TC Energy Corporation (TRP) Earnings Call Transcript & Summary

November 8, 2023

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 67 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone holding on. I’m the conference operator, and I’d like to welcome you to TC Energy’s Third Quarter 2023 Financial Results Conference Call. <<operator_script>> Please note that this call is being recorded. <<operator_script>> At this point, I’ll hand the conference over to Gavin Wylie, Vice President, Investor Relations. Please go ahead.

Gavin Wylie

executive
#2

Thank you so much, and good morning to everyone. It's my pleasure to welcome all of you to the 2023 Third Quarter Conference Call for TC Energy. With me today are Francois Poirier, our President and Chief Executive Officer; Joel Hunter, Executive Vice President and Chief Financial Officer; plus additional members of our senior leadership team. To start things off, Francois will offer his comments regarding our overall operational performance. Bevin will then walk through the progress achieved so far on the intention we announced to spinoff our liquids business. And last, Joel will cover our financial results and outlook. You can find a copy of the slide presentation that accompanies our remarks on our website in the Investors section. Once the remarks are done, we'll open things up for questions from the investment community. We do ask that you keep yourself to 2 questions. If you're part of the media, please reach out to our media team. I'd also like to remind everyone that today's remarks will contain forward-looking statements, which carry important risks and uncertainties. For further details, please refer to the reports TC Energy has filed with Canadian Securities Regulators and with the U.S. Securities Exchange Commission. Lastly, throughout the presentation, we'll reference certain non-GAAP measures, which may not be comparable to similar measures that other entities provide. We use these measures to give you additional information about TC Energy's operating performance, liquidity, and its ability to generate funds to finance its operations.

Gavin Wylie

executive
#3

In the appendix of this presentation, you'll find a reconciliation covering the different GAAP and non-GAAP measures. So with that, I'll hand things over to Francois.

François Poirier

executive
#4

Thanks, Gavin, and good morning, everyone. To begin, I'd say our team is delivering outstanding progress on the priorities we set for 2023. The emphasis we've placed on execution is now bearing fruit. You can see that in the strong year-over-year growth in comparable EBITDA, and in the fact that our major projects are either on schedule or running ahead of where we planned to be in 2023. That positions us very favorably for 2024. During this year to date, we've brought roughly $5 billion of assets into service, which includes most of our West Path project, placed in service on November 1st. What matters is that the projects we've commissioned this year have, for the most part, come in on budget. Turning to deleveraging, we closed the sale of a non-controlling minority equity interest in Columbia Gas and Columbia Gulf and received $5.3 billion in cash proceeds. That puts us solidly on the road toward rebuilding the strength and flexibility of our balance sheet. We're also still assessing a further $3 billion in asset sales. Accordingly, beyond 2024, we've made a commitment to cap annual net capital expenditures at $6 billion to $7 billion, which will also help drive additional organic deleveraging. Demand for our services remains strong and sustained, and that is what allows us to maximize asset value through safety and operational efficiency.

François Poirier

executive
#5

So because of that, we now anticipate 2023 comparable EBITDA landing at the top end of the 5% to 7% growth guidance versus 2022. Our Natural Gas Pipelines operations don't really carry any meaningful volumetric or price exposure, but robust utilization levels do show how much demand exists for what we provide and how essential our assets are. Take the NGTL system — we kept seeing solid receipts there. In fact, on August 6th the system hit its highest single-day record of 14.6 Bcf. Same story in the U.S.: LNG deliveries averaged 3.1 Bcf per day year-to-date in 2023, roughly a 1.5% gain versus last year's third quarter. And during July, we set a fresh all-time record for deliveries to power generators of 5.2 Bcf. Also, on our GTN system, we hit an all-time delivery record of 2.96 Bcf. We're glad that the GTN XPress project just got FERC approval. That project is going to expand the GTN system so it can transport additional contracted export enabled by the Foothills West Path Delivery Program. We keep making solid progress in Mexico. The lateral portion of VdR has entered commercial service, and as for the one remaining piece, the South section, we anticipate it being in service by the second half of 2024.

François Poirier

executive
#6

Within Power and Energy Solutions, we hit a major execution milestone as Bruce Power’s Unit 6 came back into service early and on budget. That underscores the joint dedication we and the Bruce Power team share to executing projects excellently. Bruce Power also posted 94% availability for the quarter, and we still expect yearly availability in the low 90% range for units that aren’t offline for the MCR program. As a benchmark, back in 2019, prior to launching the MCR program, Bruce’s average availability stood at 84%. So across the past several years, what we’ve delivered amounts to a 10% gain in average availability, driven largely by a consistent drop in the forced loss rate and fewer planned outages. Once the MCR program wraps up, we anticipate availability will keep rising. Also, across our Alberta cogen fleet, we recorded roughly 98% peak price availability in the third quarter, with Alberta power prices averaging $152 per megawatt hour. And at Keystone, operational reliability ran near 94% year-to-date, and Bevin will revisit that shortly. In summary, our operational excellence and unmatched asset base have continued to produce robust operational results and robust availability, which has converted into solid, sustainable financial results across every phase of the economic cycle.

François Poirier

executive
#7

Like I said before, we've become more focused on how well we carry out projects. Following 5 years of building and 55 million hours of labor, we have now reached the huge milestone of mechanical completion at Coastal GasLink, and we got there before our target for the end of the year. What this means is that the welding, coating, and lowering into the trenches is done for 100% of the pipe. All 800 classified water crossings are finished. We have hydro tested the whole pipeline. And in addition to what we announced about this project last week, we have now completed the documentation and the extra engineering analysis tied to the mechanical completion milestone. Coastal GasLink is the first pipeline in Canada to the West Coast in 70 years. And when it becomes operational, it will provide the first direct route for Canadian Natural Gas to access global markets. The upcoming steps for this project are introducing natural gas, commissioning the project, and the land reclamation work that is already underway along the route. As our press release this morning noted, the project is also still on track with our cost estimate of approximately $14.5 billion. Now moving to Southeast Gateway. Looking at how the onshore portion of 25 kilometers is coming along, all the land has been acquired, and construction at all 3 landfall sites is moving forward as planned.

François Poirier

executive
#8

When it comes to getting ready for offshore work, our engineering is finished, and coating of the concrete pipe is progressing nicely. We anticipate that installation of the 690 kilometer offshore pipeline will get started before this year is over. We keep realizing advantages from the improved process we have for capital allocation governance. And at Southeast Gateway, this means that the project is still on schedule to enter service, as anticipated, in mid-2025. I'd like to pause and acknowledge our Board Chair, Siim Vanaselja, for the outstanding leadership he has shown through a period of considerable change at TC Energy. Come the 2024 Annual General Meeting, Siim will have been on our Board for 10 years, and he has held the Chair position for the last 7. I am deeply thankful that Siim will go on providing his knowledge and expertise as he steps down from the Chair role while remaining a Board member in a Director of Capacity. Under our Board's continuing succession program, John Lowe has been named as TC Energy's next Board Chair. His extensive midstream and energy background, together with his service as a Board Director of TC Energy since 2015, make him an ideal fit for this important role. And at this point I'll hand the call to Bevin.

Bevin Wirzba

executive
#9

Thanks, Francois. Back in July, we said we intended to spin off the liquids pipeline business into a stand-alone investment-grade entity, so as to get the most commercial potential out of this highly competitive corridor. In only 3 months we've achieved meaningful progress, and this morning I'd like to spend a few minutes going over a handful of the highlights. Today I'm delighted to reveal what the new liquids pipeline company will be called: South Bow. That name reflects the historical roots of the company, which was set up near the Bow River in Calgary. It also acknowledges the strategic corridor of the pipeline systems, which lets the company move a premier resource southward to the strongest U.S. refining markets, in the Gulf Coast as well as the Midwest. Last month we also announced that Hal Kvisle has agreed to be appointed Chair of South Bow's Board of Directors. Hal is a distinguished industry leader whose extensive experience covers a wide range of companies throughout the energy space. He also served as President and CEO of TransCanada from 2001 to 2010, back when Keystone came into service. He knows our liquids assets and understands this business very well. We look forward to welcoming Hal's leadership and guidance in this key role at South Bow.

Bevin Wirzba

executive
#10

I'd like to revisit a few key things regarding what this spin-off stands to deliver for shareholders. This was announced during the prior quarter. Customers have given us robust backing. Several factors explain that. The assets within our network play an essential role in serving what customers require, and we're observing further appetite for added services that mirror how competitive the corridor has become. We link together some of the biggest and most durable supply, demand, and export markets, and we provide the quickest, most economically competitive routes from the Western Canadian Sedimentary Basin down to the Gulf Coast. We'll have the ability to steer cash flow with flexibility, without having to compete for capital inside a company whose strategic focus is on getting the most out of synergies across its natural gas and power operations. Our premium valuation is underpinned by a compelling and sustainable dividend yield along with a low-risk, heavily contracted business that carries competitive advantages and contract structures matching none of our peers. Central to what makes our value proposition attractive is that South Bow is anticipated to hold investment-grade status when the spin occurs. That expectation still holds given where interest rates stand today. We'll aim to put the capital structure in place when capital markets conditions are constructive. On top of that, nothing imposes a deadline on us for completing the spin.

Bevin Wirzba

executive
#11

We absolutely anticipate that the capital structure will be set before the spin. If we haven't fully put the capital structure in place, we have a number of options at our disposal—including tapping the bank term loan markets and making use of hedging instruments, where suitable—so we can flexibly implement the long-term capital structure at South Bow in the best way. Our team is likewise dedicated to operational excellence. Across the third quarter, our system kept delivering outstanding performance. We continue to observe robust, sustained demand for Canadian crude in the U.S. Gulf Coast. We wrapped up 2 open seasons on Marketlink successfully. That system is running well. As Francois noted, Keystone's system operating reliability for the year to date stands at roughly 94%. Consequently, year-to-date comparable EBITDA of $1.1 billion from the liquids business rose by approximately 8% compared with the same period last year. As of this past week, we finished the cleanup at Milepost 14 and brought natural flow back to Mill Creek. We thank the local community, Washington County, EPA, Kansas Department of Health and Environment and the Army Corps of Engineers for their support and assistance as we brought this work to a close. We will keep a presence at the site in order to advance long-term reclamation activities and environmental monitoring.

Bevin Wirzba

executive
#12

I'd encourage you to check our website if you want further information. Regarding inspections throughout Keystone, in-line inspection is now done on 60% of the whole system. Our Integrity Digs Program stands at 50% finished, and we expect full completion by early second quarter of next year. Nothing worrisome has come to light, and we keep meeting our contracted volumes. More information will come your way at our Investor Day, which takes place in a few weeks. At this point, I'll hand things over to Joel.

Joel Hunter

executive
#13

Thanks, Bevin. In Q3, we kept up our solid results, which produced a 7% rise in comparable EBITDA versus a year earlier. The main factors are greater flow-through costs and higher NGTL rate-based earnings in our Canadian Natural Gas rate-regulated pipelines business, more assets coming into service in our Mexico Natural Gas Pipelines business, larger long-haul contracted volumes plus increased volumes on the U.S. Gulf Coast section of the Keystone Pipeline System, and the effect of a stronger U.S. dollar. As Francois noted, because of our robust performance so far this year, we now anticipate 2023 comparable EBITDA landing at the top of the 5% to 7% outlook against 2022. Comparable earnings per common share should be broadly in line with 2022. So far this year, we have put roughly $5 billion of projects into service, among them capacity projects across our natural gas and liquids pipeline businesses and Bruce Power's Unit 6 MCR program. We now expect total capital expenditures for 2023 to come in at about $12 billion to $12.5 billion. I'd like to point out that projected costs for major projects are unchanged. The rise mostly stems from our choice to pull 2024 capital expenditures and work forward into 2023. That covers moving up the timing of certain maintenance and growth capital expenditures to optimize efficiencies and reduce project execution risk in our Natural Gas Pipelines businesses, along with the foreign exchange impact of a stronger U.S.

Joel Hunter

executive
#14

We've also made substantial headway on our deleveraging goal. There's a clear route for us to hit a 4.75x debt-to-EBITDA target by the close of 2024, and we'll stay at that level after 2024. On October 4, we closed the sale of a 40% minority equity stake in our Columbia Gas and Columbia Gulf systems. The $5.3 billion in cash proceeds from that deal will go toward cutting our year-end 2023 debt-to-EBITDA metric by more than 0.4x. We keep assessing capital rotation opportunities totaling roughly $3 billion. Organic comparable EBITDA growth, as we bring more assets into service, gives further support to our deleveraging. As of November 1st, nearly all of the West Path delivery program on our NGTL system has been placed in service. That lifts our year-to-date total to about $5 billion. During 2024, we anticipate placing roughly $7 billion of projects in service, among them Coastal GasLink, GTN XPress, and the South section of the Villa de Reyes pipeline in Mexico. Turning to 2025, we expect to put $9 billion of assets into service at an average build multiple of about 8x. That figure includes our Southeast Gateway project in mid-2025, anticipated to add roughly $800 million in incremental annual comparable EBITDA, plus another $3 billion of assets on our U.S.

Joel Hunter

executive
#15

Within the Natural Gas Pipelines segment, a few of the projects are the Gillis Access Extension, Virginia Reliability, and Wisconsin Reliability. Given the market's volatility right now, I'd like to remind everyone how stable TC Energy's low-risk business model is. Our debt maturity profile is very manageable, and fixed-rate debt makes up 89% of our long-term debt portfolio, with an average maturity of 18 years and a weighted average pretax coupon of just over 5%. That largely shields us from interest rate movements. Rate-regulated frameworks also support our Canadian and U.S. natural gas businesses, and those frameworks further permit recovery of interest expense in tools. What that means is the cost of debt flows directly through in our regulated Canadian business and gets factored into U.S. rate cases. This has partly enabled us to raise the earned returns on our sanctioned capital projects in recent years and to maximize the spread against our cost of capital. Given our low-risk business model, together with net capital expenditures of $6 billion to $7 billion annually post-2024, we anticipate continuing to grow the business in line with our 3% to 5% dividend growth rate.

Joel Hunter

executive
#16

That's why, even with the difficulties the wider market is dealing with, I have confidence that our dividend can be sustained across every phase of the economic cycle, and one of the lowest payout ratios among our midstream peers gives it further support. A third quarter dividend of $0.93 per common share has been declared by TC Energy's Board of Directors, which works out to $3.72 per share on an annualized basis. Our dividend will stay foundational to the enduring value proposition of TC Energy, building further on 23 consecutive years of common share dividend increases. Thank you. I'll pass the call back to Francois.

François Poirier

executive
#17

Thanks, Joel. Ahead of moving into Q&A, I’d like to restate the value proposition we’ve held to for a long time. Each of our recent strategic announcements directly supports our 4 pillars. We adopt a long-term perspective, seeking the greatest synergies between our natural gas and power operations. At the same time, through the spin we intend to carry out, we are realizing the complete long-term potential of our liquids business. In addition, we remain disciplined and are sharpening our focus on the conservative risk preferences we have long established. We are rebuilding the strength of our balance sheet, and we are deploying capital thoughtfully, in a way that balances our capacity to grow the dividend, keep the balance sheet strong, and reinvest in the business. You’ll be hearing much more on this at our Investor Day on November 28th, and I hope you can join us. With that, I’ll hand things to the operator for questions.

Operator

operator
#18

<<operator_script>> Theresa Chen from Barclays has our first question.

Theresa Chen

analyst
#19

To start, I want to ask about how you intend to handle the Mexico exposure, the pro forma asset sales, and the South Coast spin, because you already have assets generating cash there, and by mid-2025, once Southeast Gateway is up and running and adding EBITDA, it would probably sit above that 10% exposure. What's your thinking on managing that? And any remarks on asset sales, particularly in that segment, would be great.

François Poirier

executive
#20

Thanks, Theresa. Francois here — I'll handle that question. Let me restate where we stand: our objective, and our commitment, is to complete $3 billion in incremental divestitures and bring in the cash proceeds from them during 2024. Some individual asset sales in the U.S. could form part of that effort. As for joint ventures, like the one we've done with GIP on our Columbia assets, we can also consider our Canadian and Mexico assets for transactions of that kind that are under consideration. Naturally, we'll be holding discussions with investors about our Mexico projects, weighing valuations against where things stand and how construction is progressing. We've committed to bringing our exposure down to a more manageable level. In time, we'll provide all of you with somewhat greater clarity and granularity regarding the percentage after the spin — and a percentage of what, exactly? EBITDA? Net assets? — since we're examining tools such as project financing. In fact, we've raised close to $4 billion in non-recourse debt across the past year, which funded roughly 2/3 of the Southeast Gateway project financing. So there's more to come on that front. And as I mentioned, we'll be exploring joint ventures in Mexico and Canada as possible tools for carrying out our $3 billion divestiture program.

François Poirier

executive
#21

What we're aiming for is bringing down how much of our total average comes from Mexico. And because of how delicate these discussions are, I think that's all we can say right now.

Theresa Chen

analyst
#22

Got it. Turning to the rest of the asset sales you still need to carry out, how are you weighing the economics in the current environment, given that some competitors recently announced they are putting their own assets on the market as well, and given some of the valuations recently paid for comparable assets in the value chains where you operate?

François Poirier

executive
#23

Yes. When you examine a number of those announced deals, my view is that the risk profiles vary quite widely. Because of that, the returns — the expected returns buyers have to be able to achieve — differ as well, and that feeds through into the purchase price. What I would say is that the interest rate backdrop remains the same as it was a few months back, when we announced the transaction with GIP. At that point, we did set the goal of announcing a very sizable transaction. Since we are now moving ahead with multiple transactions in order to reach the remaining balance of the $3 billion, I do believe that smaller bundles will generate more competitive tension. So even though the interest rate environment is similar, smaller assets mean more competitive tension. Then you also need to factor in that the assets we would offer, whether for partial or full interests, carry very low risk, are highly contracted, and have no commodity volumetric or price risk — and people will take that into account when they value those assets. But once again, as I said, we remain in the same interest rate environment as a few months ago.

François Poirier

executive
#24

So our plan, I'd say, is built on expectations that are fairly conservative.

Operator

operator
#25

Praneeth Satish from Wells Fargo has our next question.

Praneeth Satish

analyst
#26

Turning to capital, with CapEx held within a $6 billion to $7 billion band in '24 and later. My guess is you're getting pickier about which projects reach FID and perhaps rejecting certain lower-return ones. So could you help us grasp if a change has occurred regarding your company return target, which in the past sat in the 7% to 9% range, and whether it is moving upward?

François Poirier

executive
#27

Appreciate the question, Praneeth. What I'd say is that for the projects we've sanctioned, we've clearly witnessed a rising trend in IRRs. Obviously, since we're going to be high-grading, our opportunity set is substantially larger than that $6 billion to $7 billion a year. We're determined to stay within that figure. That gives us the ability, as you mentioned, to be somewhat more selective. And risk-adjusted returns will be one of the key criteria. If you go back to 2019 or around then, the projects we sanctioned that year sat in the 7% to 8% range, and over time that has gradually climbed to where, in 2022, we were sanctioning projects in the 9% to 10% range. In today's environment, we do keep seeing projects sanctioned within that range. That will move up or down depending on what share of the portfolio goes, say, into Canada Gas, where returns are somewhat lower, versus something like Bruce Power, where returns are higher. So on average, those returns have gone up, and through our commercial discussions with customers, we've managed to sustain the levels we've seen over the last year or so.

Praneeth Satish

analyst
#28

That's useful. Then, changing topics, I wanted to ask about the upcoming rate case for Columbia Gas in 2025. By our math, the ROE for Columbia Gas came in at just 10% according to the 2022 filings. So it looks like there may be some room there to potentially raise revenue in 2025. So I suppose, how should we think about the size of the next Columbia Gas rate case compared with the prior one, where you received, I believe, a $200 million step-up?

François Poirier

executive
#29

I’ll have Tina address that point.

Tina Faraca

executive
#30

Right now, a moratorium is in place that blocks any new rates from taking effect before April 2025. And as you might remember, there's also a comeback provision for new rates that kicks in on April 1, 2026. So when we file our next rate case, we'll be operating inside those limits. And clearly, we'll aim for a balance — recovering our capital, earning a fair return, and keeping rates competitive for our customers.

François Poirier

executive
#31

One more thing I'd like to mention here, Praneeth, and it just echoes what Joel said earlier: in the U.S., this is how we go about mitigating interest rate risk. Whenever we return for a rate case, we're able to fold the present cost of our debt into our rates. And the reason you're seeing us file rate cases more frequently throughout our U.S. system is that we want to reflect the capital -- the interest rate environment in which we're operating. But it's also because we're putting a considerable amount of maintenance capital to work, and we want to be sure we're earning a return on and of that incremental capital as well.

Operator

operator
#32

Linda Ezergailis with TD Securities has our next question.

Linda Ezergailis

analyst
#33

So with Coastal GasLink now mechanically complete ahead of schedule, I'm curious how we should think about your conversations with LNG Canada — perhaps around them acknowledging that early finish through some form of financial incentive, and Phase 2. How might the commercial assets for Coastal GasLink look different in Phase I? And just more broadly, your thoughts on the timeline for reaching FID on that, and what the main sticking points might be — including, maybe, how compression is powered on your system?

François Poirier

executive
#34

Appreciate the question, Linda. I’ll have Bevin handle the points regarding Phase 1 finishing ahead of schedule, and then Greg will take up your Phase 2 questions.

Bevin Wirzba

executive
#35

Yes. Thanks, Linda. Bevin here. First off, we're extremely proud to have reached this milestone. It reflects the team's unrelenting emphasis on safety, on safeguarding the environment, and on working alongside our contractors, Indigenous and local communities, and government to arrive at this point. So we take real pride in having hit this early mechanical completion — something we hadn't expected, but we're genuinely proud to be there. As for what comes next, we clearly have continuing commercial discussions with our contractors to ensure those contracts get closed out effectively. We have roughly 100-plus kilometers of reclamation work ahead of us next year, and the team is currently busy bringing natural gas into the system so it's ready for LNGC to call for that gas. We look forward to hitting that milestone by year-end — we'll be ready for our customer whenever they need it. When it comes to Phase 2 and those discussions, I'll hand things over to Greg.

Greg Grant

executive
#36

Yes. Thank you, Linda. Right now, I'd simply say that, as LNGC has asked, we're moving ahead with early development of Phase 2 so we can evaluate those expansion opportunities. So in early engineering, we're examining various possible electrification options. But there's still plenty of work ahead there when it comes to engaging with our local communities and indigenous partners. So it's quite early. You may be aware that Cedar is actually somewhat further along in the process toward completing Phase 1, where we've been working hard alongside our Cedar partners, which include the Haisla. This will be Canada's first LNG facility with indigenous majority ownership. We had been aiming for FID at the end of this year. We believe that could slip somewhat as we move into Q1. But I just wanted to remind you that, when it comes to our $6 billion to $7 billion capital commitment, our FID depends on TC securing project financing. That, together with our 35% equity ownership, would in the end mean TC needs a relatively modest amount of capital.

Linda Ezergailis

analyst
#37

Appreciate that background. As a quick follow-up on your CapEx: I know we'll likely receive a fuller update later this month, but for refreshing our model it would help to understand — given that some of the 2024 capital was pulled forward into 2023, though there are probably FX-related headwinds affecting 2024 CapEx — how should we frame your present outlook for 2024 growth CapEx on a gross basis, before any asset sales are netted out?

Joel Hunter

executive
#38

Yes, Linda — it's Joel. What I'd suggest is that you hold off until our Investor Day on November 28, since that's when we'll address the 2024 outlook for capital spending, on both a gross and a net basis. That said, let me remind you that after 2024, as we've consistently stated, we stick to capital discipline and keep spending at $6 billion to $7 billion per year post 2024. But there will be much more for you at Investor Day on November 28 regarding our 2024 outlook.

François Poirier

executive
#39

And one thing I'd tack on to that, Linda: the plan we have and the capital program we're putting together for 2024 do let us get under 4.75 debt-to-EBITDA by the end of the year and remain at that level going forward. But, as Joel mentioned, we'll have more detail in just a few weeks, and I appreciate the question.

Operator

operator
#40

We'll take our next question from Rob Hope at Scotiabank.

Robert Hope

analyst
#41

On the Q2 call, several organizational changes were announced. I’d like an update on how the reorganization has changed the organization, and also where we stand on the $750 million of synergies and how they are tracking overall and in 2023.

François Poirier

executive
#42

Thanks, Rob. This is Francois. I'll begin with a bit of background, and then hand things to Stan so he can speak to the details of your question. Just as a reminder, these initiatives and the thinking behind them have been in development for a couple of years. As for the initiatives on focus, we're genuinely at the implementation stage now. Combining our gas businesses into a single entity, along with the spin — those are efforts that have been set up and that the teams have been working on for quite a long time. So, Stan, over to you.

Stanley Chapman

executive
#43

Rob, our focus project — that's what we call the $750 million initiative — if you remember, is really about changing in a fundamental way the way our work gets done, especially when it comes to safety, operational excellence, and how we manage capital and costs, so that we deploy cash as efficiently as we can and stay competitive versus our peers. Just to give you a couple of proof points, on things like operational excellence and safety, we've simplified our operational management system, cutting more than 1,400 legacy requirements down to fewer than 100. That gives our field employees more time, so they can raise tool-in-hand time and become more productive at other things. On the capital and cost management side, we combined our 3 gas businesses under one leader. And we've identified roughly $750 million in run-rate synergies, to be delivered by the end of 2025. You can think of the value tied to those synergies as showing up in a couple of different ways. It could be capital reductions. It could be expense reductions, or even revenue enhancements. And broadly speaking, you could think of 50% of the savings coming from capital reductions, 40% from O&M reductions, and about 10% from revenues.

Stanley Chapman

executive
#44

Just remember that as we file rate cases in the various jurisdictions where we operate, a substantial portion of that value will return to our customers. If it would help, I can give you a few proof points showing how we arrive at $750 million. This year, calendar year '23, we expect to deliver $130 million in in-year savings, which annualizes to roughly $185 million. We achieved that through steps such as cutting our IS spend by $50 million in order to remove redundant or low-value projects. We have eliminated our technical center or folded it into the business. That produced $30 million in savings. We also brought down our legal costs and our insurance costs by $30 million. So there is considerable optimization on that front. Across the following 2 years, 2024 and 2025, we anticipate a further $200 million in savings, mainly in our growth capital programs, by, for instance, changing how we engineer our facilities and shrinking our footprint. An additional $85 million in reductions comes from our HIPE integrity program, along with $90 million in reductions to our maintenance capital projects, which will begin to materialize in 2024 and are already reflected in our 2024 forecast.

Stanley Chapman

executive
#45

When you consider the optimization that comes from how the organizational structure is designed, we figure there are likely around $50 million in synergies as we work through integrating and optimizing our gas businesses under a single umbrella.

Robert Hope

analyst
#46

Then perhaps we can shift to the NGTL system. A toll settlement runs through the close of 2024. When do you anticipate engaging with customers on that? Might we see a higher ROE there? And then how does that square with the possibility of a partner?

François Poirier

executive
#47

Greg, I’ll have you handle that question.

Greg Grant

executive
#48

Yes, thanks, Rob. So as a reminder, the NGTL settlement comes to an end on December 31, 2024. We've begun discussions with customers, and the goal is to lay out a clear path toward reaching another settlement by mid-2024. While we're keeping an eye on the market and on ROE — and as I just noted, ROE isn't the only value measure we consider — we're seeking to optimize the return on and of capital. There are plenty of levers available to accomplish that while still maintaining competitive tolls and service offerings. For instance, things like Project Focus are helping us keep toll increases to a minimum, which will let us enhance that return on and of capital. Obviously, we won't get into specifics of confidential negotiation, but we're highly confident we can find a win-win here with our customers, and we likely won't be able to share more details on that until Q1 and Q2.

Operator

operator
#49

Robert Kwan from RBC Capital Markets has our next question.

Robert Kwan

analyst
#50

Let me begin with the business side. You pointed to strong deliveries on the gas system and record deliveries in terms of the number of systems. There are a bunch of projects under construction, and you have some new regulatory approvals. I'm just wondering, looking ahead, as you consider the volumes on the system, are new projects taking shape? And if so, could you talk about how large that spending might be, and over what timeframe it might unfold?

François Poirier

executive
#51

Yes, Robert — Francois here, and thanks for raising that. I'll handle this one. Let me start by reiterating that our focus is razor-sharp on net spending of $6 billion to $7 billion annually once 2024 has passed. In our line of work, we're fortunate to have considerable visibility into capital expenditure essentially through the decade's end. Consider that commercial sanctioning of a project takes a couple of years, followed by another couple of years to secure the necessary permits and regulatory sign-offs. After that comes ordering the long lead items, and then you're looking at a year or 2 of construction in the field. So looking toward the decade's end, our aim isn't merely to stay inside that $6 billion to $7 billion range — it's also to avoid running more than one large project simultaneously. One of the main lessons we've drawn over these last couple of years is the importance of managing the aggregate risk of the capital program on an annual basis, rather than only the risk attached to individual projects. When we consider that program alongside our performance — and as I noted, a case in point is the $5 billion we've placed into service thus far this year, largely on budget — that amounts to singles and doubles.

François Poirier

executive
#52

From a risk perspective, those are quite manageable. The regulators are familiar to us, we have ties within the communities, and we understand the local terrain. So expect us to execute as many of those singles and doubles as we can moving forward—organic projects in corridor, plus a very select few among those bigger projects that would stretch across many, many years and involve large dollar amounts.

Robert Kwan

analyst
#53

All right, understood. So I suppose, just considering that CapEx change and the currency effect, have you had any discussions with the rating agencies about this yet, specifically regarding your FedEx rates hold? You'll receive your debt marks this year on December 31, but your EBITDA is going to lag. So do you believe that, just given some of the outlook — I mean, for 2024, you're still at 4.75 — does that alter anything for you here concerning the funding plan over the near term?

Joel Hunter

executive
#54

Yes, Robert. Joel here. What I'd tell you is that I spoke with each of the 4 agencies, which we do quarterly, just to bring them up to speed, and we gave them this update too. They're really focused on the end of next year when it comes to bringing our leverage metrics on-site down to that 4.75, as we've said, and we have a path to reach it, and we're staying with that plan. So even though the cost is a bit higher here—and what we're talking about is roughly a 4% increase from the midpoint, given the raise in our outlook for this year—we're also seeing stronger EBITDA, since you've seen us guide EBITDA to 7% higher year-over-year at the top end of the 5% to 7% range we highlighted. So, you know, heading into yearend, we don't have a—I can't tell you where debt-to-EBITDA will land, because there are still some moving parts with EBITDA, where CapEx ends up landing and where FX lands. But really, Robert, the goal here is to reach that 4.75 as we exit 2024.

Joel Hunter

executive
#55

Our roadmap for reaching that point is clear, the agencies are aware of what it entails, and we intend to stay the course.

Robert Kwan

analyst
#56

Okay, so to put it briefly, you're not anticipating any moves from the rating agencies as a result of today's change?

Joel Hunter

executive
#57

Obviously, we’re not able to talk with the agencies, but from what we’ve discussed, they’re quite happy with several accomplishments we’ve had this year. If you consider how we began the year, with our goals set at $5 billion in asset sales, we ended up completing $5.3 billion, moving forward on major projects such as CGL—getting that mechanically complete—Southeast Gateway progressing, and still delivering solid operational and financial results. So every one of our priorities for the year has been achieved, and they are certainly aware of that.

François Poirier

executive
#58

Yes. And again, Robert, I just want to emphasize that the boost to our capital program came about because one of the advantages of combining our gas businesses is that we now look at the portfolio as a whole and identify places where we can group work together and get it delivered more efficiently and at a lower cost, and we're going to do exactly that. That's the choice we made. That's the visibility an integrated gas business gives us. So with Coastal GasLink, we're also delivering our $5 billion of assets on plan. So really, this is about accomplishing more work in 2023 than we had planned to do, rather than any inflation effects on our projects or FX pushing the capital up. That said, our U.S. dollar program is what it is, so foreign exchange translation rate means there's no inflation effect, and the rating agencies know that.

Operator

operator
#59

Jeremy Tonet from JPMorgan has our next question.

Jeremy Tonet

analyst
#60

Let me begin with the asset sale program—if you wouldn't mind flipping back to that for a moment. On the $3 billion figure that's been under discussion, is there a possibility the number ends up bigger than that? And if it does, what would that figure be? When you think about asset sales or capital recycling going forward, is it mostly a matter of the rates of return you could get from incremental new growth projects versus the returns given up on asset sales? I was hoping you could give us a broader, more holistic view of how the asset sale program is working at this point.

François Poirier

executive
#61

Thanks, Jeremy. Like I mentioned earlier, we're holding firm at $3 billion for 2024. We won't be counting on a single transaction to bring in those proceeds. Instead, we'll be pursuing several transactions to get there. I believe it's sound practice for us to consistently maintain the discipline of marking our assets to market and rotating capital wherever that generates value for our shareholders. So past that $3 billion figure, you might see us act selectively down the road if an opportunity arises to put capital to work and proactively monetize assets ahead of schedule — ones we consider more mature or where we perceive some value. So it will remain a tool we use on an ongoing basis. For 2024, though, the emphasis is on $3 billion.

Jeremy Tonet

analyst
#62

Understood. And as we look ahead to the Analyst Day, I'm wondering whether you might share some thoughts at this point about key updates we should be watching for, or anything else you could offer right now?

François Poirier

executive
#63

My answer would be to wait and see. Look, what we're aiming for from here on out is getting back to no surprises. Simply execute well, stay within our means, show excellence in project execution, show operational excellence. And we take a lot of pride in what was achieved here in 2023. We'll be speaking with you about what the priorities for 2024 are going to be. But believe me, they're going to center on balance sheet integrity, operational excellence, and project execution excellence. And honestly, Jeremy, it shouldn't get any more exciting than that.

Jeremy Tonet

analyst
#64

That's useful. I'll stop at that point.

François Poirier

executive
#65

Absolutely.

Operator

operator
#66

Robert Catellier from CIBC Capital Markets has our next question.

Robert Catellier

analyst
#67

Could you walk us through the deal TC Energy signed with the SI-LSM LNG partnership regarding work on the Prince Rupert Gas Transmission project? Also, how hungry is the company to take on another big project of that kind, and how would that square with your deleveraging objectives?

François Poirier

executive
#68

Thanks, Robert. Francois here — I’ll handle that question. Look, we do have a permitted route, and we see real value in it. The SI-LSM’s Group has asked us to keep those permits in place, and that’s our contractual duty. We’re glad to do it, first because it gives our indigenous partners a chance to build value, and second because it gives our customers a chance to build value. As we move more egress out of the basin, the NGTL system becomes more valuable too. All of that works in TC Energy’s favor. I do want to be very clear, though: we are firm on our $6 billion to $7 billion. And if we cannot fit our PRGT project — or any project, for that matter — inside our portfolio, number one, and number 2, manage to have fewer large ambitious projects going forward, then if a project like PRGT can’t fit within those limits, no capital will be allocated.

Robert Catellier

analyst
#69

Alright, that makes sense. Then I just want to move ahead with a question for Joel. How do you view hybrids fitting into your funding plan — both for 2023 and for hitting your '24 goals? What's your appetite there, and what are you seeing in the market?

Joel Hunter

executive
#70

Yes, thanks Rob. So when it comes to hybrids, we aren't seeing anything and have no near-term plans. We're running pretty close to that 15% cap regarding our capital structure for this year and into 2024. Once the balance sheet grows after 2024, there'll be room for issuing hybrids down the road. But when we think about our 4.75 target for next year, that plan doesn't contemplate any additional hybrids at this point. Where we would look at hybrids is we'll work in conjunction with the Liquids team here, or the South Bow team as we now call it, to examine their capital structure where a need might exist for them. On pricing right now, it's kind of in the high eights, so that's roughly 200 basis points behind where we'd issue 10-year senior unsecured at this point.

Operator

operator
#71

Ben Pham from BMO has our next question.

Ben Pham

analyst
#72

Since Coastal GasLink isn't finished yet, does that create a surge of NGTL opportunities for you in the period after 2025?

François Poirier

executive
#73

Appreciate that, Ben. Greg, would you mind handling that question?

Greg Grant

executive
#74

Absolutely, and thanks for raising that, Ben. As you know, we've completed a significant amount of construction on the NGTL system over the past several years. Last year we brought on 1.3 Bcf. In a similar vein, we expect to add roughly an equivalent amount during this year. And I want to give a shout out to the team that was mentioned earlier — once again this year, on time and on budget performance. So there's a great opportunity there. Looking ahead, though, I'd say you should expect a more normalized level of spending on NGTL. We believe we're well positioned for the next few years given the expansions we've already completed. And we're putting a lot of effort through project focus and system optimization to determine what additional capacity we can extract from existing assets without capital. But we're in a great position to handle the expansions going forward.

Ben Pham

analyst
#75

All right. Now for my follow-up — I understand you brought up the matter of returns and getting the most out of them within the NGTL system. Are there any considerations or drivers behind promoting team equity in the pipeline, so that you could capture additional cash while bringing down leverage at the same time?

François Poirier

executive
#76

Ben, we are at the beginning of a negotiation process with our customers. As Greg mentioned, we will be providing some feedback and color as next year proceeds. At this point it's too early to give any indication as to where those discussions are heading. But whenever we can, we will be sure to provide some color to our shareholders and to other stakeholders.

Operator

operator
#77

Brian Reynolds from UBS has our next question.

Brian Reynolds

analyst
#78

Perhaps I could ask a follow-up regarding Coastal GasLink. It's encouraging to hear about mechanical completion. So looking toward next year's earnings expectations, I'm just curious how we ought to consider the EPS or EBITDA contribution tied to that asset, given that LNG Canada won't yet be operating. Does LNG Canada reimburse TC for maintenance expenses? Or is there some sort of regulated return framework built into the arrangement? I'm simply wondering how we should think about Coastal GasLink earnings prior to LNG Canada coming online, hopefully in '25.

François Poirier

executive
#79

Thanks, Brian. I'll get us started — this is Bevin. As you'd understand, LNG projects take quite a while to commission and bring into service, even along the Gulf Coast. So our part is done: we brought the project in on time and by the end of the year. Now it's a matter of watching how LNGC moves forward. They're advancing well, but my expectation is that a substantial portion of next year will be spent in the commissioning process.

Joel Hunter

executive
#80

Brian, Joel here — just one more thing to add. As we think about what CGL gives back to us, first, our stake today is 35%, and that could drop to 25% should First Nations exercise their 10% option. So obviously our ownership position in the project isn't a large one. And regarding how much we've had to impair against this project, it was roughly $3 billion last year and just over $2 billion this year. From that you can infer that a meaningful return on this project going forward isn't in the cards for us. The main objective was really getting the project finished on the revised budget and on schedule. That mattered critically to us, and safely, obviously. But if we look at how much incremental equity income this investment would produce, it won't be all that significant.

Brian Reynolds

analyst
#81

Okay, shifting over to the South Bow COO, and this is a two-part question. First, could you talk about how the discussions with the agencies are progressing regarding investment grade? In the slide deck, you made some reference to managing a certain amount of floating interest rate exposure, and I'm curious whether 5x remains the target the agencies are looking for. Then for the second part, regarding the SpinCo: it appears you've reaffirmed 2% to 3% DPS growth from the spin, yet only about $200 million in secured capital backlog exists at present. Obviously, the companies will separate and each will be able to chase different opportunities. So I'm curious whether you could sensitize what that secured capital backlog at the Liquids company might look like following the spin?

Joel Hunter

executive
#82

Brian, this is Joel. I'll handle the first portion of your question, and then Bevin will take over. Once more, we're collaborating closely with Bevin's group to assist with their financing. What I'd tell you is that there has been no change since our previous update at the end of July, when we approached the agencies with the deemed capital structure we had in mind and received an indicative rating at that time—one that would sit at investment grade on the basis of approximately 5 turns of leverage. So as of right now, nothing has shifted. We'd anticipate returning to the agencies at some point around late winter or early spring, as we complete the work on the capital structure for South Bow and obtain firmed-up ratings, after which South Bow would seek, once the spin has been approved, to begin putting that capital structure in place at that time. But let me remind you that the essential point here is that South Bow is going to carry an investment-grade rating, regardless of anything else.

Bevin Wirzba

executive
#83

And Brian, let me take the second part of your question. It's Bevin here. As a quick reminder, the value proposition we're after is double-digit total shareholder return for our investors. That consists of a high-yield piece delivered through a highly sustainable dividend, supported by best-in-class contracts and the connectivity of our quarter running from the best supply basin to the strongest demand. That dividend, combined with the 2% to 3% growth you mentioned, comes from 2 points. First, it stems from operational and commercial excellence across our current systems. Over the last 3 years, you've heard us raise the bar on our system operating factor by nearly 10%. We see a tremendous amount of further opportunity to grow our EBITDA through our existing systems without capital. A proof point is that we've delivered all our contracts even subject to the derate this past year. The second lever for growth is very low capital investment opportunities surrounding our corridor. A great example is the Port Neches Link asset that we placed into service this year on time and on budget. It has attracted a tremendous amount of flow, again enhancing the value of our Marketlink system.

Bevin Wirzba

executive
#84

We think we can see a path to several of those kinds of capital opportunities, and they do more than support our 2% to 3% growth, while carrying very little execution risk. The third element of our value proposition, however, is that when it comes to capital going out, we will preserve the capacity — which connects to your first question about the strength of our balance sheet — to keep delevering. Keeping a very strong balance sheet at South Bow is essential. So hopefully that answers your question.

Brian Reynolds

analyst
#85

Yes. It does seem like there are quite a few build-type projects with low multiples ahead of us. So I'm eager to hear more about that at the Analyst Day in a few weeks. Enjoy the rest of your morning.

Bevin Wirzba

executive
#86

I appreciate that, Brian.

François Poirier

executive
#87

I believe we can take just one additional question, please.

Operator

operator
#88

The next person to ask something is John Mackay of Goldman Sachs.

John Mackay

analyst
#89

I guess I'd like to begin by talking about how Unit 6, Bruce, came online somewhat ahead of the planned date. Is there any read across to the rest of the MCR program, and perhaps anything that might translate into lessons for potentially moving ahead with Bruce 6?

François Poirier

executive
#90

Yes, this is Francois, and I’ll begin, after which I’ll have Annesley complete the question. First, we feel a great deal of pride in how Unit 6 was executed. That effort included more than 100 force majeure days amid COVID. As a result, that asset came in ahead of schedule and according to plan, and we’re very proud of how it was carried out. And naturally, we’re also in a solid position on Unit 3, which sits in the early stage of its program, but I’ll turn it over to Annesley for additional detail.

Annesley Wallace

executive
#91

Okay. So for the near term, we're definitely concentrating heavily on carrying out all six of those major component replacement projects really well. Unit 6 coming in ahead of schedule and within budget definitely boosts our confidence about executing the rest of the units. The scope of work is mostly the same. So having one fully finished and returned to service gives us far more insight when it comes to planning and optimizing how we handle the remaining projects. Regarding your question about future newbuild at the Bruce site, it's still very early days. As we've mentioned, our near-term focus is going to be on delivering the refurbishment program that already exists, and that's where capital spending will be directed. We support Bruce Power beginning initial investigation into what a new build, Bruce C, would look like. That comes on the back of very strong policy support in Ontario. So we're working closely with the government, really just to explore what the possibilities could be at this point.

François Poirier

executive
#92

And John, just to remind you and everyone else listening, as we set out during our Sustainability Day at Bruce earlier this year, through a mix of price increases and by steadily returning more units to service through the end of the decade, we expect a fairly significant rise in profit before tax from Bruce, which gets consolidated into our EBITDA.

John Mackay

analyst
#93

Thanks for that. Perhaps just one final brief item, sticking with projects that may be dated a bit later. It appears that for Ontario Pump Storage, the FID timing is perhaps 25 rather than 24 previously. And I believe we were anticipating some kind of regulatory update toward the end of this month. Could you perhaps just comment briefly on those 2?

Annesley Wallace

executive
#94

Appreciate the question. This is Annesley. Work on the Ontario Pump Storage project keeps moving forward. It's something we're enthusiastic about. Once more, Ontario offers quite robust policy backing for this initiative. We also expect — and it would be a prerequisite for us to proceed — a commercial structure subject to rate regulation, which gives us a solid framework as we move forward. Should we go ahead, and you're correct, we do expect input from the government prior to the close of this year, a final investment decision would probably not come until some point in 2025, and significant CapEx would arrive even later than that, by the time we reach any substantial construction phase.

Operator

operator
#95

That wraps up the question-and-answer portion, everyone. Should anything else come up, you can reach out to Investor Relations at TC Energy. At this point I'll hand things over to Gavin Wylie. Go ahead, Mr. Wylie.

Gavin Wylie

executive
#96

Yes. Thank you, and I appreciate all of you joining us this morning. As Ariel said, should you have any questions, or if we didn’t reach yours, please get in touch with the Investor Relations team. We’re always glad to assist. We truly value your interest in TC Energy, and we look forward to our next update. Thanks once more.

Operator

operator
#97

That brings us to the end of today's conference call. Your lines can be disconnected at this point. We appreciate your participation, and we hope the rest of your day is pleasant.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TC Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to TC Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TC Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.