TC Energy Corporation (TRP) Earnings Call Transcript & Summary
July 28, 2022
Earnings Call Speaker Segments
Operator
operatorAppreciation for holding. I’m the conference operator. You’re welcome to the TC Energy Second Quarter 2022 Results Conference Call. <<operator_script>> This call is being recorded. <<operator_script>> At this point I’ll hand the conference to Gavin Wylie, Vice President, Investor Relations. Please continue.
Gavin Wylie
executiveAbsolutely. Thank you so much, and good morning to all of you. It's my pleasure to welcome everyone to the 2022 Second Quarter Conference Call for TC Energy. Joining us today are Francois Poirier, our President and Chief Executive Officer, and Joel Hunter, our Chief Financial Officer, as well as other members of our senior management team. Francois and Joel will start things off with some commentary on our financial results and a few other company developments. You can find a copy of the slide presentation that will accompany their remarks on our website, in the Investor Relations section, under Events and Presentations. After they speak, we'll take a handful of questions from the investment community. So that everyone has an equal chance to participate, we ask that you limit yourself to 2 questions. If you're a member of the media, please reach out to Jaimie Harding following this call. I'd also like to remind you that today's remarks will contain forward-looking statements, which are subject to important risks and uncertainties. For more details on these risks and uncertainties, please refer to the reports TC Energy has filed with the Canadian securities regulator and with the U.S. Securities and Exchange Commission. Lastly, during this presentation, we may reference certain measures, including comparable earnings, comparable earnings per common share, comparable EBITDA, and comparable funds generated from operations.
Gavin Wylie
executiveThese, along with certain other similar metrics, are treated as non-GAAP measures. Consequently, they might not line up with comparable metrics that other entities report. We use these metrics to give extra insight into TC Energy's operating performance, liquidity, and its capacity to generate funds for financing its operations. With that said, I'll hand the call over to Francois.
François Poirier
executiveThank you, Gavin, and good morning to all of you, and we appreciate you being with us today. Even with volatility in the markets and world events that continue to unfold, the value proposition at TC Energy stays the same, and this quarter saw us make meaningful headway. We kept generating robust operational and financial outcomes from assets that are high-quality and long-lived, and that shows how strong our utility-like business model is, along with our emphasis on safety and operational excellence, the worth of the partnerships and long-term relationships we hold, and naturally, the growing demand across North America for the essential services we provide. . On top of that, we are happy to report that Coastal GasLink LP has reached an important milestone by signing revised agreements with LNG Canada that resolve every outstanding dispute and let us carry on with completing the project safely and on schedule. Since Coastal GasLink will be top of mind for everyone, I will begin by explaining why these revised agreements matter before turning to a few operational highlights from the quarter. Joel will then walk through our revised funding plan in more detail and explain why we are confident we can deliver EBITDA compound annual growth of 5%, 21% to 26%, dividend growth of 3% to 5%, and hit our debt-to-EBITDA target of 4.75.
François Poirier
executiveLet me begin by noting that much has shifted across the 10-year lifespan of the CGL project. Additional requirements from regulators and stakeholders have emerged, along with expanded scope, effects from COVID, inflation, weather, and other unusual events. What has stayed the same, though, is our dedication to providing a competitive LNG solution for the Western Canadian Sedimentary Basin. That basin holds global competitiveness, with fundamentals that line up with our strategy and with the long-term worth of our CGL and NGTL system assets. Through our revised agreements with LNG Canada, we've built a stronger framework for moving the project forward — one that deepens our long-term partnership further. These agreements lower project funding and execution risk, set up a revised and faster dispute resolution process, and will let us collaborate with LNG Canada on CGL Phase 2 if and when that project receives sanction. To be more specific, we have lessened our capital recovery risk on the project by clearing up uncertainty regarding specific and anticipated costs, which now reflect a new estimate of $11.2 billion. This settlement will permit an increase in a project-level credit facility to $8.4 billion. And along with our equity contribution, we can step down our balance sheet subordinated loan over time. Now let me reaffirm that we still view the Coastal GasLink project as economically viable, and we expect mechanical in-service by the end of 2023, followed by commercial in-service.
François Poirier
executiveTo wrap up, these deals provide a strong base and a more defined route ahead for possibly developing Coastal GasLink Phase 2, which, if and when it gets approved, might improve TC Energy's project returns. This project's success matters not just to TC Energy and LNG Canada — it's a nation-building effort that adds to worldwide climate change objectives and delivers concrete social and economic gains for many stakeholders. CGL is set to become the first direct route for Canadian natural gas to access worldwide LNG markets, offering extra egress capacity for some of the most competitive and responsibly produced natural gas anywhere on earth. Crucially, our resolution lets us keep carrying out the project safely and on schedule, and it is now roughly 70% complete. Contracting and employment opportunities worth over $1.4 billion have been granted to indigenous and local communities, and as many as 6,000 people will be working at peak construction this summer. Looking ahead, this project also embodies the pledge we made to partner with indigenous communities on one of Canada's largest resource projects. That is among the ways we keep advancing reconciliation. We hold agreements with all 20 of the First Nations along the project route, and we have signed historic option agreements to sell a 10% equity interest to 2 indigenous groups representing 16 of those nations.
François Poirier
executiveAlong with LNG Canada, this project has the potential to cut worldwide greenhouse gas emissions by between 60 million and 90 million tonnes each year by replacing coal-fired power. On this slide now, you can see a stretch of pipe on its way up to the mountain top. This purpose-built cable crane, 1.4 kilometers in length, is able to carry 16 tonnes of materials and was designed specifically for this project. Here is innovation in action. Given the slope classification, this is Canada's first such system, and I take pride in what our team has achieved. Carrying out the CGL project is plainly in step with mounting North American and global demand for energy that is affordable, reliable and low-cost. Depending on the forecast one consults, worldwide LNG demand is expected to rise from 50 Bcf a day to roughly 75 Bcf a day by the close of this decade, with North America taking on a growing role. Heightened energy security concerns and the reorientation of Europe's energy mix, together with strong demand from expanding economies in Asia, largely underpin this growth. By 2030, combined European and Asian LNG demand is projected to climb more than 40%, or 20 Bcf a day. This next wave of LNG demand is opening up significant opportunities that fit with our strategy.
François Poirier
executiveTC Energy's unmatched asset base is going to be essential when it comes to keeping the world's energy supply secure. According to our revised projections, North American LNG exports will rise by more than 90%, climbing from 13 Bcf per day up to 25 Bcf per day by 2030. Since we have several world-class LNG export terminals along the Gulf Coast, the U.S. now stands as the biggest LNG exporter anywhere in the world. That accounts for more than 1/4 of the worldwide market and should keep expanding in the years ahead. At present, we are connecting roughly 25% of the volumes headed to U.S. LNG exports safely and reliably, and we are well positioned to compete for and capture our fair share of this expanding market. We keep moving our slate of LNG projects forward at a consistent pace. Grand Chenier XPress began service in January. Louisiana XPress is already delivering partial volumes and will reach full service by the end of this year. Work is underway on Alberta XPress, with targeted in-service by the end of '22. In addition, North Baja Xpress is scheduled to come online in spring 2023, and we anticipate customer FID on the East Lateral XPress to come later this summer, with an in-service date in late 2024.
François Poirier
executiveTaken together, those projects amount to 3.3 Bcf per day of added capacity, along with more than $1 billion in capital investment for TC Energy. Canada, meanwhile, is very well positioned to help meet LNG demand growth going forward. As we've noted, CGL will link up to one of North America's most abundant and cheapest natural gas supply sources. Once finished, CGL Phase 1 will support more than 2 Bcf a day of LNG exports from the West Coast, and could grow to roughly 5 Bcf a day should Phase 2 receive sanction. So with 94,000 kilometers of natural gas pipelines already in place across the continent, TC Energy's unmatched asset footprint sits at the heart of North America's LNG achievements both now and ahead. And we keep seeing enormous opportunities. At this point I'd like to recognize our operating teams right across the platform. They did a phenomenal job running our system during the second quarter. Utilization stays elevated throughout our diversified portfolio of high-quality life energy infrastructure assets, supported by rising energy demand. Throughput on our 13 U.S. natural gas pipelines came in at an average of 25.4 Bcf a day, an increase of more than 3% versus the second quarter of 2021. Total system deliveries on our NGTL System averaged 12.8 Bcf a day.
François Poirier
executiveThat marks a 9% rise from the equivalent quarter a year earlier, which keeps showing how we reliably secure market access. Over at Bruce Power, performance remains outstanding. We finished planned outages early, and those results got an extra boost from roughly $10 per megawatt hour more in contracted power price that we received in April, tied to the major component replacement program that's ongoing, plus asset management work and other adjustments. And on the Keystone Pipeline system, we safely hit close to 610,000 barrels per day as we brought into service around 30% of the 2019 open season contracts. That once more underscores the vital part our infrastructure plays across North America. Turning now to what we're focused on in 2022, I'm quite pleased with how far we've come overall. Safety sits as our highest value, and it never changes. It's part of our culture, and I'm committed to running every bit of our business in a safe, dependable way. Delivering on the secured capital program and lifting returns from the assets we already have are key priorities as well. As I said a moment ago, we're raising long-haul volumes on Keystone, and we're likewise striving to boost utilizations on Marketlink. In our Power and Energy Solutions business, we have now signed contracts totaling roughly 820 megawatts — specifically 580 megawatts of wind and 240 megawatts of solar energy.
François Poirier
executiveThat renewable power is going to supply the electricity needed for the U.S. part of Keystone, so it can become one of the first net-zero liquids pipelines in North America. It will also deliver renewable energy solutions for industrial demand and, after that, for corridor demand — an area where we've had a lot of success aggregating. We're still reviewing the proposals that came in through our RFI process, and we expect to wrap up more contracts in 2022. Now, so far this year, we've put $1.6 billion of assets into service, and we're working toward our target of sanctioning $5 billion of high-quality, low-risk growth opportunities annually. As Joel will cover in more detail, we're funding our capital programs prudently so that we keep our financial strength and flexibility. And we're making progress on our ESG commitments as well. This year, TC Energy joined the UN Global Compact — the world's largest corporate sustainability initiative — and the TNFD forum. We'll keep identifying innovative and viable energy solutions. We are energy problem solvers. And we're committed to doing that safely and sustainably while building on our long track record of delivering superior total shareholder value. Thank you very much. I'll now hand it off to Joel for a few comments on our second quarter results.
Joel Hunter
executiveGood morning, everyone, and thank you, Francois. As Francois noted, our assets kept producing solid results during the second quarter, even as we safely and reliably satisfied rising energy demand. Comparable earnings in Q2 came in at $1 billion, or $1 per common share, versus $1 billion, or $1.06 per common share, in 2021. Comparable EBITDA was $2.4 billion and comparable funds generated from operations were $1.6 billion, compared with $2.2 billion and $1.8 billion, respectively, during the same period in '21. Net income to common shares totaled $889 million, or $0.90 per share, in the second quarter 2022, against net income of $975 million, or $1 per share, during the equivalent period of 2021. A number of specific items appear on the slide and receive further discussion in our second quarter 2022 report to shareholders. On an overall basis, second quarter comparable EBITDA from our operating segments rose 5% year-over-year, driven partly by a stronger U.S. dollar, to $2.4 billion. Mexico Natural Gas Pipelines comparable EBITDA rose mainly because of lower interest expense tied to repayment of our loan, together with the subsequent issuance of a U.S. dollar-denominated loan entered into on March 15, 2022, at <<inaudible>>. Liquids Pipelines comparable EBITDA fell as a result of lower contracted volumes in Marketlink, partly offset by higher long-haul contracted volumes on the Keystone Pipeline System, as we placed roughly 30% of the 2019 open season contracts into service effective April 1, 2022.
Joel Hunter
executiveLiquids marketing brought in stronger margins for the three months that closed on June 30, 2022, thanks to better arbitrage chances relative to the corresponding stretch in 2021. Within the Power and Storage segment, EBITDA from natural gas storage rose because we actively managed our gas positions during the second quarter of 2022. Moving sales out of the fourth quarter and into the second let the gas storage team lock in favorable Alberta XPress pricing and trim future operating costs. Worth noting: although we have secured an overall position for 2022, we anticipate that the realized gains booked in the second quarter will be partly offset during the second half of 2022, when the matching purchases get recognized. Power and Storage results likewise felt positive contributions from Bruce Power, largely driven by a higher contract price that was partly offset by reduced volumes stemming from more planned outage days. Across all our businesses that earn income denominated in U.S. dollars, translation into Canadian dollars happened at an average exchange rate of 1.28 during the second quarter of 2022, versus 1.23 in 2021. As a reminder, our U.S. dollar revenue streams are partly naturally hedged by U.S. dollar amounts below EBITDA, and the remaining exposure is actively managed on a rolling basis covering as much as 3 years.
Joel Hunter
executiveThe rise in interest expense was driven mainly by issuances of long-term debt and Junior Subordinate Notes, net maturities, a stronger U.S. dollar, and elevated interest rates on greater levels of short-term borrowings. Worth noting is that roughly 85% of our long-term debt carries a fixed rate, with an average maturity term of 20 years. Comparable interest income and other fell mainly because of realized losses on derivatives during the second quarter, which were used to manage our net exposure to foreign exchange rate fluctuations affecting U.S. dollar-denominated income. We keep advancing our industry-leading $28 billion secured capital program, and this year we have placed $1.6 billion of projects into service. That program should deliver a weighted average unlevered after-tax IRR of about 7% to 9%, still in line with our targeted range. In addition, the $5 billion of projects we target for sanctioning annually has to adhere to our strategic capital allocation threshold. Our value proposition will not be compromised. Projects have to meet our risk legit requirements and return preferences. And this will be done with per share accretion as a priority. At this point we remain opportunity-rich. Our capital program is focused not only on growing the business but also on modernizing and advancing projects aimed at cutting emissions and providing low-carbon energy solutions.
Joel Hunter
executiveWe’re reaffirming our projection that comparable EBITDA will rise 5% from 2021 through 2026. A key point is that this EBITDA forecast rests mainly on long-term take-or-pay contracts and cost-of-service regulation. That clarity around future cash flows keeps putting us in a position to raise dividend per share at a yearly pace of 3% to 5%. Moving on to our funding program: as you’ve heard, we’re happy to report that Coastal GasLink LP and LNG Canada have reached amended agreements that settle and address every unresolved dispute regarding certain incurred and anticipated project costs. Capital costs are higher than the initial estimates from 2012, and under the amended agreements a new cost estimate for the Coastal GasLink project is included at $11.2 billion. In acknowledgement of the updated project agreements with LNG Canada, and consistent with a binding commitment that depends on definitive agreements being executed with our Coastal GasLink LP partners, we’ll contribute $1.9 billion of equity to Coastal GasLink LP. That amount will be paid in installments starting in August 2022, with our 35% ownership unchanged as a result. The contribution will be counted among recoverable project costs and will earn a return on and of capital.
Joel Hunter
executiveWhatever extra equity payments come due will first be covered under the amended 2021 interest-bearing subordinated loan agreement that TC Energy and Coastal GasLink LP are party to. Once the project is in service and final costs are settled, the Coastal GasLink partners — ourselves included — will repay those outstanding amounts. I'd like to echo what Francois said. Our view of Coastal GasLink as economically viable hasn't changed, and these agreements lay a solid foundation and a clear path forward for potentially developing Phase 2, which, if and when it gets sanctioned, could improve TC Energy's project returns. Importantly, the deals we've reached lower our project financing risk and back a $1.6 billion expansion of the credit facilities at the project level, bringing the total to $8.4 billion. Our commitment under the subordinated loan agreement between TC Energy and Coastal GasLink LP will be stepped down over time from the current $3.8 billion as capacity under the project level credit facilities grows and as we make installment payments tied to our equity contribution. Turning to 2022 capital spending, we now expect to invest roughly $8.5 billion, reflecting higher costs on the NGTL system and our equity contribution related to Coastal GasLink of approximately $1.3 billion. The graph shows our revised forecasted sources and uses of funds for 2022 through 2024, these revisions included.
Joel Hunter
executiveBeginning with the left column, across the 3 years our total requirements are projected at roughly $29 billion, which reflects capital expenditures — including $18 billion of maintenance capital — plus dividends of $11 billion. The second column shows expected cash flow generated internally of $21 billion along with proceeds from the $800 million hybrid issued in March. That leaves a residual need of approximately $7 billion, shown in the far right column, which we expect to fund via a combination of commercial paper, incremental debt, hybrids, the dividend reinvestment plan, asset sales and Keystone XL project recoveries. So that we can keep prudently funding our capital commitments while maintaining our leverage targets, we have reinstated issuance of common shares from treasury at a 2% discount under our dividend reinvestment plan, commencing with the dividends declared on July 27, 2022. The dividend reinvestment plan is meant to serve as a short-term funding mechanism that we anticipate will be activated for 4 quarters, based on historical participation and as we bring additional projects into service. So in summary, we will always use the most optimal funding tools to maintain our financial strength and flexibility while delivering per share value. Given the strong year-to-date performance of our base business, we reiterate our 2022 comparable EBITDA outlook to be modestly higher, with comparable earnings per share generally consistent with last year.
Joel Hunter
executiveWe're reiterating our $28 billion capital program, which leads the industry, and it's expected to deliver comparable EBITDA growth of 5% from 2021 through 2026. And we have strong visibility into incremental growth, which leaves us comfortable in our ability to hit our leverage target of 4.75. Finally, we expect to grow our dividends by 3% to 5%, with sustainable growth in earnings and cash flow per share and strong coverage ratios. When you put together our enduring business model, unparalleled asset footprint and organizational capabilities, we are differentiated in our potential to capitalize on the opportunity-rich environment before us. Overall, solid execution will allow us to continue to deliver superior long-term shareholder value. That's the end of my prepared remarks, and I'll now turn the call back over to Gavin for the Q&A.
Gavin Wylie
executiveYes, thank you, Joel. So, right before I hand things over to the conference coordinator for questions from the investment community, we'd ask that everyone please keep it to 2 questions. Thank you.
Operator
operator<<operator_script>> Linda Ezergailis from TD Securities has our first question.
Linda Ezergailis
analystCould you give us a bit more background on the revised Coastal GasLink costs? On the forward-looking cost figure, how much have you actually secured at this point? And have you built in any kind of extra contingency? Or perhaps you could tell us what level of confidence you have in those cost estimates?
Bevin Wirzba
executiveYes. Linda, it's Bevin here. As we said earlier, 70% of the project is done at this point. Everything we require to finish the work is now onsite. Out of the 8 sections, 2 have been fully resolved and finished as far as mechanical completion goes, and every one of our contracting strategies has already gone out to tender and is less. So our confidence is high as we put together the new estimate. That $11.2 million estimate includes a contingency covering the potential risks we still see ahead as we move toward conclusion. Still, we're quite confident we'll hit our mechanical completion date by the end of 2023. So at this moment we stand with a great deal of confidence, given that a settlement is in place with our partners and customers at LNG Canada. That leaves us well positioned to deliver on our commitments: the $11.2 million and mechanical completion by the end of 2023.
Linda Ezergailis
analystAnd as a quick follow-up, are you currently in active talks with LNG Canada regarding Phase 2? Also, in your view, what would the optimal FID timing be to help minimize any dismantling and rebuilding of labor camps, et cetera, presumably as part of a cost-savings effort? Could you give us some context on that?
Bevin Wirzba
executiveYeah. So we're actively talking with LNG Canada about Phase 2 and whether it's feasible, doing the right front-end work to figure out what the scope and scale of that project is going to be. The project looks quite different from Phase 1. It isn't a linear build-out. It's compression facilities. And that shifts the risk profile in our favor. On FID timing, that's something our customers at LNG Canada control — they decide when they're ready to move toward a final investment decision, and we're helping them with that evaluation right now. There's a huge amount of work that has to get done, but doing that work today matters. That way we go into that FID with a high-confidence decision.
Linda Ezergailis
analystMoving to my second question, which is broader and concerns how you plan to spend capital: in the funding plan you laid out, $18 billion has been identified. Is all of that current with respect to inflationary pressures of any kind, or suitable contingencies? Or is it possible that certain projects contained within it could rise in cost, or be pushed back, insofar as you possess some discretion over that?
Joel Hunter
executiveLinda, this is Joel speaking. We've now caught up on that capital spending you mentioned. As you may remember, during Q1 we made a revision to our cost projections for the NGTL System expansion projects. That is clearly where the bulk of the cost pressure in the portfolio is showing up. What we're seeing at Bruce Power has us quite encouraged. The Unit 6 MCR Program remains on schedule and within budget. At this point, no inflationary pressure is appearing on our capital investment in the United States, though as you're well aware, it's really coming from Alberta. That's a massive market here. We have the CGL project underway. Trans Mountain is moving ahead, together with, clearly, the NGTL expansion. So going forward, we don't anticipate any material changes to our cost estimates, and what you're seeing reflects our current estimates most closely.
Operator
operatorBen Pham from BMO has our next question.
Ben Pham
analystI'd like to return to that gray shaded category in your funding program. More specifically, I'm curious about asset sales — where do you think that ranks within that overall gray-shaded area? Is there anything logical that tends to stand out? And is selling assets really appealing in this environment when you're also looking to reduce debt at the same time?
Joel Hunter
executiveBen, this is Joel. Whenever we review our capital program and the way we finance it, clearly we're constantly seeking the ideal capital structure — one that genuinely brings our cost of capital down, lifts shareholder value as much as possible, and truly satisfies our leverage goals. Clearly, we're extremely careful about our share count. Our aim is to maximize earnings per share along with cash flow per share. So as we approach financing, it's genuinely a strategy that draws on every available option. And as shown in that gray box, provided our balance sheet allows it, we do make use of debt. We do push our utilization of hybrids to the fullest at 15% of our capital structure. After that we turn to internal equity, meaning joint venture partnering and the sale of non-core assets, and then obviously external equity by way of the dividend reinvestment plan and, if necessary, discrete equity. So that's roughly the stack we consider, though we do hold quite a few non-core assets within the portfolio that we could potentially monetize. But once again, what we're striving for here is maximizing shareholder value and finding the lowest cost of capital option for funding our capital program.
Ben Pham
analystAll right. So with this revised financing plan, you're clearly factoring in the Coastal GasLink effect on NGTL. Are you also taking into account some of the Mexican pipeline developments when you consider activating your DRIP for a minimum of a year?
Joel Hunter
executiveBen, I'll begin with the DRIP. As we described, the DRIP relates to the increased spending we are seeing on NGTL as well as Coastal GasLink. At this point, we simply judged it prudent, clearly for us, to maintain our financial strength and flexibility and to keep a strong balance sheet. So we decided to activate the DRIP for 4 quarters, and what we aim to accomplish is roughly $1.25 billion of common equity, using a 35% historical participation rate at the 2% discount, which is suitable for funding our capital program at this time.
Ben Pham
analystAll right, so you're not going to say anything about Mexico, then?
Joel Hunter
executiveRegarding Mexico, I don't have anything to say. I'll hand things over to Stan.
Stanley Chapman
executiveYes. Ben, it's Stan here. Here's what I can share. Around the definitive agreements with CFE — covering both the settlement and the possible project — we've achieved some quite significant headway in the negotiations, though we haven't quite wrapped things up yet. As you're aware, our presence in Mexico spans more than 30 years. Our strategic alliance with the CFE remains something we're deeply, deeply committed to. So I'd simply ask that you allow us a little additional time so we can finish closing out the negotiations.
Joel Hunter
executiveBen, one final point on that. As I said, consider what currently sits in that gray box within our funding plan, since we have several levers available to us. If we were to proceed with a project in Mexico, as I noted again. We are quite judicious regarding our share count, and we will aim to secure the lowest cost of capital that ultimately maximizes shareholder value and genuinely satisfies our leverage targets. So it is somewhat of an all-above strategy, not just with our existing capital program, but clearly, should anything move forward with Mexico.
Operator
operatorWe’ll now take a question from Robert Kwan at RBC Capital Markets.
Robert Kwan
analystLet me go back to Coastal GasLink and the returns question. Could you discuss how much the base returns have come down compared with what was originally expected, which I believe was fairly low to start with? Then, when you consider a possible Phase 2 expansion, has the cost and return framework been formalized under your new agreement? And if no additional liquefaction expansion happens, does the current agreement contain a mechanism for improving the returns on CGL? Or, if it doesn't, are you simply left with those low returns?
Bevin Wirzba
executiveRobert, it's Bevin here. Phase 1 obviously fell short of its original return targets. As we said, though, reaching a settlement leaves the project best placed to go forward. Above all, we wanted to make sure of overall competitiveness — to back the project and to back the Phase 2 work now underway, which would come after it if LNGC elects to make an FID. Our returns for Phase 1 and Phase 2 aren't tied together. What we agreed in the settlement stays confidential. Even so, we have confidence that the return profile Phase 2 would offer — and talks with LNG Canada on that are quite far along — along with our settlement, gives shareholders a strong project.
Robert Kwan
analystAll right, then — with Phase 2, do you end up back at the level you had originally expected?
Bevin Wirzba
executivePhase 2 delivers the same thing. When you combine Phase 1 and Phase 2, the whole project gets back to a very competitive return scenario.
Robert Kwan
analystAll right, let me just wrap up here by covering funding, and the DRIP in particular. You've mentioned that you intend to be careful about your share count. So could you walk through why turning on the DRIP was chosen as the best funding instrument rather than, for instance, asset monetizations? And although you said it will stay on for a year, if conditions in the market remain much like they are right now, does that change the math — or does switching the DRIP on at this point signal that you view the DRIP, or equity, as the preferred funding source should you be able to bring in things such as Mexico or other projects into the portfolio?
Joel Hunter
executiveYes, Robert, Joel here. To start with, the thing we're really focused on is those extra increases we're seeing at NGTL and Coastal. That's happening across a fairly compressed window. Really, we're talking about 2023, when our metrics came in somewhat higher than what our internal forecast had projected. And we found that activating the DRIP for 4 quarters mattered a great deal to us. What appeals to us about DRIP is how well it aligns with the shape of our capital spending profile. If you compare DRIP with discrete equity, it comes in far cheaper than a 2% discount, versus an all-in discount of, say, 7% to 8% that discrete equity would carry. And clearly, we can switch it off each quarter. Looking ahead from here, if we perhaps see our capital program expand further, obviously we'll be looking at non-core assets again that we could monetize. And once more, we weigh that against alternative capital sources, so that, again, we maximize shareholder value and truly keep our leverage in check. But once more, I want to stress that we're really focused on 2023 and on bringing our leverage down to a level we're comfortable with.
Joel Hunter
executiveIt's a fast route to reach that point quite economically, and once more, it fits really nicely alongside how our capital spending is laid out.
Operator
operatorThe next person to ask something is Robert Catellier with CIBC Capital Markets.
Robert Catellier
analystTo start, congratulations on finalizing the Coastal GasLink deal. That was a priority for you and for the industry, I know, and it could not have been easy. I was wondering whether you could say more about any changes in the revised agreement that mitigate risk. I believe you mentioned that in your opening comments. So what specific changes can you tell us about that would mitigate your risk going forward?
Bevin Wirzba
executiveOkay, Rob, thank you for that question, and I appreciate you noting that we got the settlement done. It involved a lengthy and constructive conversation with our customers, and the result we arrived at is genuinely a good one. Transparency and clarity around how we handle issues moving forward are the main mitigation elements. We have faster dispute resolution processes in place, and we're making sure alignment is properly maintained all the way through to final project delivery — that gives us strong confidence in the transparency, both for us and for our equity partners, as well as our indigenous partners, who gain clarity on the path ahead too. So what the mitigations really amount to is tighter alignment, greater openness in how we work through challenges or changes on the project going forward, and really solid alignment between our customer, LNG Canada, and ourselves.
François Poirier
executiveFrancois, Robert, I'd also add that if there were no settlement, we'd be holding a fairly sizable amount of capital on our balance sheet. Getting the settlement done lets us increase the size of the credit facility, and we won't need to hold a substantial amount of capital for something that might in the end have stretched many years into the future.
Robert Catellier
analystAll right. And like you mentioned, during the first half of the year the U.S. became the biggest LNG exporter. Could you give us a bit more detail on some of the approaches we're taking to address not the projects you've listed, but ones that could become available to the industry down the road? Is it just a matter of using your existing transmission network so you can keep taking part? Or is there some way you might gain from upgrading what you already have via M&A or other asset acquisitions?
Stanley Chapman
executiveRobert, it's Stan here. Let me begin by saying that the foundation for what I've said previously about our unmatched asset base lies in its scale and scope: we ought to be generating roughly $1 billion annually in new growth products, and LNG sits squarely at the front of that effort. What's more, this is largely a matter of organic growth. From my vantage point, in light of current geopolitical developments, Europe must secure approximately 20 Bcf per day of natural gas to replace the Russian supplies they have traditionally relied upon. If we assume roughly 2/3 of that volume originates in the U.S., that amounts to an additional 13 Bcf coming from the U.S., mostly along the Gulf Coast. As things stand, we move around 25% of U.S. LNG. Going forward, I anticipate that we will hold that share at minimum, and possibly expand it. So you should view us as having a set of opportunities across the coming 2 to 3 years in the neighborhood of 3 Bcf to 4 Bcf per day. I'm unable to share specifics at this point because of market sensitivity. But it's fair to say that we are fully cognizant of these opportunities concerning LNG growth and LNG demand, and we are actively in discussions with a range of counterparties about offerings that truly capitalize on our competitive edge, namely our footprint.
Stanley Chapman
executiveThis isn't limited to the Gulf Coast region of Louisiana — it also applies elsewhere across the country, including our North Baja system and the opportunities we see at Costa Azul.
Operator
operatorJeremy Tonet from JPMorgan has our next question.
Jeremy Tonet
analystI'd like to dig a bit deeper into Mexico, if that's alright. Regarding the VdR delay, what visibility do you have into finishing it on the timeline you mentioned for early '23? And before VdR is fully complete, would you proceed with another project in Mexico?
François Poirier
executiveJeremy, I’ll begin. And naturally, Stan and I have had extensive discussions about these matters for quite a while now, so I’ll have him add what we are seeing specifically at Villa de Reyes. And as I’ve stated publicly before, we have been in Mexico for 30 years. Our relationship with the CFE is very positive and constructive. From the standpoint of putting incremental capital into the country, we do believe it is critical to settle any outstanding contractual disagreements before or at the same time as any decisions on incremental capital. So that is how we would approach it. And Stan, over to you.
Stanley Chapman
executiveYes, Jeremy — Stan here. As you're aware, at this point we've placed into operation, or rather readied for operation, the north segment along with the lateral portion of Villa de Reyes. At the moment, our attention is squarely on the Southern segment. Should we manage to settle a few matters, a number of those heaters could be set to go into service likely at some point in early 2023.
Jeremy Tonet
analystUnderstood — that helps. To revisit the point: suppose a sizable Mexico pipeline project gets the green light either later this year or early next year. And if that ends up pushing CapEx above $5 billion annually in 2023 or beyond, how should we think about the timing of additional portfolio rotation or equity issuance if CapEx climbs in that manner?
Joel Hunter
executiveJeremy, this is Joel. As I said before, whenever we assess putting capital into something—especially once we're above that threshold of $5 billion you mentioned—we aim to identify the ideal capital mix that genuinely brings our cost of capital down as far as possible. Again, we're thinking about being very careful with our share count and about maximizing earnings per share and cash flow per share. So, as noted, this really is a strategy that draws on every available option. Again, wherever we're able to use that, we will; wherever a capital project includes hybrid capacity, we'll use it. After that, we'll consider internal equity along with partnering and asset sales. And if required, external equity through the DRIP and discrete equity. So again, it's a strategy that uses all of the above. We settle on that at the moment we're making the investment decision—what the best way forward is when it comes to our cost of capital.
Operator
operatorMatt Taylor from Tudor, Pickering, Holt & Co. has our next question.
Matt Taylor
analystThis one reaches further out. Regarding your targeted EBITDA growth of 5% through 2026, I'd like to understand how the increasing price of carbon factors into that. Clearly, you have initiatives to lower the emissions profile, whether through renewable power at Keystone or additional pumped storage. But what about the emissions that still need cutting where no disclosed plan exists? What I'm driving at is this: as the government raises those carbon costs over time, are you presently baking in some portion of that rising carbon expense as you work to offset it, perhaps via offsets or other projects? Or how are you working toward your longer-term emissions reduction targets?
François Poirier
executiveAppreciate the question, Matt. We are definitely taking offset or mitigation costs into account, and those are built into the EBITDA growth outlook we've given. In fact, that dynamic will help drive growth down the road, since embedded in our strategy is lowering our own emissions and assisting our customers in lowering theirs — which is exactly why we remain opportunity rich. Reducing emissions will act as a catalyst for the company's growth. Look, in some jurisdictions we can pass those costs through, and in others we have to find a way to mitigate them on our own account. Every one of those is factored into the growth estimate we provided, to the extent they are visible and have been passed into law.
Matt Taylor
analystGreat. And if I could, one more question. We've now heard a number of times about possible opportunity in Mexico. Could you just give us a higher-level view of Mexico? We've seen LNG projects that are gaining momentum, some floating LNG, and just a general sense of how you're looking at that market. You've been there for a long time. Obviously, any thoughts on the backbone infrastructure there. Would now be a good moment to crystallize value? Or do you see some of those opportunities in terms of things we've heard about before regarding helping the industrial power stack transition over to gas, and some of those longer-term opportunities?
François Poirier
executiveI'll begin with a broad overview of how I view government policy and backing for gas transmission, and after that I'll turn it over to Stan to add some detail on a few of the things we're observing. My sense is that the Mexican government and the CFE are learning, and what has happened over the last few years shows they've come to see gas transmission as an enabler and a supporter of CFE's goals of bringing power costs down and tackling the social and economic disparity among different regions of the country. So put simply, expanding access to natural gas across the country is a very powerful socioeconomic tool for the country, and they regard partnership with the private sector in Gas Transmission as an essential tool for putting policy into practice. Over to you, Stan.
Stanley Chapman
executiveYes. Matt, it's Stan here. The way I see it, this again ties back to the asset base we have in Mexico, and right now we transport roughly 15% of the gas moving today, and with robust demand — robust demand given that Mexican imports from the U.S. will rise from 8 Bcf to 12 Bcf in the years ahead. So that suggests a couple of things to me. First, more capacity into Mexico is going to be needed, and that might give us a chance to grow our pipeline at some point, which we could accomplish fairly efficiently through compression. We'll be concentrating heavily on expanding our backbone system through the central part of Mexico, especially as power loads and industrial load growth keep materializing. And then finally, you raised the opportunity around LNG, particularly along Mexico's West Coast, perhaps linked to the transition efforts the Mexican government is pursuing. But at present, at least near term, we're focused on the potential project opportunity with the CFE and wrapping up those negotiations.
Operator
operatorBrian Reynolds from UBS has our next question.
Brian Reynolds
analystI'm just curious, as a follow-up to a few of the capital allocation questions: could you comment on how management views a possible pause in dividend growth over the near term, as one lever to support the balance sheet over the long term?
François Poirier
executiveI'll handle that question, Brian. That simply isn't going to happen — plain and simple. We have confidence in our capacity to expand EBITDA within that 5% range and to deliver growth in earnings per share and cash flow per share — underlying growth that supports dividend growth in the 3% to 5% range, along with bringing our leverage down to the 4.75 level within that 5-year window. So we can balance all of those various interests. Maintain our capital discipline, maintain deleveraging as our priority while also delivering a stable and growing return to our shareholders. So there are no plans to moderate dividend growth given how rich the opportunities before us are.
Brian Reynolds
analystThanks. Building on that, you mentioned asset sales as an additional lever earlier. I'm wondering whether you might give us a bit more detail on what those non-core assets could be. Also, now that the Coastal GasLink matter has been resolved, what appetite do First Nations have to participate in the project at this point in Phase 1? Or would it be reasonable to think they want to see better returns from CGL expansion first, before they eventually take up their equity stake?
Joel Hunter
executiveBrian, this is Joel speaking. We won’t identify in detail the particular assets we’re reviewing. What I can say, though, is that as we review our footprint, there are several assets — perhaps smaller in nature — that are non-core and that we might seek to monetize over time if necessary. That said, at this moment we aren’t going to name anything we’re considering with respect to portfolio management.
Bevin Wirzba
executiveBevin here. Regarding First Nations, the settlement leaves the terms of their option agreements untouched, and their involvement in the project stays at 10% under the original deal. So nothing changes for the indigenous option agreements, though the settlement does give them clarity and a way forward.
Operator
operatorPraneeth Satish from Wells Fargo has our next question.
Praneeth Satish
analystAt a high level, you're considering asset sales and DRIP as ways to help fund the existing CapEx backlog, and you're still weighing some bigger projects such as the Mexico pipeline and pump hydro, among others. My question, I suppose, isn't about funding, but rather: is there any consideration given to trying to pursue a greater return on the future projects that you do FID — I guess, above the 7% to 9% corporate return — basically to align with the fact that your cost of funding, your cost of incremental funding, may be beginning to edge higher.
François Poirier
executiveThanks for that, Praneeth. And since we have an abundance of opportunities, plenty of choices lie ahead of us. One of the essential strengths we offer as a company is discipline in how we allocate capital, along with the chance to upgrade toward those projects yielding the greatest returns. Your question didn't bring up risk, but I will. The connection between risk and return matters a great deal. Our risk preferences, as they've historically stood, remain the same, and we feel confident about advancing projects that carry a low-risk profile, supported either by long-term contracts or by regulation, and that produce a 7% to 9% unlevered after-tax IRR. If we're considering additional capital past our $5 billion run rate that free cash flow can support, then you need to examine the marginal cost of capital required to fund it. And management's task is to maximize the spread between the return being earned and, in that instance, the marginal cost of capital, which could involve asset sales or equity — sitting at the highest-cost end of that stack. And our thinking is that a sensible spread has to exist between the earned return and that cost of capital for that capital allocation decision to be made. But once more, risk — and managing toward a conservative risk profile while not altering our value proposition — is always foremost in our minds.
Praneeth Satish
analystOh, and just to switch gears — sorry, did you have more you wanted to say?
François Poirier
executive<<inaudible>>
Praneeth Satish
analystAll right, let me shift topics here. I'm just wondering whether there's anything new on that possible Bison project up in the Bakken. My understanding is you kicked off an open season, so I'd like to hear how that's going. I'm aware the Bakken has seen some disruption tied to the weather, so I don't know whether that has had any effect on things.
Stanley Chapman
executiveYes, this is Stan. And once more, returning to that best-in-class footprint and the opportunity-rich environment we have here—these supply push projects represent yet another growth opportunity for us. We did conduct a nonbinding open season that closed in May. We were very pleased with how that open season turned out. And it's fair to say we're going to use the second half of this year to convert those negotiations into precedent agreements, and we look forward to sharing more with you in the weeks and months ahead.
Operator
operatorMatthew Weekes from iA Capital Markets has the next question for us.
Matthew Weekes
analystI just wanted to ask briefly whether there's any news on that open season you mentioned last quarter for Marketlink, and on trying to push volumes up a bit there? And what might the outlook look like going forward from here?
Bevin Wirzba
executiveMatthew, thanks. This is Bevin. During the quarter just ended, we conducted 2 open seasons — Marketlink, of course, and also one for our port and interest lateral — and both came through successfully, with contracts put in place. Our approach, as contracts on Marketlink have been rolling off, has been to rebuild profiles for both short-term and long-term contracts. We're mindful of the volatility present in the market at the moment and some of the headwinds we face, at least in the near term. Still, our mid- to long-term view is that the Marketlink asset will get back to performing, shifting from a headwind situation into something like tailwinds. And so the Port Neches Link open season pairs with that project, which is arriving under budget and ahead of schedule, boosting deliveries into the Motiva refinery — the largest refinery in North America. Giving our customers more delivery points has therefore been a key piece of our strategy. So those 2 open seasons both went very well.
Operator
operatorRob Hope from Scotiabank has a follow-up, and that's our next question.
Robert Hope
analystI'd like to return to the Mexican project for a moment. Given the CapEx backlog that's fairly full, measured against what we'd call appealing risk-adjusted returns, how are you thinking about bringing in a partner there? That would reduce some of the upside, but it would make financing the project simpler should it proceed — comparable to the situation at Sur de Texas.
François Poirier
executiveFrancois here, Rob — appreciate the question. When we think about how much Mexico EBITDA we'd like within the consolidated portfolio, our view is that a contribution of roughly 10% to consolidated EBITDA is a suitable near- to medium-term objective for the company. That's really just sensible portfolio management and spreading diversification, and so on. So to the degree we come across appealing chances to earn a premium run — and to the degree that bringing a possible partner in for a piece of it helps us pursue and make the whole franchise more valuable — we'd certainly look at that. So the short answer is that the possibility of selling a minority stake later on is something we'd be open to, though again it sits more within the framework of sensible portfolio management and appropriate diversification.
Robert Hope
analystOkay, thank you for that. And then, as we look ahead to 2023, is there any flexibility within the capital plan that could help address what we'll describe as this balance sheet tightness? Might we see you becoming less inclined to put money into certain renewable projects later in the year? Or is it possible that some capital spending could be pushed from '23 into '24?
François Poirier
executiveI'd say our room to push back capital is fairly limited, since—as you can imagine—it often takes 2 or 3 years between sanctioning a project and securing the regulatory approvals and permits. We've already committed to contractors, and we've placed orders for long lead equipment, so delaying spend can be somewhat difficult. In our view, when a project adds value, we have ways to be creative with rotating capital. We can also get creative about bringing in partners so we can deliver long-term value for our shareholders, and you're more likely to see us take that route than defer near-term capital projects.
Operator
operatorThat wraps up the question-and-answer portion, everyone. Should anything else come up, you can reach Investor Relations here at TC Energy. At this point I'll hand things back to Francois Poirier. Go ahead, Mr. Poirier.
François Poirier
executiveThanks so much. I appreciate everyone spending time with us today. Let me just remind all of you that capital discipline, discipline regarding our risk profile, and deleveraging are the key priorities for our company. We are rich in opportunity. The energy transition will keep serving as a catalyst for growth. Our incumbency, through our unmatched asset footprint, is going to keep bringing us a very healthy flow of opportunities. And we have high-quality franchises that will carry that forward. So — we're well positioned to prosper no matter the pace and direction of the energy transition, and we will always balance growth, risk and maintaining balance sheet strength. Thank you very much for your attention today.
Operator
operatorThat brings us to the end of the conference call for today. Your lines can now be disconnected. We appreciate you joining us, and we hope the rest of your day is pleasant.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete TC Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to TC Energy Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TC Energy Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.