The Hub Power Company Limited (HUBC) Earnings Call Transcript & Summary
November 3, 2026
Earnings Call Speaker Segments
Unknown Executive
executive[Audio Gap] Hub Power Company's corporate briefing for the year ended June 30 and some of our Q1 highlights. I have with me our CEO, Mr. Kamran Kamal; and our CFO, Mr. Muhammad Saqib, and the team. And we will go through the presentation with you, and then you can ask your questions. We have a few, which have already been received. We will be answering those. And any questions that you have, please feel free to put them in the chat box.
Muhammad Kamal
executiveYes. So welcome, everyone. I think this is a slide that we show where we are geographically located, all our power plants from Tharparkar to Hub, Balochistan, Narowal and Mirpur, then there is oil and gas installation in Bhit and Bhadra and Kadanwari as well. And we are setting up a BYD plant in Gharo, Sindh. These are our 2 plants. Basically, third plant is ThalNova Energy -- ThalNova Power Plant Limited and also Thar Energy Limited, which is 330-megawatt power plant in Tharparkar using Thar Coal Power Block II Coal and China Power Hub Generation Company, which is 1,320-megawatt power plant located at Hub, Balochistan. It is -- I mean, has been in production since 2019. So yes, the CPHGC has declared 2 dividends in Q1 2027. And they actually have 1 annual dividend cycle, which is once a year from the lenders, but then we distribute it as and when needed from China Power to the parent companies as well. And just recently, there has been an event and a disclosure that we had, which was that the Unit 1 transformer, which is the main transformer connected to the 500 kV transmission line, which had a fault in it. And there is a design institute, which has been engaged in the manufacturer to assess the reason for this damage as well and how we can actually, in the future, make sure that such an instance isn't repeated. We are still assessing all these things in terms of being in touch with the transformer manufacturer, the insurance company, the lenders and also we've mobilized the contractor who is going to be, I mean, doing the repair works for installing a new one that is being still under consideration. Prime Energy, obviously, that is oil and gas company. We have a Sukhpur block. We are in Naing Sharif. We also got a 10% stake in another block with a Polish oil and gas company, Baran Block. We also acquired 4 offshore at what they are going to be doing the seismic activity jointly with Mari and Turkish Petroleum company as well. We are, at the same time, looking at offshore in the West African offshore waters. We have been in conversation with multiple companies out there, and we will continue to do -- look at opportunities in Pakistan, onshore, offshore and outside Pakistan as well. Obviously, given our size, we will have to look at the opportunities which offer the maximum economic value for a company of our size, which is a small oil and gas company, but there are opportunities, which keep coming up in Pakistan and outside as well. Ark Metals is the mining and minerals company that we had invested in. Obviously, with the slowdown in the activity in Balochistan, we are also observing the situation. So, we are now focusing our efforts in the GB and the KP area. For other minerals, we were actually working on a drilling -- we were running a drilling program near Dalbandin on a lease -- on a mining lease, and we have done about 4,000 meters of drilling, which we will continue to do as -- I mean, as and when situation gets better in terms of the mining activity around because it's an ecosystem thing. There is a Barrick, there's NRL, there's Mari, there's FWO. So, all the contractors when they are mobilized, it's easier to basically carry on that activity because a lot of these core samples have to be shipped outside Pakistan for testing and everything. So, we remain hopeful that we will be expanding our footprint into this domain as we progress further. But obviously, one must realize that these are long gestation projects and anything that will come through will be after 2030. So, I mean, they are on track because they are slow-moving projects, and you have to keep looking at what the resource is, which area will be more prosperous. So it's a much slower process than any of setting up a factory or a plant in a settled area for a production line. So, this is the most exciting part in our portfolio at this point in time, which is the business -- which is the consumer business. So, we have had 6 product launches over the last 2 years, Atto 3, Seal, Shark 6, Atto 2 and Sealion 7. We had unveiled Sealion 6, but it was always scheduled to be a CKD production. So we -- this was shown in the lineup in August 2024, but I think this is just now around the corner. We have achieved many milestones. Over the last year, 1.5 years, we have sold over 10,000 BYD cars, and most of them are electric or plug-in hybrid cars. We do not have any other -- I mean, the ICE or hybrid electric cars. Atto 2 and Atto 3 have been very successful. You will see across the country. Shark 6 has done really well. Seal and Sealion 7 are premium brand cars, and they've done considerably well in the bracket that they operate in because these are high-end cars. The Sealion 6 will be a plug-in hybrid, and we will be starting our production. The production will come online in December [Foreign Language] as planned. We've always maintained the second half 2026 will be when our plant will be completed, and we are on track despite, I mean, shipment delays and all of that, which is the geopolitical risk. But we will [Foreign Language] be starting with Sealion 6. And as I've repeated earlier as well that the best thing about BYD is that they have a car in every category from A0 to all the way up to a luxury car or a sedan or a 4x4. So it will be in line with our launch schedule earlier that we'll continue to bring the cars. Obviously, people have a question that how would it be priced? Just like all our products in the past, they'll be very competitively priced, and we've maintained that we believe in offering value to the customer. So, this will be a value for your money as people have seen over the last 6 to 8 months that offtake for Atto 2 and Atto 3 has been very, very well received because of the value that we offer to the customer in such a competitive environment. It's all about caring for the customer, offering them the value and providing the ecosystem. And that is, I think, what is synonymous with BYD, and that has been the key to their success across the globe as you see in Europe, as you see in South America, ASEAN or Southeast Asia and China particularly. So, we will continue to follow that. And I think we will have the dealer network across Pakistan by the time our assembly plant is in the production phase. We've already been gearing up our launches of our 3x dealerships across Pakistan, Faisalabad, Gujranwala, Lahore, Islamabad, Peshawar, Karachi. These are all the leaderships that we are already in the process and in the pipeline, multiple dealerships in Karachi, multiple leaderships in Lahore, Sialkot. So, all of these will be launched in a series phase as they should be -- a customer should be served across the country as well. These are some of the features of Sealion 6, which has been, I think, in our initial launch, we shared that. It's a 1.5 turbo engine. It's in the C category, which is very similar to the other competitors' category. It's a good car. I think it offers -- for the urban mobility, it can operate on a battery. And if you are doing intercity, then you will be basically be relying in a mix of a battery and an engine or an ICE engine. So these are -- I've already talked about dealerships. Now, what have we done differently than the others is that we have taken care of our customer now. We can proudly say that any customer leaving Karachi can reach Peshawar safely without caring or without concerned about the range anxiety. From Karachi, until Peshawar, we have our charging stations. They are fully backed up. The uptime is 99.5% and higher. They are everywhere. We have a backup generator. And I think we will be expanding the footprint. Now, our focus will shift to the national highways because first, we were focused on the motorways. And from that, we will also be evaluating in the cities as well. And we are non-exclusive with all the OMCs. We would look at the charging point, wherever the traffic is, we will be putting it up. The government has been very kind to offer A2D connection, which is PKR 39 all-inclusive tariff, which means that the charging on the road is not really expensive, and it is around PKR 100 a unit. Obviously, you people have been benefiting from their solar rooftop and also doing it from the residential. If you are parking your car at home, you can charge your car at less than PKR 40. If you have a solar and a battery during the day, you can charge it at a no cost. So, I think what we believe in is providing the ecosystem so that you can drive your cars without being concerned about if you're going to be stranded. We have a commitment to our customers that we'll take care of them, and this is one of those initiatives. We will continue to expand our footprint. We have about 25 to 27 charging points at this point in time, but we are committed to reach to 50 and then 100. And we will make sure that there is a charging station at every 150 kilometers along the major highways, and we will continue to observe on. There is a live app, which allows you to plan your trip. There's a website. There's a lot of -- we take the feedback very seriously. So, I mean, we continue to give the service. There's a regular maintenance cycle. We make sure that our charging stations are up and running at all times. We do not want anyone to be stranded at any time during 24 hours or anywhere. Privatization of Discos. So, one of the questions was that why -- I mean, we are after what has happened in the sector. I think we look at it in a positive way that the government has realized that energy sector needs to be reformed and it needs to be privatized. Whatever they've set out to do in the '80s and couldn't do it, I think even it's better late than never because what we believe is that if the distribution companies are privatized, the sector will actually flourish rather than being driven by a public sector only because that has only created problems for everyone involved in the value chain. And given that our exposure in one part of the value chain, which is the generation only, it can only get better from here because these distribution companies are very well-performing distribution companies. There is a change globally happening with the distribution -- distributed solar and renewable energy in the battery with the duck curve getting worse. The pricing by the private sector will stop this reneging from the grid. I think there is a reform package, which government has brought in. We hope that they do it in a spirit that actually makes the sector more vibrant. And even -- I mean, you can go for the return, but overall, you have to look at how the return -- how the reform is going to deregulate this sector and create opportunity for investment and making this sector better. Obviously, this is a tough sector given how electric has fared over the last 20 years, but more private sector participation can only make it better. We've seen in earlier sectors as well. And we are hopeful that you have to be part of the reform process. So, this is an opportunity to be part of the reform process. If we can do, I mean, improve any of these distribution companies, if we are successful, we would do that. Obviously, this doesn't come without challenges. But if you are in a sector, what else the opportunity would be? I don't think we need any more generation capacity. We need to make this generation capacity more affordable to the customers. And if reform process can make it affordable, I think there is an opportunity for improving the national grid, improving the industrialization in this country, bringing locational pricing, which has been the -- I mean, at this point in time in anathema for the thinking in Islamabad. I think we can use this stranded southern capacity in a much better way if this sector is reformed. These are operational highlights. We've shared earlier as well that our plant is available. We only look at the availability that is in our control, making sure our plants are available at all times and above the PPA limits. PPA is just a contractual limit. We aspire to be on a much higher level. And then the load factor is determined by the demand on the grid, and that is determined by the National Power Control Center, which has been now changed to ISMO, Integrated System and Market Operator. So, that is what they determine. But if you are available and as and when needed, they will dispatch you.
Muhammad Saqib
executiveThese are for the first quarter.
Muhammad Kamal
executiveThese are for the first quarter, obviously, the same.
Muhammad Saqib
executiveLoad factors have improved because of the non-availability of LNG. So if you look at load factors of CPHGC and Narowal, they are much better than what they were last year. These are the revenues for the fiscal year 2026. So, our revenue is down on the unconsolidated level because HUBCO's contract was terminated. So, there is no revenue from the old HUBCO plant. But the share of profit has increased 97% as compared to the last year from PKR 15 billion to PKR 29 billion and net profit has also increased from PKR 19 billion to PKR 24 billion. On the consolidated level, the revenue and gross profits are down primarily because of the full impact of the termination of HUBCO. But dividend income and share of profit from the associates has improved. Similarly, net profit has also gone up to PKR 50 billion from PKR 46 billion last year, and EPS is also up by almost PKR 3. So the key drivers on the consolidated accounts are that we have a higher share of profit from associates and we have lower finance costs because all of the debt was repaid pursuant to termination. And the downside is that this was the last year in which we had an impact of PPA. From next year onwards, there will be no impact appearing in the accounts. On the -- this is for the first quarter. On the first quarter -- in the first quarter, on the stand-alone basis, the dividend income and share of profit is up by 20% and net profit is also up marginally by 3%. And the key drivers are higher dividend from subsidiaries and higher income from our investments. On the consolidated basis, revenue is up by PKR 22 billion from PKR 17 billion to PKR 22 billion and gross profit is also up by 5%. We had a higher share of income from associates around 18%, and this had an impact on the net profit, which is up by 10% as compared to last quarter of fiscal year 2026. Next?
Muhammad Kamal
executiveThese are the awards that we received during the year.
Unknown Executive
executiveSo on ESG, HUBCO continues to strengthen its approach on ESG through the governance right from the Board level. We have a strategy in place, which has also been approved by the Board, which is a 5-year strategy. Under that, we have strengthened the water stewardship and the waste management at our Thar site. There's also been a reduction in the greenhouse gas emissions and implementation of the ISO 5001-based energy management initiatives. We proceed with our targets of plantation, and we have increased that in Q1 as well. We've also secured the WWF Green Office Certification at our Laraib site and in AGT and the head office. Solar street lights have been put at Thar site. So overall, there has been also a strengthening of ESG governance right at the management level. We have a Sustainable Growth Committee, as well as we have all the way up to the Board level monitoring. There has been maintained compliance with OSHA CFR, ISO and PSM, and we have been able to achieve a 0 total recordable injury rate. And we continue to work on increasing female representation across the workforce at all our locations.
Muhammad Kamal
executiveSo on the community impact, we continue to focus on education, livelihood, health care infrastructure around our plant sites, which are in Tharparkar, Narowal, Mirpur and Hub, Balochistan. So, we partner with all the leading NGOs and also make sure that wherever there is an opportunity to help the local community, if that can mean the livelihood, training the women for digital technologies or health care in terms of working with LRBT, education, TCF or any other organization that we can feel that is -- I mean, can be helped and that will be beneficial to the local community, we continue to use our CSR funding for this. And we have a dedicated team, which goes around and evaluates and monitors the progress on all of these areas as well and see where the next year's funding can be in and how we can best utilize it.
Unknown Executive
executiveWe will go to the questions. So shall we go to the ones which we received online. So there's following the recent transformer failure at CPHGC Unit 1, what impact is expected on the plant's load factor, which currently averages 28% to 30%? And by how much percentage points is it likely to decline?
Muhammad Kamal
executiveSo at this point in time, I'm sure many of you would be aware that there's a North and South transmission constraint. So, our best estimate that as we saw that the load factor has improved in the Q1 as well, but still there is a constraint. So, maximum demand would have been at 600 megawatts, which one unit can serve. And overall, even if you were to look at the high merit order plants in Tharparkar, they are also not dispatched at 100% all the time. So, there is a curtailment or there is a constraint, which restricts the movement of electron beyond Jamshoro. So, I think there will not be an overall impact on to the China Power because maximum that can be dispatched is 600 megawatt after Lucky Power has come on to a domestic coal. So, their merit order has increased. So, that 600 megawatt will be dispatched ahead of all the other southern plants. So, I think we do not see -- foresee any decline in the dispatch numbers. Obviously, as I explained earlier, it is up to the National Power Control Center to give you the dispatch. So, that's how our view is that the demand is being met. On the...
Unknown Executive
executiveYes. On the second one, following this, what is the expected time line to restore Unit 1 to service?
Muhammad Kamal
executiveAt this point in time, it's a couple of months. We are in talks with our transformer manufacturer. And we have mobilized one of our contractors who's going to bring the installation equipment, move the previous one and bring in the newer one. Obviously, these transformers are specially made, so it will take a few months. But I think we should be back in service as soon as possible. Subsequently, your question would be that, I mean, how -- obviously, there will be a capacity payment deduction, which is covered under a business interruption insurance. The insurers, how it works, there are some deductibles, certain deductibles, which is within a manageable range. And then also this final determination can only be done how much outage allowance that we use. There is something called scheduled outage and there is something called forced outage. So, that allowance calculation will happen once we have a firm time line from the supplier and also everything is understood. But we will be -- we are very confident that this will be compensated. And there will be some deductible loss that will happen, but that is in -- that's already in the manageable range. But the final number will only be available to us after the allowances have been calculated that how much post outage allowance we have consumed and how quickly we can come back in service as well.
Unknown Executive
executiveAnd in the interim, how much capacity remains available for generation? And will it be sufficient to sustain the load factor going forward?
Muhammad Kamal
executiveWe've already answered. 660-megawatt Unit 2 is available and is already dispatching.
Unknown Executive
executiveMoving on. Recent industry reports indicate that a private group has proposed to restructure the 1,320-megawatt Port Qasim imported coal plant PPA to create dedicated captive power offtake for a greenfield smelter. Given Port Qasim's existing port infrastructure, the government grants such a framework to a competitor at Port Qasim, does HUBCO's proposed 300 kt aluminum smelter project at Hub remain commercially viable?
Muhammad Kamal
executiveSo, we believe that any such policy will be for a pan-sectoral -- on a pan-sectoral basis. It will not be on an individual basis. I think such a large industry cannot be just developed on a one-on-one basis. So if the government comes up with a policy, we believe there is not a -- captive power is not the solution. We have a different approach to it. But whatever the policy is, these projects are basically for the export focus. So if it is economically viable, wherever it is viable, we feel that our project remains viable, we will set it up. But it remains subject to the government policy. I do not think that any policy will be about a certain power plant or a certain location. So, that is not in line with what Pakistan has been doing over the last several years now. So, we do not feel -- and if there is an opportunity for more than one smelter, then so be it. So, that's how we look at it.
Unknown Executive
executiveHas HUBCO evaluated pitching a similar PPA restructuring, repurposing framework for its own CPHGC plant to power a co-located smelter under CTBCM rules?
Muhammad Kamal
executiveNo, we believe that the smelter requires a different -- multiple power sources. So, I think the solution that we are proposing is much different than what you might have read about the other companies. So, we feel that our proposal is more pragmatic and also makes sure the continuous operation, which the smelters, just for reference, operate about 95% to 98% of the time entire year, which means like in excess of 8,500 hours on a yearly basis, which is very continuous operation. So, I think we do not need to propose any restructuring or work under CTBCM rules. I think it is going to be on a locational pricing model, which makes sure that there is an affordable power and then the excess power can be used for economic use and bring the export dollars for Pakistan and create economic opportunity downstream as well.
Unknown Executive
executiveWhy is the management not exploring battery as a service or battery swapping infrastructure to lower the initial acquisition cost of vehicles and accelerate EV market penetration in Pakistan?
Muhammad Kamal
executiveSo on the 4-wheeler that we've been focusing, I think, globally, the battery swappable solution has not been very prevalent. The NEO as a brand does that, and they've been testing with it. But I think in a country like Pakistan, you need to have a setup and all of that, given that people have been very comfortable charging the battery at home and using it for the city commute, I do not think that, that is the place where it has gained traction anywhere globally. However, a 2-wheeler is a different thing where it does make a difference. But our focus has been 4-wheelers. Obviously, there are people who are looking at a battery as a swap -- battery as a service, and it will go hand-in-hand with the EV -- 2-wheeler EV penetration and maybe 3-wheelers because the battery technology there is still evolving. So, we would continue to observe it. And if there is an opportunity, we will look at it.
Unknown Executive
executiveOkay. I think you already answered when you were talking about the discos. In light of NEPRA's approval for ISMO's 400-megawatt wheeling auction with a mandatory 10% BESS requirement, does HUBCO intend to utilize its available 1,100-acre Hub base plant site to set up a solar plus BEES facility and supply power directly to bulk power consumers?
Muhammad Kamal
executiveSo for this, I think participation in CTBCM, this 400-megawatt auction is -- I mean, has to be based on a location, which has the best renewable energy potential. And I feel that Hub site is a brownfield industrial site, which is more valuable for an industrial installation rather than converting into a solar farm as well. And there are better areas available in Sindh, where you have a wind corridor, you have a good solar radiation, so you can bring the tariff lower and you can be competitive as well. So, I think we would continue to -- if there's an opportunity, we would look at the most opportune piece of land and also wherever the tariff can be lower because this is going to be a competitive auction.
Unknown Executive
executiveSince key growth platforms Thar plants, Mega Motor, et cetera, reside under Hub Power Holdings, is any corporate reorganization or holding structure review under consideration to eliminate some of the parts discount and maximize value for the HUBCO shareholders?
Muhammad Saqib
executiveAs far as power holding is concerned, because it is a 100% subsidiary of HUBCO, there is no tax advantage or disadvantage in having the holding company because whatever dividend is received from Hub Power Holding, there is no dividend tax on that. So as of now, we do not have any plans to actually merge these 2 entities and have just one holding company because we may actually decide to have some facility, some industrial undertaking in the old -- in our HUBCO books.
Unknown Executive
executiveOkay. So CPHGC, we got the answer on the port outage. What is the breakup of CPHGC's dividend income?
Muhammad Saqib
executiveIn the first quarter, we received PKR 36 billion.
Unknown Executive
executiveWhy is the company?
Muhammad Kamal
executiveFull year?
Muhammad Saqib
executiveIn the full year, we did PKR 36 billion? In the first quarter?
Muhammad Kamal
executivePKR 24 billion.
Unknown Executive
executiveWhy is the company holding so much money back in HPHL despite much of investment done in BYD?
Muhammad Saqib
executiveThe money in HPHL is transferred to HUBCO based on the requirements in HUBCO of dividends to shareholders and any other investments, which is needed at the HUBCO level.
Unknown Executive
executiveThe BYD reported profits of PKR 780 million in Q1. What was the reason for that in volume and margin breakup?
Muhammad Saqib
executiveBYD first quarter profit was almost PKR 1,500 million. Our share was PKR 780 million. And the reason was that because of the increase in the overall petrol prices, the car sales actually increased.
Muhammad Kamal
executiveSo we've delivered -- we've been consistently delivering a high volume, and that's why it helped us achieve 10,000. Now, I think we are much higher than that number as well. And we only disclose it as and when BYD wants to disclose this number globally as well. So, we've been one of the fastest-growing markets for BYD for their Atto 2 and Atto 3 as well over the last 8 months since this war in Iran broke out. And that is directly correlated with the petrol prices and people see value for money in terms of a city commute. So, that's the volume and the deliveries that we've been able to make in the first quarter that has resulted in a profitability for the company. And [Foreign Language], it will continue to go from strength to strength as we come up into the CKD production as well.
Unknown Executive
executiveWhat is the pricing for B8 and Sealion 7? And when will the plant come online? Anything on plant...
Muhammad Kamal
executiveSealion 7 is already priced. I think the Sealion 6 is the question. And we've said that just like all our products, it will be very competitively priced. And Bao 8 and Bao 5 will also be launched towards the end of this year [Foreign Language]. So the exact date will be known whenever that decision is made, but we are hopeful that, that will be launched this year as well.
Unknown Executive
executiveThere are already some car companies in Pakistan with a lot of experience and specialists. What is your distinction? And whom have you hired with auto industry experience?
Muhammad Kamal
executiveI think as I said earlier as well that we believe in delivering value to the customer and that obviously, there are people who might have been in the business longer than us. But our commitment is to the customer, offering them the value and the product itself. Everybody and anybody who's given a BYD product, people read reviews, people are much -- the customers are much more savvy now. I think the product matters and product has been world-class as well. We've offered the best product at the best value to the customer. That's our commitment. I think having experience helps, but it all boils down to the product. So, that's what we are focused on. And BYD being the world leader at this point in time, we are very hopeful we'll continue to do what their motto is to be the world's #1 car company, and that will translate into every market, including Pakistan [Foreign Language].
Unknown Executive
executiveWhat is the updated cash and receivable position for the ICPs across HUBCO?
Muhammad Saqib
executiveAs far as the trade debt are concerned, in Narowal, we have an overdue balance of PKR 875 million. In Laraib, we have around PKR 5.7 billion; in CPHGC, PKR 59 billion; in TEL PKR 8.2 billion; in ThalNova, PKR 5.7 billion.
Unknown Executive
executiveWhat are the volumes for BYD since inception? What segments are you planning to target post COD of the BYD plant? Can you share volumes for Q1 where profits stood at PKR 780 million?
Muhammad Kamal
executiveI think I've already answered the volume question that [ PR ] is much higher than 10,000 now. So that is where we are. In terms of -- as we've been carefully curating the models to be launched in Pakistan, given that BYD has a model available in the right-hand drive from a category which is A0, which is closer to what Pakistan has seen the smaller cars to all the way up to a very luxury 4x4 or SUV or a sedan as well. So, we will continue to look at where we can serve the customer better. Pakistan has a larger volume in a category B and a category C. So, we will focus on to that as well with a strategic focus on to brand launches, regular brand launches or product launches. So, this lineup is still being discussed and determined with the BYD global team and the sales team. So we will -- whenever we are ready to launch, that will be done whatever we've done over the last almost 24 months now.
Unknown Executive
executiveCPHGC has been reporting higher profits from last 2 quarters. Any particular reason for that?
Muhammad Saqib
executiveCPHGC profits are up marginally because they are getting dispatched. And when you get dispatched, you also start getting variable O&M revenue because in a no-dispatch scenario, the overall O&M cost is something which -- against which you don't get any O&M revenue, if you're not getting dispatch. But if you are getting dispatched, then the variable O&M revenue is one thing, which helps improve profitability margin.
Unknown Executive
executiveHow much GST is being charged in Sealion 7 and EV with more than 50-kilowatt battery? [Foreign Language] What's the status on TEL, TN's true-up tariff? What reductions does the company expect? And why is the true-up taking so long?
Muhammad Kamal
executiveSo it is -- as we keep highlighting at every stage that the true-up has been submitted to the NEPRA and they take their own time and they do it in sequential manner because they have a lot of other determinations to do as well because the same authority has to do with the distribution tariff, the consumer tariff and this as well. So, this has been in the pipeline for over a year now. So, I think whenever they determine on the -- I mean, overall policy level, there are no deductions in terms of -- we have been getting the upfront tariff. Whatever they determine, that will be in line with whatever the industry norm has been. So, we just remain engaged with them. Putting a time line is difficult. There are other projects which commissioned before us. They are also awaiting their true-up tariffs as well.
Unknown Executive
executiveAny update on CPHGC's true-up and when can we expect the final decision?
Muhammad Kamal
executiveAgain, the same answer. There is a review petition in the Appellate Tribunal, which is determining whether the true-up tariff spirit, what the true-up means for an upfront tariff versus a cost plus tariff. I think this -- the upfront tariff has to be taken in that whatever has been determined upfront. The indexation will be done appropriately for the steel, for the interest rate, for the cost, the time lines and everything. So, I think that's a larger policy question that they are evaluating and deliberating on. So it is hard to put a time line on to any of it.
Unknown Executive
executiveDid Prime book any tax reversal during fourth quarter of 2026?
Unknown Executive
executiveBecause of the super tax decision, they had some tax reversals.
Unknown Executive
executiveIs SECMC providing 100% local coal to LEPC?
Muhammad Kamal
executiveYes. They started on October 1, 2026, after their Phase 3 was completed. Now the mine size has gone to close to 12 million tonnes, and it supports nearly 2,000 megawatts of power production from Block II.
Unknown Executive
executiveWhat is your ROE for charging venture? What is the status of the charging venture? I think what he's spoken about -- when are you planning for flash charges?
Muhammad Kamal
executiveSo the flash charges are basically a concept charges at this point in time because there are 2 things that are critical for flash chargers. One, for a 1-megawatt charger, you need to have a electrical system to support it. The grid in Pakistan is not as resilient, but they are working on a solution where they put a battery energy storage system at the back behind the charging station, charging point. The other thing is that the battery -- the car battery has to have the capability to be flash charged as well because if you would have ever noticed that if you use a fast charger on your mobile, the battery heats up much faster. So, this is a battery technology development that they are trying to do so that they can manage the energy dissipated from it. So whenever that is available and commercially viable, we would put it up. But I do not think that it makes economic sense at this point in time, not in Pakistan, not in many other markets as well, including China because either you have to upgrade the grid or you have to put the auxiliary system of a battery energy storage system to support the fast charging. And you need to have the car, which can be fast charged as well. So, these are demo and concept cars that they've shown in the videos to show what future has to offer by these companies charging and the battery electric companies as well.
Unknown Executive
executiveDoes the company expect dollarized margins for discos and what ROE in percentage terms does the company expect?
Muhammad Kamal
executiveSo, I think they are still deliberating. I think they've -- just like any other business, the government has moved away from the dollarized returns. But in order to solicit interest, they will have to offer a decent return. So, we are still awaiting that will be -- let's see what they offer in their bidding documents and whatever the final outcome of this bidding is. That's hard to say what the return would be.
Unknown Executive
executiveThe company holds a significant amount in other receivables from CPPA(G) under sales tax and WPPF unresolved for many years. When does the company expect that to be solved?
Muhammad Saqib
executiveWPPF receivable is -- has a corresponding WPPF payable also. So whenever we pay WPPF because some of these -- those WPPF payments are under litigation and some are in dispute. So whenever we pay WPPF, we have actually booked both liability and receivable at the same time. As far as the CPP receivables are concerned, we have already answered that they remain -- they are receivables, but they have been constant for the last 2 years and there has been no buildup of receivables.
Unknown Executive
executiveWhat's the realizable value for base plant, land and plant and for 2 units for which RFP was given to sell? Yeah, I can remember. I think that's information which we can't reveal. What reforms are you looking forward for the privatization of discos? I think you've already spoken about this. What level of utilization does the company expect for NEL during the next year? What overall growth in power demand does the company expect for calendar year '27?
Muhammad Kamal
executiveSo it's just our guess about the power demand is as good as what the grid operator and the [ CPHGC ] offers because they have a much closer look at the customer demand on an hourly, daily and a weekly basis. In terms of the NEL, due to the unavailability of LNG for the RLNG plants, we feel that these furnace oil plants in the center of the country will continue to operate on a peaking basis. So whenever there is a demand, which is usually in the late afternoon till the late evening, that's where they are operated. So it varies based on multiple factors like weather. As it gets into the autumn, there is no air conditioning load. There's no cooling load and there's no heating load. So, that profile changes. And as the months come up, there's the non-hydel months as well when the hydro is reduced. So it will have a higher load factor than last year. But to project what exactly would it be depends on multiple factors as well. And also the smog in the central part of the country also plays part because that is when the solar generation is not at its optimal levels as well. So, let's see how it actually pans out. but it will be higher than what we have seen last year and we remain available with sufficient fuel stocks and ready to dispatch.
Unknown Executive
executiveWhat will be the impact of ROE on CPHGC after Unit I first closure?
Muhammad Kamal
executiveWe've already answered this.
Unknown Executive
executiveAnother one is also related to default. When is it expected to come online? I think that also you have -- can you just split up BYD cars? I think that we've already shared. After Lucky Electric Power converted to local coal and Jamshoro plant also converted to local coal, it will affect CPHGC dispatches into merit order. Is it your consideration to convert CPHGC to local coal?
Muhammad Kamal
executiveI don't think that Jamshoro has -- I mean, yes, there has been a conversation about conversion of Jamshoro on to local coal, but it has not received all the approvals. So let's see what happens there. Obviously, these plants, imported coal plants are designed on a certain calorific value of coal and converting this would incur additional hundreds of millions of dollars of conversion cost as well and non-availability of these units to dispatch. I think the economic analysis does not support with the dispatch requirement as forecasted by the National Grid Company. But let's see what decision is taken on Jamshoro, which government and K-Electric is working. And then we will see if there is an opportunity or economic viability for such an effort, then that can be considered. But at this point in time, we strongly feel that the conversion does not have any strong economic case.
Unknown Executive
executiveHow much of CPHGC's outstanding debt has been repaid as of Q1 2027? And when is the company expecting to fully repay its debt?
Muhammad Saqib
executiveWe have already answered about the repayment. The debt repayment will happen in 2020 -- by end of 2027.
Muhammad Kamal
executive2029.
Muhammad Saqib
executive'29.
Muhammad Kamal
executive2029 when we have -- so we are in the eighth year of the debt repayment, and this is a 10-year loan. We should be, I mean, free of debt by 2029, second half of 2029.
Unknown Executive
executive[ LPS ] position across the -- you've already done that. Is HUBCO moving forward with government plan to build old city at old infrastructure? I think you already mentioned something on that. Merit order of CPHGC is now 25, whereas Lucky is at 7, is management doing anything to improve the merit order for future years?
Muhammad Kamal
executiveMerit order entries are based on certain fuels. So, what is important is being on the dispatch and dispatch is determined based on the economic merit order and all the network constraints and the network stability as well. So, a lot of these entries that you see, they are based on gas availability, they are based on RLNG availability. And also when they are dispatching, they are basically looking at how much demand is needed, what is the start-up time for each plant and the availability in terms of the electrons are free of constraints. So, I think we are very well positioned in terms of the base load. So, Pakistan and the demand of 15,000 to 22,000 megawatts, and that is where you will be dispatched. So the merit order runs until probably 80s and 90s. So, that's not something that we are much concerned about.
Unknown Executive
executiveIs there any reason for not increasing stake in SECMC?
Muhammad Kamal
executiveSo, I think we've answered earlier as well that this is -- Engro is managing that asset. And the only reason that we thought at that point in time when Engro was exiting out of their energy business, which they decided not to. So, I think they've done a good job over the last nearly 10 years, and I think there is no reason to -- all the shareholders have worked very well. We continue to expand the mine. We continue to bring the price of local coal down. I think it's been a great partnership. So, there's no reason at this point in time to look at that.
Unknown Executive
executiveOkay. I think we've come to the end of our Q&A. Thank you, everyone, and we look forward to the next one.
Muhammad Kamal
executiveThank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete The Hub Power Company Limited transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to The Hub Power Company Limited earnings transcripts and 261,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in The Hub Power Company Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.