paying more attention to the electricity price. It's paying more attention to interest rates. As I said a few quarters back, the market was highly focused on how we execute our plan. These days, our execution plan isn't an issue. And I believe every market is going to acknowledge that. Over the coming quarters, you're going to see a huge number of megawatts get connected and get executed. It's just like the execution plan in Spain. It doesn't matter. It sounds aggressive, but that's the actual situation. Within a few months, it won't be a problem. And I'm entirely certain that price and interest rates in the coming quarters — this noise we're seeing in the market today — will fade, because we're going to add batteries. We're going to sign PPAs, and we'll keep going with our business model. That model rests on CapEx, OpEx, good prices, good conditions, and being an extremely efficient infrastructure player. I think Solaria today is probably the best platform in Europe for solar and probably for renewables as well.

Jose Arturo Diaz-Tejeiro Larranaga

executive
#45

I believe we have a genuinely strong pipeline across Spain, Portugal, Italy, and Germany, and we'll lay that out in September. That said, I get that the market is jittery for separate reasons. What we need to do is offer reassurance, provide a sense of security, and keep walking people through our business plan and why it's advantageous. And my role is to keep buying shares, and hopefully we'll shift the current climate of chatter and everything else that has the market on edge. Thank you, and have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Solaria Energía y Medio Ambiente, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Solaria Energía y Medio Ambiente, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Solaria Energía y Medio Ambiente, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.