TC Energy Corporation (TRP) Earnings Call Transcript & Summary

November 7, 2024

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 52 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for joining TC Energy's Third Quarter 2024 Financial Results Conference Call. <<operator_script>> This call is also being recorded. <<operator_script>> At this point, I'll hand things over to Mr. Gavin Wylie, Vice President and Investor Relations. Go ahead, sir.

Gavin Wylie

executive
#2

Thank you so much, and good morning everyone. It's my pleasure to welcome all of you to the 2024 Third Quarter Conference Call for TC Energy. With me today are Francois Poirier, our President and Chief Executive Officer, and Sean O'Donnell, Executive Vice President and Chief Financial Officer, as well as several other members of our senior leadership team. Francois and Sean will kick things off with some commentary on our financial results and operational highlights. You can find a copy of the slide presentation that will accompany their remarks on our website in the Investors section. After they speak, we'll open things up for questions from the investment community. We do ask that you keep yourself to two questions. And for any members of the media, please reach out to our media team. Should you have questions about the Liquids Pipelines business or South Bow that go beyond what is included in our third quarter reporting, please get in touch with the South Bow team. I'll also remind you that today's remarks will contain forward-looking statements, which are subject to important risks and uncertainties. For more information, please refer to the reports TC Energy has filed with the Canadian Securities regulators and with the U.S. Securities Exchange Commission. Lastly, during our presentation, we'll reference non-GAAP measures, which provide additional information on TC Energy's operational and financial performance; however, these may not be compared to similar measures presented by other entities.

Gavin Wylie

executive
#3

You'll find a reconciliation of the different GAAP and non-GAAP measures in the presentation's appendix. So with that, I'll hand things over to Francois.

François Poirier

executive
#4

Thanks, Gavin, and good morning to everyone. Keeping our attention fixed on a defined set of 2024 priorities—safety, operational excellence, and project execution—has once more produced solid operational and financial outcomes. For the third quarter, comparable EBITDA rose 6% versus the same quarter a year ago. That puts us in a very strong position for the remainder of 2024, and we now anticipate comparable EBITDA landing at the top end of our full-year outlook range. We have moved several strategic initiatives forward, all intended to maximize the long-term worth of our assets, and that includes the successful completion on October 1 of the spin-off of our Liquids Pipelines business into South Bow. I want to pause and acknowledge our teams for months of dedication, focus, and collaboration from every part of the organization that made this milestone achievable. This is the start of a new era for TC Energy, and I look forward to sharing our refreshed vision with you at our Investor Day on November 19. Turning next to project execution, our attention there is producing meaningful results. Substantial progress is underway on our major projects, among them Bruce Power Unit 3 MCR and Southeast Gateway, which I will cover in greater detail on the following slide.

François Poirier

executive
#5

Year to date, we have brought $1.2 billion of projects into service, and for 2024 we anticipate placing roughly $7 billion of assets into service, including Coastal GasLink, with a further $8.5 billion entering service in 2025. Given how well we've executed on projects and our optimization work, we now forecast 2024 net capital expenditures in the range of $7.4 billion to $7.7 billion — a midpoint that is about 8% below our original outlook of $8 billion to $8.5 billion, which further strengthens our financial position and flexibility. Together with our robust year-to-date EBITDA results, this updated capital expenditure outlook, and completed asset sales in 2024 amounting to $1.6 billion, we remain on course to hit our year-end debt-to-EBITDA goal of 4.75x. Turning to Southeast Gateway, our marine pipeline project, it will deliver as much as 1.3 Bcf per day of natural gas to serve the rising demand for reliable, affordable energy in southeastern Mexico. Notably, our solid execution and safety performance have led to a revised estimated capital cost for this project of between USD 3.9 billion and USD 4.1 billion, roughly 11% below our original estimate of $4.5 billion, and that is a major factor driving the overall reduction in our 2024 capital program.

François Poirier

executive
#6

Mechanical completion has now been reached across every major onshore facility — that covers the compressor stations and a delivery meter station at Paraiso. Installation of both the deepwater and onshore pipe is finished, and roughly 500 kilometers of the offshore section have been hydro-tested. Just 1.4 kilometers of shallow water pipe installation is left, and we expect that work to wrap up during the fourth quarter. Our expectation remains mechanical completion in late 2024 or very early in 2025, and we're on track for commercial in-service no later than mid-2025. The outlook for our business, meanwhile, has never been stronger. Wide-scale electrification is underpinning it, and demand for natural gas and reliable power generation keeps hitting record highs. North American natural gas will be critical to expanding global access to reliable and sustainable energy. Our forecast shows North America's natural gas demand rising by about 40 Bcf a day by 2035. That surge is driven by LNG exports, coal plant retirements, utility reliability needs and, of course, growing electricity consumption from AI and data centers. Rising demand will require connections to new supply and demand centers, plus maintenance and modernization of existing infrastructure so it stays safe and reliable.

François Poirier

executive
#7

Taken together, this rising demand is fostering a landscape full of chances for adding natural gas infrastructure in increments. We will go through those opportunities in greater depth during our Investor Day on November 19. Still, it is fair to say that TC Energy stands alone among energy infrastructure firms in holding an established position across all 3 regions of North America. And we think that the strength of our base business, together with the enormous opportunity set and disciplined capital allocation, will enable us to produce solid growth, low risk and repeatable performance. Safety and operational excellence are the bedrock of all our work at TC Energy. The third quarter proved no different. Our team's attention to these core principles, paired with demand for our essential energy assets, guaranteed sustained high utilization and availability throughout our asset base, including, for instance, reaching 98% availability at Bruce Power. That, in turn, produces higher year-over-year financial performance, as this slide illustrates. We intend to sustain this positive momentum through the end of 2024, and our focus stays on meeting our strategic priorities while we keep delivering long-term shareholder value. And now I will hand the call to Sean.

Sean O'Donnell

executive
#8

Thank you, Francois, and good morning to all of you. I'd like to begin today by pointing out how the gains Francois referenced in our cost optimization and project execution initiatives are feeding into the results we're delivering this year. The chart on the left displays the net CapEx guidance we originally set for the year, between $8 billion and $8.5 billion. During our second quarter call, we noted that our expectation was moving toward the bottom of that range. Our 2024 net CapEx is now projected to land between $7.4 billion and $7.7 billion. That works out to roughly $700 million less, and it delivers a dollar-for-dollar effect on our deleveraging efforts, which I'll address shortly. As Francois also told you, the biggest source of these CapEx savings comes from the ongoing successful delivery of our Southeast Gateway project, though we've also captured project and cost optimization benefits throughout the whole portfolio. Beyond that $700 million in capital savings, third quarter comparable EBITDA rose 6% year-over-year. And as in earlier quarters, contributions this year came from every part of our asset base, which the chart to the left illustrates. Canada Gas delivered higher rate base earnings as system expansions kept entering service, on both NGTL and Foothills.

Sean O'Donnell

executive
#9

U.S. gas brought growth and modernization projects online, among them the Gillis Access project that serves Gulf Coast LNG markets, and those results were partly offset by the August closing of the Portland Natural Gas sale. In Mexico, equity earnings at Sur de Texas came in higher, driven mainly by the U.S. dollar strengthening against the peso. As a reminder, our Mexico contracts are denominated in U.S. dollars, though peso fluctuations do affect us through equity accounting at Sur de Texas. Our Power and Energy Solutions team posted improved contributions from Bruce Power, which hit 98% availability in the third quarter, compared with 94% a year earlier. Our Liquids segment declined, mainly on lower margins from marketing activities stemming from incremental WCSB egress capacity. Higher volumes on the U.S. Gulf Coast system partly offset that. Turning to the chart on the right. Comparable earnings of $1.1 billion came in 4% above the third quarter of '23. A few variances on the right-hand chart deserve a moment. Depreciation ran higher, reflecting expansion facilities and new projects entering service. Interest expense was lower, largely because of reduced short-term borrowing levels and more capitalized interest.

Sean O'Donnell

executive
#10

AFUDC came in higher because total spending on Southeast Gateway continued. And finally, the deduction for noncontrolling interest this quarter rose mainly from the sale of the 40% interest in Columbia, which closed in the fourth quarter of last year. Our 2024 earnings outlook stays consistent with what we shared in the 2023 annual report: earnings per common share are expected to be lower this year than in 2023, driven largely by the NCI adjustments stemming from the asset divestiture program. Moving to Page 12. We'll give an update on our 2024 EBITDA outlook. Our focus on safety and operational excellence has helped deliver yet another quarter of exceptional asset performance. If you look at the chart on the left for 2024, comparable EBITDA is expected to land at the upper end of our $11.2 billion to $11.5 billion range. Excluding the Liquids EBITDA contribution in 2024, we expect TC's comparable EBITDA to be at the high end of our $9.9 billion to $10.1 billion range. To be clear, that is the range we expect to report in TC year-end 2024 financials once Liquids has moved to discontinued operations. On the right side of the page, I wanted to recap several important financial and deleveraging milestones the team has achieved this year.

Sean O'Donnell

executive
#11

Our EBITDA results have been strong. Through efficiency and integration efforts, we've captured synergies. We completed $1.6 billion of asset sales, and we've kept enhancing our capital efficiency along with our CapEx cost optimization initiatives. Together, these business plan improvements have us positioned to hit our 4.75x debt to comparable EBITDA goal by the close of 2024. Looking toward 2025, we anticipate bringing roughly $8.5 billion of assets into service, which will fuel EBITDA growth during the latter half of 2025 and across full year 2026. I'll wrap up my remarks this morning by reflecting on how our business model has produced repeatable growth over the last 2 decades. For TC, 2024 marks a significant inflection point, since we are at once seeing better capital efficiencies, repeatable low-risk growth projects, the start of an organic deleveraging cycle, and unprecedented demand increases for natural gas and power across each of our systems. With our focused strategy as a natural gas and power company, we believe our business model carries the lowest risk in this sector, with a growth portfolio delivering highly attractive risk-adjusted returns. In light of that outlook and our ongoing strong financial performance, TC's Board of Directors has declared a fourth quarter dividend of $0.8225 per common share.

Sean O'Donnell

executive
#12

The updated quarterly dividend we're declaring mirrors TC's share, on a proportionate basis, of the dividend calculated as if the spin-off had already been completed — that transaction closed on October 1. If you add to it the dividend South Bow plans to pay for the fourth quarter, the total our shareholders receive across both companies stays intact for 2024. With that said, I'll hand things back over to Francois.

François Poirier

executive
#13

Thanks, Sean. To recap, staying focused on a defined set of priorities in 2024 — among them safety, operational excellence, and excellence in project execution — has produced solid results both operationally and financially. Our focus for the remainder of the year is unchanged, and we'll keep delivering on those 3 priorities. We look forward to engaging more with you at our Investor Day in a couple of weeks. With that, I'll hand the call back to the operator for questions.

Operator

operator
#14

<<operator_script>> Our initial question comes from Praneeth Satish at Wells Fargo.

Praneeth Satish

analyst
#15

Perhaps you'll address this at the upcoming Analyst Day, but as you survey your portfolio and all the different gas expansion opportunities, could you break down how much demand stems from coal-to-gas switching versus greater demand from power plants versus behind-the-meter generation? Which of those categories makes up the biggest portion of the demand you're seeing? And do you notice any differences in the economics among those various project types, or do they all sort of cluster in that 6 to 8x build range?

Stanley Chapman

executive
#16

Praneeth, it's Stan here, and I can try to answer that. What I'd say is that the growth we're seeing in North America remains robust, backed by fundamentals indicating 40 Bcf of added demand from now through 2035, taking our overall gas market to roughly 160 Bcf. From our vantage point, that expansion comes from 5 main drivers. The largest one is LNG exports, where North American volumes are set to triple from 13 Bcf per day currently to 39 Bcf per day, driven by U.S. exports more than doubling. Turning to power generation, we see plenty of tailwinds throughout our footprint from rising power demand, driven by coal-to-gas retirements and new demand from data centers. On coal conversions, 9 plants sit within 15 miles of our pipelines and are slated for retirement by 2031, which we believe could add another Bcf a day of load for us. Of the roughly 300 data centers under consideration across the U.S., 200 are within 50 miles of our pipe, and we are presently negotiating with various entities for as much as 2 Bcf a day of that load, and I expect we'll compete for and capture our fair share.

Stanley Chapman

executive
#17

We're likewise concentrating on possibilities tied to LDC reliability, which might add another 1 to 2 Bcf, plus securing supply access so producers can get export capacity out of constrained market areas. And finally, we'll keep putting money into modernization and maintenance capital expenditures throughout our systems. So at a high level, adding it all together, I see roughly 13 Bcf a day in growth opportunities sitting at various stages of execution, development or origination. And given this target-rich environment, I doubt we'll struggle at all to fill our $6 billion to $7 billion of capital and direct it toward the projects delivering the best risk-adjusted return, then build those projects within our 5 to 7x build multiple.

François Poirier

executive
#18

And Praneeth, this is Francois — regarding the final portion of what you asked, about color coding the returns coming from the various customer classes. That isn't really how we think about it. What I'd say is that our capital is finite. Our aim is to put it to work in a way that balances balance sheet strength, dividend growth and repeatable performance. The presence of 6 or 7 separate demand sources all competing for our capacity makes it directionally more likely that we'll be able to sanction projects at higher returns going forward than was possible in the past. And since we see our cost of capital moving in a favorable direction over the next year or 2, we therefore expect the spread between the returns we earn and our cost of capital to widen meaningfully over the next couple of years — which has us really excited.

Praneeth Satish

analyst
#19

No, that helps. It may be a bit early to raise this, but I'll go ahead and ask anyway. Clearly, there are plenty of opportunities across the gas pipeline footprint. You've set a CapEx limit for 2025. Still, do you see yourselves as CapEx constrained, to the point where you have to prioritize the best projects? The way we look at it, most of these demand-pull gas projects come with long lead times—roughly 4 years. So even if you sanction them today, that spending really won't land until the 2027–'28 period, when your leverage is considerably lower. Given all these opportunities, then, how do you think about the company's long-term CapEx trajectory?

François Poirier

executive
#20

I suppose the way I'd frame it, Praneeth, is that in terms of direction, we're now moving into what you could call an organic deleveraging stage of our evolution. Because of how attractive our business is and how strong our franchise is, we can see where capital will be deployed, and we're confident that we can put that $6 billion to $7 billion of capital to work all the way through to the end of the decade, and we'll share more detail on that with you on November 19 at our Investor Day. At this moment, we believe the priority is to create a bit of a cushion, or some room to maneuver, beneath that 4.75x debt-to-EBITDA leverage. And until we see that show up, we're unlikely to be looking at expanding the size of our capital program. But as you mentioned, we still have ample capital in the later years of the decade in which to deploy capital, and that is our main focus at present.

Operator

operator
#21

Rob Hope from Scotiabank has the next question.

Robert Hope

analyst
#22

It's good to see the progress you've made on optimizing costs on the capital expenditure side. Could you add a bit more detail on what the main drivers there have been? And then, I suppose, on the expense side, has any progress also been made to improve EBITDA there?

Stanley Chapman

executive
#23

Yes. Stan here again. I can begin. We announced a reduction in capital guidance, moving from $8 billion to $8.5 billion down to $7.4 billion to $7.7 billion. You can view that in a couple of tranches. The first comes from our focus initiative that we've discussed with you before. About $270 million of those savings tie directly to initiatives connected with our Focus program. We're quite pleased about that. Much of the remainder stems from strong execution on our project and maintenance capital expenditures and from lowering those costs going forward.

Robert Hope

analyst
#24

And then, perhaps, just to follow up on that point. Beyond the capital part of the business, what about the operating cost side? Has the Focus Project produced any additional improvements there? And could you help us put a number on that?

Stanley Chapman

executive
#25

Yes, it has. On the Focus initiatives, roughly 30% of the value we generated came from cutting expenses — reductions in O&M expense. And as we have various tolling rate cases coming up, we'll again be passing those through to customers. What it does, though, is put an emphasis on cash and make us more efficient going forward.

Operator

operator
#26

Theresa Chen from Barclays has the next question.

Theresa Chen

analyst
#27

I'd like to expand a little on the CapEx question, particularly as it relates to Southeast Gateway. Could you give us some additional detail on the downtick in project cost? What was behind that? And on a related note, given that mechanical completion is earlier, what's the likelihood that commercial service could begin before the mid-2025 time frame? Also, could you remind us where things stand with the downstream power gen assets, please?

Stanley Chapman

executive
#28

Yeah, there's quite a bit to cover there, and I'll do my best to break it down. First, on the cost savings — that really comes down to strong project execution, and you can think of roughly $140 million in savings on procurement. So we managed to purchase materials and equipment at lower prices. Then there's about $230 million in savings tied to more efficient construction and civil works activities. Together, those two items let us free up additional contingency of around $130 million. As for the power plants, I'd simply note that CFE's plants by and large remain on schedule, and the two we're watching most closely are Merida and Valladolid, with both on track for Q1 2025 in-service. On in-service, I'd add that we're sitting down with CFE regularly to make sure we're aligned on the various project completion activities, and those include both the favorable effect on tolls from the lower costs and the possibility of an accelerated project completion date and payment date. Those conversations are ongoing. And we'll have clearer visibility into the timing of in-service and payment once project construction activities move a bit further along.

Theresa Chen

analyst
#29

Thanks. Looking ahead to 2025 and past that, I'd really like an update on how you see yourselves managing the leverage challenge. So will this lean more toward self-help — concentrating on organic growth and organic CapEx? Or are you considering further asset sales from this point to supplement that?

Sean O'Donnell

executive
#30

Theresa, this is Sean. I'll try my hand at answering that. That's a really good question. Perhaps I should begin with the 2024 plan so you understand which levers we've been using under the deleveraging plan, and then we'll give you a feel for what 2025 and beyond looks like. When we headed into 2024, with 4.75x firmly in our sights for the end of the year, we were counting on EBITDA performance, capital efficiency, CapEx and asset sales. And our internal planning assumed conservative EBITDA, conservative CapEx, and we aimed for roughly $3 billion of asset sales during the year. What today's quarterly results show is that we're at the top end on EBITDA, a couple hundred million dollars better on EBITDA, and $700 million better on CapEx. That adds up to $1 billion. And as Francois said, $1 billion of savings works out 2-for-1. It's nearly equivalent to $2 billion of asset sales. So we reached our leverage target in 2024 through the lowest-cost, highest-value-retention route available, essentially via those CapEx savings Stan described. So as a bit of a preview of Investor Day, the $700 million we're discussing with you today is one piece of roughly $2.5 billion of CapEx savings across the coming couple of years in our development portfolio, on top of some of the savings that will flow into EBITDA over the next couple of years.

Sean O'Donnell

executive
#31

We'll break down the mix and the schedule for all of that at Investor Day, but what that means is that our leverage goal for '25, specifically, is set to gain from the very same EBITDA and CapEx trend we're discussing right now. We'll dig into that in more detail for you in 2 weeks.

Operator

operator
#32

The next question is going to come from Maurice Choy at RBC.

Maurice Choy

analyst
#33

I'd like to return to something Stan said about having plenty of targets and no difficulty filling the CapEx plan. Philosophically, do you lean toward high-grading a portion of these and capping things at $6 billion to $7 billion? Or would you rather locate alternative funding that isn't equity-based, such as sales or perhaps JV partners, in order to build more while keeping net within $6 billion to $7 billion? On that point specifically, would you first bring in a partner and then build? Or build first and seek a funding solution afterward?

François Poirier

executive
#34

I can take that question, Maurice — this is Francois. Sure, definitely. We've discussed how beneficial it is to have partners such as GIP involved in our TCO system, since that lets us, on a gross basis, keep allocating the entire amount of capital the system requires to hold onto its incumbency position, while at the same time letting us manage to our $6 billion to $7 billion of capital spending on a net basis. If we find chances to add more partners or to rotate capital out of mature assets later on so that we can boost our EBITDA growth and lift our return on invested capital on the assets we already have, we will certainly look at doing those. Right now, though, we are firmly committed to the $6 billion to $7 billion. We believe it matters that we keep delevering organically as time goes on and build some cushion beneath that 4.75x metric. And given that we see the spread between the return we earn and our cost of capital widening over the coming couple of years, we are really quite confident in our capacity to keep growing EBITDA, growing cash flow per share and, as a result, growing the dividend in a commensurate way.

Maurice Choy

analyst
#35

And just to wrap up with a question about Southeast Gateway. You said there's still 1.4 kilometers of shallow water construction remaining. Is that the only significant construction work item left? Or are there other items you're monitoring that could throw off your cost or timing? And specifically, since you have savings from this overall cost structure, I assume your expected EBITDA is unchanged and there's no sharing involved here?

Stanley Chapman

executive
#36

As for the work itself, the 1,400 meters remaining are largely the final portion of the major construction. Once that's done, our focus will shift to pre-commissioning, followed by commissioning, with an in-service date no later than mid-2025. The agreement we have with CFE includes cost sharing, and we'll be adjusting the totals accordingly once the final capital expenditures are known.

François Poirier

executive
#37

And Maurice, you'll notice that in our forecast and outlook for EBITDA for 2025 and beyond, we will have adjusted for the revised capital spend. We thought that the cost sharing, basically on a 50-50 basis when CFE only owns 13% currently of the common equity, provided us with good downside protection. We have a happy customer. We've reduced our capital spend by $600 million. So I think it's a happy day for everybody.

Operator

operator
#38

The next question comes from Keith Stanley at Wolfe Research.

Keith Stanley

analyst
#39

I'd like to ask about the opportunities tied to data centers. Are you considering vertical integration at all, and possibly even moving into behind-the-meter gas-fired power generation? I'm aware that the company previously constructed gas power plants. And on a related note, how are you approaching the EPA 111(d) rule, which will ultimately mandate CCS for new gas plants, and what effect is that having on your conversations with customers?

Annesley Wallace

executive
#40

Regarding the first portion of what you asked about gas-fired generation: within our Power & Energy Solutions strategy, building stand-alone gas-fired power generation is not something we're pursuing. We definitely see advantages throughout the existing portfolio from rising electricity demand driven by tailwinds in the sector. That doesn't automatically rule out examining gas-fired generation if it were supportive of investment we were seeking to make on the gas transmission side of the business. Even so, it would need to compete for capital across the portfolio. Therefore, we'd only consider those projects if we saw returns competitive with the opportunities present in the portfolio.

François Poirier

executive
#41

And Keith, regarding the second part of your question about the EPA rule, with respect: look, clearly we are always in compliance with regulations. That rule, were it to be applied, would apply to the entire industry in a uniform way — meaning every developer and operator of gas-fired generation would need to comply with it. We'll see what policy changes a new administration in the United States brings. And as I said, when it comes to natural gas for power generation, the data centers have high ambitions around developing their projects. It's not only economics — it's time to in-service. And we feel that natural gas-fired power generation is going to be the broad solution to meet their electricity requirements. There are only so many nuclear plants that you can de-mothball, and they need the reliability that natural gas provides. So we're not concerned about regulation materially impairing the competitiveness of gas-fired generation going forward.

Keith Stanley

analyst
#42

Next question — I'm just curious whether there's anything new on the talks with stakeholders about a sell-down of NGTL, whether you feel optimistic about it, and what the potential time line might be?

François Poirier

executive
#43

Yes. So that question kind of has two parts, Keith. I'll take the first part, and then I'll have Sean handle the second part. And I want to emphasize that we are continuing to work with our indigenous partners to find a way forward. We believe indigenous economic participation matters a great deal, but out of respect for the 72 communities and everyone involved in the process, I'm going to keep my remarks on these ongoing discussions limited. Of course, we will provide material updates as they become available. But behind that question is another one, which is our need for and reliance on that transaction for deleveraging, and I'll turn that over to Sean.

Sean O'Donnell

executive
#44

Yes. Thanks, Francois. Look, overall, on the question of whether we need asset sales to reach that 4.75x target — broadly speaking, the response is no. And that's good news, right? The fact that our EBITDA came in above expectations, together with the CapEx savings — not just the $700 million today, but also the $2.5 billion we'll discuss in a couple of weeks — eases things considerably; it genuinely takes away the pressure to sell assets, since we're now entering this phase of organic deleveraging. So we're glad that we don't have to focus specifically on asset sales purely to meet our leverage targets going forward.

Operator

operator
#45

Manav Gupta from UBS has our next question.

Manav Gupta

analyst
#46

I appreciate the encouraging news regarding Southeast Gateway. I did want to discuss the remaining growth projects that are likewise scheduled to arrive within the coming 12 to 18 months — be it Columbia, the Gulf expansion, or NGTL System Phase 2. Could you share where things stand on the other major growth projects slated to enter service over the next 12 to 18 months?

Stanley Chapman

executive
#47

Right, so across roughly the coming 12 months, capital of about $8.5 billion is entering service, and SGP is the main driver of that — as you've heard, it's performing very well. On top of that, there are 2 major projects in the U.S., and both are on schedule and within budget. All in all, that's a pretty positive story.

Manav Gupta

analyst
#48

Great. Now, what's the right way to view the expansion plans in Bruce? And how does that tie into your portfolio as a whole?

Annesley Wallace

executive
#49

Regarding Bruce Power, we're still getting a handle on the refurbishment program, and things are going extraordinarily well. As you probably know, the Unit 3 MCR outage started in Q1 of 2023, with completion expected in Q2 of 2026. Both cost and schedule are on plan, with the fuel channel assembly removal series finished and the inspection series progressing nicely. Unit 4 is the next MCR. We got ISO approval to proceed in February, and a refurbishment outage start date is set for Q1 of 2025. So all the prep work is moving along well, and we're now shifting into readiness for construction to begin early next year. We remain very happy with the capital we keep putting into Bruce Power. It gives us continued opportunity within our $6 billion to $7 billion capital program — roughly $1 billion per year at very good returns through the end of the decade.

Operator

operator
#50

Olivia Halferty from Goldman Sachs will be asking the next question.

Olivia Halferty

analyst
#51

I'd like to return to the CapEx budget from next year on. Of that $6 billion to $7 billion yearly CapEx budget, what portion is already committed across the next 2 years? And conversely, how much remains uncommitted and thus available for projects tied to growing natural gas demand?

François Poirier

executive
#52

Appreciate that, Olivia. Once more, given how strong our franchise is and how much visibility we have on the development projects ahead, most of our capital for 2025 is already committed. There's a small amount of flexibility left, and we'll share more details on that at the upcoming Investor Day on the 19th of November. We also have a bit of room in certain other years, but we're already seeking to fill and sanction projects whose spend and in-service dates fall in the latter portion of the decade. Once again, I believe we're somewhat distinctive in our capacity to give you a fairly high level of visibility into where capital will be allocated, and we know the return profiles hold up through the end of the decade.

Olivia Halferty

analyst
#53

Understood. And one final question. After the Liquids business was spun off, and with Southeast Gateway almost finished, how do you plan to weigh the wider set of opportunities in Mexico going forward against the need to manage overall exposure to the region?

François Poirier

executive
#54

So I think maybe the sole case where deleveraging wouldn’t be organic and where the divestiture program wouldn’t be finished would be Mexico — though at this point it isn’t really about deleveraging anymore. It would be about handling our customer concentration risk and our overall Mexico exposure. We’re still working on it, and we do have it in our plans for the latter part of '25 or the first half of '26 to look at either bringing in a partner or finding some other way to cut our exposure. That’s good news, because we see further growth opportunities in-country once the infrastructure backbone is built. Adding fingers and toes to that infrastructure offers very attractive risk-adjusted returns. But before we could contemplate any additional capital, we’re going to have to reduce our exposure. Pro forma for Southeast Gateway going into service, it will be at about 15% of consolidated EBITDA. We’d like to see that come down. We believe that derisking and putting into service all of the cash flow streams we have in Mexico before doing that is really the way to maximize shareholder value.

Operator

operator
#55

Our next question comes from Robert Catellier at CIBC.

Robert Catellier

analyst
#56

You've already covered most of what I asked. So perhaps just a few brief updates on projects. To start with Coastal GasLink, it sounds like that initial phase will be up and running before much longer. Do you have any idea where things stand with Phase 2?

Stanley Chapman

executive
#57

Yes, this is Stan. Honestly, there haven’t been any fresh developments regarding Phase 2 since our previous discussion. As LNGC has asked, we’re still carrying out early-stage development work and evaluating the opportunities for expanding Phase 2, and clearly, the final investment decision is theirs to make.

Robert Catellier

analyst
#58

There's a comparable question regarding the Ontario pumped storage project. Could you share any updates on how things are progressing there, particularly around securing the commercial framework that's required?

Annesley Wallace

executive
#59

Yes, thanks — this is Annesley. We're still very enthusiastic about this project. We keep seeing meaningful economic upside for the province, along with our partnership with the Saugeen Ojibway Nation, and the advantages that a long-duration storage project of this kind can deliver for the province's nuclear ambitions. Ontario appointed a new minister of Energy and Electrification in June. There's also been fresh emphasis on getting the project into its next phase, which is essentially some development work that lets us tighten the capital cost estimate for the project. So we're working toward an agreement that would most likely take the shape of a cost recovery agreement, which would put us in a position to move the project forward to that next stage. Discussions are ongoing, and we're hoping to reach some commercial conclusion that lets us keep that project going.

Operator

operator
#60

Ben Pham of BMO has our next question.

Ben Pham

analyst
#61

Could I begin by asking about Bruce Power and how available it was during the quarter? From what I can tell looking back, that appears to be a record. Could you discuss what was behind that utilization? Was any of it driven by outside factors as well? And then could you speak to how available your units are once they've gone through MCR?

Annesley Wallace

executive
#62

Absolutely, and I appreciate you asking. Bruce Power achieved record availability during the quarter. This wasn’t due to any external factor — it happened because Bruce Power had no planned outages in that quarter. That allowed the units to run at a much higher availability, and at present we have just 1 unit under MCR. That’s how we managed to deliver the output we achieved for the quarter. As we move into the fourth quarter, it should look similar, since once again we’ll have only 1 unit under MCR and no planned outages during the quarter. That said, it won’t carry over into 2025. We anticipate returning to an availability factor in the low 90s, as has been the pattern, simply because we will keep having planned outages as we have historically.

Ben Pham

analyst
#63

Alright, understood. I mean, low 90s is still quite solid. And then perhaps for the second question, regarding the EBITDA growth guidance, maybe looking out toward the end of the decade, if you were hypothetically to spend $6 billion to $7 billion on a self-funded basis, returns remain fairly attractive. On a CAGR basis through the end of the decade, what EBITDA growth would you expect?

François Poirier

executive
#64

Ben, we completely respect the question, and what we'd prefer to do is share insights at our Investor Day in a couple of weeks, together with plenty of information backing up how credible that range is. So I'd ask you to hold off until then, and we'll answer it very fully at that point.

Operator

operator
#65

Jeremy Tonet from JPMorgan will ask the next question.

Jeremy Tonet

analyst
#66

I’d like to return to Southeast Gateway from a somewhat different perspective, if I may. From everything you’re describing, it sounds as though mechanical completion is about to happen, in-service is near, and all the commissioning work is moving very quickly too. I’m wondering whether, if in-service does occur early, there could be an opportunity to serve additional customers in that market should it be available ahead of the agreed start date. And specifically on leverage, how much deleveraging does this project’s in-service provide?

Stanley Chapman

executive
#67

Yes. Jeremy, I'll handle the first part of that. There's still some work remaining on pre-commissioning and commissioning. Mechanical completion should come around year-end, perhaps a bit after. And again, we're aiming for the contractual in-service date of midyear 2025. If we can do better than that, we will. As for serving markets, again, our customer is CFE, and this gas is meant to supply power generation facilities in the Yucatán Peninsula.

Sean O'Donnell

executive
#68

Jeremy, this is Sean, and I appreciate the question. Look, we'll be providing you with all kinds of modeling metrics on this over the coming 2 weeks. But look, to put it in round numbers on a full-year basis, what SGP will deliver to us is CAD 750 million in EBITDA. So on a full-year basis, depending on how you're modeling debt figures for us, you can kind of land at 0.05 to plus or minus 1, but we'll have all of that model detail ready for you at Investor Day.

Jeremy Tonet

analyst
#69

Understood — that's interesting. It sounds like there could be data center opportunities in Mexico, involving fingers and toes. But I wanted to pivot slightly. In my view, the appetite for nuclear in Ontario really stands out compared with other regions. And we see the Bruce C study there. You've called yourself the best intersection of electron molecules here. Could you take us through how the portfolio lets you capitalize in the current environment, particularly on the nuclear side, though it could be a little later dated. But what potential do you see there at your site?

Annesley Wallace

executive
#70

Let me begin with Bruce Power in particular. Our Power and Energy Solutions strategy as it relates to nuclear really centers on the investment we've made in Bruce Power, and the reason is that we hold an extremely robust power purchase agreement running all the way to 2064, which lets us keep putting meaningful capital to work under that agreement at very attractive returns. So we remain committed to carrying the refurbishment program forward. Regarding Bruce C, as I believe we've mentioned, that effort is still at a very early stage, with a site impact assessment under way, yet it shows there's potential for an even greater nuclear commitment further down the road. Still, it provides us with ample opportunity to truly maximize the value of the investments we already hold by deploying capital at really strong returns.

François Poirier

executive
#71

And Jeremy, regarding our broader interest here, look, what really makes nuclear attractive in terms of growth potential is this: you need a solid site, you need an operating license — since obtaining those licenses is extremely costly and takes a great deal of time — and then you need a management team with a proven record of excellence in both operations and project execution. We think our team at Bruce has shown that clearly, having brought in Unit 6 MCR during the middle of COVID on budget and a month ahead of schedule. So with those 3 factors being essential to how we allocate capital into nuclear, we really don't see any need for us to go beyond the Bruce Power site. We believe there's plenty of opportunity for us to put capital to work as part of our $6 billion to $7 billion, extending really into the 2030s.

Operator

operator
#72

That wraps up the question-and-answer portion, everyone. Should anything else come up, you can reach Investor Relations at TC Energy. At this point, I'll hand the call back to Mr. Gavin Wylie for any closing remarks. Go ahead, sir.

Gavin Wylie

executive
#73

Well, we appreciate your interest in TC Energy and for being with us this morning. As Francois mentioned, our 2024 Investor Day is set for November 19th, and we're looking forward to seeing you in person and giving you a more detailed update then. Thanks again.

Operator

operator
#74

That brings us to the end of today's conference call. You can go ahead and disconnect your lines at this point. We appreciate everyone for joining us, and we hope the rest of your day goes well.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TC Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to TC Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TC Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.