TC Energy Corporation (TRP) Earnings Call Transcript & Summary

February 16, 2024

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 63 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line. I'm the conference operator, and I'd like to welcome you to TC Energy's 4th Quarter 2023 Financial Results Conference Call. Please note that everyone attending is in listen-only mode and that this call is being recorded. Following the presentation, you'll have a chance to ask questions. If you'd like to enter the question queue, press * then 1 on your phone's keypad. If you need help at any point during the call, you can alert the operator by pressing * then 0. At this time, I'll hand the conference over to Gavin Wylie, Vice President Investor Relations. Please go ahead.

Gavin Wylie

executive
#2

Thank you so much, and good morning everyone. It's my pleasure to welcome all of you to the conference call for TC Energy's fourth quarter of 2023. With me today are François Poirier, our President and Chief Executive Officer, and Joel Hunter, Executive Vice President and Chief Financial Officer, as well as other members of our senior leadership team. François and Joel will kick things off this morning with some commentary on our financial results and operational highlights. You can find a copy of the slide presentation that will accompany their remarks on our website in the Investors section. After they speak, we'll open things up for questions from the investment community. We ask that you limit yourself to two questions, and if you're a member of the media, please reach out to our media team. Before François begins, I'd like to remind you that today's remarks will include forward-looking statements that are subject to important risks and uncertainties. For more information, please see the reports filed by TC Energy with Canadian securities regulators and with the U.S. Securities and Exchange Commission. Finally, during the presentation, we'll refer to certain non-GAAP measures that may not be comparable to similar measures presented by other entities. These measures are used to provide additional information on TC Energy's operating performance, liquidity, and its ability to generate funds to finance its operations.

Gavin Wylie

executive
#3

In the presentation's appendix, you'll find a reconciliation covering the different GAAP and non-GAAP measures. So with that, I'll hand things over to François.

François Poirier

executive
#4

Thanks, Gavin, and good morning, everyone. As we entered 2023, we laid out 3 priorities that were clearly defined, centered on getting the most value from our assets, executing projects, and strengthening the balance sheet, and I'm happy to say we came through on each of those commitments. Our emphasis on safety and operational excellence produced high availability along with several utilization records throughout our systems, which helped make 2023 Comparable EBITDA 11% higher than 2022 — yet another record year for both operational and financial results. We also announced that we intend to spin off our liquids pipelines business, creating two standalone investment-grade companies with more flexibility to pursue distinct strategies aimed at unlocking their full potential and delivering incremental long-term shareholder value. Our project execution focus led us to place roughly CAD 5.3 billion of projects into service on budget, and our major projects, including CGL and Southeast Gateway, stayed on track or ahead of our 2023 targets. We committed to strengthening the balance sheet through capital rotation and successfully completed the sale of a non-controlling interest in our Columbia pipelines, with cash proceeds totaling CAD 5.3 billion, which cut our 2023 debt-to-EBITDA leverage metric by more than 0.4 times — a major step toward our 2024 year-end objective of 4.75 times debt-to-EBITDA.

François Poirier

executive
#5

With that positive momentum carrying into 2024, we've raised our dividend for a 24th year in a row and we're reaffirming our 2024 comparable EBITDA outlook of between CAD 11.2 billion and CAD 11.5 billion. Now, following five years of construction and 55 million hours worked, we reached the monumental milestone of mechanical completion on Coastal GasLink. This ranked among the most technically challenging pipelines ever constructed in Canada, and our team brought project execution and safety excellence to bear in delivering it ahead of our year-end target. After mechanical completion, we safely finished the required commissioning process in 2023, and we're now ready to deliver natural gas to LNG Canada's facility as soon as they are ready to receive it. In recognition of the team's monumental efforts in achieving these milestones, TC Energy, as the project developer, earned a CAD 200 million incentive payment, which was settled through a cash distribution earlier this week. Post-construction and reclamation activities will carry on throughout 2024, with the project remaining on track with its cost estimate of approximately CAD 14.5 billion. The success of this project matters not only for TC Energy and for our customer, LNG Canada. It's a nation-building project that will give Canada its first direct path for sustainably produced Canadian natural gas to reach global LNG markets.

François Poirier

executive
#6

Down in Mexico, we’re seeing meaningful progress on the Southeast Gateway marine pipeline. During the 4th quarter we hit a milestone by starting offshore pipe installation on that project. At this point, 100% of the concrete weight coating has been finished across all the offshore pipe, and the rest of the offshore pipe installation work will carry on through this year. And with every critical construction permit now in hand, onshore construction at all landfall sites keeps moving forward on plan. Importantly, the project remains on schedule and on expected cost of $4.5 billion, as we keep seeing the benefits of sanctioning it under our enhanced capital allocation governance process, which included a Class III estimate before our final investment decision. Now, although our utility-like assets carry no material volumetric or commodity price risk, continued high utilizations throughout the 4th quarter keep reflecting volume growth and the incremental demand for our services that underpins our future investments. Inside our integrated natural gas business, total NGTL system deliveries in Canada averaged 14.5 BCF a day, while our investment base grew by 9% year-over-year. In the U.S., various pipelines achieved record throughput volumes, including our GTN system, which hit an all-time delivery record of 3.1 BCF in November.

François Poirier

executive
#7

Daily throughput on our Mexico pipelines also came in higher, at an average of 2.7 BCF per day — a 30% increase over the levels seen in the 4th quarter of 2022. Within power and energy solutions, operational excellence means keeping our assets ready to supply power at the moments of greatest need. The Alberta Cogen Power Fleet posted 99% availability in the 4th quarter, and Bruce Power turned in a solid performance as well, averaging 92% availability across 2023, comfortably ahead of our historical averages. After its major component replacement outage, Bruce Power's Unit 6 came back into commercial operation in 2023, finishing ahead of schedule and within budget. Bruce also filed its final basis of estimate for the Unit 4 MCR with the IESO during the 4th quarter, and last week we received the IESO's approval. Unit 4 is the third of six units in the Bruce MCR program, through which we are extending the asset's life for another 40 years. This outstanding emissionless asset generates 30% of Ontario's electricity. Turning to South Bow, Bevin and the team keep advancing the proposed spin-off of our liquids pipelines business into a standalone investment-grade entity. Van Dafou has been appointed incoming Senior VP and CFO.

François Poirier

executive
#8

Bringing more than 30 years of energy-sector experience, among them 8 years as CFO of a publicly traded company, Van will play a key role in guiding South Bow's finances and strategy. In addition, Lori Marotta has been appointed incoming Senior VP and General Counsel. Lori will be responsible for South Bow's legal, compliance, and regulatory work, and she brings more than 20 years in the energy industry along with 30 years in total spent practicing law. As for next steps, we anticipate filing our proxy circular during the first half of this year, and we continue to expect a shareholder vote by mid-year. We expect to hold our AGM at the same time as the shareholder vote on the spin-off transaction. I'll now hand the call over to Joel.

Joel E. Hunter

executive
#9

Thanks, François. Solid operational results in the 4th quarter produced 16% year-over-year growth in Comparable EBITDA. The main factor behind that growth is higher Comparable EBITDA from our Canadian natural gas pipelines business, mostly tied to recognition of a CAD 200 million incentive payment after certain project milestones were met on Coastal GasLink. That amount was settled via a cash distribution on February 12, 2024, and it was recorded as income from equity investments in our consolidated income statement for the year-ended December 31, 2023. I'll point out that even without the CAD 200 million incentive payment, we achieved roughly 8% growth in Comparable EBITDA compared with 4th quarter 2022. As François noted, our base business did exceptionally well in the 4th quarter, and across 2023 our team safely brought approximately CAD 5.3 billion of projects into service on budget. We also posted a 24% rise in quarterly comparable earnings versus last year. That mainly came from higher comparable EBITDA, partly offset by greater interest expense and higher net income attributable to non-controlling interests after the Columbia sale in 2023. Looking to 2024, we anticipate comparable EBITDA in the range of CAD 11.2 billion-CAD 11.5 billion, in line with what we announced at our November 2023 Investor Day.

Joel E. Hunter

executive
#10

The main driver of this growth is an expansion on the NGTL system, the full-year effect of projects that went into service during 2023, and roughly CAD 7 billion in new projects we expect to put into service this year. Comparable earnings per common share should come in below 2023, mostly because of greater net income attributable to non-controlling interests tied to the Columbia sale. We expect total net capital expenditures this year to land at about CAD 8 billion-CAD 8.5 billion. Now I'll go over a few highlights from our 2024 outlook. In our integrated natural gas pipelines business, comparable EBITDA should hold steady in Canada thanks to continued growth of our NGTL system, partly offset by the absence of the Coastal GasLink incentive payment that was recognized this year. It should be higher in the U.S., largely because of assets placed in service in 2023 and projects we expect to place into service in 2024, including Gillis Access and GTN Express. And it should be higher in Mexico, with growth underpinned by a full year of incremental revenue from the VDR Lateral that was placed into service in Q3 2023. With Bruce Power Unit 6 having returned to service, comparable EBITDA from our power and energy solutions business is also expected to rise relative to 2023.

Joel E. Hunter

executive
#11

Excluding any effects tied to the proposed spin-off, comparable EBITDA for the liquids pipelines segment should come in line with 2023. As we presented during Investor Day, and leaving out the liquids pipelines contributions that appear on the left side of this slide, comparable EBITDA through 2026 should land between CAD 11.2 billion and CAD 11.5 billion. The growth through 2026 rests on top-quality assets that we expect to bring into service, and it is further backed by the heavily rate-regulated, long-term contracted character of our operations. I would point out that our recent announcements concerning the Heartland project and Bruce Unit 4 MCR were factored into the net capital expenditures outlook we gave at Investor Day. Those projects leave intact our pledge to cap net capital spending at CAD 6 billion to CAD 7 billion, leaning toward the lower end in 2025 and beyond. Turning to the right side of this slide, South Bow's longer-term outlook likewise stays in line with what Bevin presented at Investor Day. The South Bow team anticipates comparable EBITDA growth of 2%-3% on average through 2026, producing low-risk, double-digit returns for shareholders. Bevin and his team intend to have most, if not all, of the capital structure finalized ahead of the spin-off, contingent on a successful shareholder vote.

Joel E. Hunter

executive
#12

The money we expect to raise from the senior and subordinated debt that was issued at South Bow is going to be used to pay down roughly CAD 8 billion of TC Energy debt and to help cover future funding needs. With last year's strong performance as our foundation, TC Energy's board of directors has declared a first quarter 2024 dividend of CAD 0.96 per common share — the same as CAD 3.84 per share on an annualized basis — which works out to a 3.2% year-over-year increase. That marks the 24th consecutive year in which the board has raised a dividend, and that is foundational to the enduring value proposition of TC Energy. Thank you, and I'll pass the call back to François.

François Poirier

executive
#13

Thanks, Joel. In 2023 we achieved considerable success by concentrating on a well-defined group of priorities that tie directly to our strategic vision and value proposition. So for 2024, it should come as no surprise that our strategic priorities will look much like those of 2023. First, we'll keep maximizing the value of our assets through safety and operational excellence and by successfully carrying out the South Bow spin-off. Second, we'll stay focused on project execution, delivering on time and on budget, including Bruce Power's MCR 3, and advancing Southeast Gateway's mechanical completion by the end of 2024. And third, we'll continue on our path toward achieving and sustaining our 4.75 debt to EBITDA upper limit by the end of 2024 by moving our divestiture program forward and continuing to streamline the business through our efficiency efforts. By executing on our high-quality secured capital program, we expect to deliver 2024 comparable EBITDA of CAD 11.2 billion-CAD 11.5 billion and incremental long-term value for our shareholders. With that, I'll hand it over to the operator for questions.

Operator

operator
#14

We’ll begin the question-and-answer portion now. If you’d like to get into the queue, press * and then 1 on your phone’s keypad. A tone will sound to confirm your request. Kindly keep it to 2 questions, and if you have more, please join the queue again. Should you be on speakerphone, lift your handset before you press any keys. To take your question back out, press * and then 2. Our first question is from Rob Hope at Scotiabank. You may proceed.

Robert Hope

analyst
#15

Morning, everyone. We’ll take questions on Mexico now. More than 50% of the spending on Southeast Gateway has already gone out. When we look ahead to 2024, which key milestones should we be tracking? What would you call the biggest risk factors, and where does spend stand? Have contingencies there risen at all?

Stan Chapman

executive
#16

Morning Rob, Stan here. Just as François mentioned, there's been no shift to either our cost or our schedule, and we remain on track for the $4.5 billion cost estimate and the summer 2025 in-service date. Roughly $2.5 billion has been spent so far. This year we'll spend another $1.5 billion, and around $500-$600 million will go toward closing things out in 2025. A few highlights. As of earlier this week, we've laid about 225 kilometers, which comes to about 34% of our subsea pipeline in the Gulf of Mexico. Onshore work is coming along nicely at all three of our landfalls. In fact, at Paraíso, we actually finished our drill last week, on time and on schedule. The micro tunnel we're building in Coatzacoalcos should be done sometime by the end of this month. So looking ahead, when I think about the next milestones, the deepwater portion of the subsea pipeline should be fully complete by early summer. The shallow water tie-in work should wrap up by the end of the summer, and then the compressor work will be finished this fall, so that we can then turn our attention to commissioning activities and put the project in service for summer 2025.

Stan Chapman

executive
#17

At this point, capital costs remain unchanged and contingencies remain unchanged, but the project is coming along well, just as planned.

Robert Hope

analyst
#18

Great. Staying with Mexico for a moment, has anything new come up in your thinking about how to reach that 10% Mexico EBITDA limit, and would you call this a near-term goal or more of a longer-term one, or is there somewhere we might get a bit more clarity on that?

Bevin Wirzba

executive
#19

Rob, François is going to handle that one. As we've mentioned previously, we're still dedicated to bringing down our exposure measured as a percentage of consolidated EBITDA. That 10% threshold applied before the spin. After the spin, assuming things go well, it will likely be closer to the 12% range. We're looking at a range of different paths to start bringing that exposure down. We're ready to do a transaction in 2024, but we won't sacrifice shareholder value in order to make it happen. Construction at Southeast Gateway is moving along well, so we'll take our time, proceed in an orderly way, and plan to bring it down to that 10%-12% level over the next two or three years.

Robert Hope

analyst
#20

I appreciate that.

Operator

operator
#21

Our following question is from Theresa Chen at Barclays. You have the floor.

Theresa Chen

analyst
#22

Good morning. Perhaps building on that final point and turning to the wider divestiture program—since you're aiming to meet your target by the close of this year—could you share any news about how further asset sales are coming along in 2025, plus what happens next, when deals might land, how big they could be, and so on? Anything we might factor in there.

François Poirier

executive
#23

Theresa, we’ve got several processes in the market at the moment, so I’m going to keep my deal discipline as much as I can while still trying to be helpful here. As we’ve said before, we aren’t aiming to reach that $3 billion through one transaction the way we did last year with the very large GIP transaction. Instead, picture us completing somewhere between, say, two and four transactions to hit that $3 billion figure. Smaller deal sizes like those generally broaden the buyer pool, since more parties are able to write checks of that size. So we’ve seen solid interest across the various processes we currently have underway. These processes tend to move at their own natural pace and cadence. We hope we can make at least one announcement during the first half of the year. That said, we will remain disciplined and make sure we preserve value for our shareholders.

Theresa Chen

analyst
#24

Appreciate that. Now, regarding South Bow and the growth expected after the spin to support its own deleveraging—when we consider the possible upside for MarketLink ahead, given all the moving parts in that mid-continent or Permian-to-Gulf Coast region. You've got some competitors adding capacity, others with contracts rolling off soon, and still others switching crude back to NGL service or the reverse. Against that backdrop, how should we view MarketLink's potential earnings expansion?

Bevin Wirzba

executive
#25

Theresa, it's Bevin here. You've essentially just laid out the rationale for the spin. South Bow has a huge chance to serve the enormous demand we keep witnessing along the Gulf Coast. During the back half of 2023, we saw more than 150,000 barrels of extra demand on our MarketLink system, and that let us support over 200,000 barrels per day of added contracts on MarketLink through the rest of the year. As a result, we pulled some of the growth we had expected in 2024 forward into 2023. Much of that, as I've mentioned before, came from the fingers and toes strategy. We added the Port Neches Link last year, on time and on budget, and it started seeing steady flows, giving those MarketLink customers that extra outlet. Beyond that, we gained the ability to reach tidewater. As you noted, many parties are offering various forms of tidewater access. We now have six terminals that can deliver that capability to our customers. Our South Bow approach is to make the most of that pre-capitalized Gulf Coast system, and we're also seeing comparable opportunities in Alberta, where we have an underutilized — we've already capitalized our Grand Rapids system, for instance, and adding more volumes to it is highly accretive.

Bevin Wirzba

executive
#26

That, in turn, is what supports our capacity — through our own capital structure — to pursue those opportunities, and that represents a genuinely strong opportunity for our shareholders.

Theresa Chen

analyst
#27

I appreciate it.

Operator

operator
#28

Our following question is from Praneeth Satish at Wells Fargo. You have the floor.

Praneeth Satish

analyst
#29

Thanks. Good morning. Perhaps I could return to the asset sales briefly. I'm just curious about the way the interest rate environment might affect when asset sales happen across the rest of the year. I mean, I know you said you expect potentially to transact at least 1 deal in the first half of this year, but I believe the general consensus is that interest rates will decline over the balance of the year. So does that make it more favorable to perhaps wait until the latter half of the year before announcing additional asset sales? Just curious for your thoughts on whether that changes how you perceive the cadence of sales.

François Poirier

executive
#30

Thanks, Praneeth. That's a good question. Like I mentioned when Theresa asked earlier, deals like these usually follow their own rhythm, and momentum can carry a lot of weight. There's no doubt that in today's climate—especially if you're looking at financial buyers—the rate environment out there does affect valuation. We're staying very disciplined about this. There's no hurry on our side. The agencies have told us we have until the end of 2024 to bring debt to EBITDA under the upper limit of 4.75, and we intend to take our time. And we're well aware that if monetary policy begins to loosen in the second half of the year, that could work in our favor. That said, our top priority is to reach at least $3 billion in divestitures, and to get there by the end of the year. We won't do any fire sales, but if we see fair value today, we'll act on it.

Praneeth Satish

analyst
#31

Understood, thanks. Gas deliveries to power plants appear to have hit another record. I'd like to know how much of that increase stems from data center demand, since that seems to be rising considerably, and whether any data centers have approached you directly about gas supply — perhaps to fuel Cogen units and bypass the grid.

Stan Chapman

executive
#32

Hi Praneeth, Stan here — I’ll handle that question. Data centers, as you’re aware, are typically very demanding consumers requiring a steady, dependable power supply, the kind natural gas delivers. We’re currently reviewing multiple possibilities throughout our service territory. These include certain of our smaller pipelines in the West, chances within the Columbia system in Virginia, and perhaps most recently at A&R, where our Mount Pleasant, Wisconsin assets will indirectly supply Microsoft’s new data center through a local distribution company situated between us and them. So indeed, this represents a demand source that keeps growing, something we’re keenly conscious of and anticipate benefiting from going forward.

Praneeth Satish

analyst
#33

I appreciate that.

Operator

operator
#34

Our following question is from Jeremy Tonet at JPMorgan. You have the floor.

Jeremy Tonet

analyst
#35

Hello there, and good morning to everyone.

François Poirier

executive
#36

Morning, everyone.

Jeremy Tonet

analyst
#37

I’d like to add a bit more on the LNG outlook as well. Given the moratorium in the U.S., I’m curious what you think about how things are positioned for West Coast Canada—future growth and potential expansions at those facilities. It seems that, with the cost that’s gone into those facilities overall, economies of scale would point toward additional expansions. I’m just wondering how you view the North American LNG export outlook ahead and what impact that has on TRP.

François Poirier

executive
#38

Let me begin with the big picture, Jeremy, and then I'll have Stan add some more detail. Look, we're the only gas transmission company with a dominant footprint across all three countries, and we can reach every shore of North America. So as our customer, LNG demand growth is going to be a major source of our growth going forward. You're right. Brownfield economics typically beat greenfield economics all day long. So in places where we already serve LNG export, we see opportunities for us to grow throughput. And Stan, over to you for a little more detail.

Stan Chapman

executive
#39

Yeah. Hey, Jeremy. To expand a bit on that point, from a macro standpoint, the U.S. is exporting roughly 14 BCF of LNG right now. By the end of the decade, we expect that figure to climb to more than 30 BCF throughout all of North America, with perhaps 3 to 4 BCF supplied by Canada and 2 to 3 BCF supplied by Mexico. You also brought up the moratorium, or the stay, and I'll offer a few points on that. To begin with, roughly 20 projects sitting in the approval queue are affected by the stay, though projects that already have approval are unaffected. That means projects such as our Gillis project, scheduled for in-service later this year, and our East Lateral Express project, scheduled for in-service in 2025, will not be affected. As things stand, our assets carry about 25% of deliveries to LNG terminals, and those two projects will only strengthen that share further. On a broader level, though, what I'd highlight is the diversity of our pipeline network throughout North America, which ranks among our greatest strengths. And we expect demand for our assets to remain strong across the LDC, power generation, and LNG export sector.

Stan Chapman

executive
#40

And if a halt to U.S. LNG exports were to drag on for a considerable stretch, the geographic variety our pipelines give us could very well open up chances in both Mexico and Canada. In fact, only a few weeks back, we heard Canada’s Energy Minister, Wilkinson, voice precisely that view.

Jeremy Tonet

analyst
#41

Understood — that's really useful. And Stan, perhaps you could say a bit more about what lies ahead for the U.S. gas pipe network. I'm curious, when it comes to growth down the road, where do you expect the greater share of it to originate? Is it mainly additional bolt-ons of this type, or might there be room for larger brownfield expansions, or perhaps even greenfield projects, in light of rising peaking demand for natural gas throughout the U.S.?

Stan Chapman

executive
#42

Once more, because of the best-in-class footprint we have, we will exploit in-corridor expansions as much as we can. So a lot of greenfield expansions is not something I expect from us. That is especially true since it makes permitting and construction more difficult. But I keep highlighting for you the expansion in the power generation sector. Our Heartland project, announced just today, is one more illustration of this: coal-fired power generation is being retired, energy demand keeps rising, and our assets are uniquely placed to close that gap. So expansion in power generation, expansion in LNG exports over the longer term, plus greater connectivity with our LDC customers, I believe, will be the primary drivers for our U.S. pipes. Understood. Thanks for that. I'll stop there. Thank you.

Operator

operator
#43

Linda Ezergailis from TD Cowen has the next question. Go right ahead.

Linda Ezergailis

analyst
#44

Thank you. I was just wondering whether you could share any update on the progress you're making with your productivity and cost-effectiveness initiatives in the natural gas business. Where do you stand when it comes to identifying opportunities and putting them into practice?

Stan Chapman

executive
#45

Yes. Hello, Linda. Stan here. What you're mentioning, I believe, relates to the initiative we refer to as Project Focus. As you might remember, its whole purpose is value creation through a fundamental shift in how our work gets done in the areas of safety, operational excellence, and cost and capital discipline. A target run rate of roughly CAD 750 million in efficiencies, to be achieved by the close of 2025, was announced by us last year. You can view that as consisting of items such as capital reductions, expense reductions, and revenue enhancements. By the close of last year, we had in fact captured and implemented run rate efficiencies totaling approximately CAD 230 million. Another CAD 270 million in efficiencies is what we expect to deliver by the end of this year. A cumulative figure of about CAD 500 million will be reached, and the remaining portion of the CAD 750 million is going to be generated during 2025. Progress, I would say, is coming along well and is on track with the plan.

Linda Ezergailis

analyst
#46

Thank you. And perhaps, as a broader follow-up, given that you have many priorities, I wonder whether you might also provide a regulatory update on how you are thinking about any significant natural gas pipeline filings, any settlements, and—with the backdrop of the Chevron Doctrine being challenged—how that may influence the way you approach your regulatory relationships. I mean, it has been quite foundational for agencies to be able to interpret any ambiguous statutes in the U.S. and for courts to defer to that. And if that is discarded or clawed back, any early thoughts at all on how that might shift your approach to managing your regulatory relationships and strategies.

François Poirier

executive
#47

Linda, I'll begin and then hand things to Stan for additional detail. At a high level—taking a step back to 40,000 feet—we've been quite successful in securing permits for our projects. In fact, we just obtained FERC approval for a project of ours in Virginia roughly four months ahead of schedule. That will let us speed up some of our capital spending, producing incremental EBITDA sooner than anticipated, and it will enhance the project's IRR. Broadly speaking, as you're aware, we're allocating more capital toward maintenance given how heavily utilized our assets are. So our strategy for reducing regulatory lag in the United States is to keep filing rate cases more often wherever permitted. Naturally, we'll move forward on that front with Columbia in 2025. Regarding the Chevron Doctrine and certain other specifics, I'll turn it over to Stan.

Stan Chapman

executive
#48

Yeah. Linda, maybe I'd start by noting that since we—both as an industry and as a company—are putting big, long-term dollars into energy infrastructure that's critically needed, having predictability and stability across the regulatory, judicial, and legislative processes matters a great deal to us. Absent something unforeseen, I honestly don't anticipate any drastic shifts in how we file and prosecute rate cases, for instance, as a result of the Chevron Doctrine. You may recall that in the U.S., the majority of our rate cases typically get settled with our customers instead of being litigated, and I likewise don't expect any significant changes in how we operate the pipe. Since this could produce more litigious outcomes, we might need to build in longer lead times when originating and constructing our projects. Ultimately, we have to wait and see what, if anything, emerges from the Supreme Court decision, and then we'll respond to those changes accordingly.

Linda Ezergailis

analyst
#49

I appreciate that.

Operator

operator
#50

Ben Pham from BMO has the next question. Go right ahead.

Ben Pham

analyst
#51

Hello there, and thank you. Good morning to everyone. Perhaps if we return to the asset sale program, you noted a stronger environment so far this year compared with last year. So I'm curious: how willing would you then be to potentially carry out more than CAD 3 billion during this year and simply drive leverage down even further?

François Poirier

executive
#52

Ben, we’re open to that, though it would have to rest on compelling valuations across our different processes. Since we want to be sure we hit our CAD 3 billion target for 2024, we have a lot of conversations underway. There’s competition inside individual processes, and there’s also competition among different processes. So if we saw some compelling valuations, we would be open to looking at going beyond the CAD 3 billion target.

Ben Pham

analyst
#53

All right, understood. So perhaps a question about how liquids performed this year and what lies ahead. Considering the stronger outcome of roughly CAD 2,300 million, wouldn't that justify — or, to put it more plainly, perhaps a somewhat greater upward tilt in your mid-decade EBITDA guidance for the liquids segment?

Bevin Wirzba

executive
#54

Ben, it's Bevin here — thanks for raising that. Like I said before, we managed to pull some of the growth we'd expected in 2024 forward into 2023. That said, I want to soften how we're framing Q1 of this year. As you're aware, we have a marketing affiliate whose main job is optimizing how our Gulf Coast system gets utilized. On top of that, there are certain accounting mismatches between physical and financial trades that we expect to create something of a headwind in Q1. So I'd dial back expectations for our results in the near term. Our outlook for that 2%-3% long-term growth is something we want to reaffirm. We're confident we can consistently underwrite that growth, and being a highly predictable source of EBITDA growth for our shareholders is exactly what we aim to be.

Ben Pham

analyst
#55

All right, that's great — I appreciate you pulling that together. Thanks.

Operator

operator
#56

Brian Reynolds from UBS has the next question. Go right ahead.

Brian Reynolds

analyst
#57

Morning, everyone. Perhaps I can add a bit to some of those South Bow questions regarding the future debt issuance that will be used to repay TC. Given the outperformance we've witnessed, capex spending from TC, and also liquids, plus now you have that $200 million CGL payment, which from what I understand wasn't initially part of the guide since you had to hit certain performance metrics. I'm just somewhat curious whether we might see any evolution, whether that's a couple hundred million here or something more material, when it comes to that eventual debt issuance to TC from South Bow. Thanks.

Bevin Wirzba

executive
#58

Yes, Brian, it's Bevin here again. So to start with, an investment-grade rating is something we intend to achieve. Once the shareholder vote has gone through successfully, we'll take ourselves out to the market — and luckily, we've observed some strengthening in the debt capital markets since the spin was announced back in July. Our aim will be to establish a capital structure that lets us support the future performance. We also need to strike a balance between what TC and South Bow each require as we split up the dividend and the debt going forward, and we'll make that as favorable as possible for our shareholders. That said, at this point I'd describe conditions as more constructive than we expected last July. So for the outlook of both entities, that's a positive.

Joel E. Hunter

executive
#59

Brian, this is Joel, and I want to add a bit on that as well. At Investor Day back in November, we laid out that, with the rate environment as it stands now, the proceeds we get from South Bow—roughly $8 billion—would let us repurchase a portion of our debt at a discount. So because that debt would be trading below par, we would anticipate retiring more than the amount that South Bow brings in.

Brian Reynolds

analyst
#60

Thanks, that's really useful. It sounds like there's more coming. Moving over to the gas side on the Northern Border, NAC gas constraints appear to be reaching a fairly difficult point now, and expansion is genuinely required before long. So I'm just wondering whether you could update us on Bison Express. And in the end, how does that feed into the possible cost effects connected to your CAD 6 billion-CAD 7 billion outlook? You're clearly very committed to that figure. How does the basin's requirement for expansion fit together with that commitment of yours to the CAD 6 billion-CAD 7 billion outlook? Thanks.

Stan Chapman

executive
#61

Sure. I’d say our Bison Express project is coming along according to plan. We fully expect to place it into service on schedule and within budget. And as you noted, more egress capacity is needed from the basin. Those dollars sit inside our $6 billion capital plan moving forward, and we fully expect to execute on that as planned.

Brian Reynolds

analyst
#62

All right, that's reasonable. I'll stop at that point. Have a good rest of your morning.

Operator

operator
#63

Our following question is from Robert Kwan at RBC Capital Markets. You have the floor.

Robert Kwan

analyst
#64

Thank you, and good morning. With Heartland now sanctioned, turning to the placeholder CapEx in your plan through 2026, could you describe which segments and which kinds of projects would contribute the most, particularly in the 2026 bucket? And on that point, building specifically on what Stan said, if the pause on non-FTA export permits becomes more permanent, how much of that gray bucket is at risk?

François Poirier

executive
#65

François here — I'll handle that question, Robert. If you look at how our capital stack is put together, not only for 2026 but more broadly, one piece would be roughly $2 billion annually of recoverable maintenance capital spread across our three pipeline systems. The second piece is $800 or $900 million per year on average for Bruce Power capital tied to the major component replacement program, along with the Project 2030 efficiencies on the non-reactor portion of the plant. Then there's predominantly growth capital across our three natural gas footprints. Regarding our projects and how the pause affects the capital stack, as Stan noted, one of them — Gillis — could be affected if its sanctioning faces any meaningful delays. But those are small dollars, in the low hundreds of millions. As we said at our Investor Day in November, our capital is essentially committed through 2026, and now with the Heartland Project 2027. We have not raised the aggregate limits. Back in November, we included some of the unsanctioned capital in our disclosures. Both MCR4 at Bruce and Heartland were included in November within the unsanctioned, or not-yet-sanctioned, growth category. We stay firmly focused on keeping our capital spend, not merely inside the 6 to 7, but honestly, toward the lower end of that range.

François Poirier

executive
#66

When you think about it from a value creation angle, the real upside comes if we deliver according to plan at about CAD 6 billion annually — and in any given year that figure could be plus or minus 100 or 200 — because then we'd have surplus capital either to speed up deleveraging or, eventually, to move ahead with share buybacks. We are factoring that optionality in on a yearly basis, and that is something we haven't done previously. So from where I sit, if for whatever reason a particular project gets pushed back and, say, we land at 5.5 rather than 6, we still have solid uses for those funds — speeding our deleveraging and eventually carrying out share buybacks — since those actions create value for our shareholders.

Robert Kwan

analyst
#67

Understood, thanks. And if I could wrap up by asking about how the 4.75 times target fits with what you said regarding running the asset sale program in a way that benefits shareholder value — or, to phrase it differently, that you won't dump assets at fire sale prices. Should the markets move against you, what's your thinking on that target, especially looking ahead to 2025, which is more or less a transitional year with roughly half of Southeast Gateway, and with the real objective being 2026? So, as I said, how are you viewing that target in 2025 as well?

François Poirier

executive
#68

Yeah. So that's a great question, Robert. From the discussions we're currently having and the way our processes have progressed so far, we have strong confidence that we'll hit the CAD 3 billion figure in 2024. And we remain firmly committed to delivering that level of deleveraging. Getting under the 4.75 upper limit by the close of 2024 is a top priority for us. As for 2025, we'd require either additional divestitures or extra EBITDA — roughly CAD 400 million in incremental EBITDA — to remain beneath that 4.75 threshold. And if, as someone asked earlier, we see a chance to potentially expand the program in 2024, we'll take that under consideration. We also believe we can reach the CAD 3 billion figure without doing any transactions in Mexico during 2024. But as we've mentioned, our focus is on cutting our Mexico exposure over the coming two or three years to arrive at that 10%-12% of consolidated EBITDA level. So you can expect us to pull some of those levers, including how well our efficiency program performs on revenue growth and cost cuts, to close any gaps we identify in 2025 and beyond.

Robert Kwan

analyst
#69

All right. That’s excellent. I appreciate it.

François Poirier

executive
#70

Glad to have you with us.

Operator

operator
#71

Our next question is from Robert Catellier at CIBC Capital Markets. You have the floor.

Robert Catellier

analyst
#72

Hey there. Morning to you. Congrats on everything you achieved in 2023. Just a quick follow-up regarding the liquids side — I was wondering whether you could share an update on where things stand with Keystone when it comes to bringing that asset back to the pressure level it had before.

Bevin Wirzba

executive
#73

Yes. Robert, it's Bevin here. As I said before, we've seen excellent operational results compared with a year ago. Our system operating factor keeps going up. At the close of the year and in the early part of this one, we hit record levels. That comes solely from our main emphasis on running the system with a very strong safety focus. It also involved completing all the integrity work during the past year. To date, we have performed full inline inspections across more than 80% of our system. All of that will be finished before any spin transaction takes place. Through those inline inspections, along with all the physical digs — more than 60 digs over the past year to confirm anything we observe in areas of possible concern — we have not identified any potential incident or problem regarding the integrity of our system. As a result, our confidence has risen considerably since we began that work. We are cooperating very closely with both of our regulators, PHMSA in the United States and the CER. So far we have managed to resolve every issue they have raised. However, the decision on restoring the system to its original operating pressure rests with them. That said, thanks to how we've operated, we were able to deliver all of our contract capacity, and we have also been able to move spot batches.

Bevin Wirzba

executive
#74

Operational excellence is what lets us keep producing solid results.

Robert Catellier

analyst
#75

All right, thank you for the thorough response, Bevin. I'd like to shift to asset development and regulation—particularly cost sharing and development expenses incurred prior to permits being granted. Given how heavily assets are being used throughout the industry and the difficult permitting climate, I'm curious how you're approaching cost sharing. And perhaps you could specifically speak to the progress being made on government funding for pre-development work on major Ontario projects, including Ontario Pumped Storage.

Bevin Wirzba

executive
#76

Thanks, Robert. I'll begin at a pretty high level. I'm going to have Stan give some background on cost sharing in the U.S., and after that Annesley can speak about our Power and Energy Solutions projects in Ontario. The one thing I wanted to say before I hand it off is just a reminder that in Canada, we have mechanisms allowing development costs to be reimbursed or to be included as spent within our tariff structure. So the idea of sharing development costs is really a U.S. matter more than a Canadian one. So, Stan, over to you, and then Annesley.

Stan Chapman

executive
#77

Yes. Morning, Robert. Once more, let me start by stressing that things are moving along extremely well across every one of our projects. During this year, we expect to place 3 projects into service. Our Virginia Electrification Project went into service a couple of weeks ago, on schedule and within budget. Later this summer, the Gillis project will be placed into service. And then, provided we receive a timely and favorable rehearing order on GTN, the remainder of that project will go into service before the year is out. As for risk-sharing mechanisms, we have been using them in the U.S. for a very, very long time. In fact, many of our projects — if not nearly all of them — involve some form of cost sharing. Typically that is roughly a 50/50 split between us and our customers in the event of cost overruns. We have other protections as well: in certain cases, if a customer does not reach FID, they reimburse us for 100% of our development costs. That is something we have done for a long time; it is simply part of our DNA. On the regulatory side, building projects has become a little bit more complex, but I believe we have the skills and the talent to navigate that.

Stan Chapman

executive
#78

My expectation is that we'll keep originating and constructing additional projects inside that build multiple of 5 to 7 times, and inside the $6 billion of annual capital spending we've set aside for build-forward.

Annesley Wallace

executive
#79

Hi, Robert. This is Annesley. Within Power and Energy Solutions, our short-term emphasis is squarely on nuclear and pumped hydro. A major driver behind that is the policy backing we observe for those two sectors, especially in Ontario. We're currently talking with the province about cost recovery agreements covering those projects. As we move them forward, we'll stay highly disciplined regarding the capital we'd place at risk. We do expect to move those agreements ahead in the near term, both for the work already underway at Bruce Power — a new nuclear build, Bruce C, at that site — and for our Ontario Pumped Storage project.

Robert Catellier

analyst
#80

All right, thank you all.

Operator

operator
#81

Patrick Kenny with National Bank Financial has the next question. Go right ahead.

Patrick Kenny

analyst
#82

Thank you. Yeah. Good morning. Just on CGL and these potential cost recoveries from contractors, not sure if you can comment on or confirm if all claims have been filed with the courts at this point, what the total amount of all claims might look like, and also if you've assumed any successful litigation or settlements within your 4.75 leverage target by year-end, or if we should be thinking about these potential recoveries being 2025 at the earliest.

Greg Grant

executive
#83

Yes, absolutely. This is Greg Grant speaking. I'll begin, and afterward Joel can address the 4.75. But before anything else — since you've handed me the microphone — I want to express appreciation to the team once more. In my view, reaching what was accomplished on CGL represents an enormous undertaking. It required everyone involved: operations, commercial, project execution, stakeholders — a collective push to hit readiness before the year closed out. That CAD 200 million meant a great deal to the team. Looking ahead to 2024, the mandate is safe execution, and that will stay our focus as we continue working through portions of the reclamation work. We won't really be discussing specific claims or how those might shape up. What I would say is that we intend to defend the claims vigorously, while also pursuing cost recoveries — we do anticipate net recoveries — and I'd just note that we remain on track regarding the CAD 14.5 billion.

Joel E. Hunter

executive
#84

Yeah, Pat — Joel here. Regarding those net recoveries Greg mentioned, we won’t be providing a dollar figure for them, but we are taking them into account in our funding plan for this year.

Patrick Kenny

analyst
#85

Alright, thank you. That's helpful. Turning to NGTL, I was hoping you could share where things stand regarding the renewal of the 5-year revenue requirement settlement. I realize you're limited in what you can say about how a possible minority interest in NGTL could take shape, but I'm simply curious whether having that new revenue settlement finalized in any way serves as a precursor for pursuing some form of ownership transaction involving NGTL.

Greg Grant

executive
#86

Sure. This is Greg. Regarding the settlement, I'll give a quick reminder. That settlement remains in effect through the close of 2024. Conversations with customers are progressing well. I'm limited in what I can say about the settlement itself, but you've recently seen the system and how healthy the basin is here. On NGTL we reached record highs here in January, and we keep seeing substantial utilization and highs at the decade level coming off Mainline. So we're quite pleased with the basin's health. I believe the discussions with customers are going well. We'll likely be looking at midyear at the earliest before we begin moving closer to a settlement, but we anticipate reaching a settlement with customers here later this year, at which point we can say more. As for how the settlement affects, or affects the timing of, any possible minority interest sale on NGTL, Pat, it's obviously public information that our settlement ends at year's end and that we're working toward renewing it with our customers. In our own minds we hold a view of what a fair outcome looks like. We will of course take that into account in judging the fairness of any transaction involving a minority interest in NGTL.

Patrick Kenny

analyst
#87

All right, that's excellent. I value the feedback you've given. Many thanks.

Greg Grant

executive
#88

Thanks, Pat.

Operator

operator
#89

Olivia Halferty from Goldman Sachs has the next question. The floor is yours.

Olivia Halferty

analyst
#90

Hello there. Good morning, and thanks for taking our questions. I'd like to begin with Bruce, if we could. Availability remains robust, even though I recognize the fourth quarter carried a heavy maintenance load. Can you identify any scheduled maintenance for 2024? And on a wider note, after the successful and accelerated MCR at Unit 6, are there lessons you've drawn that could be applied to upcoming MCRs? Also, how much conservatism would you say has been built into the MCR timelines?

Annesley Wallace

executive
#91

Hi, Olivia. This is Annesley, and I'll handle that question. We clearly saw robust results from Bruce Power in the prior year, both at the operating units and through how the Unit 6 MCR program performed. As we move into 2024, availability should be comparable to what 2023 delivered. So continued solid performance is what we anticipate. Scheduled maintenance outages will occur on a regular basis, just as they did in 2023, though that is already reflected in the guidance. On the MCR side, we have of course captured a great deal of learning from the Unit 6 MCR project and brought it into how the upcoming units are planned and executed. Right now we are executing on Unit 3, and we are already seeing some of the gains from that learning. Unit 4 will follow a comparable path. Past the lessons within Bruce Power, we have also definitely worked with the broader industry and kept incorporating learnings from beyond Bruce Power too. Perhaps the final point I'd mention regarding Bruce Power's 2024 performance: we do anticipate our yearly price increase arriving in April. We'll share further detail at that time.

Olivia Halferty

analyst
#92

Alright. Thanks for all that detail. So I suppose, more broadly speaking about the 2024 EBITDA guidance, what would be the biggest factor behind possible variability? Perhaps you could walk through what might push results toward the high end as opposed to the low end of the target growth range.

François Poirier

executive
#93

Appreciate the question, Olivia. We don't assume any meaningful exposure to commodity prices or volumes. So really, what drives our results is operational excellence — keeping our assets highly available and delivering projects on schedule and within budget. If we execute as planned, we'll land inside that range. And if we uncover added efficiencies or greater operational availability, you might see us shift toward the top end — or, as happened in 2023, go beyond the upper bound of our guidance range. Then there's the other element, naturally: getting our projects delivered on time.

Olivia Halferty

analyst
#94

Understood. Thanks for that extra context — appreciate it.

François Poirier

executive
#95

I appreciate that.

Operator

operator
#96

That brings our question-and-answer portion to a close, everyone. Should anything else come up, you can reach the investor relations team at TC Energy. At this point I'll hand things over to Gavin Wylie. Mr. Wylie, the floor is yours.

Gavin Wylie

executive
#97

Yes, thanks. And I appreciate all of you joining us this morning. As mentioned, should you have further questions, or if we didn’t manage to address every item on today’s question list, please reach out to the investor relations team. We’re always glad to assist. We truly value your interest in TC Energy, and we look forward to sharing our next update. So thank you, and enjoy the rest of your day.

Operator

operator
#98

That wraps up the conference call for today. Your lines can now be disconnected. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TC Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to TC Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TC Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.