operatorHi everyone, and thanks for joining SSR Mining's Second Quarter 2022 Conference Call. We're recording this call. Right now, to give opening remarks and introductions, I'll hand things over to Alex Hunchak of SSR Mining. Go ahead, please.
Alex Hunchak
executiveThank you, operator, and good day to all of you. We appreciate you being on SSR Mining's Second Quarter 2022 Conference Call, where we'll share an update on the business along with a review of how we performed financially. Our consolidated financial statements for the second quarter of 2022 have been prepared in line with U.S. GAAP. Those statements are filed on EDGAR, SEDAR and the ASX, and you can also find them on our website. An online webcast accompanies this call, and details on how to access it appear in our news release about this call. Please keep in mind that unless we say otherwise, every figure we discuss today is in U.S. dollars. Forward-looking statements will be part of today's discussion, so we ask that you read the disclosures in the relevant documents. With us on the call today are Rod Antal, President and CEO; Alison White, CFO; and Stew Beckman, COO. I'll now hand things over to Rod for his opening remarks.
Rodney Antal
executiveThanks, Alex, and hello everyone, and thank you for being with us. I want to begin with a quick overview of our strong first half results. The first half of 2022 showed our business continuing to be resilient despite supply chain constraints and inflationary pressures, as our consolidated production and cost metrics are tracking well against our year-to-date targets. Our 4 operating assets produced 333,000 ounces of gold at all-in sustaining costs of $1,177 per ounce, with solid margins and attributable net income of $126 million. Our financial strength is pushing us to keep up our peer-leading capital return program. During the quarter, we announced a buyback program that lets us repurchase up to 10.6 million shares. That, along with our 40% dividend increase earlier this year, has produced year-to-date returns to shareholders of nearly $100 million, or equivalent to a 2.8% yield and growing. Despite the positive performance in the first half of the year and numerous strategic milestones, we keep facing increased cost pressures across the portfolio, especially in fuel, electricity, reagents and labor costs. While we have successfully bucked the cost inflation trend over the past 18 months, costs have now outpaced our mitigation efforts.
Rodney Antal
executiveSo because of that, we're reaffirming our production guidance, though it sits at the low end of the range, and we're raising our cost-cut target for the first — for the year, to reflect macroeconomic pressures as well as the temporary suspension of Çöpler, which we'll cover during the presentation. So let's move to Slide 4. And on the following slide, I'd like to emphasize our core values as they relate to our ESG initiatives. ESG is, and has for a long time been, a core value and area of focus for the company, since it underpins the success of our business. We published our fourth annual Sustainability Report in April, which highlighted a number of achievements during 2021 as well as some new initiatives for the company. During 2021, among other things, we advanced our efforts to establish a science-based action plan supporting our commitment to net zero greenhouse gas emissions by 2050. In 2022, we'll keep rolling out our integrated safety management system, with full implementation expected this year. In addition, we'll finish third-party closure reviews across all our operating assets to ensure a positive post-mining future for stakeholders, and we're also developing a water stewardship strategy, as we see ourselves continuing to reduce our environmental footprint going forward.
Rodney Antal
executiveMoving to slide 5 now. As we move through 2022, our strong execution record deserves emphasis. Although the Çöpler shutdown affected our projections for the full year, we are pushing forward on opportunities so the business can surpass the low end of production guidance. Looking ahead, the main point is this: we have built a baseline production platform, and we see a clear chance to deliver more than 700,000 ounces of gold production each year through 2030. That solid foundation, together with the many growth targets we are advancing throughout the portfolio, means this is only the starting point for the company to keep building on. Turning to Slide 6. When I speak about our record of operational delivery, we have also built a proven history of disciplined, accretive M&A as well as project development. That includes the Taiga Gold acquisition, which closed in the second quarter and broadens our exploration platform in Saskatchewan. We also completed the sale of Pitarrilla in July, and our divestitures of noncore assets have now brought in $245 million in proceeds across the last 4 quarters — more than 2x the street consensus value assigned to those assets. With our record of strong operations and project execution, along with the robust balance sheet, we keep carefully assessing strategic opportunities throughout the sector and will stay disciplined regarding any future transactions.
Rodney Antal
executiveMoving to Slide 7. By the final day of the month, we had made sure that our robust free cash flow generation shows up in our capital returns program. Along those lines, we returned $191 million to shareholders in 2021, which works out to an effective 5% capital return yield. Early this year, we raised our base dividend by 40%, and on its own that yields 1.8% annually. Following the second quarter, we announced a share buyback allowing repurchase of 10.6 million shares. During the year-to-date period, we have already returned close to $70 million under that program. Together with the 2 quarterly dividend payments year-to-date, our capital returns already total $100 million, or a 2.8% yield. All in all, the mix of our strong operating results, accretive and strategic M&A initiatives and peer-leading capital return programs has produced significant outperformance for our shareholders, a trend we expect to keep going with a multitude of catalysts over the coming 6 to 12 months. Now on the next slide to talk about the quarter. Here are just a few key points worth considering that are relevant for the quarter. First half production came in at 333,000 ounces of gold at all-in sustaining cost of $1,177 per ounce, in line with our internal budgets and guidance.
Rodney Antal
executiveThat said, an incident occurred at Çöpler on June 21, which led us to halt operations until improvement initiatives could be finished. Those initiatives are now complete, and verification and inspection work by the regulators is pending. Once inspection and verification are done, we will proceed toward the required approvals to restart operations, which is expected in the third quarter of 2022. We continue to work closely with the regulators and will share further updates as needed. With that, I will hand the call over to Alison, who will cover the financial performance and the updated 2022 outlook on Slide #9.
Alison White
executiveThanks, Rod. Good evening and good afternoon, everyone. During this quarter we generated more than 159,000 gold equivalent ounces, and for the first half of the year we produced over 333,000 gold equivalent ounces, which aligns with what we expected given our back half weighted production profile. As we noted earlier, we have updated our all-in sustaining cost guidance to a range of $1,230 to $1,290 per gold equivalent ounce, and we are aiming for the lower end of our current production guidance range. We are pursuing continuous improvement and cost management initiatives aggressively, with the goal of mitigating inflationary pressures wherever possible, while also working diligently to make sure that higher costs do not become a permanent feature of the business going forward. Gold equivalent sales of 167,000 ounces during the quarter drove revenue of $320 million. Attributable net income for the quarter came in at $58 million, or $0.27 per diluted share, and adjusted attributable net income was $67 million, or $0.30 per diluted share. Operating cash flow was $33 million in the second quarter, and $95 million for the first half. First half free cash flow of $19 million was affected by the timing of tax and royalty payments, capital expenditures and working capital outlays, as previously guided. Turning to the back half of the year, we expect a strong Q4 to shape the distribution of free cash flow, with 80% to 90% of the forecasted second half free cash flow expected during Q4.
Alison White
executiveOn the right-hand side of Slide 9, I want to offer a few remarks about the $0.30 diluted earnings per share we reported, which is computed using the company's own definitions of adjusted attributable net income per share. We took attributable net income of $0.27 per share and adjusted it for foreign currency movements in the quarter, since the Argentinian peso and Turkish lira lost value relative to the U.S. dollar. There were also small adjustments tied to tax impact and adjustments related to mark-to-market accounting on our marketable security portfolio. Now let's turn to Slide 10 and talk through the outlook for the rest of the year. As Rod has already shown and described, we have raised our 2022 cost guidance because of the temporary suspension at Çöpler and the inflation that keeps pressing on every part of the business, which I also mentioned on the first quarter call. Production guidance is still unchanged, but we anticipate closing out the year at the bottom end of that range, once again a reflection of the temporary suspension at Çöpler. Our all-in sustaining cost guidance range now stands at $1,230 to $1,290 per ounce. The biggest factor behind the higher cost guidance is weaker silver prices when converting gold equivalent ounces, together with reduced production volumes and increased diesel, electricity and reagent prices at every one of our locations.
Alison White
executiveWe keep concentrating on efforts to improve the business and save on costs, which help reduce how long these cost pressures last and how much they affect us. Although certain items, such as increased wages, are going to stay with the business over the years ahead, we are still confident that we can meet our operating track record while folding in cost improvements. Now turning to the second quarter results in greater detail. On Slide 11, we will discuss SSR's financial position. When the quarter ended, the company held a cash and cash equivalent balance of almost $940 million, with net cash of almost $640 million. Keeping that strong cash position in mind, I want to restate our priorities regarding capital allocation within the business. Above all, we will keep reinvesting in growth, including our Ardich and C2 projects, which deliver exceptionally high returns and will represent roughly $300 million in total growth capital through 2025. After that, we are dedicated to keeping a robust balance sheet so we can ride out volatility in the commodity price environment and make sure that all of our capital commitments, debt servicing requirements and base dividend payments are fully funded even if there is a potential downturn in the gold price.
Alison White
executiveThird, we're still dedicated to returning capital to shareholders. You can see that in the share repurchases we've done recently, which came to almost $70 million over the year — a pretty impressive figure when you consider that we only announced the 2022 buyback program a little more than a month ago. That new repurchase program adds further strength to our capital returns, along with the 40% dividend increase we announced earlier this year. When you combine the buyback activity year to date with an annualized dividend of $60 million, or $0.28 per share, that gave us a minimum capital return of roughly 3.7% for the year. Above all, we stay disciplined in how we go about this, while making sure our returns properly reflect the strong free cash flow our company generates. With that, I'll hand things over to Stew for an operational update.
Stewart Beckman
executiveThank you, Alison. As usual, I'll begin with EHS&S. Our injury rate improved during the quarter, yet it still sits above the level we're aiming for and, as ever, remains an area demanding significant effort and attention. The incident that led to the suspension at Çöpler disappointed us, and we're working to examine and strengthen the systems and practices underlying our operations throughout the business. I'll say more about Çöpler shortly. Safety, along with caring for our teams, communities, and the environment, are core values, and we view them as fundamental to business performance. Turning to Slide 13, we'll discuss Çöpler. As mentioned on the Q1 call, we finished our first scheduled major autoclave shutdown, including rebricking of the face courses of autoclave number 2, early in Q2. That's impressive performance from the autoclaves, considering we started them back in 2018. The planned maintenance shutdown required roughly 3 weeks to complete, and together with lower mine grades, that produced a somewhat softer quarter with higher costs. We achieved production exceeding 51,000 ounces at an all-in sustaining cost of $1,253 an ounce. We're also continuing to ramp up the flotation plant this quarter.
Stewart Beckman
executivePerformance is generally solid, though we're still feeding more carbonate into the autoclave than we'd like, which means we're consuming more <<inaudible>>. We're focused on enhancing that carbonized split, and that includes partnering with a Turkish university. The restart clearly weighs on the business, but I'm happy to say that every improvement initiative mandated by Türkiye's Ministry of Environment has now been finished, and we're waiting on verification and approval from the relevant authorities. A local director came by today to inspect the completed work. Better process control on the pumps that feed the heap leach, along with upgrades to the burns and runoff, were finished with regulatory officials overseeing the work. Our team has gained substantial knowledge from the incident, and we continue to stay in close touch with the regulators, with the goal of restarting the operations we told you about during the quarter. More positively, while operations were temporarily suspended, we managed to pull forward a large portion of the 3-week maintenance for autoclave 1 that had originally been scheduled for the fourth quarter, which sets us up for a stronger finish to the year once Çöpler is back at full operations. Turning to our growth initiatives, the Cakmaktepe extension, or Ardich, is still on track for first production in 2023.
Stewart Beckman
executiveWe're also advancing the C2 project through PFS during 2022, and we anticipate sharing the results from this more optimized project with the market in 2023. Both of these projects — with their longer terms and low capital costs — have us excited about their potential. Turning to Slide 14, let's discuss Marigold. Marigold showed quarter-over-quarter improvement, although production timing is still being affected by stacking of fine material from an old pit. Output of almost 46,000 ounces at an all-in sustaining cost of $1,458 per ounce came largely in line with expectations for a back half weighted production profile. Near the end of the second quarter, we started stacking higher grade material, and we anticipate significantly stronger production in half 2, particularly during the fourth quarter. We expect 71,000 ounces in Q2, with 30,000 of those ounces coming just in June thanks to the higher grades. Permitting kept moving forward at Valmy, and we anticipate receiving the EA for the expanded Valmy pit in 2024. We pushed ahead on advanced work for the Marigold District master plan and expect to release that report to the market in 2023. On to slide 15. Seabee turned in another fantastic quarter, producing over 38,000 ounces at an all-in sustaining cost of $628 per ounce.
Stewart Beckman
executiveAfter that record first quarter, the mine turned in a record first half, producing close to 91,000 ounces at $611 per ounce. We're pushing exploration forward on the extension of the very high-grade zone that was behind the first half's outperformance. The good news is we believe there's more there, though we don't anticipate being able to mine that area before 2023. That said, we've sped up development work to reach a different high-grade area within the Santoy reserves. As a result, 2022 production guidance has been raised to 150,000 to 160,000 ounces. A phenomenal outcome for the asset and for the team. I'll say more about the exploration work that carried on during the quarter in a few moments, but I want to flag the progress on the Seabee District master plan, which we also expect to publish in the first half of 2023, and which John can begin presenting himself shortly. There are some genuinely exciting targets for future development that we're accelerating with the intent of including them in this document and in later master plan documents. We've been drilling at Porky West, Taiga, which is showing potential for an open pit option at Seabee. If it works out, that could give us a foundation for reframing Seabee's development pathway.
Stewart Beckman
executiveNow, if you’ll turn with me to Slide 16. After a weak first quarter, we rebounded, producing almost 2 million ounces of silver at an all-in sustaining cost of 1,523 — $15.23 per ounce. We expect output to rise during the latter half of the year as grades improve, though expenses remain under pressure from Argentina’s high inflation. Finally, before I open things up for questions. I’d like to go to Slide 17 and call attention to several exploration efforts we advanced this quarter. During the second quarter, we moved exploration programs forward throughout the company and are getting ready to publish results from certain of those initiatives in this year’s second half. At Ardich, resource development and expansion drilling are ongoing as we keep adding growth to the ore body that might further enhance the production profile set out in the CDM P21 earlier this year. Also in Türkiye, drilling has resumed at the Copper Hill project, our pure copper prospect located in the Black Sea region. In Saskatchewan, the team advanced definition drilling of the same target, situated just off the whole road between the mine and the processing plant. As I mentioned, we are also quite enthusiastic about Porky West’s main target to the northwest of the Seabee plant, where recent drilling and reinterpretation of the existing resource modeling point to the potential for an open pit target that could run at the same time as the underground operation in the future.
Stewart Beckman
executiveThat extra tonnage gives us the ability to rethink how we run things — for example, expanding or upgrading the process plant, plus the possibility of an all-season road out to the site. In Nevada, exploration moved ahead both close to the mine and on a broader regional basis. We're drilling right now at Trenton Canyon and Buffalo Valley, and near-pit drilling at new Millennium is delivering encouraging results. Our exploration rig count now stands at 6, which shows just how many targets we have and how excited we are about this asset — a portion of the new Millennium drilling ought to make it into our annual resource update later this year. Finally, at Puna, we began drilling for the first time since 2018. The exploration team has pinpointed quite a few in-pit and near-mine targets that, if they pan out, could open up chances to extend mine life. We intend to put out exploration updates for Çöpler — which, of course, includes Aldrich — along with Copper Hill, Seabee, Marigold and Puna before the year is out, and we'll aim to fold as much as we can of those extensions and that exploration success into the new technical reports for Türkiye, Seabee and Marigold in 2023. Thank you very much, and back to you, Rod.
Rodney Antal
executiveAlright, thank you Stu, and thank you Alison. As a sector, we're definitely up against considerable outside difficulties in 2022, and we're staying watchful and taking proactive steps to reduce those effects. We're still on course to meet our production guidance for the full year, and there are several potentially favorable catalysts ahead across the asset base. We're looking forward to operations resuming at Çöpler, and we'll keep the market informed about any additional developments concerning the necessary approvals. Lastly, I'd like to welcome John Ebbett to the executive team, and he will keep contributing to the business as we move through this planned transition in senior leadership. So with that, Ariel, I'll turn it over to you for Q&A.
Operator
operator<<operator_script>> Cosmos Chiu from CIBC has our first question.
Cosmos Chiu
analystI'll start with a couple of things about Çöpler, if I may. Just to confirm or clarify — Stu or Rod — it sounds as though the inspector is now on site. Is it still hazy, or is she there? And at this point are you simply waiting for the regulatory approvals to come through?
Stewart Beckman
executiveSo the work wrapped up over the weekend, and today we've got the local inspector coming out. There's a set of approvals that need to take place, and we'll also be getting visits from the Ankara inspector too. It's something of a process, but we'll work our way through it.
Cosmos Chiu
analystUnderstood. Once every approval is in hand, could you perhaps lay out—or give us a little more detail on—how much time it would take to get the autoclaves and everything else going again?
Stewart Beckman
executiveAltogether, getting the autoclave going again from a cold spot is going to take roughly 4 days.
Cosmos Chiu
analystMy apologies. Then on the planned maintenance side, I suppose there’s a bit of a silver lining in that you can move some scheduled maintenance forward from the second half into the shutdown period. So just to confirm, I think previously you had scheduled roughly 3 weeks for a planned shutdown in the second half. Those 3 weeks will no longer be needed, then, and that should help you make up for lost time when we discuss second half production. Is that right?
Stewart Beckman
executiveRight, so the autoclave’s mechanical work is finished, and we can move it into next year to handle the face courses on the bricks.
Cosmos Chiu
analystAnd on that point as well, I suppose, like you mentioned, you're re-breaking the autoclave for next year. How much time is that going to take in 2023? Are we talking about 1 week, 1.5 weeks? Or is it going to take the full 3 weeks?
Stewart Beckman
executiveThat'll take <<inaudible>> 3 weeks. We won't handle all of it — only a portion.
Cosmos Chiu
analystAll right, you'll open it up, check whether things are more or less fine, and then proceed from that point, I suppose.
Stewart Beckman
executiveAbsolutely. Some areas experience heavier wear compared to others, and those are exactly the ones we've been reworking <<inaudible>>.
Cosmos Chiu
analystThanks. Maybe we pivot a bit here to Seabee. It’s good to see—I believe you raised the full-year guidance as you discussed production guidance. You mentioned that during the call in your prepared remarks too. But that increase—does it reflect the fact that you’ve exceeded expectations in Q1 and Q2? Or is part of it also contingent on some outperformance in the second half as well, in order to reach those updated production guidance figures for Seabee?
Stewart Beckman
executiveYeah, some of it was pulled forward a bit, and there's a bit of a high rate in there, but it sits inside the reserves. So that's part of the mine rescheduling. I wouldn't call it high risk <<inaudible>>.
Cosmos Chiu
analystAbsolutely, and this final question will be the last one. You noted that cost guidance for the year had to be raised somewhat. I realize you addressed this during your prepared remarks, but would you be able to explain what inflation assumptions had been included in the earlier guidance? And what are you now incorporating? I ask only because, as we discussed, the makeup of that guidance is now somewhat different. Çöpler guidance has decreased on the production side. Seabee output has gone up. Seabee costs are somewhat lower so far. So I would think that helped offset some of the inflationary pressure, yet inflation still pushed your guidance higher. So did you build a fair amount of conservatism into your cost guidance? Perhaps a few comments on that.
Alison White
executiveCosmos, I’ll handle that question. It’s good to hear from you today. We didn’t add another factor into inflation; we’ve observed a consistent run rate throughout the year in which inflation has clearly exceeded what we originally budgeted. So we based our guidance for the rest of the year and our cost guidance on what we’ve already seen come through this year. And to expand a bit further as well, the rising number of ounces at Seabee is bringing some of the costs there down. But overall, we’re definitely seeing a pattern of inflation raising the cost base throughout the organization.
Operator
operatorThe next person to ask a question is Michael Siperco from RBC Capital Markets.
Michael Siperco
analystLet me press a bit further on Çöpler. Do you have a timeline and planned site visits set up? Should we be thinking in terms of days or weeks? Or could the operation potentially stay off-line through the end of September, simply depending on what schedule the government follows?
Rodney Antal
executiveYeah. Michael, I believe we laid it out thoroughly across the written materials, our opening comments, and what you just expanded on regarding the greater amount of physical work happening at the site over roughly the last 72 hours. Right now, our plan assumes a start-up during quarter 3. And given what we know as of today, that is our best estimate.
Michael Siperco
analystAll right, got it. And perhaps I could also build on that earlier question regarding costs and possibly costs past '22 — could you expand on what trends you're observing throughout your business? Are certain costs beginning to level off? Do you see some that have stabilized while others keep climbing? Any sort of visibility into what you're seeing?
Alison White
executiveMichael, we're definitely beginning to see what I'd call a bit of a peak on fuel, though we're not really trying to — into — sorry, so — we have definitely just gone past the peak on fuel. And looking ahead, we are certainly seeing that some sticky costs that we're dealing with now will carry on into next year. But given how quickly the rate of inflation has changed over the past few months, we aren't necessarily certain what that exact rate will be going forward, but we do expect that we'll have some as we head into early next year.
Michael Siperco
analystAll right, that's helpful. Now, when it comes to mitigating this and heading off future issues, are you thinking about adjusting your approach on stockpiling, hedging, or supply chains? I'd assume these are things you review continuously, but have you reached any conclusions yet about altering your strategies down the road?
Stewart Beckman
executiveMichael, I believe we're ready to go through our usual planning cycle as a company. We're always seeking ways to enhance our cost base, whether that's via supply chain opportunities. It might be continuous improvement, or certain operational effectiveness initiatives that we have — that's simply business as usual for us. So we'll incorporate those into our planning cycle. But as Alison kind of noted, a number of those costs have definitely run ahead of the work we had already planned for 2022. So we'll pull all of that together over the next few months, and that will show us where we land net-net.
Michael Siperco
analystAll right, and perhaps the final question — returning to Çöpler and next year's Ardich start-up, which ought to help costs. Could you say a bit more about how you expect costs at Çöpler to trend from here as Ardich comes in during 2023?
Stewart Beckman
executiveMy view is that the CDMP21 technical report we put out earlier this year serves as the clearest reference point for what we anticipate with Ardich.
Operator
operatorOvais Habib from Scotiabank has our next question.
Ovais Habib
analystI've just got a couple of questions. Some of the things I was wondering about, like the Çöpler restart and cost inflation, I think have already been addressed. So maybe just a follow-up on Ardich. Is there anything still pending on permits or other regulatory requirements before Ardich can move to production in 2023?
Stewart Beckman
executiveRight. For Ardich, the permits have always been the crucial piece, above all. From a technical standpoint, then, it's fairly straightforward. To date, every one of the permits — and the headway made on them, since like any mining project there are several permits needed — has been proceeding on par with, or slightly ahead of, our timetable. So we remain on schedule relative to what we anticipated at the time we published the technical report.
Ovais Habib
analystThanks. Turning to the exploration side now — as you said, there are clearly plenty of programs running everywhere. Do you plan to put out some kind of exploration update, and after that a resource update, and then move toward those mine plans or master plans you intend to release in early 2023? If you could shed a bit more light on that, that would be great.
Rodney Antal
executiveYes. So later this year, we'll put out exploration updates for the projects, and in those we'll give our usual exploration updates or provide the details of the holes and the results we've received on them. We'll then build those out depending on how fast it comes in and what the drill density is, which deposit it's in, whether it forms part of the existing resource or a new resource. Some of those will go into our normal updates. And then we'll build as much as we can into the next technical reports when we do them. But as has happened, for example, with Ardich over the years, we're continuing to explore Ardich. So we'll get as many holes into this next iteration as we can. And we'll keep drilling that prospect going forward.
Operator
operatorThe next person to ask something is Lawson Winder from Bank of America Securities.
Lawson Winder
analystGood to hear from both of you. Could I perhaps follow up on Çöpler once more? I was just wondering why the maintenance at Çöpler isn't being completed now rather than being pushed into 2023. I'm talking about the relining of the second autoclave. Is that because you expect the restart could happen at just about any moment? Or is something else going on?
Stewart Beckman
executiveThe issue relates to what we scheduled for November, and the bricks are only now coming in. As a result, we lack sufficient bricks to complete the entire job. They'll be delivered over the coming week. And should we not be operational at that point, we'll get some work done. If not, we'll carry that cost into next year.
Lawson Winder
analystAll right, that's great. So, given the inflation we're seeing in costs, have you considered possibly raising the reserve gold price assumption at Marigold, and maybe at some of the other assets as well?
Stewart Beckman
executiveThat will happen in the usual way once we get to the technical reports along with the resource and reserve calculations later this year, just as we always do.
Lawson Winder
analystThat's usually something you handle in November, correct?
Rodney Antal
executiveYes. That happens at year-end. Look, I don’t believe — at this point, Lawson, we haven’t anticipated anything that would answer your question. We’ll take a look. In any case, we conduct a kind of market review and consensus pricing. So it won’t be something we drive arbitrarily just to push the reserve price up. I think — if that’s what you’re asking. It will simply form part of our usual reserve reviews.
Lawson Winder
analystAll right, that makes sense. Then perhaps a somewhat wider question. You brought up M&A, and valuations are certainly at quite low levels historically. Could you perhaps bring us up to date on how you're thinking when it comes to geography, the mix of target metals, and development stage?
Rodney Antal
executiveHonestly, Lawson, not much has shifted regarding our position or the kinds of opportunities we'd view as suitable for SSR. So I'd say the earlier conversations we've had quite transparently with the market concerning the jurisdictional mix — the reasoning behind the strategic drivers — those remain the same in today's conditions. That said, as I've noted, we'll clearly be quite careful about anything we examine or anything that lands on our desk, making sure it's a proper fit. So none of the drivers have been altered. The market hasn't pushed us to accelerate or to decelerate. Once again, this is simply standard practice for us, and we're continually evaluating various opportunities and permutations so that nothing gets overlooked. But at this point, that's all there is to it.
Operator
operatorLevi Spry from UBS Australia has our next question.
Levi Spry
analystPerhaps this is simply a question about exploration. I may have missed it, but is an exploration update expected soon? And regarding this Porky — how significant is it? Could you walk us through what you discovered there?
Stewart Beckman
executivePorky was already well tested before. I suppose that while we were exploring in that vicinity, there was a strong emphasis on examining what lies beneath the surface, so to speak. Our senior geologists needed to review it, and they had a thesis that Porky could function as an open pit, which we have been exploring. As a result, we have encountered some intercepts that are somewhat wider yet lower grade and fairly near surface. It appears to cover a reasonable extent. So we are quite excited about it. We will spotlight the data we have gathered when we put out a release before this year ends.
Levi Spry
analystAll right, so that covers everything on the exploration side. Is it — I wasn’t aware there was much to that.
Stewart Beckman
executiveYes. We'll carry that out at every one of the sites. So Çöpler, and that takes in Ardich plus some additional drilling we've completed inside Çöpler, Seabee. Quite a few targets at Seabee, Marigold, which includes Buffalo Valley, Trenton Canyon and the work around New Millennium. I doubt we'll get anything out of our units. We've only just begun drilling holes in the ground there.
Operator
operatorMike Parkin from National Bank has the next question for us.
Mike Parkin
analystI might have missed this, but regarding Seabee, there's talk about potentially getting back into high grades, higher than normal. Is that roughly in the same area where you pulled that high-grade pocket earlier this year that really drove the really good results?
Stewart Beckman
executiveYes, regarding that high-grade profit: we moved out and started drilling there, since our hope was to re-enter it right away. It appears to pinch out just beneath our current position, though a level or so lower it opens back up across a couple of levels, and we're quite enthusiastic about how it looks beneath that. That said, reaching it this year isn't going to happen. My expectation, then, is that we'll have it in '23, but first we have to establish what we've actually got. Another zone we're advancing through is a different area that sits in reserve, and we adjusted the mine plan somewhat to reach <<inaudible>>.
Mike Parkin
analystWould you say it's roughly the same situation, where a bit of infill work just brings out a small sweet spot within the mine plan?
Stewart Beckman
executiveThe one we're heading to that's already in our plans—this is inside the reserve, in that very high-rate pocket where we currently sit—and the one we're currently exploring and putting money into lies outside the resource reserve, and we're pursuing it further.
Mike Parkin
analystAlright. And could you remind me — maybe this fits better with that exploration update — but as you head south toward the Fisher property, I remember the vein structure being fairly widespread at surface, what with the discovery coming through forest fires and all that. How much of your focus are you directing to the south as opposed to up near the gap, like the hanging wall? Are a lot of rigs spread out evenly? Or do you still see the easier wins lying more to the north, and are you putting more of your attention there?
Stewart Beckman
executiveNo. Drilling has been happening in both of those areas. Clearly, the exploration work inside the mine is aimed at bringing things in tighter. Then there's the amount of work we carry out — most of it close in, converting to ensure we can feed the plant and hit the medium-term targets, plus a bit more work. And we're still testing those other areas. Fisher still has us pretty excited, and we figure there's a good probability we'll get something from it. Right away to the south of Santoy sits Joker. What we observe at Santoy is that grade and volume appear to build with depth — it improves as you go deeper. So we've chosen not to push Joker toward any sort of resource development until we've drilled some deeper holes and tested that hypothesis, and after that we'll likely develop the asset.
Mike Parkin
analystAll right. And regarding the Türkiye region specifically — there's clearly a fairly major heat wave moving across Europe at the moment. Could you say anything about how regional forest fires might be affecting things? Or would you say you're located quite a distance from anything currently active?
Rodney Antal
executiveMike, honestly, we haven't seen any effect at all around the mine. So that part is good news.
Operator
operatorThat brings the Q&A portion to an end. Mr. Antal, I'll hand the conference back to you now.
Rodney Antal
executiveGreat. Well, I appreciate all of you. Thanks for being with us, and we look forward to the next quarter and to continuing updates regarding Çöpler. Until then, goodbye.
Operator
operatorThat brings our conference call to a close. You're welcome to go ahead and disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete SSR Mining Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to SSR Mining Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in SSR Mining Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.