SSR Mining Inc. (SSRM) Earnings Call Transcript & Summary

February 18, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 39 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, everyone, and thank you for joining SSR Mining's conference call covering the fourth quarter and year-end 2024. I'd like to let you know that this call is being recorded. <<operator_script>> Right now, to give opening remarks and make introductions, I'll hand things over to Alex Hunchak of SSR Mining. Alex, please go ahead.

Alex Hunchak

executive
#2

Thanks, operator, and good day to all of you. I appreciate you being on today's conference call, where we'll go over SSR Mining's financial results for the fourth quarter and the full year. Our consolidated financial statements follow U.S. GAAP. These statements are on file with EDGAR, SEDAR, and the ASX, and you can also find them on our website. An online webcast goes along with this call, and the details for accessing that webcast are in this afternoon's news release as well as on our corporate website. Keep in mind that, unless we say otherwise, every figure we talk about on this call is in U.S. dollars. Forward-looking statements will be part of today's discussion. So please do read the disclosures in the relevant documents. In addition, our discussion and the slides that accompany it make reference to non-GAAP financial measures. For details on the comparable GAAP measures, please see our press release. Joining Rod Antal, Executive Chairman, on today's call are Michael Sparks, Chief Financial Officer, and Bill MacNevin, EVP, Operations and Sustainability. I'll hand the line to Rod now.

Rodney Antal

executive
#3

Thanks, Alex. I'd like to open today's call by noting that February 13 was the one-year anniversary of the tragic event at Çöpler. A moving memorial service took place at the site to honor the 9 colleagues we lost. That event has left a lasting mark on all of us at SSR, and I want to recognize the hard work and commitment shown by everyone throughout this organization in 2024. We've achieved solid progress at Çöpler, particularly over recent months. Discussions that remain constructive are ongoing with the appropriate Turkish authorities regarding a route to move forward with restarting operations. Bill will give a further update on current activities at Çöpler later in the call. Turning now to our 2024 results. I'm happy to report that we finished the year strongly, with solid operating results, a year-over-year increase in our consolidated reserves, and a major strategic announcement — the acquisition of the Cripple Creek & Victor mine from Newmont. As a result, CC&V will expand our scale, free cash flow and portfolio diversification, and we've made excellent progress on integration planning since the transaction was announced in December. Our consolidated 2025 cost and production guidance, including CC&V, will be released shortly after the transaction closes in the coming weeks.

Rodney Antal

executive
#4

As we look ahead and continue pushing forward with our work at Çöpler, there are a number of key priorities and catalysts coming up in 2025. Among them: delivering a technical report and an updated life of mine plan for CC&V; moving Hod Maden toward a construction decision; making continued progress on an updated and extended life of mine for Puna, including possible laybacks into tiers and assessing the longer-term potential of Cortaderas; advancing the Buffalo Valley deposit at Marigold, which now holds over 500,000 ounces in its maiden reserve; carrying on exploration activities throughout the portfolio as we assess further opportunities to extend mine life at each of the operations; and, most importantly, continuing to move Çöpler toward a restart. I'd also like to call out 2 significant milestones the SSR team reached in 2024. At Marigold, we marked 5 million ounces of life of mine gold production from that asset on December 30 — a huge accomplishment and a testament to the quality of the mine and of the team. In addition, Puna produced 10.5 million ounces of silver in 2024, a record for the operation's 15 years of life and reaching the top end of its previously increased production guidance. We're proud of our team in Argentina for what they've done to build Puna into one of the premier silver mines.

Rodney Antal

executive
#5

Moving to Slide 4, we'll discuss the MRMR update. At the close of '24, our consolidated reserves came to 8 million gold equivalent ounces, with no contributions counted from CC&V or Hod Maden. That marked a 3% gain versus '23 following mine depletion — a solid outcome demonstrating how well our resource development drilling has worked. Of particular note, reserves at Marigold rose 14% year-over-year, thanks to the declaration of a 523,000-ounce maiden reserve at Buffalo Valley, which going forward will be a key life of mine extension opportunity for Marigold. It's also worth noting that changes in metal prices were not a material driver behind this reserve growth. Gold price assumptions at Çöpler and Seabee were unchanged from 2023, while Marigold and Puna raised their metal price assumptions by just 3% over the prior year. Our gold equivalent resources exclusive of reserves declined only 1% year-over-year despite the strong reserve conversion and unchanged metal price assumptions. Gold-only M&I resources grew 9% over '23, driven in part by continued resource additions at Seabee. Additionally, the addition of both Hod Maden and CC&V will deliver meaningful reserve and resource growth in 2025, and we will keep advancing resource development activities across the portfolio as we strive to extend mine lives at each one of the producing assets.

Rodney Antal

executive
#6

That covers how things are moving along at the New Millennium and Buffalo Valley deposits at Marigold, the Porky's target at Seabee, Puna, and the Cortaderas project. At this point I'll pass the call to Michael, who will go over the quarter on Slide #5.

Michael Sparks

executive
#7

Thanks, Rod, and good afternoon, everyone. Our strongest quarter of the year came in Q4 2024, when we produced 124,000 gold equivalent ounces at all-in sustaining costs of $18.57 per ounce. Over the full year, output reached 399,000 gold equivalent ounces with an AISC of $18.78 per ounce. Marigold, Seabee and Puna together delivered 371,000 gold equivalent ounces in 2024 at an AISC of $15.42 per ounce. As a reminder, U.S. GAAP does not allow us to adjust for care and maintenance costs incurred during the year, and the cash impact of those expenses shows up in our AISC figures. If you exclude the roughly $178 per ounce of cash care and maintenance costs incurred at Çöpler and Seabee in Q4, AISC for the quarter comes to $1,679 per ounce. For the full year, excluding care and maintenance costs, AISC was $1,699 per ounce. At Çöpler, reclamation and remediation spend for the full year totaled $128 million. We also spent approximately $14 million advancing Hod Maden in the fourth quarter, which brought full year spend at the project to $42 million as we progressed engineering and preliminary site development activities. Lastly, as Rod mentioned, 2024 was a good year at the drill bit, and we look forward to continued advancement of these brownfield opportunities in 2025.

Michael Sparks

executive
#8

Turning to Slide 6 for our financial results. For the fourth quarter, we posted attributable net income of $0.03 per diluted share, along with adjusted net income of $0.10 per diluted share. Care and maintenance costs at Çöpler came to $36 million in Q4, which works out to $0.18 per diluted share. Operating cash flow for the fourth quarter reached $95 million, and free cash flow came in at $56 million — a very strong way to close out 2024. We ended the year with total cash of $388 million, a net cash position of $158 million, and total liquidity of roughly $890 million. Given this liquidity on hand and an expectation that free cash flow generation will continue in 2025, we have finished the year in a strong financial position, and we are well placed to handle remediation costs at Çöpler as well as our reinvestment needs throughout the business. In addition, we anticipate that CC&V will deliver immediate free cash flow to our business once integrated, allowing for a rapid payback of the transaction's $100 million upfront consideration, especially at these gold prices. I'll now hand it over to Bill for Slide 8.

William MacNevin

executive
#9

Thanks, Michael. I'll begin with a quick update on Çöpler. During Q4 2024, we kept pushing forward with reclamation and remediation work at the site, and all of the displaced heap leach material has now been removed from the Sabirli Valley. Discussions are ongoing with Turkish government officials regarding the final remediation plan for Çöpler. On a positive note, we keep seeing public comments from Turkish officials confirming that no recordable contamination was found in local soil, water or air in location samples. After the incident, we brought in Call & Nicholas, Inc., or CNI, an international mining consultancy, to carry out an independent review of the Çöpler heap leach failure. That was an important piece of work for us as we worked to establish what caused the Çöpler incident. CNI concluded that the most likely cause of the Çöpler incident was a deep-rooted flaw in the third-party engineering design of the heap leach pad — specifically, an overestimation of the shear strength properties of the liner system at the base of the heap leach. That error inflated the calculated factor of safety and led to insufficient shear strength along the liner interface to support the heap leach facility as designed. CNI also concluded that, in all material aspects, construction and operation of the heap leach pad were carried out in conformance with the issued-for-construction engineered design parameters, and that nothing substantiated that excess water, ground vibrations from blasting or stacking beyond the design caused the event.

William MacNevin

executive
#10

For our team in the field, these results bring clarity and understanding as we look to restart the Çöpler mine, and we keep working closely with the relevant authorities on that. As a reminder, we anticipate that Çöpler can be restarted within 20 days of receiving the required permits, and initial operations would involve processing a mix of stockpiled ore and ore from Çakmaktepe mine while remediation work carries on. Let's now turn to Slide 8 for some comments about Marigold. Marigold turned out 60,000 ounces during the fourth quarter — its strongest quarter of the year — and that marked 5 million ounces of cumulative production across the mine's 35-year operating life. That is a major milestone for any gold mine and stands as clear evidence of the quality of the people we have on the ground in Nevada. Over the full year, Marigold produced 160,000 ounces at ASIC of $1,711 per ounce, and costs reflected higher royalty expenses given the current gold price as well as ongoing cost pressures related to OEM components. We expect those costs to stay elevated in 2025. As Rob mentioned in the MRMR update, we achieved some excellent progress on brownfield exploration and studies at Buffalo Valley, which allowed us to declare a maiden mineral reserve of 523,000 ounces at the deposit.

William MacNevin

executive
#11

We also achieved growth in mineral resources at New Millennium, and during 2025 we'll keep pushing forward with brand fill drilling at Marigold so we can build on those positive results. Moving now to Seabee on Slide 9. Operations at Seabee restarted on October 11, and the mine wrapped up the year with its best quarter of 2024, producing 28,000 ounces at an ASIC of $1,214 per ounce. That strong output came from head grade that ran higher than expected, averaging 9.7 grams per tonne during the quarter. Thanks to that robust fourth quarter, Seabee ended the year above the production guidance it had previously revised, at 79,000 ounces ASIC — at an ASIC of $1,515 per ounce. In 2024 the team kept up its evaluation of drilling at the Porky and Porky West targets, which helped deliver an 88% increase in measured and indicated mineral resources for Seabee. We're carrying out additional drilling and technical studies to better define the opportunity to potentially extend Seabee's operating life, both through extra mineralization at Santoy and a possible new development pathway at the Porky targets. Moving on now to Puna. Puna produced 3 million ounces of silver in the fourth quarter, which drove record full year production of 10.5 million ounces of silver.

William MacNevin

executive
#12

Output matched the top end of the increased guidance Puna had issued earlier, giving this operation a strong finish to what has truly been an exceptional year. For the full year, ASIC at Puna came in at $15.56 per ounce, which delivered significant free cash flow margins given where silver prices stand today. During '24 we made solid headway in evaluating ways to extend Puna's life, at the Chinchillas pit as well as the Cortaderas target. We anticipate being able to share further updates on those initiatives at some point in 2025, and we're excited that we can build on the recent success at Puna by delivering a longer mine life and continued economic benefits for our local stakeholders. Before handing things back to Rod, let me briefly address the Cripple Creek & Victor acquisition. I have personally overseen the integration process since we closed the transaction in December, and I'm confident we are positioned to realize significant value from CC&V right from the start. Our due diligence identified meaningful opportunities to build on the sizable mineral reserves and resources that already exist at the asset. And we look forward to demonstrating other opportunities to deliver additional value from the asset in an updated life of mine plan for CC&V within 2025.

William MacNevin

executive
#13

Bringing an asset and team of this caliber into our portfolio is something I'm thrilled about, and I look forward to discussing our long-term plans for the mine in the near future. Back to Rob now for closing remarks.

Rodney Antal

executive
#14

Thank you, Bill, and Michael as well. At the conclusion of the third quarter call, I mentioned our anticipation of a robust finish to 2024. I'm pleased to report that those expectations were met, and we anticipate carrying that positive momentum forward through the delivery of several catalysts in 2025. With the CC&V transaction set to close within the next few weeks, we've brought in yet another long-lived, free cash flow generative asset to the portfolio, and we anticipate sharing our consolidated production and cost outlook for the company prior to the quarter's end. Meanwhile, we keep diligently working toward a possible restart of operations at Çöpler. Çöpler makes a meaningful contribution to both the local and national economies in Türkiye, and we're eager to resume operations as we carry on with remediation and reclamation work in '25 and beyond. I take pride in the tremendous resilience our teams and the business showed in 2024. We've begun a new year with fresh optimism, and although the year ahead is busy, we look forward to creating value across all of our assets in 2025.

Rodney Antal

executive
#15

With that said, I'll now hand things back to the operator so we can take your questions. Thank you.

Operator

operator
#16

<<operator_script>> The initial question this session comes from Ovais Habib of Scotiabank.

Ovais Habib

analyst
#17

I have just a couple of questions. To begin with Seabee: clearly, Q4 was a strong quarter for you. Should we be anticipating that kind of outperformance carrying on into 2025?

Rodney Antal

executive
#18

Ovais, I'll hand that question over to Bill.

William MacNevin

executive
#19

Yes. I appreciate the question. It was an excellent quarter. Clearly, we came across some truly exceptional grade. We're still exploring and carrying out more work at Santoy. I can't count on those grades repeating every single quarter, though we do anticipate staying in that same trend year after year. But, as you're aware, if you've followed Seabee, there are occasions when we encounter some of that stronger grade, and this quarter certainly was one of those.

Ovais Habib

analyst
#20

All right. Now turning to Çöpler. Rod, is there any particular information or study that the regulators still need before they can reach any kind of decision about proceeding with the restart of operations? Or were the recent CNI findings sufficient for the regulators to make their decision to move forward?

Rodney Antal

executive
#21

Yes. Look, I think the easy way to frame this, Ovais, is that it's a bundle of work. If you consider the 12 months since the incident, we've achieved enormous progress, as we've been reporting continuously throughout 2024 and, obviously, now with our full year financials. And the priorities we established, along with the aggressive timetable we set for ourselves to accomplish what we've actually done — controlling the site, ensuring we had no environmental contamination, remediating clearer Sabirli Valley to make this site safe — all of those are essentially precursors to a restart, as you'd expect. In the same way, the CNI report itself, obviously, isn't a precursor, but it matters to understand that as we're talking and working with the regulators. And the last few pieces really concern locking down and agreeing on what the closure plans will be. And that relates to the East Storage facility that Bill mentioned. So that's being concluded now, as well as the final heap leach closure itself. So it's all been a bundle, if you like, as a progression toward where we are today, to get us into this position as we look forward to a restart.

Rodney Antal

executive
#22

There's still plenty left for us to do, just as there always will be. As we've mentioned previously, the remediation work is going to keep going even after Çöpler is back up and running, and so on and so forth. So a restart doesn't automatically mean no further work remains. But when I think back to where things stood at this point last year — when all of us were plainly in shock over what had occurred — and compare that with where we are today, we've covered a great deal of ground. And of course, we're engaging with the regulators in a confident manner as we pursue the authorization and permits needed to bring Çöpler back online.

Ovais Habib

analyst
#23

And then, third point from my side. Again, as we turn to Hod Maden, is the start of development there in any way dependent on Çöpler resuming operations?

Rodney Antal

executive
#24

Yes. I think the easy way to frame it, Ovais, is something we might have discussed previously. When we bought our stake in Hod Maden, we did mention that we wanted to allow time for a plan to be developed. And by a plan, I mean a technical study reflecting how we intend to advance the asset, with the right level of detail on the execution plan and the necessary technical specifics — especially for years 1, 2, and 3 following startup, so we have high confidence about what we anticipate from the asset in those early years, since that is obviously where the payback sits, and so on and so forth. So that effort has been underway in the background, and we are diligently advancing all of those elements, separate from Çöpler. So — and that effort will keep going through this year until we reach a point where we can pull it all together to essentially redo the technical reports and then begin project financing conversations externally with the banks to move Hod Maden into construction. So it does not depend on Çöpler. And in fact, the work we have been doing, and how we have split the teams and the efforts around those teams, is designed so the two are mutually exclusive.

Ovais Habib

analyst
#25

That’s great. I’ll be waiting for the guidance once CC&V has closed.

Rodney Antal

executive
#26

Excellent. Thank you, Ovais. I appreciate that.

Operator

operator
#27

Cosmos Chiu from CIBC has the next question today.

Cosmos Chiu

analyst
#28

I’ll start with Marigold. It’s good to see an initial reserve declared at Buffalo Valley. Can you remind me how that fits into Marigold’s production profile?

Rodney Antal

executive
#29

Yes. Look, I’ll let Bill respond to that question. But what I think matters most — what most people should take away from this year — is that there could have been a stretch when we lost sight of the rest of the business. Yet we managed to accomplish what we did despite the Çöpler challenge, with operations performing well while we kept advancing and brought the portfolio’s growth into the light. I’m genuinely proud of the team and everything they’ve delivered. And I want to state that openly, because we tend to forget — we simply take it, I think, for granted. But the behind-the-scenes work to bring Buffalo Valley into a reserve now shouldn’t be overlooked, since it matters for Marigold’s future. And once more, that’s another strong signal of the focus and energy we’ve brought to this business. But Bill, why don’t you take the question on the timing?

William MacNevin

executive
#30

Yes. So Cosmos — we're quite enthusiastic about that one. It's essentially a satellite of that core area. A considerable amount of solid work has already been completed, carrying it through this year. We're now advancing that into feasibility study-type efforts involving substantial engineering, and as is typical, we'll be refreshing our life of mine plans over the course of this year. So regarding timing, 2 factors will drive it: the net value, which we think will be substantial for Buffalo Valley, but we also still need to complete the permitting processes. So it remains several years away, but it's certainly something we're eager about as it moves through the pipeline. And we'll be in a position to share more detail on that later in the year, once we've completed our life of mine scheduling processes.

Cosmos Chiu

analyst
#31

Thanks. To build on what you said, Rod, that is exactly the reason I wanted to raise that question — I am also pleasantly surprised that we can see progress at a number of these different assets, Buffalo Valley included. So I agree with your remarks, Rod.

Rodney Antal

executive
#32

Yeah, thank you for that. And I think the other piece — just one more thing regarding Marigold, while you're on the subject. I think the other area we'll be focused on in '25, beyond what Bill laid out for Buffalo Valley, which matters, will be to keep drilling holes into the new Millennium target, which is another one that has moved along, just not as far along as Buffalo Valley has.

Cosmos Chiu

analyst
#33

Yes. Great. And then, as you noted, you released an updated mineral reserve and mineral resource estimate today for the year as well. And as you said, you relied on very conservative commodity price assumptions — $1,500 for some of the assets, and even lower for the others. Could you perhaps discuss the rationale behind choosing those conservative commodity price assumptions? And what would have occurred? For some of them — Marigold, for instance — I would imagine there are some ounces that could come into the pit if a higher commodity price assumption had been used. So, two parts. Why did you keep using a commodity price much below today's spot prices, and what could have happened?

Rodney Antal

executive
#34

Yes. Look, I won’t speculate about what might happen, since each of those is sensitive in its own way. But what I’ll say is that the straightforward explanation for where we landed, Cosmos, is this: if you look at Çöpler, since that asset is on care and maintenance, we kept metal prices unchanged—it simply made sense to do so until a restart happens. That was really the key point. Seabee, as you’ll recall, already sits at $1,650 because its mine life is relatively short. So we saw—we didn’t see any reason to change it. And then the others went up slightly, obviously, as well. So that was the decision we made as we worked through our assumptions. We also take a kind of consensus view. We look at what our peers are doing. And that’s how we arrived at the reserve and resource statements as they stood. We’ll keep reviewing that. We only conduct 1 sort of strategic mine plan review each year, because otherwise it just becomes unwieldy, and we’ll review that during 2025. Remember, we’ve also got to factor in now the acquisition of CC&V. And historically, Newmont has been fairly conservative in its resource and reserve statements.

Rodney Antal

executive
#35

We’ll need to see how they handle the new resource and reserve statements over the coming period. And we’ll factor that in as we conduct what amounts to a strategic review of the entire portfolio through our mine plan process in 2025. So there may be some revisions to it as we move through this year or later on. How they affect — how commodity prices affect the pit shells, the optimal pit shells, and so on — each is positioned quite differently when it comes to sensitivity. So again, I won’t go into elaborate detail on every single one, but clearly they’ll benefit from a higher commodity price across the years. So expect more later this year.

Cosmos Chiu

analyst
#36

Absolutely, and perhaps a final question. Sorry, just to return to Çöpler as you brought up. You said remediation and containment overall run $250 million to $300 million, and roughly $127 million has been spent to date. Could you remind us how the rest of that spending is timed?

Rodney Antal

executive
#37

Sure. I’ll hand that question to Michael — Michael, go ahead.

Michael Sparks

executive
#38

Yes. Thank you, Cosmos. I think if you consider what Rod said earlier on this call, much of the attention during 2024 was on the Sabirli Valley, and that effort is now finished. While we work through the engineering and the schedule for the East Storage facility, material movement is going to be subdued for all of 2025. After that facility gets built, material movement will pick up again. So my expectation is that remediation and reclamation spending will come in below the 2024 level, and once we have that permitting and other items completed for the East Storage facility, we will ramp material movement back up.

Rodney Antal

executive
#39

I'll provide that along with guidance, Cosmos, to the best extent we can. One additional point I'd make is that it's important — you state the figures accurately regarding the liability we hold, since I believe people need to grasp this clearly. Our estimate remains at $250 million to $300 million. That figure is unchanged, and it holds firm. And clearly we've already worked through a substantial portion of that via the '24 efforts. So what we expect is that the remaining spend will occur across several years past 2025 as we gradually construct the East Storage facility and carry out the remediation work on the pad, just as Michael mentioned. So I think the takeaway from that, if you consider layering it onto our liquidity position, is that we're clearly in an exceptionally strong position.

Cosmos Chiu

analyst
#40

Lawson Winder from Bank of America Securities has the next question today.

Lawson Winder

analyst
#41

I'd like to ask about Marigold before you give guidance. To be clear, I'm not asking for a preview of that guidance, but conceptually speaking, a year ago Marigold was designed to go through an investment period. So as a result, 2025 would have seen reduced gold production, followed by a rebound in 2016 and then an even higher level in '27. Broadly, does that concept still hold? Or might the investment that was contemplated a year ago be pushed out?

Rodney Antal

executive
#42

Apologies, Lawson—I needed to take myself off mute. My view is that if you take the tech report we released around this same point 12 months ago and treat it as the stand-in for guidance, that still holds up. So, up until the point we actually issue it, I'd say that's the strongest benchmark to work from.

Lawson Winder

analyst
#43

All right, that's great. So could you give us a bit more detail on what Türkiye is weighing as conditions before the operating approvals for Çöpler get reinstated? For instance, is there any thought being given to raising local ownership in some portion of the mine? Is there consideration of resubmitting an entirely new EIA, or what are the various moving pieces? Or are there certain stage gates you're able to share with us, just to help us think through possible time lines? Anything you can tell us would be very useful.

Rodney Antal

executive
#44

Yes. Well, I think I'll say again pretty much what I said a short while ago, but consider the incident itself — it was unprecedented, correct? So yes, when it comes to what has to be done for a restart, there's no playbook for this. Still, the efforts we've undertaken, and those efforts in and of themselves, are fully consistent with pursuing a restart. So we've achieved excellent progress on those fronts, and we keep advancing on those fronts. We think we're approaching the sharp end of that work, which requires finishing the engineering for the East Storage facility along with the engineering related to the heap leach pad remediation, and we're closing in quickly on completing that. And clearly, those conversations are happening concurrently with the regulators to make sure we're doing everything required before we apply for approval to reinstate the temporary operating certificate. So there's no condition precedent. Nothing dictates that a new EIA must be done. Operations will take place under the 2014 EIA. And as I believe I said probably during the previous call, regardless, we actually needed a new EIA for Çöpler in any case, which we fully anticipate finishing this year for somewhere around the middle of what we'll refer to as the Çöpler 2025 EIA.

Rodney Antal

executive
#45

That's going to factor in the planned expanded leach circuit as well as a few of the growth opportunities we flagged in last year's technical report around this same time. And that's kind of standard practice. It clearly carries more weight at the moment since we're aiming to bring the higher throughput rates back up at Çöpler, but even so, for us it was more a matter of routine rather than something required by any regulator preference. So I think, once again, as we move ahead, we're completing everything that needs completing, and we simply have to keep delivering on those items and keep up our ongoing dialogue with the regulators.

Operator

operator
#46

That brings the Q&A portion and today's conference call to an end. You're welcome to disconnect your lines at this point. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete SSR Mining Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to SSR Mining Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in SSR Mining Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.