Taylor Wimpey plc (TW) Earnings Call Transcript & Summary
July 31, 2024
Earnings Call Speaker Segments
Jennifer Daly
executiveThanks, Alice. We're running slightly late — that's down to my chatting, so my apologies. Good morning, everyone, and thanks for being with us. As always, I'll make a few short opening remarks and cover the half-year highlights, then Chris will walk you through the financial review and our guidance. After that, I'll explain how we're viewing things right now and how we're positioning the business for the future. You'll have seen the statement already, I think, and noticed that we now expect full year completions, excluding JVs, to come in towards the upper end of our previous guidance of 9,500 to 10,000. I'm delighted to report that we performed well in the first half. And importantly, we're very well set up to grow again from 2025 if the market is supportive. It's early days for the new Labor government, but all early indications look positive for the sector, with recognition that planning is a major barrier to economic growth and that housebuilding contributes significantly to that much needed growth, but there'll be more on this later. So I think some great progress in the year so far, but I'll just pick out a few of the highlights this morning.
Jennifer Daly
executiveWe feel genuinely good about the private sales rate at 0.75 — that's 0.69 once you strip out bulk sales. And although interest rates and mortgage rates stayed elevated while hopes for cuts got pushed back, the market itself has held steady. Nobody could question that the teams put in serious effort to get us here, all while safeguarding value. First half completions mirror a smaller order book at the start of the year and match the guidance we gave before. Looking along the bottom line here, I think it's clear this company is in genuinely strong shape, with a superb landbank of 79,000 plots, supported by a mature, strategic land pipeline and a track record of successful pull-through. Last year I said customer service was going to be a major priority. We're already a five-star homebuilder. So it's been a pleasure watching customer service scores rise thanks to that focused push, moving from 90% to 96%. We've also noticed encouraging movement in the nine-month scores over recent months, which is very pleasing. But as ever, there's more work ahead. And finally, I believe these results speak to our experienced teams and how dedicated they are — and a very proud and special shout-out this morning to our 62 site managers who just picked up Pride in the Job Quality Awards, taking home more awards this year from fewer or smaller sites, which I think really says something about the calibre of our teams.
Jennifer Daly
executiveI believe this quality also shows up in a different stretch that had strong construction quality review scores along with fewer reportable items, and the appendices contain further detail on those. So this is an update to a chart I presented to you at full year. I won't go through everything I said at that point again, except to note that mortgage rates, despite some improving momentum as of late, have stayed elevated, and that is weighing on affordability, especially for first-time buyers. And naturally, we've witnessed market expectations from earlier for bank rate cuts being pushed back. So against that background, we're pleased with just how resilient the market has proven. There is encouraging news, however. There are just as many mortgage products available today with high LTVs as at any point since before the mini budget in 2022, and competition among lenders is still good, which is in turn feeding into pricing, where we're beginning to see some improved lending rates coming through. So, a stable first half of the year. Pricing has stayed firm since quarter four of last year, and it's worth keeping in mind that, on the whole, we've seen only low-single digit erosion of house prices since the peak in September 2022. As previously flagged, the order book is down slightly, and building it back up remains a key priority so we're set up as well as possible for 2025.
Jennifer Daly
executiveAnd with that, I'll hand things over to Chris.
Chris Carney
executiveThanks, Jennie. Good morning, everyone. I'm happy to report a solid first half performance, delivering in line with our expectations. As you can see from the variances on this slide, the results have been impacted by the lower order book coming into this year, but we are pleased with the good progress being made through 2024 so far, both in sales and operational delivery, setting ourselves up for growth from 2025, assuming supportive market conditions. In the first half, we delivered 4,728 Group completions, resulting in revenue of GBP1.5 billion, a reduction of 7% on the first half of last year. Our focus on driving increased operating efficiency, cost savings, and value improvement helped us achieve a gross margin of 19.3% and operating profit margin of 12%, down 2.4 percentage points on last year, and I'll expand on that in a minute. Return on net operating assets reduced to 10.9%, which, you should remember, is reported on a rolling 12-month basis. So, the prior-year comparator includes a period of strong trading before the mini budget intervened. In the UK, we experienced good levels of demand in the traditionally strong spring selling season. And as Jennie mentioned, market conditions remained relatively stable throughout Q2.
Chris Carney
executiveBut since we began the year with a smaller order book, first-half completions came in lower, and we achieved 45% of the upper end of our full-year guidance range, which was pretty much what we expected. Affordable homes accounted for 22% of completions in the first half, and for the full year I expect affordable properties to make up roughly 21% of the mix. In line with our guidance, the blended average selling price for half one was broadly flat versus the prior year. Inside that figure, and again as anticipated, private pricing came in 2.7% lower, with the bulk of that decline driven by some underlying market deflation, which you'll see on the following slide, and the remainder attributable to mix. Back in February I also noted that affordable selling prices had continued to rise, and the 7.8% increase shown here reflects geographical size and tenure mix. Going forward, I expect the blended average selling price for the full year to be somewhat higher, at roughly the GBP320,000 mark, reflecting the second-half mix. At the bottom of this slide you can see our UK and gross operating profit margins, at 18.9% and 11.5% respectively. Both benefited from the sale of commercial land in the first half, as the next slide will show.
Chris Carney
executiveThe purpose of this slide is to lay out for you the specifics of the different factors affecting operating margin during the period. When you set this slide against the one from February, you will notice that the anticipated half one build cost inflation of 4% actually landed at 3.5%, and net pricing on completions in the half was, as expected, a touch lower thanks to market deflation of 1.5% on selling prices versus the first half of last year. A 0.5% impact also arises from landbank evolution, as we begin trading out certain sites acquired in the years following the Brexit referendum, when the land market was at its most benign. Together, these market factors produced a 3.7 percentage point cut to operating margin in the period. Moving further down, there is, as is typical, always some contribution from land and property sales. This half that contribution was GBP16 million higher than in half one last year, and the increase lifted operating margin by 1 percentage point. Turning to the second half, spot market build cost inflation on new tenders is essentially zero, and the value improvement actions we have taken push things just into deflationary territory — say, 0.5% to 1%.
Chris Carney
executiveWhen you look at the half two income statement, there’s still a bit of lingering historical build cost inflation sitting in WIP, though value improvement and efficiencies will largely offset that. Net pricing has been pretty stable for some time now. As a result, the flow-through of price deflation coming from the order book will keep diminishing and ought to be smaller in the second half. And while half two will carry some additional costs tied to IT improvements, we expect to deliver more volume during that period. That means there will be an operating leverage benefit relative to half one. So, taking it all together, if you strip out the impact of land sales from half one, we anticipate a modest improvement in the underlying operating profit margin in half two. We keep an enviably strong balance sheet, with net assets of GBP4.4 billion as at the end of June. The movement versus last year is driven mainly by the increase in fire safety provision, which I’ll explain shortly. The value of our land holdings net of land creditors is broadly flat, with both balances coming down as expected. WIP has risen year-on-year, reflecting a greater weighting of completions in half two this year and an intent to deliver smoothly during the second half, setting ourselves up for 2025.
Chris Carney
executiveTurning to building safety — as you're aware, we've had a dedicated team focused on fire safety remediation for a number of years. And after assessing all of our buildings, we're making solid progress in moving buildings from detailed design work into tender and then on to starting work on-site. The pie chart on the right lays out how far our remediation has progressed to date. Turning to the increased provision we've announced today, we assess our remediation provisions on an ongoing basis. And across the two years since our last update, the tenders we've received have generally shown our cost estimates to have been very accurate. That said, some inflation in remediation costs has shown up in our recent tenders, likely driven by greater demand for limited resources, and that required us to reassess the expected cost for buildings where work is not yet complete, which has produced an additional charge of GBP46 million. In addition, the work we've carried out to assess how complete our building register is has identified a small number of further buildings, with an estimated remediation cost of GBP10 million. We're very committed to getting these works done as swiftly as possible, and reflecting that, we're providing additional funds to grow the size of our remediation team and also updating our expectation on legal fees in what can at times be a complicated and contentious area, and in total this amounts to a further GBP9 million.
Chris Carney
executiveFinally, what we've seen in practice is that pre-tender costs under the building safety fund haven't been tracked or kept in check consistently. So we've decided to make full provision for those costs, plus a contingency covering all untendered works. That puts another GBP23 million into the provision. Altogether, this lifts our provision by GBP88 million, which takes the total set aside for remediation to GBP333 million, and GBP67 million of that has already been spent. As I've mentioned on more than one occasion, this provision represents our best estimate of what it will cost to complete these works. Given how long and complex the work is, it's not impossible that it could need to change at some point down the line, but building in a small intent — a contingency and taking a prudent stance on BSF pre-tender costs is meant to prevent that. Turning to cash flow. We ended the half with a strong net cash position of GBP584 million. On an adjusted basis, once land creditors are deducted, we remain negatively geared, which highlights how strong our financial position is. As the slide shows, the drop in cash over the six-month period is largely a function of the investment in WIP that you also just saw reflected on the balance sheet, and that investment sets us up for delivery in the second half and beyond.
Chris Carney
executiveWe continue to be a business that generates cash, and our spending on land and WIP is governed by the opportunities we identify in the market — which leads me neatly into capital allocation. This slide should look familiar, since our capital allocation priorities have not changed. Keeping a strong balance sheet will always come first for us. The adjusted gearing figure I referred to earlier shows that this genuinely ranks as our top priority, particularly given the market difficulties of the last couple of years. Second, when solid opportunities arise to put money into land and WIP, we will use our capital to back growth over the medium-to-long term. As the statement shows, there have been more approvals during the period, since more appealing opportunities have come to market, and Jennie will cover that in a little more detail. And naturally, our strategic pipeline will keep giving us greater choice over where and when to put our capital to work. Third, our ordinary dividend policy shows how we have structured the business to produce shareholder returns across the cycle and is a key differentiator for Taylor Wimpey, returning 7.5% of net assets to shareholders annually.
Chris Carney
executiveThis policy comes from our relentless emphasis on capital discipline, and the goal is to give investors confidence in the long-term return they get from putting money into Taylor Wimpey. Today we're announcing an interim dividend for 2024 consistent with that policy, at 4.8 pence per share, to be paid in November. And last, whenever we hold excess cash, it goes back to shareholders, and we have a solid record of doing precisely that at the right points in the cycle. Last, on guidance. Given how strong the first half was, I'm glad to say we now expect to deliver UK volumes for the full year toward the top end of our prior 9,500 to 10,000 guidance range, and we're still on track to deliver Group operating profit in line with current market expectations. I expect net cash at the year-end to be roughly GBP550 million, depending on where land spend lands in the second half. And with deposit rates staying elevated for longer, we now expect net interest income in the P&L of about GBP4 million. So, to sum up, I'm pleased with our first half performance, which came in line with our expectations.
Chris Carney
executiveOur confidence hasn't changed, and we're still on course to hit the guidance we laid out at the beginning of this year. And provided market conditions are favorable, we're in a strong position to achieve growth starting in 2025. With that, I'll turn things back over to Jennie.
Jennifer Daly
executiveThanks, Chris. Now let me spend a little time on what we're seeing on the ground and what that means for how we're setting up the business. Here's the usual slide on sales performance, and I know you'll focus on the first column of the numbers, so essentially, the last four weeks of trading. We're running at 0.64, which compares to 0.47 in the equivalent period last year. But I'd encourage you not to get too carried away. It's only four weeks and it's against a very weak comparator. I'd say, generally, that we've returned to a fully normalized cancellation rate, albeit, again, you could see that the last four weeks is a little high, which I think is a function of lower sales overall — gross sales overall in that period. Cancellations in order book terms aren't particularly noteworthy. As you will have heard from others and noted from our statement this morning, the housing association sector is facing a number of significant headwinds affecting their appetite for Section 106 affordable housing. This is a sector-wide issue and we don't expect it to impact our 2024 completions, but it has the potential to impact order book and affordable housing completions from 2025 onwards without action.
Jennifer Daly
executiveNaturally, we're pushing forward with mitigation steps wherever possible, and we continue to be fully engaged with our affordable housing partners as well as the government. Then last on this slide, as has characterized the past two years, we are observing very low down valuations even with a degree of uncertainty, which I believe is encouraging to see. With the market normalizing, I wanted to give a little more detail on what we're observing and hearing from customers. The general impression I'd offer is that customer sentiment is more positive. We saw no meaningful shift in customer behavior as the election approached. And the graphs on the left side of the slide show a fairly typical seasonal pattern for website traffic, appointments, and walk-ins. When it comes to the timing of commitment to exchanges, though, customer behavior has shifted. As we noted at the full year, these may have extended beyond what we've seen in recent years, although conversion time to reservation has in fact fallen slightly and the quality of inquiries has gotten better. Talking with our sales teams across the country, I think you sense a certain amount of chain anxiety and some people sitting on the sidelines simply waiting for rates to move.
Jennifer Daly
executiveThat said, it's genuinely encouraging to watch the share of first-time buyers rise to 40% of private reservations during the first half. Since prices have been fairly flat, a few of the triggers that push people to act aren't especially powerful right now. As a result, incentives stayed a feature of the market for driving commitment, though they held at a steady level of between 5% and 6%. And our teams keep working hard to help customers over a longer journey and to manage the process, which makes that better customer service score I referenced earlier even more gratifying. So mortgage costs are above where they stood before 2022, yet for buyers with bigger deposits it is still less expensive to purchase than to rent in the UK today. The graph's red line indicates the cost of a 75% loan-to-value mortgage. And per our IFAs, during the first half of 2024, Taylor Wimpey customers who took a mortgage carried an average of 72% LTV, while for first-time buyers that average was 78% LTV. So in the first half we held IFA and mortgage myth-busting educational events, and those continue to be valuable for our customers. And data from our IFAs keeps showing customers — first-time and second-time buyers alike — making use of mortgage terms that are longer.
Jennifer Daly
executiveWhile five-year fixes are still the most common choice, we're seeing a slight shift toward two-year fixes as people anticipate interest rates coming down. So on the whole, the fundamentals of the underlying and longer-term market stay compelling. The wish to own a home is still strong. There's a meaningful undersupply across every comparison measure relative to population, and that will support this market for the foreseeable future. And now we move to planning. So I don't think you need much reminding, but perhaps for those listening in, I don't know, from somewhere else, the present planning situation is still extremely challenging. So if you look at this graph using the HBF figures, it shows that in the 12 months to March 2024, the number of both units and sites approved kept declining to record lows. The number of units securing planning permission was the lowest in almost a decade, while the number of sites approved in quarter one in England and on a rolling 12-month basis overall was the lowest since recording began in 2006. So that's roughly half the number of sites that were being approved in the latter part of the 2010s. So, we saw some localized disruption stemming from the local government elections in May, with a number of more contentious planning decisions experiencing further delays as a result of the national election through June.
Jennifer Daly
executiveThose decisions are now starting to come through, and by and large they're unfolding as we expected. So, as you've heard, the government is committed to getting Britain building again and has placed that at the heart of its economic growth agenda, which is very positive news. It's early days, but I believe these measures are key. To deliver their manifesto promise of 1.5 million homes over the parliament, the government recognized that it begins with planning, and every signal so far indicates the government wants to move quickly. So we've had announcements of our return to mandatory housing targets, which featured prominently in the Chancellor's speech, a new task force to accelerate stalled housing sites, of which there are many, and funding for additional planning officers, all of which are very welcome. We've also had confirmation in the King's speech of a new planning and infrastructure bill aimed at increasing the number of homes built each year by simplifying the process to approve key infrastructure projects, modernizing planning committees to speed up decision making, reform of compulsory purchase orders to ensure that fair but not excessive compensation is paid, therefore unblocking development sites and improving the land assembly process, and it has also introduced a nature recovery and development funding provision to leverage development projects to fund nature recovery initiatives, though, I believe, the government is hopeful that they won't need to wait for legislation to resolve the neutrality issues.
Jennifer Daly
executiveWe anticipate that the Deputy Prime Minister will be writing to local authorities, laying out unambiguous expectations regarding universal local plan coverage, and they are additionally mandating that those authorities give priority to grey belt and examine green belt boundaries, where needed, in order to satisfy housing need. And lastly, it has been a busy few weeks — indeed, a busy 24 hours — and they have committed to new towns, national coverage of strategic plans, and publication of a long-term housing strategy. So the consultation draft of the NPPF came out yesterday. That consultation runs for eight weeks, and throughout that period we will, of course, engage with government and officials and submit representations. The consultation contains various provisions aimed at delivering a growth-focused approach to the planning system. It proposes reversing the changes made to NPPF in December 2023, renders housing targets mandatory, and obliges local authorities to apply the same standard methodology. Consequently, local targets will climb to a total of just over 370,000 dwellings per year, since the new standard method captures the urgency of supply more accurately. This means local authorities must plan for homes in proportion to their existing communities — put another way, a stock-based approach featuring an uplift where house prices are most out of step with local incomes.
Jennifer Daly
executiveHousing needs should preferably be satisfied on brownfield land, and where that isn't possible—or on grey belt—local authorities will be required to review green belt. Lastly, every local authority has to show a five-year housing land supply moving forward. All of these steps are very welcome, but we have to acknowledge there is no quick fix or simple answer here. The NPPF, mandatory housing targets, five-year housing land supply—those can, once in place, shift the dial fast in planning terms for an authority that's willing, yet delivery of homes in the near term will depend on sites already in the system. Councils' resource constraints, and possibly local opposition, will keep affecting schemes as well. New land opportunities that these changes free up are more likely to produce output over the medium term, though we are confident the government appreciates how important this industry is to economic growth and that it needs to act on this swiftly. Taylor Wimpey, then, I believe, is well positioned for growth and ready and able to do our part in delivering much needed new homes throughout the UK. What underpins our confidence in the future is our landbank—having land where homes are needed and where our customers want to live.
Jennifer Daly
executiveShould the government manage to get its agenda through, then the solid, widely spread landbank we already hold plus a really strong strategic pipeline give us a major edge. And, as Chris mentioned a moment ago, our balance sheet lets us purchase land for years ahead — either by turning our liberated strategic pipeline into owned plots or by going to the open market whenever land availability picks up — which positions us to keep generating robust returns over the coming cycle. Our short-term landbank remains excellent at 79,000 plots. And with planning conditions being as difficult as they are, the 2,000 plots we converted from strategic holdings, while a decent figure, falls short of what we've typically achieved. That stems from the hold-ups we've encountered in both the determination of planning applications and in plan making. On the whole, though, the landbank has remained at a genuinely healthy level, and bearing in mind how much we cut back land activity across the last two years, we can anticipate carrying on benefiting from strategic pull-through going forward. We hold a truly substantial edge in our mature strategic land pipeline of roughly 140,000 potential plots, which is ready for delivery over the medium term. In my opinion, we have the finest strategic land position in the sector, one we've invested in consistently, providing the flexibility and optionality to capitalise on the execution of our strategy today.
Jennifer Daly
executiveThat adaptability isn't merely about valuations being marked to market and the option of choosing when to act — it also shows how we can be flexible and exercise optionality as policy environments shift. The land market is still constrained, sure, but in some areas we've come across somewhat more opportunity than you'd have anticipated back at the beginning of the year, and we've taken an active, opportunistic stance, approving 5,000 units during the first half. We'll stay opportunity-led, though I want to be clear that the quality of the deal stays our focus. Taking a step back for a moment, I think you'll recall me describing how we set this business up quite deliberately, and thoughtfully in my view, to manage through the cycle. Naturally, there's a reason we've given you visibility over roughly the last year into how many plots sit in applications within the system. We've spent the last 24 months actively preparing for possible planning changes, when we challenged our strategic land teams to bring forward more assertive applications, and we've been deliberately loading the bases in anticipation of a shift in policy direction.
Jennifer Daly
executiveAs of June 30, we have 30,000 plots in planning for first-principle determination — a mix of outline, full, and hybrid applications. Just to remind everyone, that's about twice the level we've seen historically. And to be clear, that's all before we factor in the more routine work of freeing up the short-term landbank. So, with the policy environment beginning to take shape, we've also been reviewing our strategic pipeline for the next tier of potential applications we could get ready, which might gain from the planning policy shifts I mentioned earlier. And I think there's some optimism too that local plan reviews — including the local plans recently paused or abandoned — will get going again, allowing more conventional strategic promotion and securing the housing land supply required to meet the government's commitment to build 1.5 million homes. What I'd like to reiterate is that although we're very hopeful that the government's changes to the planning system will meaningfully shift and enhance future prospects, I'm also realistic that many changes will take time to flow through into deliverable sites, which can then become outlets and future volume. We've said we're well positioned to grow next year, assuming supportive market conditions, but I do want to be clear.
Jennifer Daly
executiveWhat I'm giving you is grounded in what we can currently see for land and outlets that are already secured with planning permission, not in any quick fix or in proposed alterations to planning rules. For our 2025 completions, every piece of land is owned and controlled by us, and nearly all of it carries detailed planning. Turning to outlets, then: we're precisely where we anticipated being. As a reminder, outlet numbers have been affected by a reduction in land purchasing over the last couple of years as well as by planning difficulties, and those factors have created pressure — and that will keep showing through for the rest of the year. Even so, I'm genuinely glad to report that despite that background, we're tracking in line with our own expectations, having added 26 new outlets, and construction has already begun on 14 of the outlets scheduled to open in the second half of this year. That means our visibility on outlets for next year is stronger today than it has ever been at this point in the year. And although we don't provide guidance on outlets, I can tell you that we anticipate opening a greater number of outlets next year than this one, no matter what happens with planning changes. We've already discussed in detail how we're pursuing operational excellence across the company in order to safeguard value.
Jennifer Daly
executiveAnd I'm very happy to report that efficiency and execution are now viewed by our teams as simply how we do business. Still, a few items deserve mention. In the first half, our timber frame facility successfully delivered its first units, and we're glad the facility obtained its ISO accreditation — a terrific accomplishment for a facility so young, and evidence of both our approach and the excellent work done by our experienced management team. As we aim for 30% of volume to come from timber frame over the medium term, this will be essential to our capacity for growth. And naturally, we're making certain we act now so that the skills are developed and ready to support growth. That can't happen overnight; it demands effort and a long-term approach. We're working with the Skills Partnership, for instance, and trialing various methods to boost new apprenticeships, including collaborating with key subcontractors to help them secure funding and training for additional trade apprentices. We've also told you about the value we get from taking a more data-driven approach, making sure we optimize it to simplify things and, wherever possible, add value.
Jennifer Daly
executiveWith our Touchpoint customer portal, we're enhancing the customer experience through an interface that's easy to use and engaging — one that lets customers follow their journey, keep an eye on build progress, and log any issues. And because it's fully integrated with our CRM system, our teams are also able to pull data in real-time, which highlights trends and supports decision making. So, to wrap up, we stay extremely focused on running the business effectively through the cycle, as well as on building the business and doing everything we reasonably can to get ready for growth. A quick reminder, then, of the priorities we continue to pursue. We keep working hard to protect and prioritize value, and we're focused on building the strongest order book we can to set us up for 2025. As always, we're tracking demand and expectations so we can match our build to market circumstances. We stay focused on moving land through the planning system, and you'll have heard today that we're active in the land market where we see good opportunities to invest, and we've seen somewhat more activity and opportunity this year than we expected coming into the year. We keep investing in the long-term sustainability of our business across all our activities, and particularly by investing in our people, to ensure we have the operational capacity for growth and the ability to execute.
Jennifer Daly
executiveAnd moving forward — apologies. As you've heard today, we expect UK completions for the full year, excluding joint ventures, to come in toward the upper end of the 9,500 to 10,000 range we previously guided to. We have kept both the infrastructure and the ambition needed to grow our business over the medium term. Our focus is on getting land into the planning system, and we are well positioned, but the positive changes announced to the system, and those expected, will take time. We have put a strategy in place that concentrates on leveraging the inherent value of our existing landbank and strategic land pipeline, as planning and market conditions allow, and we are focused on delivering growth and shareholder value. And finally, visibility of sites has never been better for us than it is now. So we remain confident of achieving growth in 2025 if market conditions allow. I know it is time. So Chris and I are happy to take questions. Thank you, Glynis.
Glynis Johnson
analystThank you. This is Glynis Johnson from Jefferies. Pardon me, but I'll begin with four questions, so my apologies to everyone. First, regarding the landbank, there are a few points. The plot cost relative to selling price has risen somewhat compared with what you approved. Could you walk us through whether there are any nuances there — for instance, is it that these are slightly more oven-ready and therefore more weighted toward build costs, more toward land rather than necessarily build costs? Just any kind of color around that would help. Second, a clarification: the 30,000 plots in primary determination — I believe you said they differ from your strategic land. Could you explain how that compares with your strategic landbank? Again, I'm very focused on the timing of when you can actually begin building on that. Is there any difference? Should we regard those 30,000 as more longer-term sites? And then just two more things. One, previously you spoke about adding extra factories, build teams, however you want to phrase it, on sites. I'm just wondering, have you started doing that now? Are you beginning to, on some of those bigger sites, consider how you might perhaps increase the build rates?
Glynis Johnson
analystAnd then, Chris, on cash — you walked us through how you're allocating capital, but how much leverage would you actually be comfortable taking this business to? At what point do we need to start weighing growth against the dividend? Could you give us a little more detail on the nuances of when things begin to feel a bit more stretched?
Jennie Daly
executiveAlright, I’ll go through them in the order you raised, Glynis. On land cost within approvals, that figure does move around a fair amount, but you mentioned oven-ready sites and how they differ from what might be a strategic site. If you look at the mix of acquisition, you’ll have noticed that across roughly the last 18 months, conversions from strategic land have come down compared with our run rate in earlier years, and strategic land typically carries a much lower land cost. So what you’re seeing is a bit of that being gradually worn away. I took a quick look at our land approvals. A couple of sites are what I’d call oven-ready, fully serviced. That does usually push the land price higher. Probably not beyond what I’d call a normal year, the — but they do usually nudge that average up somewhat. I mean, I think the average remains at about 15% — 15.5%, which I’d call a very healthy balance. On the strategic land pipeline and those 30,000 plots, we have two — for convenience, we usually think about our strategic land pipeline in two buckets.
Jennie Daly
executiveOne bucket consists of long-term specialist strategic land teams managing parcels that tend to be somewhat larger, probably at first with a focus on local plan promotion; then there's strategic land we'd regard as a bit more front-footed, which our business units would run. But the 30,000 plots I'm referring to are a mix of strategic land in its purest form plus some that we're running through the businesses. Still, as I said, nothing in our short-term landbank is included there. So that liberation work sits in a different bucket. And then I mentioned a third one that we're now analyzing and serving through the strategic landbank, given the changes as the government's communication became more crystallized regarding what else we could prepare for promotion. As for adding extra factories, that's still a strategy we use. We do still have some sites with multiple factories on-site. It's a very live conversation. It's quite intuitive with our businesses and from the divisional chairs to make sure we keep pace as the market moves. And as we've said quite a bit over the last year or two, it would be wrong to assume that all sites move at the same pace.
Jennie Daly
executiveIt really comes down to going site by site, and then making sure we have the resources in place. And if a second factory outlet is needed for that, then that's what happens. Where there's a market to deliver it, we're not holding back on WIP. And then cash — that was your question, Chris.
Chris Carney
executiveYes. Glynis, I would describe our approach — which has been in place for several years now — as positioning this business so it can deliver through the cycle, and our distinctive dividend policy, delivering a consistent return tied to net assets, fits perfectly with that approach. So the fact that adjusted gearing is still negative, and that the short-term landbank stands at 79,000 plots, as Jennie mentioned, tells us there is considerable distance to travel before any kind of problem arises on that front.
Jennie Daly
executiveMy apologies.
Glynis Johnson
analystMind if I ask a quick follow-up? Are you adding more factories at your sites?
Jennie Daly
executiveAt this point I'd call it still stable, though that's definitely an active conversation. Glynis, we've discussed agility quite a bit — as we were, in a sense, reining things in, we'd been adjusting build rates to match a declining sales market. Now we're taking the opposite tack, where we're carrying more WIP, but should a site reach the point where demand calls for that second factory, we'll open it. Those sites have certainly been configured for exactly that. So they'll be ready when the time comes. Yeah, okay. Will?
Will Jones
analystThanks. This is Will Jones from Redburn Atlantic. First, just on the market, please. Obviously, you've had a pretty good sales rate so far this year and through July. How close does that put us to being able to adjust slightly on either gross prices or incentives going into autumn? And then maybe just on planning and outlets — I suppose, on the government agenda, you spoke quite a bit about it probably taking time. But if you were pressed on it, for the first half of next year, would you say that's a reasonable expectation for those measures to begin benefiting the system? And how much do you worry that the government's affordable housing requirements might somewhat hold back progress on that? And then, I guess, big picture on your outlets — I appreciate you won't want to give guidance, but I think this year and last, you'll open on the order of 50 outlets in each of those two years. Before that, you were running at 70 to 100, I think, as an annual range. At a high level, I suppose, in a better planning environment, is that 70 to 100 kind of ballpark something you could aim for, or does the land constrain you somewhat from getting back to there, I suppose?
Will Jones
analystAppreciate it.
Jennie Daly
executiveAll right, so on the market side — you can see that pricing has stayed pretty much flat since around quarter four of last year. Customer interest is at good levels. The quality of the inquiries we're getting is solid, in my view, but affordability is still clearly an issue. And we've had to keep some incentive in place to encourage commitment, because with house prices flat and the possibility that interest rates might come down, that enticement is needed to get people to commit. We're reviewing all the time, and we've spoken before about going plot by plot and site by site, fine-tuning our pricing. I can see that coming through in the weekly sales. A few sites are actually picking up a little; others aren't moving, perhaps even softening slightly. So it's a balance. If there's a rate move, that will definitely be a help. It's really good to see first-time buyers back at that 40%, but there's still some way to go, and first-time buyers definitely act in a more procyclical manner. So even a modest positive move on house price could help drive that demand. On planning and outlets and how those would flow through — look, I'm genuinely pleased with the draft NPPF that came out yesterday.
Jennie Daly
executiveThere's a great deal of promise and opportunity in it, but it is a consultation. So the first thing, Will, is that for a local authority sitting today and deciding what it's — what decision it's going to make, the Minister's statement in Parliament counts as a material consideration, so to think a bit about planning. And so, some authorities might shift somewhat more to the positive, but many more will hold off until the consultation finishes. That's at the end of September. And then we can expect quite a lot of revisions, and I think the message yesterday was NPPF commentary at the end of the year, after which it becomes a material consideration. So, what does that mean for the first half of 2025? Will, you'd like to think that as a material consideration, it would begin to drive planning decisions. But again, history would show us that there'll be a reasonable community of local authorities that will need more incentive in order to do that. So I think planning approvals is something that, first half of 2025, anything that's in the system now, you might see a little bit of improvement, but I would be — I would caution you sort of in your optimism, and really then new applications going in to fit the new model of housing need, those determinations, late '25, start of '26, and then volume flowing out through then.
Jennie Daly
executiveThe reason I keep showing you that HBF chart so often is that land supply—how many approvals are coming through—has dropped to a genuinely low level. So you need a recharge just to get back to something roughly normal before you can even talk about driving growth. I think we simply have to watch how long it takes for those to flow through. On affordable housing, I'd say there are two issues. There's the point we made about affordable housing associations and the real problem right now, which is that the current affordable housing program is pretty well committed through 2026. That makes the spending review an important signal of where things are heading. And I believe the Chancellor has also indicated she'll make a statement at the autumn budget on rent provisions for housing associations, which I think would help them a great deal. As for overall affordable housing demand, the government has been very clear about its aspiration on the green belt review—they've mentioned 50%, and they've mentioned a 40% requirement for new towns.
Jennie Daly
executiveAnd that’s really what we’re looking ahead to — what’s coming next. I think people understand well that viability challenges exist, that development can’t provide everything, and that there’s a need for ongoing discussion around viability. It’s a fairly small reference, admittedly, but the new draft of the NPPF keeps referring to “subject to viability.” So that’s something we’ll need to examine. Then there are outlets. Looking forward — we’ve spoken about loading the bases, and we did that on purpose to push the strongest parts of our strategic land pipeline into the system. That took a considerable amount of work. It isn’t something that happens instantly. Over the years ahead, we’d hope to generate an uplift in outlets coming through from our strategic landbank. And going back to the point about the land availability environment — the land market as a whole needs something of a recharge. As that recharge happens, my expectations and ambitions for more outlets would rise in line with it.
Aynsley Lammin
analystThank you. This is Aynsley Lammin from Investec, and I have just two questions, really. Clearly there's a lot of attention on the supply side and on planning, but I'd like to hear about your conversations with the government. Are there any signals at all that they may be considering measures on the demand side — not precisely Help to Buy, but something along those lines? Does the industry believe that kind of support is necessary? I'd just like to hear your thinking on that. Then, second, on M&A: obviously there have been a couple of deals underway in the sector. I think I read that Taylor Wimpey had taken a look at one of the private players. I'd be interested in your perspective on that. Is that something you'd rule out, or would you consider it? Anything you can share there?
Jennie Daly
executiveAlright. So on the demand side, I'd basically just echo what I've read in the manifesto. The government is very focused on supply side measures. They've mentioned the mortgage guarantee scheme. Personally, I do think that will have fairly low levels of impact, if any at all, but I'm not aware of any other discussions across the sector about demand side stimulus. And on M&A, look, as a matter of principle, I won't comment on M&A. What I would say is that I think we are, as a business, in a fantastic position. We have a strong and resilient landbank. We have an excellent balance sheet and a great business platform. And we've retained the infrastructure within the business to drive volumes to that 16,000 to 17,000 plots. And I hope that over the last two years, you've heard a lot from us as well about how we're setting the business up, using the challenges and this time in the market, not just to mitigate for the current environment, but to really prepare the business and our platform for a growth opportunity. And that includes some of the strategic land actions that we've talked about, the timber frame investment, IT investment, and people investment.
Jennie Daly
executiveSo we're going to take the actions we believe create the most value for shareholders, Aynsley. Thanks.
Ami Galla
analystAmi Galla from Citi here. I've got a few questions. First, back to capital allocation: can you give us some detail on land spend? What's your ambition for investment in land over the coming couple of years? What level would be sensible for us to budget? Second, on build costs — your comment that build cost is flat today on new tenders is helpful. But looking ahead to next year, as we consider the moving parts, the recovery on track, and most housebuilders getting on-site more quickly, how do you expect that to change, and do you have any sense of what a normalized rate of build cost inflation would be at a sustainable level that we should assume for this sector over the next couple of years? Sorry — I have a couple more. One on grey belt sites: within the landbank, within the strategic land you hold, can you give us some sense of what potentially falls within the grey belt definition that exists? And the last one concerns the remediation of the recladding work you're doing — what's your best estimate of how many years it would take to complete?
Jennie Daly
executiveOkay, so — Chris, if I handle the grey belt and green belt question and pass everything else along to you, does that work?
Chris Carney
executiveYeah, that's fine.
Jennie Daly
executiveOkay, on grey belt — that's a newly introduced definition. In my own head, at least, I picture it as a kind of urban fringe, an urban edge, a liminal zone sitting between urban areas and green belt. Yesterday gave us a bit more detail: previously developed land within the green belt, plus land making only a limited contribution. That's likely somewhat broader than what we had anticipated. We do hold land that we've tagged as meeting the grey belt criteria. What comes next is a second assessment of where those local authorities stand on land supply, since grey belt really only comes into play when they aren't meeting housing need. On green belt overall, I'd put roughly 40% of our strategic land — that 140,000 — as green belt. Some of that, I'd say, is already progressing through local plans. Certain authorities have remained willing to take a reasonable, medium-term view on allocations. So a portion of it already sits in emerging local plans. And Chris?
Chris Carney
executiveOkay, regarding how we deploy capital and land spending across the coming couple of years — clearly, the land market could shift once the NPPF is announced. As Jennie mentioned, that won't take effect right away. So our stance on land remains highly opportunistic and selective. Because of that, it will depend on what the land market offers. Every single site we purchase gets reviewed by Jennie and put through a rigorous process — that's how our capital allocation works. We won't be altering our approach or our aspirations, since, as Jennie said, we hold a really good land position, so there's no desperate need on our part to buy land. And should the market improve somewhat down the road as consented land supply grows, we're able to seize opportunities now while also waiting as that plays out. On build cost — yes, build cost inflation — what will it normalize to going forward? I'd be quite rich if I knew that. I think looking back through history, in a stable sort of market, I think the industry would wish for something like house price inflation of 1% to 2% alongside build cost inflation of 3% to 4% that can be sustained within that, and that would be a happy place to be.
Chris Carney
executiveAnd I suppose it hinges somewhat on affordability, and how that improves over the coming years, and what that means for demand levels. Whether the trajectory will be sharper — who knows. But history would suggest that if the market grows steadily, perhaps that happens, though what can't be denied is that resources are scarce, be they materials or labor. And as volumes rise, costs will come under pressure. Oh, sorry, the last one was remediation. I mean, given the extra investment we've made in growing the team, I'd be really disappointed if it took more than four years.
Harry Goad
analystMorning, everyone.
Jennie Daly
executiveGood morning.
Harry Goad
analystHarry Goad at Berenberg — two questions if I may. First, returning to what you said about land, Chris: could you expand a bit on what you're observing on land pricing, and whether, at a high level, you believe land prices have come down sufficiently? Because when we consider how much build cost inflation we've seen over the last two years to three years, and when we consider pricing and incentives, at a high level it simply feels like land prices still need to reset quite materially lower. And I'd be interested in how far you're seeing sites come forward on which you can actually hit your hurdle rates. The second one is on partnerships. I don't imagine you'll tell us you're going to pivot the business model the way Vistry has, but at the margin, are there certain sites where you might consider entering into that kind of partnership transaction right at the outset? I'm not referring to the bulk deals as such, but more like budgeted, preemptive bulk type deals. Thank you.
Jennie Daly
executiveSure, I'll take those questions. Hi there. I mean, look, when it comes to land pricing, in a situation where the supply of land is limited, land prices have stayed at a level that I think has surprised us, considering how sharply overall output has changed. But I do think that simply shows just how scarce land is in certain parts of the market. We're examining that quite closely, but it comes down to demand-and-supply economics. The more land that becomes available, the more eagerly landowners need to sort of evaluate where they stand. So, what would I expect? I'd expect that if we began to see more increases in sort of planning, some easing of planning friction, then you'd expect land supply to begin rising. I think because we are at a low level, it won't sort of shift overnight, but you would expect a gradually improving situation around land pricing to emerge. And as to sort of hurdle rates, I am happy with the land that we have bought. We've characterized it as opportunity and quality deal-led, and that is exactly what I see. When I sort of run my finger down the list of opportunities, I'm very comfortable with them.
Jennie Daly
executiveNow, regarding partnerships—I think in the past we've taken some trouble to make clear that partnerships do exist for us. We engage in certain bulk deals. Our preference is for those to form part of how we assess a site and to prepare the site so it can handle output going to bulk buyers, very much project by project. That said, I'm pleased to say we'll carry on doing so. And we favor collaborating with proven partners who appreciate the standard of the construction and the service they get from Taylor Wimpey. You've been very patient. Thank you.
Charlie Campbell
analystCharlie Campbell from Stifel here. I've really got just a couple of questions. First off, that short landbank contains 79,000 plots. Roughly what share of those sit on sites that are currently under construction? And how does that share change between, say, today and — I don't know — 2019, before planning became really tough once more? I'm just trying to get a sense of what happens when planning frees up and, effectively, how many additional sites you can pull from land you already hold. Then the second one concerns the 106 agreements and housing associations, which are struggling somewhat. What happens in the worst case — I want to understand that. If you have permission for 100 units on a site and 20 are social, must you actually deliver those 20 social units, or can you say, well, look, we couldn't find a buyer for them? So can we effectively change the plans? I suppose the real question is whether the 106 ends up causing a problem for private delivery.
Jennie Daly
executiveYes. All right. That's a fair question, Charlie. So when it comes to the short-term landbank — the simplest way we can explain how we segment it, I think, is to describe it as everything that carries detailed planning permission. You can take it that those are on a site that is running through. There's also a slide, I believe, in the appendices, that will show you something like a small pie chart with a — if you squint really, really hard, you may be able to make out a very small representation of sites with implementable planning permission where we're not yet on-site. So we are very active. This business does not sit around on schemes that hold detailed, implementable planning consent. They're all open. I think the area you'd want to look at is what sits with outline planning permission within the short-term landbank. And to that you would then add that big bundle of applications I've been talking about this morning. Honestly, Charlie, I can't call to mind the 2019 breakdown, but you'll be able to find it in the appendices of the slides. And in housing worst case scenarios, I spoke about mitigation — mitigation and mitigating actions, which our teams are pursuing very actively.
Jennie Daly
executiveThere are various options out there. Some for-profit participants in the market view things somewhat differently and wouldn't be as constrained by certain elements we mentioned regarding the balance sheet, legacy, cladding and other matters. Yet the majority of Section 106s additionally include what is known as a cascade mechanism, which is essentially a set of different steps you'd work through alongside the local authority in the event you couldn't deliver a specific housing association. So how might that cascade operate? It could shift from one kind of housing association structure to another. It could shift away from 10 years. So instead of affordable rent, it could shift to shared ownership, it could shift to discounted market. It could then shift to payment in lieu off. So a variety of choices exist that can be pursued, and it truly will depend on each individual scheme and conversation. I think we might also witness something akin to passporting or a possibility where, if there's a problem that you reach a headline and certain Section 106s could contain a — you shan't deliver more than 90% of your open market housing until 100% of affordable housing is delivered.
Jennie Daly
executiveThere are — there’s a pretty wide variety of different arrangements through which a local authority can grant you leniency, and you can keep delivering a private sector. So quite a wide variety of options are on the table, but all of it involves friction, and it does call for engagement with the local authority. Does that answer your question? Yeah, excellent. Okay. At the back of the room.
Peter Ajose-Adeogun
analystThanks. Morning. This is Peter (ph) with Morgan Stanley. I just wanted to ask about — we've already talked through planning and land availability, and how those could potentially affect how fast volume recovery moves. If the rate environment gets better, how quickly do you believe volumes could bounce back? And beyond that, what other supply chain problems might come up? Labor, for instance. Could you give a little detail on that — labor availability and the way it could influence the volume recovery too? That's all I have.
Jennie Daly
executiveOkay, honestly, pinning down a specific pace for volume recovery is going to be tough for me, since it hinges on how interest rates take shape and how quickly they come down. So we'll be watching that closely and grounding our assumptions in whatever the market is showing us at the time, and we'll keep you posted as things develop. That said, supply chain pressures, labor availability, and similar factors all feed into that planning and into getting ready for growth, which we've been working on energetically right across the business. Chris touched on the material suppliers and so forth. That could turn out to be a limiting factor. And I genuinely think government can play a helpful role here, since staying consistent about its ambitions, and consistent about its aims regarding net zero, future home standards, and similar matters, will give the supply chain more confidence and push it to ramp up the kinds of things we're able to do. We've discussed our work with subcontractors. We're in clear, regular contact with our subcontractors about our ambitions and what we expect for growth in the near term.
Jennie Daly
executiveThe timber frame facility is definitely a piece of how we deliver on the growth expectation and the advantages timber frame offers — both in speed and in removing certain trades from the critical path. And we've worked very hard across a number of years. Our procurement process is, I dare say, a good deal slicker, but also better informed, far more analytical and data-driven, and our ties with the supply chain, subcontractors and material manufacturers are a good deal closer. So I do believe challenges will arise, as Chris mentioned, but we're working very hard to remove as much friction from that as we possibly can as we work to make sure we have a solid platform to grow from. Thank you. Okay. Chris?
Chris Millington
analystMorning. This is Chris Millington at Deutsche. First off, really just a couple of questions on margins, actually. I'm not sure whether you're able to say where you believe your embedded landbank margin sits now, given some of the pressure witnessed over the last few years. The next one concerns the trajectory of administration costs. I mean, you're among the few that have actually delivered a year-over-year reduction here. Will we see that bounce back as items such as bonuses return and activity levels build? Sorry, there's another one on margin. Affordable housing margins, how are those accounted for? Are they materially different? Some normalize, some carry a differential there. And then the last one I have really is just about this premise that a supportive market will help you grow in 2025, because if we look at reservation rates today, they're fairly consistent with your volume outlook at the moment. So, when we talk about a supportive market, are we talking about sales rate uplifts, outlet uplifts? I'm just curious about what that driver needs to be to kind of move you on somewhat further.
Jennie Daly
executiveAll right. Now, when you look at it from the margin angle, Chris?
Chris Carney
executiveOkay, let's begin with affordable. How do we reflect that in our numbers? It's done on a blended basis. Every site carries its own budget, and the margin is equalized across both private and affordable completions. Regarding the margin built into the landbank, to the best of my recollection we have never disclosed that figure. But clearly, what's visible is that today's results, along with the chance to recover margin later on, depend on growing the business and achieving better recovery of our fixed costs. So as time goes on and we expand that side and meet that demand, that is how margin gets better. On admin costs, yes, I think you'll notice that in the half one income statement admin costs are actually flat. Net operating expenses, which uses a slightly different definition, are lower — so it's mainly the other income expense line that shows a benefit, and that comes from the absence of abortive pre-acquisition land costs in this period versus the first half of last year. And what was the last one?
Jennie Daly
executiveMargins in affordable housing.
Chris Carney
executivePardon me? No, that one relates to affordable housing. I was going through them in an order that was confusing.
Chris Millington
analystOn margin, I believe that covers it. Regarding admin costs — is there anything on whether you're beginning to see those grow again?
Chris Carney
executiveYeah, yeah, sorry. So I mentioned — and I believe Jennie did as well — that we'll see some higher IT costs in the second half. We're switching our IT service provider this year, so there will be some expenses coming through on that front. And so for admin expenses, you're probably looking at a 2%, 3% increase year-on-year. So that's admin, not net operating expenses, yeah.
Jennie Daly
executiveAnd then, look, I think we've made it really clear, Chris, that for our outlets in 2025 we have excellent visibility, and when it comes to planning for those outlets, we're in an excellent position. So a supportive market means, sort of, the consumer market.
Chris Millington
analystSo we should expect outlet growth on a year-over-year basis—whether that's being driven by outlets or, and I realize you don't provide guidance on outlets, but they
Jennie Daly
executiveNo, and we are kind of moving toward that tough spot. But look, we are breaking it apart. For outlets, our visibility is genuinely strong. We have discussed, on a year-on-year basis, that our new outlets, broadly speaking, are going to increase. So next year, more outlets will open than this year, and then a market that is supportive. So with luck, we will see some rate cuts that help with that too. Okay. Thank you. Okay. Oh, Sam, correct? Is this the final one?
Sam Cullen
analystYeah, I think so. Just one.
Jennie Daly
executiveAlright.
Sam Cullen
analystThanks. Sam Cullen here from Peel Hunt. Just to revisit the strategic land and the green belt — did you say 40%?
Jennie Daly
executiveRoughly 40%.
Sam Cullen
analystAre they clustered within a handful of somewhat more enlightened local authorities? And considering
Jennie Daly
executiveNo. There's — when I discuss maintaining a broadly spread landbank, covering both the strategic land pipeline and the short-term landbank, our position is really quite robust. So in certain areas where green belt constraints are tighter, you may notice a somewhat greater concentration of green belt, since no other strategic land options exist there — and in that situation, I believe our standing in the beauty parade is good. And in areas where green belt isn't a constraint, you probably won't see much of it represented.
Sam Cullen
analystThen for my follow-up, I suppose it concerns that 50% figure — the affordable housing requirement that's been set out. Will that end up being a net negative when it comes to viability, or is your view that getting half of something will be worth more than getting 100% of nothing?
Jennie Daly
executiveI mean, it truly depends on your location—and not merely location, but also what technical limits exist, how heavy the infrastructure load is, and what Section 106 obligations must be met to get it built. So, in the same way I'd warn government against adopting a 50% target, since people might assume every bit of green belt sits in lovely surroundings, I'd point out that even in strong areas, a hefty Section 106 or a big community requirement could make hitting 50% affordable a struggle. Elsewhere, if you can come directly off a highway and face no significant ground conditions, it's completely achievable. So the variables in play really do span a substantial range. Okay. All right. That one ran a little long this morning. Many thanks to all of you for attending. Anyone who hasn't taken a break yet, I hope you have a wonderful summer holiday, and we'll see you in the autumn. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Taylor Wimpey plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Taylor Wimpey plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Taylor Wimpey plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.