Good day, ladies and gentlemen, and welcome to the Steel Authority of India Q2 FY ’25 Earnings Conference Call, hosted by Nuvama Institutional Equities. <<operator_script>> Following the conclusion of the presentation, you will have a chance to ask questions. <<operator_script>> I’ll now turn the conference over to Mr. Ashish Kejriwal of Nuvama Institutional Equities. Thank you, and over to you, sir.

Ashish Kejriwal

analyst
#2

Thanks, Yusuf. Good afternoon, everyone. We at Nuvama Institutional Equities are glad to welcome all of you to the Q2 FY ’25 conference call for Steel Authority of India. It’s a pleasure to have Mr. Anil Tulsiani, Director of Finance, with us on this call, together with his team. And I want to express our thanks to the management for the chance to host this call. At this point, I’ll invite Mr. Tulsiani to give his opening remarks. After that, we’ll open the floor for Q&A. Over to you, sir.

Anil Kumar Tulsiani

executive
#3

Thank you, Mr. Ashish. Good afternoon, everyone. I'd like to welcome all of our investors and analysts joining this results con call, where we'll discuss SAIL's financial results for Q2 and H1 of financial year ’25. I'm sure most of you have already looked at the results on the company's website and on the stock exchanges, but I'll briefly go over them for the benefit of the house. First, I'll talk about the world economic scenario. The global economy has been struggling with the impact of several factors, such as high inflation and the resulting monetary tightening policies meant to counter it, along with rising geographical and political uncertainties, supply chain disruption, and so on. The scenario, however, has been gradually improving, with headline inflation moderating, which has led major central banks to cut rates. While this will support growth, economies need to watch out for downside risks, such as a resurgence of monetary volatility and a deeper slowdown in China. These have led to revisions in the projections for global economic growth. In the World Economic Outlook released during October ’24, the IMF has retained its projections for 2024 at 3.2%, but for 2025 the figure has been revised downwards to 3.2% from the earlier projection of 3.3%.

Anil Kumar Tulsiani

executive
#4

Looking at emerging and developing economies, projections show a drop to 4.2% across 2024 and 2025, versus the 4.4% estimated for 2023. Advanced economies, on the other hand, show a slight uptick in the forecasts for those two years, at 1.8%, against an estimated 1.7% for 2023. Turning now to India: its economy has likewise felt the effect of global signals, with GDP growth for Q1 FY ’25 put at 6.7%, lower than the 8.2% recorded in the corresponding period of FY ’24. Even so, supported by strong policy frameworks and rising demand, it keeps performing considerably better than its peers. India has pushed back against inflationary pressures more effectively than other economies, preserving comparative steadiness in the domestic market. Continued momentum in manufacturing and services, a higher frequency of investment activity, the government’s ongoing emphasis on infrastructure development, growth in steel consumption, and better prospects in private consumption all signal a robust outlook. According to projections from major agencies such as RBI, World Bank, IMF, etc., the economy is set to expand somewhere between 6.5% and 7.3% over the coming two years, which helps it retain its standing as one of the fastest growing among the major economies.

Anil Kumar Tulsiani

executive
#5

Turning to the global steel picture. China, which is the largest producer and consumer of steel, has slowed down, and that has had a major effect on how the worldwide steel industry has performed. Steel demand in China has been hit especially hard, since investment in the real estate sector has kept falling steadily. Steel demand is projected to be 3.3% lower in 2023 compared with the prior year, and it is expected to stay negative — 3% in 2024 and 1% in 2025. At the same time, output in the country has fallen 3.6% from January to September ’24 versus CPLY. The flood of exports out of China has seriously weakened international prices. And the industry’s performance broadly, and SAIL’s in particular, has been significantly affected by those international price trends. The developed world is expected to see a 2% drop in steel demand in 2024, as major steel-using economies such as the US, Japan, Korea and Germany post significant declines. Meanwhile, demand growth for steel in the European Union also remains a major challenge. Demand is set to fall by roughly 5% in 2024 and by 0.7% in 2025.

Anil Kumar Tulsiani

executive
#6

Worldwide demand growth is set to stay negative at 0.9% in 2024, then swing positive to 1.2% in 2025, with nations such as India, Germany, Brazil, US and Japan providing the push. Turning to the Indian steel sector. In spite of every hurdle, among them softer steel prices, India's steel industry has kept expanding steadily in both output and usage. In H1 ’25 too, crude steel production rose 3.6% over CPLY. Meanwhile, finished steel consumption increased 13.5% across the period over CPLY. According to WSA, India has become the most powerful engine of steel demand since 2021 and is expected to expand beyond 8% during 2024 and 2025. India's steel demand will keep racing forward, powered by ongoing growth across all steel using sectors and above all by sustained strong growth in infrastructure investments. Indian producers' top line and bottom line have taken a hit because prices fell persistently through August 2024, and there are now indications of prices firming up, particularly for long products, particularly following the monsoon season. The industry expects improved results in the quarters ahead.

Anil Kumar Tulsiani

executive
#7

Imported coal prices have likewise stayed under control, so the industry can breathe easier on the cost side as well. Turning now to how the company performed in the half year. The company's results for H1 ’25 are as follows. Crude steel production came in at 9.457 million tonnes, roughly matching the CPLY figure of 9.47 million tonnes. Saleable steel sales volume reached 8.108 million tonnes, a drop of 6.3% against the CPLY of 8.651 million tonnes. Domestic sales fell by a smaller margin of 4.5%, landing at 8.063 MT. As NSR came down by about 5%, turnover slipped close to 10% versus CPLY, to INR48,262 crores. On profitability, the company posted EBITDA of INR5,593 crores, PBT of INR1,127 crores and PAT of INR844 crores. Given worries about rising borrowings, we are glad to report that borrowing is at a level similar to Q1 financial year ’25. Borrowings at the close of Q2 financial year ’25 were INR35,596 crores. In fact, borrowings climbed to a peak of INR39,163 crores during August, and have since come down by nearly INR5,000 crores, standing at INR34,224 crores at the end of October 2024.

Anil Kumar Tulsiani

executive
#8

When it comes to operational efficiency, we've been progressing steadily on cutting coal consumption, raising CDI usage, lowering specific energy consumption, and lifting year productivity. SAIL is running a range of decarbonization initiatives across three phases, and the first phase has already reduced specific CO2 consumption by nearly 20%. We're now preparing to cut it by 12%, down to 2.1 tonnes per tonne of crude steel, by financial year 2031. As part of our ongoing push to improve the product mix, the share of semis and saleable steel production came in at about 16%. By using conversion services in and around the plant and in demand sectors, the percentage share of semis in sales has been lower, at 9%. We've placed an order for a bar mill of 1 mtpa capacity at the Durgapur Steel Plant, which will bring the percentage of semis down further. Looking ahead, the boost from the various measures the government is taking on infrastructure spending bodes well for steel demand in the country. With the overall outlook positive for sustained growth in domestic consumption, we're hopeful that realization, and consequently the margin, will improve for the company in the quarters ahead.

Anil Kumar Tulsiani

executive
#9

Having said that, I'll return the floor to Mr. Kejriwal so he can kick off the Q&A. I'm certain all of you have plenty of questions regarding the performance. Thank you.

Operator

operator
#10

Thanks a lot. At this point we'll open it up for questions. <<operator_script>> Our first question comes from Amit Dixit at ICICI Securities. Go ahead.

Amit Dixit

analyst
#11

Hi there, good afternoon everybody, and thank you for giving me the chance to ask. I've got a couple of questions. First, regarding that rail price provision and the gain of roughly INR1,637 crores that was booked this quarter relating to earlier periods: I just wanted to get a sense of how much of the FY ’23 amount tied to the rail price revision is still outstanding? And if there's anything for FY ’24, could you put a number on it? Also, at what point do we anticipate receiving that cash?

Anil Kumar Tulsiani

executive
#12

Yes. Regarding that rail price hike, whatever it amounts to, it rests on — you see, there’s a mechanism where normally the railway hands us an ad hoc rate for rail covering a given financial year. Then the cost gets finalized by CA Cost. Following that, we submit CA Cost’s recommendation for discussion with the railways. So this concerns ’22-’23, where previously our ad hoc price stood at roughly INR75,000, and CA Cost has now revised it to approximately INR89,000. The benefit from this comes to about INR14,000 per tonne. Now during this particular quarter, we’ll also be submitting the cost for ’23-’24 to CA Cost. And likely by the close of this financial year, we will be in a position to assess what the pricing will be for the rate for ’23-’24. Now I believe I’ve answered both of your questions.

Amit Dixit

analyst
#13

Sir, just to get a bit of clarification — since for FY ’23 there’s a difference of INR14,000, and we’ve already recognized INR1,637-odd, how much is left to recognize now for FY ’23?

Anil Kumar Tulsiani

executive
#14

No, nothing will happen for FY ’23. There will be a few — there will be a couple of rounds of discussions with the railways. And if this price gets agreed to, then we’ll raise the invoices accordingly on the railways.

Amit Dixit

analyst
#15

And at what point should we expect that cash to come in?

Anil Kumar Tulsiani

executive
#16

That should take place in — likely starting around the close of this quarter and carrying on through the next quarter, the fourth quarter as well.

Amit Dixit

analyst
#17

And this is going to cut…

Anil Kumar Tulsiani

executive
#18

Sorry, could you repeat that?

Amit Dixit

analyst
#19

This will also cut down on the leverage you've noted. <<inaudible>>

Anil Kumar Tulsiani

executive
#20

Yeah, yeah. Sure, sure, it will really bring leverage down.

Amit Dixit

analyst
#21

Alright, moving on to the second question, which concerns coking coal. Could you tell us how much reduction in coking coal we saw during Q2, and what we should expect for Q3? Also, would you be able to highlight the realization uptick we might see in Q3, given the price increases taken so far?

Anil Kumar Tulsiani

executive
#22

During Q2, the pricing — or rather the imported coal price that we had — stood at roughly INR22,000, in that range. Okay. And if you look at Q1, it was approximately INR24,000, so the average works out to about INR23,000 for H1. That's the situation. And going forward, our projection is roughly — it comes to around INR20,000 for October and November. But then again, in December there could be a modest increase on the upside, since the Platts and Argus indices have risen somewhat over these two months.

Amit Dixit

analyst
#23

All right, then — what about realization, sir?

Anil Kumar Tulsiani

executive
#24

On the realization side, are you asking about the October and November numbers?

Amit Dixit

analyst
#25

Yeah.

Anil Kumar Tulsiani

executive
#26

In October and November, the average realization—in October, it was lower, at roughly INR48,000-odd. And for the month of November, it's approximately INR49,500. The main reason it went up in November is this factor, because of long products. Flat products, that continues to be a challenge.

Amit Dixit

analyst
#27

And what would that look like on average next to the realization we saw in Q2?

Anil Kumar Tulsiani

executive
#28

Regarding Q2, the realization came in at approximately INR50,500 on an overall basis, and for H1, it stood at INR52,000.

Amit Dixit

analyst
#29

Understood, sir. Thanks very much, and best of luck.

Anil Kumar Tulsiani

executive
#30

Thanks.

Operator

operator
#31

Thanks. The next question comes from Sumangal Nevatia at Kotak Securities. Go ahead, please.

Sumangal Nevatia

analyst
#32

Good afternoon, sir, and thanks for the opportunity. Sir, my first question concerns our sales volume. We have observed a very significant drop. And when we compare against all the peers and the industry that have reported, our performance looks considerably worse. So what would likely explain this? Is there any reason we are also losing market share relative to peers?

Anil Kumar Tulsiani

executive
#33

Yes. In fact, a drop has occurred, and I’ll simply provide the figures on that. Home sales have fallen by roughly 5.2%, and the reason is this: because the country’s exports are lower, additional product has entered the market. That, in turn, has affected our sales as well. Yet if you look closely, Q2 improved compared with Q1. During Q1, our sales came to approximately 4.01 million tonnes. Then in Q2, that figure reached 4.10 million tonnes. The effect is essentially that we could not export much material. So that too has affected our sales — total quantities sold. But during October, I want to mention, during October we managed to sell a substantial quantity. That helped us cut our stock by roughly 1 lakh tonne. Sales in October therefore came to 1.648 <<inaudible>>. So if we treat that as — looking forward across the whole quarter, it might reach approximately 5 million tonnes.

Sumangal Nevatia

analyst
#34

Got it. And sir, regarding the earlier question, you gave an answer on NSR. Was that blended, or was it long only for a particular…

Anil Kumar Tulsiani

executive
#35

Yeah. The answer I provided was the blended one.

Sumangal Nevatia

analyst
#36

So approximately, we're seeing something like a drop of maybe INR1,500 to INR2,000 in 3Q. And regarding costs, you gave coking coal figures for October and November. But with the inventory lag taken into account, what kind of cost reduction should we expect in 3Q on the coking coal side?

Anil Kumar Tulsiani

executive
#37

On the coking coal side, we’re expecting a decline — because, as I told you, in Q1 it was — in Q2 it was INR21,681, and right now we’re coming in at roughly INR20,000. So if that holds, I think we should see the advantage from cheaper coal prices in September and October. We’ll certainly carry that into November as well for our consumption. So it should land in the neighborhood of INR20,000. That means a benefit of roughly, you could say, INR1,600 or INR1,700 versus Q2 prices. And for H1, if you look at it, it comes to around INR2,000-odd.

Sumangal Nevatia

analyst
#38

Got it, got it, understood. Sir, my next question concerns the balance sheet. Regarding our net debt — I mean, we haven't begun any growth capex yet, but net debt has climbed across the past two, three years. Roughly what annual capex should we expect this year and next? And at what point do we kick off growth capex for the new expansion?

Anil Kumar Tulsiani

executive
#39

For this year, we've actually projected roughly INR6,000-odd crores of capex to the ministry. Next year, though, it will rise, because a lot of our major capex — we'll be freezing most of our contracts for our IISCO modernization as well, and also some of the major projects we've taken up, such as the revamping of the blast furnace at Durgapur and the bar mill at Durgapur. So the bulk of the spending on this will begin coming through starting next year. So for next year, I can't give you an exact figure, but it should certainly be higher than what it is for this particular financial year.

Sumangal Nevatia

analyst
#40

Understood. And sir, if I could just fit in one more question. Over the past few years, we've only managed to sell roughly 2 million tonnes, 2.5 million tonnes of iron ore, and we're sitting on about 40 million tonnes of iron ore inventory, which we've essentially been carrying on the balance sheet at around INR4,000-odd crores. Sir, I mean, are we — I mean, what are we practically looking at over the next one, two years? And are we considering writing it off, since this is needlessly inflating our book value and hurting our return ratios.

Anil Kumar Tulsiani

executive
#41

Writing it off is out of the question. In fact, it's an asset we hold. And this asset isn't just — it came onto our books through a sale roughly three years back, but it's an asset that exists. The value won't be reduced by iron ore fines, since those will sit there for a further three years, as they are stocks — we hold stocks that are, you could say, over 40 years to 50 years old as well. So they were valued only about three years ago. And yes, we have a plan for cutting down these stocks. We already have our pellet plant and manifestation plant at Goa in the pipeline. So once that comes in, there will be a depletion of approximately 3 million tonnes to 3.5 million tonnes of iron ore from Goa, which is the main location where most of the stock sits. And now permission has also been obtained to dispatch from there to our steel plants as well. So we are progressively dispatching material from there to our steel plant.

Sumangal Nevatia

analyst
#42

Got it, sir. Thanks, and best of luck to you, sir.

Anil Kumar Tulsiani

executive
#43

I appreciate it.

Operator

operator
#44

Thanks. Our next question comes from Amit Murarka at Axis Capital. Your line is open.

Amit Murarka

analyst
#45

Yeah. Hi, thanks. So just regarding the notional price booking for rails, I just wanted to get a general sense of how you go about it. For instance, typically speaking, if prices are rising, is it also possible during that period that rail realization gets overbooked and then, say, some write-back occurs afterward? Could that happen as well? Or do you always book it on a conservative basis?

Anil Kumar Tulsiani

executive
#46

What actually happens is that we operate under a railway pricing system. Typically, at the start of the year, the railways inform us of the ad hoc price for that particular year. So we factor that in when raising invoices on them. After that, we act right away — since that price rests on historical data. Then we approach the railway to say that prices have risen, or that there are signs of prices and costs increasing. And we ask — request that the railways grant us an ad hoc price. So once the revised ad hoc price comes through, we handle the accounting on that basis, invoicing as well as accounting. After that, we send our details to the CA Cost organization. So once CA Cost finalizes the prices for us, we submit them to the railways. Now, based on whatever prices CA Cost has finalized, we hold discussions with the railways. So when those discussions take place, there is a sort of negotiation with them. And usually, a few — you might see some — a certain percentage of the prices, they ask for a reduction, which we negotiate, and we ultimately arrive at our final price.

Anil Kumar Tulsiani

executive
#47

That, then, is the closing price for a given year. This is the foundation our work rests on. Essentially, at every single stage, we do our accounting using whatever price we have on hand.

Amit Murarka

analyst
#48

Just to make sure I follow, suppose the notional price — that ad hoc figure the railways would have shared with you — actually comes in above where current market trends are. In that case, would you sort of advise the railways on that and then book the realization at a lower price accordingly? Or

Anil Kumar Tulsiani

executive
#49

Usually, what happens is we tell the railways, for instance, that our price will be X figure. So the railways are also somewhat conservative. Typically on that, they'll cut another INR5,000 or so and hand it to us as an ad hoc price. They won't give us that exact price. So once the CA Cost finalizes it, we get the benefit of that.

Amit Murarka

analyst
#50

The bottom line is that it's always below the actual market price, and a higher recovery always comes in that…

Anil Kumar Tulsiani

executive
#51

Right, right. The only exception is when we're still working through the final price negotiation with the railways. At that stage, we typically see a reduction effect. That's the moment we book it into whichever quarter the impact actually lands, the quarter where we close it out.

Amit Murarka

analyst
#52

And once the final price is set, does that follow a cost-plus mechanism? Or is it just tied to, say, how historical prices have moved?

Anil Kumar Tulsiani

executive
#53

No, no. It’s cost <<inaudible>>. For sure. CA Cost, Chief Adviser Cost is the agency that actually collects every cost detail from us. And from that, the cost — how the rails are priced is correct.

Amit Murarka

analyst
#54

So in a sense, it's a business with a fixed margin, isn't it?

Anil Kumar Tulsiani

executive
#55

Yeah, yeah, it’s a business with a fixed margin.

Amit Murarka

analyst
#56

Got it. And once more, those receivables would hinge on the railway budgets, correct — I mean, on how solid those budgets are, whether the budgets are…

Anil Kumar Tulsiani

executive
#57

Yeah. Actually, typically what happens is that railways — we haven't really run into much trouble getting budgets from the railways, since our share of the whole railway budget is quite small. But there were a few difficulties in 2021, when the budgets for ’19, ’20 and 2021 ran out. So at the start of financial year 2021, they provided us with additional budgetary support.

Amit Murarka

analyst
#58

Got it, thanks. And one last thing — could you also give us a refresher on the capex plans for this year and next year?

Anil Kumar Tulsiani

executive
#59

So this year, as I mentioned, our capex will come to roughly INR6,000 crores — approximately INR6,000 crores. Initially, though, in our budget estimates for ’24, we had put it at INR6,300 crores. So our expectation is that it lands at around about INR6,000 crores. How much have we spent? I can give you the figure — we've already spent approximately INR2,250-odd crores during the H1 period. And typically, capex accelerates when we — over the second half.

Amit Murarka

analyst
#60

Right, right, got it. And that sizable capital expenditure initiative will largely kick off beginning in FY ’27, the expansion initiative…

Anil Kumar Tulsiani

executive
#61

Not for — not FY ’25. I believe a number of significant outlays will begin appearing from ’26-’27. In ’25-’26, we may — we will have these initial advances that we need to provide. And for the drawings and engineerings and all those items, we will need to put up some funds for that. And certain expenditures — I also mentioned to you before that we have already placed orders for a few of the major packages, such as the bar mill at Durgapur and the blast furnace also at Durgapur, and also stand charging battery for Rourkela. So the — some progress payments will begin arriving starting next year onward, ’25-’26 as well.

Amit Murarka

analyst
#62

Absolutely. Got it. Thanks so much.

Operator

operator
#63

Thanks. The next question comes from Kirtan Mehta at BOB Capital Markets. Go ahead. Mr. Kirtan, your line is unmuted. Please proceed.

Kirtan Mehta

analyst
#64

Can everyone hear me at this point?

Operator

operator
#65

Yes, go right ahead.

Kirtan Mehta

analyst
#66

Yeah, thanks for the chance to speak. During this quarter, we're observing a gain in structural steel output, coming in at 16% versus the usual range of 8% to 9%. What contributed to that rise in structural steel production over this quarter?

Anil Kumar Tulsiani

executive
#67

So really, what's taken place is that we now have two significant new mills up and running. The first is an MSM over at Durgapur Steel Plant, and the second is the Medium Structural Mill, plus we also have the Universal Structural Mill at IISCO. Those mills have now settled into stable operation, and their products have likewise gained acceptance in the marketplace. As a result, we've seen a fairly strong rise in sales volumes for these products.

Kirtan Mehta

analyst
#68

Now, on profitability — at roughly INR3,100 per tonne, that's still not what I'd call a fairly good level. So what's the reason that even with structural steel output going up, we aren't seeing profit rise in step with it?

Anil Kumar Tulsiani

executive
#69

So when we look at profit, basically what’s happening is that flat product prices did not rise during this quarter. That’s a major challenge we’re facing. As for longs, which also include structural, there is improvement in prices. And then in October, we’re seeing additional price improvement, with long product prices firming up.

Kirtan Mehta

analyst
#70

Normally, for that structural product out of MSM and USM, what extra realization would it bring above the benchmark indicator?

Anil Kumar Tulsiani

executive
#71

So what happens now is — look, we've essentially got these 2 major mills in place, and from those we'll be working on marketing the products. There are some mills where we'll be phasing things out gradually. For instance, we have a section mill in Durgapur. The products coming from there will be phased out gradually over the years. So you could say that any indication on pricing reflects only these major mills.

Kirtan Mehta

analyst
#72

There's another question about saleable steel in Q1 — it came in at roughly 4.2 million tonnes, compared with crude steel production of 4.7 million tonnes. In this quarter, that figure has moved to 4.6 million tonnes, versus crude steel production of about 4.8 million tonnes. What's behind the lower availability of saleable steel in Q1?

Anil Kumar Tulsiani

executive
#73

Yes. What we'll do is explain what occurred with our hot strip mill at Bokaro — it was undergoing major maintenance. That maintenance was planned, naturally, and it happened during Q1. That's the reason a gap exists between saleable steel and crude steel.

Kirtan Mehta

analyst
#74

So what's driving semis up to roughly 16% this quarter, when in the prior quarter they'd been trending down around 13%, 14%?

Anil Kumar Tulsiani

executive
#75

It could be — it's similar to that situation because, you see, what's happening is we've made flats, which are also regarded as semi. So that output has really shifted this ratio somewhat. That's regarding Bokaro, where we couldn't take HR coil. We couldn't turn out the finished products.

Kirtan Mehta

analyst
#76

Got it, sir. Regarding the expansion projects we're carrying out at IISCO and Durgapur, where do things stand right now in terms of approval?

Anil Kumar Tulsiani

executive
#77

So actually, at the Board meeting yesterday, the Board took up a proposal for brownfield expansion at the Durgapur Steel Plant as well.

Kirtan Mehta

analyst
#78

So now we've got the Stage 2 approval to move forward with…

Anil Kumar Tulsiani

executive
#79

Stage 2 approval isn't in hand yet. Look, Stage 1 — actually, we're going to get the Stage 1 approval for this brownfield expansion at Durgapur. And for IISCO Steel Plant, Stage 1 approval is already with us.

Kirtan Mehta

analyst
#80

Okay, so where do we stand right now on getting that Stage 2 approval — how much further do we have to go?

Anil Kumar Tulsiani

executive
#81

For Stage 2 at Durgapur, you could say it will take another — maybe eight months, or somewhere between six and eight months — since we will begin tendering right away and then return to the Board for Stage 2 approval. As for IISCO Steel Plant, out of the major technical packages, I believe there are 14 major technical packages — I’m not certain of that number, but it should be 14 — and we have already tendered 8 of them. So offers will start coming in now and we will evaluate them. We should probably be able to finalize that by the middle of next year as well.

Kirtan Mehta

analyst
#82

Okay, so most likely the capex spending will begin after that—essentially in the second half of next year—once the Stage 2 approval comes through.

Anil Kumar Tulsiani

executive
#83

As I mentioned before, perhaps those first payments—the upfront amounts tied to certain milestone payments—will be made next year, around the end of ’25-’26, so to speak. And some progress payments on the projects for which orders have already been placed, such as the stand charge battery, the mills, and the blast furnace at Durgapur, will begin in ’25-’26.

Kirtan Mehta

analyst
#84

Thanks very much, sir, for walking us through that so thoroughly.

Anil Kumar Tulsiani

executive
#85

I appreciate that.

Operator

operator
#86

Thanks. Our next question comes from Pallav Agarwal at Antique Stock Broking. Go ahead.

Pallav Agarwal

analyst
#87

Good afternoon, sir.

Anil Kumar Tulsiani

executive
#88

Good afternoon, everyone.

Pallav Agarwal

analyst
#89

I've got a question about the segmental data. When I look at the segment assets and liabilities for this quarter, they're sharply lower than in previous quarters across all plants. So has there been some reclassification, or is there some error in how these numbers are being reported?

Amit Agarwal

executive
#90

Yes. Pallav ji, Amit here. So actually, yes, you’ve got that right. Some inadvertent error occurred when those figures were reported. We’ve already taken action on that, and the corrected figures will be posted on the website shortly. Perhaps you can look at the Q2 numbers — the H1 numbers that are shown there. Those are the figures that will also hold true for Q2.

Pallav Agarwal

analyst
#91

Right. As far as assets and liabilities go, that ought to stay the same.

Amit Agarwal

executive
#92

Correct.

Pallav Agarwal

analyst
#93

All right, turning to the other question about the coal cost you brought up — that INR20,000 figure you're expecting. Is that purely imported coal, or does it combine both imported and domestic coal?

Anil Kumar Tulsiani

executive
#94

No, that's imported coal.

Pallav Agarwal

analyst
#95

And at this moment, what would the split between imported and domestic be?

Anil Kumar Tulsiani

executive
#96

So essentially, the split we have is 85% to 15%. Imported coal accounts for 85%, while indigenous coal makes up 15%.

Pallav Agarwal

analyst
#97

And what about the domestic coal…

Anil Kumar Tulsiani

executive
#98

For domestic coal produced by Indigenous, the figure sits at roughly — it also tracks the prices of coal brought in from abroad. And that number should land somewhere between INR13,000 and INR13,500.

Pallav Agarwal

analyst
#99

Sure, sir. And then, finally, what utilization levels are you running at for crude and saleable steel? If I recall correctly, there was some debottlenecking at the billet caster, I think, or something like that at this plant. So are you currently running near optimum capacity? Is there still some headroom left?

Anil Kumar Tulsiani

executive
#100

No. In fact, we’re running at pretty strong capacity right now. So our annualized crude steel output should come in at roughly 19.2 million tonnes. That means we’ll be at — I think it’ll be above 95% of what we’re capable of producing.

Pallav Agarwal

analyst
#101

All right, so if we don’t pursue that next year of expansion, it’s unlikely volume growth will occur in any truly material way.

Anil Kumar Tulsiani

executive
#102

That’s not the case. In fact, we also have certain debottlenecking initiatives that are going to come online now. And we’re working to get more out of our existing assets as well, so that another 2.5 million tonnes to 3 million tonnes get added over the next two to three years.

Pallav Agarwal

analyst
#103

Yes, sir. All right. Thanks, sir.

Operator

operator
#104

Thanks. Our following question comes from Raashi Chopra at Citigroup. The line is yours.

Raashi Chopra

analyst
#105

Thanks. Regarding NSR, you said the average came in at roughly INR50,500 this quarter. Could you break that down between flats and longs for us?

Anil Kumar Tulsiani

executive
#106

Yeah. For this quarter, the long will be around INR52,000 and the flat will be roundabout INR49,000.

Raashi Chopra

analyst
#107

And if we look at it on a spot basis, what does the data show? Which areas are flat, and which are long?

Anil Kumar Tulsiani

executive
#108

During October, the flat was priced at roughly INR46,500 to INR47,000. And regarding the flat, it was INR42,500 to INR53,000 — for the long, pardon me. As for the long, the figure sits at INR52,500 to INR53,000.

Raashi Chopra

analyst
#109

So we're in October. And as we sit here right now, November?

Anil Kumar Tulsiani

executive
#110

In November, there was a small marginal improvement—a marginal improvement in both cases.

Raashi Chopra

analyst
#111

Alright, thanks. Then turning to volume, what amount of finished steel inventory did you hold at the close of the quarter?

Anil Kumar Tulsiani

executive
#112

Could you repeat that? I didn't catch your question.

Raashi Chopra

analyst
#113

As of June — the close of the June quarter — finished steel inventory stood at roughly 1.84 million tonnes; what does that figure typically look like at the end of September?

Anil Kumar Tulsiani

executive
#114

The figure stands at 1.93 million tonnes.

Raashi Chopra

analyst
#115

So what sales volume are you now aiming for across the whole year, FY ’25?

Anil Kumar Tulsiani

executive
#116

Roughly 18 — somewhere between, let's put it at about 18.

Raashi Chopra

analyst
#117

And finally, regarding what you asked before about the growth plan, is that 35 million tonne target for FY ’31 still being kept in place?

Anil Kumar Tulsiani

executive
#118

Yes, yes. We're still holding to that, and we're staying consistent with it.

Raashi Chopra

analyst
#119

Right now, the sweating capacity sits at roughly 3 million tonnes. IISCO accounts for 4 million tonnes, Bokaro contributes around 2.5 million tonnes, and Durgapur adds about 1 million tonnes.

Anil Kumar Tulsiani

executive
#120

There's also 1 million tonnes. And then Rourkela Steel Plant is going to come in as well. So that's roughly 3.8 million tonnes too.

Raashi Chopra

analyst
#121

When is that expected to happen?

Anil Kumar Tulsiani

executive
#122

We're still waiting on certain land clearances. Once those land clearances are in place, we'll then move ahead with this expansion plan. But it is planned within — by '31.

Raashi Chopra

analyst
#123

Alright, thanks.

Operator

operator
#124

Thanks. Our following question comes from Rahul Gupta at Morgan Stanley. Go ahead, please.

Rahul Gupta

analyst
#125

Hello, and thanks for taking my questions. I have a couple of things to ask. First, to carry on with this expansion pipeline: I recall that you have mentioned the Bokaro expansion too, at 2.4 million tonnes. Is there any news on where things stand with its approval? On Durgapur, you received the first round of approval. But is there any update regarding Bokaro?

Anil Kumar Tulsiani

executive
#126

Bokaro — well, a PFR has actually been done already for Bokaro Steel Plant. And as for the final DPR, that's been prepared too, though it's still being examined.

Rahul Gupta

analyst
#127

Understood. I have another question regarding coking coal. I recall that during the previous quarter, you mentioned certain long-term coking coal contracts had been booked, and those would have expired by December or January. So what is the current status on that? The reason I'm asking is that you referenced coking coal — international coking coal prices rising by INR1,600, INR1,700 quarter-on-quarter. So I'm just trying to connect both pieces of data here.

Anil Kumar Tulsiani

executive
#128

Look, the way it works with these long-term agreements is we have a system where a long-term agreement runs for three years, and it can be extended by another two years. So most of them are now in the ’24-’25 year. They’ll be reaching their end, but we’ll then keep this contract going with these long-term suppliers. And pricing, of course — look, on pricing it’s very clear: it’s a percentage, a discount or a premium, on the Platts and Argus index. So that gets negotiated. Normally all the steel companies negotiate this, normally during the — for the next — for this — for a financial year, just in the quarter but before the financial year starts. So that’s what we’re doing. And on these agreements, we’ve already taken it up with all the suppliers to finalize them — mainly the commercial terms, which will be finalized before we go in for these negotiations with the suppliers about the quantities and the rates, which will happen in the month of April.

Rahul Gupta

analyst
#129

All right, I understand. I just want to get a clearer picture here. Earlier this year, when you signed that contract, how do current prices compare with the prices agreed to at that time?

Anil Kumar Tulsiani

executive
#130

As I told you, every one of our prices is tied to the indices. Right. So whatever price gets arrived at — say I have a supplier with whom I've negotiated and gotten an X percent discount. That X percent discount then holds for the entire year, based on — and the foundation for it is the Platts and Argus index.

Rahul Gupta

analyst
#131

Understood — thank you very much.

Operator

operator
#132

Thanks. The next question comes from Pratim Roy at B&K Securities. Go ahead, please.

Pratim Roy

analyst
#133

Hello there, sir, and thanks for taking my questions. I actually have just one or two things I'd like to ask. First off, I'd simply like to understand how much additional benefit from the rail price revision you anticipate in the second half — that's my first question. Then, for the second one: given that coking coal prices are where they are and there's no significant capex in the pipeline, what sort of debt reduction can you expect over the coming two years to three years? So how much debt do you think could be brought down in the next two years to three years? Those are my two questions, sir. Thank you.

Anil Kumar Tulsiani

executive
#134

Yes. On rail pricing — the system that’s normally in place is now, you see, it’s — steel cost has submitted its pricing to the railways for ’22, ’23. For ’23, ’24, rail pricing needs to be submitted by CA Cost to the railways. So for that, the railways must submit a request to CA Cost so the pricing can be finalized. So, we are now following up with the railways to ask CA Cost to begin that activity. Once that activity begins, we submit the details to CA Cost. And then normally, they finalize it within two months to three months’ time. So that’s how the price will be finalized. If CA Cost is able to indicate the pricing for ’23-’24 within, say, 31st March ’25, then we’ll be taking the benefit of that in ’24-’25, as it will get carried over to the next year. On debt reduction, we are — from today’s level, like it’s roundabout INR34,500, we are planning a reduction of around about another INR4,500 crores to INR5,000 crores in the remaining part of this financial year, provided the markets support us.

Pratim Roy

analyst
#135

For this financial year, we expect a reduction of INR5,000 crores in debt…

Anil Kumar Tulsiani

executive
#136

Yeah, INR4,500 to INR5,000 above where we are now. So you could put it in the neighbourhood of INR29,000 crores — INR29,000 crores to INR30,000 crores.

Pratim Roy

analyst
#137

When we wrap up this financial year, correct?

Anil Kumar Tulsiani

executive
#138

Right, right.

Pratim Roy

analyst
#139

Absolutely, sir. Thanks very much.

Operator

operator
#140

Thanks. Our next question comes from Vikash Singh with PhillipCapital. Go ahead.

Vikash Singh

analyst
#141

Good afternoon, sir, and thanks for giving me the chance to speak. Sir, since we've now also made the decision to expand the Durgapur plant, I just wanted to get some clarity, given that the finalizations for both IISCO and Durgapur have already taken place. What's the peak debt level you'd feel comfortable with? Because, as you can see, our interest cost is very high, and we're quite vulnerable <<inaudible>> when it comes to EBITDA levels.

Anil Kumar Tulsiani

executive
#142

Look, our whole expansion plan has been built around a debt-to-equity ratio of 1:1. So on that basis, the most debt we'll reach, I believe, is — that comes to roughly INR1 lakh crore. The debt-equity — just 1 sec. Please hold on. The debt will be — during the year, it will peak at — in the financial year ’28-’29, and the debt-equity ratio at that point of time will be around 1:1.1 <<inaudible>>.

Vikash Singh

analyst
#143

Got it, sir. So, sir, is there any news you could share regarding where things stand with our raw material and the pellet plant site?

Anil Kumar Tulsiani

executive
#144

Look, regarding pellet plants — we have a number of them in the pipeline. A few are being offered on a COM basis, meaning construct, own, manage and maintain — so that's construct, operate and maintain. One facility is coming at Bhilai with a capacity of 1 million tonnes, and then there's another one being set up at Rourkela Steel Plant. That one will also be around 2 million tonnes. Then we have a big plant we intend to establish at Gua Ore Mines. That facility is essentially a 4 million tonne pellet plant that we're planning there. So that too — there's — some work has already been kicked off by our consultants to get the final DPR ready for it. And apart from that, for IISCO and Durgapur pellet security, we'll also have a COM plant of this kind.

Vikash Singh

analyst
#145

Got it. Sir, just one final question. Although we’ve heard a INR1 lakh crore capex figure, right now we only understand that IISCO would be INR35,000 crores. So could you tell me what — how much plant size are we thinking of spending this split of this INR1 lakh crore across plant size?

Anil Kumar Tulsiani

executive
#146

Look, the DPRs for the remaining plants haven't been finalized yet. So this number is only indicative — it's what we've used for now. And once those DPRs are finalized — and perhaps not just the DPR; once orders get placed, that's when we'll actually learn the true capex outflow for these modernization and expansion projects. So at this point, we're treating it on an assumptive basis only. The moment any project is finalized, or the expansion plan is finalized, that's when we'll be able to state what the capex is.

Vikash Singh

analyst
#147

Got it, sir. Sir, just one point of clarification on these INR1 lakh crores assumptions — is that INR1 lakh crore figure an average, or does it lean toward the higher end? Basically, I just want to get a sense, once we begin finalizing, of what the probability is that this number moves up?

Anil Kumar Tulsiani

executive
#148

Look, we genuinely don't know what's going to happen. These are our calculations — the calculations done by our consultants, our team of experts, and everyone. So for the time being, that's what we're sticking with.

Vikash Singh

analyst
#149

Make a note of that, sir. Please note it. That’s everything from my end, and best of luck, sir.

Anil Kumar Tulsiani

executive
#150

Thanks.

Operator

operator
#151

Appreciate it.

Anil Kumar Tulsiani

executive
#152

That will have to be our final question. We can handle the balance offline.

Operator

operator
#153

All right, sir. Ladies and gentlemen, we’ll treat this as the final question today. I’m now turning the conference back to management for closing remarks.

Anil Kumar Tulsiani

executive
#154

Thanks so much. The analysts raised quite a few solid questions, and I appreciate how they're thinking about sales. I want to assure you that this company will get better in the months ahead, with a great deal of focus placed on cutting costs and maximizing profit. So thank you, everyone. All the best.

Operator

operator
#155

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Steel Authority of India Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Steel Authority of India Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Steel Authority of India Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.