Good afternoon, everyone, and thanks for being with us. Back in September '25, when we listed, we made a commitment to update you each quarter — whether SME platform listings choose to do this or not is optional, but we've always done it, and today's call continues that same commitment. If this is your first time with us, allow me to briefly introduce the company. Sugs Lloyd is an energy infrastructure business; we've operated in this sector since 2009, which is almost 17 years now, and our team numbers around 1,000 people. We operate across three primary business segments: power transmission and distribution, encompassing smart grid, solar EPC, and our engineering products, spearheaded by our fault passage indicator — in that space we rank as India's biggest manufacturer, with an estimated domestic share above fifty percent. Across the years, more than eighty projects have been finished by us. Additionally, this year at the EPS Energy Awards 2026, the title of Best Integrated Transmission Distribution and Solar EPC Company of the Year went to us. Back in July, we announced Sugs' best-ever first quarter. I'm glad to report that the second quarter has surpassed that result. For Q2, revenue reached INR 134.91 crores — a 12% gain compared with the same quarter a year earlier, and 72% higher than the preceding quarter, Q1. If you combine those two quarters, H1 FY '27 becomes the strongest half year in the company's history. Now I'll take you through the half-year figures. Revenue from operations was INR 231 crores, a rise of 73% from INR 123.03 crores last year. EBITDA climbed to INR 31 crores, up 64%, with a margin of 14.5%, which falls inside the 14% to 15% range we have consistently promised. Profit after tax came in at INR 20 crores — INR 20.01 crores, to be exact — which is a 69% increase, and EPS stood at INR 8.62 versus INR 6.86. To put the half in context, in 6 months we have already delivered 71% of the revenue we recorded for the whole year of FY '26. The second quarter by itself was just as strong. EBITDA reached INR 19.1 crores, up 91% year-on-year and 59% quarter-on-quarter. Profit after tax, PAT, is INR 12.51 crores, up 108% year-on-year and 67% quarter-on-quarter. We are also growing more efficiently. Interest cover improved to 5.2x in the first half, compared with 4.8x a year ago. Also, our financing expenses dropped to 2.8% of revenue, compared with 3.2% in the prior year. Looking at the revenue mix, power T&D and smart grid accounted for roughly 80% of our H1 4% for FY '26 overall, as work on our RDS and other distribution projects shifted into full swing. Solar EPC made up the remainder. Let me take a moment on execution, since these figures really mirror that. Our flagship partner project, worth approximately INR 542 crores pre-GST, is now entirely in execution and on track to finish by March '28. Carrying that forward together with our other projects has meant bringing on more manpower, more equipment, and more vendors across many sites at the same time. The know-how we've built in that area—especially with SCADA and ABMS—has turned into something of a calling card that we're taking into additional states. A six-month stretch of this size demonstrates the systems we're keeping up and running as we expand. Moving on to orders, which I see as the key piece of this quarter's narrative: in Q2 we booked 7 fresh orders worth INR 395 crores net of GST, or INR 466 crores with GST included. That comes to almost three times the revenue booked during the quarter. On 30th September our order book was INR 1,067 crores, about 3.5x the prior year's revenue, of which close to INR 929 crores sits in power T&D and the balance in solar. The origin of these orders is just as significant as what they're worth. Every one of the 7 came from beyond Bihar, historically our core market. As a result, Bihar now accounts for roughly 55% of our order book, down from about 82% at July's close, and our operations span 11 states. That's exactly the diversification we said on the previous call we were pursuing. Quality of the book counts as much as its size. Close to 9/10 of the order book is held by government utilities, PSUs and centrally funded schemes, while a solid share of what remains belongs to Tata Power's DISCOM and other well-established private utilities. This gives our projects robust payment security. Fresh business also improves our forward view. The Odisha upkeep deal kicked off on 1st October and will contribute steadily each month across 3 years, creating a recurring stream of roughly INR 60 crores per year. The Punjab RDSS project must wrap up within 15 months, while the Amritsar solar facility is due to finish by December. All of this together provides solid revenue visibility across upcoming quarters. Our opportunity pipeline makes us confident regarding business still ahead. Among the tenders we monitor, roughly INR 19,150 crores have been issued; we elected to compete for around INR 6,600 crores, and approximately INR 1,260 crores now sit in the last phase of assessment. About INR 800 crores came from power T&D, INR 400 crores from solar and storage, and INR 60 crores from products. Our strike rate target remains 15% to 20% on qualified bids, and 10% to 15% in states where we're new. As you all know, products are among our most important growth engines. The Madhya Pradesh and Noida Power orders I mentioned bring 2 more utilities onto our fall passage indicator and closer platform; and once a DISCOM adopts these devices, repeat orders always tend to follow. With 2.65 lakh feeders nationwide, the market is very large. Product margins exceed those from our EPC business, and we're targeting roughly 10% of revenue from them by FY '28. I'd also like to address working capital and cash flow, areas we're monitoring closely as the company expands. Billing growth has pushed receivables higher, though collections have kept up. Measured over a trailing 12-month period, receivable days improved to about 150 in September from roughly 179 in June '26. The half recorded an operating cash outflow of INR 12 crores, compared with INR 37 crores across all of FY '26. Over the next few quarters, our priority is to push this improvement further. With the Patna project now entering bulk billing, we anticipate a quicker working capital cycle. We're collaborating intently with clients to get milestones certified and payments released sooner, and we're turning to surety bonds rather than cash-backed bank guarantees, plus trades and purchase bill discounting, to unlock working capital. So going forward, our business has traditionally been back-half loaded, with particular concentration in the March quarter. What we need to focus on is straightforward: hit the Patna milestones, get the new Punjab and Odisha work up to speed, turn our remaining tenders into orders, and keep making cash flow better. As we head into the second half, our order book is the biggest it has ever been, and our geographic footprint is much broader than it was a year ago. On that note, I'll turn things over to Mr. Santosh Shah, our Chairman and Managing Director, for his comments. Thank you.

Santosh Shah

executive
#2

Thanks, Basu. Good afternoon to everyone joining us. Trust is something a company builds gradually—through what it delivers and through how consistently it communicates. That's the benchmark we set for ourselves every quarter. We're building Sugs Lloyd to endure for generations, and that long-term vision shapes every choice we make. Our efforts to grow the share of products in our revenue continue steadily, and quarter after quarter we'll report that progress to you in numbers. Testing on the compact FPI is finished, and within this quarter we will deliver the first unit against one of our existing orders. Our vacuum circuit breaker and rain unit work is moving forward according to plan. Additionally, we're pursuing backward integration and are considering producing several of the goods we purchase in the largest volumes. That would give us improved control over cost, quality and timing. We're also talking with utilities about fresh approaches to deploying fault package indicators — for instance, a gain share model or a rental model — so that additional feeders get covered. SCADA is our next key focus. The capability we've developed via the Patna project is enabling us to bid on additional SCADA projects in other states. Also, we have some tenders in the pipeline that we're actively pursuing. Going forward, we expect SCADA to account for a solid share of our overall business. In addition, we're talking with several companies about technical collaboration in SCADA. We anticipate that coming together sometime between now and the first half of the next financial year. The area where we're putting in the most effort right now is cash flow. Our debtor days have fallen from roughly 193 in March, to 179 in June, and to around 150 in September. And since the quarter closed, we've collected approximately INR 50 crores. Our focus now is to bring debtor days down even further. Sugs Renewables, which we own entirely, is going to bid on and hold RESCO projects, and that gives us recurring revenue. In transmission and battery storage, we're proceeding one step at a time. To wrap up, our order book spans 10 states. Our products and SCADA business are making progress, and we're paying close attention to cash flow. The INR 1,000 crores target for financial year '28 is still the direction we're working toward, and we'll update you each quarter, fully and on schedule. Thank you. We're now glad to take your questions, so please go ahead.

Vaibhav Mishra

analyst
#3

Nice work on those very strong numbers. My question concerns margins. As I recall, last quarter our margins were 15.3% and our aim was to hold them, or at minimum not let them fall below that level. This quarter, I believe, we came in at 14.1%. So could you explain the reason, even with the move into SPI products? And what margins should we expect for the next — I mean, FY '27 — the rest of FY '27 and FY '28, sir?

Santosh Shah

executive
#4

EBITDA for H1 stands at INR 14.54%. Let me walk you through the nature of our business. First, this deviation is not — it is very marginal. But in the kind of projects we take on, the project is bid for a period of 24 months or whatever the completion time is. Within that project, certain items carry a higher margin and some carry a lower one. It depends precisely on the availability of work front, on customers' permissions being available, all those factors, and which material we are going to bid well. So in any given quarter, we may bid some — we may execute some portion that has less margin. In another quarter, we may have the engine of those portions where margins are higher. So overall, if you look at margin on a yearly basis, at least if you look, it will stay the same. So on a quarter-to-quarter basis, it may vary. But on a year basis, so to speak, it will remain almost along the same lines.

Vaibhav Mishra

analyst
#5

So for the full year, can we expect a margin of roughly 15% across the whole year?

Santosh Shah

executive
#6

Yes, that is what we expect to have.

Vaibhav Mishra

analyst
#7

That's really helpful, sir. And sir, about this transmission segment, the one we had our sights on, did we land any orders there?

Santosh Shah

executive
#8

Yes. On transmission, we were L1 in one of the Jammu and Kashmir projects, but sadly the tender or that L1 got scrapped because of some shift in state policies. As a result, the contract didn't come to us. We've now bid for other tenders, and those are at various stages of evaluation, and we're expecting some solid orders in the transmission sector. We've already put in bids for a few contracts in Rajasthan, and a few tenders in Bihar are being worked on, and we will be bidding this. At the same time, we're also exploring other opportunities, so both things are in line, and we expect to click something very soon.

Vaibhav Mishra

analyst
#9

And, sir, I have one question about the debt level. I believe on the last call we were aiming at something like a peak debt for FY '27 of roughly INR 130 crores for this year; and I think we're somewhere near INR 160 crores. So what I mean is, is that the peak for FY '27, or could debt go above those levels within this year itself?

Santosh Shah

executive
#10

The peak, INR 130 crores — what we would have discussed would be more of a fund-based requirement. Whenever we bid for new tenders and so on, we need a lot of bank guarantees and other facilities. So what I should say is that under all circumstances, our debt to equity ratio will stay somewhere around 1.2x to 1.3x. That is what we are maintaining, and we are confident that we will be able to manage our targets with that kind of exposure.

Vaibhav Mishra

analyst
#11

And sir, one final thing on cash flow. Is it reasonable for us to look for positive operating cash flow by the end of this year — I mean, it's small, flat to slightly positive. Is that something we can expect?

Santosh Shah

executive
#12

Right now it's very hard to say, because given how fast we're growing, we can't count on staying cash positive. And the only way for us to turn cash positive is to slow down that growth speed. So I don't think anyone would want that, or anyone would advise us to do it; so as long as growth stays at 70% or along these lines, we'll stay cash negative.

Vaibhav Mishra

analyst
#13

Just a quick question about the FY '27 goal of INR 600 crores, and the 10% product revenue we were aiming for in FY '28 — I mean, are those two targets still intact, sir?

Santosh Shah

executive
#14

Yes, yes. Whatever guidance we've given or whatever we've committed to, we're completely on track.

Avanish Burman

analyst
#15

Congrats on a really strong set of numbers. I've just got one question. You're quite clear about your ambition and your guidance toward FY '28 in terms of P&L of INR 1,000 crores. I'd just like to get a sense of how the balance sheet would look at that point. As things stand right now, I believe, unless I'm wrong, that your debt is roughly INR 160 crores — how much do you expect that debt to grow? And what — if you could share any color on the return metrics, ROCE or ROIC, that would be helpful. Thank you.

Santosh Shah

executive
#16

Thank you, Avanish. I can offer guidance on how the debt will move. At the close of this financial year, or you could say at the start of financial year '28, our debt will again stay at roughly INR 230 crores or INR 240 crores, something like that; and as these quarter-on-quarter results keep coming in and we keep generating those profits, the debt ratio will stay the same, 1.3x, meaning equity will remain at about 1.3x only; and by the end of the financial year, we will have roughly — perhaps about INR 300 crores of debt, which will be sufficient. That's what we've planned. And beyond that, we're also using the spreads, we're trying to persuade customers and we've succeeded in many places in getting them to accept surety bonds instead of bank guarantees. If that also happens — if it happens in 1 or 2 contracts, it will further ease our total working capital pressure. So that's how we intend to manage the whole cash flow for the next financial year.

Avanish Burman

analyst
#17

One quick question: over the last little while, have you noticed any shift in the interest on working capital debt that lenders are offering you? Or does it look the same as it did, say, 6 months ago?

Santosh Shah

executive
#18

When you say interest, do you mean the finance charges, the interest?

Avanish Burman

analyst
#19

Yeah, sure. The interest cost on the working capital loan.

Santosh Shah

executive
#20

Right, we do anticipate a bit more of a drop in those interest rates, since our ratings are improving and all of that, the external credit ratings; and we can expect a similar sort of improvement from the bank as well when it comes to the interest rates.

Avanish Burman

analyst
#21

So you're seeing some savings when it comes to interest cost?

Santosh Shah

executive
#22

Even if you look at our interest cost, it has come down from — at the finance level. So yes, we do expect some reductions.

Analyst

analyst
#23

Great results for Q2 — congratulations on those strong numbers. I have just one thing I'd like to ask about regarding the balance sheet. There's a line item, tangible assets under work in progress, showing INR 37 crores. Could you help me understand what that is? And what does the total expenditure come to?

Santosh Shah

executive
#24

That project is one we're carrying out for the government of Bihar, and it's a hybrid CapEx and REC model for the government of Bihar. On this project, there's a subsidy — whatever our cost is, we'll receive a similar subsidy from the center and the state through the central CFA scheme and the SFS scheme, within 2 months or 3 months after commissioning. That's the project; so this INR 37 crores you're looking at, the subsidy is going to come — it may arrive in a month, and it has already started coming in. Within the next 1 month it will be done. We've already received INR 6 crores, and the balance we'll get in the next 40, 45 days.

Analyst

analyst
#25

So once the recovery happens, that amount is going to come down, correct?

Santosh Shah

executive
#26

Yes.

Analyst

analyst
#27

By FY '28, what amount of revenue could we anticipate from the business for the indicators?

Santosh Shah

executive
#28

We're making a strong effort to get it up to no less than 10% of overall revenue. I mean every product combined, not only FPIs. So yes, that's the goal we've set, and we're attempting to reach it. We'll see how it turns out. We're trying everything. We're in discussions with DISCOMs about various models, such as a gain share basis or rentals. But we're giving it our best effort.

Analyst

analyst
#29

Sir, what’s the manufacturing capacity you have right now for the project business, and how will it look in the years ahead — say next year or FY 2030? So how is the manufacturing business going to be? How long — how big do you want to scale it?

Santosh Shah

executive
#30

See, we want products to make up a larger share of our total revenue. First of all, to answer your first question, which was about capacity for FPIs: we aren’t even at 5% utilization of our total capacity; we have huge capacity. Producing FPI isn’t something that — it doesn’t need a big setup. So we’re only 5% or 10% utilized on capacity. Capacity for FPI is not a constraint. Now, to raise the product share of total revenue, we’re also working on vacuum circuit breakers and ring units as well; so we’ll see — in the next financial year, we can expect some billing from vacuum circuit breakers, and maybe 6 months down the line, we can begin some billing from RMUs too. The plan is there. How much we’ll be able to achieve is very difficult to comment on at this point in time.

Analyst

analyst
#31

Also, is there any competing business in India right now, or is your company the only one making this FPI?

Santosh Shah

executive
#32

When it comes to FPI, Siemens is the one we compete against. For this product, Siemens is our largest competitor. On VCBs, once again Siemens, ABB, Schneider, plus Stelmach and plenty of other firms; for RMUs too there are many companies. As of today, Siemens is the primary competitor for FPI.

Analyst

analyst
#33

Also, sir, do any entry barriers exist in this space? How difficult is it to get this business done, sir?

Santosh Shah

executive
#34

Yes, it has to be developed. This product is one that requires time for development and all. And it isn't just that we've developed a product and are sticking with it. Each day, on a continuous basis, we work on it, and we keep improving the product. We keep bringing out new models, which keeps us ahead of the market. For instance, we recently developed a compact fault passage indicator, where the testing and everything has been completed. And in this quarter, we will begin billing for those products as well; so for these products, the entry barrier is high.

Vishvender Singh

analyst
#35

I'd like to ask about the bid pipeline — I didn't catch that part. Where does the bid pipeline stand right now?

Santosh Shah

executive
#36

What's in the final stages of evaluation comes to INR 1,260 crores. The portion already picked for bidding stands at INR 6,600 crores, and the tenders that interest us total INR 19,150 crores.

Vishvender Singh

analyst
#37

So from this, we've put in bids for roughly INR 6,000 crores. Is that right?

Santosh Shah

executive
#38

No, no; what we've chosen is that bidding is underway for INR 6,600 crores, and what's already bid and under is INR 1,260.

Vishvender Singh

analyst
#39

On the last earnings call, you said you were aiming to finish FY '27 with an order book of roughly INR 2,000 crores once execution is done. Are you still on track to hit that guidance?

Santosh Shah

executive
#40

Yes. A lot of tenders are in preparation, we know about them, and we are also working alongside the customers. So that will happen, and we are completely confident.

Vishvender Singh

analyst
#41

And finally, regarding the recent credit rating, sir, it said promoters will probably put in equity and unsecured loans to meet working capital needs. So are there any specific plans for that?

Santosh Shah

executive
#42

It is definitely needed whenever required, and promoters will certainly step in and try to make things better. Everything hinges on the situation.

Vishvender Singh

analyst
#43

So — though it was a little different on the last call, you said you weren't planning to raise any equity for at least 1 or 2 years out.

Santosh Shah

executive
#44

You're saying equity — I thought you meant some loan from — the loan from the promoter will be on the cards. But diluting equity, any further dilution, that isn't on right now. As of today we have no plans for any further dilution.

Vishvender Singh

analyst
#45

Do you have any approximate figures you could share regarding the unsecured loan?

Santosh Shah

executive
#46

That would hinge on the circumstances. Provided we aren't facing any shortage of cash, there's no reason to bring the loan into the picture.

Vishvender Singh

analyst
#47

So for the second half, we shouldn't expect that — is that the right assumption regarding the unsecured loan piece?

Santosh Shah

executive
#48

No, no.

Kevin Vora

analyst
#49

Nice work on those strong results. I have a couple of questions about our grid products. Specifically on our fault passage indicators and auto reclosers, is there any approval process or technical qualification that clients might expect from us?

Santosh Shah

executive
#50

Yes; in each tender, the customer requires — the customer sets specific technical qualifications, and we satisfy them. Since we are the largest and leading player in this area, we face no difficulty. As a matter of fact, we satisfy those eligibility criteria in most of the contracts.

Analyst

analyst
#51

And sir, suppose, for instance, a new player wished to come into call package indicator — what would that approval cycle then look like?

Santosh Shah

executive
#52

If somebody begins producing, producing it may take a year, then roughly 6 months and all for the type testing to be completed; and after that every tender, because all of these are only going to be used in government utilities. So they set a qualifying criteria such as they should have experience or they should have supplied, installed, tested and commissioned at least this many number of FPI, which becomes very difficult for them to arrange.

Analyst

analyst
#53

And sir, just one more question from me. So in our presentation, we stated that we hold a 50% share in the FPI market. So I simply wanted to get a sense of whether our peers, since all of them are MNCs, aren't competitive enough in this space?

Santosh Shah

executive
#54

Yes. Once again, we do have a competitive advantage over the others, and that is there. And the biggest advantage that we have is product customization. Now an FPI that suits an Odisha DISCOM will not be — will require some kind of modification before it can be used in Himachal or in some Hilli areas. We are very flexible and very much capable of carrying out that customization. That gives us an edge over the others.

Analyst

analyst
#55

I wanted to ask about trade receivables. So of that INR 191 crores, what portion should we expect to come in over the next 6 months?

Santosh Shah

executive
#56

Of the INR 190 crores, all of the INR 190 crores will come in within 6 months. Last quarter — how much did we get last quarter? During H1, we got INR 200 crores. It was INR 200 crores that came in H1 alone; so the INR 190 crores, we will get well before that in H2.

Analyst

analyst
#57

So working capital won't face much pressure, right?

Santosh Shah

executive
#58

No.

Analyst

analyst
#59

I've got a quick question regarding SCADA and the distribution contracts. I know we landed a contract back in March. I just want to know whether that has opened doors for us going forward on the SCADA project. I assume the answer is yes. But is it technical feasibility that we've improved? And what exactly is that improvement that's let us move away from traditional EPC players toward more high-value projects?

Santosh Shah

executive
#60

That's a very precise question. Thank you for that, Puneet. Look, for any project like this, a normal conventional EPC company, they don't get into those software parts and the telecommunication network part of the SCADA. So with this Patna facility, we've now established the capability to carry out projects of that kind — that's the first point. This represents capacity we added over roughly the past year. The second thing we've done is form partnerships with SCADA firms that bring the software and technology. Accordingly, for each individual project, we set up something like a consortium or joint venture — a project-specific JV — and then we place our bids. With those partners involved, we're in a position to satisfy the eligibility requirements. Yes, they're assisting us with execution capacity as well, and that's what's paving the way for our entry into the SCADA business. We've begun submitting bids on several tenders, and we anticipate receiving some SCADA orders shortly too. So it's really about building capacity.

Analyst

analyst
#61

Absolutely. And of course, there will be technical aspects, naturally, plus valuation and such, which has gotten better over the years too. And the last question had to do with, like, the value addition and how Sugs Lloyd has been getting better in this area to achieve — like, for instance, are we using hardware and software from third parties, and integrating them with our system in order to deliver the project, right? Is that accurate? Yes.

Santosh Shah

executive
#62

Is this question specifically about the SCADA project?

Analyst

analyst
#63

Every bit of the SCADA. That's right.

Santosh Shah

executive
#64

As of today, those developers—the SCADA firms—are the ones supplying us with this software. The software belongs to them, whether it's SCADA or ADMS, DMS and all the rest; and we're forming joint ventures and carrying out the work together. So that's the model as things stand today. Down the road, we're talking with a technology company about some sort of arrangement through which we'd be able to have that SCADA. Those talks are ongoing. I can't shed much more light on it, since nothing has been announced yet. But we're working on it, and at some point we will be bringing out our own SCADA as well.

Analyst

analyst
#65

And sir, one final question: given this SCADA work, the high margins, and all these engineering-heavy projects, where would you place us — are we among the leading companies in India, perhaps around 15 or 20? What exactly is the competitive moat? If you could just give us a bit of insight, maybe a few lines. And are there other companies doing this, or?

Santosh Shah

executive
#66

Let me explain: our main focus is executing SCADA projects in the transmission and distribution sector. Well, if you look at that sector, international MNCs largely dominated it; at present the Government of India is quite clear that SCADA must be developed within India and that an indigenous player is needed for this; so — and actually, there were several meetings at PFC, the Power Finance Corporation, where they stated categorically that SCADA at least needs to be built in India, and that they should somehow — they were in a — or the government is moving to discourage international players from SCADA. Should that happen and it opens up fully, it would represent a massive opportunity for companies such as ours. And perhaps, with all the developments we are planning and all the discussions we are having, there is no doubt that we can also become one of the leading players in SCADA, the top indigenous player.

Analyst

analyst
#67

Nice work on those strong results — I’ve got 2 questions. To start, your guidance is INR 1,000 crores for next year, correct? To hit that figure, we’d need fresh orders of at least INR 400 crores to INR 500 crores. And those would have to come in within the next 6 months, because delivery usually takes 1 to 2 years. So can we count on that volume of orders, say, over the next 5 to 6 months?

Santosh Shah

executive
#68

Absolutely, yes. We’ll actually bring in more than that.

Analyst

analyst
#69

And I'd like to ask a follow-up on that as well. So I noticed recently that your reliance on Bihar has gone down too, correct? You've picked up some orders from Punjab and from Odisha too. So do we expect some large orders from other states as well?

Santosh Shah

executive
#70

Yes. Look, Bihar stays our top priority, since we've been working — we've been carrying out projects there for a long time, and we've built solid infrastructure and a setup there. But yes, given that we are — with the kind of system and processes we've put in place, the scalability exists within that system; so we're executing and delivering at the same pace in Punjab as well as Odisha. And beyond that, we're going to carry out or deliver comparable results in other states too. And we're bidding across all the states. We do some picking and choosing. But yes, we're open. We've begun bidding in Jammu and Kashmir. We're bidding in Rajasthan. We're bidding in other states. So more states will keep getting added.

Analyst

analyst
#71

And you're saying as well that these orders are going to be significant, correct — not merely small ones, but a decent amount, say in terms of crores? I mean, I'm presuming you'll receive solid orders from a few other states too, right?

Santosh Shah

executive
#72

Yes.

Analyst

analyst
#73

My second question is a quick one. You said there are — that no plans exist for any fund raise in the near future. So will we be relying only on debt to ease the working capital pressure, since we're growing quite aggressively? I just want to understand whether debt is the sole route for now.

Santosh Shah

executive
#74

As long as debt is manageable, we'd prefer to manage that way. But that said, whatever we're earning, whatever profits and all of that, also gets added into the system. So it's a mix of debt and equity, both. Further dilution, though, isn't in the plan at the moment. And as of now, we don't see any requirement either. Should some requirement arise, we'll definitely do it.

Analyst

analyst
#75

So what you're basically saying is that the ratio is going to stay around 1.3, or say 1.4, relative to demand, is that right?

Santosh Shah

executive
#76

That's right.

Devanshi Sanghavi

analyst
#77

Well done on those strong results. So could you walk us through how you view the growth opportunities in each of the segments?

Santosh Shah

executive
#78

You mean across every segment in which we operate?

Devanshi Sanghavi

analyst
#79

Yes.

Santosh Shah

executive
#80

Yes. Look, the first area is power transmission and distribution. The whole country is undergoing what I'd call an upgrade of the entire electrical network. So enormous opportunities are going to emerge. There are several schemes, such as RDSS — RDS had INR 3 lakh crores, and INR 1 lakh crores is still available, which is going to be executed. Then there's a scheme under which a great deal of underground cabling has to be done. For instance, in Gujarat, they wanted to make it so that — the sky has to be wire-free. That same approach is going to be replicated in other states as well. So that too is going to present a huge opportunity for us. Then there are many other schemes. And the fundamental point is that today, even though India is 100% electrified — the end consumer still wants better power; they want supply without interruption; they want quality power. For that, the whole system needs upgrading. It presents a huge opportunity. So there is no shortage of business in this sector, transmission and distribution. Solar, I don't need to say much. It is a rising sector, and a huge opportunity exists there. Though competition is present. But again, we are changing our modality. For example, EPC is becoming somewhat competitive. So gradually, gradually, we are shifting gears toward CapEx plus RECO or pure RECO as well, and then that too. So those things we are doing. And on products, because the government of India is very serious about reducing their AT&C losses and cutting the total outage time, our products are very helpful and beneficial for this whole system; so we are very confident that this will also gain a huge traction with the government. So in terms of opportunity, there is no — the only thing is how much we are able to execute; we have our own limitations. And based on that, we have to work. Otherwise, opportunities — there is no dearth of opportunity, I'll say.

Devanshi Sanghavi

analyst
#81

What kind of visibility do you have into the order book for this segment?

Santosh Shah

executive
#82

Look, like I mentioned, this year we're expecting another addition of roughly INR 400 crores, INR 500 crores quite comfortably, and after that we're aiming for more. If you look at our pipeline, we have — we're bidding on about INR 6,600 crores at a strike rate of roughly 15% or so, INR 900 crores to INR 1,000 crores, which we'll probably be adding over the next 6 months to 9 months.

Analyst

analyst
#83

Sir, on the last call, management said transmission and battery could begin contributing from H2 FY '27. Could you give us an update on where the bids stand, such as the firm order and the revenue contribution we can expect from them?

Santosh Shah

executive
#84

Yes, we felt very confident that transmission would contribute, and in this H2 itself. In fact, in Jammu and Kashmir there was a transmission tender where we were L1. It was almost being awarded to us. But something happened in the state, a policy change occurred, and that tender was scrapped and refloated; we are bidding again for it. So those things, that was the development at that time, that tender would have come. We would have begun billing in maybe October or November only. But again, anyhow, even if that has not happened, then tenders exist that are at various evaluation stages, and we are very hopeful that billing will begin within H2 of financial year 2027.

Analyst

analyst
#85

And sir, what kind of investment limits are you planning for this battery energy system and all, how much are you willing to put into the BESS, expanding BESS projects?

Santosh Shah

executive
#86

I didn't catch that. What investment limits? It all depends. As for the BESS, whatever we bid for both, we bid for EPC as well and we bid for RESCO as well. And what we've bid is roughly 20 megawatt-hour; and again, should that contract come through, it will be a mix of both equity and debt.

Analyst

analyst
#87

Sir, I had one additional question. On the prior con-call, you said peak borrowing this quarter would be roughly INR 130 crores, and now it has risen to INR 163 crores. Could you walk us through what caused that higher figure?

Santosh Shah

executive
#88

I believe something has been going on there. On INR 130 crores, my remark was about fund-based. Even so, if we put it the way we do, our debt to equity ratio will not exceed roughly 1.3. That is what we are going to try to keep intact.

Analyst

analyst
#89

Apologies — a couple of quick extra questions from me. As you can see, in March '24 we had INR 65 crores, and next year we're targeting INR 600 crores — sorry, this year; so that works out to a 10x jump across almost 3 years, under 3 years. I was just wondering — I recall you guys have in-house software and all, everyone has their own tasks and so on. I just wanted to know how internal efficiencies are coming along, particularly now that the company has grown literally 10x in 3 years. So I just wanted to hear about growth going forward, and whether it's going to be very explosive.

Santosh Shah

executive
#90

Yes. So that's a very nice question, Puneet, once again. Let me put it in a somewhat different frame. Prior to the Patna project — that's the INR 640 crores job we're carrying out — our biggest-ever contract was roughly INR 120 crores. So we've gone from INR 120 crores to running a INR 640 crores effort with hardly any expansion in the core software or service functions and the like; the service function is of much the same kind, procurement is close to the same headcount, accounts is close to the same headcount, and HR stays close to the same headcount. The one area that keeps growing is our site execution crew, since you have to scale that up in order to carry out projects of this sort. So once those core systems and core personnel are established at head office, a project worth INR 600 crores becomes manageable for us. Beyond INR 600 crore jobs, I would put it this way: with a comparable setup, we can take on a INR 1,000 crore project too. That is exactly why we put such a system in place and why we built it out the way we did. It gives the organization scalability, which means we are fully scalable. Whatever number you mentioned—600, or whatever you call it—we've expanded beyond that; 1,000 will also work, and we can push it even further. And now, with whatever systems and tools we've built, we aren't staying put; those systems are also being improved every single day.

Analyst

analyst
#91

And sir, all of these are basically a type of subcontractor that we bring in to work through the project. Our head team is sort of the same thing, right? These are subcontractors who make the project happen.

Santosh Shah

executive
#92

Yes, that's right. Look, our model works this way: in the kinds of projects we do, there are goods that need supplying and installation execution that has to be done. So when it comes to installation, we bring in small local contractors and so on. For those people, we need a team on the ground at the site to manage things. Then the supply of goods and so on, plus planning, all of that gets handled from head office. So that's the model we use.

Analyst

analyst
#93

Nice work on those strong figures. Sir, I'd like to understand the tender bidding process that the company follows. Lately I was following some tenders from Haryana and UP that got disqualified — essentially the company didn't qualify on the technical side. Sir, could you explain what went on there, and whether that's a one-time thing?

Santosh Shah

executive
#94

In Haryana and UP, were we disqualified? No, we haven't been disqualified. I don't believe so — there has been no disqualification.

Satyakam Basu

executive
#95

In Haryana, yes, sir, there was a minor delay in submission of documents.

Santosh Shah

executive
#96

There was a tender — sorry about this — where our team wasn't able to get one of the documents in on time, and because of that DHBVN, the Haryana utility, disqualified us. That was one instance. Apart from that, we haven't been disqualified in any other tender; and again, these things are minor. When you're bidding on 100 projects, in one of them there might be a missing document or something along those lines, so that's, again, it's basically —

Satyakam Basu

executive
#97

They revised the bank certificate format, there was no major document.

Santosh Shah

executive
#98

And it wasn't anything to do with our qualification or eligibility. It was more that the bank had given a format, and they wanted it revised; they wanted some amendment, and our team couldn't get that to them in time.

Analyst

analyst
#99

Also, sir, when it comes to those FY '28 figures, is the target still where you expect to be?

Santosh Shah

executive
#100

Yes, yes, yes. The target is where we are.

Santosh Shah

executive
#101

Thanks to all of you. I appreciate your joining this earnings call. And I'm grateful that you've put your money into our company. We hope for your continued support going forward as well. Thanks. Many thanks to each of you.

Operator

operator
#102

Appreciate it. That wraps up today’s conference call for Washuvi Financial Advisory. Thanks for being with us, and at this point you’re free to disconnect your lines. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Sugs Lloyd Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Sugs Lloyd Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sugs Lloyd Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.