SSR Mining Inc. (SSRM) Earnings Call Transcript & Summary

August 4, 2021

Toronto Stock Exchange CA Materials Metals and Mining earnings 49 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, everyone, and welcome to SSR Mining's Second Quarter <<inaudible>> At this time, and introductions, I would like to turn the call over to Alex Hunchak with SSR Mining.

Alex Hunchak

executive
#2

Thank you, operator, and good day to all of you. I appreciate you being with us on SSR Mining's second quarter 2021 conference call, where we'll share an update on how the business is doing along with a review of our financial results. Our financial statements and management's discussion and analysis have been filed on SEDAR, EDGAR, the ASX and are also available on our website. Alongside our call, there is an online webcast, and the information you need to access the webcast can be found in our news release relating to this call. Please note that all figures discussed during the call are in U.S. dollars unless otherwise indicated. All references to cash costs and all sustaining costs are per payable ounce of metal sold. We'll be making forward-looking statements today. So please read the disclosures in the relevant documents. Joining us on the call today are Rod Antal, President and CEO; Alison White, CFO; and Stewart Beckman, COO. Now I'll turn the call over to Rod for his opening remarks.

Rodney Antal

executive
#3

Thanks, Alex, and good afternoon and good morning to everyone, and thank you for joining us today. First, I’ll talk about the fantastic second-quarter performance. These results have reinforced how high-quality and consistent our operations are, as we reported a number of significant production milestones. At Çöpler, even with a planned maintenance shutdown in quarter 2, we set a record for tonnes processed in the sulfide plant. At Marigold, we reported record material move for both the quarter and the half year period, while at Seabee and Puna, we delivered record quarterly and half year metal production. In quarter 2, we produced 200,000 gold equivalent ounces at an all-in sustaining cost of $961 per ounce. For the first half, we produced 396,000 gold equivalent ounces and an all-in sustaining cost of $983 per ounce. With another strong quarter, it is clear all 4 of our operations have been and continue to perform very well. This is especially pleasing given we have avoided the common risk associated with post-merger deterioration in operating performance as teams adjust to new leaders and priorities. For SSR, there is now almost 1 year post merger and with 4 quarters of really strong performance we have clearly delivered and more.

Rodney Antal

executive
#4

That's a tremendous effort and really speaks well of everyone throughout the organization. There's plenty still ahead of us, and right now we're placing considerable attention on the numerous growth possibilities that exist in our portfolio. That operating strength has turned into robust cash generation, with $100 million of free cash flow delivered in the second quarter and $177 million across the first half, and that is underpinning a capital returns program that leads our peers. Beyond the base dividend we pay each quarter, in April of this year we announced a substantial NCIB of as much as $150 million, which lets us buy back as many as 10 million shares. I'm happy to say that we have been actively executing under that NCIB. During the quarter, we repurchased 4 million shares for cancellation, which returned $70 million to our shareholders. A core discipline we've put in place at SSR is to keep reviewing and evaluating our asset portfolio. Through these continuing reviews, we concluded that the sustained royalty portfolio was noncore and that the market neither recognized it well nor valued it properly. We ran a successful process that produced an accretive sale, with total proceeds of $100 million, which we announced last week. That valuation went well beyond the consensus value that had been placed on the royalty portfolio, and it stands as one more illustration of how we work to generate positive returns for our shareholders.

Rodney Antal

executive
#5

Looking at growth, our strong balance sheet keeps letting us put money into capital projects that add value, while we keep moving forward with our big organic development and exploration portfolio. There are several exploration updates due from different parts of the business over the next few months, so you'll be able to track how we're doing. Stu will give you a taste of those a bit later on. The main aim of our development and exploration program is to prove we can maintain gold production of 700,000 to 800,000 ounces for a minimum of 10 years. Moving now to the next slide on ESG. It's encouraging that health and safety trends at our operations remain positive, which shows the focus and effort we're putting into improving the well-being of our employees, contractors and communities. We're achieving these gains even with Covid causing widespread difficulties around the world, and our mitigation work has meant no Covid-related shutdowns at any of our operations this year. Our dedication to our communities and the environment is still top of mind as we keep delivering on the priorities set out in our 2020 Sustainability Report. That covered our pledge to start putting together an action plan aimed at reaching net 0 greenhouse gas emissions by 2050. We've also started strengthening our climate and water management disclosures by responding to the carbon disclosure project and bringing our reporting in line with what the task force on climate-related financial disclosures requires.

Rodney Antal

executive
#6

We take pride in our ongoing work to get better at ESG, and we'll keep reporting on how we're doing while also seeking fresh ways to strengthen our standing as a leading, forward-thinking ESG steward. Turning to the following slide. As I mentioned, first half output of 396,000 gold equivalent ounces, with an all-in sustaining cost of $983 per ounce, stacks up well against our full-year guidance, which this slide shows. Given such a strong first half, the outlook for the rest of the year keeps us firmly on course to hit our guidance ranges. On the production side, our bigger operations, Çöpler and Marigold, are presently running toward the middle of guidance. At Puna and Seabee, we saw a stronger-than-expected half 1, mainly thanks to excellent operating results and one-off benefits that Stu will cover later. On costs, our all-in sustaining cost is trending toward the bottom of guidance. We are putting money into several high-return growth opportunities throughout our business, such as capital projects like the Çöpler flotation circuit, exploration drilling, and funding work to finish a number of technical reports — all intended to enhance both the longevity and the value of SSR.

Rodney Antal

executive
#7

Stu is going to cover several of those points shortly. Now, let's move to the following slide covering our quarterly highlights. Some of those quarterly highlights we've already addressed. I won't devote much time to this particular slide. Alison and Stu are going to give a fuller overview in just a moment. Still, here are a few highlights worth keeping in mind for this quarter. Our safety results keep getting better, and on the operational side, we're setting records throughout the company. On the financial side, the robust operating result produced adjusted EPS of $0.46 per share. Free cash flow came to $100 million, with the bulk of it directed toward our NCIB dividend payments and servicing our debt. And even after all those cash outflows, we could still hold a net cash position above $500 million, which gives us the flexibility to move our large organic pipeline forward. With that, I'll hand the call over to Alison, who'll go through our financial performance in greater detail on Slide #7.

Alison White

executive
#8

Thanks, Rod, and hello, everyone. This was another outstanding quarter, and I'm glad to walk through the results you can see on Slide 7. Building on our record of success since last year's merger, we produced 199,673 gold equivalent ounces in the quarter and sold 201,504 gold equivalent ounces, generating $377 million in revenue for Q2 and a solid first half with $743 million in revenues. Attributable net income for the quarter came to $54 million, or $0.25 per share, while adjusted attributable net income was $101 million, with adjusted attributable earnings per share of $0.46. For the first 6 months of the year, attributable net income was $107 million, or $0.49 per share, and adjusted attributable net income was $203 million, or $0.93 per share. On the right side of the slide, I'd like to offer some commentary on the $0.46 in adjusted earnings per share we reported, which is calculated based on our definition of adjusted attributable net income per share. We begin with attributable net income of $0.25 per share and then make adjustments to exclude the after-tax impact of specific items that don't reflect the company's ongoing operations. Each of those items appears in the waterfall chart on the right of the slide, with the largest adjustment, for $0.10, stemming from our recent announcement of the sale of our noncore royalty portfolio for $100 million, which remained accretive to our NAV against analyst consensus estimates, and an adjustment for $0.11 related to the amortization of the fair value resulting from the adjustment to bump up the value of inventory in mineral properties at Çöpler at the time of acquisition.

Alison White

executive
#9

I also want to draw attention to how we've looked at inflation affecting the whole company, especially since we were able to navigate those challenges during the first half of 2021. To begin with, we observe that inflation in Turkey and Argentina—together representing a bit over half of our 2021 production guidance—is mostly counterbalanced by the corresponding currency depreciation in those nations. That pattern has held for us in the past, and we expect it to persist going forward. Throughout the organization, we've handled other cost pressures by means of our continuous improvement efforts, which we have intensified since the merger closed last year. Stu will discuss those initiatives in greater depth later, but our updated strategy for supply chain and procurement is positioning us to more effectively absorb any possible inflationary increases, since we remain focused on extracting value and achieving cost savings. Moving to Slide 8, we can discuss the strength of SSR's balance sheet. SSR Mining ended the quarter with $908 million in consolidated cash, which reinforces both our balance sheet strength and our substantial liquidity. As mentioned earlier, effectively 100% of our quarterly free cash flow went toward share repurchases, dividend payments and debt servicing.

Alison White

executive
#10

We’re still in a strong position to keep executing our capital allocation policy—fully funding the portfolio of organic growth opportunities while also maintaining the significant returns we provide to shareholders. Also, during the quarter, we amended the existing undrawn revolving credit facility, raising the facility size from $75 million to $200 million, with an additional $100 million accordion feature over a 4-year tenor. Our net cash to EBITDA ratio stands at 0.6x, which again shows our resolve and puts us in the top quartile of our peer group. Looking ahead, we’ll stay active on the share buyback program, maximizing purchases where possible. After the quarter ended, we bought an additional 2 million shares for cancellation. Our share repurchases now total 6 million of the allowable 10 million shares under the NCIB, which clearly demonstrates our commitment to delivering capital returns to shareholders. Beyond the NCIB, we again declared a $0.05 dividend per share during Q2. On Slide 9, we can discuss more about SSR’s position as a free cash flow leader and our capital returns. Our continued track record of success has strengthened our cash flows, with operating cash flows at $149 million and free cash flow of $100 million during the quarter.

Alison White

executive
#11

Through our share repurchase program, we've been buying back stock aggressively — $70 million worth of shares during the quarter, plus another 2 million shares after quarter end in July. For us, the highlights so far this year include $177 million in free cash flow in the first half, as well as $125 million returned to shareholders in the year-to-date period. We expect cash flows in the second half of the year to stay strong and to be equally weighted to the first half. Our capital allocation program, we're confident, provides attractive yields for shareholders. SSR Mining's free cash flow yield of 10.9% is well above the peer group at 4.2%, and SSR's capital return yield of 3.5% for the year-to-date period is already above the projected mid-cap yield of 3.4% for the entire year. We look forward to continuing our track record and delivering consistent financial and operational results. Investing in growth, returning cash to shareholders and maintaining balance sheet strength are among our capital allocation priorities. What differentiates SSR Mining is the combination of leading returns and significant free cash flow generation. As we move through 2021, we will continue to execute on our priorities, both financially and operationally.

Alison White

executive
#12

Starting on Page 10, Stu is going to take you through the operational highlights.

Stewart Beckman

executive
#13

Thanks. Starting with ESG: the ongoing push to strengthen EHS&S across the business carries on, and every site is showing clear gains in performance. During this year's first half, our teams cut the recordable injury rate by more than 50% versus 2020. Working with outside experts, we launched a program designed to chart our route toward the new commitments set out in our recent Sustainability Report, which include net zero greenhouse gas emissions by 2050. Implementation of our new integrated ESG management and information systems is picking up pace, and every site has now finished gap assessments against the new standards and is putting together its compliance plans. Those new standards line up with, and match or surpass, current expectations and industry standards. In recognition of the organization's work and results, our rating in the latest MCSI ESG report moved up from BB to A. Operations are handling COVID very well, with each site taking an approach suited to its own situation. Vaccination levels among our workforce have ranged from good to excellent, with more than 70% having received at least 1 shot so far. Seabee stands at 76%, Marigold 41%, Puna 67%; and Çöpler, an impressive 85% vaccinated. Now turning to operations and growth.

Stewart Beckman

executive
#14

Q2 carried on the momentum we saw in Q1, with solid output figures and effective expense management. What falls within our control is what we focus on, so our sites concentrate on operational excellence — that covers both productivity gains and keeping costs in check. The OE program has 2 streams. One is continuous improvement, which underpins dependable, optimized output and expense discipline. Under that continuous improvement effort, an opportunities baseline is right now being finalized across every site. Doing so will pinpoint and gather opportunities and extract additional value from the assets we already have. Those opportunities are subsequently being folded into our plans and budgets for the remainder of '21 and '22. The second piece of OE is an innovation stream, aimed at delivering a step change in how the operations perform through deploying divergent or disruptive technologies. At present our emphasis there is the digital opportunity, including AA and AI. We have already notched up some wins in that space, so we are increasing the resourcing. Beyond that, we are bolstering our resourcing and processes on the supply chain side so that we keep optimizing both our working capital and our input cost position.

Stewart Beckman

executive
#15

Turning now to the sites and Çöpler, on Slide 11. Throughput at the Çöpler sulfide plant kept running well above design rates, and the first half delivered yet another record half-year throughput. Autoclave #1's shutdown, which had slipped from Q1, was finished on schedule and went off without any surprises. No other major autoclave shutdowns are scheduled for the rest of this year. Construction at the flotation plant, along with operational readiness work, is now complete — on time and on budget. That fantastic result from the project team, despite Covid's impact, stands as testament to a Herculean effort by certain individuals and to the company's capacity to deliver projects. Exploration in the Çöpler district remains active, with some good results coming through. At Ardich we currently have 7 drill rigs, and an exploration update on the project is planned for later this month, so watch out for that one. An order of magnitude study for Çöpler copper C2 is underway. Its aim is to leverage the considerable copper-driven mineral value located within and immediately adjacent to the reserve and resource shelves that the current mine plan does not exploit. Should the study prove positive, we intend to request funding and advance the project to a prefeasibility study for inclusion in the Çöpler District Technical Report, CDMP 21.

Stewart Beckman

executive
#16

Ardich is going to shift to a reserve case and will be the main highlight in the revised CDMP 21 technical report, which we're targeting to finish and publish by Q1 of next year. Turning to Marigold on Slide 12. We had another record for mined tonnes, and gold production came in within 250 ounces of the prior half-year record. Along with the warmer weather, the new KOMATSU PC7000 shovels saw reliability decline during the quarter, after performing very well in Q1. We have every expectation that these problems will be fixed. Drilling and equipping of dewatering boards carried on, and the water table drawdown rates are looking favorable. On the whole, the project should be finished on schedule. Stripping at the 5 end pits north of the property moved ahead nicely, with mining in the first benches proving easier than anticipated. Exploration at Marigold centers largely on the pits that already exist and is picking up pace at Trenton Canyon. All told, we drilled a bit more than 20,000 meters in the quarter. A second soil sampling program, covering areas at Trenton Canyon not previously tested, also came close to wrapping up. We intend to issue an exploration update for the Greater Marigold Project before this year ends. On to Slide 13.

Stewart Beckman

executive
#17

Seabee turned in a tremendous quarter, with production for both the quarter and the half-year reaching record levels. At the bottom of the Santoy Lower 9 zone, right at the boundary of the resource model, we hit an unexpected zone of very high grade. We are adjusting the mine design so we can restore access for additional exploration testing of that area and also reopen access for mining, and we are aiming for early next year on that. The Seabee operation is constrained by mine rate. While the feed grade was extremely high, we ran the Seabee plant more slowly so the circuits would not be overloaded with gold — a wonderful problem to have. Because of this, a stockpile of mill feed has built up, and it will be drawn down over the remainder of 2021 by using the plant's catch-up capacity. On a positive note, the underlying mine production metrics at Seabee have likewise been improving steadily, as several of their continuous improvement projects are paying off. Exploration inside the operating Santoy Mine kept drilling the Gap hanging wall and Santoy hanging wall targets, with the goal of bringing these into reserve and resource and into the mine schedules in the nearer term. Drilling likewise carried on at the distal exploration sites of Mackay North, Joker and Fisher.

Stewart Beckman

executive
#18

Also, we’ve begun drilling at Amisk, which is our other active exploration site in Saskatchewan. I’ll give you an update on that in due course. And here’s something for everyone to look forward to: later this quarter, we’ll put out an exploration update for Seabee, and it will include work on the Fisher properties. Turning to Slide 14. Puna kept stepping it up, once again delivering production records. Strong production and cost control brought all-in sustaining costs down to $14 an ounce—or under $14 an ounce. The switch to owner haulage from the mine to the plant began in April, and performance has been far better than expected, which has helped lower operating costs. Planning for Puna is now being redone on the assumption of better mine performance, higher throughput rates, and a lower cost base. Let’s go to Slide 15 for the exploration pipeline. I’ve pretty much covered everything in here with the site discussions. But I just wanted to add a couple of comments on some of the other projects. We have boots on the ground in San Luis in Peru. Some of our team from the Denver and Vancouver-based exploration group are mapping and reinterpreting the area. At Copper Hill, our partner has started a summer drilling program.

Stewart Beckman

executive
#19

Copper Hill sits up in Turkey's Black Sea area. Back in April 2020, we put out exploration results covering 8 holes at that property, and several of them showed really clean, high-grade copper intercepts near surface — one of them being 41 meters at 2.6% copper. The drilling program now underway at Copper Hill is designed to step out and test how far that mineralization extends. What we've seen so far is quite encouraging, and my goal is to have this season's drill results in your hands before the year is out — so that's another thing to look forward to. To close things out, it was a solid quarter for the business as well as for the operations and growth teams. Thanks so much — over to you, Rod.

Rodney Antal

executive
#20

Thanks, Stu, and thanks, Alison. There's a lot to look forward to. In summary, the strength of our business and our dedication to shareholder returns have both been plainly shown during the first half of 2021. Across the portfolio since the merger, we've achieved record productivity, which strengthens SSR Mining's standing as an appealing leading mid-tier gold producer. Given a solid portfolio of organic growth opportunities, we anticipate sharing several exploration updates with the market during the second half of this year. We believe that our strong free cash flow, capital returns that lead our peers and meaningful growth optionality will underpin a premium valuation that better reflects the quality of our assets and our people. So with that, I'll now hand the line to the operator to take the questions you may have. Thank you, Edi.

Operator

operator
#21

<<operator_script>> Today's initial question is from Tyler Langton.

Tyler Langton

analyst
#22

To begin with, I realize you addressed inflation, and I noted that, I suppose, the FX effect was somewhat counterbalancing the pressures at Puna and Çöpler. But when it comes to Marigold and Seabee, I suppose, could you discuss which items are showing inflation and, I suppose, roughly how much? And then a bit more detail on the ways you're counterbalancing it, and whether any contracts or hedges might be assisting as well.

Alison White

executive
#23

Thanks for the question. This is Alison. So yes, we do have — as we stated, we do have sort of offsetting inflation at Puna and Çöpler and Turkey offsetting inflation to currency devaluation. And at Seabee and Marigold, that's where the part that Stu really touched on in terms of continuous improvement and the activities that we're working on in the business has really helped us to not see as much inflation through that process. And then we do have an active hedge program within the organization, and we are constantly reevaluating if those hedges are meaningful for the organization, and we will continue to do that.

Tyler Langton

analyst
#24

And then regarding Çöpler, compared with my figures, it seems like growth CapEx and sustaining CapEx came in somewhat under the annualized pace for the full year — should that ramp up in the second half? And then I believe in the MD&A there was also some reference to awaiting permits for the flotation circuit and, I guess, Stage 4 for the tailings. I'm not sure whether that ties to the CapEx at all, but any specifics on that would be helpful.

Rodney Antal

executive
#25

I'll begin with the permits, then hand things over to Stu and Alison to address some of the other questions specifically. But yes, look, we're awaiting the final permit for the flotation circuit at Çöpler. Obviously, we've got a long track record of success obtaining permits in that country, and we are — while the process doesn't always match up with our needs. We've always managed to secure them previously. It's definitely been more perverse with Covid affecting governments and their push to get things done. But we understand the permits are now awaiting a final signature and we expect them soon. So that should be coming along pretty shortly. So on the other questions, I'll let Stu and Alison speak to those.

Alison White

executive
#26

Tyler, I’ll address the CapEx questions you raised. And we do expect that as the year goes on, we will spend what we’re anticipating or what we originally planned for and what we are anticipating we will spend. So expect to see that perhaps rise somewhat as the year moves forward.

Stewart Beckman

executive
#27

I believe we've essentially wrapped that up, Tyler. So what we expect is that we will carry out the exploration work too, just as we planned. On the capital side, we're finalizing all of the incoming capital. We think that for the flotation plant, everything has now been checked and tied, and nothing unexpected will come out of it.

Operator

operator
#28

Cosmos Chiu from CIBC has the next question for you.

Cosmos Chiu

analyst
#29

To begin, congratulations on such a robust Q2. My initial question probably also concerns Çöpler, specifically regarding permitting. I’d simply like to gain some clarity. It appears a delay has occurred. But I suppose my question has 2 parts. First, it sounds as though you’ve already begun the water runs as well as a portion of the commissioning work at the flotation. So might you perhaps discuss which permits are still required? And at what point should we begin to feel somewhat concerned about timing? Then the second part concerns the Stage 4 tailings, and as you mentioned, a slight delay has occurred there too. Could you discuss the current tailings capacity with Stage 3? And when would that Stage 4 capacity be needed?

Rodney Antal

executive
#30

I’ll hand that over to Stu. I think that question had, like, 4 parts to it. So make sure...

Stewart Beckman

executive
#31

On the flotation plant side, we're awaiting the updated EIA for Çöpler. Once that comes through, there's an operating permit, and getting the EIA normally takes a couple of weeks. As we understand it, we believe the EIA has cleared all the bureaucratic steps at the department level and now sits with the ministerial office. So we're hoping it won't take too long. As everywhere, things are shutting down because of Covid. And we've just had the big religious holiday, the Muharram holidays. So pretty much everything has stopped. We're waiting for people to get back up to speed now that it's over. So hopefully it comes soon. We're putting a mitigation process in place. So we're handling the blends in front of us in the best way we can with the material we have. And we believe that at a stretch, we'll make it into guidance even without the permit. So we're fairly confident we'll get there. And it will come soon, we hope. What was the other part of your question? It was very long.

Cosmos Chiu

analyst
#32

My apologies — any further questions from me will be limited to one or two.

Stewart Beckman

executive
#33

Yeah, on the tailings side. So at this point we have all of the <<inaudible>> requirements. And there's a small parcel of land in the next stage that we need to secure for the next phase. And that is needed. I'd have to go check my notes, but I believe the deadline for that is somewhere around August 23. So we're working to make sure we have those in good time. We're obviously always busy. We're going to get those well ahead of when we need them.

Cosmos Chiu

analyst
#34

And Stu, I suppose the second half of what I asked was: what tailings capacity do you currently hold? And at what point would you require the capacity that Stage 4 will provide?

Stewart Beckman

executive
#35

Like I mentioned, it won't be until we get into 2023 — we're quite a distance off. With Cosmos, we're constructing — the tailings are something we keep building, right there ahead of us, and we're considerably ahead of schedule.

Cosmos Chiu

analyst
#36

Perhaps we could pivot slightly here. Turning our attention back to Seabee, I saw that the head grade for the quarter was remarkable, at 13.19 grams per tonne. So I suppose the first thing I'd ask is whether that level can be maintained. Then, for the second part, it sounds as though the grade at Santoy Lower 9 came in better than you had expected too. Could you discuss whether that represented favorable grade reconciliation against your block model? And if so, to what extent — just how favorable was it?

Stewart Beckman

executive
#37

Yes. So we saw a positive reconciliation not only there but also at the mine. From time to time, these do occur at the mine. It was quite positive, and it sat right at the very bottom edge of the resource. So that's positive in the sense that we're drilling it out, and we'll likely be able to extend beyond what the current reserve contains. But we don't yet know how much that will be, because that's going to be your next question, until the drilling is finished. So we're putting in a drive now — we've already put a few holes into it, but we're putting in a drive now to get some additional drilling into it. And then we're gaining and putting in another drive to gain access so we can get back in and do some more mining next year. But that — there were zones with spectacular grade. Generally, that stock came out at over 15 grams a tonne.

Cosmos Chiu

analyst
#38

Also, is there any chance you could weigh in on what the potential grade might be for Seabee in the second half, or would you rather hold off on that for now?

Stewart Beckman

executive
#39

I'm not going to engage in speculation on that.

Cosmos Chiu

analyst
#40

Then maybe a final question on Marigold. Again, Q2 grades came in strong. First half grades came in strong as well. What ought we to anticipate potentially for the second half? And on that point, I think, if I were to calculate it, it's always difficult with heap leaches. Well it appears the first half recovery was roughly 81%. If you're anticipating potentially weaker grades in the second half, might that also have an effect on recovery?

Stewart Beckman

executive
#41

Yes. You’re correct regarding the recoveries. Right now, we have 3 heaps operating, and they differ in duration. As a result, the breakthrough times span from 50 days down to 4 days, depending on which heap we happen to be stacking and leaching from. That said, the grade for this half is going to match what it was in the first half.

Cosmos Chiu

analyst
#42

Alright, and perhaps a final question just to close things out. I don't want to keep harping on the same point, but the new "I" word appears to be the latest focus right now, and that's inflation. Regarding inflation, you mentioned currency effects offsetting inflation. We've also been hearing this from a number of other companies. It appears that with labor, there are cost pressures; with energy, there are cost pressures; with other input costs, there are cost pressures. Could you perhaps speak to the various areas? Where are you seeing the greatest potential cost pressures across some of your different operations here? Is it labor? Is it energy cost? What exactly are we discussing?

Alison White

executive
#43

We are therefore observing certain cost pressures where diesel is concerned. And labor pressures of the kind others have mentioned are not necessarily something we have experienced, though we will keep reassessing that. As for some of our other input costs, we are right now actually in the process of renegotiating for cyanide and related items at a few of our sites. So inflationary pressures of the sort some of our other companies are seeing have not been experienced by us.

Operator

operator
#44

The following question is from Ovais Habib at Scotiabank.

Ovais Habib

analyst
#45

Nice job on a really strong quarter. Many of the things I was going to ask have already been covered, though I did want to check on Covid in Turkey — are you seeing any kind of effect at Çöpler, and what mitigation measures are you putting in place?

Stewart Beckman

executive
#46

Çöpler has handled this exceptionally well. And the Turkish shelf systems are really quite solid too, for anyone who has visited. There’s an isolation procedure being implemented at the site. So we get nearly instantaneous turnaround, with our own medical personnel arriving on site, administering a PCR test as well as an antibody test. If you have sufficient antibodies and your PCR result is clear, you can enter the site right away. If not, you spend a week in quarantine, and then we test you again prior to your return to the site, and that protocol remains in place even though 85% are immunized among both the workforce and the contractors at the site. So they have truly made an exceptional effort there and have handled it extremely well.

Ovais Habib

analyst
#47

And that sort of makes me think we should look at how Seabee is shaping up for the second half, and how Çöpler is developing. On Marigold, you described it as going to be flattish, I would say, simply because of the grade as we move into the second half. I mean, regarding what you've produced so far, it's roughly 395,000 ounces, and the top end of guidance is near, let's say, 800,000 ounces. If Seabee does deliver some solid outperformance and Çöpler gets the flotation running, do you expect to actually exceed that guidance level? Is that the reason you're being conservative, to watch how these things perform before you start talking about achieving above and beyond your guidance?

Rodney Antal

executive
#48

No, I believe, as we mentioned in the script, for the bigger operations — meaning both Marigold and Çöpler — we're trending closer to the midpoint of that guidance. And although Puna and Seabee have definitely performed well during the first half, that doesn't automatically mean we'll end up at the top end. So if quarter 3 delivers some favorable surprises again, then clearly we'll take another look at it. But right now, what we're saying is we'll land within that guidance range we initially issued.

Ovais Habib

analyst
#49

Now shifting over to exploration. You mentioned that we should expect a couple of exploration updates within roughly the next month. Is Rod still concentrating on exploration close to the mine — examining further satellite deposits and, in a sense, building greater confidence in the reserves and resources at Seabee?

Rodney Antal

executive
#50

Yes, it's both. Our primary focus is on near-mine areas so we can convert resources. At Seabee, that means Santoy and the Gap Hanging Walls, since those are the adjacent sources. But we're also stepping out to extend them. One thing we want to do — and we're devoting more resources to it — is extend our horizon, our time horizon at Seabee, so we can plan over the longer term instead of relying on a rolling, shorter reserve. The belief among everyone connected with Seabee is that a much bigger resource exists there. It's just that we haven't defined it. If we understand the extent of the mineralization better, then we can plan for expanding the mine and for longer capital, and look at the mine through a different paradigm. So that's pretty exciting. Certainly, at Çöpler, we have the work we're doing on the copper mineralization that sits in and around the existing resource and reserve shelves. This was never valued in the value of the ore coming to the plant, because at the moment we don't recover it, even though the plant was designed so that a copper recovery circuit could be tacked on at the back end.

Rodney Antal

executive
#51

But we're revisiting that with a new way of thinking about what happens if we capture that copper as it comes in. So with a flotation plant, maybe generating a pyrite concentrate, which we'd then add to the feed headed to the autoclaves, lifting our total output and generating copper from the circuit. So that's quite exciting. That's due out soon. We'll be sharing another — I believe it's slightly fewer than 200 holes. Those are both infill holes within the resource, raising confidence levels in the resource and the reserve for Ardich. And also step-out holes, where we're expanding beyond what was previously published for the resource there. And then we're already at work on it. That data will be part of the work we're doing, and we're updating the technical report for the Çöpler District Master Plan, as we refer to it, and we'll launch that at the start of next year. So the extra million ounces and nearly $500 million in NPV that you saw should move into reserve, grow somewhat, and then feed into the base case of the valuation for the business.

Rodney Antal

executive
#52

There's a substantial amount of activity underway right now, and we're driving that forward. And naturally, there's everything happening around Marigold too. So we have both of those right next to the existing operations, and we're also really ramping up the work we're doing down at Trenton Canyon.

Operator

operator
#53

The next question is from Mike Parkin at National Bank.

Mike Parkin

analyst
#54

Nice quarter. I have a few follow-up questions. Regarding Trenton Canyon, what's the permitting status there? Since it's a historic site, do those permits remain valid? Or would restarting operations there require going through a permitting phase?

Stewart Beckman

executive
#55

There are a few permits in place there, sure. But right now, what we're doing is re-exploring that area too. So it'll hinge on what we find, what we want to develop, and what we need to — what we decide we want to do down there. So at the moment, I can't answer your question.

Mike Parkin

analyst
#56

Now, looking at Marigold overall. The most recent study, from 2018, indicates a production decline in 2024 and 2025. However, since that time, you've acquired a few small parcels of land inside the main mine plan area, plus there's been continued exploration success, and then there's also a slight shift at the water table, which moved some of the higher-grade tonnes that appeared to go into 2022 and 2023. So do you see potential for that decline to be softened, or even eliminated?

Stewart Beckman

executive
#57

That's affirmative. At the close of this year, we will put out 3-year guidance, and it will lay out our refreshed life of mine plan covering those years you're asking about. We've also begun planning the work for an updated technical report — we're calling it the Marigold District Master Plan — and it factors in everything we believe we'll do to develop Marigold as a whole property. So...

Rodney Antal

executive
#58

The other point we made, Mike — and this applies right across the portfolio — is that while all of Çöpler is relevant, since we issued the latest technical report only last year, the remaining operations also require that update. So that forms part of the investment in these technical reports, to bring ourselves up to date and, clearly, the market as well, regarding what the assets truly look like, instead of discussing things that are really 4 or 5 years old.

Mike Parkin

analyst
#59

And regarding Çöpler — based on the update we received compared with the prior one, we had some high-grade ounces sitting at the back end of the mine plan, simply because of the category they were in. Now that this update is coming, it sounds like those ounces would be moved into reserve. So we could get them properly sequenced and moved forward ahead of stockpile processing. Is it correct to assume that?

Stewart Beckman

executive
#60

Absolutely. That is how the scheduling would work. The sole reason they were placed at the back end was that we didn’t want to push out reserve material with the material from Ardich, some of which was only in a third category because it offsets the regulators. So it would naturally be slotted into the plant as soon as it became available.

Mike Parkin

analyst
#61

And so my last question concerns Seabee, where you're seeing some excellent surprises. From what I remember, there's actually a huge quantity of gold in that deposit that shows up as free gold and is recovered through the gravity circuit. With that style of mineralization — where free gold turns out better than anticipated — does grade reconciliation usually follow along, perhaps with a negative impact? Or when that occurs, is it some other factor that gives you that kind of upside surprise?

Stewart Beckman

executive
#62

At Seabee, we do see upside surprises, and predicting that line is hard, as it is with every vein-hosted gold deposit at Magadi. In the plant, our reconciliation is always very high. Recovery is always very high as well. That said, reconciliation usually comes out strongly positive, and every so often we end up with positive surprises. Of course, when you work through the resource estimation, any unusual highs generally get smoothed out. So it isn't about overestimating.

Operator

operator
#63

There don't appear to be any more questions right now. That brings today's question-and-answer portion to an end. We appreciate everyone joining us. You're welcome to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete SSR Mining Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to SSR Mining Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in SSR Mining Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.