David Guengant

executive
#1

Good afternoon, everyone, and welcome to the Solaria 2024 Annual Results Webcast. I'm David Guengant, Head of IR at Solaria, and with me today is Arturo Díaz-Tejeiro Larrañaga, our Chief Executive Officer. On this call, we'll go over our business outlook and make forward-looking statements. Those comments rest on our predictions and expectations as of today. In this presentation, we'll start with an overview of the results and the main developments during this period, delivered by our CEO, Arturo, and after that, we'll move on to the Q&A session. I'd also like to remind you that all your questions have to be submitted via the web. Thank you very much, and I'll now hand the word over to Arturo.

Arturo Díaz-Tejeiro Larrañaga

executive
#2

Thanks, David, and I appreciate everyone being on the conference call. As usual, we'll move quickly through the presentation and then get to the Q&A session. Naturally, we have the first slide, this new era of growth, since I believe Solaria, as you're aware, is shifting its business model. At this point we're engaged not just in the generation business, in solar and wind generation. We're taking our business into other areas, other new developments, real estate tied to renewables, energy, and the data center business. That's one of the essential elements of our future strategy over the coming five years. We'll begin, and we'll walk you through it. First, the results, more than EUR 200 million of EBITDA, and I believe we delivered on all the financial figures we communicated to the market in earlier results presentations. We're holding and even raising certain figures such as EBITDA. As you know, last year was extremely difficult when it came to the price of electricity, and that clearly has had an impact on our numbers. Yet even with this hopeful situation on the pricing side, we've held and even grown revenues and EBITDA figures.

Arturo Díaz-Tejeiro Larrañaga

executive
#3

And EBITDA came in above EUR 200 million for us. That's a solid figure, and it lines up with what we had projected. For 2025, we're reaffirming our EBITDA target, and we'll try to give you more visibility on that target during this call. But we've set the EBITDA target for 2025 at between 245 and 255. On energy, we keep building. We're in a rush hour when it comes to construction. As you know, we're currently involved in building more than 1.5 gigawatts of capacity, with a particular focus on Spain. And in the short term, during this quarter, we're going to add other gigawatts on top of that. Today we have more than 3.1 gigawatts of capacity ready to build, and we'll begin construction soon during this year, probably. It's like, globally, Solaria, probably in one year and a half, we'll have a completely different picture of the company, the situation and the picture of the company, with several gigawatts up and running and connected to the grid. Probably we'll be the global leader in Europe from a solar standpoint, and especially, obviously, in the Iberia region. We're continuing with our hybridization strategy involving wind and batteries. Today in Iberia, from a wind standpoint, we have a global portfolio of 2.2 gigawatts, and we'll start construction in the coming years, and we're going to combine that with the solar technology we've built at these connection points.

Arturo Díaz-Tejeiro Larrañaga

executive
#4

At the same time, we're putting money to work, investing in battery development and in inclusion. Across all our projects—particularly in Spain—we want batteries and wind included. It's a worldwide mix of technologies that will provide substantial support, above all when it comes to supplying electricity to end customers. Business, the new business we've launched, which we explained on a previous conference call: Genergia. With a U.S. infrastructure fund, we've signed a pre-agreement that will cover a capital increase within Genergia of EUR 125 million. That basically guarantees this company's growth in full. As you know, the assets we hold inside Genergia today are full equity. For the 50%, we're going to get a cash position of EUR 125 million, and we'll pair that with debt that we'll add to Genergia. In the coming two, three years, we believe growth in this part of the company will be incredible. We're extremely excited about this new company we created two or three years ago, but at last we're getting results, and around energy we'll see strong growth over the next three years.

Arturo Díaz-Tejeiro Larrañaga

executive
#5

When it comes to data centers in Europe right now, everyone is discussing them—the expansion of data centers and the huge demand that data center operators will create. Solaria is likely the leader, or among the top companies in Europe tied to data centers. We have many demand points, and we'll go through that in the presentation. Naturally, the figures—as I said—we raised output and we raised sales. From a pricing standpoint, this has been an exceptionally difficult and demanding year. As I've noted, we hold our figures and actually push them higher. The surge in production, sales, and EBITDA will likely arrive in 2025 and 2026, since we're going to add a massive, enormous quantity of megawatts. That will have a significant effect on our figures in 2025 and 2026. All the work we've done over the past three years on development and construction—we'll see the results this year and in the years ahead. Naturally, resilient EBITDA—we hold it and even raise EBITDA compared with 2023, with two issues that have hit our figures hard, particularly the electricity price, as I mentioned earlier, and the new tax the government approved, 7% of our revenues, which has affected our OPEX cost—but it's a serious impact.

Arturo Díaz-Tejeiro Larrañaga

executive
#6

For 2024, this year, that figure was EUR 7 million, and it will likely be considerably higher in the current year. On investments, we've carried out a huge amount of investment. We've put an enormous amount of CapEx in, and we keep the cash level steady. We're still using the project finance structure. We've grown the project finance, and over the coming years we'll grow it further in line with our construction pipeline. Our financial debt, as you're aware, is 93% project finance, with a fixed interest rate, a project finance tenor of 13 years, residual tenor for the lifetime. Naturally, EBITDA — the 2025 EBITDA, with particular focus on 2025. We've estimated that over this year we'll see an average electricity price of roughly 45. As you know, we blend fixed prices under PPAs with merchant prices, which run approximately 35 to 65, and we've assumed 45 for merchant prices, the average price. I think that sounds good as of today, because we'll be discussing how the electricity price evolves, but as of today we're pleased with where the electricity price stands, the solar electricity price, and meanwhile our infrastructure business keeps expanding, and combining both results delivers to us the figure of 245 to 255.

Arturo Díaz-Tejeiro Larrañaga

executive
#7

Nothing out of the ordinary is in there — nothing tied to energy, nothing tied to data centers. The crucial thing, naturally, is how capacity evolves. As you're aware, following plenty of slippage over recent years, we're now in the middle of an enormous build-out, and with luck, within this year we'll add over 1.4 gigawatts hooked up to the grid onto our balance sheet — a truly massive transformation. The company's profile will shift entirely, going from 1.6 to over 3 gigawatts, in just a matter of months, and we've put a quarterly connection report in here; it's roughly indicative, though we'll aim to move faster, but this gives an approximation of the megawatts we'll connect each quarter. Naturally, we've also included 2026. As I said, we've received — particularly over the past year — a huge amount of ready-to-build permitting approvals. Right now we hold plenty of projects able to enter construction. I noted that near term we'll kick off construction on 1 gigawatt of fresh capacity, and likely in the second half we'll add over 2 gigawatts more of new construction capacity.

Arturo Díaz-Tejeiro Larrañaga

executive
#8

We're putting in a huge amount of work to reach the position of leader in renewables in Europe, since what does that mean by the end of 2026? We will have over 6 gigawatts connected to the grid. On power price, you know that in the second quarter, and especially the first quarter of last year, the second quarter gave us hope from an electricity price standpoint. The last quarter of 2024 was good, with genuinely strong electricity prices. The first quarter is in a great spot. What we've included here is the average market price, not the final price we received, but the average price in the market. In January it was EUR 85, in February EUR 78. It sounds as though, compared with 2024, the situation is completely different. Our March forward is positive. I think it could even be better than the figure we've put in this slide, 48. It sounds like electricity prices will probably remain in a better position and a better situation this year, and that obviously has a serious effect on our accounts. On batteries, you know the Spanish government has changed the law. We're now able to include batteries.

Arturo Díaz-Tejeiro Larrañaga

executive
#9

That's a good step, an important step, since you know in the past establishing batteries wasn't forbidden, but ultimately, from a technical standpoint, you couldn't connect batteries for various reasons, due to technical law. The law has been changed. As of today, installing batteries is possible, and the good part is that the government will simultaneously set up a new capacity market. I believe we'll see installations across Spain, massive battery installations across different PV assets, and obviously we'll take part, and that's something that will extend the hours of sun radiation late in the day, because we'll be able to sell electricity for more hours than just the sunny hours. Wind — we keep believing the ideal hybridization is with wind, and today we hold permitting processes on site for 2.2 gigawatts, which is a lot, and probably we'll get ready-to-build permitting during this year and next year, and we'll begin constructing wind parks. That matters enormously for our global strategy. Genergia — you know that roughly one year ago, or a year and a half, we presented Genergia ID and the business plan to the market.

Arturo Díaz-Tejeiro Larrañaga

executive
#10

To be honest, I don't think it included any analysis report or valuations. Even so, we have strong conviction in this business area. In our view, this real estate combines real estate with renewables. It makes a lot of sense, with really good levels of project IRRs. Roughly six months ago, we began a process aimed at attracting a partner. We received — and this was a great surprise — strong interest from the market. I can't recall whether it was nine or 10 proposals from funds, serious funds globally, from all over the world, showing strong interest in entering Genergia, as a partner holding 50% of the company's shares. During the last part of the process, we chose to work with two players, and in the end we decided to sign with one infrastructure player from the United States. As of today we are under due diligence, and hopefully in two, three weeks or four weeks, we will close the deal, and naturally we will start with Genergia's business plan. What we intend to do at Genergia is develop and acquire land massively in an extremely short term, grow the company, and probably, in a normal and logical period of time — which could be three, four years — sell the company and obtain strong profits associated with Genergia.

Arturo Díaz-Tejeiro Larrañaga

executive
#11

On data centers, we've put a number of slides in the deck. I won't spend too much time walking through this. I think it's useful to grasp where data centers stand, particularly in Spain, and particularly the self-consumption model, because companies that use self-consumption data centers are going to save on the PPA price. They'll secure power at a cheaper rate. That's really compelling. I see it as a significant edge for data center operators. This is something we spotted quite a while back. Quite a while back, it was 18, 24 months. We began working on it there, and the positive thing today is that Solaria leads globally on connection points, or consumer points, for data centers. Right now we have over 600 megawatts. In the near term, likely in March or April, we'll confirm further megawatts. We'll probably go beyond one gigawatt, and we'll reach 1.5 gigawatts of data center connection points. That's genuinely good, because we see substantial value within this company, this new brand, this new business plan, this Solaria Data Center. To put it precisely, Solaria in the data center space, in the data center business, acts as the power and land supplier to data center players.

Arturo Díaz-Tejeiro Larrañaga

executive
#12

We're the energy company that's going to provide power, land, and PPAs to the data center firms. We won't remain involved in the data center technology itself. Our role is to be the supplier of the connection point, the consumption point, the land, and the PPA. This is a business requiring no CAPEX. It's a business that will produce cash. Right now we're out in the market, speaking with every participant in the market, with strong interest, and we have five agreements signed that are under negotiation and under due diligence with some of them, with due diligence being carried out, and we're pleased. As you know, since we announced it in recent weeks, we've secured two important points in recent weeks across two locations, in Madrid and in the Basque Country. I believe that in the near term we'll report additional connection points, additional consumption points for data centers, and we think the data center strategy will deliver a great deal of cash to Solaria and will bring plenty of positive news in the short and medium term. I think we're opening up two options, two business model options, because we've gotten strong interest from infrastructure players, infrastructure funds that want to come directly into the shares of the Solaria company, into the Solaria Data Center company with 50%, and we're receiving strong interest from specific players involved in the data center business who want to acquire assets of this company, and we'll report to the market as soon as we close firm agreements, and hopefully I think that during 2025, first half, second half, we'll report a lot of good news around the data center business.

Arturo Díaz-Tejeiro Larrañaga

executive
#13

Naturally, we've put in a number of slides that are worth looking at and that help you grasp that self-consumption points translate into savings on your PPA. As I said, right now we hold a solid amount of secured capacity that's ready for sale, and with luck we'll bring on additional volume before long. And I believe I've already covered this. What matters, I think, is delivery timing, and we're focused on that. Naturally, data center expansion — you're fully aware of it. In Europe, probably, as usual, they're proceeding behind schedule in this area. Here in the United States, we're experiencing an extraordinary moment with data centers, and that will carry on. In Europe, meanwhile, we sit in a notably weaker position when measured against the United States. But we face an obligation. Establishing data centers is something we are obligated to do. Ultimately, the European Union understands that managing data belonging to citizens of the European Union requires you to set up the data center inside Europe. And I think that aligns very logically with the requirement to locate in Spain. From an electricity price standpoint, Spain is a genuinely strong hub, since our electricity price is genuinely attractive.

Arturo Díaz-Tejeiro Larrañaga

executive
#14

We’ve got a substantial amount of renewables in place, and our grid is genuinely strong—an outstanding grid, with excellent connection capacity. For Spain and the Iberia region, building data centers at massive scale makes a great deal of sense. We’ll watch how things develop over the near term, but our optimism about this business’s growth is very high. As a provider of energy solutions, Solaria today is probably the top company when it comes to data centers. In Europe, we are the essential guide, the essential platform. Growth will continue—not just in Spain but worldwide: Spain, Italy, Germany, and every country where we operate. As you know, our portfolio request stands at 2.4 gigawatts. And as I said, in March and April we’ll report additional new connection points, and you’ll see. Naturally, as I mentioned, we currently have many deals under negotiation tied to connection points that sit within our balance today and are confirmed. Those connection points will likely increase—increase substantially—but right now we’re negotiating with various players around them. Always tier one, always the same concept: power, land, and PPA. We’ll move to the Q&A session.

David Guengant

executive
#15

Thank you, Arturo. We're going to begin the Q&A portion now, and thanks again for spending time with us. Let's hold on for just a minute, as the first question comes from Fernando Garcia at RBC. The initial question, I believe we've already addressed it, right? What's the power price assumption behind our 2025 guidance? It is 45 for merchant prices. Fernando's second question asks whether we expect all 455 megawatts that have finished construction to start delivering to the grid over the course of 2025. If possible, could we share additional information about those completed 455 megawatts and the timing of their connection, and then his final question concerns how we intend to finance this entire plan of PV hybridization and DC given a cash position of EUR 54 million. On the connection schedule, I believe we've included a slide showing the precise connection schedule for every PV asset. I think that information is public, and I think it contains quite a lot of detail.

Arturo Díaz-Tejeiro Larrañaga

executive
#16

On the cash side, and whether we’ll be able to finance things, I’d say our cash position is basically identical to what it was probably seven years ago. Whether that’s unfortunate or fortunate, I’m not sure. But as of today, the cash position is stronger. We’ve gotten quite a few project finance payments, particularly in January and February, though that isn’t significant. Nothing unusual there. It’s in line with the schedule. As you’re aware, we cover our CAPEX through project finance. That’s something we’ve done previously and we’re still doing now. And I’m not factoring in anything exceptional on the cash side here. If we receive something, we’ll see. Should exceptional cash come in, we’ll put it to use, but not for the construction process. The next question comes from Daniel Rodriguez at Bestinver. Have you signed any PPAs for the 1.4 gigawatts currently under construction? How are we funding the construction? As you know, we currently have agreements with our banks that cover the entire construction phase project finance based on merchant prices. But as we announced roughly two years ago, and we’re continuing with support from European Investment Bank along those same principles.

Arturo Díaz-Tejeiro Larrañaga

executive
#17

Regarding PPAs and whether we'll be covering them, you'll see that play out in the near term. As we've said repeatedly on every one of our conference calls, we believe it makes sense to keep 70% under PPA and 30% on a merchant basis, and that's what we'll stick with in the near term. That said, I think right now we've got plenty of favorable developments on the table — solid results, solid new agreements. In the coming days we'll have more encouraging updates to share. On the PPA front, we'll bring more encouraging updates involving new customers and on good terms. That said, I don't think we're under any obligation from the banks at this point to sign PPAs. That's a choice we make ourselves. The next question comes from Manuel Palomo at BNP Paribas. Part of what he asks, I believe, we've already addressed. As for what we expect in energy sales for 2025, I think Arturo just said it's 200 megawatts at a merchant price of 45 EUR, so you can work that out on your own. And then Manuel's next question concerns the rationale behind the impairment reversal for the Puertollano factory. Is there any specific signed deal that backs such a reversal at Puertollano?

Arturo Díaz-Tejeiro Larrañaga

executive
#18

Yes, that’s correct. But we’re discussing the 2024 results, and in the first quarter of 2025, we’ll be reporting information tied to 2025. And yes. The other question concerned the merchant side. Okay. The next question comes from Manuel—perhaps the final one—and it asks whether we can offer some perspective on financing. Are banks open to providing new financing? Do banks show enthusiasm about financing merchant assets? I think at present, clearly, the banks do, and I think that stance is sensible. I fully share their view. When you operate on a merchant basis, you’re required to be highly efficient with CAPEX. What does that mean? They’re at ease with a merchant approach, but you have to bring in more equity. That’s the crucial point, and previously I observed certain project finance structures covering 0.8, 0.9, or even 1 EUR per watt. Right now we’re not at that level. Currently banks are covering roughly 0.4, 0.45, and at times 0.35. If you aren’t efficient on the CAPEX side, you must put up more equity. That’s the crucial point. Ultimately, whether it’s merchant basis or PPA, it comes down to more equity or less. With a PPA, assuming you secure appropriate PPA prices, then clearly you need to include less equity in your deal, in theory.

Arturo Díaz-Tejeiro Larrañaga

executive
#19

However, in our specific situation, as you’re aware, the real picture with our banks and the lenders involved in project finance is that they are covering 100% of our CAPEX. The next question comes from Jorge Alonso at Bestinver. First, could we get some color on new PPAs in Spain—volumes and prices? Second, is the battery standalone or co-located? Third, can we share maybe some economics on the battery, or is it trading? If we expect some PPA with solar and batteries, then in that case, what could the PPA price level be? Curtailment—curtailment in 2025 or expected in 2026. And maybe your last one from Jorge: wind. Pipeline, timeline, when do we expect to see some wind turbine in our project? On new PPAs, I addressed this in the previous question—probably in the short term we’ll give color when new PPA and new PPAs are signed. We are negotiating big volumes with new players, exciting new customers that trust in us, and I think they will be exciting deals. But we will see. It’s 2025, first quarter, and second quarter. On prices, we are talking about PPAs that could start depending on the player, but sometimes 2027, first day of January of 2027, talking about 36.

Arturo Díaz-Tejeiro Larrañaga

executive
#20

And on batteries—if we're dealing with standalone or co-located setups, to respond quickly in Spain we'll rely on our solar capacity and our merchant capacity. What does that mean? To address your question, it's co-located. Right? It isn't strictly co-located, but I get what you're asking. It's co-located. In other nations, such as Germany or Italy, we're pursuing a standalone approach. Not only that—I believe even the United Kingdom is attractive for batteries on a standalone basis. In Spain, I don't think it's needed, at least for us; we have plenty of sun capacity, solar capacity, and we hold merchant exposure since we will always keep no less than 30% merchant exposure, and it makes sense to pair our co-located batteries with our solar plants and trade new PPAs for energy, solar, and batteries. Regrettably, today the issue, as ever, is the license and permitting process for batteries. It's extremely simple, yet even though it's extremely simple, we must obtain a positive answer from the authorities for our batteries. Hopefully, I think that over the next quarter, we'll report information on a ready-to-build concept around batteries. But in our view it's still too early to sign PPAs because we lack visibility on this ready-to-build concept for batteries.

Arturo Díaz-Tejeiro Larrañaga

executive
#21

On curtailments, the picture, as you know, is getting better. Clearly, higher demand—particularly demand that might stem from hydrogen or from data centers—is one thing that could ease the curtailment effect at certain points. As you know, at our power plants this isn't among the main issues, because it mainly hits the Andalucía and Extremadura regions. Unfortunately, we have no plants in Andalucía, and our capacity in Extremadura is not that large. Where we hold a massive volume of solar plants, Castilla y León and Castilla-La Mancha, there are no curtailments. On wind, as I explained, 2.2 gigawatts sit in the ministry's hands. They make the call, since we are ready to begin construction or whatever. We want to start now, but we must go through the Ready-to-Build process. What does that mean? One year, one month, six months, one year—roughly this stretch of time is what we need to receive the Ready-to-Build concept. The next question comes from Philippe Ourpatian at Oddo. His first question: is our EBITDA 2025 guidance still inclusive of EUR 25 million of capital gain? Philippe's second question: what do we think about Solaria's valuation when it comes to going private versus staying listed, given the trend in the stock price?

Arturo Díaz-Tejeiro Larrañaga

executive
#22

Naturally, this is complicated—and not always from a legal standpoint when discussing matters like these. It's complicated. But to combine both points, I believe that as of today we're in a blackout period, as I mentioned on the previous conference call, and it's hard to begin with a capital gain over the extremely short term. And this ties into your second question about becoming private. The company is constantly getting unsolicited proposals from third parties. And I really appreciate the interest in the company. I find that extremely interesting, because the stock market isn't recognizing the company's value. Honestly, I believe that remaining in the stock market today makes no sense. It's stupid, because people aren't focused on valuation or on whether the data center is going to proceed. They're focused on global issues. And you know that our peers, particularly renewable energy companies, are extremely affected by the new U.S. government. You know there are a lot of impairments stemming from offshore wind in the United States. But unfortunately, or fortunately, solar doesn't involve the United States. Solar doesn't involve offshore applications or wind applications.

Arturo Díaz-Tejeiro Larrañaga

executive
#23

And unfortunately — since I believe the United States is a wonderful nation — but sadly, we have no business there. In every country, Europe keeps backing the expansion of renewables, in my view, and that expansion is going to carry on. But clearly, the stock market hardly makes distinctions, and all of us get lumped together. And my perspective is that, at present, publicly traded markets aren't assigning value to renewable energy firms. What might unfold? Time will tell. Time will tell. And time will tell. Our next question comes from Henry Tarr of Berenberg. Do we face any obstacles to hooking up the 1 GW of capacity that is being built right now during this year? His second question: how are we going to fund the 3 gigawatts target — the new 3 gigawatts target — for 2026? Henry's final question: do we believe that adding storage to the Spanish power system will assist in driving the average captured solar price up? Of that capacity, 1.4 gigawatts rests with us. We're building it now, and we're pressing every subcontractor to speed up the connection, since the electricity price is genuinely attractive. In my opinion, this year we'll witness a genuinely attractive electricity price, particularly over the summer.

Arturo Díaz-Tejeiro Larrañaga

executive
#24

We’re driving everyone to get connected as quickly as possible. That hinges on solar right now—not on barriers, not on third parties. It’s our job. We’re building everything jointly, and I believe we’ve gotten a solid read, and we’re working to do better. Still, over this year we’ll put all our efforts into connecting as soon as possible—as soon as possible. We’ve set a strict schedule, we intend to meet it, and we’ll aim to improve. On financing for the 3 gigawatts, I think likely in April we’ll announce a global deal with project finance banks that will back this new construction process. As you know, I think we have global agreements, or master agreements, with some entities such as European Investment Bank and other players. Likely they will or won’t be involved, but probably they’ll take part in this new deal, and we’ll stay with the same banks—the players that have supported solar throughout this entire period. I’m not nervous about this. The batteries that could affect price—we need to see. We need to see. Obviously, it’s like today we can sell electricity for six, seven, depending on timing—winter or summer—six, seven, between 10 and six, seven hours per day.

Arturo Díaz-Tejeiro Larrañaga

executive
#25

And when it comes to batteries, that window is going to get longer. Clearly, this matters. It's a factor that won't just touch solar PV technology. Wind will feel it, nuclear will feel it, gas will feel it, every participant will feel it, since batteries will let us operate more efficiently and let us sell power across more hours each day. Our next question comes from Victor Peiro at GVC Gaesco. Could we go into a bit more detail on the battery project and on how we're already signing battery procurement? Yes. I believe we'll kick off with a single 50-megawatt project. Likely within the coming weeks, we'll announce a new battery deal together with a supplier, and those batteries are destined to be placed during the first half of this year. Construction, placement, and grid connection will all happen in the first half of this year. That's not a huge amount, since it's 50 megawatts, but that isn't the point. It's the start. It's the start of this fresh revolution tied to batteries, and it will take place in the first half of this year. Our next question comes from Marina Garcia of Morgan Stanley.

Arturo Díaz-Tejeiro Larrañaga

executive
#26

On capacity additions, how many megawatts have already secured every permit from the administration? Then the second one: what production level should we expect in 2025 in order to hit EUR 245 to 255 million? I believe we've already addressed that. The figure comes to roughly an average capacity of 2,000, with a load factor above 1,800 hours. As for your first question, if we can shed more light on permitting for 2025 and 2026 — permitting apart from wind is on site. We have a permitting process ready to build, apart from wind, which, as I explained, will likely bring us positive answers during this year. The remaining portion is ready to build. That hinges on the announcement I mentioned regarding the project finance structure — a new project finance structure we are currently negotiating at really attractive interest rates, if you compare them with the last deal Solaria signed, and we will probably report it to the market. It depends, but April could sound reasonable. Perhaps the last question comes from Fernando Lafuente of Alantra. Beyond Generia and this subsidiary, do you intend to carry out asset sales tied to the pipeline, as we did in 2024? And the second one: is it possible to refinance merchant project finance once the asset is operating?

Arturo Díaz-Tejeiro Larrañaga

executive
#27

No. Selling assets isn’t something we plan to do, at least not as of today. We believe our data center business will generate substantial cash. There’s a revolution happening within the company. With this deal, I think Generia is in a well-financed position for growth. And Solaria, with all the project finance and everything surrounding it, is also in a well-financed position. I don’t think it’s necessary to rotate assets or do anything similar. We’ll see whether the price evolution of the assets makes sense. It could make sense if the price is good. If we get really good prices, it could happen. But today, honestly, we are entirely focused on growth. Growth is Generia. Growth is the data center business. Growth is new generation. Growth is new countries. People who stay in different fields at the same time usually make a lot of mistakes. And probably the next CEO of this company in some years will start selling a lot of assets, and he’ll be an expert on the money, and he’ll rotate a lot. My job here is to grow, to grow using not too much cash because we are poor, as I always explain.

Arturo Díaz-Tejeiro Larrañaga

executive
#28

So my role involves keeping cash burn modest while still achieving growth. That's a tough mix, yet that's what I'm tasked with right now. Regarding refinancing, there's a lot of logic to it since interest rates sit differently now. For certain assets it makes sense to carry out a refinancing, particularly given that some have already paid down a substantial amount of debt and are in a genuinely strong position in terms of debt volume — but we're not rushing this. It will happen. We're tracking what the ECB, the European Central Bank, is saying. Our expectation is that over the coming quarter we'll see a favorable move on rate cuts, further reductions, perhaps at a slower pace than forecast, but still a positive direction for interest rates. A broad refinancing could make sense. We're not deeply concerned about it. It's a possibility down the road, but frankly, it isn't critical for us at present or in the next quarter. It could happen provided it makes sense from a pricing standpoint. Thanks for being with us on today's call, and I'll pass it to Arturo to wrap things up. Many thanks.

Arturo Díaz-Tejeiro Larrañaga

executive
#29

Thank you. I'd like to express my appreciation for your participation in today's conference call. As I noted earlier, this is genuinely a difficult period for renewable energy businesses around the world. Renewable energy technology isn't glamorous right now, particularly in the United States. That doesn't bother me much. Ultimately, what matters to me is producing cash and running a solid business with solid project IRRs. Whether it's one thing or another, or whether the market gets excited by this or that, is irrelevant. My view is that if you can produce solid cash and a solid project IRR, that's a solid business. In today's renewables landscape, plenty of new ventures are burning money — the data center business, the real estate business, for example. As for generation, I'd say the situation is better than it was 12 months ago, with new countries coming in. And as I've consistently said, I'm not as pessimistic as the market is about future electricity prices. We'll watch how things develop. So, thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Solaria Energía y Medio Ambiente, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Solaria Energía y Medio Ambiente, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Solaria Energía y Medio Ambiente, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.