SSAB AB (publ) (SSABA) Earnings Call Transcript & Summary

October 28, 2026

OM SE Materials Metals and Mining earnings 59 min

Earnings Call Speaker Segments

Per Hillström

executive
#1

Good morning, and welcome to the presentation of the SSAB Q3 report. My name is Per Hillström. I'm Head of Investor Relations at SSAB. And presenting today, we have our President and CEO, Johnny Sjöström; and also our CFO, Leena Craelius. And the agenda, Johnny will start by going through the quarter in brief. Leena will present more details on the financials, and then Johnny will close up with the outlook and a summary. And after that, we will open up for questions. So by that, Johnny, please start.

Johnny Sjöström

executive
#2

Thank you very much, Per, and good morning to all of you. I'd like to summarize the Q3, and I will, as usual, start with health and safety. And as you can see on the graph to the left that we have a good trend where our lost time injury frequency is continuing to go down, a very remarkable work by the whole organization, changing the culture related to safety. I also want to point out the total recordable is at 4.8, which is a record low for SSAB, an area we will continue to work on and try to strengthen as we move forward. And then when we look at our financial performance, you can see that Q3 ended up on SEK 3.3 billion, which is better than Q3 last year, somewhat lower than Q2, but we have to remember that Q3 is a typical maintenance quarter and especially for Americas, the financial performance was held down because of the maintenance, but I will come back to that later on in this presentation. But I would also like to point out that we were able to grow our shipments even further within the advanced high-strength steel going into automotive, but as well as within Special Steels. So those are things that I want to highlight. And if you look at our net cash position, and I guess that Leena will comment on that later on in her part of the presentation, we still have a very good and stable balance sheet, a very strong net cash position. Now a few comments on our investment program. So the conversion or the transformation in Oxelösund, where we are replacing our blast furnace with an electric arc furnace is progressing really well. We are planning for production start-up in Q2 next year. So it's actually around the corner. And then we also have the work in Luleå with the mini-mill or what I would like to refer to as the mega-mill. It remains on time and budget. But I also want to highlight that with projects of this size, there are a lot of things that is challenging. And we have had some issues in the beginning of the project, things that we couldn't foresee. And with projects at this size, there are things that will always come up that we couldn't really prepare ourselves for. But I also want to point out that this investment is extremely important for the future of SSAB. It is in line with our strategy to accelerate our premium leadership. And it's product that goes directly into the automotive industry, especially for the electrical vehicles to help them to become lighter, which is a requirement from the market. And then, of course, we also had a groundbreaking ceremony a few weeks ago in Oxelösund. It was a new quenching line that we are planning to construct. That's going to give us more capacity to produce the most advanced quenched and tempered material within Special Steels. We have a very strong underlying demand from the defense industry and the mining industry. So it's important for us in order to grow with the customer demand. And also, we're expanding the capacity to be able to produce more powder for additive manufacturing. Now if we go into the divisions, we can see that the shipments within Special Steels were higher than they were Q3 last year. So that's a very good thing. We could also see that the prices were higher than they were Q2 this year. So both shipments and prices are good. But then if you look at the profitability, you might wonder why the profitability is lower than Q3 last year. That's mainly related to cost increases we have seen in alloys, transportation and to some extent, in natural gas, et cetera. So that has been sort of offsetting. We're not super concerned about this. We know that our prices are going to continue to go up. There is a delay and for Special Steels is an even longer delay than there is for other divisions. So we know that the price increases will offset sort of the cost increases going forward. I think it's still a very stable performance by Special Steels. There's a very strong underlying demand. So I'm very optimistic for the future. Now looking at SSAB Europe, the shipments came out on a higher level than they were Q3 last year. And especially very happy with the amount of premium steels that we're selling, which I commented on in the beginning, the advanced high-strength steels that goes into automotive industry, automotive industry that is shrinking on the European market, but still we're able to grow on a shrinking market. So it shows that we have a very good competitive advantage and that we create unique customer value. Prices have been increasing for SSAB Europe. We came out on a decent financial performance. We have to remember that in Q3, we also have maintenance that's affecting the cost but as well is affecting the deliveries. But I think still a decent performance. And then if you look at SSAB Americas, volumes came out pretty much in line with what it was Q3 last year, a stable performance. And for those of you who are following the CRU prices, you can see that the CRU prices have been moving up very rapidly. And having in mind that we are the second largest plate producer in the U.S. market, a market where the underlying demand is still very, very strong for heavy industrial applications, energy, oil and gas, et cetera. So we have a good combination of a lack of competition, but at the same time, a strong underlying demand. Our prices went up higher than we guided for. It was roughly 8%. We're not super surprised about that. But also I have to remind you, we have a delay because of the contract structure that we have. So even if the CRU prices are moving up, it's only 20% of what we sell in the United States, which are sold on spot. So there is a delay for us. And once again, if you compare our Q3 performance compared to Q3 last year, we have maintenance every other year. So that's the reason why we came out lower Q3 this year compared to Q3 last year. Just worth pointing out. And then we have the 2 subsidiaries. We have -- starting with Tibnor, where the shipments were somewhat lower or in line with Q3 last year. And then if you look at our financial performance, it was considerably stronger than it was last year. But then again, Tibnor is benefiting for prices going up, and that also has an impact on their inventory, so that's on the positive side. And if you look at Ruukki Construction, we haven't really seen an improvement in the Construction segment. They are still working on a low demand situation in the market. Still, the revenues are very much in line with what it has been in the past. And I think that they came out on a decent level when it comes to the financial performance higher than it was last year and also higher than Q2, but they are not having the same benefit from the inventory revaluation. So with that, Leena, I'll leave the word over to you.

Leena Craelius

executive
#3

Thank you, Johnny. A bit more details and also Johnny mentioned a few things that I'm going to repeat here. But as the headline is saying, improved earnings versus Q3 last year, all the graphs are illustrating improvement in shipments, revenue and profitability. But let's begin with shipments. Q3 outcome, 1,530 kilotonnes, clear improvement compared to previous year by 64 kilotonnes and 4%. And the seasonality, as already mentioned, with the maintenance outages is showing that the reduction compared to Q2 was 230 kilotonnes and 13%. We were guiding significantly lower shipments in Special Steels and Europe as well as lower in Americas, and this was in line with the guidance. Then if we look at the revenue, SEK 25.6 billion reduction compared to Q2, SEK 1.9 billion and 7%. When shipments are going down 13% and revenue only 7%, it's indicating that the prices did develop upwards during Q3. EBITDA performance in relative terms, stable 13% year-on-year. But in absolute terms, we have seen -- or we can see the improvement, SEK 0.4 billion, as we can see improvement in the EBITDA per tonne performance. Then a bit more detailed analysis, bridge analysis comparing operating result Q3 versus previous quarter. Seasonality already mentioned, but good performance with prices. The biggest increase took place in Americas by 8% and then Special Steels and Europe division increasing prices by 3%. Both Ruukki Construction and Tibnor also increased their prices. Only minor impact here with the positive FX that was only impacting 2%. Volumes lower, already mentioned seasonality. Europe division, 160 kilotonnes lower; Special Steels, 44 and Americas, 27 kilotonnes lower. And as already mentioned, maintenance impacting this. Variable cost, here, we see an increase and here, a bit sort of a diverse development. In Europe division, we have seen that the pellet premium has started to climb up. We have higher logistics and zinc and paint cost. In Americas, majority of this negative impact is related to change in inventory. Inventories came down during the maintenance outage. And in Special Steels, already mentioned here, we had higher iron ore, coal, alloys and logistics cost, while the scrap cost was slightly lower in Alabama. Fixed cost positive impact seasonally, always Q3 tends to be such. We have lower personnel and external services cost. And then the capacity utilization, yes, related to maintenance outages, we didn't have any outages during Q2 as we did during Q3. So the crude steel and rolling production was around 10% lower quarter-on-quarter. And then a comparison against previous year. And here, we can see the improvement in the profitability performance. Prices have developed upwards. And here, the biggest increase took place in Americas by 12% year-on-year, contributing SEK 590 million to this positive EBIT impact, then followed by both Special Steels and Europe division, where prices went up 4% and impacting both divisions were contributing SEK 330 million here. Also, Ruukki Construction and Tibnor have succeeded to increase prices. Shipment volumes also positive impact by 64 kilotonnes. And here, Special Steel division has increased by 8%, followed by Europe division 4%, while as Johnny already referred to, Americas was rather stable year-on-year. Also to point out that Ruukki Construction and Tibnor, they were somewhat lower in their volumes year-on-year. Variable cost also negative impact in this comparison, especially with the Americas with higher maintenance-related costs and also higher scrap cost is contributing a big part of this. In Special Steels, we have seen higher alloys, CO2 emission allowance cost and logistic costs. And then in Europe, also higher CO2 cost, alloys, zinc and logistics. Fixed cost, minor negative impact here. We have some higher personnel-related costs and higher external services and also some higher rental cost. Capacity utilization with positive impact, and this is mainly seen in Europe division, where we have around 15% higher crude steel and rolling production. But to remind that last year, we had more extensive maintenance outage in Luleå compared to the maintenance outage this year. If we then continue with the cash flow, if we compare Q3 this year versus previous year, very similar trend when it comes to EBITDA performance, higher this year compared to last year. Similar trend in change in working capital, positive impact, even better than last year. Maintenance-related CapEx was fairly stable and similar compared to last year. And to remind that this other item or line here is related to CO2 emission spend that we are doing throughout the year. And then the strategic expenditures, slightly higher compared to last year, and I will get back to the guidance later on. But all in all, good operating cash performance. This led to strong net cash position, SEK 8.4 billion, which leads to the gearing minus 11%, which is still very well in line with our financial guidance, plus/minus 20%. And to remind that we did pay out the dividend during Q2 amounting to SEK 2 billion. Raw materials, as the graph is illustrating, let's start with the iron ore has been rather stable throughout the year. But to point out that the pellet premium has been going up quarter-by-quarter, and we see that it continues to go up also during Q4. Coking coal prices, as the graph is illustrating, have been developing upwards during the year, perhaps starting to move more sideways, but definitely, this is impacting the cost of all the Nordic mills. And then the scrap cost also illustrated in the graph has been higher this year compared to last year. And it tends to be that towards year-end, the trend as also last year shown, it tends to go upwards just before year-end. And perhaps to point out, which is not illustrated on this slide, we have seen rather significant increase in alloys cost during this year, zinc and paint cost and of course, the logistic cost has been going upwards. And also to summarize the cost impact of CO2 emission allowances. On group level, last year, the cost impact was around SEK 600 million, while this year, the cost impact will be close to SEK 2 billion. So there is a significant increase in CO2 emission allowance cost and mainly, of course, hitting the Europe division and to some extent, Special Steel division as well. Maintenance cost, this table, we have not updated since last time we were showing this. During Q3, the planned maintenance outages have been going according to plans. And to bear in mind that these will continue during Q4 in all steel divisions and thus impacting the volumes as well as the cost. And then the CapEx guidance. And this time, we actually updated the guidance for this year. Previously, we've been guiding for SEK 13.5 billion, and we have reduced it for this year by SEK 2 billion. And if we split this strategic CapEx, SEK 8.2 billion, biggest portion is then related to Luleå, SEK 4.2 billion and Oxelösund just below SEK 3 billion, Alabama Mill, SEK 0.3 billion, and then the rest is split to other smaller strategic investments. And to highlight that this update is related purely to the timing of the invoicing. And then also no change in the net cash impact when it comes to CO2 emission allowances. We continue to purchase the allowances. And the estimate is that it will be on a similar level as last year, around SEK 780 million to SEK 800 million. And no change in the digital road map plans that we have around IT projects. We continue to spend around SEK 200 million more or yes, more compared to '25. So that continues to be the same as previously communicated. But with this, I give it back to Johnny.

Johnny Sjöström

executive
#4

Thank you very much, Leena. And I will give a short outlook and summary. So if we look at the global market for high-strength steel, this is mainly related to Special Steels, we can see that their strongest segments such as mining and protection is still very, very strong. And roughly, you can say that 50% of what Special Steels sells goes into rock moving or earth moving in one way or another. So mining is extremely important for Special Steels, and that segment is still very, very strong. And now protection is picking up, but it has a long lead time. And it's also an area or a segment which -- where we have lower volumes, but it's a big demand. And if we look at the geographies, I think if you talk about the overall plate market in Europe, it's very, very strong, and it's going to continue to be very, very strong. And of course, that has a positive impact as well on Special Steels. But the underlying demand for plate in Europe is not super strong, but the supply situation is very favorable. But for Special Steels, we believe that it's going to continue to be strong. Same thing with the U.S. plate market. We see we are the second largest plate supplier into the U.S. market. Here, we have a very strong underlying demand, segments such as energy, oil and gas, transmission towers, wind, heavy transport, all of those segments are going really well. We see a large demand. Customers are concerned that they are not going to be able to get the availability that they need. So here, we have a very strong position, very optimistic. I think that the Section 232 and the melted and poured works in our favor. We've now recently seen some imports starting to increase on plate, mainly from POSCO. But it shows that there's not enough availability on the American plate market and prices have been moving up. And then if you take a look at the European steel market, the tariffs are -- and the CBAM is working in our favor. But I also want to point out that recently, we've seen companies such as ArcelorMittal opening up -- reopening up idled capacity. I think there is an additional 10 million tonnes of capacity coming online. They have some production start-up issues. But once they're online, then that will have -- that will sort of close the supply and demand gap on strip. But if you look at the plate, there is no idle capacity to open up. So from that perspective, there's still a very strong demand and limited supply on the plate market in Europe. The Construction segment, we don't see any improvements yet, unfortunately. There are some infrastructure projects, but not to the extent that we were hoping for. I think the Nordic infrastructure market is quite strong, but for the rest of Europe, it's still very low activity. And the automotive industry, as you all know, has a challenging situation. And now we also can see a lot of Chinese car manufacturers settling down in Europe. That, of course, will increase the demand of steel because it most likely will be locally supplied steel. So that, of course, is beneficial for us. But that pretty much summarizes it. And now then if we go into the outlook and the guiding, if you look at Special Steels, we have guided for somewhat lower shipments, and that's mainly related to the maintenance that we are doing. So the Oxelösund mill has a sort of a longer maintenance period now, and that will have an impact on the shipments. And then prices, we guided for somewhat higher. The contract structure we have for Special Steels is normally a longer-term contract. There's a long lead time for when we had the order intake price until we have an invoiced price. If you look at SSAB Europe, we believe that the shipments will be higher. Now I think that their bigger maintenance is over. So they are -- they have the ability to increase the shipments compared to Q3. And here, we also guide for a somewhat higher price situation. And then we have SSAB Americas, where we believe we're going to be stable on the shipments, but we also guide for somewhat higher prices. I think that's for the summary of the outlook and the guidance. I think that we're getting closer to opening up for questions. Per, what do you think? We have a summary, but we can skip that. Actually, I pretty much covered everything in my presentation. So if there are any additional questions, we can take it during the call instead.

Per Hillström

executive
#5

Indeed. Thank you, Johnny and Leena. And then we're ready to go into the Q&A. And may I just suggest before we start that in the first round, we limit to 2 questions each. So we'll let as many as possible get a chance to ask questions. And please state them one at a time to facilitate the process here. So please, operator, present the instructions.

Operator

operator
#6

[Operator Instructions] We will now take the first question from the line of Kaleb Solomon from SEB.

Kaleb Solomon

analyst
#7

Maybe first on your Americas price guidance. I appreciate there's a lag and you explained that the sort of gap between market prices and your realized prices mainly due to the contract structure with, I think you said 20% being sold on spot. But for the remaining 80%, can you give us a rough split between the sort of quarterly and longer-term contracts? Just trying to understand how much pricing upside is still to come at the beginning of next year beyond what you guided for in Q4.

Leena Craelius

executive
#8

Well, in Americas, we also have so-called annual contracts, which are then index price. So there is sort of a delay also when we are updating the prices according to index. And then as you said, there is a combination of annual quarterly contracts and sort of a smaller part is something that is actually then reacting to prices more rapidly. So it is a mixture of all these different contract structures.

Johnny Sjöström

executive
#9

But I would also like to add that we are -- we have a tendency to be a little bit conservative. I rather be safe than sorry. So I think we had the same guidance in Q3, and you know where we ended up. So yes.

Kaleb Solomon

analyst
#10

Yes, that's fair. And on Special Steels, you shipped 9% more than last year and achieved higher prices, but earnings were still a bit lower. And I know you've highlighted sort of freight and energy costs and alloys. But can you give a rough sense of how much of that cost pressure you're able to recover through pricing and what the sort of timing of that is?

Johnny Sjöström

executive
#11

I can't give you any numbers, but we're -- I mean, we're quite optimistic. And we're not losing market share. We're not losing momentum. The demand is there. Our prices are -- continue to go up for Special Steels. We were -- some of the cost increases that we could see in Q3 were slightly higher than we expected. We don't believe that they're going to continue to go up at that pace and our price increases are going to be higher than the cost increases. We're certain of that. But then again, I mean, we're living in a world now where things are changing so fast. The war in the Middle East, we couldn't foresee that. We couldn't foresee that all of a sudden, there was a freight limitation and the cost went up several hundred percent and just to be able to find a ship to ship it on. And this is more sensitive for Special Steels than it is for others. And that also have an impact on other costs like alloys, et cetera, because they need to be transported quite often as well. So this is a tricky part where in the world we're living in right now, the things are happening. It's very unstable in that sense.

Operator

operator
#12

We will now take the next question from the line of Adrian Gilani from ABG Sundal Collier.

Adrian Gilani Göransson

analyst
#13

I'll use my first question on Americas, where you seem to have taken the vast majority of your maintenance shutdown costs already in Q3. And you're saying you have strong end market demand, but still you're only guiding for stable deliveries into Q4. How come you don't expect deliveries to come up into Q4?

Leena Craelius

executive
#14

As I mentioned, the -- of course, a big portion of the Q3 deliveries were taken from inventory, and that also had the impact on the profitability on top of the maintenance cost. So thus, we think that the shipment volumes will be relatively stable also for Q4. And as you said, there will be still continuing the maintenance outage activities during Q4, even though the majority of the cost related to that was impacting Q3. So that is the reason for the stable.

Adrian Gilani Göransson

analyst
#15

Understood. And then we saw some speculation just the other day about the U.S. and Canada being in talks to ease these Section 232 tariffs. I guess what are you hearing on the ground regarding sort of the likelihood of this going through, what people are saying? And yes, what's the talk on the ground regarding these discussions?

Johnny Sjöström

executive
#16

So I think the market, everyone is convinced that the tariffs between Canada and the United States is not going to hold for a longer period of time. But we don't think that there's going to be any agreement within this year. If there's going to be an agreement, it's probably going to be next year. So that's the talk of the town. But then again, if you look at the plate market, the demand is so high now locally. And even if, let's say, Algoma would start shipping into the United States, it would not have a big impact on the pricing that's according to our estimates. They still need to import material from outside North America to fulfill the demand that we see right now.

Operator

operator
#17

We will now take the next question from the line of Alain Gabriel from Morgan Stanley.

Alain Gabriel

analyst
#18

A couple of questions as well. I'll ask them one at a time. The first one is on Oxelösund. So you're adding 100 kt of advanced high-strength steel capacity, which will come on stream at some point next year. Presumably, this capacity or these volumes are higher-margin products as compared to your current output. Can you help us think about the EBITDA bridge or upside to the earnings as your mix improves at Oxelösund? Maybe we can take the Q3 run rate as a baseline and if we hold everything on spot. Any guidance on that would be much appreciated. That's my first question.

Johnny Sjöström

executive
#19

Well, thank you for asking regarding our new quenching line in Oxelösund. And that investment will take more than 3 years to be up and running. So it's not going to be any additional capacity for next year.

Per Hillström

executive
#20

No, Alain, I think you think about the Mobile investment we are running at the moment. That will start up Q2 next year. But that's not the same magnitude in terms of capacity. It's more maybe product mix.

Johnny Sjöström

executive
#21

Exactly. So we have been, first of all, extending the quenching line #6 that we have in Mobile, and that's going to be able to take more capacity. But also we're doing a tempering loop. That means we're doing a tempering furnace. And that tempering furnace, most of our advanced high-strength steel grades needs to be tempered as well. And we have been using the quenching line for tempering. And now with the new tempering furnace, we will relieve some of the quenching capacity. So that will happen in Mobile. And we have been able to increase the capacity in Mobile, can I say the exact numbers or -- so from 280,000 tonnes, now we're getting closer to 330,000, 340,000 tonnes. So that's an increase of 50,000, 60,000 tonnes, but that's what we have as an increase for next year. Now the quenching line in Oxelösund, that will take 3 years, but that investment also have the potential to reach another 300,000 tonnes. But the initial what we have communicated is the 100,000 tonnes because we will be using that furnace as well for tempering, but it's designed for being able to quench more than 300,000 tonnes, but that's more of a future project. Then to your question, what kind of financial impact this is going to have, I think it's a little bit too early to say because it's a few years away. But I also want to highlight that this investment is also approved to be able to supply and support the defense industry in Europe, where the demand is going to be significantly higher in 3 years' time than it is today. And there's a surprisingly long delay from when there's an order placed on, let's say, a military vehicle until we actually supply the steel. It takes several years, actually. So now we see an increased order intake, but it's not near as we believe it's going to be, let's say, in 3 years from now when we have that quenching line up and running. And those orders typically comes at good margins.

Alain Gabriel

analyst
#22

Yes, I was referring to Oxelösund, apologies. It's not 1, but 3 years ramp-up. And my second question is on the CapEx. So you have deferred quite a big chunk of CapEx out of '26 into '27. Does this mean your budget for '27 will go up? Or is it fair to assume a similar deferral of magnitude out of '27 into '28? I'm trying to get a sense if this is going to be additive to your '27 or we will have the same mechanism in '27 as well.

Leena Craelius

executive
#23

Yes. Thank you. This is purely a timing issue. And at this stage, you can move this SEK 2 billion to next year. But of course, we will get back to more detailed guidance during Q4 when it concerns next year. So at this stage, it moves between years.

Operator

operator
#24

We will now take the next question from the line of Tristan Gresser from BNP Paribas.

Tristan Gresser

analyst
#25

First one is on the Q4 guidance. So you guide for somewhat higher prices across all divisions and also higher cost. Can you tell us if you expect actually margins to improve in Europe, Special Steels, Americas? And would you expect Q4 to mark the peak of operational quarterly performance for the year? That's my first question.

Leena Craelius

executive
#26

Well, we don't guide the margins, first of all. And of course, the uncertainty -- the Q4 is always a bit difficult to predict because it is the year-end quarter. We continue to have the maintenance outages. Of course, the production performance is in focus that we succeed in that. We have sold a majority of the order book in Q4. So we are quite certain about the price development during that quarter. And then the cost, like Johnny said, some of that cost we know and foresee that will remain stable or slightly increase. So it is a combination of all these. And as I said, we don't guide for the margins as such.

Tristan Gresser

analyst
#27

And the cost outlook across division, if raw material is somewhat higher, that's the same kind of magnitude that for price, so that's 0.5%. And then you flag additional costs to that. Is that correct?

Leena Craelius

executive
#28

Well, I don't sort of flag for more additional costs as such for Q3, but somewhat higher as...

Per Hillström

executive
#29

No. And Tristan, as you can see in the outlook statement, we expect freight and those costs to remain on a high level. So we are not speaking about any significant delta on that account. But raw material, as Leena showed, is moving up.

Tristan Gresser

analyst
#30

And the pellet premium is included in the raw material?

Leena Craelius

executive
#31

Yes, premium goes up quarter-on-quarter.

Tristan Gresser

analyst
#32

Yes. Okay. That's clear. And just on the European supply and demand outlook, I think you mentioned inventory is normal. So do you think that overhang is behind us? And why would you explain steel prices not moving higher, faster given the plunge in imports? And you mentioned 10 million tonnes of capacity restarts. I mean, I'm struggling a bit to see that. I'm seeing the 3 blast furnace from ArcelorMittal, but HKM has lost 1 furnace. Ilva is about to shut down. So can you help me understand a bit why do you think that we'll have enough capacity restart to fulfill the plunge in imports? That would be great.

Johnny Sjöström

executive
#33

I think you're right that there are start-up problems and Ilva is another question mark what's going to happen to that and so on. But there are idle capacity coming back online that's going to give additional capacity. But then you're absolutely right. The question mark is kind of startup problem issues do they have and what kind of capacity will be closed down and not be utilized. And we've also seen political influence on production -- steel production where governments have taken a bigger initiative to support the steel industry. You know Ilva, since the past, that the Italian government has stepped in and supported it. So what's going to happen to Ilva, it's not a simple answer to give if they're going to close down or not. My guesses are maybe that they're not going to close down, but it's remaining to be seen. And then we have also the Eastern Europe countries where also the governments are stepping in and supporting. And here, we see some other smaller mills with idle capacity starting up again. We know that they have starting up problems. It's not easy. I think that my number was more theoretical, but it's a fact that we have some idle capacity coming back online, mitigating some of the supply and demand gap, but that's primarily on the strip side. Hence, I'm not as maybe so optimistic when it comes to price increases on the strip as I used to be because of this additional capacity. But then again, as I've been saying on the plate market, we believe that there is a shortage already. We see it already when it comes to steel structure that goes into data centers and also piles, steel piles that goes into a lot of construction work that there's a lack of capacity forcing companies to look outside Europe to get the availability that they need, and that will, for sure, drive up the prices. So a little bit hard to predict. I'm a little bit more cautious when it comes to price increases on strip than I am on plate.

Operator

operator
#34

We will now take the next question from the line of Boris Bourdet from Kepler Cheuvreux.

Boris Bourdet

analyst
#35

2 questions. The first, maybe with the other segment. I remember that you guide for something around SEK 1.4 billion negative contribution for the year at the EBITDA level. The run rate is well above that level. So do you stick to that guidance of SEK 1.4 billion per year, including '26? Or should we shoot at a lower level? That's the first question.

Leena Craelius

executive
#36

I think we will stick to the guidance that we have given.

Boris Bourdet

analyst
#37

Okay. So that would mean a big catch-up in Q4, like SEK 0.6 billion in Q4? What would be the reason for that?

Leena Craelius

executive
#38

The year-end, we need to see how all the costs develop. And of course, the programs continue, IT-related programs. During Q3, of course, the IT activities related to these projects was lower. We had the summer break taking place. And now we have more activities during Q4. But this, of course, remains still to be seen how the cost will develop.

Boris Bourdet

analyst
#39

Okay. And the second question is on Luleå. Johnny, you mentioned in the introductory remarks that the project is running according to budget and timing. But you also hinted that some structurally potential challenges coming with big projects. So where do you see the main risks? And if there is any specific early signs of coming challenges there?

Johnny Sjöström

executive
#40

So we're in the beginning of an extremely large project, and there are a lot of regulatory factors impacting the progress of that investment. And we've learned from Oxelösund that the power line was delayed because of an appeal to the environmental court. And that came at the end of that investment. We were not able to foresee it. We were not able to forecast it. And this is the sort of regulatory environment we have in Sweden. Maybe for other countries, it's hard to understand, but that's the way it is. And we are very much dependent on regulatory approvals for a lot of things that we do and a lot of things that we are planning to do. Hence, the reason based on experience from Oxelösund, we're highlighting the regulatory risk that we have with this large project.

Operator

operator
#41

We will now take the next question from the line of Bastian Synagowitz from Deutsche Bank.

Bastian Synagowitz

analyst
#42

I actually only have a quick one left on the ramp-up in Oxelösund, which is not too far away, I guess, second quarter next year. So I'm just wondering, have you refreshed numbers here on how the costs will look like in the current environment compared to your existing blast furnace operation as that new EAF is ramping up? And then also, how long do you expect to take until you're being fully ramped up and will also have the full, I would say, most of the product spectrum available there?

Leena Craelius

executive
#43

Well, for the cost side, of course, we -- there will be some additional cost always with the ramp-up. As you know, it's more like a trial period, so not optimal energy efficiency and production efficiency from the beginning. And of course, the net working capital, we have started to sort of revise and plan that there will be some higher scrap inventory while we still continue with the blast furnace. So those we need to take into account during next year. But of course, we will get more into details during Q4 when we have more sort of calculations ready. Maybe Johnny can then comment on the timing.

Johnny Sjöström

executive
#44

So for the time frame, so we're planning for 6 to 9 months sort of double production and ramp-up. That's sort of the plan we have right now.

Bastian Synagowitz

analyst
#45

And Johnny, that's only, I would say, like by industry standards, a pretty ambitious plan. I think we've been seeing some of the peers which were probably aiming for similar, say, 12 months, it took them at least 24 and they're not fully up and running operationally and then there is a product spectrum question. So do you think that, that is realistic for your product spectrum? Or why do you think you'll be doing better than those? Is it more -- is it an easier ramp-up process in terms of the product specifics?

Johnny Sjöström

executive
#46

Yes. I mean your conclusions are right. Normally, it takes longer. But then again, we're just replacing a blast furnace with an electric arc furnace. The rest of the production is exactly the same, which means that if the chemistry from an electric arc furnace is right, then everything should be the same. So there shouldn't be any changes. And we have been training our staff in Mobile to run an electric arc furnace, and we will have staff for Mobile coming over to start up the production. Unless we run into any start-up problems with the equipment as such, I don't think that the qualification period should be longer than 6 to 9 months. And we don't have too many customer qualifications that we do. It's -- the products that we produce don't have those specific customer standards or specifications. It's actually our own specification and our own quality guarantees. And that makes it a lot more simple. If it would be grades and material that we sell to the automotive industry, then you're absolutely right, and it takes 24 months, and it's a rigorous testing and evaluation that needs to be done. But in this case, it's more simple.

Operator

operator
#47

We will now take the next question from the line of Andrew Jones from UBS.

Andrew Jones

analyst
#48

I just wanted to just get a bit more detail on like energy costs and sensitivities and things like that. I mean you've -- in terms of the actual 2Q as the 3Q headwind versus 2Q, can you just quantify how much energy, I mean, the power and gas and so forth added to your cost base? And maybe is there like a rule of thumb you could give us in terms of sensitivity to the power price in Sweden or the price on TTF? Any sort of color around that to help 4Q would be helpful.

Leena Craelius

executive
#49

How we interpret the sort of cost category when it comes to energy, we are then not talking about coking coal or CO2 emission allowances as such, but we are talking about oil and gas and electricity. So we can see that, of course, the natural gas prices have developed upwards. But in the big portion of this raw material impact on our profitability, it is still minor. It's less than 10% increase in relative terms. So it has gone up for sure. And I think that the biggest impact is in Europe division, definitely, while Americas and Special Steels when it comes to gas prices is less. But it's from the cost elements that have developing upwards during this year, I would say that the CO2 emission allowance cost is definitely the biggest that you need to take into consideration. Also alloys and the logistic cost is much, much higher.

Andrew Jones

analyst
#50

Yes. Okay. And could you just put any numbers around like -- I mean, in Europe, how much was your sort of total -- excluding coking coal, your energy bill in the third quarter?

Leena Craelius

executive
#51

So unfortunately, I do not have that figure in my head right now. So I can't give the exact figure.

Andrew Jones

analyst
#52

Okay. No worries. And just sort of second question on the market. I mean, Johnny sounds quite or less bullish maybe than some on sort of pricing outlook on strip. I mean there any particular customer segments or areas where you're seeing weakness on the demand side that might be informing that sort of relative caution? I mean, I guess -- I kind of echo what Tristan was saying about it seems like the market situation on the supply side is tighter than you were implying with the sort of 10 million tonne restart unless demand is sort of super soft, would prices not continue to move up pretty materially into the start of next year?

Johnny Sjöström

executive
#53

No, I think the difference between Europe and United States is that U.S.A., we have a strong underlying demand. In Europe, we don't really see the strong underlying demand. It's -- when it comes to steel consumption, it is within construction, which is the largest segment for consuming steel and then we have automotive. And both of these segments are down on low levels. If there will be any change in any of 2 of these segments, of course, the demand would go up and then the situation would change. But I don't really see that to happen, at least not in the beginning or first half year next year. So -- and then I was more optimistic when it comes to the supply situation before than I am now. So -- and that's based on theoretical calculation on capacity coming online. But then again, I think one of the previous questions we got, it depends on what happens to a few of these mills and how successful they are. So that's also remaining to be seen because if Ilva doesn't -- if it's closed down, let's say, that will be a game changer because there's a lot of capacity coming through that mill. And then we also have Thyssen, et cetera. But all other investment we're talking about HKM and electric arc furnace and so on, that's going to take a few more years. We will run on blast furnaces primarily during next year. And then a lot of the companies are trying to maximize their output to secure they get free allocations for the future. That's what we've seen. So it's a little bit changing the game a little bit.

Operator

operator
#54

We will now take the next question from the line of Maxime Kogge from ODDO BHF.

Maxime Kogge

analyst
#55

So I have the first question is on U.S. plate pricing because it seems at this level, the current spot level, which is extremely high, there's a big incentive for imports now to flow into the U.S. If you look at where Chinese or South Korean plate prices sit, if you add 50%, it seems it's still interesting for them to land in the U.S. So do you expect that this big arbitrage window that we have right now in the U.S. plate market be closed anytime soon? Or can it be sustained for some time?

Johnny Sjöström

executive
#56

What we see is on the market that customers are extremely concerned about the availability. I don't see that the market has restocked or replenished their inventories and they haven't been able to because there's not enough capacity within the country. Recently, we've seen that imports have starting to increase. It's been mainly from South Korea. And prices are on a level where it's starting to be interesting to look at imports. We don't believe that prices will go down, but then immediately, we will see less imports coming in. I think that rather that the prices will stabilize on a higher level and that it's very likely that we're going to see more imports coming in to supplement the shortage on the market. And then we also have to remember that there is still antidumping duties on countries like China, et cetera. So it's -- we're not going to see any Chinese material coming into the country, but it's likely that we're going to see more material from Canada, likely we're going to see more material from South Korea and also some material from Europe. That's more likely.

Maxime Kogge

analyst
#57

Okay. Interesting. And the second question is on EU regulation because I mean, CBAM and the new -- the new tariff rate quota system have been very powerful and effective. But there are still talks around extending CBAM to downstream processes, introducing melted and poured. I think slabs are not yet really incorporated now in the TRQ system. So that's a loophole. So where are the areas that you think should deserve attention from the regulators? And need to be improved further to really make the market watertight, not going as far as the U.S. perhaps, but still having a strong system.

Johnny Sjöström

executive
#58

So these will be more my personal reflections on your question, then I think it's absolutely critical that we include the slabs into the tariffs that melted and poured is included. Otherwise, Europe will be just a rerolling country, clearly. So that is a must. And it's also very likely that, that will happen. And those discussions are ongoing as we speak. And then we talk about derivatives, I mean, products produced out of steel. I think also this is important because if that is not included, then production will move out from Europe. So then it will be a deindustrialization situation, and no one really wants that. So I think that we're going to follow what U.S. have done. That is my prediction at least.

Maxime Kogge

analyst
#59

Okay. And perhaps just the last one as I'm perhaps the last in the queue. So I mean, it's about the auto contracts. What's your first views? Because, I mean, a lot of them will be renegotiated in the coming weeks. At the same time, the market remains quite weak in Europe. So how do you balance in your negotiation, very strong spot prices against the subdued volume trades and also pricing trends for autos in Europe?

Johnny Sjöström

executive
#60

No. I mean, we have been negotiating Q1, and we've been doing that for quite some time. I think that we've closed most of the Q1 contracts already. And we've already seen that we have price increases for Q1. So that the market is accepting a price increase, which is clear. But then again, then what's going to happen around that corner, it's hard to see and hard to predict now, and this is mainly related to strip. Did I answer your question? I don't...

Maxime Kogge

analyst
#61

No, no, that's clear.

Operator

operator
#62

We will now take the next question from the line of Krishan Agarwal from Citigroup.

Krishan Agarwal

analyst
#63

Most of them have been answered, and I have a last one pending. The carbon cost in the quarter was slightly higher than what we expected. Is there any way you can help us in terms of how should we look at the carbon cost for the full year and more importantly, for next year, given that Oxelösund EAF will come on stream and then in theory, that should lower your carbon cost? Just looking for some kind of a pointers on just for this year and the next year.

Leena Craelius

executive
#64

Yes, as I mentioned, the cost related to CO2 emission allowances has been now increasing for this year significantly. We see SEK 1.4 billion higher cost compared to last year. Now this year, there has been a combination of issues impacting the cost. Of course, the free allocations are lower, and they will also be lower for next year. Then the reference point for free allocation, our production volumes in the reference period has been low. Now they are higher. So we will benefit from higher production. So that will partially compensate for the sort of the lower free allocations. And then also, as you mentioned, Oxelösund EAF will be going live next year. So we are reducing, hopefully, the blast furnace production, and that will have a positive impact. Then the issue is that how the emission allowance price will behave. We have some of the trades for next year planned are fixed, but then the remaining part is uncertain how the price will develop. So at this stage, I would give a guidance that it's fairly similar to this year level, plus/minus something, but it's really hard to predict at this stage.

Krishan Agarwal

analyst
#65

I understand that. And then just a quick clarification. So you mentioned the reference point is higher. So allocation will improve, for example, in 2027. But then once you switch from blast furnace to EAF, does that production level continue to be the reference point or because the blast furnace is going down and hence, your reference point for free allocation also goes down, that means allocation in '28 or '29 goes down significantly?

Leena Craelius

executive
#66

To be completely honest, we are still uncertain how the free allocation will be treated when we are closing the blast furnace in Oxelösund because it might be that we still keep it mothballed for, for example, defense need purposes. So we are still looking into this. So I don't have, unfortunately, an answer to you at this stage.

Krishan Agarwal

analyst
#67

No problem.

Operator

operator
#68

There are no further questions at this time. I would like to hand back over to the speakers for closing remarks.

Per Hillström

executive
#69

Okay. Thank you, Johnny. Thank you, Leena. And then we can conclude today's conference. If you have anything further, you are much welcome to contact Investor Relations. So -- but with that, we wish you a nice day.

Leena Craelius

executive
#70

Thank you.

Johnny Sjöström

executive
#71

Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete SSAB AB (publ) transcript — plus 257,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to SSAB AB (publ) earnings transcripts and 257,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research