Suzlon Energy Limited (SUZLON) Earnings Call Transcript & Summary
January 31, 2024
Earnings Call Speaker Segments
Operator
operatorLadies and gentlemen, good day, and welcome to the Suzlon Energy Limited Q3 FY '24 Earnings Conference Call hosted by JM Financial. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Sudhanshu Bansal from JM Financial. Thank you. And over to you, sir.
Sudhanshu Bansal
analystThank you, Sagar. Good evening, everybody. On behalf of JM Financial, I welcome you all to the conference call of Suzlon Energy Limited to discuss the third quarter FY '24 results. We have with us the leadership team of Suzlon comprising of Mr. J.P. Chalasani, Group CEO; Mr. Himanshu Mody, Group CFO. Thank you so much, sirs, for your kind presence and giving JM Financial the opportunity to host the call. With this, I would like to hand over the call to Mr. Chalasani for opening remarks and taking the call forward. Over to you, sir.
Jayaram Chalasani
executiveThank you, Sudhanshu. Good evening, and thank you for joining us on our Q3 FY '24 earnings call. I hope you had an opportunity to review our results and investor presentation. We will now share with you an overview of the industry, and we will talk -- we will walk you through our quarter 3 performance. We will then take your questions. India has witnessed a renewed optimism backed by the good policy initiatives from the government with a clearly laid road map for grid connectivity with an approach for accelerating the deployment of wind turbine installations. The 2030 target of nonfossil fuel-based capacity includes a healthy mix of wind and solar capacities. As for the optimal cost generation mix outlook for 2030, the wind capacity in India is required to reach 100 gigawatts as a base-case scenario. On top of this target, there is a sizable demand from C&I segment, which further boost up the demand outlook for wind. In line with the new market scenario, wind capacity additions are now happening across all eight windy states. This can be seen in the order book state mix in the latest investor presentation. There will also be pooling of tariffs, which will reduce the average cost of procurement of power for consumers and, at the same time, will improve economic feasibility of new wind projects across different sites in India. With respect to order book, our cumulative orders of 3,157 megawatts include the order book as on December 31, which is 2,290 megawatts, plus orders announced subsequently of 867 megawatts from Everrenew and Evren. This is a well-diversified and healthy order book from marquee customers. Our endeavor going forward is to pursue quality orders with higher value and better margins. Our prime focus remains on executing and building an order book. The order from Evren, a Brookfield entity, of 642 megawatts is the single-largest order won by Suzlon in India. This shows scaling up of project sizes in India and confidence in Indian market. Our OMS business continues to do well with over 14.5 gigawatts of capacity in wind. The growth of the wind sector will also help SE Forge as their major source of revenue comes from the supply of wind components. With strong fundamentals and strong sectoral tailwinds, Suzlon is now well-equipped to leverage the market opportunity arising from the energy transition. I would now like to invite Himanshu to take you through our financial performance.
Himanshu Mody
executiveThank you, J.P.C. sir, and good evening, ladies and gentlemen. I will be using Slide #17 to 24 of our investor presentation, which has now been uploaded on our website as the reference point for my discussion during this presentation. Q3 FY '24 has seen us register robust improvement in all our key parameters and fundamentals and strengthened with a focus on the bottom line. We have made deliveries of 170 megawatts in Q3 FY '24. On the P&L front, our renewed focus on bottom line has resulted in substantial reduction in quarterly net finance costs by over 94% on a year-on-year basis. So we stand at about INR 5 crores in Q3 FY '24 versus INR 80 crores in Q3 FY '23. Depreciation of INR 38 crores in this quarter is comparatively lower on account of lower amortization of molds for our S120, which is the 2.1-megawatt models. Consolidated PAT before exceptional items for Q3 FY '24 stands at INR 203 crores versus Q3 FY '23 of INR 78 crores, registering a growth of 2.6x in our PAT. Talking of 9-month performance, consolidated PAT before exceptional items, it has gone up from -- to INR 433 crores in 9 months FY '24 versus INR 98 crores for 9 months of FY '23, registering a 4.4x year-on-year growth on our PAT numbers. We are pleased to report a very strong and healthy balance sheet as of December '23, which demonstrates a very strong position of strength, where our net worth stands at INR 3,626 crores and our net cash position stands at INR 719 crores as of December 2023 vis-à-vis a net debt of INR 1,180 crores as of March '23. So this was a swing of over INR 2,000 crores in a matter of 9 months. The economy, of course, is on a very strong footing, as said by J.P.C. sir. And the sectoral tailwinds that we are witnessing continue to be very strong with a renewed focus on the renewable energy sector. And all of this augurs very well for Suzlon. With that, I'd like to conclude my brief presentation, and we can now open the floor for any Q&A that the callers may have. Thank you.
Operator
operator[Operator Instructions] The first question is from the line of Mohit Kumar from ICICI Securities.
Mohit Kumar
analystIt's very heartening to see a strong accretion order book. Sir, my first question is, of course, we have very strong order book. But the execution especially in the Q3 has been only 170 megawatt, while we are having an order book of 3.2 gigawatts. Can we see a higher execution in Q4? And can you give some tentative timeline of execution of this entire order book of 3.2 gigawatts?
Operator
operatorLadies and gentlemen, the line from the management has been dropped. [Technical Difficulty]
Mohit Kumar
analystSir, my question was the execution for the Q3 was only 170 megawatts, but you're carrying an order book of 3.2 gigawatts. How do you see the execution in Q4? And how do you -- how one can expect this 3.2 gigawatt to flow into our revenues for the next -- some tentative timelines, yes?
Jayaram Chalasani
executiveThe order book that we have, 3.2 gigawatt, Mohit, what you're seeing, is partly small capacity of participants this year and significant portion is for the next year, that is by FY '25 and also for FY '26. As you know, the orders are becoming long term, anywhere between 18 to 24 months is what the supply completion is happening from the order date. So that's how the orders are. So therefore, this is a split between a small portion this year, a significant portion next year and the following year, FY '26. As far as this year is concerned, yes, we delivered 170 megawatts this quarter. Obviously, the question is that when so much large order book, why only 170? There are two factors for that. One is that we deliver as per the requirement of the project sites. As you know that significant portion of our order book is also non-EPC depending upon the sites we deliver. That's one. There are some clients who rescheduled their requirements because of the likely delay in their evacuation system, the CTU connected system, or some places with the land. Also, we had a little slow progress internally because of the delay in the time of working capital, which has come in -- significant portion is coming in December. So I think put together is what we just created the volumes. But we expect now it to continue to grow because as far as we are concerned, now the working capital is there and the orders are there.
Mohit Kumar
analystUnderstood, sir. Are we maintaining the execution guidance of 800 megawatts for this fiscal?
Jayaram Chalasani
executiveI don't think we ever gave a guidance. This is the expectation of the market. So I will neither say yes nor say no at this stage.
Mohit Kumar
analystUnderstood, sir. My second question is on the given -- we have seen a very high pending activity from the PSU side, especially NTPC, Suzlon -- SJVN and NLC. And I think there is a tender out from GAIL for 300 megawatt. This sizable opportunity, are we participating -- are you participating in these tenders?
Jayaram Chalasani
executiveNo, we don't. We are an O&M and an EPC player. We don't participate in the bids directly. We support anyone participating in the bids. Pre-bid tie-up or post-bid, they come to us for [implementation] on this, but we don't directly participate because we are not an IPP. So therefore the -- but you are right, there's a significant amount of bids done till now and as well as being announced. In fact, as we speak, I think there's roughly about 15 gigawatts of bids open today. And then we expect, depending upon the different types of models, about 15 gigawatts of wind would be there in that model. And then for us, it's an opportunity, not as a participant.
Mohit Kumar
analystSir, I was referring to the wind OE tenders, which NTPC has 1,000 megawatts...
Jayaram Chalasani
executiveYes, we get the OEM tenders. We are looking at them, but right now, we have not yet started participating in the PSU tenders because of some of the requirements of qualification criteria with respect to net worth of the previous ones. So therefore, once we get qualified, we'll bid for that. As our balance sheet is getting strengthened, then we could qualify for that, then we will participate. We used to participate earlier, but in between because of our balance sheet going negative net worth, we don't meet the qualification criteria. So moving ahead, now we will qualify, then we'll start participating. Sorry, I took it as we are talking about tenders, not EPC tenders, I took it otherwise. But in EPC tenders, we would participate in the future. But right now, we're not participating.
Mohit Kumar
analystOkay. My last question is on the EPC order book, I think, has -- is 25%, if I'm not wrong, that we thought the EPC order book will see a slightly higher accretion. Is there something to -- if you can just please comment on that, why the EPC order book is slightly on the lower side?
Jayaram Chalasani
executiveSee, in fact, if you look at, including what we announced yesterday, it's about 28% is our EPC order book. But having said that, that EPC when we say it is actually the end-to-end. But otherwise, the rest of the portions isn't the same. It's like we do a part. There are 3 categories. We do EPC, we do equipment supply erection and then we do the equipment supply. So there are different categories. So it depends upon what the market wants. So if people want EPC, then we offer EPC. If people want as a supply equipment and do the erection, we do that. If the people want supply erections only, we do that. It's a question of -- we provide à la carte services. It's for them to choose. So what is in the market, we can meet end-to-end requirement. And in fact, we are the only O&M. I repeat we're the only large O&M in India today which offers end-to-end EPC services.
Operator
operatorThe next question is from line of Rahul Kothari from Grit Equities.
Rahul Kothari
analystFirst of all, very congratulations for the amazing results and also for winning such a large single order of 642 megawatts. Congratulations for that. And sir, can you help me understand more on the ecosystem regarding the EPC or we can say BoP system in place? Considering the significant increase in the wind sector, so how is this industry gearing up to cope up with the requirement of the OEM manufacturers? I would like to understand it on three fronts: How Suzlon itself is gearing up for the execution? How IPP players if they are looking to execute on their own? And is there any significant players available to take up this execution tasks?
Jayaram Chalasani
executiveI will talk about Suzlon and I'll talk about the sector. Obviously, how IPP is scoping up, I'm not the right person to answer the question. As I was answering the previous question, as far as we, Suzlon, is concerned, if anyone wants an EPC scope, we are there to provide EPC scope. And if anyone wants the part of it, then we are there to provide the part of it. We are -- as I said earlier also that we are the only OEM who provides EPC. Other OEMs today are not providing EPC services. So therefore, what's happening is that we -- for post-equipment supply, the balance work to be done, whether you call it as BoP work and things like that, we need to depend upon the other players who are coming up in the market today. But we don't -- in our view, we still don't have enough capacity built up in that, which is what we're really seeing in terms of capacity addition. Even in the first 9 months, we're still struggling at 2.1 gigawatts of capacity addition, when we had much bigger targets for this year. So that is one going to be a constraint moving ahead. One is the capacity building and execution of BoP. And definitely, still there is a concentration of projects in places like Karnataka and things like that. So there are issues with respect to land acquisitions that are delaying it. It's a fact the land availability is delaying plus execution capabilities. So therefore, we are continuing to struggle. And we would continue to struggle for some more time in terms of overall capacity addition in the country.
Rahul Kothari
analystOkay. And sir, also regarding like this 3-megawatt wind turbine, I understand there would be different height and different set of cranes requirement for this. So considering that an earlier time, there was like 2 gigawatt turbines, so crane requirements were different. So is there still -- like the industry with regards to crane availability still there, is coping up with respect to the growth in the wind industry?
Jayaram Chalasani
executiveYes. Answer is yes because the crane supplier companies are also tracking the sector in a big way. And then they know that what model is coming up much in advance. Even when we start launching a new model and putting up the prototype, they know that Suzlon is sending out this model. They sit with us. They understand what is the requirement of the crane. And they get those cranes in time. In fact, right today, we are tied up already for the cranes what we need for the next year. So there are adequate cranes available as long as we're talking to these people in advance and then booking them up. And because we are constantly in this business, we do have a relationship with each of the crane suppliers. So we don't see in our case. Obviously, I can't comment on anybody's case. We don't see that as a constraint, including for 160-meter hub height turbines what we're going to do now, 3.15 megawatt.
Rahul Kothari
analystOkay, okay. And sir, last question, regarding this hybrid project, I understand lots of projects are also coming in the hybrid in nature with solar and wind together or solar and battery, wind plus battery, et cetera, RTC based. So how Suzlon like participates or provides its products to the other players in such kind of order segment?
Jayaram Chalasani
executiveYes. So if you look at annualized 15 gigawatts of orders fixed, which are outstanding today, 9.5 gigawatts is what we call this FDRE bids, fixed dispatch renewable energy bids, which would include the solar, wind and storage system. And then we have about 2.6 gigawatts in pure wind bids. So you don't find the pure solar anywhere. But significantly, the bids are 15 gigawatts measured capacity is for FDRE and pure wind bids. In the 15 gigawatt bid, equivalently 15 gigawatts is required if you want to meet different types of -- 15 gigawatts of wind is required. So when the IPP, let's say, is doing an FDRE or doing a hybrid, wind portion, they approach us and obviously, we'll develop the wind projects for them. No one has come to us till now. If they come in future, if there is a hybrid, to coordinate the whole thing, we are willing to coordinate. But otherwise, we will provide the pure wind portion of it.
Operator
operatorThe next question is from the line of Raj Rishi from DCPL.
Raj Rishi
analystJust wanted to understand your perspective on this supply side. Like demand side, the government is talking about a certain level of capacity addition for the next 5, 7 years. C&I is talking about a certain level. Green hydrogen is there and repowering, et cetera, is there. So that's the demand side, which seems to be very robust. Now as far as the supply is concerned, do you foresee any chance of oversupply in the domestic market in India? Or that's -- I hope -- I just would like to hear you out on this.
Jayaram Chalasani
executiveI think the demand obviously is expected to be there because you've seen the opportunity itself. Obviously, therefore, demand is not being today subscribed to. If you look at the -- roughly about 13 gigawatts or something, including the greenshoe option of bid out recently, what you put together. But subscription is only about 7 gigawatts. What would decide is not the supply of equipment, the capacity addition would purely depend upon how much can we convert the supply turbines into commissioned capacity. That's where the concern we are facing today in the country. So as I said sometime back, that is what is going to decide as a country, how much we are going to add the capacity. If that is getting slowed down and not ramping up significantly, then obviously, you will have a backward impact on how much will be the surplus required. So basically, the commissioned capacity would actually decide the demand on the supply of equipment but not the demand of the -- greater demand of the C&I customers. That's our clear view.
Operator
operatorThe next question is from the line of Nikhil Abhyankar from ICICI Securities.
Nikhil Abhyankar
analystCongrats on a good set of numbers. Sir, my first question is regarding the profitability of WTG segment. So it has been low in the first 9 months. So what exactly is the reason for this, sir? And how will be the trend going forward?
Himanshu Mody
executiveSo -- Himanshu here. So in terms of WTG segment, we've always maintained that our break-even points are close to about 600 megawatts. So long as we're able to deliver 600 megawatts in any given year, the WTG business, manufacturing business on its own, will break even at the EBITDA level after meeting the fixed costs. So we continue to maintain that. In the 9 months so far, we've done about 437 megawatts of deliveries. So a large part of the fixed costs have already been absorbed through the deliveries that have happened over the 9 months. And of course, based on the deliveries that we do in Q4 of this financial year, I think the WTG segment is well on its way to have a reasonably decent operating profit on a stand-alone basis.
Nikhil Abhyankar
analystOkay. So as and when the volumes increase towards the next year, the margins are expected to go up.
Himanshu Mody
executiveThat's correct, yes.
Nikhil Abhyankar
analystOkay. And sir, the second thing was regarding -- it is an industry-specific question. So recently, pure wind tenders have seen -- like if the tender is for, say, 100 megawatts, the bidding is done only for 20, 30, 40 megawatts. So what exactly is the reason for this? What are the problems that IPPs are facing?
Jayaram Chalasani
executiveI think it is not specific to wind. As I said sometime back, overall 13 gigawatts bidding done, about 7 gigawatts is subscribed. Even if you see the latest hybrid bid UVNL, which is including greenshoe option of 1,000 megawatts, which was the latest bid that happened in end of January, only 200 megawatts got subscribed. So that is not specific to wind. It is generally what's happening is that compared to the bids that are coming in, the subscription level is becoming a little low. That could be because everybody has got already bid out earlier bids and then acquired capacities. And second also is also because there could be a potential diversion of concentration towards the C&I segment and the bid PPS. So that could also be other reason we assume that there is an undersubscription. But that is not specific to the wind.
Nikhil Abhyankar
analystSo what exactly happens to this unallocated capacity, will it get re-tender?
Jayaram Chalasani
executiveThey're coming up, like I said, that now as we speak, there is only 7 gigawatts subscribed. The next 15 gigawatts of this, they're already in the market, which I said that 9.5 gigawatts of FDRE and about 2.6 gigawatts of pure wind base. This FDRE NTPC or NHPC, those bids are there already in the market. Then government will continue to come out with bids. So if they are undersubscribed, fine, the next bid will come again.
Operator
operator[Operator Instructions] Next question is from the line of Deepesh Agarwal from UTI Asset Management Company.
Deepesh Agarwal
analystMy first question is of the current order book, how much is pure credit supply that is without erection?
Jayaram Chalasani
executiveSee, EPC is about 28% -- 30%, 70% is non-EPC. In that we will have, let's say, almost like 50-50, which is pure equipment supply versus some portion of other erection or some other portions included roughly.
Deepesh Agarwal
analystOkay. So would there be a possibility of delays in projects where only credit supply is there because the customer -- erection is dependent on customer?
Jayaram Chalasani
executiveYes, yes. So there are, not just the delays, in fact, we're also seeing some of our equipment which got supplies, let's say, 3, 4 quarters back are still getting commissioned. So there are obviously delays. That's a point which I was making earlier. Because as a sector, we are facing headwinds in terms of capacity buildup for doing the BoP work, on-ground work. So not the supply constraint but more so on the project execution side. Because there's hardly any large players in the project execution. As I said that we are the only large OEM which is doing further execution, but others don't do it. They only just supply the equipment and that's all, their job is over.
Deepesh Agarwal
analystSure. Sir, in terms of your delivery commitment to the clients, how much of this 3,157 megawatts would be for next year?
Jayaram Chalasani
executiveI can't say that because that would actually giving you guidance indirectly. As I said, sometimes back in this 3.2 gigawatts of order book or whatever we said till yesterday, a significant portion of that is for FY '25, and also some portion of that is for FY '26. But specifically to say when it is, it's difficult for two reasons. One is that what schedule we agreed today is different and also when the projects starts getting executed, then what would become the actual delivery schedule is depending upon the client's side and everything would be different. So unless we get closer, so we won't be able to firm up what is likely scheduled for the reasons what we discussed sometime back on the site readiness and project readiness and execution capabilities.
Deepesh Agarwal
analystSure, sure. And sir, last time when we met, you mentioned that despite having 4,500 megawatts, there would be a gradual increase in the capacity. Basically, you'll have to invest in some of the capacity on supply chain, et cetera. So can you help us understand the ramp-up in both erection capacity and project supply capacity, how that is happening now?
Jayaram Chalasani
executiveNo, in the erection capacity, there is nothing that's called the CapEx, which is required. So what is required is your organization bandwidth increases. For each project you open up, then you get a set of leadership and the workforce required there. That we keep expanding from time-to-time, depending upon what capacity we're executing on it. There is no significant CapEx required in terms of project execution. As far as the supply is concerned, currently, whatever CapEx is required, we already committed. Am I right, Himanshu?
Himanshu Mody
executiveYes, yes. So I mean, on the CapEx side, there is a sustenance CapEx of about INR 100 crores, which historically the company has been incurring. But particularly for the ramp-up that we are seeing to invest in the 3 megawatts molds, we may be looking at a delta CapEx of about INR 250 crores a year, which we are quite comfortable with meeting from our own internal accruals.
Deepesh Agarwal
analystOkay. So practically, if the orders are available, we can even go to 4,000, 4,500 megawatt execution in a year?
Jayaram Chalasani
executiveIt's not so simple to say the capacity -- see, manufacturing capacity versus the supply capacity are two completely different parameters. I might -- we might have a 4 gigawatt of supply capacity, but that is when you run this like a flat-out machine, okay? But it doesn't happen that way. If a couple of your supplies are made ready but not taken, not dispatched, then you don't have a place to manufacture the next one. So therefore, there will be -- therefore, one is creating how much of the manufacturing capacity. They're not like a mass production, just produce and send it out. It also depends upon offtake of capacity. Again, we'll come back to the same thing, everything gets decided based on what is the offtake at the project sites. That would decide our manufacturing capacity, that would decide our supply capacity. Yes, if everything is ideal, if whatever we produce is taken out in time, what you say is right.
Operator
operatorThe next question is from the line of Aadesh Mehta from Motilal Oswal.
Aadesh Mehta
analystCongratulations on a good set of order inflows. I just wanted to understand, since January is already over, would it be possible to know what is our execution run rate for January?
Jayaram Chalasani
executiveWe don't provide it. Unfortunately, we don't provide the guidance. So we've not been providing earlier as well.
Aadesh Mehta
analystOkay. No worries, sir. And sir, in terms of when we are seeing the new tenders, right, we are seeing that the delays have been -- especially the SECI and the NTPC tenders, the delays have been slightly more than what we would have initially expected. And even then, there is some delay in the bidding as well. Sir, can you, as an industry participant, articulate that why the recent FDRE contracts are running in some delays, and even in terms of bidding, not the entire amount has been bidded for?
Jayaram Chalasani
executiveIt's a question of some appetite in the sector today for absorbing the bids. So that's what we were discussing sometime back. Obviously, there is an undersubscription on an overall basis with respect of what type of a bid it is. That could be one. Because the players are currently a bit saturated, are also they are looking at risk of execution. So therefore, they don't want to take the risk beyond the X amount of capacity, which is already bid and taken. Third, one of the reasons also mainly could be because we have these people who are concentrating on C&I segment, which doesn't come to the bidding route. It is outside. In fact, even if you look at our current order book what we have, 50% is C&I. In fact, it's looking more but for the large order what we announced yesterday. Otherwise, our C&I segment is actually remote. So that could also be causing people absorbing less in terms of bid PPS, which is an increase in PPS.
Aadesh Mehta
analystGot it, sir. Sir, while there is a saturation at the developer level, there could be some transition bottlenecks, right? Sir, would delays continue? What is your outlook on how long can these delays continue?
Jayaram Chalasani
executiveI wish I had an answer -- exact answer for that. The -- see, let's look at this year. This year, it's 2.1 gigawatts done in the 9 months. So our estimate is anywhere between 3.2 to 3.5 gigawatts is what we'll achieve this year, okay?
Aadesh Mehta
analystAnd when you're saying this year, so in next -- so basically in 3 months, another 1 gigawatt of execution should happen on ground?
Jayaram Chalasani
executive1 megawatt of commissioning will happen on the ground, not execution. So execution could be in different phases because some places, it may be impacting heavily, but some places is not ready, so they're not commissioned. So another 1 gigawatt of commissioning will happen, okay, outer limit like 2.1, could move to 3.1, 3.2. That's the best-case scenario of what could happen compared to what we were thinking as a country, we will cross that FY '17 figure of 5.5 gigawatts. But therefore, again what would happen in FY '25, our estimates are, as a country, if we resolve some of this capacity-building issues in terms of BoP, we could do 5 to 6 gigawatts next year.
Aadesh Mehta
analystSo FY '25, 5 to 6...
Jayaram Chalasani
executiveMore than the transmission constraints, that would be there, but more than that, it's execution constraints what we're facing in terms of capacity as well as availability of land, et cetera.
Aadesh Mehta
analystGot it, sir. So next year, 5 to 6 gigawatts should be doable, right?
Jayaram Chalasani
executiveThat's our estimate at this stage. It's our view that at least government would be needing more. So even this year, we always maintain it will be sub-4. That's the guidance what we've been saying sectorally. I think that's what would happen, it could be max 3.5 this year.
Operator
operatorThe next question is from the line of Avishek Datta from Anand Rathi Shares and Stockbrokers Limited.
Avishek Datta
analystSir, can you just update, like given the favorable economic standings you have got because of economies of scale, how big is the threat for imports when the demand scenario improves?
Jayaram Chalasani
executiveYou mean the wind turbine imports?
Avishek Datta
analystYes, sir.
Jayaram Chalasani
executiveWind turbines per se cannot get imported because of the size of plates and size of the things. What people can do is that they can import the raw material. That's what the -- some of the large players today in the market are doing. Because the -- first of all, it is supplied only provided you have got a listing in RLMM of MNRE. RLMM also provides for either you manufacture or you assemble in India. So therefore, once they get listed in RLMM, they can get -- import the raw material. And that is what some of the players are doing today, importing the raw material but converting them into turbines here. For example, the blades are there, you can get the entire raw material from them, which is a major cost of it, and converting into blades that fit in the molds here. And you get all your knockdown commission equipment and you assemble them as natural and sent it. So that's what can happen. And tower is basically anybody can do with steel manufacturing here. Imports of components is happening but not import of turbines per se.
Avishek Datta
analystOkay. But we can do the assembly, like any player who is registered in the directory can actually import from China at a lower cost and assemble in India and participate in the bids.
Jayaram Chalasani
executiveYes. Right now, there is -- as long as your turbine is -- the process is done in India, prototypes done and certified and got listed in RLMM, yes, you can import. Even today, there is no specific restriction of how much component -- how much portion of your wind turbine has to be domestic, how much has to be imported. And that restriction doesn't exist today. Theoretically, you can import 90%, 95% of your materials from outside and convert them, assemble them or convert them into place and then supply them.
Avishek Datta
analystOkay. And secondly, sir, like when you say the non-EPC part is 70%, what do you exactly mean, like it will be like parts of the wind turbines, blades? Or how do you define that?
Jayaram Chalasani
executiveNo, no, no. When I said the EPC scope means it includes the land -- including the land, developing the land, doing the foundation, improving the erection, doing the [indiscernible] system, doing the pooling substation and integrating the whole thing. That's an EPC, okay? So whereas the other portion is that one extreme is -- the other extreme end is that we just supply the equipment and we supervise the erection and commissioning. We only supervise. We supply the equipment. We deliver the equipment with those protocols. That's the other extreme. In between the two, there could be different variations saying that we can supply plus do the erection or we can do supply, some erection plus foundation but don't do the line portion or don't do the [indiscernible] system. That depends on different models. That scope can be varied and we cater to any type of scope. What -- we do -- we supply thali as well as we supply à la carte menu.
Operator
operatorThe next question is from the line of Dhruv Muchhal from HDFC Asset Management.
Dhruv Muchhal
analystSir, the question was that the execution probably, as you mentioned, is probably a big thing to monitor and see. So sir, next year, you mentioned probably the industry can do probably 5, 6 gigawatts. But sir, say, next 3, 5 years, do you see the ecosystem and the setup moving towards greater than 6 or probably 8 gigawatts? Because it seems the demand is there, whatever multiple factors as we mentioned earlier. Can the execution exceed 6, 8 gigawatts per annum? Is that -- I mean, is the sight visible there? And do you think the ecosystem is moving in that direction?
Jayaram Chalasani
executiveObviously, there is going to be an improvement from year-on-year. Like for example, we have been struggling in the last 5 years to do anywhere between 1.5 to 2.1 gigawatts, whereas in this year, the first 9 months, we did 2.1 gigawatts. So there is an improvement. There is a wish in the complete industry, including government, that we should hit 8 gigawatts a year. Whether that will happen in FY -- definitely not in FY '25. It will happen in FY '26 and FY '27 is what we need to wait and see. But the capacity building is happening. There are more and more players coming in terms of providing BoP services. But then how much -- how quickly and how fast they can do plus the issues like, as I said, one is the capacity, second is a land-related issue of continuing to grow. But that problem to some extent will get reduced once we do the multi-stage bidding. But then the concentration of projects won't happen. Today, Karnataka is at peak. If you go to Karnataka, then you'll see how people are really struggling to get even 1 footprint MV up there. With the new bidding coming up and the bidding for MP, there are bidding for other places, now slowly Andhra Pradesh is opening up. And if you see our -- the metrics today, but number of states what we're getting the orders is diversifying it. If that happens, obviously, your land problems also would come down. So therefore, we slowly reach towards 8 gigawatts. But when we would be able to get this stage, maybe by FY '27.
Dhruv Muchhal
analystGot it. And sir, you mentioned that concentration away from land, I mean, multiple states will help. But is that a constraint for developers? Because, say, for example, if you move to MP, the cost of generation increase. Is that a factor? I'm just trying to understand. Is that the reason they're not moving -- I mean, themselves moving there? What's holding them back? I mean, if the issue is...
Jayaram Chalasani
executiveNo, no. If you move to MP, developers, there will be land available. To solve the problem of tariffs going up in the states where the wind potential relatively is low is why they came up with this pooling tariff concept.
Dhruv Muchhal
analystPooling tariff. Okay, got it, got it.
Jayaram Chalasani
executiveSo we have announced the impact. Therefore, the bidding there has been operating agency and the whole notification has come up as well as the date from which it gets applicable. In fact, this pooling tariff system, it's not just for the wind alone, we're seeing it for every type of model, pure wind, pure solar, pure hybrid, put together is this thing. And based on each capacity coming into the pool, there will be a revision in the overall tariff and which is what we are doing from time to time. The bidders would continue to get the tariff, what they quoted. But this tariff for the discount would keep changing based on the pool.
Dhruv Muchhal
analystGot it. Yes. No, I understand. That's helpful, sir. Sir, the second question was...
Jayaram Chalasani
executiveWhat happens is the diversification of the states happen. And then the land availability happen. Second option is that we do a proactive development. Like today, we are trying to do a proactive development in the states of AP and Rajasthan with the government cooperation of identifying X amount of land, saying that this is an area you get rights to develop. So therefore, we are going ahead in that model. And working with the different clients, saying that let's do the joint development. We'll first procure the land so that it will be fixed to those projects. Even that model, we started right now in AP as well as in Rajasthan.
Dhruv Muchhal
analystGot it. And sir, the second question was on the hybrid projects. I think earlier, you mentioned -- some of the comments, you mentioned that you're okay -- I mean, you're also looking at doing both wind for a hybrid project, the solar portion also. So what component are we looking at doing there? I mean, the whole ecosystem of solar or just the EPC?
Jayaram Chalasani
executiveYes. We are not -- we don't volunteer to do solar, let me be clear. We don't want to volunteer solar because that is not our forte. Because we need to buy everything in unit. And the EPC's margin is hardly anything. But if someone says that, "We don't want to bifurcate and use two different parties, would you want to take up hybrid, we will look at that option as a whole. Basically, there has to be a large portion of wind and smaller portion of solar. But till now nobody has come up. Because obviously, everybody implements the projects to their strengths. In solar, most of the people procure their own modules and thus get the players to do implementation. They are giving the green portion to us. That requirement has not come. I only said if there's a scenario arising, we will definitely consider. But that is not our preferred option.
Operator
operatorThe next question is from the line of Dhyey from Niveshaay Investment Advisors.
Dhyey Desai
analystSir, I had a question related to the crane availability. It is more sort of from an industry point of view. I just wanted to understand -- so I understand that the company has good contracts and good relations with the crane rental companies. But I wanted to understand from an industry perspective that, is the availability of high-tonnage cranes, is there were shortage in them?
Jayaram Chalasani
executiveSee, infrastructure constraints at initial stages will happen. It all depends upon what is the ramp-up rate. Let's say that this year, we do 3.5 gigawatts. Next year, we want to do 8 gigawatts. Then obviously, do we have a required infrastructure, then such place available or not could become an issue. But if we are moving 3.5 to 5, 5 to 7, it's a different situation. Not just the cranes, cranes is only one part of it, your entire transportation ecosystem. Because these are the large-diameter cranes are coming up now. So all that becomes an important, which place the project location is there, the route survey, logistics. And that would also will become constraints. Some places you need to modify some bridges, strengthen the bridges. But that's likely -- I think what is the -- that will always be there for any power project we do, whether we are doing a fossil fuel-based project or wind projects, these will be there. But looking at the entrepreneurship in the crane companies, if there is a demand, I don't see them actually ramping up capacity. There could be a slight mismatch here and there, but I don't see that as an issue at all. Because there are a lot of cranes available globally for this capacity.
Dhyey Desai
analystAll right, sir. And sir, are we seeing any increase in the rentals of these cranes, the high-tonnage cranes particularly?
Jayaram Chalasani
executiveThis depends time to time. It's all question of supply-demand situation. Once we have a contract and then we have a relationship with these people working for, let's say, 10 years, 15 years, then that relationship would be different. So I wouldn't be able to comment for the market as a whole. It depends a lot on your relationships, what sort of the minimum guaranteed capacity we need with them. The number of factors which play a role in terms of your pricing.
Dhyey Desai
analystFair enough, sir. I just had this question that we face a lot of the EPC players regularly who face a lot of difficulties in the land acquisition process. So is there any relief from the government? Or are there any policies in the wind sector in the acquisition part?
Jayaram Chalasani
executiveSee, this is -- land is a state subject, okay? So each state you go, you need to work with the local authorities to see how quick it happens. So even if there is a process implementation, implementation could become potentially an issue. This will continue. If it's a revenue land, we have it a little more easier. If it's a private land, it's more cumbersome. Some states where it's more and more revenue -- and state to state it differs. Maybe if you go to Rajasthan, it's much quicker. But today, Karnataka is difficult. So it varies. But this is a problem which we need to live with where we are. Sometimes it's easier, sometimes it's tougher. And we need to continue. And this is not new to just the wind sector. Land acquisition has always been an issue for any infrastructure project. And more so for wind because you have multiple footprints and then also you need to have pathways. Your cranes have to reach, your blades have to reach the site. So these problems will be more. That is the reason why we're facing the more roadblocks in terms of execution.
Dhyey Desai
analystCorrect, sir. Sir, I had this a company-specific question that as we have a very good non-EPC order book, so are we looking at higher execution from a point of deliverables in maybe a year or so, in FY '25 or '26?
Jayaram Chalasani
executiveYou mean higher delivery of equipment?
Dhyey Desai
analystHigher deliveries of WTG.
Jayaram Chalasani
executiveYes. So what happens is that when we are doing EPC, then it is our organized capability of how much is the land acquired and then how much the equipment supplied. So that, if we add to the clients who are doing their own acquisition of land, there's obviously multiple parties working on this, that would definitely increase the capacity of offtake. So supplies would definitely would increase in that mix, rather than 100% within EPC versus part EPC, part equipment supply, answer is yes. The supply of equipment would increase -- quantity of supply of equipment would increase.
Operator
operator[Operator Instructions] The next question is from the line of Mr. Sudhanshu Bansal from JM Financial.
Sudhanshu Bansal
analystSir, how do you see the repowering opportunity, particularly in terms of availability of the land where we already have the land and transmission system?
Jayaram Chalasani
executiveRepowering is a good subject and a good wish to call into that. But I don't think that's going to move a needle within the next couple of years. Repowering policy has come. But the repowering could have happened even without the policy. The repowering policy only helps a limited extent that we basically have a PPA. That PPA can get suspended for some many years and the PPA will continue later on based on the 3 years' previous average generation. To that extent, we will get PPA continued. So other than that, there is nothing significant in the policy, okay? So nothing more than that. The issue is that today, if somebody wants to do the repowering, you go there, you remove the existing ones, put up the new ones. And most of the repowering options are available with these states grid connected. So incremental capacity, if that state doesn't take it, then you go somewhere, then you get into issues that appear in the state grid, state to open access, state transmission charges, what really happens. There are plenty of issues. Idea is good, generation from the given site can go up by doing repowering. But does it give a significant impact on the cost of generation? At this stage, the answer is still not there. So repowering would happen in my opinion but not like -- it's going to happen sometime in FY '25, significant capacity is going to come in, sorry, no. We have estimated 25 gigawatts of repowering potential. But realization is going to take time in our view.
Operator
operatorThe next question is from the line of Depesh Kashyap from Invesco Mutual Funds.
Depesh Kashyap
analystSir, your contribution margin is lower quarter-on-quarter by like 2%-odd. Can you please explain the reasons for that?
Himanshu Mody
executiveSo Depesh, contribution margin, you're talking on a consol basis or for the particular business division?
Depesh Kashyap
analystThe consol that you've given in the PPT.
Himanshu Mody
executiveSo console, Depesh, also is a factor of how much of the supplies are we doing in the WTG segment for the overall business. So I urge you to look at contribution margin from a business segment-wise. So our direction always has been that for the WTG manufacturing, contribution margin will be in the mid-teens. So currently, we are at about 17.5% contribution margin for the WTG manufacturing business, which is actually fairly in line with our plans. It was higher in Q1 at about 20%. But that we have -- when we hosted the call in Q1, we mentioned that, that is an aberration and cannot be taken as the standard going forward. So -- but I would say that somewhere around mid-teens would continue as the contribution margin for the manufacturing business. So far as the O&M business is concerned, our contribution margin will be roughly a little north of 60%, which continues to be the case. So of course, the blend on a consol basis will depend on what is the mix of the manufacturing numbers along with the O&M numbers.
Depesh Kashyap
analystUnderstood, sir. Secondly, if you can also highlight, what part of your order book is still for the 2-megawatt turbine? And secondly, also you mentioned in the call that you're not participating in that PSU orders, right? So just want to understand how will you maintain or increase your market share. So these are two questions.
Jayaram Chalasani
executiveSee, the 120 share today in the 3.1 gigawatts is about, I'd say, roughly about 20% to 23% in 2 megawatt share. I don't know what you mean by the market share in what, within order book or is it in supplies commissioning. In the commissioning, we're maintaining a 30% market share consistently as quarter-on-quarter basis. As I said that the option of NTPC's equipment tender is one of the options for us to increase the order book. At this stage, we are not having the pressure for not participating in that activity of that because we are seeing a significant interest flowing in terms of order books for us. And we announced and then we do a number of potential orders, which we are discussing with various people. While we would love to participate in that tender, but I don't think that it is affecting -- in any manner affecting our order book share.
Depesh Kashyap
analystSir, just to be clear, with the improved balance sheet, with the net worth and everything, are you now allowed to participate in that -- those orders or not?
Jayaram Chalasani
executiveSee, NTPC has a different type of calculations, right, they are not because today if you look at them, there is a different formula, unless they see that impact. They see that we participate, obviously, because we are largest industry player. So do you want to answer that, Himanshu?
Himanshu Mody
executiveSo we do qualify, Depesh. I mean it also depends how the user is saying on the qualification criteria. But once our March '24 audited numbers are out sometime in May, post that, there would be clearly no doubts about our qualification because that would be the first sort of audited balance sheet with our positive net worth that we'll be issuing. So there would be no gray area. We certainly would qualify under all the parameters in those tenders.
Jayaram Chalasani
executiveBut then also, we will evaluate each of those bids in terms of alternate opportunity versus bidding because we have X amount of capacity. Because many of these tenders will come in very stringent conditions, stringent payment terms, back-ended payment terms and things like that. So therefore, obviously, even we get qualified, it is not necessarily that we'll participate in every bid. We will evaluate the options, what will be the best option for us to book our entire capacity. So if that is that kind of play, obviously, we participate.
Operator
operator[Operator Instructions] The next question is from the line of [ Vikas Mukundan ] from [ Freelance Consultant ].
Unknown Analyst
analystFantastic numbers, sir. Can you hear me?
Jayaram Chalasani
executiveYes, yes, we can hear you. Go ahead, please.
Unknown Analyst
analystThis question is for Mr. Mody. Sir, I saw your interview on NDTV Profit on January 4, when you mentioned that your order book as of that day was shy of 2 gigawatts. But I see in today's presentation, end of December, your order book is about 2,290 megawatts. So does that mean between the 4 days implementation or other deliveries of 2 to 2,290 megawatts?
Himanshu Mody
executiveSo yes, that would have been because of the RR numbers that we would not have made public at that point in time, the 170 megawatts. So the differential would be on account of that broadly.
Unknown Analyst
analystOkay, okay, so -- and if you can just tell me what is the difference between installation and delivery?
Himanshu Mody
executiveSo there are two things you need to look at, which we track and we also disclose that in our investor presentation slides. So one is the RR, which is the revenue recognition, which means that the full turbine dispatched from our factory premises based on which we book the revenue for a particular turbine. So that, for the 9 months period, we've done about 437 megawatts in this financial year. The other parameter what we monitor is the commissioning of the turbines. So like that is, in all-India, the number about 2.1 gigawatts that has been commissioned in 9 months ending December '23. And out of that 2.1 gigawatts, Suzlon's share has been about 611 megawatts in the commissioning numbers. So commissioning has to be clearly differentiated from the delivery numbers or the revenue recognition numbers that we report.
Unknown Analyst
analystAnd this commissioning is Suzlon turbines only or could be other company turbines as well?
Jayaram Chalasani
executiveWhat we track is only Suzlon supplies, that 611 megawatts is what we talk about our turbines either we directly commissioned or we supervise the commissioning, where it's only equipment supply. These are our turbines.
Operator
operatorLadies and gentlemen, we would take that as the last question for today. On behalf of JM Financial, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
Jayaram Chalasani
executiveThank you.
Himanshu Mody
executiveThank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Suzlon Energy Limited transcript — plus 251,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Suzlon Energy Limited earnings transcripts and 251,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.