executiveThanks, Kate, and good morning to all of you. We appreciate you being with us today. Earlier this morning, we submitted our quarterly report covering the period that ended on September 30th, 2026 — filed on Form 6-K with the SEC as well as on SEDAR+. Some of what we say today could include forward-looking statements. Telesat's actual results might differ materially from the known and unknown risks and uncertainties that exist. If you'd like a discussion of the known risks, please refer to Telesat's annual report and the updates we have filed with the SEC. Telesat takes on no obligation to update or revise any of these forward-looking statements. At this point, I'd like to hand the call over to Dan Goldberg, who serves as President and Chief Executive Officer of Telesat.
Dan Goldberg
executiveOkay, thank you, James, and good morning to everyone joining us. I’ll start with a few remarks about the business, and then Donald will take over to go through the figures in more depth, and afterwards we’ll open it up for your questions. Over the past quarter and through the first nine months of the year, we made strong headway in advancing our key strategic priorities and in positioning the company for significant growth and value creation. The deal we announced in August with Canada’s Defence Investment Agency is a clear and important endorsement of the critical, differentiated capabilities of the Lightspeed network, and of what we see as the size of the opportunities in the defence vertical. When you factor in the option periods, the deal is worth $2.7 billion, and it's going to provide high-performance, secure communications to the Canadian Armed Forces in the Arctic through military Ka-band frequencies. As we emphasized when we made the announcement, this is the first contract Telesat has signed under the ESCAPE program. More ESCAPE contracts for Arctic satellite communications are on the way, and beyond ESCAPE we see substantial additional opportunities with the Canadian Armed Forces for services outside the Arctic — that is, the rest of Canada and other geographic areas of interest. We're also seeing very significant, concrete opportunities with Canada's allies when it comes to defence and sovereignty requirements. The conflict in Ukraine has especially led governments and armed forces worldwide to prioritize guaranteed access to a sophisticated low Earth orbit capability—similar to what we are developing—so they can safeguard their people and territorial sovereignty, and we are highly committed to meeting those requirements. Beyond that, there is considerable appetite for sophisticated LEO services across additional market segments, such as connecting rural areas to broadband, delivering broadband to aircraft and vessels, and serving various other enterprise uses. Our customers are showing growing appreciation for a network that is resilient, secure, and high-performing—one built to handle demanding, mission-critical applications. When it comes to implementation, Lightspeed keeps moving forward across all the pieces of the end-to-end network: satellites, ground infrastructure, user terminals, and software systems. This is a major endeavor, and I'm delighted with how my colleagues are advancing work in the technical, operational, regulatory, and commercial areas. On timing, MDA is making headway on the first two initial satellites, which we require in orbit in order to validate spacecraft performance and the end-to-end network. We've looked into the optimal way to get these satellites into orbit, and with the launch vehicle market as constrained as it is, we really don't want to spend one of our precious Falcon 9 slots on a mission carrying only two satellites. We think we've landed on an approach that lets us get them up at a sensible price by riding along on a third-party Falcon 9 rocket, which should go up in mid-2027. Our plan is to put those first satellites through testing on the network for about 2 months. After we're happy with how they perform, we can kick off our full launch cadence, with 15 satellites aboard each Falcon 9 we've already lined up. That said, we now expect to achieve complete worldwide service around the close of Q2 2028, rather than the close of Q1 2028, which had been our earlier goal. To offset that modest slippage, we have changed how we deploy our satellites, so that we can still provide coverage at higher latitudes by the close of Q1 2028 — meaning we can begin offering services to the Canadian military in the Arctic through the ESCAPE program, along with our other northern rural broadband offerings, on the timetable we originally set. That 3-month shift in the worldwide service date is captured in the LEO capex guidance we have updated for this year. Turning to GEO, performance over the first nine months of the year was largely consistent with what we had expected. Revenue declines reflect the structural changes underway in video distribution and broadband that we've previously covered, along with the impact from specific contract renewals and expirations and from retiring certain GEO satellites over the last 12 months. Against that backdrop, we remain intently focused on delivering strong customer service and maintaining strict cost discipline on both opex and capex. Our 2026 guidance for GEO revenue and adjusted EBITDA is being reaffirmed. Lastly, we continue to prioritize refinancing the Telesat GEO debt, which begins maturing later this year. Our advisors keep pursuing engagement in good faith with the Telesat GEO debtholders, and we are also assessing other alternatives, aiming for a result that treats all stakeholders fairly. Although I am certain investors have questions about where matters stand and what the likely path ahead looks like, I hope people understand that, regarding the Q&A portion of today's call, we face fairly tight limits on what we can share right now. With that, I will pass the call to Donald, who will walk you through the financial results in greater detail.
Donald Tremblay
executiveAppreciate that, Dan, and hello everyone. Today in my prepared comments, I'll go over the key points from the press release and filing we issued this morning. Our third-quarter 2026 performance matched what we had planned and anticipated: consolidated revenue reached $81 million, adjusted EBITDA was $12 million, and we recorded a net loss of $157 million. For the first nine months of 2026 overall, consolidated revenue was $247 million, adjusted EBITDA came in at $69 million, and the net loss amounted to $867 million. Both adjusted EBITDA and net loss include costs related to refinancing our debt — $25 million in the quarter and $46 million for the year, compared with $16 million and $26 million in the same periods last year. The quarterly and year-to-date net loss also reflect a loss from the rise in fair value of the Telesat Lightspeed financing warrants: $90 million in the quarter and $577 million across the first 9 months of 2026. That jump in warrant valuation mirrors Telesat Lightspeed's increasing worth after the ESCP contract and the additional progress we're achieving on the program. For the quarter, interest expense came to $55 million, and it was $155 million across the first 9 months of the year. Interest of $28 million for the quarter and $60 million for the year incurred on the Telesat Lightspeed financing was capitalized to the project. In the third quarter and year to date, our GEO segment results matched what we expected; revenue reached $79 million, a decline of 21%, or $22 million, from the same period a year earlier. GEO segment revenue for the first 9 months was $243 million, down 24%, or $79 million. The drop stemmed mainly from a broadcast contract that wasn't renewed in 2025, lower contracted capacity for a broadcast customer in 2026, decreased service to a North American fixed broadband customer, and taking certain geostationary satellites out of service. At September 30th, 2026, GEO satellite utilization stood at roughly 59%, and GEO backlog came to about $800 million. Third-quarter adjusted EBITDA for our GEO segment was $36 million, a decrease of 43%, or $27 million, versus the same period in 2025. GEO adjusted EBITDA for the first 9 months totaled $135 million. When you strip out the costs tied to our refinancing, operating expenses for the first nine months of the year fell 12% versus the same stretch a year earlier. Absent those refinancing-related costs, GEO EBITDA in the third quarter would have come in at $61 million, and the adjusted EBITDA margin would have been 78%, versus 79% a year earlier. Over the first nine months, GEO adjusted EBITDA, again setting aside the refinancing expense, would have totaled $180 million, for an adjusted EBITDA margin of 74%. Turning to LEO, we put $368 million into the Telesat Lightspeed program in the third quarter of 2026 — $344 million of that was capital expenditure and $24 million was operating expense. During the first 9 months, our total investment came to $705 million. That figure includes $641 million of capital expenditure plus $64 million in operating expense. We closed the quarter with roughly $5.6 billion of backlog in our LEO business segment. On liquidity: as of September 30th, 2026, consolidated cash and cash equivalents stood at about $814 million. In the quarter we collected $510 million in milestone payments under the ESCAPE agreement, and approximately $1.5 billion more in milestone payments will come due as development and deployment benchmarks are met. Beyond that, roughly $1.5 billion remained available to draw under the Telesat Lightspeed financing as of the end of September. Based on how the first nine months of 2026 went, we're reaffirming our full-year guidance for the GEO segment: revenue between $300 million and $320 million, and adjusted EBITDA of $210 million to $230 million, with non-recurring debt refinancing costs excluded. Considering actual capex and opex outlays over those first nine months, along with what we project for the fourth quarter, our updated expectation for full-year Lightspeed spending is now $1.1 billion to $1.3 billion — down from the $1.3 to $1.5 billion range we guided to previously. Just before I finish my prepared comments, I'd like to state that we are, as of the filing date, meeting the financial covenants on both our Telesat GEO financing and our Telesat Lightspeed financing. With that said, I'll return the call to the operator so we can begin Q&A. Thank you.
Drew McReynolds
analystThank you so much, and good morning. Dan, I realize you're limited, obviously, when it comes to the debt refinancing process. I was just wondering whether you could speak to this: when you consider fair value and what a fair outcome would be, does that take in possible equity issuance among, obviously, the other alternatives and options you're reviewing? And then my second question, on the LEO backlog build, obviously you're fairly optimistic about future government and defence contract pipelines. Any fresh comments on perhaps the timing of some additional contracts, whether by the end of this year or certainly through 2027? Thank you.
Dan Goldberg
executiveYeah. Okay. Good morning, and thanks for the questions. Regarding your first point, you're correct, and I did mention it in my prepared comments—there simply isn't much we can share right now about the refinancing. On your question about equity issuance, I'd just say that yes, speculating on that would be premature at this stage. We've stated that resolving the refinancing is a key priority for us. Through our advisors, we're in discussions with the lender group and are considering a range of alternatives, but beyond that, there's nothing further we can say at this time. Regarding the LEO backlog, we've clearly expanded it substantially this year through the ESCAPE contract along with various smaller opportunities that came up during the year. The pipeline is compelling, especially when it comes to sovereign opportunities. On timing, sovereign opportunities inherently involve governments, so pinpointing exactly when they'll close is always difficult. If I had to guess, I think meaningful opportunities could get closed mostly over the course of next year, and that's simply how it feels at the moment — again, with all the caveats that nothing is finished until it's finished, and forecasting the timing of these things when working with government customers is even harder. What's actually happening is that people increasingly understand what we're creating. Worldwide, demand keeps rising and intensifying for a capability similar to the one we're developing, and taken together, those factors tell us we're in a strong position to seal some significant deals.
Drew McReynolds
analystAlright. That's excellent. Got it. Many thanks.
Dan Goldberg
executiveThanks.
Edison Yu
analystHi there, good morning. Appreciate you taking our questions. To start, I wanted to ask about the LEO side. You sort of alluded to this earlier regarding the Starlink-Starshield situation. Could you maybe help us understand, I guess from your perspective, is it about terms of service or priority? How do you see scenarios like that unfolding going forward with respect to Lightspeed?
Dan Goldberg
executiveEdison, thanks for the question. If you could just be a little more specific, what exactly do you mean?
Edison Yu
analystWell, at least based on what's come out publicly, it was switched off — though clearly Ukraine didn't want that to happen — and I believe there was a terms of service violation, and you've got, I suppose, lots of parties weighing in with different views. So if you look at Lightspeed and the sovereign use angle, does that fall under terms of service? Is that a different situation? Is it really about who gets the final say over what you're permitted to do, that sort of thing?
Dan Goldberg
executiveUnderstood. Let me address a few aspects of that. We don't have any special visibility into what happened between Ukraine and SpaceX and so forth. Telesat has existed for nearly 60 years at this point, and collaborating with allied governments — Canada, the US, other allies — is work we've been doing for decades. Lightspeed definitely holds strong appeal for sovereign users, and we incorporated the military Ka-band frequencies precisely so allied governments could use them in support of their defence needs and sovereignty requirements. Regarding terms of use, a few points. First, unsurprisingly, we oblige our customers to follow the law along with every relevant regulatory framework, so that condition is always in place. We are ourselves subject to the jurisdiction of the government of Canada, certainly, and then as we obtain market access across the globe, the licensing conditions of each country that permits us to serve its market apply to us. We take that seriously, and the system is designed to comply with it — whether that means lawful intercept or being able to shut off service, that kind of thing, the system is engineered to enable it; that's essentially the framework within which we function; and then certainly, regarding how the government of Canada might use the Lightspeed constellation — and again, they're a major anchor customer through the deal we signed with ESCAPE, and potentially other sovereign governments we reach arrangements with — as to how Lightspeed gets used, we would coordinate closely with the government of Canada especially to confirm we're aligned on use of the network. The government of Canada, naturally, would maintain its own relationships and understandings with the allies who would utilize the constellation. That's quite a mouthful, but that's the way we'd handle it.
Edison Yu
analystGot it. Appreciate the specifics. My next question really concerns the launch side of things. You've given a quite detailed road map for how you plan to carry that out. What interests me, as we look forward — I realize your launch is already secured, but I think everyone can see what is going on in the market and feels that it is incredibly tight. So how do you view the capability to launch following Lightspeed, should you wish to add additional satellites, should you be part of some other kind of constellation? Will that end up being rather heavily constrained given how tight capacity is and/or how high pricing is? What is your view on that?
Dan Goldberg
executiveYeah. No — and yes, this is definitely an area we're watching closely. As you mentioned, we've already got our arrangements set with SpaceX for the Falcon 9s we're using now, and there's one additional one — we're contracted for 14 Falcon 9 rockets and require a 15th. An agreement for that 15th vehicle is in place with SpaceX, though it is still being finalized. We're comfortable that we've made provision for the 225 satellites we're launching, and I believe we have the appropriate rockets to get that done. Your question was, essentially, what happens after that? On that, I'd point to a couple of things. SpaceX has a lot to say about how Starship is coming along, and based on what I remember from their previous call and from our own conversations with them, they're hopeful that regular Starship launches will be happening early next year. As for whether Starship will be available to companies like Telesat and other third parties, my understanding is that their own satellite deployments and their own needs will come first and foremost. Alongside that, or perhaps just after, the US government will be a priority customer for them, and possibly other governments too. That's certainly going to be up to them. As long as our next-generation satellites can be configured to fit inside their dispenser—the very same dispenser they'll use to deploy their own satellites—then yes. At this point, we hold some expectation that Starship will be accessible to Telesat for supporting upcoming missions. That's the way we view our future relationship with SpaceX. Beyond that, there are additional providers currently in the market—not at the level the industry would prefer them to be at present, but all of them are gradually scaling up their capacity and capabilities. And there are also some newcomers entering the market. A few of those options appear rather promising. This is definitely something we watch closely. That said, as the constellation expands — and expanding it is our intention, provided demand remains — I believe those various platforms will give us a route for getting our satellites deployed.
Edison Yu
analystThanks.
Erin Kyle
analystHello, and good morning. I appreciate you taking my questions. I'd like to build on the launch schedule you provided and the moved timeline for global service into Q2. My aim is to confirm that this change is chiefly related to when the pathfinders are now going up and how long you must wait before the launches can move forward, and that no further scheduling problems exist on the manufacturing side — as things stand, MDA remains on track?
Dan Goldberg
executiveHi Erin, thanks for the question. On the launch, as we said, we're focusing on being able to piggyback on that other Falcon 9 launch vehicle, which we expect will launch around the middle of next year, roughly June. MDA is making progress on the first two satellites — in the past we've called them pathfinder satellites — and those will go on that launch vehicle. They aren't finished yet, but we expect them to be ready in time for the June launch. We're looking at the production-level satellites — our first launch of the complete set of 15 satellites on our first Falcon 9 opportunity — and we anticipate that happening around September, which is just under a year away. Based on what MDA is telling us and what we're observing, we expect those satellites to be ready in that window. That said, it's entirely dependent on two factors: first, MDA having the satellites and the necessary software ready to meet those launch windows, and second, that first launch vehicle being available to us in June — and then we'll proceed from there.
Erin Kyle
analystThanks. That's useful detail. So perhaps just for my follow-up — and you touched on this in the prepared remarks — but I did notice the fair value of the warrants went up again this quarter. I'm just wondering whether you could give any additional color on what's behind that increase in value, since I know last quarter's adjustment reflected the ESCAPE contract?
Dan Goldberg
executiveDonald, would you like to take that?
Donald Tremblay
executiveI suppose the program keeps moving forward, and as we make progress, forward risk declines somewhat; that essentially helps us raise value when we carry out the work on the project valuation, basically.
Erin Kyle
analystTied to progress and the risk profile.
Donald Tremblay
executiveThat's
Erin Kyle
analysthelpful, thank you.
Donald Tremblay
executiveExactly.
David McFadgen
analystYeah, great. I've got a couple of questions. So the timing for you to be fully up and running and bringing in revenue for Lightspeed would now be Q2 2028 rather than Q3 2028?
Dan Goldberg
executiveDavid, to me "fully up and running" and "generate revenue" are two separate things. Under the plan, we'll launch our first satellites, we'll begin in September next year, and after that the plan is to launch roughly every 3 weeks; with that schedule, we believe that by the end of Q1 2028 — which was when we last updated the market, we wanted global coverage by the end of Q1 2028 — because of the update we gave today that's slipping by about 3 months, but still by the end of Q1 2028, we expect to have enough satellites in orbit that we can begin commercial service in the higher latitudes, and that will let us start the ESCAPE services under that first contract we have with the government of Canada. It will let us start providing broadband connectivity to some of the communities in the Far North. We think the constellation at that time could support other services as well. We're working, for instance, on broadband to planes, right, certainly the planes flying in those higher latitudes, we could potentially already start connecting them to Lightspeed; we're evaluating what other use cases we could start by the end of Q1 2028, which means we expect to begin recognizing revenue in that time frame. Now by the end of Q2 2028, that's when we expect to have global service; then again, we'll have global service, but then we'll keep launching more satellites until we deploy all 225.
David McFadgen
analystWhat's your precise timeline for getting all 225 into space?
Dan Goldberg
executiveOur plan calls for every one of them to be in orbit by the close of 2028, though a handful could still be performing some orbit raising, and we may still be inserting them into the constellation. The first 156 — prior to our adding the other 69 with ESCAPE — should be in place and providing service, we expect, in roughly Q4 2028, and after that the remaining 69 will come online.
David McFadgen
analystAll right. Suppose you can't deliver the ESCAPE service to the government by the close of Q1 2028 — would there be any financial consequences for not being ready at that moment?
Dan Goldberg
executiveNo, the only effect is that we'd need to hold off a bit longer before turning on the service and beginning to recognize revenue — but no.
David McFadgen
analystNo financial penalties or anything. Okay.
Dan Goldberg
executiveThen,
David McFadgen
analystLooking ahead to 20 — sorry about that?
Dan Goldberg
executiveMy apologies, what I said was "zippo," meaning there are zero financial penalties.
David McFadgen
analystGreat. November is clearly almost here. Looking ahead to 2027, I'm just kind of wondering whether we might see the decline on the GEO side slow down a bit. I don't know if you're able to share any color on that right now, but I figured it was worth asking.
Dan Goldberg
executiveSorry, David, could you ask that one again?
David McFadgen
analystHow do you view the GEO business's revenue decline in 2027? Could that decline decelerate, in your view?
Dan Goldberg
executiveYeah; clearly, we'll provide guidance for 2027 at the point when we give our guidance, and that will come early next year. Just speaking for myself, to begin with, this business has been on a downward trend. A number of our GEO satellites have hit the end of their operational lives, they've been taken out of service, so some of that will factor in. The Nimiq 6 contract with Bell is due for renewal around the middle of next year. It's our expectation that this satellite matters a great deal to Bell, and they clearly still have plenty of subscribers who continue to need that service. My expectation is that we'll renew that contract with Bell, probably at a lower rate, which will create some headwinds for what next year looks like. In any case, my expectation is that revenue declines will continue, though as I said, we'll give guidance on that early next year.
David McFadgen
analystOkay. All right, thanks.
Dan Goldberg
executiveThank you.
Greg MacDonald
analystThanks. Dan, I’ll take another crack at a question about this GEO debt, though I think this one may be within your ability to answer. Among the major developments over the last 3 months is the Defence Industrial Agency turning into a Crown corp, or being on the verge of doing so, with fresh financial powers. My initial take was that this widens the options for backstop scenarios, for bridging scenarios, and even—given your new, somewhat altered free cash flow profile—allows for partial maturity and partial refi scenarios. Plenty of non-dilutive routes. Would you interpret it the same way, and is that DIA change shaping what you mean by, quote, unquote, "other alternatives" too?
Dan Goldberg
executiveNo, it isn’t.
Greg MacDonald
analystWhat's behind that fresh commentary?
Dan Goldberg
executiveI wouldn't call it fresh commentary. For a while now, I believe we've been saying that our priority has been to get a consensual outcome on the refi, that we've been negotiating in good faith, but we've consistently stressed that the company has been weighing quite a few alternatives. This isn't a new message from us regarding the refi. I'd say our communications on that have been fairly consistent.
Greg MacDonald
analystAll right. So the second follow-up relates to returning to Starshield — the restrictions, as I'll call them, or at least that's how they put it. Since that happened, have you seen any uptick in interest from prospective clients outside Canada? Is it sort of igniting things in Europe more than it did back in '23 or '22 — I can't recall when they first did that?
Dan Goldberg
executiveFor a while now, I would say, governments have understood how significant access to an advanced LEO constellation really is. Engagement with the government of Canada has been solid on our side, and, as I noted, with Canada's allies regarding the use of Lightspeed for their own sovereign needs. It is definitely true that what happened with SpaceX and Ukraine has stirred up a range of governments. I read the news just like everybody else. We have certainly seen reports that the Europeans intend to push forward with greater emphasis and so forth on, for example, IRIS² — that's something we've come across. All I can really say is that, yes, given how modern warfare is conducted today, the significance of these autonomous networks, the significance of a high-throughput, low-latency, highly resilient network being available has become truly critical. Space has been designated by Canada as a key sovereign capability within its relatively recent defence industrial strategy, and I believe other governments — whether stating it outright the way the government of Canada did or simply recognizing it implicitly — all of that, I think, has, yes, generated, yes, I suppose it's reasonable to say, greater momentum behind some of the conversations we're having. Our timing works out such that we're approaching market soon. The first launch of the initial two satellites is coming, and testing of those will be done not only by us but by users too; that's roughly 7 or 8 months away, and then within less than a year from now, we'll be launching a great many satellites, so I think the market is quite aware of that, of our timing, that we're well along in the project. In any case, yes, that's the current environment, which explains why, when we're optimistic about how the pipeline looks, when we feel confident about signing and announcing meaningful contracts over the course of next year, that's where it stems from. It stems from those conversations and the environment we find ourselves in at present.
Greg MacDonald
analystReally appreciate it. Thank you, Dan.
Maher Yaghi
analystGood. Appreciate you taking my question. Dan, please tell me if I've got this wrong, but regarding October 23rd — and I won't ask you to discuss the talks you're having with the plaintiffs in court, since I completely get that this is privileged and confidential — could you perhaps just give us a broad overview of the settlement proposal the plaintiffs put forward on the 23rd?
Dan Goldberg
executiveThank you for asking. No, I don't believe it's really suitable for us to get into that kind of matter. Conducting this refi engagement via the newspapers strikes us as a bad idea. I suppose the only thing I'd say is that we have some highly capable advisors backing us; they're in discussions with the debtholder advisors, and our focus is truly on reaching an outcome that's good for the company and good for the various stakeholders we have, and that's where we're putting our energy. Going into the specifics of precisely what the conversations are like at this moment simply isn't productive.
Maher Yaghi
analystFair enough, I understand. Perhaps we could shift over to the commercial side instead, since that's the more exciting part, and you'd likely be able to expand on it a little. Should the launch — or the commercial stage — of LEO be delayed, does that alter in any way the speed and timing of your ability to sign fresh contracts prior to that launch? Put differently, the commercial partners you're negotiating with, the airlines, possibly, or any sort of terrestrial operators — are they waiting to commit to some kind of long-term contracts until they receive validation from the two initial launches you're going to carry out for them?
Dan Goldberg
executiveThat's a great question, and my answer would be yes — certain customers definitely want the capability to try out an actual network and put the satellites through their paces, and we have what amounts to a queue building up of precisely those sorts of activities, carrying out real-world testing with a range of customers across the globe. Beyond that, we have additional customers — and this is precisely the reason our LEO backlog currently stands at $5.6 billion — additional customers who have finished substantial technical due diligence and have walked through the factory. As you likely are aware, we presently have a low Earth orbit satellite in orbit; while it isn't as capable as the Lightspeed satellites we'll be building, it is still a LEO satellite, and we're able to conduct a good amount of testing and demonstrations using it. Other customers feel confident enough to move forward contractually on that basis. We still have to deliver the service. Sure, a customer can put pen to paper, but should we fail to provide the service we committed to, they clearly aren’t obligated to pay us. Getting those first satellites into orbit matters, and continuing our launches matters just as much. The greater the number of satellites we have aloft, the more testing we’re able to carry out, and the closer it gets to real-world conditions—how the network performs, how traffic moves between satellites, from a gateway to a user terminal, and everything in between. We're really committed to finishing this, and we've said the global service date is moving back by three months. The upside is that commercial service will still start on schedule at the end of Q1. Global service would have been our first choice, but the ability to meet the tougher high-latitude needs matters to us — those are considerable for Telesat, given the ESCAPE program and other requirements.
Maher Yaghi
analystThanks for that — good to hear. Perhaps one final point of clarification. Can you spell out for us what's behind the pushout of those two test satellites: was the call you made about launch logistics rather than any production delays on those satellites? I just want to be sure we've got a very clear understanding.
Dan Goldberg
executiveNo, I'd describe it as twofold. Those first satellites aren't ready to launch yet. The hardware is coming together. We've been spending quite a bit of time at MDA's factory, and it's encouraging to see those two satellites in assembly, which is precisely what's going on at the moment. Beyond that, there is software that has to be ready to sustain operations and, I'd say, to bring out what the satellites can do — software MDA is responsible for providing, plus software we build ourselves so we can fully test the satellite's capabilities, which matters for the testing. That effort is ongoing right now. We anticipate finishing all of it in time for the June launch window we have. Those are the two items. Were the launch vehicle ready today, we would not be in a position to place those first two satellites aboard it. We never expected to be at this point now, but that is roughly where things stand.
Maher Yaghi
analystGot it. Thank you very much.
Dan Goldberg
executiveThank you.
Caleb Henry
analystHi, thank you for that question. I actually have two. The first concerns the $5.6 billion backlog. Once service begins, how should we think about conversion — is it even, or does it ramp, and how much of it is take-or-pay?
Dan Goldberg
executiveHow much is take-or-pay? Essentially all of it is take-or-pay — the entire $2.6 billion. Let me address a couple of points. First, there's the $600 million deal with the government of Canada for rural broadband connectivity; that runs 10 years, and revenue recognition on it is essentially linear, roughly $60 million annually. As we discussed previously regarding that contract, it creates a pool of capacity that rural ISPs in Canada can draw on. When they do — and the Northwestel contract we announced, I believe, earlier this year is one example — that comes on top of the $600 million, and we expect that $600 million from the capacity pool to be exceeded. On the ESCAPE contract, I believe we've shared a fair amount of detail. A large prepayment is involved, and it has already begun arriving this year and next as we build the 69 satellites that the ESCAPE program helped unlock. Again, ESCAPE will leverage all 225 satellites. Much of the $2.7 billion in revenue recognition — that's the $2.3 billion for the initial piece, plus two option periods of $200 million each. There's a distinction between cash and revenue recognition. Revenue recognition will be more or less flat across a 15-year period, I believe. The cash mechanics differ, and since nearly $2 billion Canadian is paid upfront, there's also a financing component. We've aimed to be very transparent about that and to illustrate how it looks in some of the materials we've provided. Those two contracts alone account for so much of that $5.6 billion. Then we have a meaningful contract with Viasat, which is also take-or-pay, but that one ramps, and it's a meaningful contract, though I don't believe we've disclosed its exact value. I think that answers your question, Caleb?
Caleb Henry
analystThat's really useful, thanks. So my final question concerns the user terminals. Could you give us a sense of the road map — which kinds of user terminals you expect to be ready first, and how they roll out after that? From what you said earlier, it sounds like perhaps enterprise first and then aeronautical, but I'm wondering whether that's accurate, and how we should think about when they become available?
Dan Goldberg
executiveWe're advancing essentially an entire family of user terminals at the same time. Some user terminals will serve fixed land applications, and those are well along in development. These are user terminals — and I'm referring here to flat panel antennas. There are parabolic antennas as well, and those are extremely useful for what you might call remote communities that require lots and lots and lots of capacity. On the flat panel side — and we're seeing the market very much wanting the flat panels — we're advancing the FPAs, flat panel antennas, in parallel for the fixed land market serving enterprise applications. The same applies to maritime: they're essentially the same antenna, though with some modifications to handle a maritime and mobile environment. We're also working simultaneously on aeronautical antennas that could be installed on large commercial planes, but on bizjets as well. Those are two distinct kinds of antennas. Then there are particular types of antennas — I'd describe them as more ruggedized, sometimes even multi-frequency — for defence applications. All of those are progressing well, I'd say, and of course we fully expect them to be available when we're coming online for the various customers that we have.
Caleb Henry
analystThanks.
Walter Piecyk
analystHi Dan, how are you doing? I've got a follow-up question about Viasat. That was among your early sign-offs for Lightspeed. I'm just wondering, looking ahead to 2030, 2035, for a customer like that, what share of the total do you figure they'd account for? Would they end up being the biggest, or just one among many customers you'd be bringing in services or revenue from on Lightspeed?
Dan Goldberg
executiveHonestly, we don't really make those sorts of projections on a customer-by-customer basis. Our approach is more vertical by vertical, region by region. After that, for specific customers, certainly, if a contract is already in place with them, we essentially roll out the backlog, and that's what underpins the projections. You then apply the same approach with countries as well, governments, since those represent big chunky opportunities. With Viasat, I'd say it depends. Viasat is clearly a large provider in the commercial inflight connectivity market for aeronautical, but they're also a significant provider to governments, including the US government, of course. They have ambitions in the maritime space; we'll have to wait and see; we have what I consider a very good partnership with Viasat. We've collaborated with Viasat for decades, at times they're a customer of ours, at times we're a customer of theirs, at times we do things jointly; regardless, I'd say they serve as a channel for us across a lot of those different verticals.
Walter Piecyk
analystUnderstood. So I guess, just to piggyback on what Chris asked, that agreement is take-or-pay — so if Amazon were to buy Viasat, and I'd also like to hear your thoughts on whether an acquisition like that makes industrial sense, but if that happened and they wished to fold in Amazon's future LEO too, would that contract still be paid out, or could they walk away from it?
Dan Goldberg
executiveNo, that contract represents a take-or-pay commitment — as long as we fulfill our side, they have to fulfill theirs, meaning they pay us. We plan to fulfill our side. Certainly as of today for Viasat, having access to Lightspeed, I believe, is a key strategic priority for them. That's roughly how we look at it.
Walter Piecyk
analystGot it. Thank you.
Dan Goldberg
executiveThank you.
Chris Quilty
analystThanks. How come Caleb got in ahead of me and asked questions? Forget it.
Dan Goldberg
executivePress
James Ratcliffe
executivestar one first! Chris got on the ball.
Chris Quilty
analystI'm aware. Okay. There was one more thing I wanted to ask about, or perhaps just offer a comment on, regarding the terminals. There's no need to cover that today, but it would be useful going forward, on later calls or in your materials, if you could walk through the identity of those vendors — simply given the track record, whether that was Inmarsat launching BGAN without terminals available, or Iridium launching CERTUS without terminals, or O3b, where the mPOWER system was operational for years with no terminals. That has traditionally been a significant hurdle, and I believe some insight into it would be extremely valuable.
Dan Goldberg
executiveYes, that's a fair point. We've issued announcements regarding the partners we've worked with previously; I believe we've put out announcements concerning Intellian, Kymeta, and Phasor?, which I think was formerly known by a different name. So we've been fairly open about the partners we're collaborating with in that space. We've run demos with other companies as well, and we typically issue press releases when we do so. Look, we agree with your perspective. This matters a great deal. Having satellites in orbit, ground stations deployed, and software handling all the traffic is excellent, and it's essential, but it doesn't go far enough. What you need are capable, reasonably priced, high-performing user terminals available in the field that can serve a variety of use cases. With each passing day, the number of applications keeps growing—defence needs among them—and our team here is deeply committed to ensuring Lightspeed handles all those different applications and that terminals are on hand for our customers, delivered promptly, to back all of it. I'd suggest revisiting a few of our earlier remarks regarding the partners we're engaged with; there's solid progress happening on the user terminal front when it comes to emerging technologies, fresh chipsets hitting the market, and so forth, which simply keep improving things more and more.
Chris Quilty
analystI suppose I ought to have been clearer there. Going forward, as those vendors work through testing and so on, please keep us posted on where things stand so we can be sure everything lines up; and one more thing, I believe you brought up adding the polar service. What number of satellites does that require?
Dan Goldberg
executiveOur estimate is roughly 45.
Chris Quilty
analystAll right.
Dan Goldberg
executiveIf we just work through the numbers, that comes to 3 launches on our side.
Chris Quilty
analystYeah.
Dan Goldberg
executiveSorry.
Chris Quilty
analystWhat I believe you're referring to is a 3-month gap between the pathfinder and the operational satellites. Is that window sufficient for testing a satellite? I wasn't able to check, but I'm not sure how much time passed with Globalstar before those reaction wheel issues arose — my understanding is it was closer to 3 to 6 months.
Dan Goldberg
executiveNo — what we have is what we regard as an extremely thorough test campaign; it's closer to the 60-day sort of range. We've mentioned this before, but I'll repeat it, we intend to perform a tremendous amount of ground testing. That doesn't remove the need for testing with actual satellites in orbit, but no, we're confident, and we'll have every ground station worldwide that we require to support the testing. We have a detailed testing validation protocol of the kind that covers all the different network elements, the spacecraft included, naturally. No, I'd say Telesat does many things, but something we excel at is bringing new spacecraft into service, and so the team, in my view, has a robust approach for that.
Chris Quilty
analystUnderstood. One last question, if I may, about those sovereign deals. I think the market generally shows us two models: either you sell a system to the customer — and you used the Starlink example, right, where SpaceX sold satellites to the NRO for their Proliferated LEO, which was a sale transferred to the government even though they operate them — versus Starshield delivering service over Starlink. Then maybe ESCAPE again looks somewhat like the WGS-style arrangement, where allied nations contributed funding for capacity. Which of those models are you discussing with sovereign customers, or are there others, and can you meet all of them?
Dan Goldberg
executiveA few thoughts on that, perhaps. In many cases — and I'll return to a point I made earlier — we've served the sovereign market for decades. One model is simply delivering a service on Lightspeed, over the Lightspeed network, to an allied government. That's one. Two, we deliver the service to a trusted service provider of the allied government. Pick a country and picture a satellite services provider there that has a very close relationship with its own government and has served that government for decades. That's another model: we contract with their trusted service provider, which then provides the service to them. At times it could be government-to-government, so we provide the capability, for instance, to the government of Canada, and they enter into their own arrangement with one of their allied governments, and it flows that way. Some of these things aren't mutually exclusive. On a particular opportunity you can mix and match; that's roughly how it looks to us right now.
Chris Quilty
analystThat’s great. I appreciate the specifics.
Dan Goldberg
executiveAll right. Thanks.
Dan Goldberg
executiveAll right. Thanks so much, Operator, and thanks to everyone for being with us this morning — we're looking forward to talking with you once more when our full year figures come out. Thanks again.
Operator
operatorThat wraps up the call for today, everyone. Thanks so much for being with us. You're free to disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Telesat Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Telesat Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Telesat Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.