Terna S.p.A. (TRN) Earnings Call Transcript & Summary

November 13, 2025

Borsa Italiana IT Utilities Electric Utilities earnings 36 min

Earnings Call Speaker Segments

Operator

operator
#1

Good afternoon, ladies and gentlemen, and welcome to the presentation of Terna's consolidated results for 9 Months 2025. <<operator_script>> Please be advised that today's conference is being recorded. I would now like to hand the conference over to today's host speaker, Mr. Stefano Gamberini, Head of Investor Relations. Please go ahead, sir.

Stefano Gamberini

executive
#2

Thanks a lot. Good afternoon, everybody, and welcome as we present Terna's results for the 9 months of 2025. Our CFO, Francesco Beccali, is hosting this call. After the presentation, we'll hold the Q&A session. So we kindly ask you to send your question to our e-mail address, investor.relations@terna.it. Francesco, please go ahead.

Francesco Beccali

executive
#3

Thank you, Stefano, and good afternoon to all of you. Before I turn to the numbers, I want to spend a moment drawing attention to a few of our latest accomplishments. I'll begin with grid development, an area where we've achieved meaningful headway on several fronts over these past few months. First, the Tyrrhenian Link — one of the flagship efforts under our 2024-'28 Industrial Plan. As a reminder, prior to the summer, we finished laying the eastern section's first submarine cable. Then, on September 16, Terna and Nexans kicked off the initial installation phase for the western section, which links Sicily and Sardinia. When finished, it will achieve a world record for the deepest high-voltage subsea cable installation, going down to 2,150 meters below sea level. This effort will also mark an important move toward Italy's urbanization target. On October 21, the Ministry of Environment and Energy Security officially opened the authorization process for the Central Link project, which is designed to rebuild the 220-kilowatt backbone connecting Umbria and Tuscany — a vital step for boosting transmission capacity, grid robustness and renewable integration. A short while later, on October 27, the Ministry launched the authorization procedure for the Sardinian Link, an initiative to reconstruct and modernize Sardinia's grid infrastructure, reinforcing the island's transmission capacity and securing a more stable and resilient electricity system.

Francesco Beccali

executive
#4

Both of these projects appear in the development plan, with timelines set past the horizon of the business plan. One thing that sets the Central and Sardinian Links apart is that Terna's proprietary 5 phases technology will be used to build them — an innovative design marking a significant leap in how transmission infrastructure evolves. The new pilots are lighter, better integrated with the environment, and able to boost transport capacity while cutting electric and magnetic fields, which supports more efficient and sustainable growth of the grid. Also, on the authorization front, we signed a 5-year memorandum of understanding with the Marche region aimed at improving planning for new infrastructure, and the ministry began the approval process for overhauling the electricity grid in the city of Ferrara. Finally, in September, Terna closed the purchase of part of the high-voltage Rome from Acea for EUR 227 million, a transaction designed to reinforce continuity and security of the electricity transmission service. These acquisitions will also enable more effective decision-making on renewal and development investments throughout the Central Italy Transmission Network, while having only a limited effect on Terna's financial leverage and staying neutral for our credit rating. In addition to infrastructure development, we have made meaningful headway on the procurement side.

Francesco Beccali

executive
#5

Now let's turn to the following slide. We keep handling possible supply chain risk well, thanks to timing and effective mitigation steps. As of today, approximately 88% of the CapEx plan covering 2024-'28 is already secured through procurement contracts, which is up from over 80% in March. Every major project — including the Tyrrhenian, Adriatic and SACOI 3 Links — is fully contracted. Regarding the ELMED Interconnection linking Italy and Tunisia, the camel portion has already been secured, and tenders for the converter stations are presently in progress. The remaining portion of planned procurement contracts that still needs sourcing mostly concerns projects planned for the later part of the period, and procurement will naturally be completed over time. Moving now to regulation. A few days ago, ARERA released Resolution 476 of 2025, which checked whether the conditions for applying the trigger mechanism for 2026 had been satisfied. Since the change in the formula's market parameters stayed under the 30 basis point threshold set out in the regulatory framework, the present WACC of 5.5% for electricity transmission will stay the same in 2026. With respect to the ROSS mechanism, in August the regulator issued Resolution 390 of 2025, which launched the experimental phase of the ROSS Integrale mechanism for the 2026 and 2027 period.

Francesco Beccali

executive
#6

Back in October, Terna sent ARERA its business plan for 2026-2027, along with proposals for incentives tied to operational and performance efficiency. That plan is going to serve as the benchmark for the <<inaudible>> mechanism as well as for the fresh incentive-penalty mechanisms the regulator brought in concerning CapEx accuracy. Also on the regulatory front, in October ARERA issued resolutions 440, which granted Terna EUR 93 million in output-based incentives for extra interzonal transmission capacity and for investment efficiency. Last, on the topic of shareholder remuneration, the Board of Directors today approved the 2025 interim dividend of EUR 11.92 per share, unchanged versus last year's interim dividend. Keep in mind that the new dividend policy shared with the market in March established a minimum dividend per share matching the 2024 dividend for the whole span of the 2024-'28 business plan. Let me now quickly walk you through the customary snapshot of the Italian electricity market, moving to the next slide. As the chart shows, during the first 9 months of 2025, national demand came in at roughly 233 terawatt hour, a negligible 1.2% contraction relative to the same period a year earlier, when national demand stood at about 236 terawatt hour. Across that period, renewable sources supplied around 43% of national demand, consistent with the level seen last year.

Francesco Beccali

executive
#7

When it comes to national net total production, that figure came in at 201 terawatt hours, which is a 1% increase over the same period in 2024. During this period, renewable sources made up roughly 50% of national net total production, basically in line with what was recorded in the same period last year, when renewable energy sources covered about 51% of net total production. Finally, let me point out the remarkable growth in photovoltaic production, which rose 23% compared with the first 9 months of last year, offsetting the decline in hydro generation. With renewables continuing to play a major role in Italy's power mix, flexibility becomes crucial. So before we move to the company's financial results, let's turn to storage and the progress made under the MACSE mechanism, moving to the next slide. As you know, storage is the next frontier of the energy transition, essential to ensure flexibility and a system increasingly powered by renewables. As of September 30, Italy's total electrochemical storage capacity stood at 17.4 gigawatt hours, mostly small-scale systems, of which around 4.4 gigawatt hours were installed since December 2024. While small-scale installations still represent the majority, we are now seeing a sharp acceleration in large-scale battery projects.

Francesco Beccali

executive
#8

Back in September, we successfully ran the first auction under the MACSE framework. That auction handed out 10 gigawatt hours of storage capacity in total, which fully covered the demand. The results confirmed strong market interest in the mechanism, with bids coming in at more than 4x demand and average clearing prices roughly 65% below the reserve premium. That's around EUR 30,000 per megawatt hour a year, against a cap of 37,000 units. The contracted facilities should come into operation by 2028, together with renewable plants from the FER X auctions, which will help balance the system and cut reliance on fossil fuels for power generation, in line with the national decarbonization objectives. On this, the first auction — the so-called transitional FER X — closed in September, with final rankings expected by December 11. It saw strong participation, awarding up to 12 gigawatts of wind and solar capacity to be commissioned by 2028. The second FER X auction, which focused on resilient photovoltaic system, took place in October and offered an additional capacity of almost 2 gigawatts. Final rankings are expected by the end of December. Overall, these results mark a major step forward in Italy's energy transition. Now let's move to the main figures of the period as Slide #8.

Francesco Beccali

executive
#9

During the first 9 months of 2025, group revenues rose by 9% and EBITDA by 7% compared with last year — an increase of roughly EUR 235 million and EUR 134 million, respectively, over the first 9 months of 2024. Group net income came in at EUR 853 million, up 5% from the same period a year earlier. Group CapEx was about EUR 2.1 billion, roughly 23% higher than in the first 9 months of last year and a new record for Terna. That again shows how we are stepping up investments to meet system needs. To fund this faster CapEx, net debt at the end of September 2025 was EUR 11.7 billion, a bit above the roughly EUR 11.2 billion recorded at 2024 year-end. Now let's look more closely at the results as we go forward. As always, we'll begin with the revenues analysis. Total revenues for the first 9 months of 2025 were up 9%, at EUR 2.882 billion, EUR 235 million higher than last year. Both regulated and nonregulated activities drove that growth, contributing EUR 135 million and EUR 99 million, respectively.

Francesco Beccali

executive
#10

Now, let's examine how revenues have evolved, moving to the next slide. Regulated revenues came in at EUR 2.357 billion, up more than 6% compared with the prior year. This growth was primarily driven by RAB growth stemming from the recognition in tariff of 2024 capital expenditure, including the update and revaluation of the capital cost parameter. Also contributing was the early recognition in tariff of depreciation tied to 2024 capital expenditure, 1 year ahead of the earlier regulatory framework. And the fast-money component, set on the conventional capitalization rate defined under the ROSS application. Together, these factors more than offset both the reduction in the weighted average cost of capital from 5.8% to 5.5% in 2025 and the lower contribution from output-based incentives versus last year. Non-regulated revenues amounted to EUR 525 million, posting a double-digit increase of 23% relative to the same period a year earlier. That improvement largely reflects greater contribution from the Equipment segment, which includes Tamini and Brugg Cables, as well as from the Energy Services segment. Now let's move on to the operating cost analysis. As this chart shows, total operating costs were EUR 856 million, 13% above last year. The cost increase in regulated activities is chiefly driven by growth in headcount and a higher average cost of labor, partly offset by greater capitalization.

Francesco Beccali

executive
#11

Higher costs for materials and services tied to developing activities—chiefly in the Energy Services segment and the Equipment segment—were the main factor weighing on the non-regulated activities. That increase came from a larger volume of activity, which also showed up in revenue growth. On EBITDA, let's move to the next slide. With revenues accelerating, group EBITDA for 9 months 2025 came in at EUR 2.026 billion, 7% above the same period a year earlier. Regulated activities accounted for most of that gain, adding roughly EUR 99 million more than in the first 9 months of the prior year and posting an EBITDA of EUR 1,923 million. EBITDA from non regulated activities rose by 51% to EUR 103 million, driven mainly by a stronger contribution from the Equipment segment, with margins improving at both the Tamini and Brugg Cables groups, along with better results from the Energy Services. Now let's look at the lower part of the P&L, moving to the next slide. D&A came to EUR 679 million. The increase compared with last year's figure was chiefly tied to new infrastructure entering service. As a result, EBIT was EUR 1.348 billion, 7% higher than in the first 9 months of 2024.

Francesco Beccali

executive
#12

Net financial expenses came to EUR 132 million. That modest rise of EUR 27 million compared with a year earlier stems chiefly from drawing down new financing and from reduced financial income on cash investments, partly offset by greater capitalized financial charges. Taxes were EUR 362 million, which is EUR 24 million above last year, essentially because of better results. Our tax rate came in at 29.8% versus 29.4% across the 9 months of 2024. Consequently, group net income came to EUR 853 million, a gain of 5% over the corresponding period a year ago. Turning now to the CapEx analysis. Across the first 9 months of 2025, total CapEx was roughly EUR 2.1 billion, 23% higher year-on-year, which confirms the robust CapEx acceleration consistent with planned targets. Roughly EUR 1.972 billion went into regulated activities. Key projects during the period include the Tyrrhenian Link, the Adriatic Link, SACOI 3, the upgrading of the high-voltage grid in the locations linked to the Winter Olympics in 2026, and the Chiaramonte Gulfi–Ciminna power line. In addition, we should factor in the investments foreseen under the defense plan, which are essential to strengthening the resilience of the National Transmission System by installing synchronous compensators, shunt reactors and dumping resistor systems.

Francesco Beccali

executive
#13

Looking at the CapEx breakdown, development CapEx made up 57% of the regulated investment total. Defence CapEx came in at 13%, and Asset Renewal & Efficiency accounted for 30%. Non-regulated and other CapEx was EUR 115 million, which includes capitalized financial charges along with other investments. Moving to the next slide. Cash flow generation during the period reached roughly EUR 2.2 billion. That came from approximately EUR 1.5 billion in operating cash flow plus around EUR 700 million from working capital and other items. At the close of September 2025, net debt was approximately EUR 11.7 billion, roughly EUR 500 million above the 2024 year-end level, mainly driven by the CapEx acceleration and the dividend payment. Now let's take a closer look at our debt profile as we move to Slide 17. As of the end of September 2025, the fixed floating ratio on gross debt came in at around 83%, with an average duration of approximately 6 years. In line with Terna's strategic approach of aligning capital allocation with sustainability goals to enhance long-term value, by the end of September, Terna's sustainable financing portfolio comprised EUR 3.75 billion in senior green bonds and EUR 1.85 billion in perpetual subordinated hybrid green bond. On that note, let me remind you of the successful launch of the first European green bond, with a total nominal amount of EUR 750 million, issued in July.

Francesco Beccali

executive
#14

These bonds got a very favorable reception in the market and will carry a 3% annual coupon. Beyond that, Terna has access to EUR 2 billion in ESG-linked term loans, 3 ESG-linked revolving credit facilities amounting to roughly EUR 4.300 billion in total, and a EUR 2 billion Commercial Paper Program devoted to issuing short-term conventional or ESG notes. Lastly, as we already told the market back in July, the European Investment Bank, Terna, Intesa Sanpaolo and SACE have signed agreements worth a combined EUR 1.5 billion to back the development and construction of the Adriatic Link, the submarine power cable that connects the Italian regions of Marche and Abruzzo. Thank you for listening. I'd like to wrap up this presentation now with a few closing remarks. First, let me stress that our focus remains firmly on carrying out our industrial plan. As we pointed out during the presentation, we're delivering a solid set of results while also making tangible progress on all our main projects, and we're staying disciplined on procurement even though the environment is still challenging. All of this reconfirms our capacity to honor our commitment. Meanwhile, the broader energy transition keeps moving ahead quickly.

Francesco Beccali

executive
#15

The latest FER X and MACSE auctions offer obvious proof of that headway: more than 12 gigawatts of fresh renewable capacity were awarded through FER X, while 10 gigawatt hours of storage capacity got contracted in the first MACSE auction — and in both cases the prices came in competitively, nicely under the caps set for each. What these outcomes show is that the market has serious momentum and that the regulatory framework underpinning the transition is solid. So, to wrap up, we firmly reaffirm our guidance for the full year 2025. Our expectation is revenues of EUR 4.03 billion, EBITDA of EUR 2.7 billion, and net profit of EUR 1.08 billion. On the investment side, the group's target for 2025 sits at roughly EUR 3.4 billion. Thanks for listening. We're ready now to take your questions.

Stefano Gamberini

executive
#16

Thanks, Francesco. We’re now ready to begin the Q&A session. Francesco, a lot of questions came in about the press rumor concerning a possible sale of a stake in the transmission grid. Could you say something about that?

Francesco Beccali

executive
#17

Although we normally refrain from addressing speculation in the press, I want to be clear about this. Right now, that is not something on our table. We are continuously reviewing every possible instrument available for financing the development and maintenance of the National Transmission Grid, and the outcomes of those reviews always find their way into the decisions laid out in the Industrial Plan. On that note, let me reaffirm what we have said since we presented the update to our plan back in March. From a financial standpoint, our CapEx plan to 2028 is fully sustainable. The upgrade of our rating to A- by Standard & Poor's, together with Moody's revision of the outlook to positive from stable in April, provides further confirmation of our financial solidity. As of today, the flexibility tools we could evaluate include the remaining hybrid issuance capacity, worth more than EUR 2 million, as well as pursuing additional public contributions to reinforce the financial structure and examining options to valorize and monetize our nonregulated activities.

Stefano Gamberini

executive
#18

Let's switch to output-based incentives for a moment. How many OBIs were recorded in the 9 months of 2025? And can you confirm what you expect for the full year?

Francesco Beccali

executive
#19

For the 9-month revenue period, nothing has been contributed by output-based incentives tied to dispatch and services market efficiency incentives. Recognition of that will happen in the final quarter, once we have complete visibility and certainty, consistent with the accounting principle. Instead, during those 9 months, we recorded EUR 16 million related to the interest incentives. As for the full year, our expectations incorporate the revised performance estimate for 2025, which lets us reach and potentially go beyond the guidance we already gave following the first quarter of 2025 — namely more than EUR 50 million from OBI's contribution.

Stefano Gamberini

executive
#20

Thanks. It's still on guidance. Given that you're already at roughly 80% of the full-year net income guidance, why aren't you raising that guidance for the full year?

Francesco Beccali

executive
#21

Okay, so the solid numbers we posted across the first 9 months gave us more visibility and made the guidance we shared back in March more reliable. That said, as I just highlighted in my earlier response, there are still some pieces where we lack full visibility — dispatching incentives being one example, since we have to wait until the year is over before we can pin down the early performance with complete certainty. Keep in mind this marks the first year of the renewed dispatching incentive framework. As a result, every incentive we book in 2025 will be tied to how 2025 performance turns out.

Stefano Gamberini

executive
#22

With the interzonal incentives that Terna was granted under Resolution 440/2025 in mind, are you raising your guidance on OBIs?

Francesco Beccali

executive
#23

As we already mentioned during the presentation, we want to emphasize that this roughly EUR 93 million in interzonal incentives gave us better visibility on the EUR 900 million guidance for total OBI across the 2024-2028 period. As we have consistently reported, those interzonal incentives will be accounted for over 3 years, beginning with next year. During the first half of 2025, we have already recorded EUR 16 million of interzonal incentives recognized from prior years. We haven't disclosed how our OBI guidance breaks down across the various mechanisms. Still, let me remind you that the overall figure mainly relates to the existing output-based incentive framework, with a larger contribution coming from the dispatching service and, for a remaining portion, instead tied to the ROSS Integrale schemes, which are back loaded.

Stefano Gamberini

executive
#24

Sure. Could you share your thoughts on the expected incentives for ROSS Integrale and what the potential timeline might look like?

Francesco Beccali

executive
#25

ARERA's most recent resolution essentially makes clear that the regulator is concentrating on the need to give companies incentives to deliver strategic, high-value energy infrastructure efficiently. Under the business plan, ARERA permits companies to submit proposals for new output-based incentives that are reward-only, and those proposals will undergo regulatory scrutiny and approval. We are not ruling out that the regulator may issue fresh incentives prior to the close of the current regulatory period.

Stefano Gamberini

executive
#26

Alright, moving on to data centers — are you noticing any meaningful pickup in data center projects?

Francesco Beccali

executive
#27

When it comes to Italy, grid connection requests tied to building data centers have seen robust and ongoing expansion over recent years. By October 31 of this year, total high-voltage connection requests came to roughly 64 gigawatts, with about 378 requests currently active. Looking at geography, roughly 80% of those connection requests sit in Italy's northern areas, particularly Lombardy near Milan, which confirms that region as the main hub for data center growth. That is why data centers will be one of the drivers — alongside electrification of household consumption and electric mobility — behind the anticipated rise in power demand over the coming years.

Stefano Gamberini

executive
#28

Could you give us an update now on where things stand with authorization and procurement across the Industrial Plan horizon?

Francesco Beccali

executive
#29

Absolutely. For our investments, the procurement process is moving forward consistent with the Industrial Plan. Projects that remain in the authorization stage and are expected to be completed after the plan horizon are not strategic and have only a limited effect on total CapEx. Authorization processes for major projects scheduled beyond 2028 will be started at the appropriate time. As of today, every one of our main HVDC projects within the current plan has obtained the required authorizations, and roughly 92% of the projects in the plan have finished the approval process. In addition, we are working actively to finish all authorization procedures in line with the planned implementation time line, for 2030 as well as for the longer-term horizon toward 2024. On procurement, we are completely aware of the possible supply chain shortages and bottlenecks impacting the industry. To manage this risk, we have undertaken several steps to ensure continuity. Thanks in part to support from Brugg Cables and Tamini transformers, about 88% of 2024-'28 CapEx is already covered by existing procurement contracts, up from the 80% in March.

Stefano Gamberini

executive
#30

All right. Turning now to working capital — can you share some detail on how things played out during 9 months '25, and what you expect the working capital figure to be at year-end?

Francesco Beccali

executive
#31

During Q3, working capital and other items show roughly a EUR 700 million decline relative to the close of 2024. That movement, clearly, benefits our cash flow. The outcome stems chiefly, first, from a rise of approximately EUR 390 million in net pass-through energy payables, driven largely by greater debt tied to the essential plant for the security and electricity system — the so-called <<inaudible>> — and the capacity market, partly offset by larger credit from the cost of procurement of procuring resources on dispatching market services. Beyond that, we must factor in the growth of other net liabilities, essentially from higher security deposits received from operators taking part in the capacity market along with greater planned subsidies received from third parties. We also need to reflect the drop of roughly EUR 156 million in receivables from regulated activities, tied to collection of the prior year's dispatching market efficiency incentive, partly offset by increased receivables from transmission revenues owing to the tariff update set by ARERA Resolution 579 of 2024. Lastly, this figure also captures the impact of closing the acquisition of the high-voltage grid portion from Acea.

Francesco Beccali

executive
#32

On the working capital forecast for year-end, because of the usual seasonality, I should remind everyone that we expect a significant reduction in working capital liabilities, pending payment resolutions from ARERA.

Stefano Gamberini

executive
#33

Thank you. And lastly, on the regulatory side. When do you anticipate the new Board of ARERA will be in place? Do you perceive any danger that ARERA might shift its stance on the energy transition — and therefore on backing for investment in the electricity networks?

Francesco Beccali

executive
#34

As we’ve said consistently, the reasoning behind Italy’s energy transition is really robust, since it essentially enables the country to lessen its reliance on imported energy and commodities. Investment is essential for the energy transition to move forward, and we play a key part in that process. We recognize that ARERA’s new Board ought to be appointed before the year is out, and we aren’t anticipating any major shift in how ARERA approaches the energy transition. Law 481 stipulates that commissioners have to be selected from among individuals of exceptional competence. We’re confident that the point we just made offers a solid rationale for avoiding regulatory risk.

Stefano Gamberini

executive
#35

Thanks a lot, Francesco.

Francesco Beccali

executive
#36

I appreciate it.

Stefano Gamberini

executive
#37

That brings the Q&A portion to a close. The Investor Relations team remains available, as always, to address any follow-up questions you may have. Thanks to all of you for joining us, and enjoy your evening.

Francesco Beccali

executive
#38

Thanks to all of you, and good evening.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Terna S.p.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Terna S.p.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Terna S.p.A. or any ticker on your watchlist.